Silvercorp ying-technical-report-master 23-feb_2017-final

246
AMC Mining Consultants (Canada) Ltd. BC0767129 Suite 202, 200 Granville Street Vancouver BC V6C 1S4 CANADA T +1 604 669 0044 F +1 604 669 1120 E [email protected] W amcconsultants.com Adviser of choice to the world’s minerals industry Report Ying NI 43-101 Technical Report Silvercorp Metals Inc. Henan Province, China In accordance with the requirements of National Instrument 43-101 “Standards of Disclosure for Mineral Projects” of the Canadian Securities Administrators Qualified Persons: P R Stephenson, P.Geo (BC, SK), BSc (Hons), FAusIMM (CP), MCIM H A Smith, P.Eng (BC, AB, ON), MSc, BSc A Ross, P.Geo (BC, AB), PhD H Muller, BEng, MAusIMM, CP AMC Project 716018 Effective date 31 December 2016 Signing date 15 February 2017

Transcript of Silvercorp ying-technical-report-master 23-feb_2017-final

Page 1: Silvercorp ying-technical-report-master 23-feb_2017-final

AMC Mining Consultants (Canada) Ltd. BC0767129

— Suite 202, 200 Granville Street Vancouver BC V6C 1S4 CANADA

— T +1 604 669 0044 F +1 604 669 1120 E [email protected] W amcconsultants.com

Adviser of choice to the world’s minerals industry

Report Ying NI 43-101 Technical Report Silvercorp Metals Inc.

Henan Province, China

In accordance with the requirements of National Instrument 43-101 “Standards of Disclosure for Mineral Projects” of the Canadian Securities Administrators

Qualified Persons: P R Stephenson, P.Geo (BC, SK), BSc (Hons), FAusIMM (CP), MCIM H A Smith, P.Eng (BC, AB, ON), MSc, BSc A Ross, P.Geo (BC, AB), PhD H Muller, BEng, MAusIMM, CP

AMC Project 716018 Effective date 31 December 2016 Signing date 15 February 2017

Page 2: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 2

1 Summary Introduction

AMC Mining Consultants (Canada) Ltd. (AMC) was commissioned by Silvercorp Metals Inc. (Silvercorp) to prepare a Technical Report on the Ying gold-silver-lead-zinc property in Henan Province, China, encompassing the SGX (/HZG), HPG, TLP, LME and LMW underground mines. AMC had previously prepared Technical Reports on the Ying property in 2012 (filed 15 June 2012, effective date 1 May 2012), and in 2013 (minor update to 2012 report, filed 30 April 2013, effective date 1 May 2012).

P R Stephenson, H A Smith and A A Ross visited the Ying property in July 2016. All authors of this report qualify as independent Qualified Persons.

Silvercorp, through wholly owned subsidiaries, has effective interests of 77.5% in the SGX / HZG and TLP projects, and 80% in the HPG and LM projects. It has all the exploration and mining permits necessary to cover its mining and exploration activities. There are no known or recognized environmental problems that might preclude or inhibit a mining operation in this area.

The Ying Property is about 240 km west-southwest of Zhengzhou, the capital city of Henan Province, and 145 km southwest of Luoyang, which is the nearest major city. The nearest small city to the project area is Luoning, about 56 km by paved roads from Silvercorp’s Ying mill site. The project areas have good road access and operate year round. The area has a continental sub-tropical climate with four distinct seasons.

Silver-lead-zinc mineralization in the Ying district has been known and intermittently mined for several hundred years. Silvercorp acquired an interest in the SGX project in 2004, the HPG project in 2006, and the TLP / LM projects in late 2007. Annual production has ramped up substantially in recent years, reaching 590,000 tonnes of ore in fiscal year 2016 (end 31 March 2016).

Geology, exploration and Mineral Resources

Geologically, the Ying Property occurs in the 300 km-long west-northwest trending Qinling orogenic belt, a major structural belt formed by the collision of two large continental tectonic plates in Paleozoic time. Rocks along the orogenic belt are severely folded and faulted, offering optimal structural conditions for the emplacement of mineral deposits. Several operating silver-lead-zinc mines, including those in the Ying district, occur along this belt. The dominant structures in the region are west-northwest trending folds and faults, the faults comprising numerous thrusts with sets of conjugate shear structures trending either northwest or northeast. These shear zones are associated with all the important mineralization in the district.

Mineralization comprises numerous mesothermal, silver-lead-zinc-rich, quartz-carbonate veins in steeply-dipping fault-fissure zones which cut Precambrian gneiss and greenstone. The veins thin and thicken abruptly along the structures in classic “pinch-and-swell” fashion with widths varying from a few centimetres up to a few metres. The fault-fissure zones extend for hundreds to a few thousand metres along strike. To date, significant mineralization has been defined or developed in at least 224 discrete vein structures, and many other smaller veins have been found but not, as yet, well explored. The vein systems of the various mine areas in the district are generally similar in mineralogy, with slight differences between some of the separate mine areas and between the different vein systems within each area

From 1 July 2013 to 30 June 2016, Silvercorp drilled 855 underground holes and 41 surface holes, for a total of approximately 225,000 m. Most drill core (core) is NQ-sized. Core recoveries are influenced by lithology and average 98-99%. Core is logged, photographed and sampled in the surface core shack. Samples are prepared by cutting the core in half with a diamond saw. One half of the core is marked with sample number and sample boundary and then returned to the core box for archival storage. The other half is placed in a labelled cotton cloth bag with sample number marked on the bag. The bagged sample is then shipped to the laboratory for assaying.

Other than drilling, the projects have been explored primarily from underground workings. The workings follow vein structures along strike, on levels spaced approximately 40 m apart. Chip samples across the structures are

Page 3: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 3

collected at 5 m intervals. From 1 July 2013 to 30 June 2016, Silvercorp undertook 128 km of tunnelling, and collected approximately 44,000 channel / chip samples.

Core samples are sent in securely sealed bags to four commercial laboratories: Analytical Lab of Henan Geological Exploration Bureau in Zhengzhou; Analytical Lab of the Institute of Geophysical and Geochemical Exploration of the Chinese Academy of Geosciences in Langfang; The Chengde Huakan 514 Geology and Mineral Testing and Research Institute in Chengde; and Analytical Lab of the Inner Mongolia Geological Exploration Bureau in Hohhot. All laboratories are officially accredited in China. Sample preparation and assaying procedures follow standard practices, although a splitting stage precedes final pulverization.

The sampling and assaying QA / QC program for the 1 July 2013 to 30 June 2016 period comprised 1,735 Certified Reference Material (CRM) samples, 1,542 blanks and 1,272 duplicates inserted with the core and channel / chip samples at a rate of one CRM, one blank and one duplicate per 40 sample batch. Silvercorp also randomly selected rejects of the mineralized samples for rechecking (internal check) at the same laboratory, and randomly selected pulp of the mineralized samples for external check at other laboratories. Silvercorp geologists at each mine review QA / QC data on a regular basis. Any batch that reaches warning threshold or fails the QA / QC program is automatically notified for investigation or re-assayed, and only approved assay results are used for Mineral Resource estimation.

AMC is satisfied that drilling, sampling, sample security, sub-sampling, analyzing and QA / QC procedures meet accepted industry standards, that the QA / QC results show no material bias or imprecision and that the assay results may be relied upon for Mineral Resource estimation.

The Mineral Resource estimates for the Ying property were prepared by independent Qualified Person, Dr Adrienne Ross, P.Geo, with the assistance of Ms Kathy Zunica of AMC, and with input from Mr Pat Stephenson, P.Geo, who takes QP responsibility for the additional geological sections in this Technical Report. Datamine software was used, and, as a result of a recommendation in AMC’s 2012 Technical Report, the June 2016 Resources were estimated using a block modelling approach, with 3D ordinary kriging and Datamine’s™ dynamic anisotropy application1. Because of the numerous veins (194) for which Resource estimates were prepared, this proved to be an extremely time-consuming process.

The Mineral Resources include material (approximately 25% of the Indicated Resources) below the lower limit of Silvercorp’s current mining permits. However, because of the nature of Chinese regulations governing applications for new or extended mining permits, and because Mineral Resources have been shown to extend below the current lower limits, AMC is satisfied that there is no material risk of Silvercorp not being granted approval to extend the lower depth limit of its permits to develop these Resources as and when required

Table 1.1 shows the Mineral Resources and metal content for the property as of 30 June 2016. The Mineral Resources are reported above cut-offs after applying a minimum practical extraction width of 0.3 m. Diluted grades were estimated for blocks with mineralization widths less than 0.3 m by adding a waste envelope with zero grade. Cut-off grades are based on in situ values in silver equivalent (AgEq) terms in grams per tonne and incorporate mining, processing and general & administration (G & A) costs provided by Silvercorp for each mine and reviewed by AMC.

1 Dynamic anisotropy re-orientates the search ellipsoid for each estimated block based on the local orientation of the mineralization

Page 4: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 4

Table 1.1 Mineral Resource estimates, Ying Property, 30 June 2016

Mine Resource Category Tonnes

(Mt) Au (g/t) Ag (g/t) Pb (%) Zn (%)

Metal Contained in Resource

Au (koz)

Ag (Moz)

Pb (kt) Zn (kt)

SGX

Measured 2.67 - 296 5.71 3.06 - 25.46 152.7 81.71

Indicated 3.86 - 271 5.06 2.36 - 33.64 195.5 91.19

Measured + Indicated 6.54 - 281 5.33 2.64 - 59.10 348.2 172.90

Inferred 3.66 - 268 5.14 2.33 - 31.50 187.8 85.23

HZG

Measured 0.33 - 390 1.20 0.24 - 4.14 4.0 0.78

Indicated 0.45 - 297 0.91 0.18 - 4.27 4.1 0.80

Measured + Indicated 0.78 - 336 1.03 0.20 - 8.41 8.0 1.58

Inferred 0.35 - 231 1.22 0.25 - 2.63 4.3 0.87

HPG

Measured 0.69 1.10 88 3.77 1.15 24 1.95 26.0 7.92

Indicated 0.63 1.10 85 2.84 1.15 22 1.72 17.9 7.21

Measured + Indicated 1.32 1.10 87 3.33 1.15 47 3.66 43.8 15.12

Inferred 1.01 1.21 114 3.88 1.09 39 3.69 39.1 10.98

LME

Measured 0.32 - 348 1.64 0.31 - 3.55 5.2 1.0

Indicated 0.93 - 312 2.19 0.49 - 9.33 20.3 4.51

Measured + Indicated 1.25 - 321 2.05 0.44 - 12.88 25.5 5.51

Inferred 0.65 - 326 1.60 0.42 - 6.79 10.3 2.73

LMW

Measured 0.54 - 329 3.44 0.27 - 5.74 18.7 1.49

Indicated 1.93 - 239 2.68 0.31 - 14.84 51.7 6.00

Measured + Indicated 2.47 - 259 2.85 0.30 - 20.58 70.4 7.49

Inferred 1.36 - 250 2.37 0.32 - 10.95 32.2 4.38

TLP

Measured 1.36 - 222 3.76 0.28 - 9.71 51.1 3.80

Indicated 2.60 - 167 3.21 0.31 - 13.97 83.5 7.94

Measured + Indicated 3.96 - 186 3.40 0.30 - 23.68 134.6 11.74

Inferred 3.44 - 196 3.95 0.32 - 21.69 135.6 11.04

Total

Measured 5.91 0.13 266 4.36 1.64 24 50.55 257.6 96.69

Indicated 10.40 0.07 233 3.59 1.13 22 77.76 373.0 117.66

Measured + Indicated 16.31 0.09 245 3.87 1.31 47 128.31 630.6 214.35

Inferred 10.47 0.12 230 3.91 1.10 39 77.25 409.4 115.22

Notes: Measured and Indicated Mineral Resources are inclusive of Mineral Resources from which Mineral Reserves are estimated Metal prices: gold US$1250/troy oz, silver US$19/troy oz, lead US$0.90/lb, zinc US$1.00/lb Exchange rate: RMB 6.50 : US$1.00 Veins factored to minimum extraction width of 0.3 m Cut-off grades: SGX 140 g/t AgEq; HZG 125 g/t AgEq; HPG 125 g/t AgEq; LME 125 g/t AgEq; LMW 130 g/t AgEq TLP 120 g/t AgEq Silver equivalent formulas by mine:

SGX=33.1895*Pb%+23.4590*Zn%+Ag g/t; HZG=31.8736*Pb%+Ag g/t; HPG=33.9925*Pb%+18.3181*Zn%+55.4773*Au g/t+Ag g/t; LME=34.0436*Pb%+Ag g/t; TLP=34.1401*Pb%+Ag g/t; LMW=34.6856*Pb%+Ag g/t;

Exclusive of mine production to 30 June 2016 Rounding of some figures may lead to minor discrepancies in totals

Comparison of Mineral Resources, 30 June 2013 and 30 June 2016

A comparison of Mineral Resource estimates between 30 June 2013 and 30 June 2016 indicates the following:

For Measured plus Indicated Resources, tonnes have increased by 16%, grades have increased by between 3% and 7%, and contained metal has increased by 20% for silver, 23% for lead and 24% for zinc.

Page 5: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 5

For Inferred Resources, tonnes have increased by 39%, silver grades have decreased by 8%, lead grades have increased by 20%, zinc grades have increased by 11%, and contained metal has increased by 28% for silver, 67% for lead and 54% for zinc.

The main reasons for the differences are Mineral Resource addition and conversion to higher categories arising from drilling and level development, different cut-off grades, and depletion due to mining.

Mining and Mineral Reserves

The Mineral Reserve estimates for the Ying property were prepared by Silvercorp under the guidance of independent Qualified Person, Mr H A Smith, P.Eng., who takes QP responsibility for those estimates. Table 1.2 summarizes the Mineral Reserve estimates for each Ying mine and for the Ying operation as a whole. Approximately 38% of the Mineral Reserve tonnage is categorized as Proven and approximately 62% is categorized as Probable.

Table 1.2 Mineral Reserve estimates, Ying Property, 30 June 2016

Mines Categories Tonnes

(Mt) Au

(g/t) Ag

(g/t) Pb (%)

Zn (%)

EQ-Ag(g/t)

Metal Contained in Reserves Au Ag Pb Zn

SGX Proven 2.32 272 5.25 2.69 509 20.28 121.6 62.21

Probable 3.18 248 4.86 2.11 459 25.40 154.5 67.06 Total Proven & Probable 5.50 258 5.02 2.35 480 45.68 276.1 129.2

HZG Proven 0.23 348 1.03 0.20 384 2.60 2.39 0.47

Probable 0.35 285 0.77 0.15 312 3.23 2.73 0.52 Total Proven & Probable 0.59 310 0.88 0.17 341 5.83 5.12 0.99

HPG Proven 0.47 1.10 88 3.76 1.13 297 16.43 1.31 17.50 5.26

Probable 0.29 1.15 108 3.28 1.17 304 10.84 1.02 9.65 3.45 Total Proven & Probable 0.76 1.12 95 3.57 1.15 300 27.27 2.33 27.15 8.71

TLP Proven 1.00 223 3.45 0.26 341 7.15 34.39 2.62

Probable 1.48 178 2.91 0.29 277 8.45 43.09 4.31 Total Proven & Probable 2.47 196 3.13 0.28 303 15.60 77.49 6.93

LM-E Proven 0.20 288 1.45 0.27 337 1.82 2.85 0.54

Probable 0.75 298 2.11 0.46 370 7.23 15.95 3.48 Total Proven & Probable 0.95 296 1.97 0.42 363 9.06 18.80 4.02

LM-W Proven 0.46 316 3.29 0.25 428 4.69 15.21 1.14

Probable 1.57 234 2.61 0.29 323 11.83 41.04 4.63 Total Proven & Probable 2.04 252 2.76 0.28 346 16.52 56.25 5.77

Ying Mine

Proven 4.67 0.11 252 4.15 1.55 431 16.43 37.85 193.9 72.24 Probable 7.63 0.04 233 3.50 1.09 374 10.84 57.16 267.0 83.45

Total Proven & 12.30 0.07 240 3.75 1.27 396 27.27 95.02 460.9 155.6

Notes to Mineral Reserve Statement: Stope Cut-off grades (Ag/Eq g/t): SGX – 190 Resuing, 170 Shrinkage; HZG – 170 Resuing; HPG – 200 Resuing, 175 Shrinkage; LME -175 Resuing, 145 Shrinkage; LMW -180 Resuing, 135 Shrinkage; TLP - 155 Resuing, 130 Shrinkage. Vein development cut-off grades of 50 g/t AgEq for all mines. Unplanned dilution (zero grade) assumed as 0.05m on each wall of a resuing stope and 0.10m on each wall of a shrinkage stope. Mining recovery factors assumed as 95% for resuing and 92% for shrinkage. Metal prices: gold US$1,250/troy oz, silver US$19/troy oz, lead US$0.90/lb, zinc US$1.00/lb Processing recovery factors: SGX – 94.5% Ag, 96.5% Pb, 61.4% Zn; HZG – 95.6% Ag, 93.8% Pb; HPG – 88.9% Ag, 93.1% Pb, 45.1% Zn; LME – 95.2% Ag, 93.2% Pb; LMW – 93.3% Ag, 95.0% Pb; TLP – 92.4% Ag, 93.5% Pb. Exclusive of mine production to 30 June 2016. Exchange rate assumed is RMB 6.50 : US$1.00. Rounding of some figures may lead to minor discrepancies in totals.

Mineral Reserve estimates are based on the assumption that the current stoping practices of cut and fill resuing and shrinkage stoping will continue to be predominant. The sub-vertical veins, generally competent ground, reasonably regular vein width, and hand-mining techniques using short rounds, allow a significant degree of selectivity and control in the stoping process. Minimum extraction (excluding unplanned dilution) widths of 0.3 m for resuing and 0.8 m for shrinkage were assumed. AMC has observed the mining methods at Ying and considers these widths to be reasonable.

Page 6: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 6

Mining dilution and recovery factors vary from mine to mine and with mining method. Average unplanned dilution factors have been estimated at 17% for both resuing and shrinkage, while assumed mining recovery factors are 95% for resue stopes and 92% for shrinkage stopes.

AMC has tested the sensitivity of the Ying Mineral Reserves to variation in cut-off grade (COG) by applying a 20% increase in COG to Mineral Resources at each of the Ying mines. The highest reduction in contained AgEq ounces of 18.6% is noted at HPG. For Ying as a whole, an approximately 6% reduction in contained AgEq ounces demonstrates relatively low overall COG sensitivity.

For the property as a whole, total Mineral Reserve tonnes are approximately 75% of Mineral Resource (Measured plus Indicated) tonnes. Silver, lead and zinc Mineral Reserve grades are 99%, 97% and 97% respectively of the corresponding Measured plus Indicated Mineral Resource grades.

Underground access to each of the mines in the steeply-sloped, mountainous area is generally via adits at various elevations, inclined haulageways, and internal shafts (winzes). The only shaft to surface is at LM West. It has a current hoisting capacity of 150,000 tpa of combined ore and waste with a standard cage. The mines are developed using trackless equipment – 20 t trucks and one-boom jumbos; and small, conventional tracked equipment – battery / diesel locomotives, rail cars, electric rocker shovels and pneumatic hand-held drills (jacklegs). Since October 2011, Silvercorp has also been developing two approximately 5 km ramps at the LM and SGX mines. The ramps will facilitate transport of men and materials, ventilation, and further development for access and exploration. In particular, the ramp at the SGX mine will be used to access mineralized areas below zero m RL.

The global extraction sequence is top-down between levels, and generally outwards from the central shaft or main access location. The stope extraction sequence is bottom-up. Stope production drilling is by jackleg. In-stope rock movement is by gravity to draw points or by hand-carting to steel ore passes or chutes. Production mucking uses mostly hand shovels or, occasionally, rocker shovels, with rail cars and electric or diesel locomotives transporting ore to the main shaft or inclined haulageway. Ore transport to surface is via skip/cage hoisting (shaft), rail-cars (tracked adit and / or inclined haulageway), small tricycle trucks (adit), or 20 t trucks (ramp). Some hand picking of high grade ore and waste is done on surface, with transport to the centralized processing plants being via 30 t or 45 t trucks or barge and truck combination.

Reconciliation

Table 1.3 summarizes the Silvercorp reconciliation between Mineral Reserve estimates and mill feed, including high grade, hand-sorted ore, for the Ying mines from 1 July 2013 to 30 June 2016.

Page 7: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 7

Table 1.3 Mineral Reserve to production reconciliation: July 2013 – June 2016

Mine Ore Grade Metal

(kt) Ag (g/t) Pb (%) Zn (%) Ag (koz) Pb (kt) Zn (kt)

Reserve (Proven + Probable)

SGX 486 380 7.68 3.00 5,951 37.38 14.59

HZG 95 584 1.37 0.21 1,784 1.30 0.20

HPG 136 97 3.83 0.97 423 5.22 1.32

LME 101 405 1.54 0.29 1,318 1.56 0.30

LMW 264 263 2.41 0.16 2,230 6.34 0.43

TLP 191 231 3.35 0.21 1,420 6.40 0.40

Total 1,274 321 4.57 1.35 13,128 58.21 17.24

Reconciled Mine Production*

SGX 662 310 5.94 2.04 6,595 39.33 13.50

HZG 138 338 1.12 1,506 1.54

HPG 188 106 3.46 0.61 642 6.49 1.15

LME 199 303 1.31 1,942 2.62

LMW 242 229 2.22 1,780 5.37

TLP 380 165 2.31 2,022 8.78

Total 1,809 249 3.54 0.81 14,488 64.13 14.64

Difference: Mill Feed* and Reserve (%)

SGX 36 -19 -23 -32 11 5 -7.47

HZG 46 -42 -19 -16 19

HPG 38 10 -10 -37 52 24 -13.24

LME 97 -25 -15 47 67

LMW -8 -13 -8 -20 -15

TLP 99 -28 -31 42 37

Total 42 -22 -22 -40 10 10 -15

*Includes high-grade, hand-sorted ore.

AMC makes the following observations:

Overall, the mine produced 42% more tonnes at a 22% lower silver grade and a 22% lower lead grade for 10% more contained silver and 10% more contained lead relative to Mineral Reserve estimates2. This suggests the mining of substantial unplanned dilution together with mineralization additional to the Mineral Reserve.

In terms of overall impact relative to silver grade, the poorest performers were HZG, TLP, LME and SGX, in that order.

In 2014, Silvercorp identified that sub-optimal contractor mining practices were a large contributor to the high levels of unplanned dilution, and took steps to remedy the situation. Comprehensive resolution was not achieved until the 2015 fiscal year, with a significant improvement in mined grade being noted from that point to the present.

Other factors that may have contributed to the situation include:

− adverse ground conditions,

− use of shrinkage stoping in very narrow and / or discontinuous veins,

− mining of lower grade, but still economic, material outside of the vein proper

− mis-attribution of feed source to the mill

− over- and / or under-estimation of Mineral Resource/Reserve tonnes and grades at individual sites

2 Zinc has minor impact on revenue.

Page 8: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 8

− mill process control issues.

Silvercorp has recently revised its stockpiling and record keeping procedures and has placed a high level of focus on dilution control by implementing a work quality checklist management enhancement program. AMC endorses these actions and also recommends that Silvercorp undertake periodic mill audits aimed at ensuring optimum process control and mill performance.

Comparison of Mineral Reserves, 1 July 2013 to 30 June 2016

A comparison of Mineral Reserve estimates between 1 July 2013 (previous Technical Report) and 30 June 2016 (this Technical Report) indicates the following:

3% decrease in total Ying Mineral Reserve tonnage.

Increase in total Ying Mineral Reserve silver, lead and zinc grades of 18%, 25%, and 26% respectively.

Increase in total Ying Mineral Reserve metal contents for silver, lead and zinc of 15%, 21% and 22% respectively.

SGX continues to be the leading contributor to the Ying Mineral Reserves, now accounting for 45% of tonnes, 48% of silver, 60% of lead and 83% of zinc, compared to respective values of 38%, 36%, 43% and 67% in 2013.

Decrease in TLP Mineral Reserve tonnes of 25% but increase in silver, lead and zinc grades of 30%, 24% and 33% respectively.

Decrease in HPG Mineral Reserve tonnes of 17%.

Increase in LM (combined LME and LMW) Mineral Reserve metal contents for silver, lead and zinc of 12%, 43% and 42% respectively.

Life of mine plan

Table 1.4 is a summary of the projected LOM production for each of the Ying mines and for the entire operation based on the 30 June 2016 Mineral Reserve estimates.

Page 9: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 9

Table 1.4 Life of mine production plan, Ying Property

SGX 2016 July-Dec 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 Total

Production (kt) 154 263 263 261 266 272 271 271 264 291 298 293 296 295 298 260 264 265 253 236 180 5,514

Ag (g/t) 356 316 322 322 285 290 290 276 267 291 291 262 275 254 225 222 210 187 168 177 156.4 260

Pb (%) 7.36 5.51 6.28 5.87 5.96 5.54 5.54 5.29 5.80 5.22 5.03 4.82 5.01 4.87 3.83 4.69 4.37 3.91 3.66 4.25 4.30 5.06

Zn (%) 2.01 2.41 2.32 2.50 2.56 2.58 2.10 2.32 2.50 2.28 2.06 2.40 2.30 2.34 2.73 2.36 2.16 2.31 2.40 2.30 1.87 2.34

Eq-Ag(g/t) 647 556 585 576 543 535 524 506 518 517 506 479 495 470 416 433 406 371 346 372 343 483

HZG 2016 July-Dec 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Total

Production (kt) 26 50 55 60 60 60 60 60 60 60 33 586

Ag (g/t) 355 338 329 338 341 327 303 289 284 269 272 312

Pb (%) 1.22 1.04 1.19 0.81 0.54 0.65 0.98 1.17 0.78 0.93 0.47 0.89

Zn (%) 0.21 0.20 0.16 0.16 0.17 0.14 0.16 0.18 0.16 0.14 0.16

Eq-Ag(g/t) 393 371 367 364 358 348 334 327 309 299 287 340

HPG 2016 July-Dec 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Total

Production (kt) 36 72 74 80 82 82 84 87 83 83 763

Au (g/t) 1.13 1.08 0.93 1.57 1.18 1.23 1.14 1.37 0.82 0.79 1.12

Ag (g/t) 128.18 114 118 116 119 75 96 96 72 57 97

Pb (%) 4.21 4.80 4.90 3.57 3.68 3.71 3.32 2.47 3.27 2.29 3.55

Zn (%) 0.73 0.86 1.20 1.33 1.03 1.59 1.09 0.70 1.10 1.63 1.15

Eq-Ag(g/t) 347 353 357 349 329 298 292 268 249 208 301

TLP 2016 July-Dec 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 Total

Production (kt) 64 123 124 120 123 130 129 124 128 126 123 119 120 118 123 117 117 116 119 111 100 2,476

Ag (g/t) 211.1 271 274 255 240 233 219 198 207 197 196 201 188 184 191 184 141 138 120 104 102 195

Pb (%) 2.4 3.84 3.18 2.80 2.70 3.00 3.69 3.17 3.84 3.16 3.00 3.41 3.39 2.99 3.42 2.89 2.66 2.78 2.66 2.40 2.73 3.08

Zn (%) 0.27 0.26 0.34 0.29 0.24 0.24 0.32 0.29 0.26 0.29 0.25 0.22 0.23 0.25 0.26 0.32 0.32 0.40 0.28 0.23 0.27

Eq-Ag(g/t) 291 402 382 351 332 336 345 306 338 305 299 317 303 286 308 283 232 233 211 186 195 300

LM East 2016 July-Dec 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Total

Production (kt) 21 52 70 81 81 79 85 85 83 83 78 78 76 953

Ag (g/t) 396 355 340 328 320 305 294 292 288 294 266 267 217 298

Pb (%) 1.87 1.88 1.60 1.90 1.86 2.05 2.10 1.97 2.27 1.83 2.23 2.46 1.55 1.98

Zn (%) 0.3 0.3 0.4 0.4 0.4 0.4 0.5 0.5 0.5 0.5 0.6 0.3 0.42

Eq-Ag(g/t) 460 419 394 392 383 375 365 359 365 356 342 351 270 365

LM West 2016 July-Dec 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 Total

Production (kt) 49 91 90 100 99 98 98 99 100 105 102 100 99 100 100 104 99 110 105 103 90 2,042

Ag (g/t) 313 314 325 362 318 291 352 333 291 298 282 279 295 276 204 179 166 124 103 149 112 253

Pb (%) 3.64 3.71 3.69 2.46 3.30 3.89 2.08 2.25 3.28 2.61 2.94 3.02 2.44 1.90 3.02 3.16 2.40 2.71 2.76 1.76 1.54 2.76

Zn (%) 0.26 0.19 0.18 0.23 0.34 0.22 0.20 0.20 0.28 0.35 0.29 0.26 0.35 0.43 0.51 0.33 0.24 0.30 0.30 0.14 0.28

Eq-Ag(g/t) 439 443 453 447 433 426 424 411 405 388 385 384 379 342 309 289 250 217 199 210 166 349

Ying Mine 2016 July-Dec 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 Total

Production (kt) 350 651 677 703 712 721 727 727 718 749 634 590 592 513 520 481 480 491 477 451 370 12,334

Au (g/t) 0.12 0.12 0.10 0.18 0.14 0.14 0.13 0.16 0.10 0.09 0.07

Ag (g/t) 303 289 293 295 272 260 265 252 241 249 267 253 253 242 213 204 184 161 142 153 131 241

Pb (%) 4.81 4.23 4.32 3.70 3.84 3.86 3.71 3.44 3.98 3.46 3.72 3.92 3.80 3.85 3.58 3.92 3.55 3.37 3.21 3.22 3.20 3.75

Zn (%) 0.96 1.07 1.03 1.08 1.07 1.16 0.91 0.95 1.05 1.07 0.97 1.19 1.15 1.34 1.56 1.27 1.19 1.25 1.27 1.21 0.91 1.12

Eq-Ag(g/t) 493 462 467 454 432 423 418 398 404 393 414 412 407 401 367 364 330 302 277 288 259 396

Notes: Rounding of some figures may lead to minor discrepancies in totals. Production from 1 July 2016 to 31 December 2016 is included. Zinc not included in AgEq calculation for HZG, TLP, LME and LMW mines

Page 10: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 10

Metallurgical testwork and processing

Prior to operation of the mines and the construction of Silvercorp’s mills, metallurgical tests had been conducted by various labs to address the recoveries of the different types of mineralization. TLP mineralization was tested by the Changsha Design and Research Institute (CDRI) in 1994, SGX mineralization was tested by Hunan Non-ferrous Metals Research Institute (HNMRI) in May 2005, and HZG mineralization was tested by Tongling Nonferrous Metals Design Institute (TNMDI) in 2006.

The results predicted a metallurgically amenable ore with clean lead-zinc separation by differential flotation and, with the possible exception of silver halides in the upper zones of the TLP deposit, high silver recoveries. Although on-site plant tuning has been carried out, AMC is not aware of any external testwork programs since the compilation of the original design criteria data.

Silvercorp runs two processing plants, Plants 1 and 2, at the Ying Mine with a total current design capacity of 2,600 tpd. The two plants are situated within 2 km of each other. Both were designed based on the lab tests completed by HNMRI in 2005. Plant 1 (Xiayu Plant, 600 tpd) has been in operation since March, 2007. Plant 2 (Zhuangtou Plant) has been in production since December 2009, with an expansion from 1,000 tpd to 2,000 tpd completed in October 2011. From January 2012, the total design processing capacity is about 2,600 tpd, but the actual capacity can reach 3,000 – 3,200 tpd. Up until now plant capacity has been under-utilized (especially Plant 2) relative to design and ultimate capacity. The LOM plan shows an increase in planned production from 650 kt in 2017 to 749 kt in 2025, then a gradual decrease to less than 370 kt in 2036.

The overall processes of the two plants are similar and comprise crushing, grinding, flotation of lead and zinc concentrates, and concentrate dewatering. Plant 1 also has a lead / copper flotation separation circuit for use when treating high grade copper ore. In the LOM plan, the majority of ore tonnes will be processed through Plant 2, with Plant 1 being used as a backup to process low grade ore or development ore from LM, HZG, and part of TLP.

To optimize profitability, high grade lead concentrate from Plant 2 is blended with middle grade lead concentrate from Plant 1, and high grade zinc concentrate from Plant 2 is blended with the very minor production tonnage of low grade zinc concentrate from low Zn ores fed to Plant 1, before shipment to clients.

SGX / HPG ores also contain high grade, large-size galena lumps with characteristic specular silver-grey colour. These are hand-sorted at the mine sites, crushed, and then shipped by dedicated trucks to Plant 1. The lumps are milled in a dedicated facility, and then sold directly or mixed with flotation lead concentrate for sale.

Both Plants 1 and 2 have been exceeding design throughput levels. Lead and silver recovery targets are being met or exceeded, although zinc recovery is lower than design, attributed to low zinc feed grades. Silver grade in lead concentrate meets the design targets, however, the lead grade has, on average, been below target since 2012. These statistics are consistent with an increasing proportion of production from lower grade mines such as TLP, LME and LMW.

Historically, higher-grade feed from SGX has enhanced plant performance but, with the proportion and grade of SGX ore decreasing, the challenge is to maintain similar metallurgical performance on lower grade feedstock. Maintaining recovery seems reasonably achievable, but with a moderately adverse impact on concentrate lead grades, still marketable, but incurring higher treatment charges and lower % payables.

Manpower

Silvercorp operates the Ying mines mainly using contractors for mine development, production, and exploration. The mill plant and surface workshops are operated and maintained using Silvercorp personnel. Silvercorp provides its own management, technical services and supervisory staff to manage the mine operations. In 2012 and 2014, Silvercorp also employed its own hourly workers for underground production and development in parts of HZG, HPG, and TLP. This practice ceased in late 2014. The Ying Mining District has about 2,300 workers in total, comprising approximately 820 Silvercorp staff and 1,480 contract workers.

Page 11: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 11

Main infrastructure, including tailings dams

There are two tailings management facilities (TMF); TMF1, adjacent to and serving Plant 1, and TMF 2, adjacent to and serving Plant 2. TMF 2 was completed in July 2012, and put into service in April 2013. Design of the dams was undertaken by Chinese design / engineering institutes and site-specific risk assessment such as geotechnical risk was carried out by Henan Luoyang Yuxi Hydrological & Geological Reconnaissance Company. Flood and safety calculations have been performed in accordance with Chinese standards, which require flood control measures to meet a 1 in 100 year recurrence interval with a 1 in 500 year probable maximum flood criterion. The calculated factors of safety are consistent with Chinese practice requirements, although they are lower than those required by international practices.

About 75% of the process water is recycled to the plants. The TMFs have working volumes of 2.83 Mm3 (TMF1) and 4.05 Mm3 (TMF2) and a remaining life at projected production rates of 6.2 years and 7.3 years respectively. The TMFs were designed based on then-current Resource/Reserve estimates and LOM production projections. Subsequent Resource expansion and increased production projections indicate that the current tailings capacity will not be adequate for the full Ying LOM. Additional tailings capacity will thus be required in the later period of the LOM production.

Each mine in the Ying Property has a number of mine waste dumps. Those for HZG and HPG are sufficient for the envisaged life of mine production, while additional waste dumps will be constructed at SGX, LME, LMW and TLP to ensure adequate capacity. Total current capacity is around 2.8 Mm3.

Power for the Ying Property is drawn from Chinese National Grids with high-voltage lines to the different mine camps and mill plants. At SGX, one 35kV overhead line supplies main power for all production, and two 10 kV lines act mainly as a standby source of power in case of disruption. In addition, two 1,500 kW and one 1,200 kW diesel generators installed at one of the substations act as backup power supply in the event of a grid power outage.

Access to the SGX / HZG mine from Silvercorp’s mill office complex is via a 7 km paved road to the Hedong wharf of the Guxian Reservoir, and then across the reservoir by boat to the mine site. Two large barges carry up to five 45 t ore trucks from the SGX / HZG and HPG mines to the plants. At the SGX mines, ore for hand-sorting is transported to a facility at the north side of the mine by diesel powered locomotive railcars in a 2.69 km long tunnel rail system. Silvercorp has constructed a 1.27 km long tunnel in order to transport ore from HZG to SGX, with completion achieved in December 2012. Ore from the TLP and LM mines is hauled to the Silvercorp central mill using 30 and 45 t truck fleets.

Domestic water for SGX mine is drawn from the Guxian Reservoir, while water for the HPG, TLP, LM, and HZG mines comes from nearby creeks and springs. Mine production water for drilling and dust suppression is sourced from underground.

Market studies and contracts

AMC understands that the lead and zinc concentrates will be marketed to existing smelter customers in Henan and Shaanxi provinces. Appropriate terms have been negotiated and calculate out to 85-90% payable for the lead concentrate and approximately 70% for zinc, at long-term prices. AMC considers these to be favourable terms relative to global smelter industry norms. Silver payables of approximately 90% are similarly in accord with industry norms.

Monthly sales contracts are in place for the lead concentrates with leading smelters mostly located in Henan province. For the zinc concentrate, sales contracts are in place with two smelters. The contracts are renewed on a monthly basis.

With respect to copper, testwork has so far been unsuccessful in producing a saleable copper concentrate, but copper levels in the ore are low and this is not a material commercial issue, nor does it materially impact on lead concentrate quality.

Page 12: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 12

Environmental, permitting, social / community impact

Silvercorp has all the required permits for its operations on the Ying Property. The existing mining permits cover all the active mining areas and, in conjunction with safety and environmental certificates, give Silvercorp the right to carry out full mining and mineral processing operations. Six safety certificates and six environmental certificates have been issued by the relevant government departments, for each of which there is a related mine development / utilization and soil / water conservation program, and rehabilitation plan.

There are no cultural minority groups within the area surrounding the general project and no records of cultural heritage sites exist within or near the SGX and HPG project areas. The mining areas do not cover any natural conservation, ecological forests or strict land control zones, current vegetation being mainly secondary, including farm plantings. Larger wild mammals have not been found in the region.

Silvercorp has made a range of cash donations and contributions to local capital projects and community support programs, sponsoring university students as well as the undertaking of projects such as road construction, school construction and school repairs and upgrading. Silvercorp has also made economic contributions in the form of direct hiring and retention of local contractors, suppliers and service providers.

Silvercorp’s main waste by-products are waste rocks produced during mining operations and mine tailings produced during processing. Waste rock is deposited in various waste rock stockpiles adjacent to the mine portals and is utilized for construction around the site. Once the stockpile is full (or at the time of site closure), the waste rock stockpiles will be covered with soil and replanted with vegetation. For stabilization, retaining wall structures will be built downstream of the waste rock site. An interception ditch will be constructed upstream to prevent the slope surface from washing out. A waste rock stockpile at the SGX mine, and several waste rock stockpiles at the TLP mine, have already been covered with soil and vegetation planted.

Process tailings are discharged into purpose built TMFs, which have decant and under-drainage systems to provide for flood protection and for the collection of return water. Daily inspections are undertaken for the tailings pipelines, TMF embankment and the seepage / return water collection system. After the completion of the TMFs, the facilities will be covered with soil and vegetation will be replanted. The SGX Environmental Impact Assessment (EIA) Report states that the tailings do not contain significant sulphides and have no material potential for acid generation.

Silvercorp has established an environmental protection department consisting of five full time staff, which is responsible for environment / rehabilitation management work in the Ying Property. Monitoring plans include air and dust emissions and noise and waste water monitoring, and are undertaken by qualified persons and licensed institutes. AMC understands that results from 2013 to 2016 indicate that surface water, sanitary / process plant waste water and mining water are in compliance with the required standards. In addition, project completion inspection results were all compliant for waste water discharge, air emission, noise and solid waste disposal. There have been a few exceptional cases in which pH values of the discharged mining water were slightly over 9.0 and Pb concentrations slightly exceeded the permitted limit of 0.011 mg/l at the general discharge point after sedimentation tank for both SGX and TLP mines.

Maintaining water quality for the Guxian Reservoir, while operating the SGX and HPG projects, is a key requirement in the project environmental approvals. Silvercorp has created a SGX / HPG surface water discharge management plan which comprises collection and sedimentation treatment of mine water combined with a containment system (i.e. zero surface water discharge), and installation of a stormwater drainage bypass system. Overflow water from the mill process and water generated from the tailings by the pressure filter are returned to the milling process to ensure that waste water (including tailings water) is not discharged.

Water from mining operations at SGX and HZG is reused for mining operations and the remaining water is treated according to the required standards before being discharged into the Guxian Reservoir at approved discharge points. A reticulation pipeline from HPG to Plant 2 is under construction to allow mine water to be reused at Plant 2. AMC understands that monthly monitoring results by independent organizations have indicated that water discharged to the Guxian Reservoir is in compliance.

Page 13: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 13

With the exception of one small creek, there are no surface water sources near the TLP and LM mines, and no mining water is discharged to this creek from the mines. There is a limited volume of mining water generated from the lower sections of the TLP and LM mines, most of which is used in the mining activities, and none generated from the upper sections.

There is a groundwater monitoring program for the processing plant area, but not for the mining areas. It is recognized that there is no requirement under the Chinese environmental approval to monitor this potential impact. It is AMC`s understanding that test results indicate that groundwater quality is in compliance with the required standard.

The nearest significant community to the Ying projects is the Xia Yu Township, located 2 km to the southwest of the Ying processing plant. Silvercorp has provided several donations and contributions to communities within the Luoning County, comprising a range of cash donations to local capital projects and community support programs. Silvercorp also employs several local contractors and local suppliers where practical. AMC is not aware of any complaints in relation to Silvercorp’s Ying Property operations.

Silvercorp’s production activities are in compliance with Chinese and international labour regulations. Formal contracts are signed for all the full time employees with wages that AMC understands are well above minimum levels. The company provides annual medical surveillance and checks are conducted for its employees before, during and after their employment with the Company. The Company does not use child or under-aged labour.

In accordance with Chinese national regulatory requirements, Silvercorp will complete a site decommissioning plan at least one year before mine closure. Site rehabilitation and closure cost estimates will be made at that time.

Capital and operating costs

The principal capital requirement in the Ying district is for mine development. Capital provision is also made for exploration drilling and for sustaining surface facilities and equipment in general. Specific processing plant capital requirements going forward are projected to be minimal as plant capacity has already been expanded to meet the forecast mine production. Projected capital costs are summarized by mine in Table 1.5.

Page 14: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 14

Table 1.5 Total capital cost – Ying property

Mine 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 Total

RMB (M)

SGX 33.77 31.27 31.58 20.12 14.05 17.03 16.5 18.02 16.12 15.44 17.13 20.44 19.87 19.61 16.29 15.82 17.24 13.4 11.79 6.01 371.50

HZG 9.06 7.09 5.48 6.76 5.95 4.61 4.65 3.08 1.32 0.4 48.40

HPG 7.34 7.29 7.38 7.4 7.52 7.76 7.32 5.5 3.29 60.80

TLP 9.04 9.21 9.04 9.12 8.9 9.03 9.14 9.02 8.78 8.67 7.25 7.15 7.27 7 6.73 5.64 4.1 3.03 2.28 0.55 140.95

LM East 7.23 7.97 5.69 4.34 3.79 4.77 4.51 2.55 2.26 1.48 1.21 0.36 46.16

LM West 11.54 12.12 12.18 12.04 10.84 10.44 13.69 12.51 9.68 9.63 9.59 9.17 9.23 8.69 7.89 7.85 7.71 7.16 7.34 189.30

Total Mining 77.98 74.95 71.35 59.78 51.05 53.64 55.81 50.68 41.45 35.62 35.18 36.76 36.73 35.3 30.91 29.31 29.05 23.59 21.41 6.56 857.11

US$ (M)

SGX 4.89 4.53 4.58 2.92 2.04 2.47 2.39 2.61 2.34 2.24 2.48 2.96 2.88 2.84 2.36 2.29 2.50 1.94 1.71 0.87 53.84

HZG 1.31 1.03 0.79 0.98 0.86 0.67 0.67 0.45 0.19 0.06 7.01

HPG 1.06 1.06 1.07 1.07 1.09 1.12 1.06 0.80 0.48 8.81

TLP 1.31 1.33 1.31 1.32 1.29 1.31 1.32 1.31 1.27 1.26 1.05 1.04 1.05 1.01 0.98 0.82 0.59 0.44 0.33 0.08 20.43

LM East 1.05 1.16 0.82 0.63 0.55 0.69 0.65 0.37 0.33 0.21 0.18 0.05 6.69

LM West 1.67 1.76 1.77 1.74 1.57 1.51 1.98 1.81 1.40 1.40 1.39 1.33 1.34 1.26 1.14 1.14 1.12 1.04 1.06 27.43

Total Mining 11.30 10.86 10.34 8.66 7.40 7.77 8.09 7.34 6.01 5.16 5.10 5.33 5.32 5.12 4.48 4.25 4.21 3.42 3.10 0.95 124.22

Drilling Program 2.02 2.03 1.93 1.75 1.54 3.59 1.23 1.09 1.01 0.97 0.74 0.62 0.62 0.59 0.63 0.52 0.48 0.41 0.25 0.13 22.18

Surface Facilities 1.02 0.87 0.43 0.58 0.58 0.58 0.43 0.58 0.73 0.43 0.43 0.43 0.43 0.43 0.51 0.29 0.29 0.29 0.14 0.08 9.58

Total 14.33 13.76 12.71 11.00 9.53 11.95 9.76 9.02 7.74 6.57 6.28 6.38 6.38 6.14 5.62 5.06 4.98 4.13 3.50 1.16 155.98

Page 15: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 15

Table 1.5 includes all development costs, exploration drilling costs, and major equipment costs related to surface facilities.

Operating costs are summarized by mine in Table 1.6. AMC considers these costs to be reasonable for the methods and technology used and the scale of the operations.

Table 1.6 Operating cost summary, Ying property (2016 $US)

Cost Item (US$/t ore) SGX HZG HPG TLP LME LMW

Mining cost 48.27 50.97 41.84 46.26 43.60 58.74

Hauling cost 3.87 4.68 3.98 3.10 3.10 3.18

Milling cost 8.90 8.90 8.90 8.90 8.90 8.90

G&A and other cost 8.76 8.76 8.76 8.76 8.76 8.76

Totals 69.80 73.32 63.48 67.03 64.36 79.54

Note: 1 US$ = 6.9 RMB

The principal components of the milling costs are utilities (power and water), consumables (grinding steel and reagents) and labour, each approximately one-third of the total cost. “G&A and Other” cost includes an allowance for tailings dam and other environmental costs. The major capital expenditure on the two tailings storage facilities has already been expended and the ongoing costs associated with progressively raising the dam with tailings are regarded as an operating cost.

Economic analysis

Although Silvercorp is a producing issuer and, therefore, does not require an economic analysis for the purposes of this report, AMC believes it is reasonable to include a summary-level analysis to illustrate the potential economic impact relative to the latest Mineral Reserve estimations and to the associated production schedules.

The Ying District is largely a mature operation. A 20-year LOM is envisaged for the resource as currently understood, with average silver equivalent grades projected to be greater than or close to 400 g/t for the first 13 years and then to fall steadily through to the end of mine life. Operating costs and capital costs are anticipated to be reasonable. For the summary economic analysis, AMC has used the same metal prices as in the Mineral Resource and Mineral Reserve estimation, namely:

Gold US$1,250/oz

Silver US$19/oz

Lead US$0.90/lb

Zinc US$1.00/lb

An exchange rate of 1US$ = 6.9RMB has been used for the economic analysis.

Based on the LOM production forecast and the metal price and other assumptions shown above, a base case pre-tax NPV at 8% discount rate of $714M is projected ($535M post-tax). Over the LOM, 63.1% of the net revenue is projected to come from silver, 31.4% from lead and 5.5% from zinc.

A simple economic sensitivity exercise, assuming a 20% adverse change in individual metal prices, operating cost or capital cost, has indicated that most sensitivity is seen in silver price. The NPV is moderately sensitive to lead price and operating cost, and only slightly sensitive to zinc price and capital cost.

AMC observation on current Mineral Resource / Reserve estimation process

As noted above, the June 2016 Mineral Resources were estimated using a 3D block modelling approach. Because of the large number of veins (194) for which estimates were prepared, this was an extremely time-consuming process, particularly for the Resource modelling. The time taken from commencement of the project to completion of the report was seven months. In AMC’s opinion, this is too long a timeframe, and merits a close examination of how Ying Mineral Resource / Reserve estimates are prepared for the purpose of public (NI 43-101) reporting.

Page 16: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 16

Silvercorp has, for the last two years, been employing its own version of block modelling on the mines for the purpose of preparing internal Mineral Resource / Reserve estimates and for short term mine planning. AMC has not reviewed this process in detail, but recommends that Silvercorp and AMC work together to assess whether an alternative modelling approach for external reporting might reduce the time required to more reasonable levels.

Recommendations

(Costs are estimated for those recommendations not covered by operational activities).

1. Review the Mineral Resource modelling approach prior to the next NI 43-101 Technical Report, with a specific focus on the respective merits of the AMC block modelling approach and the Silvercorp on-site block modelling approach. The aim should be to appropriately balance the complexity, work and time involved with the estimation accuracy required to (a) correctly report results in the public domain, and (b) provide a sound basis for operational planning and scheduling on a short to long term basis.

2. Depending on the results of Recommendation 1, consider having Silvercorp take Qualified Person responsibility for the next NI 43-101 Technical Report3, subject to the Mineral Resource and Mineral Reserve estimates being audited by a recognized consultant.

3. For the next NI 43-101 Technical Report, review each section of the current report with a view to reducing the level of detail to that described in Form 43-101F1, bearing mind that “The objective of the technical report is to provide a summary of material scientific and technical information concerning mineral exploration, development, and production activities ….” (Instruction (1) in Form 43-101F1).

4. Continue with current efforts to fully integrate the Resource estimation, Reserve estimation and mine planning processes.

5. Maintain particular focus on consistent provision of the skilled resources that will be necessary to achieve targeted production over the LOM.

6. Continue recent and current focus on dilution and grade control via the Mining Quality Control Department.

7. Maintain the highly focused development approach that will be necessary throughout the Ying operation for LOM development targets to be achieved.

8. Continue with a focus on safety improvement, including implementation of a policy where the more stringent of either Chinese or Canadian safety standards are employed.

9. Consider the application of more bulk-mining methods, such as long-hole benching, where applicable, while recognizing that significant technological change would certainly be required.

10. Place a strong focus on stockpiling and record keeping procedures, and ensure that the summation of individual ore car weights by stope and zone is, as far as practicable, fully integrated into the tracking and reconciliation process.

11. Undertake periodic mill audits aimed at ensuring optimum process control and mill performance.

12. Continue exploration tunnelling and diamond drilling at the Ying Property. The exploration tunnelling is used to upgrade the drill-defined Resources to the Measured category, and the diamond drilling is used to expand and upgrade the previous drill-defined Resources, explore for new mineralized zones within the unexplored portions of vein structures, and test for the down-dip and along-strike extensions of the vein structures. The proposed exploration work is as follows:

SGX

Exploration Tunnelling:

25,000 m exploration tunnelling on vein structures S1, S2, S2W, S4, S6, S6E1, S7, S7-1, S7-2, S7E2, S7W, S8, S8E, S10, S14, S14-1, S14-2, S16E, S19, S21, S21W, and S22 between levels 110 m and 710 m.

Diamond Drilling:

30,000 m underground diamond drilling on vein structures S2, S2W2, S7, S7-1, S8, S10, S11, S12, S16W, S18, S19, S21 and S29.

3 Since Silvercorp is a “producing issuer” in terms of NI 43-101, it is not necessary for its Technical Reports to be prepared by Independent Qualified Persons unless one of several triggers described in Section 5.3 of NI 43-101 applies.

Page 17: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 17

HZG

Exploration Tunnelling:

5,000 m exploration tunnelling on vein structures HZ20, HZ20E, HZ22, HZ23, and HZ5 and H22 between levels 450 m and 810 m.

Exploration Drilling:

5,000 m underground exploration drilling on vein structures HZ5, HZ22 and HZ22E.

HPG

Exploration Tunnelling:

5,000 m exploration tunnelling on major vein structures H4, H5, H13, H14, H15, H16, H16E and H17 between levels 100 m and 700 m.

Underground Drilling:

9,000 m underground diamond drilling on vein structures H5, H5W, H16 and H17 as well as their subzones.

LMW

Exploration Tunnelling:

6,500 m on vein structures LM7, LM8, LM10, LM11, LM12, LM13, LM16, LM17 and LM19 as well as their parallel subzones between levels 500 m and 900 m. LM2, LM3, LM5 and LM6 between levels 500 m and 750 m at LME, and LM7, LM8, LM10, LM11, LM12, LM13, LM14, LM16, LM19, and LM20 between levels 650 m and 900 m at LMW.

Diamond Drilling:

5,000 m underground drilling on LMW6, LM17, LM19 and W6 and their parallel vein structures.

LME

Exploration Tunnelling:

4,000 m on vein structures LM2, LM2-1, LM4, LM4W2, LM5, LM5E, LM5W, LM5W2, LM6, LM6W, LM6E and LM6E2 between levels 450 m and 790 m.

Diamond Drilling:

6,000 m underground diamond drilling on vein groups LM4, LM5, LM6 and LM21.

TLP

Exploration Tunnelling:

7,500 m exploration tunnelling on vein structures T1 vein group, T2, T3E, T4, T5 vein group, T11 vein group, T14, T14branch, T15 vein group, T16 vein group, T17 vein group, T21 vein group, T22 vein group, T23, T27, T28E, T33 vein group, and T35 vein group between levels 500 m and 790 m.

Diamond Drilling:

12,000 m underground drilling on vein structures T11, T14, T16, T21 and T35E.

