Transcript of Simple Management of Risks Through a Web Accessible Tool for EU Regions SMART WATER.
Simple Management of Risks Through a Web Accessible Tool for EU Regions
SMART WATER
CO: Province of Padua – Civil Protection Department
AB1: Danube Delta National Institute for Research and Development
AB2: University of Thessaly – Research Committee
AB3: Institute of Information and Communication Technologies – Bulgarian Academy of Sciences
AB4: Region of Thessaly
THE PARTNERSHIP
GENERAL INFOStart date 01/02/2013End date: 31/01/2015Duration in months: 24
PARTNER TOTAL BUDGET EC CONTRIBUTION PARTNER CONTRIBUTION
CO – PROVINCE of PADUA
€ 168.000 € 126.000 € 42.000
AB 1 – DANUBE DELTA INSTITUTE
€ 94.000 € 70.500 € 23.500
AB 2 – UNI OF THESSALY
€ 115.000 € 86.250 € 28.750
AB 3 – ICT INSTITUTE OF BULGARIA
€ 100.000 € 75.000 € 25.000
AB 4 – REGION OF THESSALY
€ 55.000 € 41.250 € 13.750
TOTAL € 532.000 € 399.000 € 133.000
PROJECT DESCRIPTION - 1
Project Idea BackgroundTragic flood event, Nov. 2010, Province of Padua.Main causes: lack of an integrated communication system; lack of updated tools for forecasting.Analogue situations in the other participating Countries
Project Main ObjectiveTo USE* the results and scientific contribution EXISTING at European level, improving them until obtaining a SMART application ACCESSIBLE at DIFFERENT territorial LEVEL.
* There are several tools to forecast events but most of the times they are not updated or they are not able to run in real time due to non existent territorial networks able to supply the necessary data
PROJECT DESCRIPTION - 2
Why the project is necessary 1 - Need of increasing information circulation and citizenship awareness in order to restore the current feeling of insecurity between citizens caused by recent events.2 - Need of increasing coordination between EU Member States and networking between funded projects on the same theme in order to maximize the reached results and link them one to another. 3 - Need of increasing cooperation and integration between territorial entities involved in Civil Protection activities and flood risk prevention in order to guarantee data availability, territorial participation and the involvement of numerous territorial levels (down to Municipalities which have the tighter link with citizens)
DELIVERABLES (except Management and Communication WPs)
WORK PACKAGE DELIVERABLE NUMBER DEADLINE
ANALYSIS OF EXISTING REAL TIME SOLUTIONS
STANDARD INPUT DATA SET 1 15/04/2013
TECHNICAL WORK GROUP MEETING 3 March – May 2013
FINAL REPORT OF HYDRAULIC 2D MODELLING SIMULATION
1 Summer 2013
FINAL HYDRAULIC RISK MAP 1 Summer 2013
MANUAL GUIDES 5 01/09/2013
ACQUISITION AND STANDARDIZATION OF
TERRITORIAL DATA
SET OF STANDARD DATA BASES 1 November 2013
JOINT SCOPING STUDY 1 December 2013
WEB SERVICE TOOL 1 February 2013
SOFTWARE DEVELOPMENT (web
based)
OPEN SOURCE SW 1 01/03/2014
MANUAL GUIDES 5 30/03/2014
TRAINING OF CIVIL PROTECTION AND LOCAL
AUTHORITIES
SETS OF TRAINING SESSIONS MATERIAL AND TOOLS
4 Jan – May 2014
OFFICIALLY APPROVED PERMANENT TRAINING PROCEDURES
4 May 2014
FINAL REVIEW 1 June 2014
TRAINING SESSIONS 4 March – April 2014
DELIVERABLES (except Management and Communication WPs)
WORK PACKAGE DELIVERABLE NUMBER DEADLINE
PROTOCOLS OF AGREEMENT
PREPARATION
Report and Online tool 2 Oct 2013 – March 2014
Meetings with relevant Actors 15 May 2013 – Dec. 2014
Memorandum of Understanding 4 Dec. 2014
MODEL CALIBRATION AND VALIDATION
Pilot testing on past events 2 15/04/2014
Flood Hazard Risk Maps 1 30/04/2014
Pilot testing in real time 4 30/06/2014
Technical Final Report 1 30/07/2014
Validated SMART WATER Model and available online
1 30/07/2014
MAJOR EVENTS
EVENT DATE PLACE
Kick – off Meeting 17/01/2013 Brussels
4 Partnership Meetings(dates and places to be confirmed)
February 2013July 2013November 2014April 2013
PaduaTulceaVolosSofia
Public Events(dates and places to be confirmed)
September 2013February 2014June 2014November 2014
PaduaTulceaVolosSofia
Project Final Event January 2015 Venice
Final Meeting January 2015 Brussels
FOLLOW - UPSMART WATER will focus on KEEPING an ACTIVE and ALIVE
NETWORK after the end of the project so to continuously monitor the situation and encourage the creation of a strong and coordinate network.
FOLLOW - UP ACTIVITIES will be: data transmission, data update, relevant territorial actors involvement, networking with EU funded project.
FOLLOW – UP PERSONNEL: 2 members for each partner (1 person for communication activities, 1 scientific expert for data update )
FOLLOW – UP EQUIPMENT: the same employed in project activities