The estimated cost for all of the above exploration work is:

Tunnelling: RMB 63,600,000 (US$9.2M)

Drilling: RMB 20,100,000 (US$2.9M)

Page 18: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 18

Contents 1  Summary .................................................................................................................................................. 2 

2  Introduction ............................................................................................................................................ 28 

3  Reliance on other experts ...................................................................................................................... 30 

4  Property description and location ........................................................................................................... 31 4.1  Property location .......................................................................................................................... 31 4.2  Ownership .................................................................................................................................... 31 4.3  Mining licenses ............................................................................................................................ 32 4.4  Exploration and mining rights and taxes ...................................................................................... 33 

5  Accessibility, climate, local resources, infrastructure and physiography ............................................... 35 

6  History .................................................................................................................................................... 37 6.1  Introduction .................................................................................................................................. 37 6.2  Ownership .................................................................................................................................... 37 6.3  Drilling .......................................................................................................................................... 37 6.4  Production .................................................................................................................................... 37 6.5  Historical Resource and Reserve estimates ................................................................................ 37 

7  Geological setting and mineralization .................................................................................................... 38 7.1  Regional geology ......................................................................................................................... 38 7.2  Property geology .......................................................................................................................... 39 7.3  Mineralization ............................................................................................................................... 40 

  SGX area ................................................................................................................. 41   HZG area ................................................................................................................. 44   HPG area ................................................................................................................ 46   TLP and LM area ..................................................................................................... 47 

8  Deposit types ......................................................................................................................................... 51 

9  Exploration ............................................................................................................................................. 52 9.1  Introduction .................................................................................................................................. 52 9.2  Tunnelling progress ..................................................................................................................... 52 9.3  SGX ............................................................................................................................................. 54 9.4  HZG ............................................................................................................................................. 56 9.5  HPG ............................................................................................................................................. 57 9.6  TLP .............................................................................................................................................. 59 9.7  LME .............................................................................................................................................. 62 9.8  LMW ............................................................................................................................................. 62 

10  Drilling .................................................................................................................................................... 65 10.1  Drilling progress ........................................................................................................................... 65 10.2  Summary of results ...................................................................................................................... 66 10.3  Discussion of results by mine ...................................................................................................... 66 

  SGX ......................................................................................................................... 66   HZG ......................................................................................................................... 67   HPG ......................................................................................................................... 68   TLP .......................................................................................................................... 68   LME ......................................................................................................................... 70   LMW ........................................................................................................................ 70 

10.4  Drilling procedures ....................................................................................................................... 71 

11  Sample preparation, analyses and security ........................................................................................... 72 11.1  Sampling ...................................................................................................................................... 72 11.2  Sample preparation and analysis ................................................................................................ 72 11.3  Ying assay laboratory .................................................................................................................. 72 11.4  Quality assurance and quality control .......................................................................................... 73 

  Assay results of reference materials ....................................................................... 73 

Page 19: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 19

  Assay results of blank samples ............................................................................... 79   Assay results of field duplicates .............................................................................. 79 

11.5  Bulk density measurements and results ...................................................................................... 81 

12  Data verification ..................................................................................................................................... 84 

13  Mineral processing and metallurgical testing ......................................................................................... 85 13.1  Introduction .................................................................................................................................. 85 13.2  Mineralogy ................................................................................................................................... 85 

  SGX Mineralization .................................................................................................. 85   TLP Mineralization ................................................................................................... 87   HPG mineralization ................................................................................................. 88 

13.3  Metallurgical samples .................................................................................................................. 88   SGX mineralization .................................................................................................. 88   TLP mineralization ................................................................................................... 89 

13.4  Metallurgical testwork .................................................................................................................. 89   SGX mineralization .................................................................................................. 90   TLP mineralization ................................................................................................... 91   HPG mineralization ................................................................................................. 92   HZG mineralization .................................................................................................. 92   Grind size optimization ............................................................................................ 92 

13.5  Concentrate quality considerations.............................................................................................. 93 13.6  Summary of testwork outcomes .................................................................................................. 93 

14  Mineral Resource estimates .................................................................................................................. 94 14.1  Introduction .................................................................................................................................. 94 14.2  Data used ..................................................................................................................................... 95 

  Drillholes and underground channel samples ......................................................... 95 14.3  Geological interpretation .............................................................................................................. 96 14.4  Data preparation .......................................................................................................................... 99 

  Statistics and compositing ....................................................................................... 99   Grade capping ....................................................................................................... 100 

14.5  Block model ............................................................................................................................... 108   Block model parameters ....................................................................................... 108 

14.6  Variography and grade estimation ............................................................................................. 111   Variography ........................................................................................................... 111   Variography methodology ..................................................................................... 112   Estimation method ................................................................................................. 113   Mining depletion .................................................................................................... 115   Minimum mining width ........................................................................................... 116 

14.7  Resource classification .............................................................................................................. 116 14.8  Block model validation ............................................................................................................... 117 14.9  Mineral Resource estimates ...................................................................................................... 126 14.10 Comparison with Resource Estimate as at 31 June 2013 ......................................................... 139 

15  Mineral Reserve estimates .................................................................................................................. 142 15.1  Introduction and Mineral Resources base ................................................................................. 142 15.2  Mineral Reserve estimation methodology ................................................................................. 142 15.3  Cut-off grades ............................................................................................................................ 142 

  AMC comment on cut-off grades .......................................................................... 144 15.4  Dilution and recovery factors ..................................................................................................... 144 

  Dilution .................................................................................................................. 144   Mining recovery factors ......................................................................................... 145 

15.5  Mineral Reserve Estimate .......................................................................................................... 145 15.6  Reserves sensitivity to cut-off grade .......................................................................................... 146 15.7  Conversion of Mineral Resources to Reserves ......................................................................... 146 15.8  Comparison of Mineral Reserves, mid-2013 to mid-2016 ......................................................... 147 

16  Mining methods .................................................................................................................................... 150 

Page 20: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 20

16.1  Ying Mining Operations ............................................................................................................. 150   Introduction ............................................................................................................ 150   SGX ....................................................................................................................... 151   HZG ....................................................................................................................... 151   HPG ....................................................................................................................... 151   TLP ........................................................................................................................ 151   LME ....................................................................................................................... 152   LMW ...................................................................................................................... 152 

16.2  Mining methods and mine design .............................................................................................. 152   Geotechnical and hydrogeological considerations ................................................ 152   Development and access ...................................................................................... 152   Mining methods ..................................................................................................... 154   Ore and waste haulage ......................................................................................... 158   Equipment ............................................................................................................. 159   Manpower .............................................................................................................. 161   Ventilation .............................................................................................................. 162   Backfill ................................................................................................................... 164   Dewatering ............................................................................................................ 164   Water supply ......................................................................................................... 166   Power supply ......................................................................................................... 167   Compressed air ..................................................................................................... 167   Communications .................................................................................................... 167 

16.3  Safety ......................................................................................................................................... 167 16.4  Development and Production Quality Control ........................................................................... 168 16.5  Production and scheduling ........................................................................................................ 169 

  Development schedule .......................................................................................... 169   Mines production ................................................................................................... 171 

16.6  Reconciliation ............................................................................................................................. 174 16.7  Mining summary......................................................................................................................... 175 

17  Recovery methods ............................................................................................................................... 176 17.1  Introduction ................................................................................................................................ 176 17.2  Ore supply and concentrate production from Ying property mines ........................................... 176 

  Ore supply ............................................................................................................. 176   Ore composition per mine ..................................................................................... 178   Concentrate production by mine in fiscal 2016 ..................................................... 178   Concentrate quality and metal recovery (average) fiscal 2012-2016 ................... 178   Impact of ore type on concentrate quality and metal recovery (fiscal 2016) ......... 180   Ore supply by plant ............................................................................................... 182   LOM mill feed schedule ......................................................................................... 183 

17.3  Mill Plant No.1 (Xiayu) ............................................................................................................... 185   Process flowsheet ................................................................................................. 185   Process description ............................................................................................... 186   Metallurgical performance (Plant 1) ...................................................................... 188 

17.4  Mill Plant No. 2 (Zhuangtou) ...................................................................................................... 188   Flowsheet .............................................................................................................. 190   Process description ............................................................................................... 190   Metallurgical performance (Plant 2) ...................................................................... 191   Sampling (For Plants 1 and 2) .............................................................................. 192 

17.5  Process control and automation ................................................................................................ 192 17.6  Ancillary facilities ........................................................................................................................ 193 

  Laboratory ............................................................................................................. 193   Maintenance workshop(s) ..................................................................................... 193 

17.7  Key inputs .................................................................................................................................. 193   Power .................................................................................................................... 193   Water usage and mass balance for Plant 1 and Plant 2 ....................................... 193   Reagents ............................................................................................................... 194 

Page 21: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 21

17.8  Conclusions ............................................................................................................................... 194 

18  Project infrastructure ............................................................................................................................ 195 18.1  Tailings Management Facility (TMF) ......................................................................................... 195 

  Overview ............................................................................................................... 195   Tailings properties ................................................................................................. 195   Site description ...................................................................................................... 196   TMF design, construction, operation and safety study ......................................... 197   Tailings transfer to the ponds ................................................................................ 202   Water balance considerations ............................................................................... 202 

18.2  Waste rock dump ....................................................................................................................... 202 18.3  Power supply ............................................................................................................................. 203 

  SGX and HZG Mines ............................................................................................. 203   HPG Mine .............................................................................................................. 204   TLP / LM Mine ....................................................................................................... 204   No. 1 and No. 2 Mills and office / camp complex .................................................. 204   Underground lighting ............................................................................................. 204 

18.4  Roads ......................................................................................................................................... 204 18.5  Transportation ............................................................................................................................ 205 18.6  Water supply .............................................................................................................................. 206 18.7  Waste water and sewage treatment .......................................................................................... 206 18.8  Other infrastructure .................................................................................................................... 207 

  Mine dewatering .................................................................................................... 207   Site communications ............................................................................................. 207   Camp ..................................................................................................................... 207   Dams and tunnels ................................................................................................. 207   Surface maintenance workshop ............................................................................ 207   Explosives magazines ........................................................................................... 208   Fuel farm ............................................................................................................... 208   Mine dry ................................................................................................................. 208   Administration building .......................................................................................... 209   Warehouse and open area storage ....................................................................... 209   Assay laboratory .................................................................................................... 209   Security / gatehouse.............................................................................................. 209   Compressed air ..................................................................................................... 209   Underground harmful gas monitoring system ....................................................... 209   Underground personal location system ................................................................. 210 

19  Market studies and contracts ............................................................................................................... 211 19.1  Concentrate marketing .............................................................................................................. 211 19.2  Smelter contracts ....................................................................................................................... 211 19.3  Commodity prices ...................................................................................................................... 211 

20  Environmental studies, permitting and social or community impact .................................................... 213 20.1  Introduction ................................................................................................................................ 213 20.2  Laws and regulations ................................................................................................................. 213 20.3  Waste and tailings disposal management ................................................................................. 214 20.4  Site monitoring ........................................................................................................................... 215 

  Monitoring plan ...................................................................................................... 215   Water management ............................................................................................... 215   Groundwater .......................................................................................................... 217   Waste water .......................................................................................................... 217 

20.5  Permitting requirements ............................................................................................................. 218   Environmental impact assessment reports & approvals ....................................... 218   Project safety pre-assessments reports and safety production permits ............... 219   Resource utilization plan (RUP) reports & approvals ............................................ 219   Soil and water conservation plan and approvals .................................................. 219   The geological hazards assessment report and approval .................................... 220 

Page 22: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 22

  Mining permits ....................................................................................................... 220   Land use right permits ........................................................................................... 220   Water permits ........................................................................................................ 220 

20.6  Social and community interaction .............................................................................................. 220   Cultural minorities and heritages ........................................................................... 221   Relationships with local government ..................................................................... 221   Labour practices .................................................................................................... 221 

20.7  Remediation and reclamation .................................................................................................... 221 20.8  Site closure plan ........................................................................................................................ 222 

21  Capital and operating costs ................................................................................................................. 223 21.1  Key unit operating cost parameters ........................................................................................... 223 

  Mining contract rates ............................................................................................. 223 21.2  Summary of capital costs ........................................................................................................... 224 21.3  Summary of operating costs ...................................................................................................... 226 

22  Economic analysis ............................................................................................................................... 227 22.1  Introduction ................................................................................................................................ 227 22.2  Annual production schedule ...................................................................................................... 227 22.3  Cash flow forecast ..................................................................................................................... 229 22.4  Sensitivity analysis ..................................................................................................................... 231 

23  Adjacent properties .............................................................................................................................. 232 

24  Other relevant data and information .................................................................................................... 233 

25  Interpretation and conclusions ............................................................................................................. 234 25.1  General ...................................................................................................................................... 234 25.2  Mineral Resource / Reserve estimation process ....................................................................... 236 

26  Recommendations ............................................................................................................................... 237 

27  References ........................................................................................................................................... 239 

28  Certificates ........................................................................................................................................... 241 

Tables Table 1.1  Mineral Resource estimates, Ying Property, 30 June 2016 ..................................................... 4 

Table 1.2  Mineral Reserve estimates, Ying Property, 30 June 2016 ....................................................... 5 

Table 1.3  Mineral Reserve to production reconciliation: July 2013 – June 2016 ..................................... 7 

Table 1.4  Life of mine production plan, Ying Property ............................................................................. 9 

Table 1.5  Total capital cost – Ying property ........................................................................................... 14 

Table 1.6  Operating cost summary, Ying property (2016 $US) ............................................................. 15 

Table 2.1  Persons who prepared or contributed to this technical report ................................................ 29 

Table 4.1  Mining licenses ....................................................................................................................... 33 

Table 7.1  Dimensions and occurrences of mineralized veins at SGX mine ........................................... 43 

Table 7.2  Dimensions and occurrences of major mineralized veins in the HZG area ........................... 46 

Table 7.3  Dimensions and occurrences of major mineralized veins in the HPG mine ........................... 47 

Table 7.4  Dimensions and occurrences of major mineralized veins in the TLP area ............................ 49 

Table 7.5  Dimensions and occurrences of major mineralized veins in the LME subarea ...................... 50 

Table 7.6  Dimensions and occurrences of major mineralized veins in the LMW subarea ..................... 50 

Table 9.1  Tunnelling exploration work completed from July 2013 to June 2016 ................................... 53 

Table 9.2  Mineralization exposed by drift tunnelling in the first three quarters of 2015 ......................... 53 

Table 9.3  Selected mineralization zones defined by the 2013 - 2016 tunnelling in SGX area .............. 55 

Table 9.4  Selected mineralization zones defined by the 2013 - 2016 tunnelling in HZG area .............. 56 

Page 23: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 23

Table 9.5  Selected mineralization zones defined by the 2013 - 2016 tunnelling in HPG area .............. 58 

Table 9.6  Selected mineralization zones defined by the 2013 - 2016 tunnelling in TLP area ............... 60 

Table 9.7  Selected mineralization zones defined by the 2013 - 2016 tunnelling at LME ....................... 62 

Table 9.8  Selected mineralization zones defined by the 2013 - 2016 tunnelling at LMW ...................... 63 

Table 10.1  Drilling programs completed by Silvercorp, 2004 to June 2013 ............................................. 65 

Table 10.2  Summary of the 2013-2016 drilling program on the Ying Property ........................................ 66 

Table 10.3  Brief summary of the 2013-2016 drilling results ..................................................................... 66 

Table 10.4  Summary of the SGX 2013-2016 drilling program ................................................................. 67 

Table 10.5  Summary of the HZG 2013-2015 drilling program ................................................................. 68 

Table 10.6  Summary of HPG 2013-2016 drilling program ....................................................................... 68 

Table 10.7  Summary of TLP 2013-2016 drilling program ........................................................................ 69 

Table 10.8  Summary of LME 2013-2016 drilling program ........................................................................ 70 

Table 10.9  Summary of the LMW 2013-2016 drilling program ................................................................. 71 

Table 11.1  Recommended values and two standard deviations of CRMs ............................................... 73 

Table 13.1  Mineral composition of the SGX mineralization ...................................................................... 86 

Table 13.2  Phase distribution of silver (SGX mineralization) ................................................................... 86 

Table 13.3  Mineral composition of the TLP-LM mineralization ................................................................ 87 

Table 13.4  Phase distribution of silver (TLP-LM mineralization) .............................................................. 88 

Table 13.5  Core samples used for ore blending test ................................................................................ 88 

Table 13.6  Head grade of blended sample .............................................................................................. 89 

Table 13.7  TLP mineralization samples for metallurgical tests ................................................................ 89 

Table 13.8  Liberation of Pb, Zn and Ag vs size fractions (70% -200 mesh) ............................................ 89 

Table 13.9  Mass balance for locked cycle test (SGX mineralization) ...................................................... 90 

Table 13.10  Mass balance for locked cycle test (TLP mineralization) ....................................................... 91 

Table 13.11  Mass balance for locked cycle test (HZG mineralization) ...................................................... 92 

Table 13.12  Grind size optimization test results ......................................................................................... 93 

Table 13.13  Product quality (blends of plants 1 & 2) .................................................................................. 93 

Table 14.1  Mineral Resources and metal content for silver, lead, zinc and gold as of 30 June 2016 ..... 95 

Table 14.2  Summary of data used ........................................................................................................... 96 

Table 14.3  Grade capping summary ...................................................................................................... 104 

Table 14.4  Channel sample summary statistics ..................................................................................... 105 

Table 14.5  Drillhole sample summary statistics ..................................................................................... 107 

Table 14.6  CSS block model parameters ............................................................................................... 109 

Table 14.7  BH block model parameters ................................................................................................. 109 

Table 14.8  Regularized block model parameters ................................................................................... 110 

Table 14.9  Regularized block model fields ............................................................................................. 111 

Table 14.10  Search parameters CSS block model .................................................................................. 114 

Table 14.11  Search parameters BH block model ..................................................................................... 114 

Table 14.12  SGX grade statistics for block model vs composites: eight largest veins ............................ 119 

Table 14.13  Comparison of 2013 and 2016 Mineral Resource estimates ............................................... 140 

Table 15.1  Mineral Reserve cut-off grades and key estimation parameters .......................................... 143 

Table 15.2  Vein development cut-off grades .......................................................................................... 144 

Table 15.3  Average dilution by mine and method .................................................................................. 144 

Table 15.4  Ying Mines Mineral Reserve estimates at 30 June 2016 ..................................................... 145 

Table 15.5  Estimated reduction in Contained AgEq Oz in Mineral Reserves for COG increase of 20%146 

Page 24: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 24

Table 15.6  Resources and Reserves comparison .................................................................................. 147 

Table 15.7  Change in Mineral Reserves, mid-2013 to mid-2016 ........................................................... 148 

Table 16.1  Ying mines current equipment list ........................................................................................ 159 

Table 16.2  Ramp contractor equipment list ............................................................................................ 161 

Table 16.3  Equipment advance rates ..................................................................................................... 161 

Table 16.4  Silvercorp staff ...................................................................................................................... 162 

Table 16.5  List of contract workers in the Ying district ........................................................................... 162 

Table 16.6  Silvercorp hourly workers ..................................................................................................... 162 

Table 16.7  Mines water flow ................................................................................................................... 164 

Table 16.8  Stage 1 water pumps at SGX mine ...................................................................................... 165 

Table 16.9  Second stage water pumps at SGX mine............................................................................. 165 

Table 16.10  Ying Mines LOM development schedule .............................................................................. 170 

Table 16.11  Ying mines production rate summary ................................................................................... 171 

Table 16.12  Ying mines production Run-of-Mine, fiscal 2012 to 2016 and fiscal 2017 Q1 (dry tonnes) . 172 

Table 16.13  Ying Mines LOM Production ................................................................................................. 173 

Table 16.14  Mineral Reserve to production reconciliation: July 2013 – June 2016 ................................. 174 

Table 17.1  Summary of processing plants 1 and 2 capacities ............................................................... 176 

Table 17.2  Ore supply to Plants 1 and 2 from fiscal 2012 to 2016, and fiscal 2017 Q1 ........................ 177 

Table 17.3  Ore supply from fiscal 2012 to 2016 (wet base including lead lumps) ................................. 177 

Table 17.4  Average ore composition by mine (dry basis including lead lumps, fiscal 2016) ................. 178 

Table 17.5  Concentrate production by mine (fiscal 2016) ...................................................................... 178 

Table 17.6  Concentrate quality by year from fiscal 2012 to 2016, and fiscal 2017 Q1 .......................... 179 

Table 17.7  Overall metal recovery by year from fiscal 2012 to 2016 and fiscal 2017 Q1 ...................... 179 

Table 17.8  SGX mine – ore processed – actual mass balance (fiscal 2016) ......................................... 180 

Table 17.9  TLP mine – ore processed – actual mass balance (fiscal 2016) .......................................... 180 

Table 17.10  LME mine – ore processed – actual mass balance (fiscal 2016) ......................................... 181 

Table 17.11  LMW mine including PD 991-ore processed – actual mass balance (fiscal 2016) .............. 181 

Table 17.12  HPG mine – ore processed – actual mass balance (fiscal 2016) ........................................ 181 

Table 17.13  HZG mine (including BCG) – ore processed – actual mass balance (fiscal 2016) .............. 181 

Table 17.14  Flotation Feeds: Ore Grade and Recovery (fiscal 2016) ...................................................... 182 

Table 17.15  Flotation Feeds: Tonnes to Plants (fiscal 2016) ................................................................... 182 

Table 17.16  LOM mill feed schedule ........................................................................................................ 184 

Table 17.17  Design mass balance at the No.1 mill (daily basis) .............................................................. 188 

Table 17.18  Flotation feeds: ore grade vs. recovery (fiscal 2016) (Plant 1) ............................................. 188 

Table 17.19  Design Mass Balance for No.2 Mill (Pb+Zn Ore) (Phase I and Phase II, 2x1000 tpd) ........ 192 

Table 17.20  Flotation Feeds: Ore Grade vs. Recovery (fiscal 2016) (Plant 2) ........................................ 192 

Table 18.1  Key Metrics of the two TMFs ................................................................................................ 195 

Table 18.2  Tailings PSD1 and compositions........................................................................................... 196 

Table 18.3  Chemical Composition for Pond Recycle Water .................................................................. 196 

Table 18.4  Criteria for dam grade definition (PRC) ................................................................................ 200 

Table 18.5  Waste dumps at the Ying project .......................................................................................... 202 

Table 18.6  Dams and tunnels in the Ying district ................................................................................... 207 

Table 19.1  Key elements of smelter contracts ....................................................................................... 211 

Table 20.1  Water environmental monitoring plan for Ying mining area ................................................. 215 

Table 20.2  July 2015 to June 2016 monitoring results, SGX mine surface water .................................. 216 

Page 25: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 25

Table 20.3  July 2015 to June 2016 monitoring results, surface water ................................................... 216 

Table 20.4  Results summary of drinking water (groundwater) ............................................................... 217 

Table 20.5  Mining water and sanitary waste water monitoring results ................................................... 217 

Table 20.6  Expenditures on reclamation and remediation from 2005 to 2016 (000 RMB) .................... 221 

Table 21.1  Cost schedule for shafts/drifts driving ................................................................................... 223 

Table 21.2  Basic rates for mining methods ............................................................................................ 223 

Table 21.3  Ground support rates ............................................................................................................ 223 

Table 21.4  2016 diamond drilling rate .................................................................................................... 224 

Table 21.5  Total projected LOM mining capital cost – Ying property ..................................................... 225 

Table 21.6  Operating cost summary (2016 US$) ................................................................................... 226 

Table 22.1  Ying property LOM production schedule .............................................................................. 228 

Table 22.2  Ying property cash flow projection ........................................................................................ 230 

Table 22.3  Ying property sensitivity analysis .......................................................................................... 231 

Figures Figure 4.1  Location of Ying Property ....................................................................................................... 31 

Figure 4.2  Location of the approved mining licenses in the Ying Property ............................................. 32 

Figure 5.1  Mine and mill locations in the Ying Property .......................................................................... 35 

Figure 7.1  Geology of Western Henan Province and location of Ying Property ...................................... 38 

Figure 7.2  Ying mining licenses and mineralization vein systems ........................................................... 40 

Figure 7.3  Tunnels and veins at SGX ...................................................................................................... 42 

Figure 7.4  Cross section on Line 2, SGX ................................................................................................ 43 

Figure 7.5  Tunnels and veins at HZG area .............................................................................................. 45 

Figure 7.6  Tunnels and veins at HPG area ............................................................................................. 47 

Figure 7.7  Distribution of mineralized veins in the TLP-LM area ............................................................. 48 

Figure 9.1  Longitudinal projection of S19 vein, SGX ............................................................................... 56 

Figure 9.2  Longitudinal projection of Vein HZ20 ...................................................................................... 57 

Figure 9.3  Longitudinal projection of vein H17 ........................................................................................ 59 

Figure 9.4  Longitudinal projection of vein T23 ......................................................................................... 61 

Figure 9.5  Longitudinal projection of vein LM17 ...................................................................................... 64 

Figure 11.1  Example results for CDN-ME-14 in the 2014 drilling program ............................................... 75 

Figure 11.2  Example results for CDN-ME-1206 in the 2014 drilling program ........................................... 76 

Figure 11.3  Example results for CDN-ME-1302 in the 2015 drilling program ........................................... 77 

Figure 11.4  Example results for CDN-ME-1302 in the 2015 tunnelling program ...................................... 78 

Figure 11.5  Field duplicate assays for core samples in the 2014 drilling program .................................... 80 

Figure 11.6  Field duplicate assays for channel samples in the 2015 tunnelling program ......................... 81 

Figure 11.7  Combined lead and zinc vs measured bulk density: all data ................................................. 82 

Figure 11.8  Combined lead and zinc vs measured bulk density: < 20 % relative error ............................ 83 

Figure 13.1  Distribution of silver minerals and silver-bearing minerals ..................................................... 87 

Figure 13.2  Locked cycle flotation flow sheet (SGX mineralization) .......................................................... 91 

Figure 14.1  3D view of the SGX mineralization wireframes ...................................................................... 96 

Figure 14.2  3D view of the HZG mineralization wireframes ...................................................................... 97 

Figure 14.3  3D view of the HPG mineralization wireframes ...................................................................... 97 

Figure 14.4  3D view of the LMW mineralization wireframes ..................................................................... 98 

Figure 14.5  3D view of the LME mineralization wireframes ...................................................................... 98 

Page 26: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 26

Figure 14.6  3D view of the TLP mineralization wireframes ....................................................................... 99 

Figure 14.7  SGX mineralized channel sample length histogram ............................................................. 100 

Figure 14.8  SGX mineralized drillhole sample length histogram ............................................................. 100 

Figure 14.9  Probability plot for silver grades in composited channel samples for vein S8 SGX mine .... 103 

Figure 14.10  Silver variograms: SGX variography Area 1 ......................................................................... 113 

Figure 14.11  Estimation pass longitudinal projection SGX mine: vein S8 ................................................. 115 

Figure 14.12  Mining depletion longitudinal projection SGX mine: vein S8 ................................................ 115 

Figure 14.13  True thickness longitudinal projection SGX mine: vein S8 ................................................... 116 

Figure 14.14  Mineral Resource classification longitudinal projection SGX mine: vein S8 ........................ 117 

Figure 14.15  Silver equivalent grade longitudinal projection SGX mine: vein S8 ..................................... 118 

Figure 14.16  S8 silver swath plot by northing ............................................................................................ 120 

Figure 14.17  S8 silver swath plot by elevation .......................................................................................... 120 

Figure 14.18  S8 lead swath plot by northing ............................................................................................. 121 

Figure 14.19  S8 lead swath plot by elevation ............................................................................................ 121 

Figure 14.20  S8 zinc swath plot by northing .............................................................................................. 122 

Figure 14.21  S8 zinc swath plot by elevation ............................................................................................ 122 

Figure 14.22  T3 silver swath plot by northing ............................................................................................ 123 

Figure 14.23  T3 silver swath plot by elevation ........................................................................................... 123 

Figure 14.24  T3 lead swath plot by northing .............................................................................................. 124 

Figure 14.25  T3 lead swath plot by elevation ............................................................................................ 124 

Figure 14.26  T3 zinc swath plot by northing .............................................................................................. 125 

Figure 14.27  T3 zinc swath plot by elevation ............................................................................................. 125 

Figure 14.28  SGX S2 long projection Mineral Resource ........................................................................... 126 

Figure 14.29  SGX S7 long projection Mineral Resource ........................................................................... 127 

Figure 14.30  SGX S7_1 long projection Mineral Resource ....................................................................... 128 

Figure 14.31  SGX S8 long projection Mineral Resource ........................................................................... 129 

Figure 14.32  SGX S14 long projection Mineral Resource ......................................................................... 130 

Figure 14.33  SGX S2W2 long projection Mineral Resource ..................................................................... 131 

Figure 14.34  SGX S19 long projection Mineral Resource ......................................................................... 132 

Figure 14.35  SGX S21 long projection Mineral Resource ......................................................................... 133 

Figure 14.36  HPG H17 long projection Mineral Resource ........................................................................ 134 

Figure 14.37  HZG HZ22 long projection Mineral Resource ...................................................................... 135 

Figure 14.38  LME LM5 long projection Mineral Resource ........................................................................ 136 

Figure 14.39  TLP T1 long projection Mineral Resource ............................................................................ 137 

Figure 14.40  TLP T2 long projection Mineral Resource ............................................................................ 138 

Figure 14.41  TLP T3 long projection Mineral Resource ............................................................................ 139 

Figure 16.1  Ying mines locations ............................................................................................................. 150 

Figure 16.2  Inclined haulageway at SGX mine ........................................................................................ 153 

Figure 16.3  SGX mine design .................................................................................................................. 154 

Figure 16.4  Shrinkage stoping method .................................................................................................... 155 

Figure 16.5  Resue stope at SGX mine .................................................................................................... 156 

Figure 16.6  Resue stoping method .......................................................................................................... 157 

Figure 16.7  Ying loco and rail cars .......................................................................................................... 158 

Figure 16.8  SGX ventilation system diagram .......................................................................................... 163 

Figure 17.1  Total ore treated and year on year percentage relative to 2012 .......................................... 177 

Page 27: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 27

Figure 17.2  Overall metal recovery to concentrate from 2007 to 2016 ................................................... 180 

Figure 17.3  General view photos (Plant 1) .............................................................................................. 185 

Figure 17.4  Flowsheet (Plant 1) ............................................................................................................... 186 

Figure 17.5  General view photos (Plant 2) .............................................................................................. 189 

Figure 17.6  Flowsheet for Plant 2 ............................................................................................................ 190 

Figure 18.1  Zhuangtou TMF 1 (17 Feb 2012) ......................................................................................... 197 

Figure 18.2  Zhuangtou TMF 1 Tailings Discharge (17 Feb 2012) ........................................................... 198 

Figure 18.3  Zhuangtou TMF 1 Downstream View of Starter Dam (17 Feb 2012) ................................... 198 

Figure 18.4  Shiwagou TMF 2 (13 May 2014) .......................................................................................... 199 

Figure 18.5  Shiwagou TMF 2 Upstream view (12 May 2014) ................................................................. 199 

Figure 18.6  Shiwagou TMF 2 Downstream view of starter dam (14 May 2014) ..................................... 200 

Figure 18.7  Silvercorp barge with five loaded trucks ............................................................................... 205 

Distribution list 1 e-copy to Silvercorp Vancouver office 1 e-copy to AMC Vancouver office

Page 28: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 28

2 Introduction AMC Mining Consultants (Canada) Ltd. (AMC) was commissioned by Silvercorp Metals Inc. (Silvercorp) to prepare a Technical Report on the Ying gold-silver-lead-zinc property in Henan Province, China, encompassing the SGX (/HZG), HPG, TLP, LME and LMW underground mines. AMC had previously prepared Technical Reports on the Ying property in 2012 (filed 15 June 2012, effective date 1 May 2012), and in 2013 (minor update to 2012 report, filed 30 April 2013, effective date 1 May 2012).

P R Stephenson, H A Smith and A A Ross visited the Ying property in July 2016. All authors of this report qualify as independent Qualified Persons.

Silvercorp, through wholly owned subsidiaries, has effective interests of 77.5% in the SGX / HZG and TLP projects, and 80% in the HPG and LM projects. It has all the exploration and mining permits necessary to cover its mining and exploration activities. There are no known or recognized environmental problems that might preclude or inhibit a mining operation in this area.

The Ying Property is about 240 km west-southwest of Zhengzhou, the capital city of Henan Province, and 145 km southwest of Luoyang, which is the nearest major city. The nearest small city to the project area is Luoning, about 56 km by paved roads from Silvercorp’s Ying mill site. The project areas have good road access and operate year round. The area has a continental sub-tropical climate with four distinct seasons.

Silver-lead-zinc mineralization in the Ying district has been known and intermittently mined for several hundred years. Silvercorp acquired an interest in the SGX project in 2004, the HPG project in 2006, and the TLP / LM projects in late 2007. Annual production has ramped up substantially in recent years, reaching 590,000 735,000 tonnes of ore in fiscal year 2016 (end 31 March 2016).

The current Technical Report is an update to the Mineral Resource and Mineral Reserve estimates, incorporating new drilling and underground channel sample results and updated depletion due to mining. The Mineral Resource and Mineral Reserve are reported with an effective date of the 30 June 2016. Table 2.1 lists the persons who prepared or contributed to this report.

P R Stephenson, H A Smith and A A Ross visited the Ying property in July 2016, in addition to earlier visits by AMC in February 2012 and September 2013. All aspects of the project were examined by the Qualified Persons, including drill core, exploration sites, underground workings, processing plant and surface infrastructure.

In preparing this report, AMC relied on various geological maps, reports and other technical information provided by Silvercorp. AMC reviewed and analyzed the data provided and drew its own conclusions augmented by its direct field observations. The key information used in this report is listed in Section 27, References.

Much of the geological information in this report was originally written in Chinese. Translations of key technical documents and data into English were provided by Silvercorp. The Qualified Persons have no reason to believe that the translations are not credible and believe they are generally reliable but cannot attest to their absolute accuracy.

Unless otherwise stated:

All currency amounts and commodity prices are in US dollars.

Quantities are in metric (SI) units.

Years are Silvercorp fiscal years (1 April to 31 March).

Tonnes are dry tonnes.

This report includes the tabulation of numerical data which involves a degree of rounding for the purpose of Mineral Resource and Mineral Reserve reporting. AMC does not consider any rounding of the numerical data to be material to the project.

Page 29: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 29

Table 2.1 Persons who prepared or contributed to this technical report

Qualified Persons responsible for the preparation of this Technical Report

Qualified Person Position Employer Independent of Silvercorp?

Date of last site visit

Professional designation

Sections of report

Mr P R Stephenson

Director, Principal Geologist

AMC Mining Consultants (Canada) Ltd

Yes 13-16 July 2016 PGeo (BC), PGeo (Sask), BSc (Hons), FAusIMM (CP), MCIM

1-12, 20, 23, 24, 27 and parts of 1, 25 and 26.

Mr H A Smith General Manager, Principal Mining Engineer

AMC Mining Consultants (Canada) Ltd

Yes 13-16 July 2016

PEng (BC), PEng (Ontario), PEng (Alberta)

MSc, BSc

15, 16,18, 21, 22 and parts of 1, 25 and 26

Dr A Ross Principal Geologist

AMC Mining Consultants (Canada) Ltd

Yes 13-20 July 2016 PGeo (BC), PGeo (AB),

PhD 14

Mr H Muller Principal Metallurgical Consultant

AMC Mining Consultants (Canada) Ltd

Yes none MAusIMM CP 13, 17, 19, parts of 22,

Other experts who assisted the Qualified Persons

Expert Position Employer Independent of Silvercorp?

Visited site Sections of report

Mr A Zhang, P.Geo

Vice-President, Exploration

Silvercorp Metals Inc. No Since February, 2015

General

Mr. Luke Liu Vice President, China Operations

Silvercorp Metals Inc. No Since July, 2014 General

Mr R Jiang, P.Geo Silvercorp consultant

Independent No Since January, 2012

General

Mr Z Li, P.Eng Senior Mining Engineer

Silvercorp Metals Inc. No Since April, 2010 Parts of 15 to 21

Mr W Yang Chief Environment Engineer, Ying Mines

Silvercorp Metals Inc. No Since March, 2010 20

Mr JM Shannon Geology Manager, Principal Geologist

AMC Mining Consultants (Canada) Ltd

Yes none Overall compilation

Mr G Methven Principal Mining Engineer

AMC Mining Consultants (Canada) Ltd

Yes No 15, 16

Mr A. Riles Principal Metallurgical Consultant

Riles Integrated Resource Management Ltd

Yes 3-6 September 2013

13, 17, 19, parts of 22,

AMC acknowledges the numerous contributions from Silvercorp in the preparation of this report, and is particularly appreciative of prompt and willing assistance of Mr R Jiang, Mr A Zhang and Mr. L. Liu.

This report has been produced in accordance with the Standards of Disclosure for Mineral Projects as contained in NI 43-101 and accompanying policies and documents. NI 43-101 utilizes the definitions and categories of Mineral Resources and Mineral Reserves as set out in the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Standards on Mineral Resources and Mineral Reserves Definitions and Guidelines (CIM Standards).

A draft of this report was provided to Silvercorp for checking for factual accuracy.

This report is dated 15 February 2017 and has an effective date of 31 December 2016.

Page 30: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 30

3 Reliance on other experts The Qualified Persons have relied, in respect of legal aspects, upon the work of the Expert listed below. To the extent permitted under NI 43-101, the Qualified Persons disclaim responsibility for the relevant section of the Report.

Expert: Audrey Chen, Partner, Jun He Law Offices, Beijing, as advised in a letter of 29 July 2016 to Mr Lorne Waldman, Senior Vice President, Silvercorp Metals Inc.

Report, opinion or statement relied upon: information on mineral tenure and status, title issues, royalty obligations, etc.

Extent of reliance: full reliance following a review by the Qualified Persons.

Portion of Technical Report to which disclaimer applies: Section 4.

The Qualified Persons have relied, in respect of environmental aspects, upon the work of the issuer’s expert listed below. To the extent permitted under NI 43-101, the Qualified Persons disclaim responsibility for the relevant section of the Report.

The following disclosure is made in respect to information provided by Silvercorp personnel led by Wang Yang, Chief Environment Engineer of the Safety and Environment Protection Department of Ying Mines.

Report, opinion or statement relied upon: information on environmental studies, permitting, social and community impact, site monitoring remediation and reclamation, and closure plan.

Extent of reliance: full reliance following a review by the Qualified Persons.

Portion of Technical Report to which disclaimer applies: Section 20.

Page 31: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 31

4 Property description and location 4.1 Property location

The Ying Property is situated in central China in western Henan Province near the town of Luoning (Figure 4.1). The term “Ying District” is used to describe a 100 sq. km size rectangular area bounded by latitude 34°07’N to 34°12’N and longitude 111°14’E to 111°23’E. Within this district block, Silvercorp has three principal centres of operation, within which six mining projects are located.

Figure 4.1 Location of Ying Property

4.2 Ownership

Silvercorp, through its wholly owned subsidiary Victor Mining Ltd, is party to a cooperative joint venture agreement dated 12 April 2004 under which it earned a 77.5% interest in Henan Found Mining Co. Ltd (Henan Found), the Chinese company holding (with other assets) the Ying silver, lead and zinc project (the Ying Project), and the silver and lead project in Tieluping (the TLP Project). In addition, Silvercorp, through its wholly owned subsidiary Victor Resources Ltd, is party to a cooperative agreement dated 31 March 2006 under which it initially obtained a

Page 32: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 32

60% interest in Henan Huawei Mining Co. Ltd (Henan Huawei), the Chinese company holding the project in Houpinggou (the HPG Project) and the project in Longmeng (the LM Project). Since that time the Silvercorp’s interest in Henan Huawei has increased to 80%.

4.3 Mining licenses

The information supporting Figure 4.2 and Table 4.1 is contained in a letter provided to Silvercorp by Jun He Law Offices in Beijing and referenced in Section 3.

As a nation-wide measure to improve the administrative management of exploration and mining activities in China, the central government and provincial governments have, since 2012, taken actions to consolidate the various small and irregularly-distributed exploration mining permits in major mining areas into large and continuous exploration and mining licenses (See Sections 4.3 and 4.4 of the Ying NI 43-101 technical report dated December 31, 2013). Being a designated sole consolidator to integrate the mining and exploration permits in Ying District, Henan Found submitted a proposal to integrate its four mining permits (except for the Yuelianggou mining permit / license) and four exploration permits into three mining licenses, i.e. Haopinggou (HPG), Dongcaogou (DCG) and Tieluping-Longmen mining licenses, in late 2012. As of 7 June 2016, all the three mining licenses had been granted to Henan Found by the Department of Land and Resources of Henan Provincial Government. The Ying property is now covered by four major contiguous mining licenses as shown in Figure 4.2.

Figure 4.2 Location of the approved mining licenses in the Ying Property

The main mines in the Ying property are located as follows:

The Shagouxi (SGX) and Houzhanggou (HZG) lead-zinc-silver mines are within the Yuelianggou Mining License in the western part of the block;

Page 33: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 33

The HPG lead-zinc-silver-gold mine is within the Haopinggou Mining License in the central western part of the block; and

The TLP, LME and LMW lead-silver mines are within the Tieluping-Longmen Mining License in the eastern part of the block.

There is currently no producing operation in the Doncaogau Mining License.

The total area of the four mining licenses is 68.74 sq km. Table 4.1 lists their names, license numbers, areas and expiry dates.

Table 4.1 Mining licenses

Area and licence name Mines Mining licence # Sq km ML Expiry Date

Yuelianggou Lead-zinc-silver Mine SGX and HZG C4100002009093210038549 19.83 Sept 2024

Haopinggou Lead-zinc-silver-gold Mine HPG C4100002016043210141863 6.2257 29 Apr 2018

Tieluping-Longmen Silver-lead Mine TLP, LME and LMW C4100002016064210142239 22.916 7 June 2018

Dongcaogou Gold-silver Mine none C4100002015064210138848 19.772 15 June 2025

Total 68.74

In addition, mining is only permitted between prescribed elevations as follows:

Yuelianggou Mining License – 1060 m and 0 elevations

Haopinggou Mining License - 955 m and the 365 m elevations

Tieluping-Longmen Mining License - 1,250 m and the 700 m elevations

Doncaogau Mining License - 1,087 m and the 605 m elevations

Henan Found will initiate applications to the relevant government departments so that exploration permits are reissued beneath the lower boundary of the mining permit areas in accordance with the “Mineral Resources Law of the People’s Republic of China” and the integration policy of mineral resource development issued by the Ministry of Land and Resources of China and the Henan Provincial Government. This will enable exploration to continue at depth.

4.4 Exploration and mining rights and taxes

The existing mining licenses cover all the active exploration and mining areas discussed in this Technical Report. Mining licenses are subject to mining-right usage fees (a fixed annual charge), mineral resource compensation fees, and applicable mineral resource taxes. The renewal of mining licenses and extending mining depth and boundaries occur in the ordinary course of business as long as mineral resources exist, are defined, the required documentation is submitted, and the applicable government resources taxes and fees are paid. The mining licenses give the right to carry out full mining and mineral processing operations in conjunction with safety and environmental certificates. The safety certificates for Silvercorp’s mining activities have been issued by the Department of Safety, Production and Inspection of Henan Province. Environmental certificates have been issued by the Department of Environmental Protection of Henan Province.

Surface rights for mining purposes are not included in the licenses, but Silvercorp has acquired surface rights for mining and milling activities by effecting payment of a purchase fee based on the appraised value of the land. Subject to negotiation, some land use compensation fees may also be due to the local farmers if their agricultural land is disturbed by exploratory work.

China has an established Mining Code which defines the mining rights guaranteed by the government of China.

China has a 17% Value Added Tax (VAT) on sales of concentrates and on articles such as materials and supplies. The VAT paid on materials purchased for mining is returned to Silvercorp as an incentive to mine in China. There is no VAT on labour. In addition, Silvercorp also pays a VAT surtax which amounts to approximately 1.6% of sales.

Page 34: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 34

Before July 1, 2016, a 2-4% of sales as resources compensation fee and RMB13 (approximately $1.92) per milled tone resource tax are payable by companies to the government. Income tax rate is 25%. Effectively July 1, 2016, the resources compensation fee is revised to be zero, while the resource tax will be levied based on certain percentage of sales. Silvercorp estimates that the resource tax applicable to Silvercorp would be approximately 2- 6% of sales. Income tax rate remains unchanged.

There are no known or recognized environmental issues that might preclude or inhibit a mining operation in this area. Some major land purchases may be required in the future for mine infrastructure purposes (processing plant, waste disposal, offices and accommodations). There are no significant factors and risks that may affect access, title, or the right or ability to perform work on the property known at this time.

Page 35: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 35

5 Accessibility, climate, local resources, infrastructure and physiography The district lies within rugged, deeply dissected mountainous terrain of the Xionger Mountain Range. Elevations range from 300 m to 1,200 m above sea level. Hill slopes are steep, commonly exceeding 25°, and have good bedrock exposure.

The area is sparsely vegetated, consisting mostly of bushes, shrubs, ferns and small trees. At higher elevations the vegetation is denser and the trees are larger. The local economy is based on agriculture (wheat, corn, tobacco, medicinal herbs) and mining. Agriculture is confined to the bottoms of the larger stream valleys and to the many terraced hillsides.

The Ying Property is about 240 km west-southwest of Zhengzhou (population 7.0 million), the capital city of Henan Province, and 145 km southwest of Luoyang (population 1.4 million), which is the nearest major city (Figure 5.1). Zhengzhou, the largest industrial city in the region, offers full service facilities and daily air flights to Beijing, the capital of China, as well as Shanghai and Hong Kong. The nearest small city to the project area is Luoning (population >80,000), about 56 km by paved roads from Silvercorp’s Ying mill site which is located centrally to the projects. The mill site is about 15 km by paved road from the Guxian Reservoir (Figure 5.1). The SGX exploration-development camp is accessed via a 10 minute ferry ride across the Reservoir.

Figure 5.1 Mine and mill locations in the Ying Property

Page 36: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 36

Note in Figure 5.1 the area with the geology drape roughly corresponds to the outline of the mining licences. To date, ore from the SGX and HZG mines has been transported by ferry across the Guxian Reservoir to the mills. Silvercorp is currently driving a haulage tunnel to connect the SGX and HPG mines to increase haulage efficiency and ensure an environment-friendly operation. The HPG, TLP and LM projects have good road access.

The area has a continental sub-tropical climate with four distinct seasons. Temperature changes are dependent on elevation, with an annual range of -10°C to 38°C and annual average of 15°C. The annual precipitation averages 900 mm, occurring mostly in the July to September rainy season and supplemented by snow and frost occurring from November to March. The projects operate year round.

Silvercorp has sufficient surface rights to operate the projects. There are major power grids adjacent to the properties, including a power line extending to the SGX Area. Adjacent to the Ying Property is a hydropower generating station at the dam that forms the Guxian Reservoir. This reservoir is on the Luo River, a tributary of the Yellow River. Sufficient manpower is available to serve most exploration or mining operations. The steep valleys form natural reservoirs for mine tailings and waste dumps. See Section 18 for further discussion of project infrastructure.

Page 37: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 37

6 History 6.1 Introduction

Silver-lead-zinc mineralization in the Ying district has been known and intermittently mined for several hundred years. The first systematic geological prospecting and exploration was initiated in 1956 by the Chinese government. Detailed summaries of the district’s historical activities from 1956 to 2004, when Silvercorp first acquired interests in the area, are described in previous NI 43-101 Technical Reports (see Section 27 – References). The most recent was prepared by AMC dated 29 July 2014 with an effective date of 31 December 2013.

Silvercorp acquired an interest in the SGX Mine Project in 2004. Subsequently, Silvercorp acquired the HZG, HPG, TLP and LM mines, all of which were previously held and operated by private Chinese companies.

6.2 Ownership

See Section 4.2 for ownership description.

6.3 Drilling

Prior to Silvercorp obtaining the rights to the SGX mine in 2004, there was little drilling work completed on the Ying Property. Drilling programs conducted by previous operators include a 10,736 m surface drilling program in the TLP-LM area by the No. 6 Nonferrous Geological Exploration Team from 1991 to 1994 and a test drilling program of two holes in the SGX area by the Henan Nonferrous Geological Exploration Bureau in 2003.

6.4 Production

The underground mine at HPG was initially constructed in April 1995, with a mining license issued in June 1996 to Huatai #1 company. The mine was shut down during 1997 and 1998, and in 2001, new mining licenses were issued by the Henan Bureau of Land and Resources to Huatai #2 company (changing names on a mine license in China is difficult so the same name is used even though they are different companies). In 2004, Huatai #3 company acquired the mine, which reportedly produced 70,000 tonnes per annum (tpa) of ore from four principal underground levels. Ore was shipped to Guxian Ore Processing Plant, owned by Huatai. In 2006, Silvercorp reached an agreement with Huatai which included both the mine and the plant.

In 1998, a mining permit was issued for the TLP area to Tieluping Silver and Lead Mine of Luoning County. The mine produced 450 tonnes per day (tpd) of ore using shrinkage stoping methods. Ore was shipped to five small mills; lead concentrates were produced by conventional flotation methods. The government closed the mine in December 2006 due to health, safety and environment concerns. The operation is thought to have produced about 1.55 million tonnes of ore, although actual production and grades are unknown. Silvercorp acquired the TLP project from the owners in late 2007.

In 2002, a mining permit was issued for the LM area to Luoning Xinda Mineral Products Trade Co. Ltd which allowed Xinda to mine 30,000 tonnes of silver-lead ore using shrinkage stoping methods. Ore was mined mainly from the 990 m to 838 m levels and shipped to a local custom mill for processing by conventional flotation. Reported production for the operation was 120,206 tonnes of ore averaging 257.06 g/t Ag and 7.04 % Pb. Silvercorp acquired the LM project from the owners in late 2007.

6.5 Historical Resource and Reserve estimates

Silvercorp acquired its interests in the Ying Property between 2004 and 2007. Any Mineral Resource or Mineral Reserve estimates that pre-date Silvercorp’s involvement are not considered by the Qualified Persons to be material.

Page 38: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 38

7 Geological setting and mineralization 7.1 Regional geology

The Ying Property is situated in the 300 km-long west-northwest trending Qinling orogenic belt, a major structural belt formed by the collision of two large continental tectonic plates in Paleozoic time (Figure 7.1).

Figure 7.1 Geology of Western Henan Province and location of Ying Property

Page 39: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 39

The northern continental plate, the North China Plate, covers all of Henan Province and most parts of North China, while the southern plate, the Yangtze Plate, covers most part of South China. Rocks along the orogenic belt between the two major tectonic plates are severely folded and faulted, offering optimal structural conditions for the emplacement of a myriad of mineral deposits. Several operating silver-lead-zinc mines, including those in the Ying Property, occur along this belt.

The Qinling orogenic belt is comprised largely of Proterozoic- to Paleozoic-age rock sequences consisting of mafic to felsic volcanic rocks with variable amounts of interbedded clastic and carbonate sedimentary rocks. The rocks are weakly metamorphosed to lower greenschist facies, with local areas of strongly metamorphosed lower amphibolite facies. The basement of the belt is comprised of highly metamorphosed Archean-age rocks of the North China plate, dominantly felsic to mafic gneisses with minor amphibolites, intrusive gabbros and diabases. The metamorphosed Qinling belt sequence and the underlying Archean basement rocks are intruded by mafic to felsic dikes and stocks of Proterozoic and Mesozoic ages. They are overlain by non-metamorphosed sedimentary rock sequences of Mesozoic to Cenozoic age, primarily marls and carbonaceous argillites, which are in turn overlain locally by sandstone-conglomerate sequences.

The dominant structures in the Qinling orogenic belt are west-northwest trending folds and faults generated during the collision of the two major tectonic plates in Paleozoic time. The faults consist of numerous thrusts having a component of oblique movement with sets of conjugate shear structures trending either northwest or northeast. These conjugate shear zones, which display features of brittle fracturing such as fault gouge, brecciation and well-defined slickensides, are associated with all the important mineralization recognized along the 300 km-long orogenic belt. At least three important north-northeast trending mineralized fault zones are identified in the Ying Property:

1. Heigou-Luan-Weimosi deep-seated fault zone

2. Waxuezi-Qiaoduan fault zone

3. Zhuyangguan-Xiaguan fault zone

7.2 Property geology

The Archean basement that underlies the district consists primarily of highly metamorphosed mafic to felsic gneisses derived from mafic to felsic volcanic and sedimentary rock units (Figure 7.2). The lowest part of the basement sequence is a 1 km thick mafic gneiss with local gabbroic dikes and sills that trend north-northeast and dip 30o to 60o southeast. This sequence is overlain by a much thicker sequence of thin-bedded quartz-feldspathic gneiss, which is bounded on the north and west by Proterozoic-age andesitic greenstones along a very high-angle (>70°) “detachment” fault-shear zone. The greenstones have been folded and dip steeply toward the northeast and southwest. The basement gneisses are commonly tightly-folded with boudins abundant near the mafic gneiss-feldspathic gneiss contact. Small granite porphyry stocks of Proterozoic to Paleozoic age locally intrude the gneisses.

All of these lithologies are extensively cut by high-angle, mostly west-dipping conjugate faults. These faults trend generally northeast, varying from mostly north to north-northeast on the west side of the district, to northeast with occasional north and rare northwest on the east side of the district. The faults are commonly near-vertical, with steep dips in either direction, and they are occasionally filled with swarms of younger andesitic to basaltic diabase dikes. Repeated movement on the faults has offered the openings which host all of the district’s important silver-lead-zinc veins.

Page 40: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 40

Figure 7.2 Ying mining licenses and mineralization vein systems

7.3 Mineralization

The Ying Property contains multiple mesothermal silver-lead-zinc-rich quartz-carbonate veins in steeply-dipping fault-fissure zones which cut Archean gneiss and greenstone. To date, significant mineralization has been defined or developed in at least 224 discrete vein structures, and many other smaller veins have been found but not as yet well explored.

Structurally, the vein systems throughout the district are all somewhat similar in that they occur as sets of veins of generally similar orientation enclosed by fault-fissure zones which trend most commonly northeast-southwest, less commonly north-south, and rarely northwest-southeast. The structures extend for hundreds to a few thousand metres along strike. They are often filled by altered andesite or diabase dikes together with quartz-carbonate veins or as discrete zones of altered bedrock (mainly gneiss) associated with local selvages of quartz-carbonate veinlets. From one-third to one-half of the structures exposed at the surface are conspicuously mineralized as well as altered.

The vein systems consist of narrow, tabular or splayed veins, often occurring as sets of parallel and offset veins. The veins thin and thicken abruptly along the structures in classic “pinch-and-swell” fashion with widths varying from a few centimetres up to a few metres. “Swells” formed in structural dilatant zones along the veins often forming mineralized “shoots”. At the SGX mine, these shoots range from 30 m to more than 60 m in vertical and horizontal dimensions over true vein widths of 0.4 m to 3.0 m. The vertical dimension of the SGX shoots is commonly twice or more the horizontal dimension. Longitudinal sections constructed along the veins indicate that many of the shoots have a steep, non-vertical rake.

The vein systems of the various mine areas in the district are also generally similar in mineralogy, with slight differences between some of the separate mine areas and between the different vein systems within each area.

Page 41: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 41

These differences have been attributed to district-scale mineral zonation at different levels of exposure. This subtle zonation is thought to be perhaps analogous to the broad-scale zonation patterns observed in the Coeur d’Alene District (USA) and characteristic of many other significant mesothermal silver-lead-zinc camps in the world (Broili et al., 2008, Broili et al., 2010).

SGX area

Currently defined Ag-Pb-Zn mineralization in the SGX area is carried by at least 43 veins which occur in eight major and two minor vein systems. Veins in the five largest vein systems (S7, S2, S7-1, S8 and S19, listed in terms of presently defined Mineral Resources) account for about 40% of this mineralization (Figure 7.3, Figure 7.4, Table 7.1).

The SGX veins have been extensively mapped and sampled at various levels in the underground workings and by drilling. Results show that approximately 30% of the material filling the veins is strongly mineralized with massive, semi-massive, veinlet and disseminated galena and sphalerite over narrow widths ranging from 0.3 m to 5 m or more with a weighted average true width of 0.6 m. Other than galena and sphalerite, the most common metallic minerals are small amounts of pyrite, chalcopyrite, hematite, and very small amounts of wire silver, silver-bearing sulfosalts (mainly pyrargyrite), silver-bearing tetrahedrite (known as freibergite) and possibly acanthite (silver sulphide). The metallic minerals are confined to the veins where they occur as massive accumulations or disseminations. The galena often occurs as massive tabular lenses comprised of coarsely crystalline aggregates or fine-grained granular “steel galena” bodies, which can be up to 1.0 m thick and 100 m or more in vertical and horizontal dimensions. Sphalerite, in its dark-coloured, iron-rich variety often known as “blackjack”, occurs with the galena as coarse bands or aggregates. Alternating bands of galena, sphalerite, pyrite and quartz are common near the vein margins.

A detailed study on assay results of drillcore and tunnelling samples from major vein structures in 2012 revealed the existence of wide alteration and mineralization zones with lower but economic grades of silver adjacent to some high grade silver-lead-zinc vein structures, such as S7-1, S16W, S16E, S6, and S2. These lower-grade zones have mostly been neglected in previous sampling programs because of a lack of visible sulphides. An improved understanding of the geology, alteration, and mineralization of major vein structures has indicated that contacts between mineralization and wall rocks can no longer based solely on visual geological mapping, but also requires consideration of sampling results because of the silver content in adjoining alteration zones. As a result, average widths of defined mineralized zones have been substantially increased.

Several shoots in some of the SGX veins are unusually rich in silver relative to lead, containing from 92 to 165 grams silver for each percent lead. This is a much greater amount of silver to lead than most other SGX veins. The silver in these shoots is thought to be carried mostly as a silver-rich, non-lead-bearing mineral such as freibergite, which is a dark-coloured metallic mineral that could easily be hidden within metallic granular masses of galena. Freibergite is also a copper-bearing mineral, so it is not surprising that these same shoots also contain up to several percent of potentially valuable copper. Very little gold has been found in the SGX veins to date, an exception being the short S7-2 vein in the eastern part of the target area which contains from 4.4 to 8.9 g/t gold but very little silver, lead or zinc. At present, neither gold, nor copper is recovered from the SGX veins.

Gangue in the vein systems consists mostly of quartz-carbonate minerals with occasional inclusions of altered wall-rock. The carbonate gangue mineral is dominantly ankerite, whereas siderite is the most common carbonate gangue mineral in many other mesothermal silver-lead-zinc districts.

Wall rock alteration is commonly marked as a myriad of quartz veinlets which are accompanied by sericite, chlorite, silicification, and ankerite on fractures. Some retrograde alteration is present as epidote along fractures. Underground drilling suggests that many of the vein systems appear to either persist or strengthen at depth. Additionally, Broili et al. (2006) notes that many of the veins exposed in underground workings are often significantly richer in Ag-Pb-Zn than the same veins exposed at the surface.

Page 42: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 42

Figure 7.3 Tunnels and veins at SGX

Page 43: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 43

Figure 7.4 Cross section on Line 2, SGX

Table 7.1 presents a summary of the characteristics of the major mineralized veins in the SGX area.

Table 7.1 Dimensions and occurrences of mineralized veins at SGX mine

Vein # Length of vein

(m)

Defined inclined depth

(m)

Elevation of defined depth

(m) Dip direction Dip angle

Average true thickness / range

(m)

S2 1100 806 660-(-140) 265-315° 75-88° 0.51 (0.30-2.07)

S2W 400 192 517-360 310° 80° 0.33 (0.30-0.91)

S4 700 602 516-(-50) 300-320° 55-85° 0.40 (0.30-0.84)

S6 1160 745 600-(-100) 280-305° 65-75° 0.37 (0.30-1.07)

S7 3000 1032 998-(-30) 112-118° 85° 0.62 (0.30-2.37)

S7-1 2337 859 745-(-88) 290-310° 67-85° 0.58 (0.30-5.06)

S8 3330 771 707-(-50) 295-305° 75-82° 0.54 (0.30-2.01)

S14 1300 758 625-(-100) 285-305° 73° 0.44 (0.30-0.96)

S16E 1200 699 661-(-20) 80-115° 70-83° 0.38 (0.30-0.97)

S16W 1890 869 738-(-50) 85-110° 62-68° 0.69 (0.30-1.44)

S19 1800 621 700-100 90-312° 70-90° 1.25 (0.38-6.99)

S21 1300 642 770-150 295-310° 70-80° 0.46 (0.30-1.01)

S21W 1000 402 646-250 130-140° 80° 0.66 (0.30-1.53)

S21W1 200 207 600-400 110-120° 70-80° 0.52 (0.30-0.75)

Page 44: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 44

HZG area

The HZG mine area, south of the SGX area, has 12 Ag-Pb-Zn veins in which mineralization has been defined to date. Underground and surface sampling and drilling indicates that 14% to 23% of the vein-filling material in these veins is strongly mineralized over a true weighted average width of 0.55 m (ranging from 0.3 to 1.44 m). The veins contain distinctly more copper but lower zinc than the district’s many other veins. The largest HZG vein defined to date, HZ20, contains an average of 0.6% copper, which occurs mostly in chalcopyrite and tetrahedrite. The tetrahedrite commonly forms massive lenses, probably filling tension gashes that are distributed in relay-like fashion near the vein margins and in ladder-like fashion near the centre of the veins. The chalcopyrite occurs as disseminated crystals in the gangue and in the tetrahedrite. Other sulphides include galena (up to several percent locally) and pyrite.

The contact of the HZG veins with the wall-rock is sharply marked by shearing and gouge. The gangue is predominantly quartz-ankerite with conspicuous amounts of bright green fuchsite, a chrome-bearing muscovite alteration product that is especially abundant near the HZG vein margins. Fuchsite apparently occurs nowhere else in the Ying Property, although it is a common alteration product in many greenstone-related mesothermal gold districts throughout the world.

The HZG veins mostly trend NE-SW, bending NNE-SSW toward the western margin, although there are a few vein systems that trend approximately N-S (Figure 7.5, Table 7.2). To date, mineralization of significance has been defined in 11 veins, HZ5, HZ10, HZ12, HZ20, HZ20E, HZ20W, HZ22, H22E, HZ22W, HZ23 and HZ23-Branch, of the many dozens of veins identified in the HZG area. Two largest veins, HZ22 and HZ20, account for about 47% of the mineralization.

Page 45: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 45

Figure 7.5 Tunnels and veins at HZG area

Page 46: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 46

Table 7.2 presents a summary of dimensions and occurrences of major mineralized veins in the HZG area.

Table 7.2 Dimensions and occurrences of major mineralized veins in the HZG area

Vein # Length of vein (m)

Defined inclined depth (m)

Elevation of defined depth (m)

Dips to Dip angle Average true

thickness / range (m)

HZ5 400 128 804-680 120° 75° 0.39 (0.30-0.93)

HZ10 500 172 781-612 90-125° 80° 0.34 (0.30-0.49)

HZ12 260 96 755-664 108° 70° 0.33 (0.30-0.49)

HZ20 1800 577 916-361 100-110° 68-80° 0.48 (0.30-2.27)

HZ22 1800 384 898-550 100-120° 60-70° 0.59 (0.30-1.69)

HZ22E 500 278 800-539 120° 70° 0.32 (0.30-0.41)

HPG area

The HPG mine area is located in the central part of the district, immediately northeast of the SGX mine (Figure 7.6, Table 7.3). Mineralization is currently defined in at least 22 veins, with four major vein systems H17, H16, H15, and H15W containing about 64% of the Mineral Resources defined to date. Sampling at various levels in workings along these vein structures indicates that from 27% to 50% or more of the vein material is mineralized, ranging from 0.34 m to 1.73 m in width, averaging 0.63m.

The veins occur in relatively permeable fault-fissure zones and are extensively oxidized from the surface to depths of about 80 m. Within this zone, the veins show many open spaces with conspicuous box-work lattice textures resulting from the leaching and oxidation of sulphide minerals. Secondary minerals present in varying amounts in this zone include cerussite (lead carbonate), malachite (copper carbonate) and limonite (hydrous iron oxide). Beneath this oxide zone, sulphide minerals are mixed with secondary oxide minerals in the vein, with sulphides becoming increasingly abundant downward to about 150 m depth, beyond which fresh sulphides are present with little or no oxidation.

The dominant sulphides are galena, typically comprising a few percent to 10% of the vein, together with a few percent sphalerite, pyrite, chalcopyrite and freibergite-tetrahedrite. Other metallic minerals in much smaller amounts include argentite, native silver, native gold, bornite and various sulfosalts. The minerals occur in narrow massive bands, veinlets or as disseminations in the gangue, which consists of quartz, sericite and carbonate, occurring as dolomite and calcite with some ankerite.

Page 47: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 47

Figure 7.6 Tunnels and veins at HPG area

Table 7.3 summarizes features of major veins at the HPG mine.

Table 7.3 Dimensions and occurrences of major mineralized veins in the HPG mine

Vein # Length of vein (m)

Defined inclined depth (m)

Elevation of defined depth

(m) Dips to Dip angle

Average true thickness / range

(m)

H5 550 418 650-250 315-345° 65-80° 0.44 (0.30-0.90)

H11 500 359 670-350 315-330° 68-85° 0.44 (0.30-0.98)

H13 400 512 680-185 310-330° 65-85° 0.54 (0.30-0.89)

H15 1300 819 850-76 295-330° 60-82° 0.51 (0.30-1.81)

H15W 400 726 860-150 300-320° 70-85° 0.38 (0.30-0.58)

H16 600 511 780-280 320-335° 75-80° 0.92 (0.30-1.66)

H17 2000 855 780-(-50) 295-330° 65-87° 0.67 (0.30-2.72)

H18 350 528 780-275 305-330° 65-80° 0.58 (0.30-0.66)

TLP and LM area

About one-third of the currently defined vein mineralization in the Ying Property occurs in veins of the TLP and LM mine areas, with 54 known veins at TLP and 93 (19 at LME and 74 at LMW) at LM (Figure 7.7, Tables 7.4 to 7.6). The five largest veins at TLP, T3, T2, T1, T3E and T4, contain 45% of the mineralization defined to date, and three largest veins at LME, LM5, LM5E and LM6, constitute 59% of the mineralization defined to date in that mine.

Page 48: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 48

Figure 7.7 Distribution of mineralized veins in the TLP-LM area

Extensive underground sampling at various levels along or across these veins indicates that a significant amount of the vein-filling material is strongly mineralized with massive, semi-massive and disseminated galena as well as minor amount of chalcopyrite and sphalerite over widths of 0.3 m to 10 m or more. Other metallic minerals present in much smaller amounts include pyrite, hematite and very sparse amounts of acanthite.

The veins at TLP mostly dip westward while those at LM dip steeply both east and west. Previous mining and stoping along the T1 and T2 vein structures at TLP indicate that the mineralization plunges shallowly to the north within structural zones extending hundreds of metres to a thousand metres or more along strike. The mineralization occurs as massive accumulations or disseminations in the veins. The galena often occurs as massive tabular lenses comprised of coarsely crystalline aggregates or fine-grained granular “steel galena” bodies, which can be up to 1.0 m thick and 100 m or more in vertical and horizontal dimensions.

Page 49: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 49

Most of the silver in the TLP-LM veins is present as microscopic inclusions in the galena. It appears that Ag:Pb ratios are distinctly different between veins of the northern TLP area (North Zone) and the southern TLP and LM area (South Zone). Based upon 15 verification samples collected for a previous Technical Report (Broili, et al., 2008), veins in the South Zone appear to have much higher zinc contents and higher Ag:Pb ratios (90 to 130 grams silver for each percent lead) than veins from the North Zone (5 to 15 grams silver for each percent lead), as well as proportionally less gold. It is thought this difference is the result of zonation or reflects differences in the level of exposure.

Gangue in the TLP–LM vein systems is mostly fine-grained silica with zones of quartz-carbonate minerals and occasional inclusions of altered wall-rock. The carbonate is dominantly ankerite, in contrast to siderite, which is the most common carbonate gangue mineral in many mesothermal silver-lead-zinc districts.

The veins occur in relatively permeable fault-fissure zones and are extensively oxidized from the surface to depths of about 80 m. Within this zone, the veins show many open spaces with conspicuous box-work lattice textures resulting from the leaching and oxidation of sulphide minerals. Secondary minerals present in varying amounts in this zone include cerussite, malachite and limonite. Beneath this oxide zone, sulphide minerals are mixed with secondary oxide minerals in the vein, with sulphides becoming increasingly abundant downward to about 150 m depth, beyond which fresh sulphides are present with little or no oxidation.

Wall rock alteration consists of numerous quartz veinlets accompanied by sericite, chlorite, silicification and ankerite on fractures. The vein systems appear to have better continuity and increasing mineralization at depth, and many veins exposed in the underground workings are often significantly richer in silver-lead-zinc than the same veins exposed at the surface. This suggests that the mineralization is either leached from the surface outcroppings or more likely becomes richer at depth due to primary mineral zoning (Broili, et. al., 2006).

The TLP system also contains some epithermal veins and veinlets. These veins contain abundant large vugs lined with carbonate and they either crosscut or follow some of the mesothermal filled structures.

Dimensions and occurrences of major mineralized veins at TLP and LM are summarized in Tables 7.4, 7.5 and 7.6.

Table 7.4 Dimensions and occurrences of major mineralized veins in the TLP area

Vein # Length of vein (m)

Defined inclined depth (m)

Elevation of defined depth (m)

Dips to Dip angle Average true

thickness / range (m)

T1 1,850 929 1170-350 285-295° 62° 1.10 (0.30-4.6)

T1W 1,400 766 1200-490 315° 65-71° 0.59 (0.30-2.25)

T1W1 650 399 950-580 300° 65-70° 1.32 (0.30-2.95)

T2 2,200 883 1150-350 285-295° 50-80° 1.33 (0.30-12.55)

T2W 1,700 851 1060-260 310 70 0.74 (0.30-1.20)

T3 2,400 1103 1200-200 290-295° 50-80° 1.07 (0.30-4.64)

T3E 2,300 1035 1100-140 310 60-75 0.85 (0.73-0.96)

T4 1,380 883 1100-300 285-295° 50-80° 0.93 (0.30-5.03)

T5 1,095 673 980-370 285-295° 50-80° 0.73 (0.30-2.05)

T11 700 673 980-370 310-325° 55-75° 0.47 (0.30-1.82)

T11E 600 539 900-400 310-325 60-75 0.73 (0.63-0.82)

T21 1,200 495 1000-650 300-320 30-60 0.73 (0.56-1.02)

T23 1,400 585 980-450 310° 60-70° 0.62 (0.30-4.09)

T33 1,100 647 1000-400 310-315° 65-70° 0.62 (0.30-4.09)

T33E 800 738 1000-390 120-320 63-83 0.71 (0.39-1.16)

T35 600 382 800-460 300-310° 55-70° 1.09 (0.30-1.55)

T35E 900 457 950-500 300-321 72-87 0.73 (0.69-0.82)

Page 50: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 50

Table 7.5 Dimensions and occurrences of major mineralized veins in the LME subarea

Vein # Length of vein (m)

Defined inclined depth (m)

Elevation of defined depth (m)

Dips to Dip angle Average true

thickness / range (m)

LM2 800 585 1000-450 90° 70° 0.48 (0.30-0.63)

LM4 700 543 980-470 310° 65-75° 0.44 (0.30-0.73)

LM5 1,800 744 980-290 310-315° 60-75° 0.97 (0.30-7.32)

LM5E 1,100 607 880-300 330° 70-75° 0.62 (0.30-2.10)

LM5W 1,100 638 960-350 330° 70-75° 0.80 (0.30-3.45)

LM6 1,200 638 1000-390 310-330° 70-75° 0.69 (0.30-2.39)

LM6E 900 593 850-300 310-325° 60-75° 0.48 (0.30-1.11)

LM6W 900 617 1010-420 325° 70-75° 0.37 (0.30-0.42)

Table 7.6 Dimensions and occurrences of major mineralized veins in the LMW subarea

Vein # Length of vein (m)

Defined inclined depth (m)

Elevation of defined depth (m)

Dips to Dip angle Average true

thickness/range (m)

LM7 800 802 900-333 310° 40-50° 1.22 (0.30-4.42)

LM11 530 468 950-500 310° 58-70° 1.22 (0.30-2.19)

LM12 800 894 1010-300 300° 65° 0.62 (0.30-2.28)

LM12-1 700 736 950-300 295-305° 57-67° 0.57 (0.30-1.10)

LM12-2 600 681 1000-360 320-325° 65-75° 0.68 (0.30-1.21)

LM17 700 640 1060-480 305-315° 55-75° 1.53 (0.30-4.43)

LM19 500 569 1010-500 50 70-80 1.78 (0.30-3.62)

LM19W2 300 409 900-500 246-260 72-84 0.61 (0.50-1.71)

W5 400 362 950-600 325 75 1.02 (0.62-1.66)

W6 500 305 950-630 60° 65-75° 0.63 (0.30-1.08)

Page 51: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 51

8 Deposit types The deposits of concern in this report are epigenetic vein deposits that have mesothermal characteristics. Mesothermal vein systems typically occur in rocks associated with orogenic belts, in the case of the Ying district, the Qinling orogenic belt. Mineralization is associated with deep-seated shear zones that cut the metamorphic rocks. The veins form in a temperature range of 200–300°C, at pressure depths from 600 m to 5,000 m. The veins occur in sets with the major veins in the system tending to be continuous for over 1,000 m in lateral and vertical sense.

Page 52: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 52

9 Exploration 9.1 Introduction

From 1 July 2013 to 30 June 2016 (the reporting period), Silvercorp conducted extensive exploration programs on the Ying property that included exploration-development activities in the SGX mine area, including two producing mines (SGX and HZG), the HPG mine area, and the TLP and LM mine areas, including three producing mines (TLP, LME and LMW). The past exploration activities, including surface activities, have been detailed in previous Technical Reports prepared for Ying Property projects.

Other than drilling, the projects have been explored primarily from underground workings. The workings follow the vein structures along strike, on levels spaced approximately 40 m apart. Silvercorp has found this method of underground exploration an effective and efficient way to define the geometry of the mineralized structures, in part due to the discontinuous character of the high-grade mineralization, but also to the relatively inexpensive development costs.

Channel samples across the mineralized structures are collected across the back of the tunnels at 5 m intervals, with the spacing of channel samples increasing to 15 or 25 m in the non-mineralized sections of the vein structures. Individual channels can consist of multiple chip samples, cut across and bracketing the mineralization and associated wall rocks across the tunnel. Assay results of samples are documented on underground level maps and longitudinal sections. Details of the procedures and parameters relating to the underground channel sampling and discussion of the sample quality are given in Section 11.

9.2 Tunnelling progress

The exploration tunnelling and drilling programs were conducted during the reporting period to upgrade the Indicated and Inferred Mineral Resources, to test the down-dip and along-strike extensions of the major mineralized vein structures and their parallel subzones, and to explore new target areas. The programs comprised 128,385 m of tunnelling, including 72,940 m of drifting along mineralized structures and 33,354 m of cross cutting across mineralized structures. Drift and crosscut tunnels have been developed at 30 m to 50 m intervals vertically to delineate higher-category Mineral Resources. A total of 44,166 channel/chip samples were collected from the six mine areas. Details of the tunnelling exploration work completed at each project area are briefly summarized in Table 9.1.

Page 53: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 53

Table 9.1 Tunnelling exploration work completed from July 2013 to June 2016

Area Tunnelling Total metres Channel samples (pcs)

SGX

Drifting 27,238

11,056

Crosscut 13,670

Raise & others 12,203

Total 53,111

HZG

Drifting 5,119

3,102

Crosscut 1,550

Raise & others 2,592

Total 9,261

HPG

Drifting 7,307

4,386

Crosscut 3,510

Raise & others 2,488

Total 13,305

TLP

Drifting 13,729

11,110

Crosscut 6,193

Raise & others 1069

Total 20,992

LME

Drifting 5,066

3,448

Crosscut 1,757

Raise & others 1944

Total 8,767

LMW

Drifting 14,481

11,064

Crosscut 6,674

Raise & others 1794

Total 22,949

Total 128,385 44,166

On average, the mineralization rate of drift tunnelling at Ying mines varied from 30% to 45% during the reporting period. As an example, Table 9.2 summarizes mineralization structures exposed in drift tunnels developed in the first three quarters of 2015. Note no tunnelling was carried out on HZG during that period.

Table 9.2 Mineralization exposed by drift tunnelling in the first three quarters of 2015

Mine Area Completed

Meterage (m) Mineralization Exposed (m)

Mineralization Rate

Mineralization Width (m)

Ag g/t Pb % Zn % Au g/t AgEq g/t

SGX 6,960 2,854 41% 0.74 298 5.70 3.03 575

HPG 2,519 846 34% 1.16 69 2.91 1.07 1.58 292

TLP 3,158 1,414 45% 0.70 406 3.45 0.36 533

LME 1,660 525 32% 0.65 365 1.63 0.46 429

LMW 5,727 1,334 23% 0.67 360 4.08 0.30 519

Total / average 20,024 6,973 35% 0.76 290 4.23 1.55 496

The results of the 2013-2016 underground tunnelling program demonstrate good down-dip and along-strike consistency in relation to existing production veins, and resulted in the discovery of numerous subzones and splays beside major vein structures in the Property. A new discovery of high-grade zones in the northwest extension of the LM19 vein group at depth in the LMW mine has resulted in the remodelling of some major

Page 54: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 54

structures. It also has important implications for the future exploration of northwest-trending mineralized vein structures at the TLP, LME and LMW mines.

The following sections summarize the results of the 2013-2016 tunnelling exploration programs by mine.

9.3 SGX

A total of 53,111 m of underground exploration tunnelling was completed along and across major production vein structures S2, S2W, S4, S6, S7, S7-1, S7-2, S8, S14, S14-1, S16E, S16W, S19, and S21 between the 750 m and the 160 m elevations. Drift and crosscut tunnels were developed at 30 m to 50 m intervals through eight access tunnels, CM101, CM102, CM103, CM105, PD628, PD690, PD700 and the ramp, to upgrade and expand drill-defined Mineral Resource blocks. A total of 11,056 chip samples were collected during the 2013-2016 program. High grade mineralized zones have been exposed in tunnels on most levels at the SGX mine. Underground channel samples from selected mineralized zones collected during the reporting period are weighted by true thickness and reported in Table 9.3. Figure 9.1 gives an example of the channel sample density and location of drifts on one of the main veins at SGX.

Page 55: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 55

Table 9.3 Selected mineralization zones defined by the 2013 - 2016 tunnelling in SGX area

Tunnel ID Vein Level (m)

Length of mineralized Zone along strike (m)

True width (m)

Weighted average grade

Ag g/t Pb % Zn %

CM105-S2-260-12SYM S2 260 60 1.10 900 20.05 4.34

CM105-S2-260-14NYM S2 260 65 0.74 576 7.75 4.90

CM105-S2-220-12SYM S2 220 75 0.84 663 12.35 1.31

CM105-S2-220-14NYM S2 220 90 0.87 345 8.70 1.12

CM105-S2W2-260-12ANYM S2W2 260 62 0.95 143 3.61 3.83

PD16-S4-400-8NYM S4 400 75 0.45 290 3.55 7.28

PD16-S4-350-8ANYM S4 350 65 0.50 312 2.43 7.62

PD16-S6-450-10NYM S6 450 85 0.37 116 1.49 1.46

CM105-2#SJ-S6W2-220SYM S6 220 75 0.50 352 5.31 4.63

CM105-S6E1-220-12SYM S6E1 220 55 0.46 201 3.49 2.49

CM105-S6E1-260-12ANYM S6E1 260 80 0.55 355 5.06 4.77

PD750-S7-750-0SMW-ECM14 S7 750 127 1.13 205 2.44 4.31

CM108-S7-710-NYM S7 710 53 0.88 595 6.60 3.29

CM105-S7-260-8ANYM S7 260 65 0.84 187 4.33 0.41

CM105-S7-260-8A#SYM S7 260 80 1.43 313 6.13 0.41

CM101-S7-1-400-SYM S7-1 400 55 0.64 496 7.71 5.94

CM101-S7-1-300-SYM S7-1 300 65 0.61 363 5.61 3.81

XPD-S7-1-300-3SYM S7-1 300 80 1.13 303 8.91 2.11

XPD-S7-1-260-NYM S7-1 260 136 1.29 743 11.04 3.86

XPD-S7-1E-300-5SYM S7-1E 300 45 0.72 218 6.30 6.47

CM102-S7-2-400-4ASYM S7-2 400 108 0.61 155 3.98 1.70

CM101-S7-2-350-1BSYM S7-2 350 96 0.80 137 4.34 3.82

CM102-S8-480-14NYM S8 480 60 0.89 36 4.56 2.16

CM102-S8-440-SYM S8 440 55 1.41 242 4.26 2.63

CM101-S8-400-NSYM S8 400 53 0.95 422 7.26 2.29

CM102-S8-400-SYM S8 400 75 0.85 284 7.76 6.84

CM102-S8E-440-2ASYM S8E 440 105 0.83 139 1.12 5.40

CM102-S8E-400-4SYM S8E 400 55 0.57 104 3.65 4.72

XPD-S14-520-2BNYM S14 520 110 0.58 522 6.59 0.84

CM105-S14-220-12SYM S14 220 70 0.76 872 8.65 1.05

PD16-S14-2-260-SYM(8#) S14-2 260 65 0.38 439 5.10 8.44

PD690-S16W2-690-12NYM S16W2 690 45 0.92 190 4.85 0.83

CM101-S16W2-400-1ANYM S16W2 400 50 0.52 112 2.10 8.21

PD700-S19-570-13NYM S19 570 50 0.44 225 7.77 3.72

PD700-S19-530-13ANYM S19 530 95 0.67 296 5.71 1.46

PD700-S19-490-15NYM S19 490 100 0.97 430 5.55 3.95

CM101-S19-350-8SYM S19 350 40 1.02 180 6.96 0.19

XPD-S19-300-3SYM S19 300 45 0.97 322 7.28 2.06

XPD-S21-375-26SYM S21 375 55 1.66 454 6.77 5.97

XPD-S21-375-NYM S21 375 55 1.08 609 6.55 4.42

CM105-S21-300-SYM S21 300 70 0.76 395 6.68 4.17

CM105-S21W1-400-60SYM S21W1 400 60 0.97 724 12.01 1.33

CM101-S21W1-350-8ANYM S21W1 350 40 1.01 371 8.16 1.41

PD16-S29-400-0NYM S29 400 40 1.01 633 9.29 7.73

PD16-S29-350-0SYM S29 350 40 0.57 564 3.97 12.99

Page 56: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 56

Figure 9.1 Longitudinal projection of S19 vein, SGX

9.4 HZG

The purpose of the underground tunnelling program (including 5,119 m of drifts and 1,550 m of crosscuts) was to delineate and upgrade the previous drill-defined Mineral Resource blocks within the major vein structures HZ20, HZ22 and HZ5 between the 650 m and the 850 m elevations. Drift and crosscut tunnels were developed at 40 m to 50 m intervals through three access tunnels PD810, PD820 and PD890 and are connected with raises, declines, and shafts through different levels. A total of 3,102 chip samples were collected during the 2013-2016 program. High-grade mineralized zones were exposed in tunnels on different levels along major mineralized vein structures HZ20, HZ20W, HZ22 and HZ5. The underground channel samples from selected mineralized zones collected during the reporting period are weighted by true thickness and reported in Table 9.4. Figure 9.2 gives an example of the channel sample density and location of drifts on one of the main veins at HZG.

Table 9.4 Selected mineralization zones defined by the 2013 - 2016 tunnelling in HZG area

Tunnel ID Level (m) Vein Length of

Mineralized Zone along strike (m)

True Width (m) Weighted average grades

Ag g/t Pb% Zn%

PD820-HZ20-730-149-SYM 730 HZ20 75 0.55 456 2.66 0.17

PD820-HZ20-690-149-SYM 690 HZ20 134 0.50 616 2.91 0.37

PD820-HZ20-650-129-NYM 650 HZ20 25 0.53 567 0.25 0.47

PD820-HZ20-650-139#-NYM 650 HZ20 32 0.45 248 0.25 0.26

PD820-HZ20W-650-131-NYM 650 HZ20W 44 0.86 600 0.27 0.49

PD820-HZ20E-730-33AECM-NYM 730 HZ20E 100 0.52 415 0.73 0.16

PD820-HZ22-770-37#-NYM 770 HZ22 30 0.60 343 3.57 0.24

Page 57: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 57

Figure 9.2 Longitudinal projection of Vein HZ20

9.5 HPG

Compared with mineralized vein systems in other areas, mineralization in the HPG area is characterized by significant higher gold grade and lower grades for silver, lead and zinc.

The purpose of the 13,305 m underground tunnelling program was to further delineate and upgrade the previous drill-defined Mineral Resource blocks within major vein structures H4, H5, H15W, H13, H14, H15, H16 and H17 between the 251 m and the 680 m elevations. Drift and crosscut tunnels were developed at 30 m to 50 m intervals through access tunnels PD2, PD3, PD5, PD88, PD600 and PD630. A total of 4,386 chip samples were collected. Significant mineralization zones were exposed in drift tunnels on different levels along the major vein structures. The underground channel samples from selected mineralized zones collected during the reporting period are weighted by true thickness and reported in Table 9.5. Figure 9.3 gives an example of the channel sample density and location of drifts on one of the main veins at HPG.

Page 58: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 58

Table 9.5 Selected mineralization zones defined by the 2013 - 2016 tunnelling in HPG area

Tunnel ID Vein Level (m)

Length of Mineralized Zone along strike (m)

True width (m)

Weighted average grades

Au (g/t) Ag (g/t) Pb (%) Zn (%)

PD600-H4-510-SYM H4 510 30 0.68 0.35 103 0.94 1.72

PD3-H5-460-SYM1 H5 460 65 1.01 3.13 151 5.89 1.51

PD600-H5W-510-NYM H5W 510 55 0.45 0.15 94 5.45 0.58

PD600-H5W-510-N2-TJ H5W 510 35 0.70 0.28 119 14.22 0.24

PD3-H5W-460-SYM-08TJ H5W 460 66 0.73 0.11 72 11.99 0.62

PD630-H13-610-SYM H13 610 45 0.61 0.34 145 3.50 0.27

PD2-H14-530-17YM H14 530 33 0.73 0.50 76 3.13 1.05

PD2-H14-490-SYM H14 490 45 0.73 3.75 44 0.88 1.34

SC2-H15-680-NYM H15 680 32 0.64 0.50 86 8.73 0.04

PD3-H15-340-4SYM H15 340 81 0.70 0.42 76 3.13 1.30

PD3-H15-300-NYM H15 300 70 0.85 1.26 94 7.16 0.37

PD88-H16-680-NYM1 H16 680 78 0.93 3.54 85 1.05 0.51

PD2-H16-520-17SYM H16 520 80 0.88 1.43 32 1.92 1.11

PD88-H16-3-680-SYM H16-3 680 32 0.66 3.33 7 1.23 0.69

PD3-H17-460-36NYM H17 460 45 1.30 1.67 154 3.18 4.32

PD3-H17-420-28NYM H17 420 162 1.50 2.52 50 2.50 1.53

PD3-H17-340-NYM H17 340 150 1.38 1.57 38 2.22 0.57

PD3-H17-340-SYM2 H17 340 55 1.21 0.83 173 5.04 0.87

PD3-H17-300-NYM H17 300 85 1.45 1.15 89 5.59 1.86

PD3-H17-300-SYM1 H17 300 153 1.31 0.49 56 5.64 1.20

PD3-H17-251-SYM H17 251 155 1.34 0.89 92 .61 0.51

Page 59: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 59

Figure 9.3 Longitudinal projection of vein H17

9.6 TLP

The purpose of the 20,992 m underground tunnelling program from 2013 to 2016 was to further delineate and upgrade the previous drill-defined Mineral Resource blocks within major vein structures T1W, T1W2, T3, T5, T15, T23, T33 and T35E between the 650 m and the 960 m elevations. Drift and crosscut tunnels were developed at 30 m to 50 m intervals through seven access tunnels PD730, PD800, PD820, PD890, PD930 and PD960. A total of 11,110 chip samples were collected. Mineralized zones were exposed in drift tunnels on different levels along the major vein structures and numerous new mineralized subzones and splays were discovered. The underground channel samples from selected mineralized zones collected during the reporting period are weighted by true thickness and reported in Table 9.6. Figure 9.4 gives an example of the channel sample density and location of drifts on one of the main veins at TLP.

Page 60: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 60

Table 9.6 Selected mineralization zones defined by the 2013 - 2016 tunnelling in TLP area

Tunnel ID Vein Level (m)

Length of

Mineralized

Zone along

strike (m)

True Width

(m)

Weighted Average Grade

Ag (g/t) Pb (%)

Zn (%)

PD840-T1W-840-7SYM T1W 840 70 1.21 368 10.73 0.33

PD800-T1W-800-9SYM T1W 800 70 0.88 201 5.18 0.76

PD730-647-T1W-39NYM T1W 647 50 1.5 30 7.53 0.19

PD890-T1W2-890-7SNYM T1W2 890 80 0.53 195 1.60 0.36

PD840-T1W2-840-7NYM T1W2 840 94 0.46 284 2.03 0.34

PD800-T5-800-33SYM T5 800 30 0.84 655 3.45 0.26

PD820-T11-755-4NYM T11 755 35 1.49 231 9.95 0.63

PD820-T11-801-4SYM T11 799 40 0.66 335 2.91 0.24

PD890-T14_1-890-5NYM T14_1 890 68 1.13 185 3.76 0.10

PD820-T15-795-8NYM T15 795 35 1.10 429 5.63 0.14

PD820-T15W1-795-8NYM T15W1 795 30 0.71 260 3.71 0.39

PD800-T21-800-33SYM/NYM T21 800 140 0.83 259 4.66 0.34

PD960-T23-960-15SYM T23 960 65 0.63 226 1.16 0.13

PD930-T23-930-15SYM T23 930 93 0.60 614 1.40 0.14

PD890-T23-890-17SYM/NYM T23 890 85 0.68 1,092 1.45 0.13

PD890-T33-890-9SYM(LCK) T33 890 75 0.68 246 1.82 0.42

PD840-T33-870-15SYM(FZD) T33 870 103 0.71 462 1.61 0.36

PD730-T33-780-13SNYM T33 780 133 0.74 174 5.04 0.34

PD930-T33W1-930-23SYM T33W1 930 40 1.03 244 3.25 0.71

PD840-T33W2-840-19SYM T33W1 840 35 0.91 141 5.06 0.25

PD840-T33W3Z-840-19NYM T33W3

branch 840 70 0.51 284 2.39 0.74

PD800-T35E-800-29SYM T35E 800 70 1.27 230 2.68 0.60

Page 61: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 61

Figure 9.4 Longitudinal projection of vein T23

Page 62: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 62

9.7 LME

A total of 8,767 m of underground tunnelling was completed from July 2013 to June 2016 at the LME Mine. The purpose of the drifting program was to upgrade existing drill-defined Mineral Resource blocks along mineralized vein structures. Drift and crosscut tunnels were developed at 40 m to 50 m intervals between the 500 m and the 950 m elevations through shaft PD900, and access tunnels PD838 and PD959 respectively. A total of 3,448 chip samples were collected. Drifting was mainly focused on the LM5 and the LM6 veins and successfully extended the strike lengths of known mineralized zones between the 915 m and the 550 m elevations. The underground channel samples from selected mineralized zones collected during the reporting period are weighted by true thickness and reported in Table 9.7. Figure 9.5 gives an example of the channel sample density and location of drifts on one of the main veins at LME.

Table 9.7 Selected mineralization zones defined by the 2013 - 2016 tunnelling at LME

Tunnel ID Vein Level (m) Length of

Mineralized Zone along strike (m)

True width (m) Weighted average grades

Ag (g/t) Pb (%) Zn (%)

PD838-LM1-750-10NYM LM1 750 30 0.51 198 3.36 0

PD838-LM1-700-8NYM LM1 700 25 0.55 772 2.13 0.41

PD838-LM2-750-0SYM LM2 750 113 0.72 322 3.71 0.57

PD838-LM5-845-51NYM LM5 845 45 0.69 225 2.24 0.65

PD900-LM5-650-60(N37)NYM LM5 650 40 0.91 358 1.38 0.63

PD900-LM5-550-50NYM LM5 550 80 1.29 795 1.93 0.46

PD900-LM6-700-50SYM LM6 700 69 0.57 404 1.38 0.07

PD900-LM6-650-50SYM LM6 650 105 0.47 408 1.42 0.22

PD900-LM6-600-50NYM LM6 600 130 0.53 341 1.93 0.37

PD900-LM6-550-50SYM LM6 550 55 0.44 718 2.52 1.00

9.8 LMW

The 22,949 m underground tunnelling program completed from July 2013 to June 2016 was focused on vein structures LM7, LM8, LM11, LM12, LM14, LM16, LM17, and LM19 as well as the parallel zones spatially associated with these major structures. Underground tunnelling was conducted on levels between the 550 m and the 1,003 m elevations through shaft SJ969, ramps XPDS and XPDN, and four access tunnels PD1003, PD991, PD969 and PD924. A total of 11,064 chip samples were collected. High-grade mineralized zones from 20 to 144 m in length were exposed in drift tunnels at different levels. The discovery of high-grade zones in the northwest extension of the LM19 vein group has resulted in the re-modelling of some of the major vein structures at LMW. The underground channel samples from selected mineralized zones collected during the reporting period are weighted by true thickness and reported in Table 9.8. Figure 9.6 gives an example of the channel sample density and location of drifts on one of the main veins at LMW.

Page 63: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 63

Table 9.8 Selected mineralization zones defined by the 2013 - 2016 tunnelling at LMW

Tunnel ID Vein Level (m)

Length of Mineralized Zone along strike (m)

True width (m) Weighted average grades

Ag (g/t) Pb (%) Zn (%)

SJ969-LM7W-750-5NYM LM7W 750 55 0.84 505 1.59 0.25

PD924-LM8-5-870-108NYM/SYM LM8_5 870 35 0.63 323 6.07 0.64

SJ969-LM10-800-5NYM LM10 800 80 0.59 174 1.62 0.01

SJ969-LM11-800-3SYM LM11 800 55 0.68 118 3.31 0.26

SJ969-LM12-800-3NSYM LM12 800 105 0.89 172 3.58 0.21

SJ969-LM12-750-3SYM/NYM LM12 750 50 0.51 128 4.30 0.60

SJ969-LM12-700-3NYM LM12 700 80 0.70 376 9.12 0.19

SJ969-LM12-2-650-3NYM LM12-2 650 70 0.68 560 4.95 0

XPD980-LM14-770-105SYM LM14 770 144 0.92 246 4.15 0.23

XPD980-LM14-770-105SYM LM14 770 40 0.72 175 2.79 0.36

XPD980-LM14-725-107SYM LM14 725 115 0.85 433 3.26 0.30

PD991-LM16-810-119NYM LM16 810 30 0.76 448 4.23 0.28

PD924-LM19-850-102NYM LM19 850 45 0.83 217 2.72 0.17

SJ969-LM19-800-102SYM LM19 800 45 0.72 131 5.93 0.10

SJ969-LM19-700-112NYM LM19 700 40 0.48 325 4.60 0.11

SJ969-LM19W1-600-110SYM/NYM LM19W1 600 30 0.65 402 1.83 0.36

SJ969-LM19W2-650-110NYM LM19W2 650 130 0.71 772 6.71 0.51

SJ969-LM19W2-600-110NYM LM19W2 600 35 0.59 671 6.13 0.23

PD924-LM20-898-3SYM LM20 898 40 0.6 550 2.66 0.15

PD924-LM20-850-1NYM LM20 850 70 0.44 779 2.6 0.49

SJ969-LM20W-750-5SYM LM20W 750 50 0.52 338 10.13 0.47

Page 64: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 64

Figure 9.5 Longitudinal projection of vein LM17

Page 65: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 65

10 Drilling 10.1 Drilling progress

Since acquiring the Ying projects, Silvercorp has initiated systematic drilling programs to test the strike and down-dip extensions of the major mineralized vein structures and explore for new mineralized structures in less-explored or unexplored areas in the Property. Longitudinal sections for the veins are seen in Section 9 and a cross section in Section 7 is back referred to as it demonstrates the drill intersection angles relative to the veins.

Drilling programs undertaken by Silvercorp between 2004 and June 2016 are presented in two tables: Table 10.1 from 2004 to June 2013, and Table 10.2 from July 2013 to June 2016.

Table 10.1 Drilling programs completed by Silvercorp, 2004 to June 2013

Mine Period Number of holes Meterage

(m) Major targets

Underground Surface

SGX

2004-Mar 2005 15 0 1,376

Mar 2005-Apr 2006 79 12 17,697 S2, S6, S14, S16E, S16W

May 2006-Jun 2007 134 18 52,403

Jul 2007-2009 223 26 82,343

2010 93 0 32,573

2011 159 0 61,066 S2, S4, S6, S6-Branch, S7, S7E, S7-1, S8, S14, S14-1,S19 and S21

Jan 2012-June 2013 372 7 86,955 S2, S7, S7-1, S8, S14, S14-1, S16W, S19, S21

HZG

May 2006-Jun 2007 2 18 6,346 HZ10, HZ12, HZ20, and HZ22.

Jul 2007-Nov 2009 40 41 24,227

Jan 2012-June 2013 87 17 29,004 HZ20, HZ22, HZ5

HPG

May 2006-Jun 2007 0 2 760 H15, H17

Jul 2007-Nov 2009 96 67 38,853 H13, H15, H5, H12-1, H29

2010 30 0 6,623

2011 58 0 16352 H3, H5, H5W, H17, H39-1 and H39-2

Jan 2012-June 2013 130 0 27,015 H4, H5, H5W, H11, H15, H17, H39-1

TLP

2008-2009 138 18 40,612 Veins T1, T2, T3, T4 and T5

2010 219 0 38,748

2011 123 0 36,638 T1, T1W, T1W3, T2, T3, T11, T16, T17 and T33

Jan 2012-June 2013 98 0 32,001 T1, T2, T3, T11, T15, T16, T17,T33, T35

LM

2008-2009 125 11 33,701 LM2, LM5, LM8, LM12, and LM14.

2010 86 0 30,743

2011 113 0 50,014 LME: LM2, LM5, LM5E, LM6, LM6E and LM6W, LMW: LM10, LM12-1, LM12-2, LM12-3, LM13, LM13W and LM17

LME Jan 2012-June 2013 90 0 21,975 LM2, LM5, LM6

LMW Jan 2012-June 2013 211 0 61,449 LM7, LM8, LM10, LM11, LM12, LM13, LM14, LM16, LM17, LM19, W5, W6

Reconnaissance drilling

RHW 2006 0 7 1,981 RHW

XM 2006 0 2 479 XM

SDG-LJG

Jul 2007-Nov 2009 11 0 2,205

2010 0 9 2,884

2011 0 9 3275 SL1, SL1-1, SL2E, and SL3

Jan 2012-June 2013 25 0 8,787 C29

DCG 2010 0 8 2,284

2011 0 17 6742 C4, C4E and W16

Total, 2004-June 2013

2,757 289 858,111

Page 66: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 66

Table 10.2 Summary of the 2013-2016 drilling program on the Ying Property

Mine area Exploration Drill holes completed Total metres completed Total Core samples

SGX Surface Drilling 26 4,312

5,911 Underground Drilling 345 84,869

HZG Surface Drilling 14 2,695

850 Underground Drilling 38 9,748

HPG Surface Drilling 1 288

1,837 Underground Drilling 147 31,297

TLP Surface Drilling 0 0

2,539 Underground Drilling 134 40,929

LME Surface Drilling 0 0

1,280 Underground Drilling 82 18,419

LMW Surface Drilling 0 0

2,027 Underground Drilling 109 32,172

Total 896 224,729 14,444

Drilling programs were continuously conducted over the Ying Property from July 2013 to June 2016 (the Reporting Period). Underground and surface drilling was carried out in mining areas to test the down-dip extension of major mineralized vein structures, extend the Indicated and Measured Mineral Resources at or above the current mining depth, and infill the Inferred Mineral Resource blocks defined in previous drilling programs below the current mining depth. Most of the holes were designed as inclined holes to test multiple vein structures. A total of 224,729 m in 896 diamond holes was completed, including 7,295 m in 41 surface holes and 217,434 m in 855 underground holes drilled from at or above the current mining elevations. Results of the diamond drilling program were the down-dip and strike extension of most of the major mineralized veins and the discovery of a number of new mineralized veins in the current mine areas.

10.2 Summary of results

Drilling results from the 2013-2016 drilling program in the Ying Property are briefly summarized in Table 10.3. These results have been incorporated into the mine databases and contribute to the current Mineral Resource update for the six Ying mine areas.

Table 10.3 Brief summary of the 2013-2016 drilling results

Mine Area

Holes Completed

No of Mineralized Intersections

(≧120g/t AgEq)

Average Grade of Mineralized Intersections

(g/t AgEq)

Average True Width of Mineralized Intersections

(m)

Detected Depth (Elevation m)

SGX 371 182 532 1.23 768 - (-71)

HZG 52 13 550 0.68 899 - 361

HPG 148 103 364 0.83 826 - (-56)

TLP 134 115 367 0.96 956 - (-82)

LME 82 68 499 0.91 958 - 276

LMW 109 79 413 1.02 951 - 433

Drilling results of individual mine areas are further discussed in the following sections.

10.3 Discussion of results by mine

SGX

The underground and surface drilling was focused on expanding the known Mineral Resource of major production veins S7, S7-1, S8, S16W and S19. Limited drilling was also conducted on veins S2, S4, S6, S14, S21 and their

Page 67: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 67

branch veins. The results from the program added and extended noticeable high-grade mineralized zones within vein structures S19, S8, S7-1, and S16W. The 2013-2016 SGX drilling program is summarized in Table 10.4.

Table 10.4 Summary of the SGX 2013-2016 drilling program

Target Vein Number of Holes Drilled Holes Intercepting Mineralization

Detected Depth (Elevation m) (≧90 g/t Ag equivalent)

S2 21 10 231-654

S2W 12 2 141-567

S2W1 3 1 188-247

S2W2 12 6 89-506

S4 18 6 240-510

S6 19 4 241-621

S7 56 11 768-(-28)

S7-1 80 25 636-(-87)

S7-2 20 3 462-(-8)

S7-3 48 12 643-(-76)

S7E2 25 4 345-(-71)

S7W 18 3 411-59

S8 88 17 583-(-29)

S8W 15 3 386-51

S14 21 6 586-(-42)

S14-1 15 4 649-16

S14-2 12 3 604-62

S16E 32 4 724-(-20)

S16W 61 18 718-(-69)

S16W1 28 3 714-(-51)

S18 20 5 690-27

S19 81 31 674-103

S19E 22 5 676-136

S21 45 8 736-74

S21W 29 5 717-30

S29 6 1 331-218

The drillhole intersection angles with the veins are variable, as in the case of underground drillholes they are drilled as fans of multiple holes from one set up. This is best seen in Figure 7.4, which is a cross section on Exploration Line 2 for SGX.

Note that the formula and values used for AgEq calculations for all the mines are discussed in Section 14.

HZG

The diamond drilling program from July 2013 to June 2016 was designed to test the along-strike and down-dip extension of major mineralized vein structures HZ20, HZ22, HZ23 and HZ5 between the 1000 m and the 370 m elevations. The 2013–2016 diamond drilling program added new mineralized zones to major production veins HZ20, HZ22 and HZ5, and expanded the mineralization in vein structures HZ20W, HZ23, HZ22E and HZ22W. The 2013-2016 HZG drilling program is summarized in Table 10.6.

Page 68: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 68

Table 10.5 Summary of the HZG 2013-2015 drilling program

Target Vein Number of Holes

Drilled Holes Intercepting Mineralization

(≧90 g/t Ag equivalent) Detected Depth (Elevation m)

HZ5 7 3 896-712

HZ20 22 2 789-361

HZ20W 8 1 748-435

HZ22 22 5 899-552

HZ22E 8 3 786-539

HZ23 6 2 760-506

The drillhole intersection angles with the veins are variable, as in the case of underground drillholes they are drilled as fans of multiple holes from one set up. This is best seen in Figure 7.4, which is a cross section on Exploration Line 2 for SGX.

HPG

The underground diamond drilling program was designed to test the along-strike and down-dip extension of the major mineralized vein structures H17, H15, H15W, H16, H13 and H4 between the minus 50 m and the 700 m elevations. Significant new mineralized zones were defined within major vein structures H17, and H15W along strike and downdip directions. The 2013 – 2016 HPG drilling program is summarized in Table 10.8.

Table 10.6 Summary of HPG 2013-2016 drilling program

Target Vein Number of Holes

Drilled Holes Intercepting Mineralization

(≧90 g/t Ag equivalent) Detected Depth (Elevation m)

H3 14 4 556-213

H4 9 0 577-365

H5 6 3 534-417

H5W 8 2 416-318

H9W 2 1 476-458

H10-2 3 0 473-422

H11 4 0 567-317

H13 21 7 552-185

H14 9 2 826-428

H15 23 5 459-76

H15W 14 9 598-287

H16 20 7 801-490

H17 72 21 682-(-56)

H32 2 1 582-577

The drillhole intersection angles with the veins are variable, as in the case of underground drillholes they are drilled as fans of multiple holes from one set up. This is best seen in Figure 7.4, which is a cross section on Exploration Line 2 for SGX. In addition, Figure 7.7 in the 2014 report shows Exploration line 20 with the attitudes of the veins and underground drilling intersections.

TLP

The 2013 – 2016 underground diamond drilling program was designed to test along-strike and down-dip extensions of the major mineralized vein structures T3, T4, T5, T11, T14E, T16, T17, T21 and T35E and to explore for new vein structures in less-explored areas. Results of the drilling program added significant mineralization zones within major vein structures T3, T3E, T5 and T11. Numerous mineralized parallel and splay structures such

Page 69: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 69

as T35E, T14E, T2W, and T2E were discovered beside major vein structures. The 2013 – 2016 drilling program at TLP is summarized in Table 10.10.

Table 10.7 Summary of TLP 2013-2016 drilling program

Target Vein Number of Holes Drilled Holes Intercepting Mineralization

(≧100 g/t Ag equivalent) Detected Depth (Elevation m)

T1 9 1 928-397

T1W 2 0 607-582

T1W1 6 3 530-424

T2 15 1 885-(-22)

T3 21 9 881-(-82)

T3E 5 3 837-225

T4 20 6 842-206

T5 17 5 870-703

T5E1 5 5 915-899

T11 25 9 805-533

T11E 14 1 731-513

T14 8 1 906-683

T14E 17 7 913-659

T14-1 7 4 907-709

T15 16 2 818-624

T15W 11 5 820-706

T15W1 6 2 824-718

T16 18 8 923-542

T16W 12 2 845-586

T16E 11 1 815-626

T16E1 4 1 834-712

T17 19 1 860-635

T17E 5 1 850-693

T21 25 7 908-603

T21E 9 3 792-683

T23 8 3 904-501

T24 3 1 956-847

T33 15 3 907-500

T33E 7 3 701-413

T33W 4 2 754-595

T35E 39 11 896-520

T35E1 13 1 810-539

T41 3 1 920-871

The drillhole intersection angles with the veins are variable, as in the case of underground drillholes they are drilled as fans of multiple holes from one set up. This is best seen in Figure 7.4, which is a cross section on Exploration Line 2 for SGX. In addition, Figure 7.9 in the 2014 report shows Exploration line 12 with the attitudes of the veins and underground drilling intersections.

The LM mine will be discussed in terms of the two sub areas LME and LMW.

Page 70: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 70

LME

The 2013-2016 LME underground drilling program was focused on vein structures LM4, LM5, LM6 and their subzones and splay structures. The purpose of the drilling program was to extend known mineralization along-strike and down-dip, and explore for new veins at or above the current mining depth within the mineralized vein structures. The drilling program added remarkable new mineralized zones within major production veins LM5, LM5W, and LM6. The drilling program is summarized in Table 10.12.

Table 10.8 Summary of LME 2013-2016 drilling program

Target Vein Number of Holes Drilled Holes Intercepting Mineralization

(≧100 g/t Ag equivalent)

Detected Depth

(Elevation m)

LM3 6 0 890-627

LM4 19 1 958-644

LM4W 10 3 954-577

LM5 66 20 909-377

LM5E 34 7 862-276

LM5W 31 11 875-381

LM6 63 15 925-425

LM6E 22 7 737-378

LM6W 16 6 885-588

The drillhole intersection angles with the veins are variable, as in the case of underground drillholes they are drilled as fans of multiple holes from one set up. This is best seen in Figure 7.4, which is a cross section on Exploration Line 2 for SGX. In addition, Figure 7.10 in the 2014 report shows Exploration line 50 with the attitudes of the veins and underground drilling intersections.

LMW

The LMW diamond drilling from 2013 to 2016 were designed to extend and expand the known mineralized zones within major vein structures LM7, LM11, LM12, LM13, LM16, LM17, LM19, W1, W4, and W18, and explore for new mineralized structures in less-explored areas. Results of the drilling program successfully expanded mineralization in vein structures LM17, LM12-2, W18 and W1. The 2013–2016 drilling program is summarized in Table 10.14.

Page 71: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 71

Table 10.9 Summary of the LMW 2013-2016 drilling program

Target Vein Number of Holes Drilled Holes Intercepting Mineralization

(≧100 g/t Ag equivalent) Detected Depth (Elevation

m)

LM7 10 2 795-494

LM8 5 0 809-455

LM8-1 3 1 903-658

LM11 17 2 882-764

LM11E 13 2 874-632

LM12 13 2 779-461

LM12-1 9 1 792-484

LM12-2 16 7 798-465

LM12E 7 1 767-433

LM12E2 4 3 742-718

LM13 10 2 822-531

LM13W 11 3 847-570

LM13W2 10 2 830-607

LM16 6 1 869-666

LM16W 2 1 898-830

LM17 16 3 951-680

LM19 8 3 746-612

LM19E 5 0 748-740

LM19W 7 2 733-590

LM19W1 3 1 636-611

LM19W2 8 2 730-552

LM20 6 2 729-572

LM20W 4 2 734-585

W1 14 5 869-766

W2 2 2 932-925

W4 8 2 864-591

W18 17 8 916-687

W18E 2 1 902-852

The drillhole intersection angles with the veins are variable, as in the case of underground drillholes they are drilled as fans of multiple holes from one set up. This is best seen in Figure 7.4, which is a cross section on Exploration Line 2 for SGX. In addition, Figure 7.11 in the 2014 report shows Exploration line 5 with the attitudes of the veins and underground drilling intersections.

10.4 Drilling procedures

NQ-sized drill cores (48 mm in diameter) are recovered from the mineralized zones. Drill core recoveries are influenced by lithology and average 98 – 99%. Drill core is moved from drill site to the surface core shack located at the mine camp on daily basis and is logged, photographed and sampled in detail there. Samples are prepared by cutting the core in half with a diamond saw. One half of the core is marked with a sample number and sample boundary and then returned to the core box for archival storage. The other half is placed in a labeled cotton cloth bag with sample number marked on the bag. A pre-numbered ticket book is used to assign the sample numbers. A ticket from the book is inserted in the bag and the stub of the ticket book is retained for reference. The bagged sample is then shipped to the laboratory for assaying.

Page 72: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 72

11 Sample preparation, analyses and security 11.1 Sampling

The numerous fault-fissure structures that cut the gneissic bedrock of the Ying Property are not continuously mineralized. Veins occur intermittently along these structures, appearing and disappearing along-strike and down-dip. Silvercorp’s exploration consists of horizontal tunnelling along and across the veins, in addition to driving raises or declines to access the veins at other levels. Core drilling is designed to intersect the veins in other locations both laterally and vertically. Channel samples are collected from underground tunnels and other workings, and core samples are collected from altered and mineralized drill cores. The sample collection and preparation follows accepted industry practice.

Channel samples are collected from the roofs of drift tunnels along sample lines perpendicular to the mineralized vein structure and from the walls of crosscut tunnels across the mineralized vein structure as described in Section 9.1. The bagged sample is then shipped to the laboratory for assaying.

NQ-sized drill cores (48 mm in diameter) are recovered from the mineralized zones. Drill core is logged, photographed and sampled in detail at the surface core shack as described in Section 10.4. The bagged sample is then shipped to the laboratory for assaying.

11.2 Sample preparation and analysis

Core samples are shipped or couriered in securely sealed bags to one of the following three reputable commercial laboratories:

The Analytical Laboratory of Henan Nonferrous Exploration Institute (Zhengzhou Nonferrous Laboratory) in Zhengzhou, Henan Province,

The Chengde Huakan 514 Geology and Mineral Testing and Research Institute (Chengde Laboratory) in Chengde, Hebei Province,

The Analytical Laboratory of the Inner Mongolia Geological Exploration Bureau (Inner Mongolia Laboratory) in Hohhot, Inner Mongolia.

All three laboratories are accredited and certified as first class laboratories by the Chinese government. The procedures for sample preparation and quality management in these laboratories are established in accordance with the official Chinese technical standard DZ/T 0130-2006 (The Specification of Testing Quality Management for Geological Laboratories), which is a combination of the basic principles and methodologies of ISO 9000:2000 and ISO/IEC 17025:1999. Their sample preparation procedures consist of drying, crushing, splitting and weighing of a 200-gram sample, followed by pulverizing to 200-mesh size. The 200-mesh sample split is split again with a 100-gram split used for final assay. Two-acid digestion and AAS finish are utilized on a 0.5 g sample for lead and zinc assay. Titration is utilized as a modified process for higher grade materials. Silver is also analyzed using a two-acid digestion on a 0.5 g sample and AAS finish.

Channel samples are prepared and assayed at Silvercorp’s mine laboratory (Ying Laboratory) located at the mill complex in Luoning County and referred to in Section 11.3 below. Samples are dried at 100° to 105°C in an oven and are then crushed and pulverized through three procedures, preliminary crushing, intermediate crushing and final pulverizing. Sample splitting is conducted at each procedure. A 200 g sample of minus 160 mesh (0.1 mm) is prepared for assay. A duplicate sample of minus 1 mm is made and kept at the laboratory archives. A 0.5 g pulp sample is treated with two-acid digestion and assayed for silver, lead, zinc and copper with AAS at the laboratory.

11.3 Ying assay laboratory

A brief examination of the Ying Laboratory was made by AMC Qualified Person P Stephenson in September 2013. The assay laboratory is officially accredited by the Quality and Technology Monitoring Bureau of Henan Province and has been used to analyze both channel samples taken from underground workings for Resource estimation purposes, and concentrate produced from the processing plants. Most of the processes for the analysis of channel samples and concentrate are completed within separate buildings, rooms and instruments.

Page 73: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 73

11.4 Quality assurance and quality control

Silvercorp’s QA / QC program and results prior to June 2013 have been described in previous Technical Reports.

Silvercorp’s QA / QC program in the period from July 2013 to June 2016 comprised the following:

Regular insertion of Certified Reference Material (CRM) samples, blanks and duplicates at a rate of one CRM, one blank and one duplicate per 40 sample batch.

Regular review of results, with additional review by independent Qualified Persons.

Silvercorp geologists at each mine and the Exploration Management Department in Silvercorp’s Beijing Office review QA / QC data on a regular basis. Any batch that reaches warning threshold or fails the QA / QC program is automatically notified for investigation or re-assayed, and only approved assay results are used for Mineral Resource estimation.

In Silvercorp’s 2013-2016 QA / QC program at the Ying Property, a total of 453 CRMs, 438 blanks and 422 duplicates were inserted with the 14,444 core samples, and 1,282 CRMs, 1,104 blanks and 850 duplicates were inserted with the 44,166 channel samples. A total of 684 core and channel samples were selected for internal check and 519 core and channel samples were selected for external check.

Assay results of reference materials

Seven CRMs purchased from the CDN Resource Laboratories Ltd in Langley, BC, Canada were used in the 2013-2016 QA / QC program, comprising CDN-ME-1204, CDN-ME-1206, CDN-FCM-7, CDN-ME-1302, CDN-ME-1304, CDN-ME-1305 and CDN-ME-14. The recommended values and the two standard deviations for each CRM are listed in Table 11.1.

Table 11.1 Recommended values and two standard deviations of CRMs

CRM Element Unit Recommended Value Two Standard Deviation

CDN-ME-1204

Au g/t 0.975 0.066

Ag g/t 58 6

Pb % 0.443 0.024

Zn % 2.36 0.12

CDN-ME-1206

Ag g/t 274 14

Pb % 0.801 0.044

Zn % 2.38 0.15

CDN-ME-1302

Au g/t 2.412 0.234

Ag g/t 418.9 16.3

Pb % 4.68 0.24

Zn % 1.20 0.04

CDN-ME-1304

Au g/t 1.80 0.12

Ag g/t 34 3.2

Pb % 0.258 0.014

Zn % 0.220 0.012

CDN-ME-1305

Au g/t 1.92 0.18

Ag g/t 231 12

Pb % 3.21 0.09

Zn % 1.61 0.05

CDN-ME-14

Ag g/t 42.3 4.2

Pb % 0.495 0.030

Zn % 3.10 0.28

CDN-FCM-7

Ag g/t 64.7 4.1

Pb % 0.629 0.042

Zn % 3.85 0.19

Page 74: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 74

Quality of assay data is visually reviewed on quality control charts. Assay results of a CRM within ± 2 standard deviations (SD) of the recommended value is considered acceptable, and assay data outside the ±3SD control lines are deemed failed assays. When two or more consecutive assays of CRMs occur outside the control lines in a sample batch, Silvercorp will notify the laboratory immediately to check their internal QA / QC procedures and re-assay samples of the batch with failed CRM assays.

Figure 11.1 shows results of 24 assays from all three laboratories of the lower grade reference material CDN-ME-14 in the 2014 drilling program. The three graphs show the results of silver, lead and zinc respectively.

Page 75: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 75

Figure 11.1 Example results for CDN-ME-14 in the 2014 drilling program

Page 76: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 76

Figure 11.2 shows results of 25 assays from all three laboratories of the intermediate grade reference material CDN-ME-1206 in the 2014 drilling program. The three graphs show the results of silver, lead and zinc respectively.

Figure 11.2 Example results for CDN-ME-1206 in the 2014 drilling program

Page 77: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 77

Figure 11.3 shows results of 38 assays from all three laboratories of the higher grade reference material CDN-ME-1302 in the 2015 drilling program. The three graphs show the results of silver, lead and zinc respectively.

Figure 11.3 Example results for CDN-ME-1302 in the 2015 drilling program

Page 78: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 78

Figure 11.4 shows results of 93 assays of CDN-ME-1302 carried out by the Ying Laboratory in the 2015 tunnelling program. The three graphs show the results of silver, lead and zinc respectively.

Figure 11.4 Example results for CDN-ME-1302 in the 2015 tunnelling program

Page 79: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 79

With the exception of zinc results for CDN-ME-1302, AMC considers that assay results from CRMs for silver, lead and zinc fall within acceptable ranges. AMC does not consider the zinc results for CDN-ME-1302 to be of material concern, since zinc is not a major contributor to revenue at Ying.

Assay results of blank samples

Blank samples were made of barren rocks from the Ying Property. 433 blank samples were inserted into core sample batches and 781 blank samples were inserted into channel sample batches from July 2013 to June 2016 to monitor possible contamination problems in sample preparation procedures. In the 433 blanks in core samples, three blanks were detected with anomalous silver of more than 30 g/t and four blanks with anomalous lead of more than 0.3%. Assay results of three batches of core samples with anomalous blank assays were reported by the Zhengzhou laboratory. The three batches were re-assayed and more intensive QA / QC measures have been practiced by the lab since late 2014. In the 781 blanks in channel samples, twelve were detected with anomalous silver of more than 30 g/t and lead of more than 0.3%, and four were detected with anomalous zinc of more than 0.3%. The Mine Laboratory was notified of possible contamination in sample preparation procedures and the relevant batches were re-assayed. Overall, AMC considers that the assay results for the blank materials are acceptable and corrective action is being taken and batches re-assayed when appropriate.

Assay results of field duplicates

Field duplicates of core samples are prepared by cutting a quarter of a core sample with visible mineralization, and those of channel/chip samples are collected by cutting a sample immediately next to a sampling line across a mineralized vein structure. Assay results of field duplicates are mainly used to evaluate the homogeneity of mineralization and the reliability of field sampling practice.

Figures 11.5 and 11.6 show the reproducibility of field duplicates in core samples and channel/chip samples respectively in the 2014 drilling program. The distribution patterns of silver, lead and zinc in the diagrams coincide with the distribution patterns of native silver, galena and sphalerite in the mineralized veins in the Ying property. The widely scattered feature of silver distribution may reflect the frequent occurrences of large film-like and wire-like native silver in some of the mines like LMW and HZG.

Page 80: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 80

Figure 11.5 Field duplicate assays for core samples in the 2014 drilling program

Page 81: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 81

Figure 11.6 Field duplicate assays for channel samples in the 2015 tunnelling program

11.5 Bulk density measurements and results

306 samples for bulk density measurement were collected by Silvercorp from different mine areas in the Ying Property. Samples were cut as an individual block of about 1 kg from different mineralization types at each mine area. A small amount of altered wall rock samples were also collected for comparison purpose. The bulk density was measured using the wax-immersion method by the Inner Mongolia Mineral Experiment Research Institute located in Hohhot, Inner Mongolia.

Note that additional bulk density samples were quoted from government reports in the 2012 AMC NI 43-101 Technical Report, but as these samples did not have associated assay data, they were not used in the regression formula below.

A relationship between measured bulk density and the weighted combination of lead and zinc grade was developed using multivariate linear least squares regression. Samples with a relative error > 20 % between the measured and calculated bulk density were removed from the dataset before calculation of the final relationship that was used in the Mineral Resource estimate. Figure 11.7 shows the relationship using all data, while Figure 11.8 shows only the data with < 20 % relative error. Using this formula, the Ying deposit bulk density

Page 82: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 82

measurements range from 2.64 t/m3 to 5.97 t/m3 with a mean of 2.74 t/m3. The relationship between bulk density and grade is:

Bulk Density=2.643339 + 0.047932 × Pb % + 0.011367 × Zn %

Figure 11.7 Combined lead and zinc vs measured bulk density: all data

Page 83: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 83

Figure 11.8 Combined lead and zinc vs measured bulk density: < 20 % relative error

In AMC’s opinion, the sampling procedures and QA / QC measurements adopted by Silvercorp for its 2013 (second half-year), 2014 and 2015 exploration programs at the Ying Property meet accepted industry standards, and the assay data is suitable for Mineral Resource estimation.

Page 84: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 84

12 Data verification Between 13-16 July 2016, AMC full-time employees and QPs P R Stephenson, Dr A Ross, and H A Smith visited the Ying Property to undertake the following data verification steps:

Discussions with site staff regarding:

— Sample collection

— Sample preparation

— Sample storage

— QA / QC

— Data validation procedures

— Underground mapping procedures

— Survey procedures

— Geological interpretation

— Exploration strategy

A review of underground tunnel roof mapping.

An inspection of the core sheds and some recent drill core intersections from the property.

Inspection of underground workings at the SGX, HPG, HZG, LM and TLP mines including active resue and shrinkage stopes.

Inspection of the mineral processing and tailings facilities.

Random cross-checks of 10-15% of the mineralized assay results in the database with original assay results from the reporting period.

AMC makes the following observations based on the data verification undertaken:

Site geologists are appropriately trained and are conscious of the specific sampling requirements of narrow-vein, high-grade deposits.

Cross-checking the database with the original assay results did not uncover any significant errors.

In AMC’s opinion, the geological data used to inform the Ying property block model estimates were collected in line with industry good practice as defined in the Canadian Institute of Mining and Metallurgy and Petroleum (CIM) Exploration Best Practice Guidelines and the CIM Mineral Resource, Mineral Reserve Best Practice Guidelines. As such, the data is suitable for use in the estimation of Mineral Resources.

Page 85: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 85

13 Mineral processing and metallurgical testing 13.1 Introduction

The lab scale mineral processing and metallurgical tests for the Ying Property deposits were done by three laboratories in China:

Hunan Nonferrous Metal Research Institute (HNMRI) using SGX mineralization in 2005.

Tongling Nonferrous Metals Design Institute (TNMDI) using HZG mineralization in 2006.

Changsha Design and Research Institute (CDRI) using TLP mineralization in 1994.

The objectives of the lab mineral processing testwork were:

To maximize silver recovery to the lead concentrate.

To develop a process flow sheet with appropriate operating parameters as a basis for the industrial scale implementation of lead, zinc and silver recovery.

To determine the product quality characteristics relative to the relevant national standards.

The metallurgical testing consisted of mineralogical assessment, flotation tests and specific gravity measurements of the mineralized veins.

SGX is the main deposit and the HNMRI work is the most comprehensive; therefore, the lab test results from HNMRI’s study (2005) on SGX mineralization were used for both mill Plant 1 (2005) and Plant 2 (2008) design.

AMC is not aware of any subsequent external Design Institute metallurgical testwork having been carried out, although continual on-site “plant-tuning” occurs.

13.2 Mineralogy

Silvercorp has three principal mining operations on the Ying Property:

SGX, consisting of the SGX and HZG mines in the western part of the block.

HPG, consisting of the HPG mine, also in the western part of the block.

TLP / LM, consisting of the TLP and LM mines in the eastern part of the block.

The mineralization in the SGX-HZG deposits and other deposits in the Ying district occurs as relatively narrow tabular veins that pinch-and-swell along fault-fissure structures.

The mineralogy generally consists of galena and sphalerite plus a variety of silver minerals from native silver to silver sulphides and sulphosalts, some rare, and in the case of TLP / LM mine some silver halides in the upper zones.

The mineralogy specific to each deposit is described below.

SGX Mineralization

In 2005, HNMRI performed petrographic analysis on samples collected for metallurgical test work from veins S14, S16E, and S16W in adit CM102. HNMRI’s study identified the following main mineral occurrences:

Polymetallic sulphide minerals: galena, sphalerite with trace amounts of chalcopyrite, pyrrhotite, hematite, magnetite and arsenopyrite.

Silver minerals: native-silver, B-argentite, and the antimonial sulphosalts: pyrargyrite and stephanite.

Table 13.1 summarizes the mineralogical compositions of blended cores, as feed for flotation tests.

Page 86: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 86

Table 13.1 Mineral composition of the SGX mineralization

Sulphides minerals % Gangue minerals %

Pyrite, pyrrhotite 2.54 Quartz 40

Galena 6.8 Chlorite and sericite 22.5

Sphalerite 7.8 Kaolin and clay minerals 15

Arsenopyrite 0.06 Hornblende and feldspars 4

Chalcopyrite etc. 0.2 Iron oxides, others 1.1

The mineralogical study results show that:

Galena is fine to coarse-grained (0.05 to 0.5 mm) and commonly occurs as a replacement of pyrite. The galena is distributed along the fractures of quartz or other gangue minerals and commonly interlocked with sphalerite and pyrite.

Sphalerite is commonly coarse-grained and ranges from 0.2 to 2.0 mm in size. It is formed by replacing pyrite and enclosed in a skeleton of remaining pyrite.

Table 13.2 summarizes the distribution of silver minerals. Silver appears in two forms:

As silver minerals, including native silver, electrum, tetrahedrite, polybasite, pyrargyrite, and argentite

As electro-replacement in galena, pyrite, and other sulphides. Native sulphides usually range from 0.01 to 0.07 mm in size

Only 4.6% of the silver is associated with gangue minerals.

Table 13.2 Phase distribution of silver (SGX mineralization)

Occurrence g/t % Comments

Native Silver 89.45 23.32 Free silver

Silver Sulphides 136.32 35.54 In tetrahedrite, polybasite, pyrargyrite, and argentite

Silver in Sulphides 140.04 36.51 In galena, sphalerite, pyrite, and chalcopyrite

Enclosed in gangue minerals 17.76 4.63 In quartz etc.

Total 100

An example of the distribution of silver minerals and silver bearing minerals is shown in Figure 13.1.

Page 87: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 87

Figure 13.1 Distribution of silver minerals and silver-bearing minerals

TLP Mineralization

The mineralogical assessment was carried out by the No. 6 Brigade, a China-based Exploration Company, and the main mineral occurrences are:

Metallic sulphide minerals: galena, sphalerite, pyrite and chalcopyrite.

Silver minerals: native silver, argentite-acanthite, freibergite, polybasite, cerargyrite-bromochlorargyrite and canfieldite (a rare silver tin sulphide).

Gangue minerals: quartz, sericite, chlorite, hornblende, feldspars and others.

The composition of the minerals in the blended sample is listed in Table 13.3.

Table 13.3 Mineral composition of the TLP-LM mineralization

Sulphides & Iron Minerals % Gangue Minerals %

Galena 2.1 Carbonate 42.5

Cerusite 0.5 Quartz 30

Anglesite 0.2 Biotite 4.5

Sphalerite 0.2 Chlorite 4.5

Chalcopyrite 0.1 Sericite 2.5

Covellite 0.1 Hornblende 2

Pyrite 0.1 Isiganeite 1.5

Hematite Limonite 6.0 Feldspars 1.4

Clay 2.1

Page 88: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 88

A detailed phase distribution of silver is listed in Table 13.4. Although only 12.7% of the silver is associated with oxides and gangue minerals, 30.9% is as halides; thus only 56.4% is as free silver or associated with sulphide minerals — much lower than was found for SGX.

AMC considers that this could result in lower recoveries for TLP mineralization, although the occurrence of halides is related to surface oxidation and would be expected to decrease at depth.

Table 13.4 Phase distribution of silver (TLP-LM mineralization)

Occurrence g/t % Comments

Native Silver 18.7 13.61 Free silver

Silver Sulphides 42.9 31.22 In freibergite, argentite-acanthite, polybasite

Silver in Sulphides 15.9 11.57 In galena

Absorbed by Fe and Mn Oxides 15.5 11.28 N/A

Silver in Halides 42.4 30.86 In bromochlorargyrite

Enclosed in gangue minerals 2 1.46 N/A

Total 100.00

HPG mineralization

Mineralogical analysis of HPG mineralization shows that:

Common sulphide minerals are galena, sphalerite and tetrahedrite, with lesser amounts of chalcopyrite, pyrargyrite, and other sulfosalts.

Small amounts of acanthite and native silver may occur, but most silver in the veins is present as inclusions in galena or tetrahedrite (silver-bearing tetrahedrite is also known as freibergite).

Copper and gold may increase at depth.

Common gangue minerals are quartz, pyrite, and carbonate, usually siderite or ankerite with distal calcite.

13.3 Metallurgical samples

Samples sent for metallurgical tests are as follows.

SGX mineralization

Blends of the core samples from veins S14, S16E, and S16W in adit CM102 at the SGX mine were used. Compositions of these core samples are listed in Table 13.5.

Table 13.5 Core samples used for ore blending test

Sample Ag (g/t) Pb (%) Zn (%)

No. 1 436.45 0.72 0.87

No. 3 659.75 2.66 13.34

No. 5 314.65 9.67 4.20

In order to better understand the metallurgical characteristics of the SGX mineralization, HNMRI blended these core samples based on the following ratios of No.1: No.3: No.5 of 2.5: 2: 5.55. It was assumed that this blend would be representative of the SGX mineralization and it would represent the expected mill grade. The head grade result of this blended sample is provided in Table 13.6.

Page 89: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 89

Table 13.6 Head grade of blended sample

Pb (%) Zn (%) Cu (%) S (%) As (%) Total Fe (%)

5.88 5.21 0.063 4.02 0.001 2.83

Au (g/t) Ag (g/t) CaO (%) MgO (%) SiO (%) Al2O3 (%)

5.88 386.5 0.063 4.02 0.001 2.83

TLP mineralization

CDRI did some metallurgical work for silver and lead materials on the TLP project in 1994. Two representative bulk samples (Table 13.7) consisting of 110 kg of high-grade mineralization, 111 kg of wall rocks and 304.5 kg of medium grade mineralization, totalling 525.5 kilograms, were collected from several crosscuts and undercut drifts for metallurgical testing. The samples consisted of mainly transition mineralization but also included a small amount of oxide and sulphide materials. Sample No.1 contained more carbonate rock than Sample No.2, which had higher silicate content.

Table 13.7 TLP mineralization samples for metallurgical tests

Samples Ag Grade Pb Grade

(g/t) (%)

Sample 1 187.1 2.37

Sample 2 204.9 2.66

13.4 Metallurgical testwork

Prior to operation of the mines and the construction of Silvercorp’s mills, metallurgical tests by HNMRI and other labs were conducted to address the recoveries of the different types of mineralization (Broili, et al, 2006, Xu et al, 2006, Broili & Klohn, 2007, Broili et al 2008):

TLP mineralization was tested by the CDRI in 1994.

SGX mineralization was tested by HNMRI in May 2005.

HZG mineralization was tested by TNMDI in 2006.

HPG mineralization: No test was done.

Some initial size by size analysis work is summarized in Table 13.8 which shows the grade and distribution of Pb, Zn and Ag vs size fractions for a ball mill stream of 70% -200 mesh. The results indicate that liberation of Pb, Zn and Ag at the grinding target of 70% -200 mesh are sufficient for desired flotation recovery.

Table 13.8 Liberation of Pb, Zn and Ag vs size fractions (70% -200 mesh)

Size

(mm) Yield (%)

Grade Distribution (%)

Pb (%) Zn (%) Ag(g/t) Pb Zn Ag

+0.150 5.59 1.80 4.21 151 1.71 4.45 2.19

-0.150+0.100 12.22 3.99 5.94 278 8.31 13.72 8.78

-0.100+0.074 12.01 5.14 5.95 384 10.51 13.50 11.91

-0.074+0.037 22.43 5.76 6.60 387 22.01 27.98 22.45

-0.037+0.019 21.65 8.93 5.24 511 32.94 21.45 28.56

-0.019+0.010 14.29 7.05 4.03 441 17.16 10.89 16.28

-0.010 11.81 3.66 3.59 322 7.36 8.01 9.83

Total 100.00 5.87 5.29 387 100.00 100.00 100.00

HNMRI’s evaluation did not find any difficulty with gangue minerals associated with the base and precious metal mineralization, but they did find a small fraction of encapsulation of the barren sulphide minerals (pyrite, etc.) with

Page 90: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 90

silver, lead, and zinc sulphide minerals. Due to the coarseness of these minerals, it is expected that adequate liberation during processing will occur to maintain high recoveries.

Thereafter, the main focus was on flotation testwork to maximize lead and, therefore, silver recovery. Both open circuit and closed circuit flotation tests were conducted to derive the final metallurgical performance predictions in line with normal practice.

SGX mineralization

As summarized in previous SGX technical reports, the test work concluded that:

A conventional Pb/Zn separation process by differential flotation (Figure 13.2, closed loop) was developed.

The optimum grinding target for the ore was 70% passing 200 mesh.

The optimum reagent dosage at different addition locations (as shown in Figure 13.2), gives the best metal recovery (refer to Table 13.9) under recommended operating conditions.

Table 13.9 Mass balance for locked cycle test (SGX mineralization)

Grade Recovery

Product Mass Pb Zn Ag Pb Zn Ag

Yield (%) (%) (%) (g/t) (%) (%) (%)

Head 5.88 5.21 386.5

Lead Con. 7.84 68.18 6.24 4,197 90.89 9.39 85.12

Zinc Con. 7.49 2.10 59.61 453.8 2.67 85.67 8.79

Tails 84.67 0.45 0.30 27.8 6.44 4.94 6.09

Total 100 100 100 100

Page 91: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 91

Figure 13.2 Locked cycle flotation flow sheet (SGX mineralization)

TLP mineralization

Under closed conditions and using an 80% -200 mesh feed the CDRI’s lab performed conventional flotation tests and reported the following results (Table 13.10). The test work demonstrates that silver and lead can be easily extracted from the mineralized vein material using a conventional flotation process. AMC notes that silver recovery did not in fact appear to be impacted by the presence of halides.

Table 13.10 Mass balance for locked cycle test (TLP mineralization)

Samples Ag Grade Pb Grade

Ag Recovery

Pb Recovery

(g/t) (%) (%) (%)

Sample 1

Head 187.1 2.37

Conc 5274 66.94 94.71 94.96

Tails 10.25 0.124 5.29 5.04

Total 100 100

Sample 2

Head 204.89 2.66

Conc 5432 61.65 94.12 82.24

Tails 12.5 0.49 5.88 17.76

Total 100 100

Page 92: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 92

HPG mineralization

No mineral processing and metallurgical tests were conducted for the HPG deposit. Silvercorp submitted a development plan to the relevant authority applying for a mining license by using the metallurgical testing results from the TLP silver-lead deposit.

HZG mineralization

TNMDI tested the HZG mineralization which contains low level of copper and zinc. The mass balance is summarized in Table 13.11.

Table 13.11 Mass balance for locked cycle test (HZG mineralization)

Product

Mass

Yield (%)

Grade Recovery (%)

Ag Pb Cu Au Ag Pb Cu Au

(g/t) (%) (%) (%) (%) (%) (%) (%)

Copper Conc 1.53 22026 16.4 19.44 0.29 85.82 9.67 89.98 3.12

Lead Conc 4.39 895.2 50.23 0.433 0.14 10.01 85.03 5.75 4.32

Tailings 94.08 17.4 0.146 0.015 0.14 4.14 5.3 4.27 92.56

Total 100 392.7 2.59 0.33 0.14 100 100 100 100

Grind size optimization

Table 13.12 shows the grade and distribution of Pb, Zn and Ag vs size fractions for a ball mill stream under different grinding targets. The results indicate that:

The minimum grinding target of 65% -200 mesh gave sufficient liberation of Pb, Zn and Ag

The grade recovery performance was relatively insensitive to grind size in the 65 – 75% -200 mesh range, although some small (1%) improvement in silver recovery could be expected at the fine end of this range.

Page 93: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 93

Table 13.12 Grind size optimization test results

Product Yield Grade (%) Recovery (%) -200 mesh

(%) Pb Zn Ag(g/t) Pb Zn Ag (%)

Lead Conc 11.84 43.1 8.61 2,726.8 86.75 19.42 84.65 60

Lead Tails 88.16 0.88 4.80 66.41 13.25 80.58 15.35

Feed Ore 100.00 5.88 5.25 381.4 100.00 100.00 100.00

Lead Conc 11.72 44.19 7.89 2,876.4 88.68 17.65 86.55 65

Lead Tails 88.28 0.75 4.89 59.34 11.32 82.35 13.45

Feed Ore 100.00 5.84 5.24 389.5 100.00 100.00 100.00

Lead Conc 11.3 45.99 7.01 2,965.2 88.69 15.21 87.19 70

Lead Tails 88.7 0.75 4.98 55.5 11.31 84.79 12.81

Feed Ore 100.00 5.86 5.21 384.3 100.00 100.00 100.00

Lead Conc 11.15 46.55 7.15 2,986.0 88.1 15.21 87.5 75

Lead Tails 88.85 0.79 5.00 53.53 11.9 84.79 12.5

Feed Ore 100.00 5.89 5.24 380.5 100.00 100.00 100.00

13.5 Concentrate quality considerations

Table 13.13 shows the product quality expected from both plants.

Table 13.13 Product quality (blends of plants 1 & 2)

Product Content (% unless stated otherwise)

Cu Pb Zn As Total Fe

Lead Conc 0.36 68.1 6.24 0.015 -

Zinc Conc 0.33 2.10 50.00 0.010 1.61

Au (g/t) Ag (g/t) MgO Al2O3 SiO2 F

Lead Conc 0.20 4196 0.13 1.13 - -

Zinc Conc 0.10 454 - - 2.87 0.10

Table 13.13 shows the product chemical composition which indicates that:

The PbS concentrate product is high grade (68-70%Pb). Copper (0.36%) and zinc (6.24%) levels in the lead concentrate are acceptable.

Arsenic levels in the zinc concentrate (0.01% As) are well below the 0.4% As level for a clean grade 3 concentrate.

The product moisture (8%) will be low due to the coarse grind (65% -200 mesh) and, therefore, efficient filtration.

Both lead and zinc concentrate quality are acceptable for the commercial market.

13.6 Summary of testwork outcomes

The mineralogy predicts a metallurgically amenable ore with clean lead-zinc separation by differential flotation and, with the possible exception of silver halides in the upper zones of the TLP deposit, high silver recoveries.

This is confirmed by the metallurgical testwork, and expected performance indices would be:

>90% lead recovery to a high grade (>65%Pb) lead concentrate with >85% silver recoveries.

85% zinc recovery to an acceptable (>50%Zn) zinc concentrate.

Low Cu and acceptable Zn impurity levels in lead concentrates and very low As impurity levels in both concentrates.

No grindability testwork has been carried out but mill throughput has been within or exceeding expectations (see Section 17).

Page 94: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 94

14 Mineral Resource estimates 14.1 Introduction

The Mineral Resource estimates for the SGX, HPG, and HZG deposits were carried out by independent Qualified Person, Dr Adrienne Ross, P.Geo of AMC who takes responsibility for these estimates.

The Mineral Resource estimates for the TLP, LMW, and LME deposits were carried out by Ms K. Zunica of AMC under the supervision of Dr Ross who takes responsibility for these estimates.

The June 2016 Mineral Resources were estimated using a block modelling approach, with 3D ordinary kriging and Datamine’s™ dynamic anisotropy application4 being employed.

The Mineral Resources include material (approximately 25% of the total Mineral Resources) below the lower elevation limit of Silvercorp’s current mining licenses. However, because of the nature of Chinese regulations governing applications for new or extended mining licenses, and because Mineral Resources have been shown to extend below the current lower limit, AMC is satisfied that there is no material risk of Silvercorp not being granted approval to extend the lower depth limit of its licenses to develop these Mineral Resources as and when required  

Table 14.1 shows the Mineral Resources and metal content by mine for the Property as of 30 June 2016. The Mineral Resources are reported above cut-offs after applying a minimum practical mining width of 0.3 m. Diluted grades were estimated for blocks with mineralization widths less than 0.3 m by adding a waste envelope with zero grade. Cut-off grades are based on in situ values in silver equivalent (AgEq) terms in grams per tonne and incorporate mining, processing and G & A costs provided by Silvercorp for each mine and reviewed by AMC. AgEq formula by mine are shown in the footnotes of the table below.

4 Dynamic anisotropy re-orientates the search ellipsoid for each estimated block based on the local orientation of the mineralization

Page 95: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 95

Table 14.1 Mineral Resources and metal content for silver, lead, zinc and gold as of 30 June 2016

Mine Resource Category Tonnes

(Mt) Au (g/t) Ag (g/t) Pb (%) Zn (%)

Metal Contained in Resource

Au (koz)

Ag (Moz)

Pb (kt) Zn (kt)

SGX

Measured 2.67 - 296 5.71 3.06 - 25.46 152.7 81.71

Indicated 3.86 - 271 5.06 2.36 - 33.64 195.5 91.19

Measured + Indicated 6.54 - 281 5.33 2.64 - 59.10 348.2 172.90

Inferred 3.66 - 268 5.14 2.33 - 31.50 187.8 85.23

HZG

Measured 0.33 - 390 1.20 0.24 - 4.14 4.0 0.78

Indicated 0.45 - 297 0.91 0.18 - 4.27 4.1 0.80

Measured + Indicated 0.78 - 336 1.03 0.20 - 8.41 8.0 1.58

Inferred 0.35 - 231 1.22 0.25 - 2.63 4.3 0.87

HPG

Measured 0.69 1.10 88 3.77 1.15 24 1.95 26.0 7.92

Indicated 0.63 1.10 85 2.84 1.15 22 1.72 17.9 7.21

Measured + Indicated 1.32 1.10 87 3.33 1.15 47 3.66 43.8 15.12

Inferred 1.01 1.21 114 3.88 1.09 39 3.69 39.1 10.98

LME

Measured 0.32 - 348 1.64 0.31 - 3.55 5.2 1.0

Indicated 0.93 - 312 2.19 0.49 - 9.33 20.3 4.51

Measured + Indicated 1.25 - 321 2.05 0.44 - 12.88 25.5 5.51

Inferred 0.65 - 326 1.60 0.42 - 6.79 10.3 2.73

LMW

Measured 0.54 - 329 3.44 0.27 - 5.74 18.7 1.49

Indicated 1.93 - 239 2.68 0.31 - 14.84 51.7 6.00

Measured + Indicated 2.47 - 259 2.85 0.30 - 20.58 70.4 7.49

Inferred 1.36 - 250 2.37 0.32 - 10.95 32.2 4.38

TLP

Measured 1.36 - 222 3.76 0.28 - 9.71 51.1 3.80

Indicated 2.60 - 167 3.21 0.31 - 13.97 83.5 7.94

Measured + Indicated 3.96 - 186 3.40 0.30 - 23.68 134.6 11.74

Inferred 3.44 - 196 3.95 0.32 - 21.69 135.6 11.04

Total

Measured 5.91 0.13 266 4.36 1.64 24 50.55 257.6 96.69

Indicated 10.40 0.07 233 3.59 1.13 22 77.76 373.0 117.66

Measured + Indicated 16.31 0.09 245 3.87 1.31 47 128.31 630.6 214.35

Inferred 10.47 0.12 230 3.91 1.10 39 77.25 409.4 115.22

Notes: Measured and Indicated Mineral Resources are inclusive of Mineral Resources from which Mineral Reserves are estimated Metal prices: gold US$1250/troy oz, silver US$19/troy oz, lead US$0.90/lb, zinc US$1.00/lb Exchange rate: RMB 6.50 : US$1.00 Veins factored to minimum extraction width of 0.3 m Cut-off grades: SGX 140 g/t AgEq; HZG 125 g/t AgEq; HPG 125 g/t AgEq; LME 125 g/t AgEq; LMW 130 g/t AgEq TLP 120 g/t AgEq Silver equivalent formulas by mine:

SGX=33.1895*Pb%+23.4590*Zn%+Ag g/t; HZG=31.8736*Pb%+Ag g/t; HPG=33.9925*Pb%+18.3181*Zn%+55.4773*Au g/t+Ag g/t; LME=34.0436*Pb%+Ag g/t; TLP=34.1401*Pb%+Ag g/t; LMW=34.6856*Pb%+Ag g/t;

Exclusive of mine production to 30 June 2016 Rounding of some figures may lead to minor discrepancies in totals

14.2 Data used

Drillholes and underground channel samples

The drillholes and underground channel sample data were provided as tables in csv format, on the 20 July 2016. The tables comprise collar coordinates, downhole surveys, and assays, and were imported and verified in Datamine software. Table 14.2 is a summary of the data used in the Mineral Resource estimation, as well as the

Page 96: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 96

number of veins per mine. The total number of veins that were estimated was 194, and is broken out by mine in Table 14.2.

Table 14.2 Summary of data used

Mine No of veins No. of channel samples No. of drillholes Metres of channel samples Metres of drillcore samples

SGX 39 19,835 1,667 21,216 415,677

HZG 11 3,523 262 3,432 74,390

HPG 20 6,673 537 6,047 130,798

LMW 58 6,317 568 7,411 180,406

LME 17 3,651 305 3,629 83,684

TLP 49 12,403 894 19,460 208,515

Total 194 52,402 4,233 61,195 1,093,470

14.3 Geological interpretation

The interpretation of the mineralized domains was provided by Silvercorp. Silver / lead / zinc mineralization was interpreted on cross section and then linked to form 3D closed solids. The nominal thresholds for the mineralization were 140 g/t AgEq for SGX, HZG and HPG mines, and 120 g/t AgEq for LMW, LME and TLP mines. However, drillhole intersections with zero grade were commonly included to aid interpretation. AMC verified the 3D solids provided by Silvercorp. The 3D solids for each mine are shown in Figure 14.1 to Figure 14.6. 

Figure 14.1 3D view of the SGX mineralization wireframes

Note: Drillhole traces (black). Individual veins are given unique colours to aid visualization. View is towards the northwest. Not to scale.

Page 97: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 97

Figure 14.2 3D view of the HZG mineralization wireframes

Note: Drillhole traces (black). View is towards the west-northwest. Not to scale.

Figure 14.3 3D view of the HPG mineralization wireframes

Note: Drillhole traces (black). View is towards the northwest. Not to scale.

Page 98: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 98

Figure 14.4 3D view of the LMW mineralization wireframes

Note: Drillhole traces (black). Individual veins are given unique colours to aid visualization. View is towards the north. Not to scale.

Figure 14.5 3D view of the LME mineralization wireframes

Note: Drillhole traces (black). Individual veins are given unique colours to aid visualization. View is towards the west. Not to scale.

Page 99: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 99

Figure 14.6 3D view of the TLP mineralization wireframes

Note: Drillhole traces (black). Individual veins are given unique colours to aid visualization. View is towards the north. Not to scale.

14.4 Data preparation

Statistics and compositing

Drillhole sample intervals were selected by the 3D solid wireframes and assigned to individual veins for each of the six mines.

AMC selected a compositing interval by reviewing sample length histograms and by comparing length-weighted raw grade statistics with composited grade statistics. Examples of mineralized sample length histograms from the SGX mine are displayed in Figure 14.7 and Figure 14.8 for channel and drillhole samples respectively. A composite length of 0.3 m was chosen as it does not distort the grade distribution for the mines when compared to the length-weighted raw grade statistics and because it is also the minimum mining width.

A study was conducted on the comparison of channel and drillhole statistics. On a mine by mine basis the channel samples had a higher mean than the drillholes, but on a vein by vein basis this was occasionally reversed. For this reason, it was decided to use the channels samples and drillholes separately, and the populations were never mixed. The channels alone were used for a close spaced sample (CSS) model where they were available, and drillholes alone were used to estimate the rest of the model, termed the BH model.

Page 100: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 100

Figure 14.7 SGX mineralized channel sample length histogram

Figure 14.8 SGX mineralized drillhole sample length histogram

Grade capping

Grade capping is the process of reducing the grade of an outlier sample to a value that is considered to be more representative of the surrounding grade distribution, thereby minimizing the overestimation of adjacent blocks in the vicinity of the outlier.

Page 101: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 101

A capped grade value should not result in an excessively large number of values being capped; typically, this should be less than 5% of the total database. The impact of this capping varies depending on the grade distribution, value of the outliers, and the number of samples in the grade domain.

In order to determine the optimal grade capping strategy, the following steps were undertaken on the composited data for each grade cap exercise:

The skewness of the grade distribution was evaluated by looking at the grade log probability plot and the coefficient of variation statistic. An example of a log probability plot of silver from a domain at the SGX mine is presented in Figure 14.9.

The spatial location of the outlier values, were visually evaluated in DatamineTM to determine if they are clustered (suggesting the existence of a high grade zone within the domain), or randomly distributed (suggesting the presence of outliers that may need to be capped).

An appropriate capped grade was interpreted based on the above criteria and in keeping with the surrounding grade distribution.

A summary of the capping grade for the outliers is presented in Table 14.3.

The raw, uncapped composite and final statistics are presented in

Page 102: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 102

Table 14.4 and Table 14.5 for the 16 most significant veins from the six mines.

Page 103: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 103

Table 14.4 summarizes the channel sample data, while Table 14.5 summarizes the drillhole data.

Capping was carried out on the composite data.

Figure 14.9 Probability plot for silver grades in composited channel samples for vein S8 SGX mine

Page 104: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 104

Table 14.3 Grade capping summary

Mine Sample Type Element No of veins top cut Lowest Top Cut Highest Top Cut

SGX

Channel

Ag (g/t) 10 500 8900

Pb (%) 6 10 80

Zn (%) 7 10 48

Drillhole

Ag (g/t) 5 500 5000

Pb (%) 4 5 70

Zn (%) 4 2 25

HZG*

Area 1

Ag (g/t) 3 3200 3200

Pb (%) 2 12 12

Zn (%) 1 4 4

Area 2

Ag (g/t) 6 4000 4000

Pb (%) 4 15 15

Zn (%) 0 N/A N/A

HPG

Channel

Ag (g/t) 3 800 2900

Au (g/t) 4 7 30

Pb (%) 3 5 30

Zn (%) 5 2 25

Drillhole

Ag (g/t) 2 60 280

Au (g/t) 4 0.8 30

Pb (%) 1 16 16

Zn (%) 1 2 2

TLP

Channel

Ag (g/t) 6 100 5000

Pb (%) 2 6 40

Zn (%) 4 3 10

Drillhole

Ag (g/t) 2 45 300

Pb (%) 0 N/A N/A

Zn (%) 2 0.2 2

LMW

Channel

Ag (g/t) 0 N/A N/A

Pb (%) 1 12 12

Zn (%) 1 4 4

Drillhole

Ag (g/t) 2 75 550

Pb (%) 1 1.5 1.5

Zn (%) 4 0.2 2.5

LME

Channel

Ag (g/t) 1 1000 1000

Pb (%) 1 11 11

Zn (%) 1 6 6

Drillhole

Ag (g/t) 1 3000 3000

Pb (%) 1 7 7

Zn (%) 0 N/A N/A

Note: Veins of the HZG mine were grouped into two areas on the basis of vein orientation in preparation for variography. Grade caps were determined for each area. Other mines showed increased sensitivity to grade capping and were capped on a vein by vein basis.

Page 105: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 105

Table 14.4 Channel sample summary statistics

Mine Vein Statistic Ag (g/t) Pb (%) Zn (%)

Raw Comp Final Raw Comp Final Raw Comp Final

SGX

S2

No. Samples 937 1934 1934 937 1934 1934 937 1934 1934

Minimum 2.5 2.5 2.5 0.01 0.01 0.01 0 0 0

Maximum 8566 8566 7000 79.37 79.37 79.37 44.99 44.99 44.99

Mean 416 419 418 7.17 7.20 7.20 2.76 2.78 2.78

Coeff. Var 1.82 1.75 1.72 1.76 1.67 1.67 1.65 1.57 1.57

S2W2

No. Samples 441 864 864 441 864 864 441 864 864

Minimum 2.5 2.5 2.5 0.01 0.01 0.01 0.01 0.01 0.01

Maximum 6354 6354 6354 77.21 77.21 77.21 37.31 37.31 37.31

Mean 489 492 492 8.38 8.44 8.44 3.04 3.04 3.04

Coeff. Var 1.83 1.78 1.78 1.64 1.57 1.57 1.52 1.45 1.45

S7

No. Samples 1688 3665 3665 1688 3665 3665 1688 3665 3665

Minimum 2.5 2.5 2.5 0 0 0 0 0 0

Maximum 3765 3765 2700 69.78 69.78 66.00 34.77 34.77 30.00

Mean 198 199 198 4.15 4.17 4.17 1.72 1.72 1.72

Coeff. Var 1.96 1.86 1.84 2.11 1.98 1.98 1.90 1.78 1.77

S7_1

No. Samples 1929 3698 3698 1929 3698 3698 1929 3698 3698

Minimum 0.0 0 0 0 0 0 0 0 0

Maximum 3676 3676 3600 74.26 74.26 74.26 56.54 56.54 48.00

Mean 180 181 181 3.87 3.90 3.90 3.90 3.92 3.91

Coeff. Var 2.25 2.16 2.16 2.41 2.30 2.30 1.75 1.68 1.68

S8

No. Samples 2968 6222 6222 2968 6222 6222 2968 6222 6222

Minimum 0.0 0 0 0 0 0 0 0 0

Maximum 7668 7668 7668 78.14 78.14 78.14 36.38 36.38 28.00

Mean 144 144 144 3.29 3.29 3.29 1.42 1.43 1.42

Coeff. Var 3.56 3.48 3.48 2.43 2.34 2.34 2.23 2.16 2.14

S14

No. Samples 2490 3714 3714 2490 3714 3714 2490 3714 3714

Minimum 0.0 0 0 0 0 0 0 0 0

Maximum 10036 10036 8900 81.85 81.85 80.00 52.96 52.96 32.00

Mean 461 464 463 8.10 8.15 8.15 1.70 1.70 1.69

Coeff. Var 2.05 1.91 1.90 1.93 1.81 1.81 1.99 1.92 1.89

S19

No. Samples 981 2078 2078 981 2078 2078 981 2078 2078

Minimum 0.0 2.5 2.5 0 0.01 0.01 0 0 0

Maximum 6824 6824 4400 72.55 61.06 48.00 21.06 21.06 21.06

Mean 213 214 213 3.73 3.73 3.72 1.38 1.38 1.38

Coeff. Var 2.42 2.33 2.27 1.94 1.83 1.82 2.06 2.02 2.02

S21

No. Samples 2338 4071 4071 2338 4071 4071 2338 4071 4071

Minimum 0.0 0 0 0 0 0 0 0 0

Maximum 10630 8190 8190 80.20 80.20 70.00 52.15 41.47 41.47

Mean 210 211 211 3.38 3.40 3.39 2.42 2.42 2.42

Coeff. Var 2.63 2.49 2.49 2.63 2.51 2.51 2.00 1.89 1.89

HPG H17

No. Samples 1,741 5275 5275 1,741 5275 5275 1,741 5275 5275

Minimum 0 0 0 0 0 0 0 0 0

Maximum 14,212 4894 2,900 67.13 67.13 67.13 30.7 30.7 25

Mean 56 55 55 2.39 2.39 2.39 0.73 0.73 0.72

Coeff. Var 3.38 2.68 2.5 2.32 2.28 2.28 2.83 2.77 2.75

Page 106: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 106

Mine Vein Statistic Ag (g/t) Pb (%) Zn (%)

Raw Comp Final Raw Comp Final Raw Comp Final

HZG HZ22

No. Samples 968 1918 1918 968 1918 1918 968 1918 1918

Minimum 0 0 0 0 0 0 0 0 0

Maximum 5674 5674 4000 48.60 48.60 15.00 3.45 3.45 3.45

Mean 178 178 174 0.82 0.82 0.78 0.14 0.14 0.14

Coeff. Var 2.70 2.62 2.44 2.72 2.67 2.10 1.77 1.74 1.74

LMW

LM7

No. Samples 286 1060 1060 286 1060 1060 286 1060 1060

Minimum 0 0 0 0 0 0 0 0 0

Maximum 1,270 1,270 1,270 10.78 10.78 10.78 0.38 0.38 0.38

Mean 80 80 80 0.89 0.89 0.89 0.06 0.06 0.06

Coeff. Var 1.92 1.87 1.87 1.35 1.33 1.33 0.91 0.89 0.89

LM12_1

No. Samples 50 108 108 50 108 108 50 108 108

Minimum 3 3 3 0.01 0.01 0.01 0 0.01 0.01

Maximum 2,106 2,106 2,106 20.65 20.65 20.65 0.84 0.84 0.84

Mean 176 176 176 0.72 0.72 0.72 0.1 0.1 0.1

Coeff. Var 2.52 2.50 2.50 2.58 1.96 1.96 1.49 1.49 1.49

LME LM5E

No. Samples 87 240 240 87 240 240 87 240 240

Minimum 0 0 0 0 0 0 0 0 0

Maximum 3,645 3,645 3,645 23.72 23.72 23.72 4.34 4.34 4.34

Mean 209 209 209 1.51 1.51 1.51 0.26 0.26 0.26

Coeff. Var 2.27 2.26 2.26 2.41 2.39 2.39 1.98 1.98 1.98

TLP

T11

No. Samples 341 969 969 341 969 969 341 969 969

Minimum 1 1 1 0.003 0.003 0.003 0.003 0.003 0.003

Maximum 8,250 8,250 3,000 33 33 33 4.2 4.2 3

Mean 260 260 239 2.58 2.58 2.58 0.11 0.19 0.19

Coeff. Var 2.78 2.76 2.26 1.94 1.93 1.93 2.02 1.8 1.74

T2

No. Samples 2,100 5,252 5,252 2,100 5,252 5,252 2,100 5,252 5,252

Minimum 2 2 2 0.003 0.003 0.003 0.003 0.003 0.003

Maximum 6,093 6,093 5,000 69.67 53.36 40 17.5 17.5 10

Mean 76 76 75 2.49 2.49 2.49 0.18 0.15 0.17

Coeff. Var 3.39 3.33 3.2 1.87 1.78 1.77 3.36 3.25 2.79

T3

No. Samples 2,081 5,748 5,748 2,081 5,748 5,748 2,081 5,748 5,748

Minimum 2 2 2 0.003 0.003 0.003 0.003 0.003 0.003

Maximum 2,941 1,900 1,900 68 68 68 3.14 3.14 3

Mean 51 51 51 1.94 1.94 1.94 0.11 0.11 0.11

Coeff. Var 2.71 2.64 2.64 2.04 1.98 1.98 2.02 1.96 1.96

Page 107: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 107

Table 14.5 Drillhole sample summary statistics

Mine Vein Statistic Ag (g/t) Pb (%) Zn (%)

Raw Comp Final Raw Comp Final Raw Comp Final

SGX

S2

No. Samples 252 734 734 252 734 734 252 734 734

Minimum 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00

Maximum 3725 3725 2600 62.24 55.11 55.11 15.99 14.70 14.70

Mean 114 114 109 1.70 1.70 1.70 0.85 0.85 0.85

Coeff. Var 3.35 3.29 3.06 3.17 2.97 2.97 2.37 2.31 2.31

S2W2

No. Samples 79 258 258 79 258 258 79 258 258

Minimum 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00

Maximum 2933 2933 2933 72.88 72.88 72.88 17.84 17.84 17.84

Mean 245 249 249 5.33 5.42 5.42 1.11 1.11 1.11

Coeff. Var 2.41 2.34 2.34 2.83 2.74 2.74 2.41 2.38 2.38

S7

No. Samples 591 1630 1630 591 1630 1630 591 1630 1630

Minimum 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00

Maximum 1938 1938 1938 61.61 60.08 60.08 13.43 13.43 13.43

Mean 54 54 54 1.14 1.14 1.14 0.51 0.51 0.51

Coeff. Var 3.19 3.07 3.07 3.81 3.56 3.56 2.52 2.49 2.49

S7_1

No. Samples 489 1577 1577 489 1577 1577 489 1577 1577

Minimum 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00

Maximum 3479 3479 3479 81.45 81.45 70.00 27.40 27.40 27.40

Mean 140 141 141 2.31 2.32 2.30 1.49 1.49 1.49

Coeff. Var 2.58 2.50 2.50 3.61 3.51 3.46 2.37 2.30 2.30

S8

No. Samples 548 1681 1681 548 1681 1681 548 1681 1681

Minimum 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00

Maximum 1366 1366 1366 62.87 62.87 40.00 24.30 24.30 24.30

Mean 35 35 35 1.11 1.11 1.09 0.41 0.40 0.40

Coeff. Var 3.51 3.44 3.44 3.53 3.44 3.31 4.64 4.59 4.59

S14

No. Samples 306 651 651 306 651 651 306 651 651

Minimum 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00

Maximum 8205 8205 5000 61.24 58.52 58.52 29.73 29.73 29.73

Mean 153 153 148 2.05 2.02 2.02 0.51 0.51 0.51

Coeff. Var 4.02 3.85 3.58 3.73 3.62 3.62 3.37 3.35 3.35

S19

No. Samples 235 769 769 235 769 769 235 769 769

Minimum 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00

Maximum 1725 1725 1725 73.94 73.94 73.94 29.15 29.15 29.15

Mean 102 103 103 2.03 2.04 2.04 0.66 0.66 0.66

Coeff. Var 2.51 2.45 2.45 3.45 3.29 3.29 2.92 2.81 2.81

S21

No. Samples 260 932 932 260 932 932 260 932 932

Minimum 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00

Maximum 5936 5936 5936 65.61 65.61 65.61 21.70 17.50 17.50

Mean 124 124 124 1.66 1.66 1.66 0.83 0.84 0.84

Coeff. Var 4.07 3.97 3.97 4.29 4.19 4.19 2.57 2.47 2.47

HPG H17

No. Samples 257 935 935 257 935 935 257 935 935

Minimum 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00

Maximum 606 606 606 29.15 29.15 29.15 29.85 29.85 29.85

Mean 25 25 25 1.04 1.03 1.03 0.90 0.90 0.90

Coeff. Var 2.34 2.32 2.32 2.80 2.76 2.76 3.50 3.44 3.44

Page 108: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 108

Mine Vein Statistic Ag (g/t) Pb (%) Zn (%)

Raw Comp Final Raw Comp Final Raw Comp Final

HZG HZ22

No. Samples 161 659 659 161 659 659 161 659 659

Minimum 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00

Maximum 3339 3339 3339 24.64 24.64 15.00 16.06 16.06 4.00

Mean 69 69 69 0.36 0.36 0.33 0.10 0.10 0.08

Coeff. Var 3.12 3.08 3.08 4.54 4.53 3.77 7.58 6.92 3.19

LMW

LM7

No. Samples 297 1,210 1,210 297 1,210 1,210 297 1,210 1,210

Minimum 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00

Maximum 2,260 1,539 1,539 11.92 11.70 11.70 7.24 7.24 2.50

Mean 56 55 55 0.68 0.68 0.68 0.11 0.11 0.09

Coeff. Var 2.91 2.78 2.78 1.82 1.76 1.76 4.83 4.77 2.71

LM12_1

No. Samples 148 400 400 148 400 400 148 400 400

Minimum 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00

Maximum 2,250 2,250 2,250 21.28 21.28 21.28 2.01 2.01 2.01

Mean 66 66 66 0.74 0.70 0.70 0.07 0.06 0.06

Coeff. Var 3.78 3.84 3.84 3.79 3.74 3.74 3.08 3.03 3.03

LME LM5E

No. Samples 222 808 808 222 808 808 222 808 808

Minimum 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00

Maximum 3,720 3,720 3,720 32.45 32.45 32.45 8.94 8.71 8.71

Mean 110 110 110 1.01 1.01 1.01 0.24 0.24 0.24

Coeff. Var 3.11 2.92 2.92 3.91 3.71 3.71 3.33 3.13 3.13

TLP

T11

No. Samples 90 304 304 90 304 304 90 304 304

Minimum 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00

Maximum 4,210 4,210 4,210 18.43 18.43 18.43 2.78 2.78 2.78

Mean 162 162 162 1.20 1.20 1.20 0.20 0.20 0.20

Coeff. Var 3.47 3.33 3.33 2.10 2.04 2.04 1.77 1.74 1.74

T2

No. Samples 566 2,184 2,184 566 2,184 2,184 566 2,546 2,546

Minimum 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00

Maximum 2,154 2,154 2,154 56.09 56.09 56.09 8.02 7.76 7.76

Mean 105 2.26 2.26 1.82 1.82 1.82 0.11 0.11 0.11

Coeff. Var 2.3 12.18 12.18 2.48 2.44 2.44 4.40 4.35 4.35

T3

No. Samples 718 2,552 2,552 718 2,552 2,552 718 2,552 2,552

Minimum 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00

Maximum 2,630 2,630 2,630 41.20 41.20 41.20 10.36 10.36 10.36

Mean 106 106 106 1.96 1.96 1.96 0.10 0.10 0.10

Coeff. Var 2.73 2.70 2.70 2.23 2.18 2.18 5.26 5.10 5.10

14.5 Block model

Block model parameters

The block models were horizontally rotated to align parallel with the strike of the veins. Two distinct groups of vein orientations are present in each mine and so two different models with different rotations were produced for each mine (Areas 1 and 2 in the following tables). This is addition to the CSS and BH model for each mine making a total of 24 models for the six mines. Parent cell dimensions were determined by the average sample spacing in longitudinal projection. The block models were also regularized for output to Micromine™ mining software after grade estimation. The block model parameters are shown in Table 14.6 and Table 14.7 for the CSS model, BH model. Table 14.8 shows the parameters for regularized block models provided to Silvercorp for use in MicromineTM for internal purposes.

Page 109: Silvercorp ying-technical-report-master 23-feb_2017-final

NI 43-101 Technical Report Silvercorp Metals inc #####

amcconsultants.com 109

Table 14.6 CSS block model parameters

SGX HPG HZG LME LMW TLP

Parameter Area 1 Area 2 Area 1 Area 2 Area 1 Area 2 Area 1 Area 2 Area 1 Area 2 Area 1 Area 2

Rotation 0 30 0 54 0 35 40 0 70 -40 40 0

Ori

gin

(m

)

Easting 522,765 521,720 526,040 525,645 523,144 522,400 532,600 533,870 531,315 532,580 531,977 532,845

Northing 3,780,200 3,781,440 3,783,155 3,783,420 3,778,201 3,778,880 3,778,285 3,779,000 3,780,555 3,778,575 3,780,305 3,779,772

RL -208 -710 275 -537 158 155 -50 285 170 275 50 391

Par

ent

cell

dim

en

sio

n (

m) Easting 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9

Northing 10 10 10 10 10 10 10 10 10 10 10 10

RL 10 10 10 10 10 10 10 10 10 10 10 10

Nu

mb

er

of

cells

Easting 1355 1978 873 1167 1489 1407 889 500 2380 1578 1925 1295

Northing 352 365 99 240 261 255 300 150 180 216 303 189

RL 105 158 51 144 90 90 135 120 105 90 126 75

Table 14.7 BH block model parameters

SGX HPG HZG LME LMW TLP

Parameter Area 1 Area 2 Area 1 Area 2 Area 1 Area 2 Area 1 Area 2 Area 1 Area 2 Area 1 Area 2

Rotation 0 30 0 54 0 35 40 0 70 -40 40 0

Ori

gin

(m

)

Easting 522,250 521,720 526,040 525,645 523,144 522,400 532,600 533,870 531,315 532,580 531,977 532,845

Northing 3,782,330 3,781,440 3,783,155 3,783,420 3,778,201 3,778,880 3,778,285 3,779,000 3,780,555 3,778,575 3,780,305 3,779,772

RL -360 -710 275 -537 158 155 -50 285 170 275 50 391

Par

ent

cell

dim

en

sio

n (

m) Easting 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9

Northing 30 30 30 30 30 30 30 30 30 30 30 30

RL 30 30 30 30 30 30 30 30 30 30 30 30

Nu

mb

er

of

cells

Easting 1355 1978 873 1167 1489 1407 889 500 2380 1578 1925 1265

Northing 117 122 33 80 87 85 100 50 60 72 101 63

RL 35 53 17 48 30 30 45 40 35 30 42 25

Page 110: Silvercorp ying-technical-report-master 23-feb_2017-final

NI 43-101 Technical Report Silvercorp Metals inc #####

amcconsultants.com 110

Table 14.8 Regularized block model parameters

SGX HPG HZG LME LMW TLP

Parameter Area 1 Area 2a* Area 2b Area 1 Area 2 Area 1 Area 2 Area 1 Area 2 Area 1 Area 2 Area 1 Area 2

Rotation 0 30 30 0 54 0 35 40 0 70 -40 40 0

Ori

gin

(m

) Easting 522,76

5 521,720 522,594.512

5 526,040 525,645 524,014 522,400 532,600 533,870 531,315 532,580 531,977 532,845

Northing 3,780,2

00 3,781,44

0 3,780,935

3,783,155

3,783,420

3,779,344

3,778,880

3,778,285

3,779,000

3,780,555

3,778,575

3,780,305

3,779,772

RL -208 -710 -710 275 -537 209 155 -50 285 170 275 -50 391

Par

ent

cell

dim

en

sio

n (

m) Easting 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9

Northing 2 2 2 2 2 2 2 2 2 2 2 2 2

RL 2 2 2 2 2 2 2 2 2 2 2 2 2

Nu

mb

er

of

cells

Easting 1355 1122 856 275 1667 514 1367 889 500 2380 1578 1925 1295

Northing 1755 1830 1830 873 1200 710 990 1500 750 900 1080 1515 945

RL 525 795 795 495 720 375 390 675 600 525 450 630 375

Note: Due to the size of Area 2 of the SGX regularized model, it needed to be split into two separate models Area 2a and 2b.

Page 111: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 111

Table 14.9 lists the block model fields for the regularized block model, which was the final output block model.

Table 14.9 Regularized block model fields

Field Description

IJK Identification number

XC Block's centroid X coordinate

YC Block's centroid Y coordinate

ZC Block's centroid Z coordinate

MINED 0 - not mined, 1 - mined out, 2 - tunnel, 3 – write-off

DENSITY Bulk density calculated from formula

VOL Volume of cell containing mineralized vein (XINC*YINC*ZINC)

TONNES Undiluted tonnes

AG Estimated silver grade undiluted (g/t)

PB Estimated lead grade undiluted (%)

ZN Estimated zinc grade undiluted (%)

AU Estimated gold grade undiluted (g/t) (HPG only)

AQEQ Silver equivalent grade (g/t)

TRDIP True dip

TRDIPDIR True dip direction

MINPROP Proportion of the cell containing mineralized vein

ESTDOM Unique code for each vein

RESCAT Classification (1- measured, 2 - Indicated, 3- Inferred)

XINC Cell dimension in X

YINC Cell dimension in Y

ZINC Cell dimension in Z

XMORIG X coordinate of model origin in world coordinate system

YMORIG Y coordinate of model origin in world coordinate system

ZMORIG Z coordinate of model origin in world coordinate system

NX Number of cells in X direction

NY Number of cells in Y direction

NZ Number of cells in Z direction

X0 X coordinate of model origin in local coordinate system

Y0 Y coordinate of model origin in local coordinate system

Z0 Z coordinate of model origin in local coordinate system

ANGLE1 First rotation angle, in degrees.

ANGLE2 Second rotation angle, in degrees.

ANGLE3 Third rotation angle, in degrees.

ROTAXIS1 Rotation axis 3 means rotation around Z axis

ROTAXIS2 Rotation axis 0 means no rotation

ROTAXIS3 Rotation axis 0 means no rotation

Note: Grey = rotated models only

14.6 Variography and grade estimation

Variography

Variographic analysis characterizes the average spatial continuity for a spatially located variable. An experimental variogram displays the grade continuity in a specified direction and variogram models are manually fitted to the experimental variograms in three orthogonal directions (3D). The 3D variogram models are then used to assign

Page 112: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 112

the appropriate kriging weights in the estimation process, taking into account the average spatial characteristics of the underlying grade distribution.

Variography methodology

3D normal score variograms were modelled in Supervisor™ geostatistical software as they were found to give better variogram structures than a traditional variogram. A normal score transform converts the approximately log-normal distribution of the original sample data to a normal distribution with a mean of zero. Original values and their equivalent transformed values are stored in a table to allow the results to be back-transformed after variographic analysis. The following method was applied to all mines:

1. Veins were grouped according to their dip and strike.

2. Experimental variograms were produced in a plane aligned with the mean dip and strike of the vein group for each vein group and each grade variable.

3. Double spherical variogram models were manually fitted to the experimental variograms. The across-strike dimension was sometimes not modelled due to a lack of sample pairs at the appropriate distance. In these cases, reasonable variographic parameters were applied.

4. The normal score variograms were back-transformed to reproduce the raw variogram model for input into Datamine™.

An example of modelled variograms from the SGX mine is displayed in Figure 14.10.

Page 113: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 113

Figure 14.10 Silver variograms: SGX variography Area 1

Estimation method

Silver, lead, and zinc grades were estimated into the block models using 3D ordinary kriging and Datamine’s™ dynamic anisotropy application. Dynamic anisotropy re-orientates the search ellipsoid for each estimated block based on the local orientation of the mineralization. Gold was also estimated for HPG. The following summarizes the estimation method:

Each vein was estimated independently of the other veins.

Two estimates were run for each vein with different parent cell dimensions.

Page 114: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 114

— The CSS estimate using only channel samples was run with parent cell dimensions of 0.9 mE × 10 mN × 10 mRL.

— The BH model estimate using only drillhole samples was run with parent cell dimensions of 0.9mE × 30 mN × 30 mRL.

— After the estimation was complete, the CSS and BH models were merged with the CSS block model overprinting the BH model.

Subcells were used to fill the mineralization wireframes with minimum dimensions of 0.075 mE × 2 mN × 2 mRL.

The BH model estimate and the CSS estimate did not use octant searching.

Discretization was set to 3 × 3 × 3 (XYZ).

Search parameters are detailed in Tables 14.10 and 14.11 by pass for the CSS model and BH model respectively.

Table 14.10 Search parameters CSS block model

Pass Search

distance down-dip

Search distance along-strike

Search distance across- strike

Minimum number of samples

Maximum number of samples

Octant search

Maximum samples per

drillhole

1 60 60 60 6 16 No 2

2 60 60 60 2 16 No 2

Table 14.11 Search parameters BH block model

Pass Search

distance down-dip

Search distance along-strike

Search distance across strike

Minimum number of samples

Maximum number of samples

Octant search

Maximum samples per

drillhole

1 50 50 75 6 16 No 2

2 100 100 150 6 16 No 2

3 100 100 150 1 16 No 2

To arrive at the above parameters, a study was carried out on the LME mine to assess the results of changing the following: maximum number of samples, octants on or off, search parameter distances.

The results were highly variable demonstrating that the vein characteristics are all different. However, to achieve a reasonable global estimate, the above parameters are fair.

An example of the estimation passes is displayed for the S8 vein of the SGX mine in Figure 14.11.

Page 115: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 115

Figure 14.11 Estimation pass longitudinal projection SGX mine: vein S8

Note: Samples shown as black dots. Model coloured by estimation pass (legend displayed). Not to scale.

Mining depletion

Mining depletion and write offs were coded into the block models using wireframes prepared by Silvercorp, which were based on survey information to 30 June 2016. An example of the depletion coding is displayed for the S8 vein of the SGX mine in Figure 14.12.

Figure 14.12 Mining depletion longitudinal projection SGX mine: vein S8

Note: Samples shown as black dots. Model coloured by depletion code (legend displayed). Not to scale.

Page 116: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 116

Minimum mining width

A minimum mining width of 0.3 m was coded into the model before applying the cut-off grade and reporting the Mineral Resource to assist in defining reasonable prospects of economic extraction. This was accomplished using the following method:

Blocks were accumulated in the block model filling direction, which was approximately the across-strike direction of the vein

True thickness of the vein was found by applying angular corrections that accounted for the differences between the block filling direction and the vein orientation.

Waste with zero grade was added where the true thickness was <0.3 m to make up the difference, and the diluted grade was calculated.

An example of true thickness coding in the model is shown in Figure 14.13.

Figure 14.13 True thickness longitudinal projection SGX mine: vein S8

Note: Samples shown as black dots. Model coloured by true thickness (legend displayed). Not to scale.

14.7 Resource classification

AMC classified the Mineral Resources with consideration of the narrow-vein style of mineralization, the observed grade continuity, and the sample spacing in longitudinal projection. Smoothing was implemented to remove isolated blocks of one category that were surrounded by blocks of another category. An example of the Mineral Resource classification is displayed in Figure 14.14. The following set of parameters was used as a guide to ensure that the construction of Mineral Resource category wireframes was consistent across the 194 veins that currently comprise the Mineral Resource:

1. Measured Resource

a. Measured Resources are defined by the presence of exploration tunneling. The boundary of Measured Resources is determined by extrapolating 20-25 m up and down dip from the exploration tunnels.

b. No Measured Resources are extrapolated along strike from the ends of an exploration tunnel.

2. Indicated Resource

c. Indicated Resources are defined by either exploration drilling or exploration tunneling.

Page 117: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 117

d. A basic drilling grid of 50 m (along strike) × 100 m (up and down dip) is used to delineate Indicated Resources. A minimum of three holes is required to define an Indicated Resource block. Boundaries of drill-defined Indicated Resource Blocks are determined by extrapolating 25 m along strike and 50 m up and down dip from the hole closest to the boundary.

e. Boundaries of tunnel-defined Indicated Resources are defined by extrapolating 40-50 m up and down dip from the exploration tunnel.

f. No Indicated Resources are extrapolated along strike from the ends of exploration tunnel

3. Inferred Resource

g. Inferred Resources are either defined by low-density holes or extrapolated from drill-defined Indicated Resource blocks.

h. Boundaries of Inferred Resource are determined by extrapolating 50 m along strike and 100 m up and down dip from the hole closest to the boundary.

i. No Inferred Resources are extrapolated from exploration tunnels.

Figure 14.14 Mineral Resource classification longitudinal projection SGX mine: vein S8

Note: Samples shown as black dots. Model coloured by Mineral Resource category (legend displayed). Not to scale.

14.8 Block model validation

The block models were validated by visual checks, statistical comparisons and swath plots.

Visual checks were carried out to ensure that the estimated grades were consistent with the drillhole grades and to check that the estimated grade distribution was consistent with the style of mineralization. Figure 14.15 shows an example of the drillhole composite silver equivalent grades compared to the block model estimated grades for part of the S8 vein of the SGX mine. The figure shows good agreement between the drillhole composite grades and the estimated block model grades.

Page 118: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 118

Figure 14.15 Silver equivalent grade longitudinal projection SGX mine: vein S8

Note: Drillhole and channel composites: coloured dots, Model: coloured open squares. Drillhole composites and model coloured by silver equivalent grade (legend displayed). White areas are splays and unclassified resources.

Table 14.2 shows the statistical comparison of the channel composites versus the channel block model grades for silver, lead and zinc in the eight largest veins of the SGX deposit. The table shows that the mean grades in the block model are predominantly lower than the composites that were used to inform them. When declustered composites are used for the comparison, the relationship is reversed. The relationships for the other mines are broadly similar. AMC considers that this is a reflection of the high variability of the grades within the deposits. In all cases, when declustering is used for the comparison the results are very sensitive to the declustering grid parameters.

Page 119: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 119

Table 14.12 SGX grade statistics for block model vs composites: eight largest veins

Mine Vein Statistic Ag (g/t) Pb (%) Zn (%)

Comp BM Comp BM Comp BM

SGX

S2

No. Samples 1934 174003 1934 174003 1934 174003

Minimum 2.5 0 0.01 0 0 0

Maximum 7000 3363 79.37 46.29 44.99 19.77

Mean 418 349 7.20 6.65 2.78 2.33

Coeff. Var 1.72 1.19 1.67 1.19 1.57 0.98

S2W2

No. Samples 864 78967 864 78967 864 78967

Minimum 2.5 0 0.01 0 0.01 0

Maximum 6354 3704 77.21 43.62 37.31 21.34

Mean 492 471 8.44 7.95 3.04 2.93

Coeff. Var 1.78 1.20 1.57 1.03 1.45 0.90

S7

No. Samples 3665 318111 3665 318111 3665 318111

Minimum 2.5 0 0 0 0 0

Maximum 2700 2160 66 32.89 30 18.27

Mean 198 138 4.17 2.67 1.72 1.46

Coeff. Var 1.84 1.40 1.98 1.42 1.77 1.23

S7_1

No. Samples 3698 228095 3698 228095 3698 228095

Minimum 0 0 0 0 0 0

Maximum 3600 2531 74.26 41.36 48 27.23

Mean 181 170 3.90 3.96 3.91 3.32

Coeff. Var 2.16 1.43 2.30 1.38 1.68 1.12

S8

No. Samples 6222 458043 6222 458043 6222 458043

Minimum 0 0 0 0 0 0

Maximum 7668 4246 78.14 40.54 28 18.78

Mean 144 134 3.29 3.38 1.42 1.13

Coeff. Var 3.48 2.05 2.34 1.64 2.14 1.6

S14

No. Samples 3714 241332 3714 241332 3714 241332

Minimum 0 0 0 0 0 0

Maximum 8900 3914 80.00 69.39 32 18.96

Mean 463 375 8.15 6.63 1.69 1.41

Coeff. Var 1.90 1.38 1.81 1.41 1.89 1.21

S19

No. Samples 2078 223942 2078 223942 2078 223942

Minimum 2.5 0 0.005 0 0 0

Maximum 4400 2780 48.00 31.93 21.06 13.32

Mean 213 187 3.72 3.54 1.38 1.42

Coeff. Var 2.27 1.65 1.82 1.20 2.02 1.33

S21

No. Samples 4071 221303 4071 221303 4071 221303

Minimum 0 0 0 0 0 0

Maximum 8190 2978 70.00 39.91 41.47 22.5

Mean 211 177 3.39 3.01 2.42 2.21

Coeff. Var 2.49 1.39 2.51 1.54 1.89 1.19

Page 120: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 120

Figure 14.16 S8 silver swath plot by northing

Figure 14.17 S8 silver swath plot by elevation

Page 121: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 121

Figure 14.18 S8 lead swath plot by northing

Figure 14.19 S8 lead swath plot by elevation

Page 122: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 122

Figure 14.20 S8 zinc swath plot by northing

Figure 14.21 S8 zinc swath plot by elevation

Page 123: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 123

Figure 14.22 T3 silver swath plot by northing

Figure 14.23 T3 silver swath plot by elevation

Page 124: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 124

Figure 14.24 T3 lead swath plot by northing

Figure 14.25 T3 lead swath plot by elevation

Page 125: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 125

Figure 14.26 T3 zinc swath plot by northing

Figure 14.27 T3 zinc swath plot by elevation

Page 126: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 126

14.9 Mineral Resource estimates

The Mineral Resource estimates for the Ying property as at 30 June 2016 are shown in Table 14.1 at the beginning of this section.

Long projections showing the silver equivalent grades with supporting data and classification for some of the largest veins on the Ying property are displayed in Figure 14.28 to 14.41.

AMC is not aware of any known environmental, permitting, legal, title, taxation, socio economic, marketing, political, or other similar factors which could materially affect the stated Mineral Resource estimates.

Figure 14.28 SGX S2 long projection Mineral Resource

Note: Samples shown as black dots. Model coloured by silver equivalent grade (legend displayed). Resource category outlines displayed as black dashed lines and annotated. Not to scale.

Page 127: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 127

Figure 14.29 SGX S7 long projection Mineral Resource

Note: Samples shown as black dots. Model coloured by silver equivalent grade (legend displayed). Resource category outlines displayed as black dashed lines and annotated. White section is a splay. Not to scale.

Page 128: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 128

Figure 14.30 SGX S7_1 long projection Mineral Resource

Note: Samples shown as black dots. Model coloured by silver equivalent grade (legend displayed). Resource category outlines displayed as black dashed lines and annotated. Not to scale.

Page 129: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 129

Figure 14.31 SGX S8 long projection Mineral Resource

Note: Samples shown as black dots. Model coloured by silver equivalent grade (legend displayed). Resource category outlines displayed as black dashed lines and annotated. Not to scale.

Page 130: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 130

Figure 14.32 SGX S14 long projection Mineral Resource

Note: Samples shown as black dots. Model coloured by silver equivalent grade (legend displayed). Resource category outlines displayed as black dashed lines and annotated. Not to scale.

Page 131: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 131

Figure 14.33 SGX S2W2 long projection Mineral Resource

Note: Samples shown as black dots. Model coloured by silver equivalent grade (legend displayed). Resource category outlines displayed as black dashed lines and annotated. Not to scale.

Page 132: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 132

Figure 14.34 SGX S19 long projection Mineral Resource

Note: Samples shown as black dots. Model coloured by silver equivalent grade (legend displayed). Resource category outlines displayed as black dashed lines and annotated. Not to scale.

Page 133: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 133

Figure 14.35 SGX S21 long projection Mineral Resource

Note: Samples shown as black dots. Model coloured by silver equivalent grade (legend displayed). Resource category outlines displayed as black dashed lines and annotated. Not to scale.

Page 134: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 134

Figure 14.36 HPG H17 long projection Mineral Resource

Note: Samples shown as black dots. Model coloured by silver equivalent grade (legend displayed). Resource category outlines displayed as black dashed lines and annotated. Not to scale.

Page 135: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 135

Figure 14.37 HZG HZ22 long projection Mineral Resource

Note: Samples shown as black dots. Model coloured by silver equivalent grade (legend displayed). Resource category outlines displayed as black dashed lines and annotated. Not to scale.

Page 136: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 136

Figure 14.38 LME LM5 long projection Mineral Resource

Note: Samples shown as black dots. Model coloured by silver equivalent grade (legend displayed). Resource category outlines displayed as black dashed lines and annotated. White internal to block model is showing depletion. Not to scale.

Page 137: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 137

Figure 14.39 TLP T1 long projection Mineral Resource

Note: Samples shown as black dots. Model coloured by silver equivalent grade (legend displayed). Resource category outlines displayed as black dashed lines and annotated. White internal to block model is showing depletion. Not to scale.

Page 138: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 138

Figure 14.40 TLP T2 long projection Mineral Resource

Note: Samples shown as black dots. Model coloured by silver equivalent grade (legend displayed). Resource category outlines displayed as black dashed lines and annotated. White internal to block model is showing depletion. Not to scale.

Page 139: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 139

Figure 14.41 TLP T3 long projection Mineral Resource

Note: Samples shown as black dots. Model coloured by silver equivalent grade (legend displayed). Resource category outlines displayed as black dashed lines and annotated. White internal to block model is showing depletion. Not to scale.

14.10 Comparison with Resource Estimate as at 31 June 2013

The most recently published Resource estimate on the Property is contained in the June 2012 Technical Report, with Mineral Resources estimated in that report to 31 June 2013. A comparison between the 2013 and 2016 Mineral Resource estimates in shown in Table 14.13. Changes since the 2013 estimate include:

224,729 m additional resource-definition drilling.

128,385 m additional level development on mineralization.

Ongoing depletion and sterilization due to mining.

Updated AgEq formulas and cut-off grades for each mine.

Page 140: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 140

Table 14.13 Comparison of 2013 and 2016 Mineral Resource estimates

Mine Resource category Tonnes

(Mt)

Ag Pb Zn Au

g/t Metal (Moz)

% Metal (kt)

% Metal (kt)

g/t Metal (koz)

SGX

2016 MS+ID 6.54 281 59.1 5.33 348.2 2.64 172.9 - -

2016 IF 3.66 268 31.5 5.14 187.8 2.33 85.23 - -

2013 MS+ID 5.07 276 45.06 5.17 262.1 2.71 137.4 - -

2013 IF 2.8 282 25.42 4.55 127.5 2.01 56.2 - -

Difference MS+ID (%) 29% 2% 31% 3% 33% -3% 26%    

Difference IF (%) 31% -5% 24% 13% 47% 16% 52%

HZG

2016 MS+ID 0.78 336 8.41 1.03 8 0.2 1.58 - -

2016 IF 0.35 231 2.63 1.22 4.3 0.25 0.87 - -

2013 MS+ID 0.67 371 7.94 1.5 10 0.2 1.4 - -

2013 IF 0.17 374 2.02 1.01 1.7 0.19 0.3 - -

Difference MS+ID (%) 16% -9% 6% -31% -20% 0% 13%

Difference IF (%) 106% -38% 30% 21% 153% 32% 190%

HPG

2016 MS+ID 1.32 87 3.66 3.33 43.8 1.15 15.12 1.1 47

2016 IF 1.01 114 3.69 3.88 39.1 1.09 10.98 1.21 39

2013 MS+ID 1.16 107 4 4.71 54.6 1.24 14.3 1.17 43.8

2013 IF 0.43 77 1.05 3.88 16.5 1.55 6.6 1.07 14.6

Difference MS+ID (%) 14% -19% -9% -29% -20% -7% 6% -6% 7%

Difference IF (%) 135% 48% 251% 0% 137% -30% 66% 13% 167%

LME

2016 MS+ID 1.25 321 12.88 2.05 25.5 0.44 5.51 - -

2016 IF 0.65 326 6.79 1.6 10.3 0.42 2.73 - -

2013 MS+ID 1.15 327 12.11 1.45 16.7 0.35 4 - -

2013 IF 0.6 294 5.67 1.46 8.8 0.45 2.7 - -

Difference MS+ID (%) 9% -2% 6% 41% 53% 26% 38% - -

Difference IF (%) 8% 11% 20% 10% 17% -7% 1% - -

LMW

2016 MS+ID 2.47 259 20.58 2.85 70.4 0.3 7.49 - -

2016 IF 1.36 250 10.95 2.37 32.2 0.32 4.38 - -

2013 MS+ID 2.08 255 17.1 2.58 53.7 0.27 5.7 - -

2013 IF 1.44 313 14.46 2.15 30.9 0.31 4.5 - -

Difference MS+ID (%) 19% 2% 20% 10% 31% 11% 31% - -

Difference IF (%) -6% -20% -24% 10% 4% 3% -3% - -

TLP

2016 MS+ID 3.96 186 23.68 3.4 134.6 0.3 11.74 - -

2016 IF 3.44 196 21.69 3.95 135.6 0.32 11.04 - -

2013 MS+ID 3.88 169 21.1 2.97 115.1 0.25 9.8 - -

2013 IF 2.09 176 11.88 2.87 60.1 0.22 4.6 - -

Difference MS+ID (%) 2% 10% 12% 14% 17% 20% 20% - -

Difference IF (%) 65% 11% 83% 38% 126% 45% 140% - -

Total

2016 MS+ID 16.31 245 128.31 3.87 630.6 1.31 214.35 1.1 47

2016 IF 10.47 230 77.25 3.91 409.4 1.1 115.22 1.21 39

2013 MS+ID 14.01 237 107.3 3.64 512.2 1.22 172.6 1.17 43.8

2013 IF 7.53 251 60.5 3.26 245.5 0.99 74.9 1.07 14.6

Difference MS+ID (%) 16% 3% 20% 6% 23% 7% 24% -6% 7%

Difference IF (%) 39% -8% 28% 20% 67% 11% 54% 13% 167%

Page 141: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 141

The following observations have been made by the QP from the comparison table:

Measured plus Indicated tonnes have increased by 16% overall, while the Inferred tonnes have increased by 39% overall between the two estimates.

Measured plus Indicated grades have increased overall by between 3% and 7%, while Inferred grades for silver have decreased by 8% while other grades increased between 11% and 20% overall between the two estimates (both comparisons excluding gold as it is a very minor contributor).

The net result in the Measured plus Indicated categories has been an increase in the contained silver metal of 20% and an increase in the contained lead metal of 23%. The increase in zinc content was 24%.

The net result in the Inferred category has been an increase in the contained silver metal of 28% and a significant increase in both the contained lead metal and zinc metal with increases of 67% and 54% respectively.

Reasons for the differences in grade, tonnes and contained metal include Mineral Resource addition and conversion to higher categories arising from drilling and level development, different cut-off grades and depletion due to mining. As well as additional channel and drillhole samples became available between the two estimates to extend the Mineral Resource along-strike and down-dip, and changed interpretation of the veins, given the greater degree of geological understanding, meant that some parts of a vein were assigned to a different vein between the two estimates.

Page 142: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 142

15 Mineral Reserve estimates 15.1 Introduction and Mineral Resources base

The Mineral Resources upon which the Ying Mineral Reserves are based have been discussed in detail in Section 14. The Mineral Resources are located in, or adjacent to, areas where Silvercorp has mining permits. The permitting issue has also been discussed in Section 14. AMC considers that it is reasonable to include all of the current Mineral Resources, including those located below the current lower limit of Silvercorp’s mining permits, in the Mineral Reserve estimation.

To convert Mineral Resources to Mineral Reserves, mining cut-off grades have been applied, mining dilution has been added and mining recovery factors assessed on an individual vein mining block basis. Only Measured and Indicated Resources have been used for Mineral Reserves estimation.

The Mineral Reserve estimates for the Ying property were prepared by Silvercorp under the guidance of independent Qualified Person, Mr H A Smith, P.Eng., who takes QP responsibility for those estimates.

15.2 Mineral Reserve estimation methodology

The Mineral Reserve estimation is based on the assumption that current stoping practices will continue to be predominant at the Ying property, namely cut and fill resuing and shrinkage stoping, using hand-held drills and hand-mucking within stopes, and loading to mine cars by rocker-shovel or by hand. The largely sub-vertical veins, generally competent ground, reasonably regular vein width, and hand-mining techniques using short rounds, allows a significant degree of selectivity and control in the stoping process. Minimum mining widths of 0.5 m for resuing and 1.0 m for shrinkage are assumed. AMC has observed the mining methods at the Ying property and considers the minimum extraction and mining width assumptions to be reasonable. Minimum dilution assumptions are 0.10 m of total overbreak for a resuing cut and 0.2 m of total overbreak for a shrinkage stope. Dilution is discussed further in Section 15.4

For the total tonnage estimated as Ying Mineral Reserves, 42% is associated with resuing and 58% with shrinkage.

15.3 Cut-off grades

Mineral Reserves have been estimated using breakeven cut-off values for shrinkage and resuing at each site as appropriate. The cut-off grade basis is summarized below and in Table 15.1.

Cut-off grade AgEq (g/t) = (mining cost + sustaining capital + milling cost + hauling cost + G&A cost + selling cost + mineral resources tax) / (processing recovery x mining recovery x Ag price).

In determining metal prices for use in the cut-off calculation (and Mineral Resource / Mineral Reserve estimation and economic evaluation), AMC has referenced three-year trailing averages, prices current as of 30 June 2016, prices used in recent NI 43-101 reports, and available consensus forecast information. The exchange rate used in the cut-off calculation was arrived at via a similar process.

Page 143: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 143

Table 15.1 Mineral Reserve cut-off grades and key estimation parameters

Item SGX HZG HPG LME TLP LMW

Foreign exchange rate (RMB:US$) 6.50 6.50 6.50 6.50 6.50 6.50 6.50 6.50 6.50 6.50 6.50

Resuing Shrinkage Resuing Resuing Shrinkage Resuing Shrinkage Resuing Shrinkage Resuing Shrinkage

Operating costs

Sustaining Capital ($/t) (mine development & exploration tunnelling cost)

29.09 29.09 32.11 23.05 23.05 18.61 18.61 12.34 12.34 21.96 21.96

Mining Cost ($/t) 51.35 36.49 36.58 55.5 40.58 49.52 29.77 46.4 33.19 55.13 29.77

Hauling cost ($/t) 4.14 4.14 4.60 4.29 4.29 3.24 3.24 3.04 3.04 3.12 3.12

Milling cost ($/t) 8.09 8.09 8.26 8.33 8.33 12.98 12.98 8.20 8.20 5.13 5.13

G&A and product selling cost ($/t) 10.33 10.33 10.33 10.33 10.33 10.33 10.33 10.33 10.33 10.33 10.33

Mineral Resources tax ($/t) 2.42 2.42 2.19 2.04 2.04 2.18 2.18 2.03 2.03 2.22 2.22

Total operating costs (US$/t)* 105.42 90.56 94.07 103.54 88.62 96.86 77.11 82.34 69.13 97.89 72.53

Mining recovery (%) 95 92 95 95 92 95 92 95 92 95 92

Mill recoveries

Au (%) 75 75

Ag (%) 94.45 94.45 95.56 88.94 88.94 95.23 95.23 92.39 92.39 93.32 93.32

Pb (%) 96.51 96.51 93.77 93.08 93.08 93.22 93.22 93.48 93.48 94.98 94.98

Zn (%) 61.4 61.4 45.14 45.14

Breakeven COG (AgEq g/t) = opex $/t / (mining recovery% x processing recovery% x Ag $ value per g*)

190 170 170 200 175 175 145 155 130 180 135

Notes: Metal price assumptions: Ag $19/oz; Pb $0.90/lb; Zn $1.00/lb. No Zn value ascribed to ore from HZG, LM, TLP and LMW sites. Operating costs from 2016 calendar year actuals and projections

Page 144: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 144

Lower cut-off grade values have been used for vein development operations where, effectively, the cost of this development is sunk and the value of the material mined has only to bear the cost of hauling, milling, G&A, selling and tax. These values are shown in Table 15.2.

Table 15.2 Vein development cut-off grades

Vein development cut-off estimates SGX HZG HPG LM TLP

AgEq Cut-off g/t 50.00 50.00 50.00 50.00 50.00

Note: Costs and metal price assumptions as per Table 15.1 above.

AMC comment on cut-off grades

AMC considers that the Mineral Reserve cut-off grades and their supporting parameters are reasonable. AMC also notes that the Ying Mineral Reserves as a whole have limited sensitivity to variation in cut-off grade as discussed in Section 15.6 below.

15.4 Dilution and recovery factors

Dilution

As indicated above, minimum mining widths are assumed as 0.5 m and 1.0 m respectively for resuing and shrinkage. For resuing, a dilution factor has been applied to each true vein width up to a minimum extraction width of 0.5 m or to (vein width plus 0.1 m) where the true width is greater than 0.4 m. For shrinkage, a minimum dilution factor of 0.2 m is added to the minimum vein width of 0.8m. AMC notes that a key strategy used at Ying for minimizing floor dilution is the placement of rubber mats and / or conveyor belting over the waste fill floor in resuing stopes immediately before each resuing blast. This effectively serves as a barrier between ore and waste.

The dilution calculation process used for the Mineral Reserves assumes that the resulting figures represent the overall tonnes and grade delivered to surface. There is a small degree of waste hand sorting, and therefore upgrading, that occurs underground, depending on the mine and mining method. AMC considers that the resulting impact of this hand-sorting on the delivered product is not significant enough to be material.

AMC notes that the projections for dilution in both resuing and shrinkage stopes assume a high degree of process control in terms of design, drilling and blasting, and that such control on an ongoing basis will be critical to achieving dilution targets.

Table 15.3 summarizes average dilution from the Mineral Reserve calculations for each of the Ying mines. There is a significant reduction in estimated dilution for Mineral Reserves compared to the most recent Technical Report (effective date 1 May 2012). AMC considers that the current dilution estimation is reasonable considering the enhanced focus on mining process control and the recently observed results from those efforts.

Table 15.3 Average dilution by mine and method

Mine Dilution %

Resuing Shrinkage

SGX 17% 15%

HZG 23% 22%

HPG 17% 19%

LM-E 21% 18%

LM-W 13% 14%

TLP 17% 19%

Total Ying 17% 17%

Page 145: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 145

Mining recovery factors

Mining recovery estimates used in the Mineral Reserve calculations are based on experience at each of the Ying operations and for each mining method. For resuing stopes, 95% total recovery is assumed; for shrinkage stopes, 92% total recovery is assumed. Minimal pillars are anticipated to remain between adjacent mining blocks in the same vein, and partial recovery in sill pillars is allowed for in the respective recovery factors.

15.5 Mineral Reserve Estimate

To convert Mineral Resources to Mineral Reserves, Silvercorp uses the following procedures:

Selection of Measured and Indicated Resource areas (potential stope blocks) for which the average AgEq grade is greater than the mine cut-off AgEq grade

Application of minimum extraction and mining width criteria and calculation of dilution at zero grade

Estimation of Mineral Reserve potential by applying relevant mining loss factors

Reconfirmation that diluted AgEq grade is greater than mine cut-off

Confirmation as Mineral Reserves by considering any other significant cost factors such as additional waste development required to gain access to the block in question

Table 15.4 summarizes the Mineral Reserve estimates for each Ying mine and for the Ying operation as a whole. 38% of the Mineral Reserve tonnage is categorized as Proven and 62% is categorized as Probable.

Table 15.4 Ying Mines Mineral Reserve estimates at 30 June 2016

Mines Categories Tonnes

(Mt) Au

(g/t) Ag (g/t) Pb (%) Zn (%) EQ-Ag(g/t)

Metal Contained in Reserves

Au (koz) Ag (Moz) Pb (kt) Zn (kt)

SGX Proven 2.32 272 5.25 2.69 509 20.28 121.60 62.21

Probable 3.18 248 4.86 2.11 459 25.40 154.55 67.06

Total Proven & Probable 5.50 258 5.02 2.35 480 45.68 276.15 129.27

HZG Proven 0.23 348 1.03 0.20 384 2.60 2.39 0.47

Probable 0.35 285 0.77 0.15 312 3.23 2.73 0.52

Total Proven & Probable 0.59 310 0.88 0.17 341 5.83 5.12 0.99

HPG Proven 0.47 1.10 88 3.76 1.13 297 16.43 1.31 17.50 5.26

Probable 0.29 1.15 108 3.28 1.17 304 10.84 1.02 9.65 3.45

Total Proven & Probable 0.76 1.12 95 3.57 1.15 300 27.27 2.33 27.15 8.71

TLP Proven 1.00 223 3.45 0.26 341 7.15 34.39 2.62

Probable 1.48 178 2.91 0.29 277 8.45 43.09 4.31

Total Proven & Probable 2.47 196 3.13 0.28 303 15.60 77.49 6.93

LM-E Proven 0.20 288 1.45 0.27 337 1.82 2.85 0.54

Probable 0.75 298 2.11 0.46 370 7.23 15.95 3.48

Total Proven & Probable 0.95 296 1.97 0.42 363 9.06 18.80 4.02

LM-W Proven 0.46 316 3.29 0.25 428 4.69 15.21 1.14

Probable 1.57 234 2.61 0.29 323 11.83 41.04 4.63

Total Proven & Probable 2.04 252 2.76 0.28 346 16.52 56.25 5.77

Ying Mine Proven 4.67 0.11 252 4.15 1.55 431 16.43 37.85 193.95 72.24

Probable 7.63 0.04 233 3.50 1.09 374 10.84 57.16 267.01 83.45

Total Proven & Probable 12.30 0.07 240 3.75 1.27 396 27.27 95.02 460.96 155.69

Notes to Mineral Reserve Statement: Stope Cut-off grades (Ag/Eq g/t): SGX – 190 Resuing, 170 Shrinkage; HZG – 170 Resuing; HPG – 200 Resuing, 175 Shrinkage; LME -175 Resuing, 145 Shrinkage; LMW -180 Resuing, 135 Shrinkage; TLP - 155 Resuing, 130 Shrinkage. Vein development cut-off grades of 50 g/t AgEq for all mines. Unplanned dilution (zero grade) assumed as 0.05m on each wall of a resuing stope and 0.10m on each wall of a shrinkage stope. Mining recovery factors assumed as 95% for resuing and 92% for shrinkage. Metal prices: gold US$1,250/troy oz, silver US$19/troy oz, lead US$0.90/lb, zinc US$1.00/lb Processing recovery factors: SGX – 94.5% Ag, 96.5% Pb, 61.4% Zn; HZG – 95.6% Ag, 93.8% Pb; HPG – 88.9% Ag, 93.1% Pb, 45.1% Zn; LME – 95.2% Ag, 93.2% Pb; LMW – 93.3% Ag, 95.0% Pb; TLP – 92.4% Ag, 93.5% Pb. Exclusive of mine production to 30 June 2016. Exchange rate assumed is RMB 6.50 : US$1.00. Rounding of some figures may lead to minor discrepancies in totals.

Page 146: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 146

AMC notes that the average silver and lead grades for the total combined Ying Mines Mineral Reserves are of the order of 20% lower than reported mined grades from operations for January to November 2016. This is consistent with the mining plan generally moving into lower grade areas as the LOM progresses. AMC notes that the grade distribution of the Mineral Reserves and the increased operational focus on minimizing dilution allows a continuing opportunity to mine at above-overall-average grades in at least the early stages of the projected remaining LOM. AMC advises that best mining practices and the focus on tight dilution control will be key to optimizing grade throughout the extraction of the Ying Mineral Reserves.

15.6 Reserves sensitivity to cut-off grade

AMC has tested the sensitivity of the Ying Mineral Reserves to variation in cut-off grade by applying a 20% increase in COG to Mineral Reserves at each of the Ying mines. The approximate percentage differences in contained AgEq ounces for each of the Ying mines and for the property as a whole are shown in Table 15.5.

Table 15.5 Estimated reduction in Contained AgEq Oz in Mineral Reserves for COG increase of 20%

SGX HZG HPG TLP LME LMW

Mine AgEq oz reduction 3.6% 2.4% 18.6% 10.3% 8.00% 7.2%

Ying Total AgEq oz reduction 6.1%

The lowest sensitivities are seen at SGX and HZG with, respectively, an estimated 3.6% and 2.4% reduction in contained AgEq ounces when the COG is increased by 20%. The highest reduction of 18.6% is noted at HPG. For Ying as a whole, an approximately 6% reduction demonstrates relatively low overall COG sensitivity.

15.7 Conversion of Mineral Resources to Reserves

Table 15.6 compares the respective sums of Measured plus Indicated Resources and Proven plus Probable Reserves for each of the Ying mines and the entire Ying operation.

Page 147: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 147

Table 15.6 Resources and Reserves comparison

Mine Tonnes Mt

Au

g/t

Ag

g/t

Pb

%

Zn

%

Au

koz

Ag

Moz

Pb

kt

Zn

kt

SGX Resource MS+ID 6.54   281 5.33 2.64 59.1 348.2 172.9

Reserve Prv + Prb 5.5   258 5.02 2.35 45.68 276.15 129.27

Conversion percentages 84% 92% 94% 89% 77% 79% 75%

HZG Resource MS+ID 0.78   336 1.03 0.2 8.41 8.034 1.58

Reserve Prv + Prb 0.59   310 0.88 0.17 5.83 5.12 0.99

Conversion percentages 76% 92% 85% 85% 69% 64% 63%

HPG Resource MS+ID 1.32 1.1 87 3.33 1.15 47 3.66 43.8 15.12

Reserve Prv + Prb 0.76 1.12 95 3.57 1.15 27.27 2.33 27.15 8.71

Conversion percentages 58% 102% 109% 107% 100% 58% 64% 62% 58%

TLP Resource MS+ID 3.96   186 3.4 0.3 23.68 134.6 11.74

Reserve Prv + Prb 2.47   196 3.13 0.28 15.6 77.49 6.93

Conversion percentages 62% 105% 92% 93% 66% 58% 59%

LM-E Resource MS+ID 1.25   321 2.05 0.44 12.88 25.5 5.51

Reserve Prv + Prb 0.95   296 1.97 0.42 9.06 18.8 4.02

Conversion percentages 76% 92% 96% 95% 70% 74% 73%

LM-W Resource MS+ID 2.47   259 2.85 0.3 20.58 70.4 7.49

Reserve Prv + Prb 2.04   252 2.76 0.28 16.52 56.25 5.77

Conversion percentages 83% 97% 97% 93% 80% 80% 77%

Total Resource MS+ID 16.31 0.09 243 3.87 1.31 47 127.42 630.6 214.35

Reserve Prv + Prb 12.3 0.07 240 3.75 1.27 27.27 95.02 460.96 155.69

Conversion percentages 75% 78% 99% 97% 97% 58% 75% 73% 73%

*Numbers may not compute exactly due to rounding.

For the Property as a whole, total Mineral Reserve tonnes are approximately 75% of Mineral Resource (Measured plus Indicated) tonnes. Silver, lead and zinc Mineral Reserve grades are 99%, 97% and 97% respectively of the corresponding Measured plus Indicated Mineral Resource grades. Metal conversion percentages for silver, lead and zinc are 75%, 73% and 73% respectively.

15.8 Comparison of Mineral Reserves, mid-2013 to mid-2016

Table 15.7 shows Ying Mineral Reserves as of mid-2013 (previous Technical Report) and as of mid-2016 (this Technical Report). The 2016 data is exclusive of ore mined since mid-2013.

Page 148: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 148

Table 15.7 Change in Mineral Reserves, mid-2013 to mid-2016

Mines Categories Tonnes

(Mt) Au (g/t) Ag (g/t) Pb (%) Zn (%)

Metal Contained in Reserves

Au (oz) Ag (Moz) Pb (kt) Zn (kt)

SGX 2013 Proven 2.66 230 4.41 2.33 19.64 117.30 61.90

Probable 2.20 206 3.75 1.90 14.56 82.50 41.90

Total Proven & Probable 4.86 219 4.11 2.14 34.20 199.80 103.80

SGX 2016 Proven 2.32 272 5.25 2.69 20.28 121.60 62.21

Probable 3.18 248 4.86 2.11 25.4 154.55 67.06

Total Proven & Probable 5.50 258 5.02 2.35 45.68 276.15 129.27

SGX % Change Proven -13% 18% 19% 15% 3% 4% 1%

Probable 45% 20% 30% 11% 74% 87% 60%

Total Proven & Probable 13% 18% 22% 10% 34% 38% 25%

HZG 2013 Proven 0.30 344 1.16 0.19 3.32 3.50 0.60

Probable 0.39 279 1.12 0.13 3.49 4.40 0.50

Total Proven & Probable 0.69 307 1.14 0.16 6.82 7.80 1.10

HZG 2016 Proven 0.23 348 1.03 0.20 2.60 2.39 0.47

Probable 0.35 285 0.77 0.15 3.23 2.73 0.52

Total Proven & Probable 0.59 310 0.88 0.17 5.83 5.12 0.99

HZG % Change Proven -23% 1% -11% 5% -22% -32% -22%

Probable -10% 2% -31% 15% -7% -38% 4%

Total Proven & Probable -14% 1% -23% 6% -15% -34% -10%

HPG 2013 Proven 0.56 0.94 100 4.54 0.81 16,931 1.80 25.40 4.50

Probable 0.36 1.05 84 3.33 1.14 12,230 0.97 12.10 4.10

Total Proven & Probable 0.92 0.98 94 4.06 0.94 29,160 2.77 37.40 8.70

HPG 2016 Proven 0.47 1.10 88 3.76 1.13 16,430 1.31 17.50 5.26

Probable 0.29 1.15 108 3.28 1.17 10,840 1.02 9.65 3.45

Total Proven & Probable 0.76 1.12 95 3.57 1.15 27,270 2.33 27.15 8.71

HPG % Change Proven -16% 17% -12% -17% 40% -3% -27% -31% 17%

Probable -19% 10% 29% -2% 3% -11% 5% -20% -16%

Total Proven & Probable -17% 14% 1% -12% 22% -6% -16% -27% 0%

TLP 2013 Proven 1.18 135 2.67 0.18 5.13 31.50 2.10

Probable 2.10 160 2.45 0.22 10.80 51.30 4.70

Total Proven & Probable 3.28 151 2.52 0.21 15.94 82.80 6.80

TLP 2016 Proven 1.00 223 3.45 0.26 7.15 34.39 2.62

Probable 1.48 178 2.91 0.29 8.45 43.09 4.31

Total Proven & Probable 2.47 196 3.13 0.28 15.60 77.49 6.93

TLP % Change Proven -15% 65% 29% 44% 39% 9% 25%

Probable -30% 11% 19% 32% -22% -16% -8%

Total Proven & Probable -25% 30% 24% 33% -2% -6% 2%

LM 2013 Proven 0.54 282 1.67 0.20 4.92 9.10 1.10

Probable 2.35 236 1.84 0.24 17.89 43.40 5.80

Page 149: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 149

Mines Categories Tonnes

(Mt) Au (g/t) Ag (g/t) Pb (%) Zn (%)

Metal Contained in Reserves

Au (oz) Ag (Moz) Pb (kt) Zn (kt)

Total Proven & Probable 2.89 245 1.81 0.24 22.81 52.50 6.90

LM 2016 Proven 0.66 307 2.74 0.25 6.51 18.06 1.68

Probable 2.33 255 2.45 0.35 19.06 56.99 8.11

Total Proven & Probable 2.99 266 2.51 0.33 25.58 75.05 9.79

LM % Change Proven 22% 9% 64% 25% 32% 98% 53%

Probable -1% 8% 33% 46% 7% 31% 40%

Total Proven & Probable 3% 9% 39% 38% 12% 43% 42%

Ying Mine 2013 Proven 5.24 0.10 207 3.56 1.34 16,931 34.81 186.70 70.20

Probable 7.40 0.05 200 2.62 0.77 12,230 47.71 193.70 57.00

Total Proven & Probable 12.64 0.07 203 3.01 1.01 29,160 82.52 380.40 127.20

Ying Mine 2016 Proven 4.67 0.11 252 4.15 1.55 16,430 37.85 193.95 72.24

Probable 7.63 0.04 233 3.50 1.09 10,840 57.16 267.01 83.45

Total Proven & Probable 12.30 0.07 240 3.75 1.27 27,270 95.02 460.96 155.69

Ying % Change Proven -11% 10% 22% 17% 16% -3% 9% 4% 3%

Probable 3% -20% 17% 34% 42% -11% 20% 38% 46%

Total Proven & Probable -3% 0% 18% 25% 26% -6% 15% 21% 22%

Some significant aspects of the comparison are:

3% decrease in total Ying Mineral Reserve tonnage.

Increase in total Ying Mineral Reserve silver, lead and zinc grades of 18%, 25%, and 26% respectively.

Increase in total Ying Mineral Reserve metal content for silver, lead and zinc of 15%, 21% and 22% respectively.

SGX continues being the leading contributor to the Ying Mineral Reserves, now accounting for 45% of tonnes, 48% of silver, 60% of lead and 83% of zinc, compared to respective values of 38%, 36%, 43% and 67% in 2013.

Decrease in TLP Mineral Reserve tonnes of 25% but increase in silver, lead and zinc grades of 30%, 24% and 33% respectively.

Decrease in HPG Mineral Reserve tonnes of 17%.

Increase in LM (combined LME and LMW) Mineral Reserve metal content for silver, lead and zinc of 12%, 43% and 42% respectively.

Page 150: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 150

16 Mining methods 16.1 Ying Mining Operations

Introduction

The Ying Mining District has been intermittently mined over many years by small-scale, local miners. Silvercorp commenced mining at its Ying property (SGX mine) in April 2006. Its current mining activities continue to be focused at the SGX mine, but now also include the HZG (a satellite deposit to SGX), HPG, TLP, LME and LMW mines. Figure 16.1 is a plan view showing the relative location of the mines.

Figure 16.1 Ying mines locations

Underground access to each of the mines in the steeply-sloped, mountainous district is via adits at various elevations, inclined haulageways, shaft/internal shafts (winzes), and declines (ramps).

The mines are developed using trackless equipment – 20 t trucks and single-boom jumbos, small, conventional tracked equipment – electric / diesel locomotives, rail cars, electric rocker shovels; and pneumatic hand-held drills (jacklegs). At most of TLP, four adits of SGX, part of LME and part of LMW mines, small tricycle trucks with a

Page 151: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 151

payload of up to three tonnes each are used to haul ore to surface. These tricycle trucks are being gradually replaced by rail cars in all mines except for TLP.

The global extraction sequence is top-down between levels, and generally outwards from the central shaft or main access location. The stope extraction sequence is bottom-up, with shrinkage and resuing being the main mining methods. Jacklegs are used in stope blast drilling. In-stope ore handling is by hand-carting/hand-shovelling to specially manufactured steel-lined ore passes for resuing stopes, and by gravity to draw points for shrinkage stopes. Production mucking uses mostly hand shovels or, occasionally, rocker shovels, with rail cars and battery-powered or diesel locomotives transporting ore to the main shaft, inclined haulageway or main loading points in declines. Ore transport to surface is accomplished via skip/cage hoisting (shaft), rail-cars (tracked adit and / or inclined haulageway), small tricycle trucks, or 20 tonne trucks on ramps. Some hand picking of high grade ore and of waste is carried out on surface at either ore pile or sorting belt, with transport to the centralized processing plants being via 30 t and 45 t trucks or barge and truck combination.

SGX

The SGX mine is located in the western part of the Ying district. It is accessed by eight adits and a ramp to 260 mRL with a total length of 2,955 m. An inclined-haulageway from the ramp at 260 mRL to 210 mRL is currently being developed and scheduled to be completed in 2017. In respect of the existing underground infrastructure and the distribution of Mineral Resources, the whole mining area is divided into 13 production systems. A production system is an independent mining area with an independent transport and muck hoisting system. SGX is the largest of the Silvercorp Ying operations, producing about 36% of tonnes and 45% of silver ounces for the total operation in fiscal 2016. The Ag-Pb-Zn mineralization is found in at least 39 veins with the five largest vein systems (S7, S2, S19, S16 and S14) accounting for over 60% of this mineralization. Vein widths range from around 0.3 m to 5.1 m with 76% mined by resuing and 24% mined by shrinkage in fiscal 2016, on a tonnage basis. Mining is currently planned down to the 10 mRL. Adjacent to the SGX mine are the ore and waste sorting facilities, and main office, engineering and administration buildings.

HZG

The HZG mine is a satellite of the SGX mine, with portals located about 4 km to the south of the main SGX site. It is accessed by five adits, and hosts five production systems. There are 11 known veins. The vein widths for mining range from about 0.2 m to 3.0 m, the veins being generally similar to those found throughout the district. The mining method by tonnage was approximately 97% resuing and 3% shrinkage in fiscal 2016, and the mining plan envisages ore being produced from five veins between the 450 mRL and 950 mRL. The first year of production at HZG was 2011. Approximately 9% of Ying ore tonnage and 11% of silver ounces in fiscal 2016 were produced at HZG.

HPG

The HPG mine has been operated since 2007 and is located in the central part of the Ying district, to the northeast of the SGX mine. It is accessed from six adits and mining from 20 veins is projected in the LOM plan between the 800 mRL and 80 mRL. The HPG mine is divided into five production systems. The mining method by tonnage was about 30% resuing and about 70% shrinkage in fiscal 2016, with vein widths projected for mining ranging from less than 0.3 m up to about 2.7 m. About 10% of Ying ore tonnage in fiscal 2016 was produced at HPG (approximately 4% of silver ounces).

TLP

The TLP mine lies about 11 km east–southeast of SGX. There are 49 known veins, all dipping westward. The mine is serviced from eight adits, and hosts seven production systems. The mining plan currently shows production occurring through to 2030 from stopes between 200mRL and 1,100mRL and from vein widths generally between 0.3 m and 5.0 m. The mining method by tonnage was 48% resuing and 52% shrinkage in fiscal 2016. TLP contributed 20% of Ying ore tonnes and 14% of Ying Ag ounces in fiscal 2016.

Page 152: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 152

LME

The LME mine is located just south of the TLP mine and about 12 km from SGX. 17 veins with steep dips to either east or west have been identified. Access is via one adit, three shafts and two inclined haulageways. The mining method by tonnage was 32% resuing and 68% shrinkage in fiscal 2016. LME contributed 12% of Ying ore tonnes and 14% of Ying Ag ounces in fiscal 2016.

LMW

The LMW mine is located just south of the TLP mine and about 12 km from SGX. To date, 59 veins with steep dips to either the north-east or north-west have been identified. Access is via four adits, two shafts, and one ramp. The mining method by tonnage was 91% resuing and 9% shrinkage in fiscal 2016. LMW contributed 13% of Ying ore tonnes and 12% of Ying Ag ounces in fiscal 2016. The ramp developed from surface to 635 mRL is 3,599 m in length.

16.2 Mining methods and mine design

Geotechnical and hydrogeological considerations

No specific geotechnical or hydrogeological study data is available for the Ying mines. In general, the ground at current mining levels is in good condition, similar to development and mining operations to date. The excavation of relatively small openings, both in development and stoping, facilitates ground stability. An increased percentage of resuing mining stopes also means a greater number of smaller rather than larger openings. Support is only installed where deemed to be necessary, with rockbolts being used for hangingwall support on very rare occasion. Timber and steel I-beams are also used where unstable ground is encountered.

AMC is not aware that water in-flow to date at the Ying mines has created any significant problems. Section 16.2.9 discusses mine dewatering.

Development and access

As referenced above, the mines in the Ying District are located in narrow valleys, and a series of adits at each mine provides access from the surface to the mining areas. Most of the operational levels do not have their own access portal and must connect to internal shafts or inclined haulageways. The LMW ramp developed from surface to 635 mRL is 3,599 m in length. The SGX ramp developed from the surface to 260 mRL is 2,955 m in length.

Mine access for rock transportation, materials supply and personnel is provided by five different means and, in combination, they form the access systems for the Ying District mines:

Adits and portals

Inclined haulageways

Decline accesses (ramp)

Internal shafts (winzes)

Shaft

Adits are driven at a slight incline at dimensions of approximately 2.2 m x 2.2 m with arch profile. These are the principal means of access for men and materials and transport of ore and waste. All services such as electrical, compressed air, drill water and dewatering lines are located in the adits. In many instances, they are also used for delivery and removal of fresh and return air respectively. Most of the adits are equipped with narrow gauge rail for transport by railcars. Where there is no rail, tricycle cars are utilized for transport of ore, waste and supplies.

Inclined haulageways are driven at approximately 25o to 30o. Typical dimensions are 2.4 m wide x 2.2 m high. They are equipped with narrow gauge rail and steps on one side for foot travel. The main purpose of these drives is haulage of ore and waste, and delivery of ventilation and other services such as water, compressed air, communications and electricity. Figure 16.2 shows an inclined haulageway at the SGX mine.

Page 153: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 153

Figure 16.2 Inclined haulageway at SGX mine

The main ramps being developed in the SGX and LMW mines are jumbo-driven drifts with dimensions of 4.2 m wide by 3.8 m high at a 12% grade. One daylights at LMW as the 980 Ramp, developed from 980 to 635 m elevation. At the SGX mine, the 560 Ramp starts at 560 m elevation and bottoms at 260 m elevation. The total developed length is just over 6 km.

As of June 2016, there were 24 internal shafts (winzes) throughout the Ying Property. The hoisting capacity of these shafts varies from 50,000 tpa to 150,000 tpa (combined ore and waste). Fully-loaded rail cars that bring up ore and waste are cage-transported via these shafts; they are also used for hoisting men and materials.

The only shaft to surface is the 969 shaft at LMW. It has a finished diameter of 3.5 m and is equipped with a ZJK-2×125P hoist winch. The total depth of the shaft is 480 m, and the hoisting capacity is 150,000 tpa of combined ore and waste, with a standard cage. This shaft works in tandem with PD900 winze in the LM East area.

At SGX, only the adit portals and one ramp connect the mine workings to surface. Inclined haulageways and internal shafts provide access to the ore, which is generally located at elevations below the level of portal entrances. Declines/internal shafts are developed for the SGX, LMW, LME, HZG and HPG mines.

Figure 16.3 is an orthogonal view of the SGX mine design.

Page 154: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 154

Figure 16.3 SGX mine design

Mining methods

Shrinkage stoping and resue stoping are the mining methods employed at the Ying mines. The LOM plan envisages the continuation of these methods.

16.2.3.1 Shrinkage stoping

A sill drive is initially driven along the vein at 1.8 m height. For typical shrinkage stopes, the lower part of the vein will be mined at 1.2 m width, while the upper part will be mined at 0.8 m width. An access drive at 2 m wide x 2 m high (conventionally a footwall drive) is also developed parallel to the vein at a stand-off distance of about 6 m. Crosscuts for ore mucking from draw points are driven between the vein and the strike drives at approximately 5 m spacing. Each stoping block is typically 40 m to 60 m in strike length by 40 m to 50 m in height. Travelway raises that are also used for services are established between the levels at each end of the stope block. Waste packs are built on each void side of the raise as stoping proceeds upwards.

Jacklegs are used to drill a 1.8 – 2.0 m stope lift that is drilled and blasted as inclined up-holes with a forward inclination of 65 – 75o (“half-uppers”). The typical drill pattern has a burden of 0.6 – 0.8 m and spacing of 0.8 – 1.2 m, dependent on vein width. Holes are charged with cartridge explosives and ignited with tape fuse. The powder factor is generally 0.4 – 0.5 kg/t. Stope blasting fills the void below with ore as mining proceeds upwards. The ore swell is mucked from the drawpoints to maintain a stope working height of about 2 m. While mining is underway, only about 30% of the stope ore may be mucked. When mining is complete, all remaining ore is mucked from the stope, unless significant wall dilution occurs. The stope is left empty beneath a sill (crown) pillar of, typically, around 3 m thickness (adopted thickness ultimately dependent on extraction width). Ventilation, compressed air and water are carried up the travelway raises to the mining horizon. Loading of the ore from the draw points is by miners into rail cars, either using rocker-shovels or by hand. Figure 16.4 is a schematic of the shrinkage stoping method.

Page 155: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 155

Figure 16.4 Shrinkage stoping method

16.2.3.2 Resue stoping

Resue stoping veins are typically high-grade and generally between 0.1 m (minimum extraction 0.3 m) and 0.80 m width. Resue stoping involves separately blasting and mucking the vein and adjoining waste to achieve a minimum stope mining width.

Vein and access development preparation is essentially the same as for shrinkage stoping, other than draw points being established at approximately 15 m spacing along strike. Blasted ore is mucked into steel-lined mill holes that are carried up with the stope and feed to the draw points. The base of the mill holes is held in place with a timber set.

Half-upper lifts are drilled with jacklegs and blasted in essentially the same manner as for shrinkage stoping. Typically, after a lift in the vein is blasted and mucked, the footwall is blasted and the ensuing waste is used to fill the space mined out and to provide a working floor. This process is repeated until the stope sill (crown) pillar is reached. The entire stope is left filled with waste from the slashing of the footwall.

The blasted ore is transported by wheel barrow and / or hand shovelled to the mill hole, which is extended in lift segments as the stope is mined upwards. The footwall waste is slashed (blasted) to maintain a minimum mining width (typically 0.8 m).

Page 156: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 156

The order of vein extraction and footwall slashing is generally dependent on the condition of the vein hangingwall contact. Where the contact is distinct and stable, the vein is extracted first; otherwise the footwall waste is extracted first, followed by vein slashing.

Figure 16.5 shows the back of a resue stope at the SGX mine. Excavation width at the back is about 0.4 m.

Figure 16.5 Resue stope at SGX mine

Rubber mats and / or belting are placed on top of the waste after each waste lift to minimize ore intermingling with the waste (ore losses) and also to minimize over-mucking of the waste (dilution). The rubber mats and / or belting are rolled up and removed prior to slashing the footwall, with that broken material forming the floor for the next platform lift.

Silvercorp acknowledges that in-stope ore movement may potentially be improved by using scraper winches with small buckets.

Figure 16.6 is a schematic of the resue stoping method.

Page 157: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 157

Figure 16.6 Resue stoping method

16.2.3.3 Stope management and grade control

Silvercorp has developed a stope management protocol and stope management manual at the Ying operations. The purpose of stope management is to implement stope operation procedures for dilution reduction via the Mining Quality Control Department. The department has a total of 22 technical staff, including management, mine engineers, geologists and technicians, and reports directly to Silvercorp’s HQ in Beijing. The mine engineers in the group are responsible for supervising the stope operation procedure, with stope inspection occurring at least once per day to check that mine contractors are following procedure guidelines. The geologists and geological technicians are responsible for stope geological mapping and sampling, which occurs every 3 - 5m of stope lift. The department also measures the mined area of a stope at the end of each month for mine contract payment purposes.

Key aspects of the stope inspection are as follows:

Ensuring that the back and floor of the stope are flat prior to drilling blasting holes.

Checking to ensure the boundary of the mineralization and drill hole locations are correctly marked with red paint before drilling.

Ensuring drill holes are inclined not less than 60o to the horizontal, are not longer than 2 m, and are drilled optimally relative to vein and excavation width to minimize dilution.

In a resuing stope, checking if the stope floor is covered with rubber mat/belt before blasting.

In a resuing stope, checking to make sure that waste is sorted first and left in the stope before mucking ore to the mill holes after blasting; also ensuring that the floor and walls are cleaned with a broom to minimize ore losses before footwall slashing.

After blasting, checking that the stope back is not more than 3.5 m high and the steel mill holes in a resue stope are properly covered with timbers.

Page 158: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 158

Regarding contract payments, a mine contractor is paid based on the amount of ore mined. As it may be seen as an incentive for the contractor to maximize material removed from the stope, contractor payments are governed by a specific formula that calculates planned ore tonnes based on extraction to design and a planned dilution factor. During mine operations, each rail car or small tricycle load of ore is weighed at a weigh station outside the mine portals. If weighed ore tonnes are greater than planned ore tonnes from a given stoping area, the mine contractor is paid solely based on the planned tonnes. For shrinkage stopes, an adjustment for paid tonnes is required to be made, since a stope usually takes several months to complete and, generally, only blast swell is mucked until the stope nears completion.

Ore and waste haulage

As described above, ore from the resue or shrinkage stopes and waste from development are loaded by hand or rocker shovel into 0.7 m3 rail cars. Each ore car is tagged to identify the stope from which the ore has been mined. The cars are pushed by hand or by loco along the rail on the production level to the bottom of the inclined haulageway, where they are hoisted to the next level. If this level is the adit level, the cars are parked until sufficient numbers have been accumulated to form a train for the locomotive to bring to the portal. The dimensions of the adits and inclined haulageways are referenced above. Some of the mines in the Ying District have internal shafts (winzes). These shafts are used in the same manner as the inclined haulageways. Rail cars are pushed onto the cage for transport to the next level. Only one internal shaft in SGX is equipped with a skip to hoist waste.

Figure 16.7 shows a typical Ying loco with rail cars.

Figure 16.7 Ying loco and rail cars

Page 159: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 159

Equipment

16.2.5.1 Mine equipment

Most of the key mining equipment is provided by Silvercorp and is maintained by contractors. Exceptions to this are the air compressors at small adits such as CM103 and CM102 at the SGX mine, which are provided by the mining contractors. Auxiliary fans, vent bags, low voltage transformers, rocker shovels, submersible pumps, small winches, etc. are provided and maintained by contractors. Ramp development contractors in SGX and LMW also use their own equipment.

The Silvercorp fixed plant is predominantly domestically manufactured and locally sourced. The equipment manufacturers are well known and commonly used. Tables 16.1 and 16.2 list equipment at the Ying mines.

Table 16.1 Ying mines current equipment list

Mine / Camp Equipment Model Capacity Quantities

SGX

Winch 2JTP-1.6*0.9 95 kW 3

Winch 2JTP-1.6*0.9 132 kW 7

Winch 2JPT-1.6*1.0 132kW 1

Winch JTP-1.2*1.2 75 kW 1

Winch JTK-1.0*0.8 (to be replaced) 45 kW 1

Winch JTK1.2*1.0 (to be replaced) 75 kW 1

Primary Fan K45-No.16 35-65 m3 /s 1

Primary Fan FKZ(K45-4-No.14) 35.7 – 67.2 m3 /s 1

Primary Fan FKZ(K45-4-No.15) 43.9-82.6 m3 /s 1

Compressor LG110A/8 Flow: 20 m3/min; Pressure: 0.8MPa 6

Compressor LG-22/8 Flow: 22 m3/min; Pressure: 0.8MPa 4

Cage GS 1-1 3

Cage GLM1/6/1/1 7

Skip 1.5 m3 1

Shotcreter HPS-5 5 m3 /h 2

Shotcreter JG-150 3.5 m3 /h 2

Auxiliary fan JK58-4 5.5 kW 52

Auxiliary fan JK58-4.5 11 kW 36

HZG

Winch JTP-1.6*1.2P 132 kW 1

Winch 2JTP-1.6×1.2P 132 kW 1

Winch JTK-1.6×1.5 185 kW 1

Winch JTK-1X0.8 45 kW 1

Winch JTK-0.8×0.6 22kW 5

Skip 1.5 m3 1

Cage GS 1-1 1

Primary Fan K45-4-No.10 30 kW 1

Auxiliary fan JK58-4 5.5 kW 10

Auxiliary fan JK58-4.5 11 kW 6

Compressor BJN-22/80 Flow: 22m3/min; Pressure: 0.7MPa 1

Compressor LG132G-8 Flow: 24m3/min; Pressure: 0.7MPa 1

Compressor JG75HA Flow: 12.5m3/min; Pressure: 0.7MPa 1

Compressor LG75A Flow: 13.5m3/min; Pressure: 0.7MPa 1

Compressor LG110-8 Flow: 20m3/min; Pressure: 0.8MPa 2

Compressor BJN-10/8G Flow: 10m3/min; Pressure: 0.8MPa 1

HPG Winch JTP-1.6 132 kW 1

Winch JK-2*1.25P 220 kW 1

Page 160: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 160

Mine / Camp Equipment Model Capacity Quantities

Winch JTP-1.2 75 kW 2

Winch JTK-1(to be replaced) 45 kW 2

Winch JTK-0.8(to be replaced) 45 kW 1

Compressor LG110-8 Flow: 20 m3/min; Pressure: 0.8MPa 2

Compressor 4L-20/8 (to be replaced) Flow: 20 m3/min; Pressure: 0.8MPa 3

Compressor L-10/7 (to be replaced) Flow: 10 m3/min; Pressure: 0.7MPa 1

Compressor BJN-10/8G Flow: 10 m3/min; Pressure: 0.8MPa 2

Cage GLM-1/6/1/1 1

Primary Fan K45-4-No.10 30 kW 1

Primary Fan FBCZ-No.11 30 kW 1

Auxiliary fan JK 2-2-No.4 5.5 kW 4

Auxiliary fan 9.19-No.5.6 11 kW 3

Auxiliary fan JK255-2 5.8 kW 8

Auxiliary fan JK58-4.5 11 kW 4

TLP

Winch JTP1.2*1P 75 kW 1

Winch JTP1.6*1.2P 132 kW 1

Winch JTP1.2*1 75 kW 1

Winch JTK-1.0*0.8 (to be replaced) 37 kW 1

Skip 1.2 m3 1

Primary Fan FBCZ-NO11 30 kW 2

Auxiliary fan JK 2-2-NO4 5.5 kW 20

Auxiliary fan 9.19-No.5.6 11 kW 15

Compressor LG110SF-22/8 Flow: 22 m3/min; Pressure: 0.8MPa 2

Compressor LG110A-8 Flow: 20 m3/min; Pressure: 0.8MPa 5

Compressor JA75HA Flow: 12.5 m3/min; Pressure: 0.8MPa 3

LME

Winch JTP1.2*1P 75 kW 3

Winch 2JTP-1.6*0.9 132 kW 1

Cage GLM-1/6/1/1 1

Auxiliary fan JK2-2-No4 5.5 kW 3

Compressor LG110-8 Flow: 20 m3/min; Pressure: 0.7MPa 5

LMW

Winch 2JK-2.0*1.25P 185 kW 1

Winch JTP-1.2*1.0 75 kW 3

Cage GLM-1/6/1/1 1

Primary Fan BK54-4-No.11 30 kW 1

Auxiliary fan Jk58-4 5.5 kW 12

Auxiliary fan JK58-4.5 11 kW 13

Compressor LG110A-8 Flow: 20 m3/min; Pressure: 0.7MPa 6

Page 161: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 161

Table 16.2 Ramp contractor equipment list

Contractors Equipment Model Capacity Quantities

SGX Ramp

LMW Ramp

One boom Jumbo Drill CIJ17HT-C 55 kW 1

Caterpillar Type Loader LWLX-180 55 kW 2

Shovel XG951 III 162 kW 1

Shotcreter PC5T 5 m3 /h 2

Concrete Mixer JZC350 20 m3 /h 2

Compressor LG110A-8/11011 20 m3/min 3

Haul Trucks 15t 125 kW 5

Auxiliary fan JK58-4 5.5 kW 15

Caterpillar Type Loader LWLX-120 55 kW 2

Shotcreter PC5T 5 m3 /h 1

Concrete Mixer JZC350 20 m3 /h 1

Compressor LG110A-8 110 kW 3

Auxiliary fan JK 2-2NO4 5.5 kW 3

Shovel LWL180 180t/h 1

16.2.5.1 Equipment advance rates

Table 16.3 summarizes advance rates assumed for development and production activities.

Table 16.3 Equipment advance rates

Development or production activity Rate (m / month) Machine type

Jumbo - Ramp 120 Single boom electric-hydraulic

Jackleg – Levels (Hand Mucking) 50 Jackleg (YT-24)

Jackleg – Levels (Mechanical Mucking) 60 Jackleg (YT-24)

Jackleg - Stope Raises 40 Jackleg (YT-24)

Jackleg – Shaft (Mechanical Mucking) 55 Jackleg (YT-24)

Jackleg – Declines (Mechanical Mucking) 60 Jackleg (YT-24)

Manpower

Silvercorp operates the Ying mines mainly using contractors for mine development, production, ore transportation and exploration. The mill plant and surface workshops are operated and maintained using Silvercorp personnel. Silvercorp provides its own management, technical services and supervisory staff to manage the mine operations.

Each mine complex is run by a mine manager and one or two deputy mine managers. Because of their proximity, the SGX and HZG mines have the same management, as do the TLP, LME and LMW mines.

The Ying mines have about 2,300 workers in total. Tables 16.4, 16.5, and 16.6 provide a recent ‘snapshot’ of the workforce, split by Silvercorp staff, contract workers, and Silvercorp hourly employees.

Page 162: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 162

Table 16.4 Silvercorp staff

Mine Staff

SGX

HGZ

244

46

HPG 47

TLP / LME

LMW

152

69

Mill Plant 169

Company Administration 95

Total 822

Table 16.5 List of contract workers in the Ying district

Mine Contractors Workers Location

SGX

Henan Sanyi Construction Engineering Ltd 300 CM101, PD700

Lushi Jinsheng Tunneling Engineering Ltd. 274 CM105

Shangluo Shunan Engineering Ltd 101 CM102

Henan Sanyi Mining Construction Ltd (Y.D). 105 SGX XPD

Cangnan County Blasting Engineering Ltd 132 PD16, PD16-SJS2

Shangluo Shunan Engineering Ltd (L.S) 89 CM103, CM108, PD928, PD690

Subtotal 1001

HZG Lushi Jinsheng Tunneling Engineering Ltd 176 PD820, PD810, PD890

Subtotal 176

HPG

Shangluo Shunan Engineering Ltd.(Z) 112 PD3, 600mRL Shaft

Shangluo Shunan Engineering Ltd.(T) 59 PD5, PD2, PD630

Subtotal 171

TLP

Shangluo Shunan Engineering Ltd.(T) 142 PD820, PD846, PD821

Shangluo Shunan Engineering Ltd. (D.J) 142 PD780, PD800, PD840, PD890

Shangluo Shunan Engineering Ltd. (W.Y) 152 PD730, PD960, PD930, PD960

Subtotal 436

LME Henan Sanyi Mining Construction 136 PD900, PD900 Shaft, PD838, PD959

Subtotal 136

LMW

Zhejiang Nanyuan Construction Group Ltd 49 LMW XPD

Shangluo Shunan Engineering Ltd.(T) 232 PD969, PD924, PD918, PD991

Subtotal 281

Total 2,201

Table 16.6 Silvercorp hourly workers

Mine Workers Location

SGX 42 SGX Hand picking, waste sorting

Total 42

Ventilation

Mine ventilation at the Ying mines is planned and set up to be in accordance with Chinese laws and regulations. Among the key ventilation requirements are: minimum ventilation volume per person (4 m3/min/person), minimum ventilation velocity (typically 0.25 - 0.50 m/sec dependent on location or activity), and minimum diluting volume

Page 163: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 163

for diesel emissions (4 m3/min/kW). The following section describes the ventilation system at SGX. Other mines have a similar network of fans, entries and face ventilation.

16.2.7.1 SGX primary ventilation

The SGX primary ventilation volume is predominantly influenced by the minimum air velocity for the various development and production activities. The peak ventilation volume is estimated to be 63.6 m3/sec, which is inclusive of 15% air leakage.

A diagonal ventilation system is utilized in the SGX mine.

West Wing (Vein S14, S6, S2 Stopes): fresh air enters 400 mRL, 350 mRL, 300 mRL, and 260 mRL from adit PD16 via No.2 internal shaft and CM105 via No.1 internal shaft. Exhaust air returns to the 650 Adit via 450 mRL, exploration line 70-72 internal shaft, and ventilation raises, and then is exhausted to surface by a main axial fan.

East Wing (Vein S16W, S7, S8, S21 Stopes): fresh air enters 400 mRL, 350 mRL, 300 mRL, and 260 mRL from adit CM101 via No.3 internal shaft, and CM105 via No.1 internal shaft. Exhaust air: part returns to the 650 Adit via 450 mRL, exploration line 70 – 72 internal shaft, and ventilation raises, and then is exhausted to surface by a main axial fan, which is located at PD650 entrance. The remainder of the exhaust air returns to the 680 Adit via 490 mRL and ventilation raises, and then is exhausted to surface by a main axial fan.

The PD700 adit uses a separate ventilation system: fresh air enters 570 mRL and 530 mRL from adit PD700 via the inclined haulageway and internal shaft. Exhaust air returns to the CM108 Adit via 640 mRL and ventilation raises, and then is exhausted to surface by a main axial fan.

One 75 kW axial ventilation fan is installed in the entrance of PD 650 Adit. One 22 kW axial ventilation fan is installed in the entrance of PD 680 Adit. One 22 kW axial ventilation fan is installed in the entrance of CM108 Adit. All these fans have spare motors for back-up.

Figure 16.8 is a ventilation system diagram for the SGX mine.

Figure 16.8 SGX ventilation system diagram

Page 164: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 164

16.2.7.2 Secondary ventilation

The secondary ventilation system consists of auxiliary fans for ventilating production faces, development faces and infrastructure chambers.

Development faces are ventilated using domestically manufactured fans (5.5 to 11 kW – 380V). A combination of forced and exhaust ventilation is applied for long distance blind-headings.

Stopes are force ventilated using domestically manufactured fans via the timber-cribbed access. The stope air returns to the upper level via a raise.

Backfill

Backfill such as tailings or development waste is not required for shrinkage mining, where blasted ore provides a working platform for each stope lift. The ore is removed on completion of stope mining leaving an empty void. There is potential to opportunistically dispose of development waste into these voids, but current mine plans do not make allowance for this.

The resue stoping method uses blasted waste from the footwall (to achieve the minimum mining width) as the working platform for each stope lift. The waste remains in the stope at completion of stope mining.

Dewatering

Mine dewatering is effected under the requirement from the “Chinese Safety Regulations of Metal and Non-metal Mines”.

Typical underground water flow from the different mines is listed in Table 16.7 below.

Table 16.7 Mines water flow

Mine Maximum water flow (m3/day) Average water flow (m3/day)

SGX 27,000 9,000

HPG 1,100 650

TLP 960 360

LM (E&W) 840 600

HZG 560 260

The SGX dewatering system is described in some detail below. The dewatering systems at HZG, HPG, TLP, LME and LMW mines are similar to those at SGX. These systems are briefly described also.

16.2.9.1 SGX dewatering

The pumping system is a dirty water arrangement with a sump and three pumps at each location. In normal circumstances, one pump is running, one is being maintained, and one is on standby. Under conditions of maximum water inflow, all available pumps can be operated, with the exception of pumps that are being maintained. If all pumps operate, they can handle the maximum estimated inflow rate. There are two main pipelines to surface, one of which is on standby. The underground sump capacity is 6 – 8 hours at the average water yield.

Stage 1 dewatering

Pump stations equipped with three or more pumps connected directly to surface are located at the bottom of internal shafts. Table 16.8 lists station pumps at the bottom of internal shafts.

Page 165: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 165

Table 16.8 Stage 1 water pumps at SGX mine

Portal Model Units Power (kW) Flow(m3/h) Lift (m)

CM101 MD85-45*9 3 160 85 405

D46-50*9 1 110 46 450

CM105-S1# MD155-67*6 2 280 155 402

MD85-45*9 1 160 85 405

CM105-S2#

MD155-67*6 2 280 155 402

D46-50*9 1 110 46 450

MD25-50*8 1 75 25 400

PD16 D25-50*8 2 75 25 400

MD25-50*8 1 90 46 400

PD700 MD46-50*7 3 75 46 350

CM105 Skip shaft MD155-67*6 3 280 155 402

CM102 MD25-50*5 1 37 50 250

MD46-50*5 1 55 46 250

CM103 WQX12.5-80/4 2 5.5 12.5 80

YPD WQX12.5-80/4 2 5.5 12.5 80

Stage 2 dewatering

Mining level accesses have been designed with a 0.3% gradient to allow proper drainage. The pump and piping arrangements are similar to Stage 1. The inflow collected from various mining levels is then pumped to the 260 m elevation; from here it is pumped to surface through the 1st stage dewatering system. Table 16.9 lists the details of the SGX second stage pumping system.

Table 16.9 Second stage water pumps at SGX mine

Pump Stations Units Model Power (kW) Flow (m3/h) Lift (m)

CM101 7 WQX12.5-120 9.2 12.5 120

CM105-S1

1 MD25-50*6 45 25 300

1 MD46-50*5 55 46 250

1 MD46-50*6 75 46 300

4 WQX20-80 5.5 20 80

CM105-S2 3 MD155-67*5 220 155 335

PD16 5 WQX20-80 5.5 20 80

In case of a flood, water dams are set up at the entrance to shaft stations and pump houses in order to protect personnel and equipment.

Development face dewatering

Conventional electric submersible pumps are used for development ramp and decline face dewatering on an as-needed basis. Water is stage discharged to the nearest level pump station.

16.2.9.2 HZG dewatering

Dewatering is divided into two stages: the first stage is from 450 mRL to 650 mRL, the second stage is from 650 mRL to 820 mRL. The first stage utilizes three 75 kW D25-50x8 centrifugal pumps. For the second stage, three 75 kW D25-50x5 centrifugal pumps are located at the pump station in a similar set-up to SGX.

Page 166: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 166

16.2.9.3 HPG dewatering

PD3 dewatering is divided into two stages: the first is from 300 mRL to 460 mRL, and the second stage is from 460 mRL to PD3 (600 m) adit level. The sumps at both 300 mRL and 460 mRL have a capacity of 300 m3. For the first stage, there are two centrifugal pumps: model D85-50X4 with power draw 75 kW, and one centrifugal pump D46-50X4 model with power draw at 45 kW. For the second stage, there are three centrifugal pumps: model D85-50X5 with power draw at 75 kW. Two 108 mm pipelines installed in inclined haulageways take the water to surface. One line is on standby.

16.2.9.4 TLP dewatering

Water discharge is currently from the 700 m level to the 730 m level, and then via the PD730 adit to surface. The pump model is WQ40-80/4-15, head is 80 m, designed discharge capacity is 40 m3/h and power is 15 kW. For the second dewatering area, there are three centrifugal pumps installed in Line 31 internal shaft at 510 mRL bottom pump station. The model is MD46-50X6, power is 75 kW. Two 89 mm pipe lines are installed along Line 31 internal shaft, via 650 mRL, Line 33 internal shaft, PD770 inclined haulageway, and PD 770 adit to surface.

16.2.9.5 LME and LMW dewatering

LMW

Three centrifugal pumps (model MD46-50X11) with a combined power draw of 132 kW, are installed in the 969 shaft 500 mRL bottom pump station. There are two 89 mm pipe lines installed in the 969 shaft, which are then routed via 926 mRL and PD 924 adit to surface.

LME

In LME, three 110 kW MD46-50x8 centrifugal water pumps are installed at 500mRL pump station in the PD900 internal shaft to the surface. The second dewatering area is handled by three 75 kW MD46-50x6 centrifugal water pumps installed in the internal shaft 700mRL bottom pump station. Two 89 mm pipe lines are installed in PD838-700 and then routed via 840mRL and PD 838 adit to surface.

Water supply

Water consumption at SGX area is low and is sourced from the Guxian Reservoir. It is primarily used for drilling and dust suppression. Water consumption is rated at 19.3 m3/h for each portal. As per safety regulations, a fire-prevention system with 27 m3/h is required. To meet safety and production needs, there is a 200 m3 water pond at each portal, with the exception of PD16, where the capacity is 300 m3. Water supply is via 89 mm diameter pipelines.

The water source for HZG, HPG, TLP, LME, and LMW mines is from nearby creeks and springs and underground sources. A water pond of 100~200 m3 capacity is established at each adit portal. Both the water quality and quantity from local creeks is sufficient to meet mine requirements.

HZG requirements are estimated at 330 m3/d. There is a water pond of 100 m3 at each portal.

HPG requirements are estimated at 310 m3/d. There is a water pond of 200 m3 at the mine site, with water being delivered via a 107 mm diameter pipeline. An additional water pond 300 m3 is to be constructed for pumping underground water to No.2 Mill.

TLP Mine requirements are estimated at 556 m3/d. There is a water pond of 200 m3 at the mine site, with water being delivered via an 89 mm diameter pipeline.

LM Mine requirements are estimated at 320 m3/d for LM East and 400 m3/d for LM West. There is a water pond of 200 m3 at each portal, with water being delivered via 89 mm diameter pipelines for LME and 150 mm dimeter pipelines for LMW

Page 167: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 167

Power supply

Power for the SGX mine is supplied from the local government network by three lines. One is a 35 kV high-voltage line that is connected from Luoning Guxian 110 kV substation; the second is a 10 kV high-voltage line that is connected from Luoning Guxian 35 kV substation. The power source is hydropower, generated at the Guxian Reservoir Dam, and the length of overhead power lines is about 8 km. The third network supply is a 10 kV high-voltage line from the Luoning-Chongyang 35 kV substation, about 12 km from SGX.

A fully automated 35 kV substation in the immediate vicinity of the mine site was built in 2008. The capacity of the main transformers is 6,300 kVA.

The 35 kV overhead line can supply main power for all mine production; and the 10 kV overhead line is maintained as a standby. Two 1,500 kW and one 1,200 kW generators are installed in the fully automated 35 kV substation as a back-up supply for the CM101, CM102, CM103, CM105, PD16 and PD700 adits and XPD decline in the event of a power outage.

Underground water pumping stations and hoist winches belong to the first class power load, and require two independent 10 kV power lines, one for operation and the other for backup. During normal operation they can maintain stope operation in addition to meeting the requirement of the first-class power load. In case of emergencies, including underground flooding, they are only required to guarantee service of the first-class power load.

See also Section 18.3.

Compressed air

Compressed air is primarily used for drilling. Jacklegs are used in all stopes and conventional development faces. A minor quantity of air is used for shotcrete application and cleaning blast holes.

Compressor plants are located adjacent to each portal; they are of two-stage, electric piston configuration. Air is reticulated via steel pipes of varying sizes, depending on demand, to all levels and is directed to emergency refuge stations. Air lines are progressively sized from 101 mm diameter down to 25 mm diameter at the stopes.

Compressed air consumption is estimated for each mine operating system (usually differentiated by adits), based on mine production and number of development faces. Suitable air compressors are installed to satisfy volume requirements.

16.2.12.1 Explosives

Refer to Section 18.8.6.

Communications

Mine surface communication is available by landline service from China Network Company (CNC) and by mobile phone service from China Mobile (CMCC) and China Unicom.

Key underground locations such as hoist rooms, shaft stations, transportation dispatching rooms, power substations, pump stations, refuge rooms and the highest point of each level are equipped with telephones. Communication cables to underground are connected via internal shafts and declines. Internal telephones are installed in operating areas and dispatching rooms, which are also connected with communication cables to the local telephone lines.

16.3 Safety

Ying Mine safety is practiced as per Chinese health and safety laws and regulations. The Occupational Health and Safety (OHS) department role is to provide safety training, enforce OHS policies and procedures, make mine safety recommendations and carry out daily inspections of the underground workings and explosive usage.

Page 168: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 168

Each of the mining contractors is required to appoint safety officers at an average ratio of one safety officer to 20 contractor workers for each portal.

A ten-member safety committee is maintained for each of the SGX (including HZG), HPG, TLP, LME and LMW mines. The committees are led by the Henan Found general manager and include the deputy general manager, mine manager, safety department supervisor, and mining contractor representatives. The committees are coordinated by each mine’s safety division, and the mine management and the safety officers are required to have valid mine safety training certificates issued by the Provincial Bureau of Safe Production and Inspection.

Insurance policies covering death and injury have been purchased for all of the company staff and contractor workers in the mines.

The mine and contractors supply Personal Protective Equipment (PPE) to their own personnel.

A contract with the Luoning County General Hospital is in place to take and treat injured workers from all mines, except those only requiring first aid treatment at the mine clinic.

AMC notes that Silvercorp has gone beyond Chinese statutory requirements in certain areas of safety but also recognizes that some operating practices and procedures fall short of more international standards. AMC recommends that Silvercorp continue with a focus of improving mine and site safety and including implementation of a policy where the more stringent of either Chinese or Canadian safety standards are employed.

16.4 Development and Production Quality Control

Since late 2015, Silvercorp has implemented a workplace safety and work quality checklist system to reinforce process control. The significant improvement in the head grades of silver, lead and zinc since the December quarter of 2015 may be attributed in part to this initiative, a feature of which is an internal “Enterprise Blog” system in the management of Mine Production and Safety Information, which the Company implemented in August 2015. The “Enterprise Blog” (EB) is an internet social media system that makes the distribution and flow of work-related knowledge and information easy and transparent for parties at different locations. In the system, for example, each of the mining stopes, development faces, or pieces of equipment is assigned a “blog” name. Daily results of onsite inspection for these stopes or faces by responsible engineers are required to be “published” on their “blogs”. The results are listed in a structured data formatted in a “check list table”, containing information and supporting photos as required by the Company. Related parties at different levels of the management team can access the daily “blog” directly for each work place, for first-hand information. The EB system will also record if a management person has accessed the “blog” to read or comment on the daily results under his responsibility. With the EB, information collection, distribution, retrieval, and monitoring has become transparent and immediate. The information and knowledge collected by the frontline technicians or engineers freely flows throughout layers of the management structure. The responsible management person has the requirement, incentive, and tools to make prompt and more accurate decisions that can be instantly delivered to responsible parties. From the safety point of view, using the EB enables personnel to be easily informed about any potentially hazardous conditions and mine safety inspectors to collect and analyze the current status and history of stopes and development faces. In summary, some of the benefits of the EB system are:

Information collection, distribution, retrieval, and monitoring has become transparent and instant.

Information and knowledge collected by the frontline technicians or engineers freely flows throughout layers of the management structure.

Safety information is readily shared.

Structured data format allows statistics to be generated for key management info.

Management has the requirement, incentive, and tools to make prompt and more accurate decisions.

Collaboration becomes easy, KPI assessments are fair and timely, and each person is accountable for his work.

Page 169: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 169

16.5 Production and scheduling

Development schedule

Table 16.10 summarizes the LOM development schedule for each of the Ying mines and for the operation as a whole.

Page 170: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 170

Table 16.10 Ying Mines LOM development schedule

SGX 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 Total Capital Lateral (m) 2,880 2,838 1,857 1,354 350 501 664.3 1393.25 642.62 1347.52 320.48 872.4 1092.2 766.84 1265.37 917.43 797.63 653.65 458.71 191 21,164 Capital Vertical (m) 1,003 160 58 58 210 477 1,966 Operating Lateral (m) 23,195 21,356 19,468 11,579 8,344 9,345 8,963 9,255 8,435 8,120 9,381 10,086 9,907 10,329 8,229 8,559 8,848 7,306 5,798 2806 209,311 Operating Vertical (m) 1,097 1,955 4,588 3,379 2,831 3,792 3,673 3,825 3,739 2963 4298 3411 4817 4532 3477 3232 4060 2798 3055 1707 67,229 Total (m) 28,175 26,309 25,913 16,370 11,525 13,697 13,300 14,473 13,027 12,431 14,000 14,847 15,817 15,628 12,971 12,708 13,706 10,758 9,312 4,704 299670

HZG 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 Total Capital Lateral (m) 708 240 947 Capital Vertical (m) 390 122 512 Operating Lateral (m) 5594 4243 3823 4262 3973 2844 2897 1879 926 273 30,715 Operating Vertical (m) 793 1171 682 1226 853 901 858 624 164 52 7,324 Total (m) 7484 5775 4505 5488 4826 3745 3755 2503 1090 325 39,498

HPG 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 Total Capital Lateral (m) 327 344 366 280 1,317 Capital Vertical (m) 273 273 Operating Lateral (m) 3,985 4,341 4,250 4,051 4,327 5,098 4,412 2,879 1,723 35,066 Operating Vertical (m) 1,630 1348 770 1,349 1152 1225 1535 1569 935 11,513 Total (m) 5,942 5,689 5,637 5,766 5,759 6,323 5,947 4,448 2,658 48,169

TLP 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 Total Capital Lateral (m) 1,002 237 30 385 702 266 348 903 381 709 465 971 660 0 350 412 308 78 67 0 8,274 Capital Vertical (m) 200 373 573 Operating Lateral (m) 5,324 5,081 5,976 5,571 4,434 5,810 5,134 4,933 4,920 4,857 3,867 3,791 4,167 4,012 4,010 3,242 2,320 1,662 1,194 274 80,580 Operating Vertical (m) 1,049 1,918 1,502 1,448 1,708 1,405 1,907 1,460 1,505 1,454 1,498 1,173 1,122 1417 1,221 1,019 754 739 593 166 25,052 Total (m) 7,375 7,236 7,507 7,603 7,216 7,481 7,389 7,295 6,806 7,019 5,830 5,934 5,949 5,429 5,580 4,673 3,382 2,479 1,854 440 114,479

LM East 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 Total Capital Lateral (m) 376 810 263 108 340 110 621 40 104 2,772 Capital Vertical (m) 650 85 60 460 323 120 60 1,758 Operating Lateral (m) 4,360 4,256 3,525 2,355 1,806 3,014 2,163 1,593 1,294 678 669 25,714 Operating Vertical (m) 615 1,406 895 640 635 715 840 480 540 420 315 7,501 Total (m) 6,001 6,557 4,743 3,563 3,104 3,959 3,684 2,113 1,834 1,203 984 37745

LM West 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 Total Capital Lateral (m) 480 749 277 201 101 239 1220 813 488 69 200 4,837 Capital Vertical (m) 120 300 220 120 360 1,120 Operating Lateral (m) 8,676 7,488 6,505 5,128 5,623 6,107 5,664 5,932 6,050 4,958 3,977 4,840 5,634 4,945 5,089 4,142 4,283 4,021 4,625 103,686 Operating Vertical (m) 1,156 2,364 2,525 3,412 2,996 2,285 2,281 1,904 1,731 2012 2188 1668 1082 2149 1520 2317 2066 1708 1443 38,807 Total (m) 9,832 9,972 9,510 9,289 8,896 8,593 8,245 8,157 7,901 7,570 7,385 7,321 7,204 7,163 6,609 6,459 6,349 5,929 6,068 148,451

Ying Mines 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 Total Capital Lateral (m) 5,293 4,125 2,974 2,962 1,949 1,077 1,633 2,437 1,024 2,400 2,005 2,656 2,241 836 1,615 1,329 1,106 932 526 191 39,312 Capital Vertical (m) 2,043 487 333 718 696 178 360 220 330 360 477 6,202 Operating Lateral (m) 51,134 46,765 43,547 32,947 28,507 32,219 29,233 26,471 23,348 18,887 17,895 18,716 19,709 19,286 17,327 15,943 15,451 12,989 11,617 3,080 485,072 Operating Vertical (m) 6,340 10,161 10,962 11,453 10,175 10,323 11,094 9,862 8,614 6,901 8,299 6,252 7,021 8,098 6,218 6,568 6,880 5,245 5,091 1,873 157,426

Total (m) 64,810 61,538 57,816 48,080 41,327 43,797 42,320 38,990 33,316 28,548 28,198 28,101 28,970 28,220 25,160 23,840 23,437 19,165 17,233 5,144 688,011 Note: Some totals may not compute exactly due to rounding.

Page 171: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

Development is characterized as either operating or capital, and includes vein exploration, stope preparation, level development, decline and shaft excavation, and underground infrastructure development. Capital development is notionally that associated with ramp excavation, level access and level rock transportation routes. Operating development is notionally the portions of the level access that provide immediate access to a stope, draw point accesses, and vein development, including exploration vein development.

AMC notes the projected advance rate of 120 m/month for the main ramp developments at SGX and LMW. AMC also notes the reported fiscal 2016 total development advance of 77,380 m for the Ying mines (not including slashing).

AMC considers that the projected LOM development totals are achievable and that a continuing high degree of development focus will be necessary throughout the Ying operation.

Mines production

16.5.2.1 Production rate

Mine operations are scheduled for 365 days of the year, but with production on a 330 days per year basis. Nominal production rates for shrinkage and resuing stopes are around 1200 and 600 tonnes per month respectively, but with the actual rate from each stope being dependent on realized vein and excavation widths.

Table 16.11 is a general summary of production rates and projected years of operation for the Ying mines.

Table 16.11 Ying mines production rate summary

Mine Production Rate (t/month) Typical No. of

Stopes in Operation

Annual Production (kt/a)

Estimated Mine Life (years) Shrinkage Resue

SGX 1200 600 80 268 20

HZG 1200 600 20 56 10

HPG 1200 600 25 81 9

TLP 1200 600 45 121 20

LM East 1200 600 40 78 12

LM West 1200 600 45 100 20

16.5.2.2 Mines production fiscal 2012 to 2016 and Q1 fiscal 2017

Table 16.12 summarizes mine production tonnes and grade from 1 April 2011 to end of June 2016, including high grade, hand-sorted ore (direct shipping ore).

Page 172: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

Table 16.12 Ying mines production Run-of-Mine, fiscal 2012 to 2016 and fiscal 2017 Q1 (dry tonnes)

Mine Ore Type Unit 2012 2013 2014 2015 2016 2017 1st Qtr

(to June 30 2016)

SGX

Ore Mined t 392,748 335,556 241,065 227,335 208,648 69,491

Grade

Ag (g/t) 361 279 241 308 330 383

Pb (%) 6.65 4.74 4.21 5.72 6.66 7.41

Zn (%) 2.11 2.02 1.85 2.06 1.99 2.29

HZG1

Ore Mined t 53,586 65,248 13,897 25,205 28,612 13,731

Grade

Ag (g/t) 215 209 187 297 325 353

Pb (%) 0.89 0.57 0.72 0.99 1.14 1.08

Zn (%)

HPG

Ore Mined t 40,700 65,393 66,358 67,647 56,988 14,668

Grade

Ag (g/t) 113 115 102 138 104 118

Pb (%) 5.48 4.4 3.36 6.89 3.34 3.53

Zn (%) 1.04 1.22 0.84 1.27 0.54 0.95

TLP

Ore Mined t 98,907 158,108 134,951 134,779 115,243 30,292

Grade

Ag (g/t) 114 115 137 154 187 206

Pb (%) 3.05 2.22 2.02 2.41 2.42 2.15

Zn (%)

LME

Ore Mined t 50,442 37,038 59,928 72,308 66,774 13,867

Grade

Ag (g/t) 319 288 319 263 328 340

Pb (%) 2.31 1.13 1.21 1.31 1.32 1.33

Zn (%)

LMW2

Ore Mined t 65,294 71,476 89,057 77,351 21,899

Grade

Ag (g/t) 243 216 211 242 287

Pb (%) 2.09 1.44 2.09 2.63 2.9

Zn (%)

Others3

Ore Mined t 13,160 10,597 3,491

Grade

Ag (g/t) 103 164 71

Pb (%) 6.08 3.34 3.28

Zn (%) 1.43 1.02 1.22

Ying Mines

Ore Mined t 650,596 757,136 619,499 640,142 573,899 163,948

Grade

Ag (g/t) 287 220 207 240 268 308

Pb (%) 5.2 3.29 2.79 3.47 3.85 4.44

Zn (%) 1.37 1.01 0.82 0.78 0.78 1.06

Notes: Total Ore Mined includes hand-sorted high grade ore 1 HZG includes ore from BCG (BCG is south portion of HZG) 2 LMW Includes ore from PD991 (small access tunnel at LM) 3 “Others” in 2012 to 2014 includes ore from YM01 and YM02, and purchased

16.5.2.3 Production schedule

Table 16.13 is a summary of projected LOM production for each of the Ying mines and for the entire operation based on the mid-2016 Mineral Reserve estimates.

The annual ore production is projected to rise to close to 750 kt by 2025. From 2026, the annual ore production is projected to gradually fall to around 450 kt by 2035 as HZG, HPG and LME mines tails off. AMC notes that the development and infrastructure required to allow the projected production increase over 2013 to 2016 levels is either already in place, is in development, or has been planned. AMC also notes that the ability to achieve the projected production increases will, to a large degree, be dependent on the consistent availability of resources, particularly skilled manpower. AMC considers that there is a certain amount of risk associated with the provision of those resources and recommends that Silvercorp maintain particular focus in this area.

AMC notes that projected metal grades through to around 2023 are largely in-line with grades reported in 2015 and 2016 to June 30. In order to maintain optimum metal grades, AMC recommends that Silvercorp continue its recent and current efforts on dilution and grade control via the Mining Quality Control Department.

Page 173: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 173

Table 16.13 Ying Mines LOM Production

SGX 2016 July-Dec 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 Total

Production (kt) 154 263 263 261 266 272 271 271 264 291 298 293 296 295 298 260 264 265 253 236 180 5,514

Ag (g/t) 356 316 322 322 285 290 290 276 267 291 291 262 275 254 225 222 210 187 168 177 156.4 260

Pb (%) 7.36 5.51 6.28 5.87 5.96 5.54 5.54 5.29 5.80 5.22 5.03 4.82 5.01 4.87 3.83 4.69 4.37 3.91 3.66 4.25 4.30 5.06

Zn (%) 2.01 2.41 2.32 2.50 2.56 2.58 2.10 2.32 2.50 2.28 2.06 2.40 2.30 2.34 2.73 2.36 2.16 2.31 2.40 2.30 1.87 2.34

Eq-Ag(g/t) 647 556 585 576 543 535 524 506 518 517 506 479 495 470 416 433 406 371 346 372 343 483

HZG 2016 July-Dec 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Total

Production (kt) 26 50 55 60 60 60 60 60 60 60 33 586

Ag (g/t) 355 338 329 338 341 327 303 289 284 269 272 312

Pb (%) 1.22 1.04 1.19 0.81 0.54 0.65 0.98 1.17 0.78 0.93 0.47 0.89

Zn (%) 0.21 0.20 0.1 0.16 0.17 0.14 0.16 0.18 0.16 0.14 0.16

Eq-Ag(g/t) 393 371 367 364 358 348 334 327 309 299 287 340

HPG 2016 July-Dec 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Total

Production (kt) 36 72 74 80 82 82 84 87 83 83 763

Au (g/t) 1.13 1.08 0.93 1.57 1.18 1.23 1.14 1.37 0.82 0.79 1.12

Ag (g/t) 128.18 114 118 116 119 75 96 96 72 57 97

Pb (%) 4.21 4.80 4.90 3.57 3.68 3.71 3.32 2.47 3.27 2.29 3.55

Zn (%) 0.73 0.86 1.20 1.33 1.03 1.59 1.09 0.70 1.10 1.63 1.15

Eq-Ag(g/t) 347 353 357 349 329 298 292 268 249 208 301

TLP 2016 July-Dec 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 Total

Production (kt) 64 123 124 120 123 130 129 124 128 126 123 119 120 118 123 117 117 116 119 111 100 2,476

Ag (g/t) 211.1 271 274 255 240 233 219 198 207 197 196 201 188 184 191 184 141 138 120 104 102 195

Pb (%) 2.4 3.84 3.18 2.80 2.70 3.00 3.69 3.17 3.84 3.16 3.00 3.41 3.39 2.99 3.42 2.89 2.66 2.78 2.66 2.40 2.73 3.08

Zn (%) 0.27 0.26 0.34 0.29 0.24 0.24 0.32 0.29 0.26 0.29 0.25 0.22 0.23 0.25 0.26 0.32 0.32 0.40 0.28 0.23 0.27

Eq-Ag(g/t) 291 402 382 351 332 336 345 306 338 305 299 317 303 286 308 283 232 233 211 186 195 300

LM East 2016 July-Dec 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Total

Production (kt) 21 52 70 81 81 79 85 85 83 83 78 78 76 953

Ag (g/t) 396 355 340 328 320 305 294 292 288 294 266 267 217 298

Pb (%) 1.87 1.88 1.60 1.90 1.86 2.05 2.10 1.97 2.27 1.83 2.23 2.46 1.55 1.98

Zn (%) 0.3 0.3 0.4 0.4 0.4 0.4 0.5 0.5 0.5 0.5 0.6 0.3 0.42

Eq-Ag(g/t) 460 419 394 392 383 375 365 359 365 356 342 351 270 365

LM West 2016 July-Dec 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 Total

Production (kt) 49 91 90 100 99 98 98 99 100 105 102 100 99 100 100 104 99 110 105 103 90 2,042

Ag (g/t) 313 314 325 362 318 291 352 333 291 298 282 279 295 276 204 179 166 124 103 149 112 253

Pb (%) 3.64 3.71 3.69 2.46 3.30 3.89 2.08 2.25 3.28 2.61 2.94 3.02 2.44 1.90 3.02 3.16 2.40 2.71 2.76 1.76 1.54 2.76

Zn (%) 0.26 0.19 0.18 0.23 0.34 0.22 0.20 0.20 0.28 0.35 0.29 0.26 0.35 0.43 0.51 0.33 0.24 0.30 0.30 0.14 0.28

Eq-Ag(g/t) 439 443 453 447 433 426 424 411 405 388 385 384 379 342 309 289 250 217 199 210 166 349

Ying Mine 2016 July-Dec 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 Total

Production (kt) 350 651 677 703 712 721 727 727 718 749 634 590 592 513 520 481 480 491 477 451 370 12,334

Au (g/t) 0.12 0.12 0.10 0.18 0.14 0.14 0.13 0.16 0.10 0.09 0.07

Ag (g/t) 303 289 293 295 272 260 265 252 241 249 267 253 253 242 213 204 184 161 142 153 131 241

Pb (%) 4.81 4.23 4.32 3.70 3.84 3.86 3.71 3.44 3.98 3.46 3.72 3.92 3.80 3.85 3.58 3.92 3.55 3.37 3.21 3.22 3.20 3.75

Zn (%) 0.96 1.07 1.03 1.08 1.07 1.16 0.91 0.95 1.05 1.07 0.97 1.19 1.15 1.34 1.56 1.27 1.19 1.25 1.27 1.21 0.91 1.12

Eq-Ag(g/t) 493 462 467 454 432 423 418 398 404 393 414 412 407 401 367 364 330 302 277 288 259 396

Rounding of some figures may lead to minor discrepancies in totals. Production from 1 July 2016 to 31 December 2016 is included. Zinc not included in AgEq calculation for HZG, TLP, LME and LMW mines.

Page 174: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 174

16.6 Reconciliation

Table 16.14 summarizes the Silvercorp reconciliation between Mineral Reserve estimates and mill feed, including high grade, hand-sorted ore, for the Ying mines from 1 July 2013 to 30 June 2016.

Table 16.14 Mineral Reserve to production reconciliation: July 2013 – June 2016

Mine Ore Grade Metal

(kt) Ag (g/t) Pb (%) Zn (%) Ag (koz) Pb (kt) Zn (kt)

Reserve (Proven + Probable)

SGX 486 380 7.68 3.00 5,951 37.38 14.59

HZG 95 584 1.37 0.21 1,784 1.30 0.20

HPG 136 97 3.83 0.97 423 5.22 1.32

LME 101 405 1.54 0.29 1,318 1.56 0.30

LMW 264 263 2.41 0.16 2,230 6.34 0.43

TLP 191 231 3.35 0.21 1,420 6.40 0.40

Total 1,274 321 4.57 1.35 13,128 58.21 17.24

Reconciled Mine Production*

SGX 662 310 5.94 2.04 6,595 39.33 13.50

HZG 138 338 1.12 1,506 1.54

HPG 188 106 3.46 0.61 642 6.49 1.15

LME 199 303 1.31 1,942 2.62

LMW 242 229 2.22 1,780 5.37

TLP 380 165 2.31 2,022 8.78

Total 1,809 249 3.54 0.81 14,488 64.13 14.64

Difference: Mill Feed* and Reserve (%)

SGX 36 -19 -23 -32 11 5 -7.47

HZG 46 -42 -19 -16 19

HPG 38 10 -10 -37 52 24 -13.24

LME 97 -25 -15 47 67

LMW -8 -13 -8 -20 -15

TLP 99 -28 -31 42 37

Total 42 -22 -22 -40 10 10 -15

Note: *Includes high-grade, hand-sorted ore.

AMC makes the following observations relative to the data in Table 16.14:

Overall, the mine produced 42% more tonnes at a 22% lower silver grade and a 22% lower lead grade for 10% more contained silver and 10% more contained lead relative to Mineral Reserve estimates5. This suggests the mining of substantial unplanned dilution together with mineralization additional to the Mineral Reserve.

In terms of overall impact relative to silver grade, the poorest performers were HZG, TLP, LME and SGX, in that order.

In 2014, Silvercorp identified that sub-optimal contractor mining practices were a large contributor to the high levels of unplanned dilution and took steps to remedy the situation. Comprehensive resolution was not achieved until the 2015 fiscal year, with a significant improvement in mined grade being noted from that point to the present.

Other factors that may have contributed to the situation include:

− adverse ground conditions

− use of shrinkage stoping in very narrow and / or discontinuous veins

5 Zinc has a minor impact on revenue.

Page 175: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 175

− mining of lower grade, but still economic, material outside of the vein proper

− mis-attribution of feed source to the mill

− over- and / or under-estimation of Mineral Resource/Reserve tonnes and grades at individual sites

− mill process control issues.

AMC understands that Silvercorp has recently revised its stockpiling and record keeping procedures and, as referenced above, has placed a high level of focus on dilution control in recent months by implementing a work quality checklist management enhancement program. AMC endorses these actions and also recommends that Silvercorp undertake periodic mill audits aimed at ensuring optimum process control and mill performance. AMC also recommends that, as practised at SGX, the summation of individual ore car weights by stope and zone be, as far as practicable, integrated into the tracking and reconciliation process.

16.7 Mining summary

The Ying mine complex is a viable operation with a projected LOM through to 2036 based on Proven and Probable Reserves. The potential exists for an extended LOM via further exploration and development, particularly in areas of Inferred Resources.

The annual ore production is anticipated to be maintained at between 650 kt and 749 kt from 2017 to 2025; then from 2026 to 2036 ore production is projected to gradually fall to around 370 kt per annum as HZG, HPG and LME mines are phased out of production. Development and infrastructure to allow access to, and mining in, the necessary number of working places is either in place, in development or is planned. AMC considers that the projected production can be achieved but that there is a degree of risk associated with having sufficient skilled mining labour consistently available. AMC also notes that a continuing high degree of focus will be necessary throughout the Ying operation for planned development targets to be achieved.

Projected metal grades through to around 2023 are largely in-line with reported production grades in fiscal 2016. The current focus on dilution and grade control will need to be diligently maintained if Mineral Reserve mining grades are to be achieved.

AMC recommends that current efforts to fully integrate the Resource estimation, Reserve estimation and mine planning processes be continued.

AMC also recommends that Silvercorp undertake periodic mill audits aimed at ensuring optimum process control and mill performance; and that the summation of individual ore car weights by stope and zone be fully integrated into the tracking and reconciliation process.

The Ying mines safety is governed by Chinese statutory requirements and AMC understands that, in certain areas, those requirements are exceeded. AMC advises, however, that Silvercorp should continue with a focus on safety improvement, including implementation of a policy where the more stringent of either Chinese or Canadian safety standards are employed.

AMC recommends that Silvercorp investigate the use of portable compressors in mining areas with a view to minimizing power costs.

AMC recommends the investigation of the benefits of the application of slushers for muck movement in stopes.

The generally good ground conditions, and the regularity and sub-vertical nature of the Ying district veins, may provide an opportunity to effectively employ more bulk-mining methods such as long-hole benching, and still with reasonable dilution. AMC recommends that Silvercorp consider the application of such methods but recognizes the technological change that would be required for their implementation.

AMC considers that adoption of the above recommendations can form part of the day-to-day running of the Ying mines and that no particular cost provisions need be made in this regard.

Page 176: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 176

17 Recovery methods 17.1 Introduction

Silvercorp runs two processing plants, Plant 1 and Plant 2, for the Ying operations, with a total design capacity of 1,600 tpd (prior to October 2011), and then 2,600 tpd after October 2011 when expansion phase II was completed. The two plants are situated within a distance of 2 km from each other. The development history is described below and summarized in Table 17.1:

Both plants were designed based on the lab tests completed by HNMRI in 2005.

Plant 1 (Xiayu Plant, 600 tpd) has been in operation since March 2007.

Plant 2 (Zhuangtou Plant): (1) Phase I (1,000 tpd) has been in production since December 2009; (2) Phase II (1,000 tpd) has been in production since October 2011 when expansion of another parallel flotation bank was completed. The total design processing capacity is now 2,000 tpd.

The actual processing capacity for Plants 1 and 2 in 2015 is 2,600 tpd of ore.

In this section, global production data up to June 2016 has generally been referenced. Individual plant performance reconciliation data is based on the full year 2016.

Table 17.1 Summary of processing plants 1 and 2 capacities

Items Plant 1 Plant 2

(Phase I)

Plant 2

(Phase II) Plants 1+2

Year in Operation Mar 2007 Dec 2009 Oct 2011

Design Capacity (tpd) 600 1000 1000 2600

Actual Capacity (tpd) 800 900 900 2600

Plant Availability (day/yr) 330 330 330 330

Major Ore Feed LM/TLP/HZG All All All

Tailings Pond P1-Zhuangtou P2-Shi W Gou P2-Shi W Gou P1+P2

17.2 Ore supply and concentrate production from Ying property mines

Ore supply

Ore from the Ying mines in the district is shipped to the milling flotation Plants 1 and 2:

SGX / HPG Lumps: Rich large-size galena lumps with characteristic specular silver-grey colour are hand-sorted at the mine sites, crushed, and then shipped by dedicated trucks to Plant 1. The lumps are milled in a dedicated facility, and then sold directly or mixed with flotation PbS concentrate for sale. The lead lumps bypass the flotation circuit.

SGX / HZG and HPG ore: Transported using trucks on barges from the SGX / HZG and the HPG mines across the lake, and then trucked to the plant. In addition, an ore transportation tunnel from SGX to HPG has been constructed and the haul road from HPG to plants has been upgraded. As a backup, the ore can be transported through the tunnel and haul road to plants.

TLP / LM Ores: Transported via truck directly from mine site to the plant.

Table 17.2 summarizes the ore supply from the mines from 2010 to June 2016. Significant aspects are:

SGX and TLP were the major ore suppliers for the plants, but with an increasing contribution from LM off-setting a decline in TLP production.

HZG mine started producing in 2011.

The lower ore production in 2016 is due to a major contractor change over at SGX.

Page 177: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 177

Table 17.2 Ore supply to Plants 1 and 2 from fiscal 2012 to 2016, and fiscal 2017 Q1

Fiscal Year Unit SGX TLP LME LMW HZG HPG Others*

Sub-Total

2012 Tonnes 402,899 101,329 51,670 55,974 41,726 13,496 667,094

Contribution (%) 60 15 8 8 6 2 100

2013 Tonnes 342,938 161,707 37,879 66,804 87,382 66,874 10,884 774,468

Contribution (%) 44 21 5 9 11 9 1 100

2014 Tonnes 246,785 138,159 61,430 73,189 43,272 68,090 3,569 634,493

Contribution (%) 39 22 10 11 7 11 1 100

2015 Tonnes 229,681 136,204 73,107 90011 49,525 68,416 655,609

Contribution (%) 36 21 11 14 8 11 100

2016 Tonnes 213,541 117,947 68,375 79177 50,066 58,345 587,450

Contribution (%) 36 20 12 13 9 10 100

2017 (Till 30 June) Tonnes 71,100 30,985 14,185 22402 14,037 15,027 167,735

Contribution (%) 42 18 8 13 8 9 100

Production Ranking (2016) 1 2 4 3 6 5  

 

Note: Wet tonnes basis Numbers may not compute exactly due to rounding.

Table 17.3 shows an initial increase in processed ore tonnes (wet) from 2012 to 2013, which then trend downwards for the subsequent three years to 2016. The trend can also be seen in Figure 17.1.

Table 17.3 Ore supply from fiscal 2012 to 2016 (wet base including lead lumps)

Fiscal Year 2012 2013 2014 2015 2016

Tonnes 667,094 774,468 634,493 655,609 587,450

Relative % 100 116 95 97 88

Figure 17.1 Total ore treated and year on year percentage relative to 2012

Page 178: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 178

Ore composition per mine

Table 17.4 shows average ore composition for fiscal 2016. TLP, LME, LMW and HZG have very low zinc values (shown as ‘zero’ in the table as processing of zinc from these sites is of little value).

Table 17.4 Average ore composition by mine (dry basis including lead lumps, fiscal 2016)

Unit SGX TLP LME LMW HPG HZG Average

Ag (g/t) 330 187 328 242 104 325 268

Pb (%) 6.66 2.43 1.34 2.63 3.34 1.14 3.85

Zn (%) 1.99 0.54 0.78

Concentrate production by mine in fiscal 2016

Table 17.5 summarizes the quantity of PbS and ZnS concentrate products produced by mine in fiscal 2016. About 3% of total products were produced by hand-sorting.

Table 17.5 Concentrate production by mine (fiscal 2016)

Products Wt. SGX TLP LME LMW HZG HPG Sub-Total

1. Hand-Sorted Concentrate

(tonnes) 1,570 1,570

2. Flotation Concentrate

Pb Float Conc (tonnes) 21,101 6,518 2,371 4,710 1,605 4,238 40,543

Zn Float Conc (tonnes) 4,398 225 4,623

3. Hand + Float Concentrate

Pb+Zn Conc (tonnes) 27,069 6,518 2,371 4,710 1,605 4,463 46,735

Conc Contribution (%) 58 14 5 10 3 10

Hand-Sorted Conc (%) 3 3

Flotation Conc (%) 55 14 5 10 3 10 97

Conc. Production Ranking (2012) 1 2 5 4 6 4

Concentrate quality and metal recovery (average) fiscal 2012-2016

Table 17.6 and Table 17.7 summarize the concentrate quality and recovery (average) by year, with the recovery also shown in Figure 17.2. The results show that:

Pb and Ag recoveries have shown a gradual increase over years. The average recovery rate for Pb is 95.2% which is significantly higher than designed recovery rate of 90%. The average recovery rate for Ag is 93.7% which is higher than designed recovery rate of 90%.

Ag grade in PbS concentrate meets the design targets; however, the Pb grade has, on average, been below target since 2012.

Zn grade and recovery are lower than the target due to lower zinc content in the ore feed.

The statistics are consistent with an increasing proportion of production from lower grade mines like LM, while over 50% of Pb concentrate is from SGX.

Page 179: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 179

Table 17.6 Concentrate quality by year from fiscal 2012 to 2016, and fiscal 2017 Q1

Product Yr Wt (t) Pb (%) Zn (%) Ag (g/t)

PbS 2012 12,566 49.96 4.82 1,641

Lumps 2013 8,201 45.39 6.80 1,672

Hand Sort 2014 2,586 50.93 5.90 1,735

2015 3,465 49.38 5.58 1,578

2016 1,570 56.72 5.98 1,756

2017Q1 215 59.45 4.13 2,123

PbS 2012 43,848 59.71 3.49 3,487

Flotation 2013 39,087 50.73 3.61 3,605

Conc 2014 29,089 51.94 3.90 3,935

2015 40,053 48.70 3.57 3,479

2016 40,542 49.88 3.96 3,539

2017Q1 14,061 49.01 5.22 3,399

Design     60 1.95  

ZnS 2012 11,964 1.24 50.59 424

Flotation 2013 9,806 0.88 52.29 324

Conc 2014 6,606 0.62 51.12 274

Design

2015

2016

2017Q1

6,208

4,622

1,595

0.89

0.88

0.76

0.95

47.85

52.06

52.50

45

322

302

314

Table 17.7 Overall metal recovery by year from fiscal 2012 to 2016 and fiscal 2017 Q1

Year Pb (%) Zn (%) Ag (g/t)

2012 95.96 67.99 92.86

2013 94.46 66.75 92.76

2014 95.01 66.85 92.67

2015 95.58 59.65 94.36

2016 95.63 54.16 94.96

2017Q1 94.67 54.18 94.64

Av 95.22 61.60 93.71

Design 90 85 90

Page 180: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 180

Figure 17.2 Overall metal recovery to concentrate from 2007 to 2016

Impact of ore type on concentrate quality and metal recovery (fiscal 2016)

Tables 17.8 to 17.12 summarize the concentrate production by mine (SGX, HZG, HPG, TLP, LME and LMW) for fiscal 2016.

Table 17.8 SGX mine – ore processed – actual mass balance (fiscal 2016)

Product Wt Mass Grade Recovery

(tonnes) Yield (%) Pb (%) Zn (%) Ag (g/t) Pb (%) Zn (%) Ag (%)

Wet tonnes 213,541

Dry tonnes 208,648 100 6.66 1.99 330 100 100 100

Lead Con. 22,671 10.87 59.27 6.83 2894 96.65 37.34 95.42

Zinc Con. 4,398 2.11 0.85 52.10 287 0.27 55.28 1.84

Tails 181,579 87.03 0.24 0.17 10 3.08 7.38 2.75

Zinc grade and recovery are slightly lower than target due to lower zinc content in the ore feed.

Table 17.9 TLP mine – ore processed – actual mass balance (fiscal 2016)

Product Wt Mass Grade Recovery

(tonnes) Yield (%) Pb (%) Zn (%) Ag (g/t) Pb (%) Zn (%) Ag (%)

Wet tonnes 117,946

Head 115,243 100 2.42   187 100 100

Lead Con. 6,518 5.66 40.4   3,095 94.36   93.51

Tails 108,725 94.34 0.14   12.7 5.64   6.49

0

20

40

60

80

100

120

2012 2013 2014 2015 2016 2017Q1

Recovery(%

)

Pb Zn Ag

Page 181: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 181

Table 17.10 LME mine – ore processed – actual mass balance (fiscal 2016)

Product Wt Mass Grade Recovery

(tonnes) Yield (%) Pb (%) Zn (%) Ag (g/t) Pb (%) Zn (%) Ag (%)

Wet tonnes 68,375

Head 66,774 100 1.34   328 100 100

Lead Con. 2,371 3.55 34.87   8,865 92.09   95.93

Tails 64,403 96.45 0.110   14 7.91   4.07

Table 17.11 LMW mine including PD 991-ore processed – actual mass balance (fiscal 2016)

Product Wt Mass Grade Recovery

(tonnes) Yield (%) Pb (%) Zn (%) Ag (g/t) Pb (%) Zn (%) Ag (%)

Wet tonnes 79,176 Head 77,351 100 2.66   242 100 100

Lead Con. 4,710 6.09 41.75   3,767 95.72   94.66

Tails 72,641 93.91 0.121   14 4.28   5.34

Table 17.12 HPG mine – ore processed – actual mass balance (fiscal 2016)

Product Wt Mass Grade Recovery

(tonnes) Yield (%) Pb (%) Zn (%) Ag (g/t) Pb (%) Zn (%) Ag (%)

Wet tonnes 58,345 Dry tonnes 56,988 100 3.37 0.54  104 100 100 100

Lead Con. 4,238 7.44 41.85 3.54  1,244 92.23 48.97 89.35

Zinc Con. 225 0.39 1.39 51.42  594 0.16 37.78  2.27

Tails 52,525 92.17 0.28 0.08  9 7.60 13.24   8.381

Table 17.13 HZG mine (including BCG) – ore processed – actual mass balance (fiscal 2016)

Product Wt Mass Grade Recovery

(tonnes) Yield (%) Pb (%) Zn (%) Ag (g/t) Pb (%) Zn (%) Ag (%)

Wet tonnes 50,066

Head 48,895 100 1.18   349 100 100

Lead Con. 1,605 3.28 33.30   10,220 92.55   96.01

Tails 47,289 96.72 0.09   14 7.45   3.99

Tables 17.8 to 17.13 indicate that:

The metal recovery includes hand-sorted PbS lumps and flotation concentrates, and is, therefore, higher than that for the flotation recovery alone, especially for the SGX and HPG cases; however, hand-selected PbS lumps have reduced significantly over the past year.

PbS grade: only SGX is close to the design expectation of 60 – 65% Pb.

Pb recovery reached design for all mines, and Pb recoveries for SGX, LME, and LMW are significantly higher than design.

Ag recovery for SGX, LME, LMW, HZG and TLP ore exceeded the design expectation; HPG recovery of Ag did not meet design expectations due to lower Ag grade ore produced at that mine.

Page 182: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 182

ZnS grade: Zn grade is lower than the target grade for SGX and HPG.

Zn recovery for all mines is lower than the design expectation, due to low zinc in the feed, or minimal zinc for TLP, LME, LMW, and HZG.

Note that, with the exception of HZG (very low lead feed grade), lead concentrates contained more than 33% Pb, which is acceptable within the Chinese domestic smelting market, although higher treatment charges and lower % payables will occur (see terms in Section 19).

Ore supply by plant

Silvercorp has adopted the following strategies to maximize the metal recovery and plant processing throughput:

High grade lead lumps are hand-sorted at the mine sites and not processed via flotation circuit. This helps to reduce the flotation loading and operating cost.

Plant 1: mainly processes development low grade ores from LME, LMW, HZG, and part of TLP. It is normally operating once a month or once every two months.

Plant 2: processes ores from all mines.

Blending lead concentrates from Plant 1 and Plant 2 to maximize profit.

For higher Ag grade ore from LME, LMW, HZG, the Pb concentrate product grade is slightly lower in order to maximize the recovery.

Table 17.14 shows the ore feeds by mine for flotation. SGX and HPG are rich in lead; and TLP, LM, and HZG have little zinc. Lead recovery ranges from 92.1% to 96.5% with average 95.4%. Silver recovery ranges from 88.9% to 96.1% with an average 94.9%. Zinc recoveries are 56.5% for SGX and 37.6% for HPG respectively with an average 55.2%.

Table 17.14 Flotation Feeds: Ore Grade and Recovery (fiscal 2016)

Mines Grade Recovery

Pb (%) Zn (%) Ag (g/t) Pb (%) Zn (%) Ag (%)

SGX 6.28 1.96 319 96.47 56.46 95.12

HZG 1.22 356 92.25 96.12

TLP 2.42 187 94.41 93.59

HPG 3.34 0.54 104 92.20 37.60 88.95

LME 1.32 328 92.13 95.97

LMW 2.63 242 95.74 94.78

Avg 3.85 0.78 268 95.40 55.24 94.87

Note: above excludes SGX lumps of 1,575t (Pb:56.7%, recovery 100%;Zn:6.0%, recovery 0%;Ag : 1,756g/t, recovery 100%)

Table 17.15 shows the ore feeds from each mine processed at flotation Plants 1 and 2 in fiscal 2016, excluding high grade lumps from SGX.

Table 17.15 Flotation Feeds: Tonnes to Plants (fiscal 2016)

Mines Plant 1 (t) Plant 2 (t) Subtotal (t)

SGX 211,966 211,966

TLP 9,943 108,003 117,947

LME 8,596 59,779 68,375

LMW 5,662 73,515 79,177

HPG 58,345 58,345

HZG 2,392 47,674 50,066

Sub-Total 26,593 559,282 585,875

Ratio (%) 4.5 95.5  

Page 183: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 183

Table 17.15 shows that:

For Plant 2, ore from all mines is used as the feed for flotation.

For Plant 1, only low grade ores from TLP, LME, LMW and HZG are processed.

95.5% of the ore is processed at Plant 2. The daily processing rate is about 1,695 tpd. Plant 2 is currently under-utilized, treating less than its design capacity of 2,000 tpd.

4.5% of the ore is processed at Plant 1. The daily processing rate is about 750 tpd.

LOM mill feed schedule

From the mine schedule a mill feed schedule has been derived on the assumption that only low grade ores from LME, LMW, TLP and HZG are fed to Plant 1, while the majority of ore from all mines is fed to Plant 2. This is shown in Table 17.16 below.

Page 184: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 184

Table 17.16 LOM mill feed schedule

Plant Plant No 1 Plant No 2 Total

ktpa Mine HZG TLP LME LMW Subtotal Rate SGX HZG HPG TLP LME LMW Subtotal Rate

Year ktpa ktpa ktpa ktpa ktpa ktpd ktpa ktpa ktpa ktpa ktpa ktpa ktpa ktpd

2017 20.08 23.40 21.55 35.77 100.80 0.31 262.53 30.00 72.45 100.00 30.00 55.00 549.97 1.67 650.77

2018 25.10 24.28 40.28 37.73 127.38 0.39 263.16 30.00 74.47 100.00 30.00 52.00 549.62 1.67 677.00

2019 20.02 20.27 51.22 61.25 152.76 0.46 261.39 40.00 79.64 100.00 30.00 38.96 550.00 1.67 702.76

2020 20.03 23.21 51.50 67.03 161.77 0.49 266.11 40.00 82.17 100.00 30.00 31.72 550.00 1.67 711.77

2021 20.07 30.05 49.01 72.36 171.49 0.52 271.97 40.00 82.22 100.00 30.00 25.81 550.00 1.67 721.49

2022 20.08 29.10 54.52 73.48 177.19 0.54 271.27 40.00 83.96 100.00 30.00 24.77 550.00 1.67 727.19

2023 20.17 24.11 55.22 77.02 176.51 0.53 271.49 40.00 86.56 100.00 30.00 21.95 550.00 1.67 726.51

2024 20.23 27.94 52.60 67.09 167.86 0.51 264.26 40.00 83.12 100.00 30.00 32.63 550.00 1.67 717.86

2025 20.29 25.70 53.34 99.37 198.70 0.60 291.20 40.00 82.96 100.00 30.00 5.84 550.00 1.67 748.70

2026 13.18 23.25 48.39 84.82 0.26 297.53 20.00 100.00 30.00 101.84 549.37 1.66 634.19

2027 19.36 47.68 67.04 0.20 293.14 100.00 30.00 100.11 523.25 1.59 590.29

2028 19.62 46.34 65.96 0.20 296.11 100.00 30.00 99.50 525.61 1.59 591.57

2029 18.24 18.24 0.06 294.91 100.00 100.16 495.07 1.50 513.31

2030 22.83 22.83 0.07 297.71 100.00 99.79 497.50 1.51 520.34

2031 16.63 16.63 0.05 259.77 100.00 104.16 463.93 1.41 480.56

2032 17.46 17.46 0.05 263.65 100.00 98.80 462.45 1.40 479.90

2033 16.24 16.24 0.05 264.65 100.00 109.86 474.50 1.44 490.74

2034 19.14 19.14 0.06 252.52 100.00 105.43 457.94 1.39 477.09

2035 11.48 11.48 0.03 236.16 100.00 102.94 439.10 1.33 450.58

2036 0.22 0.22 0.00 179.86 100.00 90.39 370.25 1.12 370.46

Total 199 413 572 591 1,775 5,359 360 728 2,000 360 1,402 10,209 11,983

Page 185: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 185

17.3 Mill Plant No.1 (Xiayu)

Process flowsheet

For processing Plant 1, general view photos and the flowsheet are shown in Figures 17.3 and 17.4 respectively.

Figure 17.3 General view photos (Plant 1)

Page 186: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 186

Figure 17.4 Flowsheet (Plant 1)

The flowsheet includes the following major unit operations:

Crusher circuit (one train).

Ball mill and Pb / Zn /Cu flotation circuit (two trains), each train is capable of processing 800 tpd.

Filtration and product handling circuit (one train).

Process description

The overall process consists of crushing, grinding, flotation of lead and zinc concentrates, and concentrate dewatering unit operations:

Ore crusher circuit (closed circuit with two-stage crushers-screen: jaw crusher, one cone crusher, vibrating screen, dust collectors, two ore storage bins) (one train: 1x800 tpd).

Ball mill circuit-spiral classifiers circuit (two trains: 2x800 tpd).

Two trains at Plant 1 were upgraded, with each train now capable of processing of 800 tpd of ore.

Flotation circuit (PbS flotation-ZnS flotation circuit: rougher-scavenger-cleaner cells, chemical preparation tanks) (two banks: 2x800 tpd).

Page 187: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 187

Concentrate thickening-ceramic filtration circuit (PbS filtration, ZnS filtration) (one train for each of Pb, Zn).

Water make-up system.

Tailings pond.

The following minor changes have been made to the original Plant 1 design:

Addition of one cone crusher to reduce ball mill feed size and thus to increase ball mill capacity from 600 to 800 tpd.

The original ball mill grinding size target was coarsened from 70% to 60% (-200 mesh), which helps to reduce energy consumption, mill grinding time and filtration time; with only a small recovery loss (see Section 13). In 2014, the system was adjusted with the ball mill grinding size target modified from 60% to 61% to 63% (-200 mesh), which resulted in increased Pb recovery of 0.41% and Ag recovery of 2.16 g/t respectively.

Replacement of lime slurry by NaOH/Na2CO3 for flotation circuit, with improvements in operability.

No re-grinding for zinc flotation feed.

Chemical consumption is slightly higher than that determined by the lab work.

No water treatment plant is required, with recycle water from pond and fresh water from the reservoir being used.

Crushing

The crushing is a closed circuit, consisting of jaw-cone crushers with a vibrating screen. The primary jaw crusher (Model: PEF 500x750) has a closed side setting of 80 mm. Discharge from the primary jaw crusher is conveyed to the 15 mm aperture vibrating screen. Ore larger than 15 mm is conveyed to the secondary cone crusher (Model: PYH-2X cone crusher), which has a close side setting of 15 mm. Discharge from the secondary crusher is conveyed back to the 15 mm aperture screen. Discharge from the screen feeds ore bins with a live capacity of 100t.

Dust from the crushing and screening processes is collected under vacuum, captured in a baghouse dust filter and then transferred to a process tank, with the resulting slurry introduced to flotation.

Milling classification (two trains)

Crushed ore from the live bins is conveyed to a closed milling circuit consisting of two trains, each with a grate-discharge ball mill (Model: MQCG 2100 x 3600) and a screw classifier (Model: FG-200).

The ball charge is made up of Mn-steel balls, with diameters ranging from 60 mm to 120 mm.

The target grind size is 61% to 63% passing 200 mesh and the overflow density is maintained at 40% solids by weight, when introduced to the conditioning tanks ahead of lead flotation.

Flotation (two trains)

The O/F from the screw classifier flows to the lead rougher conditioning tank, and then to the lead rougher flotation cells. The lead flotation bank consists of one stage of roughing, two stages of scavenging (both BF-4 type cells) and three stages of cleaning (BF-1.2 type cells).

Lead scavenger tails flow to zinc flotation. The zinc flotation bank consists of one stage of roughing, two stages of scavenging and three stages of cleaning, cells being the same size as in the lead circuit.

Product concentrating, filtration and handling

Both lead and zinc concentrates slurries flow to their respective concrete settling containment structures for settling.

The settled slurries, containing approximately 50% to 60% solids by weight, are pumped to a ceramic filter for dewatering. The moisture content of dewatered lead and zinc concentrates are 7% to 10% and 9%, respectively.

The filter cake products are sent to Plant 2 for concentrate blending. Blended concentrate products are then sold and shipped by truck to the clients.

Page 188: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 188

Due to low Zn in the feed ore to Plant 1, the zinc flotation circuit is currently not in operation.

To optimize profitability, high grade PbS (55% to 65% Pb) from Plant 2 is blended with medium grade PbS (40% to 50% Pb) from Plant 1 before shipping the blended concentrate to the clients.

Tailings thickening

Tailings from the zinc scavenger flotation circuit (when in operation) are directly pumped through up to 4 discharge outlets into to the Zhuangtou tailing dam located at the northern creek located between No.1 Mill and No.2 Mill.

The plant recirculates the lead and zinc concentrate tailings overflows in addition to the tailings dam supernatant water.

A crew of two people monitors the tailings dam. Reclaimed process water from the tailings pond is recycled for reuse in the milling process. In addition, a crew of two staff carry out maintenance of the water reclamation circuit and pump stations.

Metallurgical performance (Plant 1)

Table 17.17 lists the mass balance based on design for the No.1 Mill. It is noted that the copper flotation circuit system added in 2009 to handle TLP and HPG ores is no longer in use.

Table 17.17 Design mass balance at the No.1 mill (daily basis)

Product Quantity

(tpd) Distribution (%)

Pb

(%)

Zn

(%) Pb Recovery

(%) Zn Recovery

(%)

Ore 600 100 3.18 1.73 100 100

Pb Conc 28.62 4.77 60.00 1.95 90.00 5.38

Zn Conc 19.62 3.27 0.95 45.00 0.98 85.00

Tailings 551.76 91.96 0.31 0.18 9.02 9.62

Mass balances have been shown in Tables 17.10, 17.11 and 17.13 for LME, LMW and HZG ores for fiscal 2016, and ore grade vs recovery for LM, HZG and (part of) TLP is shown in Table 17.18. The processing results show that:

Pb/Ag recoveries exceed the design expectation for both LM and HZG ores.

Pb recovery is slightly lower than the design expectation for TLP ores, but the Ag recovery exceeds the design target.

Since Zn grades are very low, no Zn concentrate is generated from LM, HZG, and TLP ores.

Table 17.18 Flotation feeds: ore grade vs. recovery (fiscal 2016) (Plant 1)

Mines Grade Recovery

Pb (%) Zn (%) Ag (g/t) Pb (%) Zn (%) Ag (%)

HZG 0.84 N/A 292 91.45 N/A 95.76

LME 0.68 N/A 200 86.76 N/A 93.34

LMW 1.81 N/A 227 94.04 N/A 94.73

TLP 2.03 N/A 186 92.87 N/A 93.99

17.4 Mill Plant No. 2 (Zhuangtou)

A general view photo and flowsheet are shown in Figures 17.5 and 17.6, respectively.

Page 189: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 189

Figure 17.5 General view photos (Plant 2)

No.2 Mill (Zhuangtou) is located 2 km to the west of No.1 Mill. No.2 Mill also includes two parallel processing lines. The first line with a design capacity of 1,000 tpd has been operating since December 2009. The second flotation line, also with a design capacity 1,000 tpd, was installed in October 2011.

Page 190: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 190

Figure 17.6 Flowsheet for Plant 2

Flowsheet

The flowsheet includes the following major unit operations:

Crusher circuit (one train)

Ball mill and Pb/Zn flotation circuit (two trains)

Filtration and product handling circuit (one train)

Process description

The process for Plant 2 is very similar to that for Plant 1, except for the larger size equipment, and consists of the following:

Page 191: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 191

Ore crusher circuit (closed circuit with three-stage crushers-screen: one jaw crusher, two cone crushers, vibration screen, dust collectors, ore storage bins) (one train: 1x2,500 tpd).

Ball mill circuit two-stages ball mill, (Model: φ2.7×4.0 15” hydrocylone/spiral classifiers, Model: 2FG2.4) (Two trains: 2x1,000 tpd).

Flotation circuit (PbS flotation-ZnS flotation: rougher-scavenger-cleaner cells, chemical preparation tanks) (2x1,000 tpd). No copper flotation.

Product thickening - Ceramic filtration circuit (PbS filtration, ZnS filtration).

Water make-up system.

A new tailings pond (monitored by 7 people).

The plant design was based on a design document very similar to Plant 1, with minor changes to those implemented in Plant 1.

Crushing

The crushing is a closed circuit, consisting of two jaw-cone crushers with a vibrating screen. The primary jaw crusher (Model: PEF 800x1000) has a closed side setting of 80 mm. Discharge from the primary jaw crusher is conveyed to the 15 mm aperture vibrating screen. Ore larger than 15 mm is conveyed to the secondary cone (Model: PYHD-3CC) and tertiary cone crusher (Model: PYH-3CC), which has a close side setting of 15 mm. Discharge from the secondary crusher is conveyed back to the 15 mm aperture screen. Discharge from the screen feeds ore bins with a live capacity of 1,000t.

Milling classification

Crushed ore from the live bins is conveyed to a closed milling circuit consisting of a two trains, each of grate-discharge ball mill (Model: MQG 2.7x4.0) and 15” hydrocylone/spiral classifiers (Model:2FG2.4).

Flotation

Similar to Plant 1, but with larger cells (BF-16 and BF-4).

No copper flotation.

Product concentrating, filtration and handling

Similar to Plant 1 with larger size thickener, filter and handling system.

To optimize profitability, high grade PbS (55% to 65% Pb) from Plant 2 is blended with medium grade PbS (40% to 50% Pb) from Plant 1 before ore shipping to clients.

Tailings thickening

Tailings from the zinc scavenger flotation circuit are directly pumped into the Shi Wa Gou tailings pond located below No. 2 Mill.

Metallurgical performance (Plant 2)

Originally No.2 Mill was designed to process both Pb and Zn ore as well as Cu, Pb and Zn ore. In practice, however, No.2 Mill currently processes Pb and Zn ore only. The design mass balance for Phase I of the No.2 Mill is shown in Table 17.19.The No.2 mill was subsequently upgraded (Phase II) in 2011. The design mass balance for Phase II is same as those for Phase I.

Page 192: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 192

Table 17.19 Design Mass Balance for No.2 Mill (Pb+Zn Ore) (Phase I and Phase II, 2x1000 tpd)

Product Quantity

(t) Product Rate

(%) Pb

(%)

Zn

(%) Pb Recovery

(%) Zn Recovery

(%)

Ore 1000 100 4.75 3.63 100 100

Pb Conc 64.4 6.44 65 1.95 93.11 9.39

Zn Conc 59.1 5.91 0.45 50.57 2.67 81.98

Tailings 876.5 87.65 0.35 0.24 6.44 4.94

Mass balances are shown in Tables 17.8, 17.9, and 17.12 for SGX, TLP and HPG ores, and grade vs recovery are shown in Table 17.20. The processing results show that:

Pb / Ag recoveries exceed the design expectation for SGX ores.

In 2016, some HPG oxidized ore was processed, resulting in lower recoveries for Pb/Ag than designed.

Pb recovery for LME, LMW and HZG ores are close to design, and for TLP exceeds design expectation. Ag recovery for LME, LMW, HZG and TLP ores exceeds the design expectation.

Zn recoveries for SGX and HPG ores are 56.7% and 37.8% respectively, lower than the design expectation (81.98%).

Since Zn grade is very low, no Zn concentrate is generated from LME, LMW, HZG and TLP ores.

Table 17.20 Flotation Feeds: Ore Grade vs. Recovery (fiscal 2016) (Plant 2)

Mines Grade Recovery

Pb (%) Zn (%) Ag (g/t) Pb (%) Zn (%) Ag (%)

SGX 6.35 1.96 319 96.46 56.65 95.22

HPG 3.37 0.54 104 92.23 37.78 89.35

TLP 2.47 187 94.51 93.46

HZG 1.20 352 92.59 96.02

LME 1.44 347 92.45 96.14

LMW 2.72 244 95.81   94.65

Sampling (For Plants 1 and 2)

For metallurgical accounting purposes, a set of five samples is usually taken during every eight-hour shift for a total of 15 samples per 24-hour day. The shift samples include flotation feed from the classifier overflow, lead and zinc concentrates from the 3rd cleaners, and lead and zinc tailings from the last scavengers.

17.5 Process control and automation

There is no centralized automation station or control room for overall plant process monitoring or control. Operation control is done locally:

Ore feed to ball mill is controlled via an electronic scale, water addition is controlled by operators via slurry density and experience.

Chemical dosages are controlled via a localized PLC system for each set of equipment. Chemical dosage is adjusted in a narrow range (around the default target or setting value), based on assay feedback (each half hour) to handle process upsets such as ore feed changes.

A central control room in the grinding-flotation building from which TV imaging of key points in the production flow can be monitored.

The planned level of process control and automation is basic but adequate, recognizing that the process separation is complex and that low-cost operating labour to monitor process variables is readily available.

Page 193: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 193

17.6 Ancillary facilities

Laboratory

The laboratory is equipped with the usual sample preparation, and fire assay, wet chemistry and basic photometric analytical equipment, as well as crushing equipment. The laboratory generally processes up to 100 samples per day.

It also conducts routine analysis of ores and concentrates as well as water quality and other environmental testing. It also provides a technical service to the processing plant in monitoring plant conditions, and solving production problems and investigating processes to assist with the improvement efforts.

Silvercorp QA / QC check procedures include inserting standards in the sample batches submitted to the labs on a regular basis and submitting duplicate pulps to an independent external lab on an intermittent basis.

Maintenance workshop(s)

Daily maintenance requirements are serviced through section specific workshops, each equipped with a crane, welding capability and basic machine-shop facilities. More extensive maintenance and major overhaul needs are met through use of appropriate contractors.

17.7 Key inputs

Power

Mill power is drawn from the Chinese national grid. It is transformed from 10,000 V to 400 V by a total of twelve 400 KVA transformers (See also Section 18.3).

Plant 1: Total installed power amounts to 2,295 kW (includes standby equipment), including 189.14 kW for crushing and milling in 2015. The mill power consumption is 26.8 kW/t per tonne of ore,

Plant 2: Total installed power amounts to 7,880 kW (includes standby equipment) including 449.21 kW for crushing and milling in 2015. The mill power consumption is 38.6 kW/t per tonne of ore.

Water usage and mass balance for Plant 1 and Plant 2

The water usage includes:

Fresh make-up water used for cooling, reagent preparation and flotation.

Recycle water used for ball mill and flotation.

Water recycle from the tailings pond back to the recycle water tank.

Water for Plant 1

The fresh makeup water usage is around 909 m3/d, while the rest is made up by recycle water - 2,956 m3/d from thickeners and tailings pond. Total water usage is about 3,864 m3/d, recycle ratio is 76.5%.

Water for Plant 2

The fresh makeup water usage is around 2,089 m3/d, while the rest is made up by recycle water - 5,911 m3/d from thickeners and tailings pond. Total water usage is about 8,000 m3/d, recycle ratio is 73.9%.

Strategy to reduce fresh water usage

To reduce water consumption, and achieve zero discharge for non-rainy seasons, the following practices have been implemented:

Reclaimed water from the tailings ponds and overflows from the two concentrators is recycled to minimize fresh water requirements. The raw water cost at 1.67 RMB per m3 is at least 250,000 RMB per annum at

Page 194: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 194

the current production rate. Water is piped to the raw water tank from a river source adjacent to the concentrator property, a distance of 2.5 km.

The cost of reclaimed water from tailing dam is 1.1 RMB per m3 and recycled water in the plant is 0.23 RMB per m3. The in-plant recycled water is mainly for milling and flotation.

With the reuse of recycled water from the tailings pond, there is minimal lock-up of water in tailings and close to 75% of the water is recycled; however, there is a requirement for fresh water, e.g. for pump seals, cooling and reagent mixing, and it is this requirement that sets the overall fresh water demand. The reclaimed water from tailings dam accounts for 65% of total water usage and in-plant recycled water for 10%.

Upfront water usage is about 3.5-4 m3/t ore processed, but allowing for recycled water, net usage is less than 1 m3/t ore processed.

Reagents

The reagents used in both plants include:

Depressant / modifiers: 1-Sodium sulphide, 2-Zinc sulphate, 3-Sodium sulphite, 4-Copper sulphate.

Collectors: 1-Di-ethyl dithiocarbamate, 2-Ammonium dibutyl dithiophosphate, 3-Butyl xanthate.

Frother: No. 2 oil (added directly).

Reagent preparation and application of chemicals are described as follows:

Reagent storage and mixing is located adjacent to the grinding / flotation plant and comprises a storage area with hoisting equipment to lift bags and drums through into the mixing area.

From the mixing area the reagents are pumped up to the dosing station, located above the flotation section for dosing and gravity feeding to the various addition points.

17.8 Conclusions

Plant 1 is exceeding the design throughput on a daily basis, but is run only in campaigns depending on the ore supply. Plant 2 is operating below the design throughput level.

Lead and silver recovery targets are being met, although zinc recovery is lower than design, attributed to low zinc feed grades.

After innovation and modification to both plants over last few years, Pb and Ag recoveries have increased significantly.

Improvements are consistently targeted on process system and other facilities both in Plant 1 and 2 to improve the metal recovery, and reduce energy consumption.

Historically, higher-grade feed from SGX has enhanced plant performance but, with the proportion of SGX ore decreasing, the challenge is to maintain similar metallurgical performance on lower grade feedstock. From recent performance, it appears that recoveries are being maintained but concentrate grades are lower than target, however, not to the extent where there is a major deterioration in smelter terms.

Page 195: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 195

18 Project infrastructure 18.1 Tailings Management Facility (TMF)

Overview

Table 18.1 outlines key parameters for the two TMFs. TMF 1 has served both mill Plant 1 and Plant 2 during the period of 2007-2012. Since TMF 2 was put into operation in April 2013, the two TMFs serve their respective mill plants:

TMF 1 (Zhuangtou tailings pond, built in 2006, designed by Sinosteel Institute of Mining Research Co., Ltd) serves mill Plant 1.

TMF 2 (Shiwagou tailings pond, built in 2011, designed by San-Men-Xia Institute of Gold Mining Engineering Co.) serves mill Plant 2.

The TMFs were designed based on then-current resource/reserve estimations and LOM production projections. Subsequent resource expansion and increased production projections indicate that the current tailings capacity will not be adequate for the full Ying LOM. Additional tailings capacity will thus be required in the later period of the LOM production. There are several options to choose a location of the third TMF. It is expected that there will be no problem to get permission to build the third TMF once it becomes necessary.

Table 18.1 Key Metrics of the two TMFs

Unit TMF 1

(Zhuangtou)

TMF 2

(Shiwagou)

Year Built 2006 2011

Start Operation Mar 2007 April 2013

Total Volume (Mm3) 3.32 5.91

Working Volume (Mm3) 2.83 4.05

Service Life (yr, design) 23 11.9

Remaining life (yr) 6.2 7.3

Production rate1 (ore, tpd) Plant 1 (600tpd) Plant 2 (2000tpd)

MF Occupation Percentage (tpa, dry) 85.1% 68.5%

Notes: The rates for production and tailings deposition indicated in this table are as per original design. Average daily production rates in the LOM plan fall within the rates indicated above.

TMF Occupation Percentage = working volume divided by total volume

This section describes the site, tailings properties, TMF sizing and design, tailings transfer, and water balance – recycle. The TMF design covers:

Starter dam

Trench, seepage collection, water decant system

Reclaiming and water recycle system

Geotechnical, safety and risk assessment, etc.

Tailings properties

Tailings from the two mill-flotation plants are similar in terms of properties. Tailings properties (mainly from zinc rougher flotation circuit) are summarized below:

Dry solids: true density 2.94 t/m3, bulk density 1.64 t/m3.

Tailings slurry: before deposition – weight percent solids of 21.8% with slurry density of 1.16 t/m3; after deposition in the pond – solids component 49% by weight; S.G. 1.49 t/m3.

Tailings particle sizing: 70% <75 µm (200 mesh), average diameter 49–50 µm. A detailed particle size distribution (PSD) analysis is summarized in Table 18.2.

Clay content is about 15% by weight.

Page 196: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 196

The compaction and ultimate density is normally quite sensitive to the moisture content. The optimum moisture can be fairly tightly constrained in the +/- 1-2% range. Shear tests are conducted to determine the internal strength of the tailings, which is important for the stability analysis.

Geochemical properties of the tailings were assessed by a multi-element analysis (Pb and Zn). No leaching tests have been carried out to determine the potential for metal leaching.

Table 18.2 Tailings PSD1 and compositions

Size Range

(mm)

Yield

(%)

Composition (%) Distribution (%)

Pb Zn Ag (g/t) Pb Zn Ag

+0.100 14.73 0.20 0.19 21.25 6.85 9.03 11.12

-0.100+0.074 15.18 0.27 0.23 27.28 9.49 11.11 14.71

-0.074+0.037 21.31 0.36 0.27 22.10 17.81 18.73 16.73

-0.037+0.019 21.57 0.62 0.40 31.43 31.10 27.83 24.08

-0.019+0.010 14.90 0.57 0.38 34.77 19.75 18.26 18.40

-0.010 12.31 0.52 0.38 34.21 15.00 15.04 14.96

Total 100.00 0.43 0.31 28.15 100.00 100.00 100.00

Note: *Measured by the Hunan Institute of Metallurgy, 1Particle size distribution (PSD)

Water chemistry is shown in Table 18.3. About 75% of the process water is recycled back to the plant (refer to Section 17.7.2).

Table 18.3 Chemical Composition for Pond Recycle Water

Element Pb Zn Cu S2- Sulphate COD1 Org carbon pH

Level (mg/l) 0.95 1.94 0.06 0.35 68 38.8 4.03 7.5

Note: 1Chemical oxygen demand (COD)

Site description

TMF 1 is located adjacent to Plant 1, and TMF 2 is located adjacent to Plant 2. The distance between the two plants is about 3 km, and the distance between the two TMFs is less than 2 km. All four facilities are within a 4–5 km radius:

TMF 1: The TMF starter dam is located within the lower reaches of Donggou valley.

TMF 2: The TMF starter dam is located within the lower reaches of Shi-Wa-Gou valley.

TMF 1 and 2 are both about 1.5 km from Zhuangtou Village and about 600 m from the entry of Xiashi Gully.

TMF 1 and 2 are located on the south edge of the North China Platform, within the Xiaoshan-Lushan arch fault fold cluster area and the Feiwei Earthquake Zone. Historically the area has been subjected to earthquakes with recorded magnitudes of less than five. Luoning County has been classified as grade 6 in terms of seismicity, and as such, a basic design seismic acceleration of 0.05 g is required to be taken into consideration in the design.

AMC’s understanding is that the seismic rating is in accordance with the China Seismic Intensity Scale (CSIS), which is similar to the Modified Mercali Intensity (MMI) scale, now used fairly generally and which measures the effect of an earthquake at the surface, as opposed to the now obsolete Richter magnitude scale which measures the energy released at source. In effect, CSIS grade 6 is similar to VI (Strong) on the MMI, although the CSIS scale also specifies peak acceleration and peak velocity. The 0.05 g acceleration cited above for design purposes would correlate more with MMI V (Moderate) according to the United States Geological Service (USGS) Earthquakes Hazard Program. AMC recommends that this be clarified.

Page 197: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 197

TMF design, construction, operation and safety study

18.1.4.1 Design: TMF 1

The following criteria and parameters are based on the design done by the Sinosteel Institute of Mining Research Co., Ltd (Report dated March 2006) and updated survey data:

Storage capacity calculations for the valley site indicate an estimated total volume of 3.32 Mm3 and available volume of 2.83 Mm3. It is assumed that, at the dry density of 1.49 t/m3, this volume is equivalent to 4.2 Mt of tailings.

At a rate of deposition of 183,000 tpa, the calculated design service life was approximately 23 years.

In 2007, the dam elevation was 610 m.

At the end of June 2016, the dam elevation was 644 m, reflecting the build-up of tailings from the previous nine years of production. Due to a lower tonnage of ore than was initially estimated to be processed from Plant 1, the actual remaining life is longer than the previously estimated 6.2 years.

At the end of another six years of service, it is expected that the dam’s maximum elevation will be 650 m at design production rates. A deposition rate of 1 m per year translates to six additional metres of height. Figures 18.1 to 18.3 show the status of TMF 1 as of mid-February 2012. In the last three years, the dam elevation has risen only three metres.

Figure 18.1 Zhuangtou TMF 1 (17 Feb 2012)

Page 198: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 198

Figure 18.2 Zhuangtou TMF 1 Tailings Discharge (17 Feb 2012)

Figure 18.3 Zhuangtou TMF 1 Downstream View of Starter Dam (17 Feb 2012)

Page 199: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 199

18.1.4.2 Design: TMF 2

The preliminary design for the Shiwagou Tailings Storage Facility (TMF 2) was completed by San-Men-Xia Institute of Gold Mining Engineering Co. (Report dated Jan 2011). The final design for Shiwagou Tailings Storage Facility (TMF 2) was completed in 2012.

The total volume of TMF 2 is 5.91 Mm3 and the working volume is 4.05 Mm3. It is assumed that at a dry density of 1.49 t/m3, this volume is equivalent to 6.03 Mt of tailings.

At a deposition rate of 500,000 tpa, the designed service life is approximately 12 years. The remaining life is projected to be about 7.3 years.

This second storage facility was completed at the end of July 2012, and put into service in April 2013. As of the end of June 2016, the dam elevation was at 634.5 m.

At the end of approximately 7 years of additional service, it is anticipated that the maximum dam elevation will be 690 m at design production rates.

Figures 18.4 to 18.6 show the status of TMF 2 as of May 2014.

Figure 18.4 Shiwagou TMF 2 (13 May 2014)

Figure 18.5 Shiwagou TMF 2 Upstream view (12 May 2014)

Page 200: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 200

Figure 18.6 Shiwagou TMF 2 Downstream view of starter dam (14 May 2014)

18.1.4.3 Dam classifications

Table 18.4 shows the Chinese system of dam classifications. This system is based on height and volume of the dam. Both TMF 1 and TMF 2 are classified as Grade III facilities.

Table 18.4 Criteria for dam grade definition (PRC)

Dam Grade Level Volume V(x10,000 m3) Dam Height(m)

I V>10,000 and / or H>100

II

III

IV

V

V≥10,000

1000≤V<10,000

100≤V<1000

V<100

H≥100

60≤H<100

30≤H<60

H<30

AMC understands that site-specific risk assessment, such as for geotechnical risk, has been carried out by Henan Luoyang Yuxi Hydrological & Geological Reconnaissance Company.

18.1.4.4 Starter dam

Each TMF consists of an initial earth retaining dam, behind which the tailings are stored. These tailings are delivered via a pipeline. The tailings are allowed to drain to the desired dry density. The same tailings are used to raise the dam gradually until the allowable height and volume is reached.

The starter dam (approximately 36 m in height) is a homogeneous rock-filled dam. Starter dam embankment slopes are designed at 1:2. Construction lifts are to be 2 m high. The preliminary design requires the downstream slope of the tailings to be formed at an overall slope of 1:5.

TMF 1: The starter dam crest elevation is at 606 m. The design information indicates that the crest design width is 4 m, and that it has a length of 97.2 m. The TMF is to be constructed by the upstream method of construction to a maximum crest elevation of 650 m and the overall height of the TMF facility will be 70 m.

TMF 2: The starter dam crest elevation is at 591 m. The design information indicates that the crest design width is 4 m, and that it has a length of 101.7 m. The TMF is to be constructed by the upstream method of construction with a height of 99 m, to a maximum crest elevation of 690 m. The overall height of the TMF facility will be 135 m (36+99=135 m).

Page 201: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 201

18.1.4.5 Trench design for surface water

Surface water drainage features have been incorporated into the design of the TMF. Immediately downstream of the starter dam embankment there is a surface water cut-off trench (cross section area 400 mm x 400 mm). Cut-off trenches (cross section area 1,000 mm x 1,000 mm) have been constructed 2 m above the starter dam embankment to prevent scour of the abutments by rainwater run-off.

18.1.4.6 Water decant system design

The results of a hydrology study have been referenced as part of the design reporting and the water balance has been evaluated.

TMF 1: Provision has been made to remove supernatant water from the TMF via five vertical reinforced concrete decant structures. Water from the decant structures is diverted around the starter embankment via a 2.0 m diameter by 1,093 m long reinforced concrete lined drainage culvert with a 5.71% grade.

TMF 2: Provision has been made to remove supernatant water from the TMF via ten vertical reinforced concrete decant structures. Water from the decant structures is diverted around the starter embankment via a 2.5 m diameter by 1,400 m long reinforced concrete lined drainage culvert with a 5.71% grade. The water discharge flow capacity is about 28 to 29 m3/s, which is greater than that calculated as required (27.23 m3/s) to meet a 1 in 500 year recurrence interval (probable maximum flood criterion).

The fact that the water diversion does not pass through the starter dam embankment is considered to be a positive feature.

18.1.4.7 Seepage collection design

Seepage control is effected by geo-membrane and geo-textile impervious layers together with an intercepting drain and collector system discharging into a downstream water storage dam for pumping to the concentrator.

The TMF provides for a cut-off drain to be constructed 150 m downstream of the starter dam embankment at an elevation of 610 m. High strength nylon injection-moulded 300 mm diameter seepage collector pipes, at a spacing of 15 m and inclined upwards at 1%, have been incorporated into the design of the cut-off drain. The cut-off drain design includes provision for a gravel (15 mm to 50 mm particle size) pack filter encased in a geo-fabric (400 g/m2). The intention of this cut-off drain is to capture seepage from the TMF and also to improve stability under dynamic conditions by lowering the phreatic surface.

18.1.4.8 Reclaim pond design

A “reclaim pond” was constructed below each starter dam, formed by the construction of an earth embankment. The stated intention of the water reclaim pond is to intercept all the seepage and discharge water of the tailings reservoir dam during normal operation to realize zero discharge for no-rainfall seasons. About 75% of water is recycled back to the mill plant:

TMF 1: The reclaim and settling pond size is about 4x150 m3 = 600 m3 (four cells in series for water clarification). Two pumps (one spare pump) are used to pump the recycle water back to the plant.

TMF 2: The reclaim and settling pond is designed to process recycle water (input 6,635 m3/day). Two pumps (one spare or standby pump) are used to pump the recycle water back to the plant (5,021 m3/day, net water recycle with evaporation losses excluded).

18.1.4.9 Geotechnical stability, safety and risk assessment study

The Henan Luoyang Yuxi Hydrological and Geological Reconnaissance Company prepared a geotechnical report titled Reconnaissance Report upon Geotechnical Engineering (4 July 2006). This report was prepared during the construction of the tailings starter embankment, when the foundation had been prepared and in accordance with recommendations given in the Preliminary Design report.

Flood calculations have been performed appropriate to the Grade III classification of the TMFs, which requires the flood control measures to meet a 1 in 100 year recurrence interval for design purposes, with a 1 in 500 year probable maximum flood criterion also. A safety and reliability analysis for the TMF has been carried out in accordance with the Safety Technical Regulations for Tailings Ponds (AQ2006-2005) and under the Grade III

Page 202: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 202

requirements. These stipulate minimum Factors of Safety, as determined by the Swedish Circular Arc Method for assessing the potential for slip rotation failure, in the 1.05-1.20 range. Although the calculated factors of safety are generally around 1.3 (minimum), the method used is now considered outdated and industry practice would be to conduct finite element numerical modelling. It is noted that the quoted factors of safety are consistent with Chinese practice requirements. However, they are lower than those required by International Practices.

18.1.4.10 Site monitor stations

For each TMF, survey monitoring stations have been established at regular intervals along the embankment crest. The results of monitoring have been seen by AMC and it is judged that, at the time of viewing, the observed settlement was consistent with consolidation of a rock fill under its own weight.

18.1.4.11 Tailings pond operation and management

Site management has indicated that each TMF is staffed by a total of 10 people, including a safety manager.

Tailings transfer to the ponds

TMF 1: Tailings (about 3,200 m3/day) and other water streams (combined total about 3,250 m3/day, 135 m3/hr) from Plant 1 are being discharged into the TMF 1 via three PVC pipes under gravity from the crest of the starter dam.

TMF 2: Tailings (about 6,300 m3/day) and other water streams (combined total about 6,650m3/day, 276.5 m3/hr: refer to Section 17.7.2) from Plant 2 are being discharged into TMF 2 via three PVC pipes under gravity from the crest of the starter dam.

The velocity of discharge at the time of the initial site visit was variable along the length of the abutment, with discharge velocity being the lowest at the discharge nearest the right abutment. Discharge direction at the discharge near the left abutment was also approximately parallel to the starter dam crest alignment. Discharge described in the above manner is not optimal in that it has potential to allow accumulation of fine material adjacent to the starter dam embankment, and this may have an adverse effect on the phreatic surface.

Water balance considerations

Water usage and mass balance for Plant 1-TMF 1 and Plant 2-TMF 2 have been discussed in section 17.7.2. About 75% of the process water is recycled back to the plant. Zero discharge is the production target for no-rainfall seasons.

18.2 Waste rock dump

Waste dumps for the Ying project are listed in Table 18.5 and locations of the dumps are marked on the surface layout maps of the different mines. Based on mine and development plans, the mines on the Ying Property will move about 4 million m3 of waste rock to the surface dumps during the remaining mine life. The remaining capacities of the existing dumps are about 19 million m3.

Table 18.5 Waste dumps at the Ying project

Mines No. of Waste Dumps Remaining Capacity (m3) LOM Waste (m3) Variance 1

SGX 4 15,293,530 2,014,127 13,279,402

HZG 2 887,695 276,194 611,501

HPG 1 648,411 159,645 488,766

TLP 8 557,704 465,023 92,681

LME 1 449,761 219,276 230,485

LMW 2 1,412,018 919,154 492,864

Total 18 19,249,118 4,053,419 15,195,699

Note: 1 +ve value indicates dump over capacity.

Page 203: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 203

From Table 18.5 it can be seen that the waste dump capacity at all mines is enough for the anticipated LOM waste rock.

At the SGX mine, there are four existing waste dumps in use:

Development waste from CM101, PD16 and PD700 will be transported to the Zhaogou waste dump, which has a remaining capacity of approximately 14.17 million m3.

Development waste from CM105, CM102, CM103, YPD01 and YPD02 will be transported to the Yuelianggou waste dump, which has a remaining capacity of approximately 0.69 million m3.

Development waste from XPD will be transported to the 628 mRL waste dump, which has a remaining capacity of approximately 70,000 m3.

Hand sorted waste rock will be transported to the CM101 Portal waste dump, which has a remaining capacity of over approximately 0.36 million m3.

At LM West, there will be a new waste dump built in the Houyangpo Valley near the New Ramp portal. The tip head capacity of this dump (+1100mRL waste dump) is approximately 1.41 million m3.

At TLP, the waste rock from PD730 can be dumped to the Xigou valley, and it can also be used for planned road construction, which can accommodate about 560,000m3 of waste.

Waste may also be opportunistically placed into the shrinkage stope voids, although this is not in the current mine plan.

Waste can also be consumed for local construction works such as hardstand areas, retainer walls and other miscellaneous infrastructure foundations.

18.3 Power supply

The power supply for the Ying property is from Chinese National Grids with various high voltage power lines and distances to the different mine camps and mill plants.

SGX and HZG Mines

Three power lines supply electricity to the SGX / HZG camps:

The 35 kV and 10 kV power lines are from nearby Guxian Hydropower Station, 7.85 km northwest of the SGX mine where the hydropower is generated by the Guxian Dam and there are two substations, one with 110 kV and another with 35 kV capacity.

The SGX 35 kV line is connected to the Luoning Guxian 110 kV substation, while the 10 kV line is connected to the Luoning Guxian 35 kV substation.

The third line is a 10 kV line that is connected from the Chongyang 35 kV substation, about 12.1 km northeast of the SGX mine.

At the SGX mine, a fully automated 35 kV transformer station in the immediate vicinity of the mine site was built in 2008. This connects to the 35 kV line from Guxian and provides main electricity for the mine production and for office and residential use. The main transformers in the 35 kV substation have a total capacity of 6,300 kVA.

Two 10 kV lines mainly act as a standby source of power in case of disruption of the 35 kV line. Two 1,500 kW and one 1,200 kW diesel generators are installed at the 35 kV substation and are connected to local mine power grids acting as a backup power supply in the event of a grid power outage.

Underground water pumps, primary fans and shaft hoists are major pieces of equipment that require a guaranteed power supply, so two 10 kV power lines (one for normal operation and another for backup) from different sources are installed to connect to this equipment.

Page 204: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 204

Power from the 35 kV substation is transformed to 10 kV and is delivered to each adit portal by overhead lines that mostly follow the access roads. The overhead lines terminate at transformers outside each adit portal, shaft or decline. The transmission cables are 105 to 150 mm2 size.

HPG Mine

Two high voltage 10 kV lines supply electricity to the HPG mine site. The main power supply line is from the Chongyang 35 kV substation, 11 km northeast of the mine, and a second line connects to the SGX 35 kV substation that is used as a standby line. One 400 kW diesel generator is installed outside of the HPG PD3 tunnel, acting as backup power supply.

The 10 kV line terminates at the transformers outside each adit portal. The office buildings and camp areas for mine operations are connected to the same power line. A 105 mm2 cable is used to connect 10 kV power to an internal shaft hoist chamber in PD3.

TLP / LM Mine

Two 10 KV power lines provide electricity for TLP and LM mine; both are from Chongyang 35 kV substation, 8 km north of the TLP mine.

Similar to the other mines on the Ying Property, the 10 kV line terminates directly to transformers outside of adit portals. The office buildings and camp areas for mine operations are connected to the same power line. The 105 to 150 mm2 cables are used to connect 10 kV power to internal shaft hoist chambers of Lines 55, 33, 23, inclined haulageways in PD730 at the TLP mine, and the internal shaft hoist chamber in PD900 at the LM East camp.

No. 1 and No. 2 Mills and office / camp complex

Power for the No. 1 and No. 2 Plants and Silvercorp’s site administration office building and camp complex is drawn from the Chongyang 35 kV substation. The 10 kV power from the substation is transformed to 400 V by several transformers for mill operations, water pumps and for office and camp uses.

The total power consumptions for No. 1 and No. 2 Plants, including associated water pumps, are 2,500 kVA and 6,500 kVA respectively.

Underground lighting

A number of 400 V to 230 V and 400 V to 127 V transformers are used to transform high voltage to low voltage power for underground lighting purpose. Mining level lights run on a 36 V system. Step down transformers are used in many locations as required.

18.4 Roads

The central mills and mine administration office and camp complex are located 3 km northeast of the town of Xiayu, in the southwest of the Luoning County. Luoning to Xiayu is connected by a 7 m wide and 48 km long paved road called the Yi-Gu Way. The company has built a 2 km long, 6 m wide concrete road to link the mill/office complex to the Yi-Gu Way.

Access to the SGX / HZG mine from the mill-office complex is via a 7 km paved hilly road to the Hedong wharf of the Guxian Reservoir, and then across the reservoir by boat to the mine site. Silvercorp has built two large barges that can carry up to five 45-tonne trucks (see Figure 18.7), to ship ore from the SGX / HZG and HPG mines across the reservoir. Mine personnel are transported by motor boats. Mine supplies are usually hauled by small barges owned and operated by local villagers.

Page 205: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 205

Figure 18.7 Silvercorp barge with five loaded trucks

The HPG mine can be accessed either by boat or 12 km paved road, southwest of the main office complex.

The TLP, LME and LMW mines are 15 km southeast of the main office complex and are accessed by paved road along the Chongyang River.

Gravel roads link to all adits from the mine camps. Drainage ditches with trees are formed along the roads. The roads are regularly repaired and maintained by designated workers. Safety barriers are installed in some steep slope areas, and warning signs are posted at steep slopes, sharp turn points, and places with potential traffic risks. The road to the TLP mine was upgraded in 2016.

The Luoyang government has considered a plan to use the Guxian reservoir as a drinking water source, which could affect ore transport by boat. To avoid possible disruption of ore transport, a tunnel and road link from the Mill to SGX via HPG has been constructed as a back-up ore transport route. The total length of three separate tunnels in the link is 5,038 m. In addition, over 10 km of road and three bridges linked to the tunnels have been built. It is anticipated that, using this alternative route, the ore transport cost would increase by between $1 and$2/t.

18.5 Transportation

Heavy-duty trucks are used to transport ore, mine supplies, and concentrates.

As indicated above, ore produced at the SGX / HZG and HPG mines is loaded onto 45-tonne trucks, with the trucks being transported by barge across the Guxian Reservoir (6 km and 4 km across from SGX and HPG respectively). The trucks then continue a further 7 km by road to Silvercorp’s central mills.

Page 206: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 206

At the SGX mines, ore from adits PD700, CM101, PD16 and CM105 is transported to a hand-sorting facility at the north side of the mine by diesel powered locomotive with railcars in a 2.7 km long tunnel rail system. The tunnel starts at PD700 at 640 mRL and then extends north-easterly for 1,245 m to CM101. From CM101, the tunnel extends north-westerly for 365 m to PD16 where an ore bin was built to transfer ore from 640 m to 565 m elevation. From PD16, the rail goes north about 810 m to the ore bin at the hand-sorting facility. Ore from CM102, CM103, YPD01 and YPD02 of the SGX mine and from all adits of the HZG mine is hauled to the ore stockpile yard at the SGX site using 6-tonne tricycle trucks.

In order to efficiently and safely transport ore from HZG to SGX, Silvercorp has constructed a 1,270 m long tunnel from PD820 that connects the existing tunnel rail system to PD700 at SGX. The tunnel was completed in December 2012, with overhead electrical line installation and narrow gauge railway construction following. This allows ore mined from all the adits at the HZG mine to be transported to the SGX mine stockpile yard via the tunnel rail system by trolley locomotive.

Ore from the TLP, LME and LMW mines is hauled to the central mill using 30- and / or 45-t trucks. All of the ore stockpiled outside of the underground adits is accessible by the trucks.

The final products from the mill plants are lead and zinc concentrates, which are transported by trucks to local smelters located within a 210 km radius.

18.6 Water supply

Domestic water for the SGX mine is sourced from the Guxian Reservoir, while water for the HPG, TLP, LME, LMW and HZG mines is sourced from nearby creeks and springs. Water is regularly tested and AMC understands that its quality and quantity meet requirements.

Mine production water for drilling and dust suppression is sourced from underground at all the mines.

18.7 Waste water and sewage treatment

Waste water is generated from mining activities, mineral processing and domestic sewage.

At the SGX mine, underground water is pumped to surface via the mine portals, and then pumped to Sedimentation Pond 1. At this pond, lime is added to assist flocculation. Further sedimentation occurs in Pond 2. The overflow is then allowed to drain to three settlement tanks before it is discharged into the Guxian Reservoir through a discharge point near CM102 that has been approved by the Yellow River Management Committee.

The Ying TMF tailings water is collected using four dams under the TMF embankment over a 1 km range. The collected tailings water from the TMF is piped back to the processing plant for reuse. No tailings water is discharged to the environment.

Sewage from mining areas is collected and treated by a biological and artificial wetland treatment system. AMC understands that reports indicate that the treated water meets all the criteria of water reuse, with 100% being reused for landscape watering. There is no discharge to the reservoir.

At the HZG, HPG, TLP, LME and LMW mines, underground water and domestic sewage are filtered through gravel pits and then discharged to the environment.

At HPG, future underground water will be pumped through a 13.2 km, 150 mm diameter pipeline to Plant No. 2 for reuse. The project includes construction of a 300 m3 waste water pond and installation of 2 MD155-67x8(p) water pumps. The project is due to be completed in Q2 fiscal 2018.

Page 207: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 207

18.8 Other infrastructure

Mine dewatering

Mine dewatering is described in Section 16.2.9. It is undertaken in accordance with the “Chinese Safety Regulations of Metal and Non-metal Mines”.

Site communications

Mine surface communications are by landline and optical fibre service from CNC and with mobile phone services from China Mobile and China Unicom. Internal telephones are installed in active mining areas and the dispatch room and are connected with local communication cable nets. An HYA cable is used for surface and an HUVV cable is used for underground tunnels.

High speed internet and fibre cables are connected to all of the mine sites from Xiayu.

Camp

At each mine and mill site there are dormitory buildings and administration buildings that are equipped with dining rooms and washrooms for Silvercorp’s management, technical personnel and hourly workers. Colour-coded steel housing structures are built adjacent to each portal as living facilities for the mine contractor workers. These buildings also include dining rooms and washrooms.

Dams and tunnels

Dam and diversion tunnels have been constructed to prevent storm and heavy rainfall from washing out surface infrastructures, and also to block waste rock and waste materials flow into the Guxian Reservoir. Table 18.6 lists the dam and tunnels at each mine.

Table 18.6 Dams and tunnels in the Ying district

Mine Tunnel/Dam Profile (m x m) Length (m) Purpose

SGX

PD700-Zhanggou Tunnel 5.0 x 5.0 512 To divert flood to Zhanggou above PD700 (712m Elevation) in the SGX valley

PD16-Zhaogou Tunnel 2.2 x 2.4 540 To divert flood water to Zhanggou above PD16 (598m elevation) in the SGX valley

CM101-PD16 Tunnel 2.2 x 2.4 330 To divert flood water from above CM101 (650m Elevation) into PD16-Zhanggou Tunnel (598m elevation)

CM105 West Tunnel 2.2 x 2.4 580 To divert flood water from above CM105 (570m Elevation) to east site of the Guxian Reservoir

SGX Dam 50 x 12 x 55 (bottom width, top width, height)

90 To prevent waste rock and waste material from washing into the Guxian Reservoir

TLP PD770-Chongyang River 3.0 x 3.0 750 To divert the Xigou Creek and prevent PD730 from flooding

LM West 924 West Tunnel 3.0 x 3.0 70 To divert the Xigou Creek and prevent PD924 from flooding

HPG PD3 Tunnel 3.2 x 3.5 80 To divert HPG creek and prevent PD3 from flooding

Surface maintenance workshop

Each mine has a maintenance workshop in which the following auxiliary services are provided:

Tire processing, maintenance and servicing

Welding

Electrical

Hydraulic

Page 208: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 208

Tools, parts and material warehouse

The repair workshop is mainly responsible for maintenance of large-scale production equipment, vehicle repair, processing and repair of component parts, and the processing of emergency parts. All necessary equipment is available. Mechanical Maintenance Facilities are composed of mining equipment maintenance workshop, equipment and spare parts store, dump oil depot, reserve battery locomotives, and tramcar maintenance workshop and stockpile yard.

AMC notes that working practices and safety equipment standards observed during its site visits were sometimes less than would be anticipated in North America in similar mining operations.

The mining contractor generally has its own maintenance workshops adjacent to adit portals. Tricycle trucks, electric locomotive and rail cars, minor equipment (such as jacklegs, secondary fans, development pumps, etc.) are serviced in these workshops.

All maintenance work at the Ying camp is performed on surface and there are no workshops located underground.

Explosives magazines

Each mine has an explosives magazine and detonator storage house with strict security. The magazines are gated and are guarded by two gate keepers and a dog. Surveillance cameras are installed in the magazine areas. All explosive tubes and detonators are labeled with barcodes, which are scanned before release from the magazine for security audit purposes. AMC has noted that these magazines were well constructed and maintained.

Underground working party magazines are located adjacent to each level’s return air shaft or decline and are limited to one day’s requirement for bulk explosives and three day’s requirement for blasting ancillaries.

Fuel farm

Diesel fuel is used for mobile mine equipment, some small trucks, and surface vehicles. There are two fuel farms at the SGX mine, with a total capacity of 60 tonnes. The first unit is located 459 m north of PD16 to supply diesel for mobile equipment. The second unit is at the PD700 waste dump, and mainly supplies diesel to the generators.

Fuel storage tanks are also installed in the TLP, LME, LMW and HPG mines to provide diesel for surface mobile equipment.

Each of two large truck-carrying barges has two diesel fuel tanks that can store up to 7.5 t of diesel. Full tanks of diesel can keep the barges operating for about 10 days.

The contractors have their own small fuel tankers near the portals, and provide fuel for underground diesel locomotives, tricycle trucks and mobile equipment.

There are up to ten 200 L gasoline tanks stored in an underground tunnel about 450 m east of the SGX wharf to supply gasoline for surface personnel-carrying vehicles and motor boats.

Containment for storage of fuel is constructed in the vicinity of the diesel generators and fuel dispensing facilities. The storage facility must be located down-wind from the mine air intake fans and a reasonable distance from buildings, camp and mine portal (dependent upon local occupational health and safety regulations and fire-fighting requirements). The lined containment area is constructed such that spills are confined and can readily be cleaned, and so that the need for extensive and costly remediation work can be avoided during site closure.

Mine dry

At each mine site, the dormitory buildings and administration buildings provide showers and washrooms for Silvercorp employees. There are showers and washrooms near each adit portal for contract workers. Provisions

Page 209: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 209

for personal protective equipment such as gloves, safety glasses, hard hats and cap lamps/batteries are made by Silvercorp or its contractors.

Administration building

At each mine site, there is an administration building that provides working space for management, supervision, geology, engineering, and other operations support staff. Silvercorp’s local office is located at the central mill site; this building can accommodate over 200 staff. The senior management in charge of Ying District sales, purchasing, accounting and technical services are located at the local office.

Warehouse and open area storage

There are warehouses at each mine site that are designed for materials and equipment inventory storage. In addition, there are open storage areas that can be used for the same purpose.

Assay laboratory

The assay laboratory is located in a separate building at the northwest side of the No.1 Plant. The laboratory is a two-storey structure equipped to perform daily analyses of mine and process samples.

Security / gatehouse

There is a designated security department at each mine site and mill plant that is responsible for daily security tasks. A security gatehouse is located at each mine site access road with personnel on round-the-clock duty. Monitoring cameras are installed at the gatehouses, loading point, ore stockpiles and warehouses for additional coverage. There are also personnel on duty at all times at each access road. The night shift is responsible for patrol of the key areas. In terms of the ore transportation, there are dedicated personnel in charge of inspection for the transportation process. The central monitoring room located at the local office is manned round-the-clock.

Compressed air

Compressed air is primarily used for drilling blast holes. Jacklegs are used in all stopes and conventional development faces. There are some minor uses for shotcreting and hole cleaning.

Compressor plants are located adjacent to every portal. These compressors are of a two-stage electric piston configuration. Compressed air is reticulated via steel pipes of varying sizes, depending on demand, to all levels and to the emergency refuge stations. Air lines are progressively sized from 4 inch to 1 inch at the stopes and development headings.

Underground harmful gas monitoring system

Each mine in the Ying District has or is planned to have underground Harmful Gas Monitoring and Personal Location Systems. At the time of its 2012 site visit, AMC noted one such unit being installed at SGX. Silvercorp has indicated that systems are now operational in the SGX, TLP, HPG, LME, LMW and HZG mines. The Underground Harmful Gas Monitoring System and Personal Location System should meet the requirements of the Chinese Coal Mine Safety Regulation (Version 2006). All of the underground areas must be covered.

The system is used to monitor the underground ventilation network. Data such as air velocity and CO concentration can be collected, processed, and reported instantly. When any item is above the threshold limit value (TLV), the mine control room is notified immediately. The sub-system of safety monitoring, which has a routine inspection cycle of less than 30 seconds, can exchange data with the Automation Integrated Software Platform instantly.

The underground monitoring substation has two-way communication with transmission interfaces. It has a simulation data collector for air speed, air pressure, CO and temperature, and can collect information on power status, ventilator switch, air door switch and smoke. The system is supported by a computer in the central office.

Page 210: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 210

Underground personal location system

The underground personal location system can indicate the exact time that each miner enters or exits underground. The system can provide the total number of miners going underground, with detail of names and working durations, and can print out daily and monthly time sheets. It can instantly report the number of workers working underground and their location. All mines also use the tag board system to monitor personnel entering and exiting a portal.

Page 211: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 211

19 Market studies and contracts 19.1 Concentrate marketing

AMC understands that the lead and zinc concentrates are marketed to existing smelters customers in Henan and Shaanxi provinces and appropriate terms have been negotiated as detailed in Section 19.2.

With respect to copper, testwork has so far been unsuccessful in producing a saleable copper concentrate, but copper levels in the ore are low and this is not a material commercial issue, nor does it materially impact concentrate quality.

19.2 Smelter contracts

Monthly sales contracts are in place for the lead concentrates with leading smelters, mostly located in Henan province. Among them are Henan Yuguang Gold and Lead Smelting Co. Ltd, JiyuanWanyang Smelting (Group) Co. Ltd, JiyuanJinli Smelting (Group) Co, and Luoning Yongning Gold and Lead Smelting Co. Ltd. For the zinc concentrate, sales contracts are in place with Henan Yuguang Zinc Industry Co. Ltd and Shaaxi Shangluo Zinc Smelting Co. Ltd.

All contracts have freight and related expenses to be paid by the smelter customers.

The key elements of the smelter contracts are subject to change based on market conditions when the contracts are renewed each month. Table 19.1 shows terms most commonly applied.

Table 19.1 Key elements of smelter contracts

Pb Concentrate & Direct Smelting Ore Zn Concentrate

% Pb Deduction RMB/t Pb

Ag (g/t) %

payable

Au (g/t) %

payable % Zn Deduction RMB/t Zn

Minimum Quality

35 500 1 40

Payment Scales

>=60 1700 >=5000 91 >=20 87 >=45 Price =<RMB 15000/t:4800

55-60 1800 4500-5000 90.5 15-20 86 Price > RMB 15000/t:4800+(price-15000)*80%

50-55 1900 4000-4500 90 10-15 85 40-45 Price =<RMB 15000/t:4800+45 per % lower than 45%

45-50 2000 3500-4000 89.5 7-10 84 Price > RMB 15000/t:4800+(price-15000)*80%+45 per % lower than 45%

40-45 2100 3000-3500 89 5-7 83

35-40 2600 2500-3000 88.5 3-5 82

2000-2500 88 2-3 81

1500-2000 87.5 1-2 80

1000-1500 87

500-1000 86.5

With respect to lead and zinc terms, the above deductibles calculate out to 85-90% payable for the lead concentrate and approximately 70% for zinc, at long-term prices. AMC considers these to be favourable terms relative to global smelter industry norms. Silver payables of approximately 90% are similarly in accord with industry norms.

19.3 Commodity prices

AMC has used the following metal prices for cut-off grade and silver equivalent calculations, Mineral Resource and Mineral Reserve estimation, and its economic analysis in Section 22 of this report, and considers them to be

Page 212: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 212

reasonable: Au $1,250/oz, Ag $19.0/oz, Pb $0.90/lb, Zn $1.00/lb. In determining these prices, AMC has referenced three-year trailing averages, prices current as of 30 June 2016, prices used in recent NI 43-101 reports, and available consensus forecast information. The exchange rate used in the cut-off calculation was arrived at via a similar process.

Page 213: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 213

20 Environmental studies, permitting and social or community impact 20.1 Introduction

Silvercorp has all the required permits for its operations on the Ying Property. The exploration and mining permits are described in Section 4.1 of this report.

The existing mining permits cover all the active mining areas and give Silvercorp the right to carry out full mining and mineral processing operations, in conjunction with safety and environmental certificates. Six safety certificates have been issued by the Department of Safety Production and Inspection of Henan Province, covering the SGX mine, Zhuangtou TMF, Shiwagou TMF, HPG mine, TLP mine and LM mine. Five environmental certificates have been issued by the Department of Environmental Protection of Henan Province, covering the Yuelianggou project (SGX mine and 1,000 tpd mill plant), HPG mine, TLP mine, LM mine and the 2,000 tpd mill plant built in 2009. For each of these certificates, there are related mine development / utilization and soil / water conservation program, and rehabilitation plan reports. Silvercorp has also obtained approvals and certificates for wastewater discharge locations at the SGX mine, the HPG mine, and the two TMFs. All certificates must be renewed periodically.

There are no cultural minority groups within the area surrounding the general project. The culture of the broader Luoning County is predominantly Han Chinese. No records of cultural heritage sites exist within or near the SGX, HZG, TLP, LME, LMW and HPG project areas. The surrounding land near the SGX Mining Area is used predominantly for agriculture. The mining area does not cover any natural conservation, ecological forests or strict land control zones. The current vegetation within the project area is mainly secondary, including farm plantings. Larger wild mammals have not been found in the region. Small birds nesting and moving in the woodland are observed occasionally. The surrounding villagers raise domestic animals, such as chickens, ducks, pigs, sheep, goats, dogs, etc.

Silvercorp has made a range of cash donations and contributions to local capital projects and community support programs, sponsoring university students and undertaking projects such as road construction, and school repairs, upgrading and construction. Silvercorp has also made economic contributions in the form of direct hiring and retention of local contractors, suppliers and service providers.

20.2 Laws and regulations

Silvercorp’s operations in the Ying Property operate under the following Chinese laws, regulations and guidelines:

Laws

1. Law of Environmental Protection PRC (1989)

2. Law of Minerals Resources of PRC (1996)

3. Production Safety Law of the PRC (2002)

4. Law of Occupational Disease Prevention (2001-Amended 2011)

5. Environmental Impact Assessment (EIA) Law (2002)

6. Law on Prevention & Control of Atmospheric Pollution (2000)

7. Law on Prevention & Control of Noise Pollution (1996)

8. Law on Prevention & Control of Water Pollution (1996, amended in 2008)

9. Law on Prevention & Control Environmental Pollution by Solid Waste (2002)

10. Forestry Law (1998)

11. Water Law (1988)

12. Water & Soil Conservancy Law (1991)

13. Land Administration Law (1999)

14. Protection of Wildlife Law (1989)

15. Energy Conservation Law (1998)

16. Management Regulations for the Prevention & Cure of Tailings Pollution (1992)

17. Management Regulations for Dangerous Chemical Materials (1987)

Page 214: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 214

Regulation guidelines

1. Environment Protection Design Regulations of Construction Project (No.002) by Environment Protection Committee of State Council of PRC (1987)

2. Regulations on the Administration of Construction Project Environmental Protection (1998)

3. Regulations for Environmental Monitoring (1983)

4. Regulations on Nature Reserves (1994)

5. Regulations on Administration of Chemicals Subject to Supervision & Control (1995)

6. Regulations on Management of Chemicals Subject to Supervision & Control (1995)

7. Environment Protection Design Regulations of Metallurgical Industry (YB9066-55)

8. Comprehensive Emission Standard of Wastewater (GB8978-1996)

9. Environmental Quality Standard for Surface Water (GB3838-1988)

10. Environmental Quality Standard for Groundwater (GB/T14848-1993)

11. Ambient Air Quality Standard (GB3095-1996)

12. Comprehensive Emission Standard of Atmospheric Pollutants (GB16297-1996)

13. Environmental Quality Standard for Soils (GB15618-1995)

14. Standard of Boundary Noise of Industrial Enterprise (GB12348-90)

15. Emissions Standard for Pollution from Heavy Industry; Non-Ferrous Metals (GB4913-1985)

16. Control Standard on Cyanide for Waste Slugs (GB12502-1990)

17. Standard for Pollution Control on Hazardous Waste Storage (GB18597-2001)

18. Identification Standard for Hazardous Wastes-Identification for Extraction Procedure-Toxicity (GB5085.3-1996)

19. Standard of Landfill and Pollution Control of Hazardous Waste (GB 18598-2001)

20. Environmental Quality Standard for Noise (GB3096-2008)

21. Emission Standard for Industrial Enterprises Noise at Boundary (GB12348-2008)

22. Evaluating Indicator System for Lead and Zinc Industry Cleaner Production (Trial) (2007)

20.3 Waste and tailings disposal management

Silvercorp’s main waste by-products are waste rock produced during mining operations and the mine tailings produced during processing. There is also minor sanitation waste produced.

Waste rock is deposited in various waste rock stockpiles adjacent to the mine portals and is utilized for construction around the site. The waste rock is mainly comprised of quartz, chlorite and sericite, kaolin and clay minerals and is non-acid generating.

Once the stockpile is full (or at the time of site closure), the waste rock stockpiles will be covered with soil and re-vegetated. For stabilization, retaining wall structures will be built downstream of the waste rock site. A diversion channel will be constructed upstream to prevent high flows into the stockpile and the slope surface from washing out. A waste rock stockpile in the main exploration-development camp, Shagouxi (SGX), and PD700 waste dump have already been covered with soil and re-vegetated.

Process tailings are discharged into purpose-built tailings management facilities (TMF1 and TMF2) - that have an effective design capacity of 2.43 Mm3 and 4.06 Mm3 respectively, (refer also to Section 18.1). The TMFs have decant and under-drainage systems that provide for flood protection and for the collection of return water. Daily inspections are undertaken of the tailings pipelines, TMF embankment and the seepage/return water collection system. The TMF under-drainage and return water collection system comprise a tunnel discharging directly into an unlined collection pond/pumping station, which is situated just downstream of the TMF embankment. According to the current rehabilitation plan, after the completion of the TMFs, the facility will be covered with soil and re-vegetated. The SGX Environmental Impact Assessment (EIA) Report states that the tailings do not contain sulphide and have no potential for acid generation.

Page 215: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 215

20.4 Site monitoring

Monitoring plan

Silvercorp developed comprehensive monitoring plans during the EIA stage, including monitoring plans during the construction period. An environmental protection department consisting of five full time staff was set up for this project. The full time environment management personnel are mainly responsible for the environment management and rehabilitation management work in the Ying Property.

The monitoring plans include air and dust emissions and noise and wastewater monitoring. The monitoring work is completed by qualified persons and licensed institutes. For water environment monitoring, an intensive program has been developed and implemented, including twice-a-month testing of sanitary waste-water and surface water by the Luoning County Environmental Protection Bureau. Mine water discharge and surface water is tested monthly by the Yellow River Basin Environmental Monitoring Centre, an inter-provincial government organization. Detailed monitoring plans are shown in Table 20.1

Table 20.1 Water environmental monitoring plan for Ying mining area

Items Monitoring Points (section) Monitoring Parameters Frequency Monitored by

Sanitary

Wastewater Final discharge point

pH, NH3-N, CODcr,

BOD, TSS Twice/month Luoyang

Environmental

Monitoring

Centre Surface

water

Shagou

Yuelianggou

pH, Cr6+, NH3-N, Cd

Pb, Ag, CODcr and Cu Twice/month

Process

wastewater

Discharge point

after sedimentation

treatment

pH Once/month Luoyang

Environmental

Monitoring

Centre

Pb, CODcr, NH3-N and SS Once/month

Cd,S2-,As, phenol, Zn, Ag and TPH

Once/quarter

Mining

water

Discharge point after

sedimentation tank Temperature, pH, SS, CODcr,

NH3-N, total P, N, SO4, Ag

Cu, Zn, Pb, Cd, Hg, phenol and TPH

Once/month

Yellow River

Basin

Monitoring

Centre Surface

water

Sections at Shagou to Guxian Reservoir

Upper section of Guxian Reservoir from Shagou

Down gradient section of Guxian reservoir (500 m from Shagou entrance)

AMC understands that monitoring results from 2007 to 2016 indicate that the surface water results are in compliance with Class II and III limits of Surface Water Environmental Quality Standards (GB3838-2002), sanitary and process plant wastewater results are in compliance with Class I limits of Integrated Wastewater Discharge Standard (GB8978-1996), and mining water results are in compliance with Class I limits of Integrated Wastewater Discharge Standard (GB8978-1996). These standards match the requirements in the EIA approvals. In addition, AMC understands that the project-stage completion inspection results were all compliant for wastewater discharge, air emission, noise and solid waste disposal.

There have been a few exceptional cases in which pH values of the discharged mining water were slightly over 9.0 and Pb concentrations slightly exceeded the permitted limit 0.011 mg/l at the general discharge point after sedimentation tank for both SGX and TLP mines.

Water management

The water supply for the SGX and HPG projects is sourced mainly from the Guxian Reservoir and mountain spring water. Water supply for the TLP, LM, and HZG projects is mainly from mountain spring water near the mines.

Maintaining water quality for Guxian Reservoir, while operating the SGX / HZG and HPG projects, is a key requirement in the project environmental approvals. Silvercorp has created a SGX and HPG surface water discharge management plan. This comprises collection and sedimentation treatment of mine water combined with

Page 216: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 216

a containment system (i.e. zero surface water discharge), and installation of a stormwater drainage bypass system for the segregation and diversion of clean stormwater and for flood protection.

Prior to completion of the stormwater drainage bypass system, drainage construction in the project water catchment area was completed. Overflow water from the mill process (which is segregated by the thickener), and water generated from the tailings by the pressure filter, are returned to the milling process to ensure that wastewater (including tailings water) is not discharged.

Water from mining operations is reused for the same purpose and the remaining water is treated according to the Surface Water Quality Standards (GB3838-2002) and Integrated Wastewater Discharge Standard (GB8978-1996) to meet the Class III requirements of surface water quality and Class I wastewater quality before being discharged to Guxian Reservoir at discharge points approved by the Yellow River Management Committee in Luoning County.

Monthly monitoring results by the Luoyang Environmental Monitoring Station and Yellow River Basin Environmental Monitoring Centre indicate that water discharged to the surface water body is in compliance. Selected data in Table 20.2 and Table 20.3 show the general level of test results.

Table 20.2 July 2015 to June 2016 monitoring results, SGX mine surface water

Sampling Date

SS COD NH3-N Ag Cu Zn Pb Cd TPH Phenol

GB3838 Limit 70 15 0.5 0.1 1.0 1.0 0.011 0.005 0.05 0.002

Jul 2015 70 15 0.5 0.1 1.0 1.0 0.011 0.005 0.05 0.002

Aug 2015 37 14.4 0.07 <DL 0.0018 0.004 <DL <DL <DL <DL

Sep 2015 30 15.7 0.06 <DL 0.0013 0.001 0.005 0.0005 <DL <DL

Oct 2015 23 14 0.02 <DL 0.0027 0.002 0.0006 0.00007 <DL <DL

Nov 2015 30 13.9 0.03 <DL 0.0014 <DL 0.0016 0.00011 <DL <DL

Dec 2015 14 14 0.01 <DL 0.0026 0.001 <DL 0.00008 <DL <DL

Jan 2016 17 13.2 0.02 <DL 0.0012 0.002 0.0006 0.00007 <DL <DL

Feb 2016 28 14.1 0.01 <DL 0.0013 0.002 <DL <DL <DL <DL

Mar 2016 27 14.3 0.01 <DL 0.0018 <DL <DL 0.00014 <DL <DL

Apr 2016 30 14.5 0.17 <DL 0.0012 <DL <DL 0.00015 <DL <DL

May 2016 29 14.0 0.12 <DL 0.0012 0.001 0.001 0.00022 <DL <DL

Jun 2016 19 13.8 0.07 <DL 0.0023 0.001 0.0006 0.00022 <DL <DL

Note: Units – mg/l

Table 20.3 July 2015 to June 2016 monitoring results, surface water

Sampling location NH3N Ag Cu Zn Pb Cd As Hg Cr

GB3838Limit 0.5 0.1 1.0 1.0 0.011 0.005 0.05 0.002

200m from Zhuangtou tailing dam

0.496 <DL 0.0014 <DL <DL <DL <DL 0.00008 0.010

SGX Mine 0.01 <DL 0.0017 <DL <DL 0.00015 0.0009 0.00008 0.005

Yuelianggou Mine 0.145 <DL 0.0018 <DL <DL <DL <DL 0.00006 0.007

HPG Mine 0.07 <DL 0.0016 0.001 0.0005 0.00015 <DL 0.00003 0.002

Note: Units – mg/l

With the exception of one small creek, there are no surface water sources near the TLP and LM mines, and no mining water is discharged to this creek from the mines. There is limited volume of mining water generated from the lower sections of the TLP and LM mines, most of which is used in the mining activities, and none generated from the upper sections.

Page 217: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 217

Groundwater

Groundwater guidelines are contained in the Groundwater Environmental Quality Standards (GB/T14848-93). There is a groundwater monitoring program for the processing plant area, but not for the mining areas. It is recognized that there is no requirement under the Chinese environmental approval to monitor this potential impact. Groundwater (the main drinking water sources) monitoring results of tested parameters, including pH, Pb, Hg, Zn, Cd, Cu, As, cyanide, and sulphate, conducted by the Luoyang Environmental Monitoring Station in January 2013 at different areas indicated that groundwater quality is in compliance with Class III of GB/T14848-93. The results are summarized in the Table 20.4 below:

Table 20.4 Results summary of drinking water (groundwater)

Location Pb Hg Zn Cd Cu As Ag CN

Class III Limit 0.05 0.001 1.0 0.01 1.0 0.05 0.05 SGX Mine <DL <DL <DL <DL <DL <DL <DL <DL Mill Plant <DL <DL <DL <DL <DL <DL <DL <DL Mill Plant nearby HPG Mine <DL <DL <DL <DL <DL <DL <DL <DL Chongyang Mine <DL <DL <DL <DL <DL <DL <DL <DL Detection limit (DL) 0.01 0.00005 0.01 0.001 0.01 0.002 0.007 0.004

Note: Units – mg/l

Waste water

There are three sources of waste water: mining activities, mineral processing and domestic sewage. Mine water is pumped to surface via the mine portals, and then pumped to Sedimentation Pond 1 via a lime dosing system to assist in flocculation. The settled water is then drained to Sedimentation Pond 2, where the overflow is allowed to drain to another system of three settlement tanks before being discharged to Guxian Reservoir through a discharge point approved by the Yellow River Management Committee at an elevation of 549.5 m above sea level. Sewage from mining areas is collected and treated by a biological and artificial wetland treatment system. The treated water meets the criteria for water reuse and is applied 100% to landscape watering with no discharge to the public water body. Table 20.5 shows representative mine water and sanitary waste water monitoring results.

Table 20.5 Mining water and sanitary waste water monitoring results

Sampling location pH Cd

(mg/L)

Pb

(mg/L)

Zn

(mg/L)

Cu

(mg/L)

Industrial wastewater reuse standard (GB / T19923-2005) 6.5-7.5 10 60 20 20

Discharge point after sedimentation treatment 8.4 <DL 0.0067 0.002 0.0061

Entrance to Guxian Reservoir 8.1 <DL 0.007 0.001 0.0017

Integrated wastewater discharge standards

(GB 8978-1996)Class I Limit 6-9 0.1 1.0 2.0 0.5

Sanitary wastewater treatment pH NH3-N (mg/L) COD (mg/L) BOD (mg/L) SS (mg/L)

According to the EIA approval, water quality protection for the Guxian Reservoir and the SGX project area is subject to Chinese National Standard Environmental Quality Standard for Surface Water (GB3838-1988 – Class II) and the mine discharge water quality is to meet Class I of the Integrated Wastewater Discharge Standard (i.e. at the point of discharge). Quality monitoring of the mine waters and the surrounding receiving surface waters is carried out under contract by the Luoning County Environmental Protection Bureau and the Yellow River Basin Environmental Monitoring Centre, in line with specifications in the site environmental monitoring plan. The monthly monitoring results have so far indicated that water discharged to surface water bodies is in compliance with both standards.

The Ying TMFs under-drainage and return water collection system comprises a tunnel discharging directly into a collection pond/pumping station just downstream of the TMF embankment. This TMF decant and under-drainage system provides a mechanism for the direct discharge of tailings and / or contaminated tailings water from the

Page 218: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 218

TMF. This existing collection pond is designed to overflow into a second containment/seepage dam. There are two further containment dams downstream, with a fourth dam, approximately 1 km downstream, also acting as another pumping station and emergency containment system. The collected tailings water from the TMF in these dams, is pumped back through a long pipe to the processing plant for reuse. No tailings water is discharged to the public water body.

20.5 Permitting requirements

The following permits and approvals have been obtained by Silvercorp for the Ying operation.

Environmental impact assessment reports & approvals

Environmental Impact Assessment Report of SGX Mine Project, by Luoyang Environmental Protection & Design Institute, January 2006

Approval of Environmental Impact Assessment Report of SGX Mine Project by Henan Environmental Protection Bureau, February 2006

SGX Mine Project Trial Production Completion Acceptance Inspection Approval by Henan Environmental Protection Bureau, January 2009

Environmental Impact Assessment Report of HPG Mine, by Luoyang Environmental Protection & Design Institute, November 2002

Approval of Environmental Impact Assessment Report of HPG Mine by Henan Environmental Protection Bureau, January 2003

Approval of Environmental Impact Assessment Report of TLP Mine by Henan Environmental Protection Bureau, November 1998

Approval of Environmental Impact Assessment of LM Mine Expansion by Henan Environmental Protection Bureau, May 2010

Environmental Impact Assessment Report of 2000 t/d processing plant and tailings storage facility, by Luoyang Environmental Protection & Design Institute, May 2009

Approval of Environmental Impact Assessment Report for 2000 t/d Processing Plant and Tailings Storage Facility, by Henan Environmental Protection Bureau, July 2009

Approval of Environmental Impact Assessment Report of TLP / LM Mines, by Henan Environmental Protection Bureau, March 2016

Approval of Environmental Impact Assessment Report of HPG Mine, by Henan Environmental Protection Bureau, February 2016

Approval of Environmental Impact Assessment Report of Dongcaogou Mine, by Henan Environmental Protection Bureau, July 2016

Clean Site Production Auditing Report of Henan Found Mining Ltd, by Luoyang Environmental Protection Bureau, December 2013

Clean Site Production Auditing Report of Henan Found Mining Ltd, by Luoyang Environmental Protection Bureau, January 2015

Environment Emergency Management Plan of Henan Found Mining Ltd, filed in Luoyang Environmental Protection Bureau, April 2012

Environment Emergency Management Plan for Henan Found TLP mine and Shiwagou Tailing Dam. filed in Luoyang Environmental Protection Bureau, January 2014

Geological Environment Protection and Reclamation Treatment for SGX Mine, Henan Found Mining Ltd. Filed in Henan Land and Resources Bureau, July, 2012

Geological Environment Protection and Reclamation Treatment for SGX Mine, Henan Found Mining Ltd. Filed in Henan Land and Resources Bureau, June, 2014

Geological Environment Protection and Reclamation Treatment for HPG Mine, Henan Found Mining Ltd. Filed in Henan Land and Resources Bureau, June, 2014

Geological Environment Protection and Reclamation Treatment for TLP Mine, Henan Found Mining Ltd. Filed in Henan Land and Resources Bureau, July, 2012

Page 219: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 219

Geological Environment Protection and Reclamation Treatment for TLP / LM Mines, Henan Found Mining Ltd. Filed in Henan Land and Resources Bureau, December, 2014

Geological Environment Protection and Reclamation Treatment for Dongcaogou Mines, Henan Found Mining Ltd. Filed in Henan Land and Resources Bureau, January, 2014

Project safety pre-assessments reports and safety production permits

Yuelianggou (SGX Mine) Project Safety Pre-Assessment Report & Registration by Henan Tiantai Mining Safety Engineering Company, December 2008

HPG Mine Safety Pre-Assessment Report & Registration by Henan Minerals Test Centre, April 2010

TLP Mine Safety Pre-Assessment Report & Registration by Henan Tiantai Mining Safety Engineering Company, December 2008

LM Mine Safety Pre-Assessment Report & Registration by Henan Minerals Test Centre, January 2011

Safety Production Permit (XCGL301B) for Henan Found Mining Ltd by Henan Safety Production & Supervision Bureau, valid from 9 May 2016 to 7 March 2019

Safety Production Permit (XCJC302B) for SGX Mine by Henan Safety Production & Supervision Bureau, valid from 9 May 2016 to 2 March 2018

Safety Production Permit (XCJC304B) for HPG Mine by Henan Safety Production & Supervision Bureau, valid from 9 May 2016 to 7 July 2017

Safety Production Permit (XCJC303B) for TLP / LM Mines by Henan Safety Production & Supervision Bureau, valid from 9 May 2016 to 18 January 2018

Safety Production Permit (XCWK332Y) for SGX Tailing Dam Operation by Henan Safety Production & Supervision Bureau, valid from 28 November 2010 to 27 November 2019

Safety Production Permit (XCWK331Y) for Shiwagou Tailing Dam Operation by Henan Safety Production & Supervision Bureau, valid from 9 November 2010 to 8 November 2019

Resource utilization plan (RUP) reports & approvals

RUP Report and Approval for SGX Mine by China Steel Group Design Institute

RUP Report and Approval for HPG Mine by Sanmenxia Gold Design Institute, February 2010

RUP Report and Approval for TLP Mine by China Steel Group Design Institute

RUP Report and Approval for LM Mine by Sanmenxia Gold Design Institute, April 2010

Soil and water conservation plan and approvals

Soil and Water Conservation Plan for the SGX Mine by Luoyang Soil and Water Conservation Supervision Station and approved by Luoyang Water Resources Management Bureau, May 2009

Soil and Water Conservation Plan for HPG Mine by Luoyang Soil and Water Conservation Supervision Station and approved by Luoyang Water Resources Management Bureau, May 2008

Soil and Water Conservation Plan for LM Mine by Luoyang Soil and Water Conservation Supervision Station and approved by Luoyang Water Resources Management Bureau, January 2007

Approval of Wastewater Discharge at the SGX mine and HPG mines to the Guxian Reservoir by Yellow River Irrigation Work Committee, January 2007

Approval of Wastewater Discharge in the Ying TMF to the Chongyang River by Yellow River Irrigation Work Committee, January 2007

Land Reclamation Plan for SGX Mine, Henan Found Mining Ltd. Filed in Henan Land and Resources Bureau, July, 2014

Land Reclamation Plan for TLP / LM Mines, Henan Found Mining Ltd. Filed in Henan Land and Resources Bureau, June, 2015

Land Reclamation Plan for HPG Mine, Henan Found Mining Ltd. Filed in Henan Land and Resources Bureau, January, 2016

Page 220: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 220

Land Reclamation Plan for Dongcaogou Mine, Henan Found Mining Ltd. Filed in Henan Land and Resources Bureau, September, 2014

Land Reclamation Plan for Shiwagou Tailings Dam, Henan Found Mining Ltd. Filed in Henan Land and Resources Bureau, July, 2014

The geological hazards assessment report and approval

The Geological Hazards Assessment Report for the SGX mine by Henan Provincial Science and Research Institute of Land and Resources, January 2009

Geological Hazards Assessment Report is a part of the documents for the mining permit application that was implemented in March 2004. This report was not required for HPG, LM, and TLP mines since the original mining permits were issued before March 2004.

Mining permits

See Section 4.1.

Land use right permits

Land use right certificate No 0032 (Luoning County Guoyong (2011) No 0032). The certificate covers a land area of 98,667 m2 located in Shagou Village, Xiayu Town, Luoning County and will expire in 2061; issued and approved by Luoning County Government, Luoning County Land and Resources Bureau and Ministry of Land and Resources of PRC.

Forest land use right permit (Yulinzixu 2008 No 170), issued by Henan Forest Bureau in November 2008. The permit covers a forest land area of 12.8064 hectares located in Zhuangtou Village, Xiayu Township, Luoning County for the processing plant and the tailings dam construction.

Water permits

Water permits (Ning Water No. 2012-001). The permit allows the taking of 309,600 m3 water for mill processing from Chongyang River at the inlet of the Xiashi Valley (downstream of No. 1 TMF) and the Chongyang River and expires on 30 June 2017. The permit was issued and proved by Luoning County Bureau of Water Resources Management on 21 June 2012.

Water permits (Ning Water No. 2008-001). The permit allows the taking of 823,100 m3 of water for mill processing from Luo River at the inlet of the Chongyang River, 7 km north of the No. 2 mill were renewed in 2013. The permit was issued and proved by Luoning County Bureau of Water Resources Management on 13 August 2008.

20.6 Social and community interaction

The nearest significant community to the Ying projects is the Xia Yu Township, which is approximately 2 km to the southwest of the Ying processing plant. The Luoning County Town is approximately 48 km to the northeast and the Lushi County Town is approximately 30 km to the southwest.

The project area surrounding land is predominantly agricultural.

Silvercorp has provided several donations and contributions to communities within the Luoning County; these comprise a range of cash donations, to local capital projects and community support programs, and capital projects such as road construction and repairing, constructing and upgrading schools. Prior to 2016, Silvercorp spent over 17 million RMB in donations. In 2013, Silvercorp spent 2,230,000 RMB in donations (including a donation of 2,000,000 RMB to the China University of Geology), 120,000 RMB in 2014, 71,905 RMB in 2015, and 110,000 RMB in 2016.

In addition to the above donations, in 2012 and 2013, Silvercorp made general contributions to local community support programs of 53,600 RMB, 2,700 RMB, 99,000 RMB and 466,000 RMB to Shagou (SGX), TLP / LM, Chongyang (where the 35 kV substation is located), and Xiayu Villages respectively.

Page 221: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 221

Silvercorp also employs several local contractors and local suppliers where practical. Between 2013 and 2016, Silvercorp sponsored several sections of local roads.

AMC understands that there are no records of public complaints in relation to Silvercorp’s Ying Property operations.

Cultural minorities and heritages

There are no cultural minority groups within the general project area. The cultural make-up of the broader Luoning County is predominantly Han Chinese. AMC understands that there are no records of cultural heritage sites located within or near the Ying Property.

Relationships with local government

Silvercorp has indicated that it has close relationships with the local Luoning County and Luoyang City, evidenced by the following:

The Company consults with the Luoning County on local issues.

The Luoning County is utilized to undertake regular water quality monitoring for the SGX and HPG Projects.

Relations with statutory bodies are positive and Silvercorp has received no notices of breaches of environmental conditions.

Labour practices

Silvercorp’s production activities are in compliance with Chinese labour regulations. Formal contracts are signed for all the full time employees with what AMC understands are wages well above minimum. The company provides annual medical surveillance and checks are conducted for its employees before, during and after their employment with the Company. The Company does not use child or under-aged labour.

20.7 Remediation and reclamation

Silvercorp developed remediation and reclamation plans during the project approval stage, including measures for project construction, operation and closure. The Company spent approximately $6.7 million on environmental protection, including dust control measures, wastewater treatment, solid waste disposal, the under-drainage tunnel, soil and water conservation, noise control, ecosystem rehabilitation, and emergency response plans. From 2007 to March 2016, a land area totalling 56,550 m2 was planted with trees and grasses as planned in the EIA. From 2013 to 2016, 17,950 m2 of land was planted with trees and grasses. Unused mining tunnels and the HPG tailings dam have been closed and rehabilitation coverage has been completed. Table 20.6 details expenditures for environmental protection, rehabilitation, reclamation and compensation for land acquisition from 2005 to 2016

Table 20.6 Expenditures on reclamation and remediation from 2005 to 2016 (000 RMB)

Year 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 Totals

Item

Environmental Protection

116 240 170 852 6,390 6,695 7,000 2,980 7,502 5,121 3,356 3,037 43,459

EIA() 114     129 78 174   580 390 250 300 400 2,415

Soil & Water Conservation

60 60     90   140 560 277 576 153 1,916

Environmental Equipment     455 998 703 349   170 219 2,894

Tailing Dam   13 4,432 3,975 1,491   22,296 3,440 2,166 136 0 0 37,949

Compensation for land acquisition

739 4,311 2,467 4,811 2,034 1,248 11,676 760 817 50 55 40 29,008

Totals 1,029 4,624 7,525 10,765 10,786 8,466 41,111 8,490 11,094 5,834 4,287 3,630 117,641

Note: Costs in 1,000 RMB

Page 222: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 222

20.8 Site closure plan

Mine closure will comply with the Chinese National regulatory requirements. These comprise of Article 21 (Closure Requirements) of the Mineral Resources Law (1996), and Articles 33 and 34 of the Rules of Implementation Procedures of the Mineral Resources Law of the People's Republic of China (2006).

The site closure planning process will include the following components:

Identify all site closure stakeholders (e.g. government, employees, community, etc.).

Undertake stakeholder consultation to develop agreed upon site closure criteria and post-operational land use.

Maintain records of stakeholder consultation.

Establish a site rehabilitation objective in line with the agreed post-operational land use.

Describe / define the site closure liabilities (i.e. determined against agreed closure criteria).

Establish site closure management strategies and cost estimates (i.e. to address / reduce site closure liabilities).

Establish a financial accrual process for the site closure.

Describe the post-site closure monitoring activities / program (i.e. to demonstrate compliance with the rehabilitation objective / closure criteria).

Based on the Chinese national regulatory requirements Silvercorp will complete a site decommissioning plan at least one year before mine closure. Site rehabilitation and closure cost estimates will be made at that time.

Page 223: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 223

21 Capital and operating costs 21.1 Key unit operating cost parameters

Mining contract rates

Silvercorp utilizes contract labour for mining on a rate per tonne or a rate per metre basis. The contract includes all labour, all fixed and mobile equipment, materials, and consumables, including fuel and explosives, which are purchased through the company. Ground support consumables such as timber and power to the portal areas are the responsibility of the company. Tables 21.1 to 21.3 list the 2015 – 2016 contract rate schedules for the Ying Property in both RMB and US$ (1 US$ = 6.90 RMB). The renewed 2017-2019 contract rates remain the same except for a minor adjustment for mining vein thickness less than 0.3 m. Table 21.4 shows the diamond drilling rate.

Table 21.1 Cost schedule for shafts/drifts driving

General drifting rates under shaft and adit

Size (m) RMB/m US$/m Notes

2.2x2.0 1,277 185 Major drifting

2.0x2.0 1,215 176 Drifting along veins

2.0x1.8 1,152 167 Drifting along veins

1.8x1.8 1,113 161 Drifting along veins

1.8x1.6 1,088 158 Drifting along veins

2.0x2.0 1,588 230 Raise

1.5x1.5 1,277 185 Raise

2.4x2.2 2,560 371 Declines

φ3.5 13,500 1,957 Shaft, cost including shotcrete

Table 21.2 Basic rates for mining methods

Methods Rates under shaft or adit

RMB/t US$/t

Short-hole shrinkage stope:  

- Vein thickness < 1.5m 103.5 15.00

- Vein thickness >= 1.5m 90.6 13.13

Resuing stope 217.0 31.45

Table 21.3 Ground support rates

Types Units Rates under shaft or adit

RMB US$

Timber Support Single Set 78.0 11.30

Steel Support Single Set 167.0 24.20

Shotcrete m2 67.0 9.71

Concrete m3 501.0 72.61

Rock Bolt Piece 33.0 4.78

Page 224: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 224

Table 21.4 2016 diamond drilling rate

Type of Drilling Metre range Basic Rates

RMB/m US$/m

Surface drill – short hole (75mm) 0 - 300 m 146.0 21.16

Underground drill - short hole 300 - 500m 175.0 25.36

Underground drill - deep hole 500 – 1,000m 200.0 28.99

21.2 Summary of capital costs

The principal capital requirement in the Ying district is for mine development. Capital provision is also made for exploration drilling and for sustaining surface facilities and equipment in general. Specific processing plant capital requirements going forward are projected to be minimal as plant capacity has already been expanded as described in Section 17 to meet the forecast mine production.

The basis for calculating the mine development capital cost has been described in Section 16, where the projected horizontal and vertical mine development meterage is presented for each mine. The table rates in Section 21.1 provide the unit cost basis for mine development capital cost.

Projected LOM mining capital costs are summarized by mine in Table 21.5.

Page 225: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 225

Table 21.5 Total projected LOM mining capital cost – Ying property

Mine 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 Total

RMB (M)

SGX 33.77 31.27 31.58 20.12 14.05 17.03 16.5 18.02 16.12 15.44 17.13 20.44 19.87 19.61 16.29 15.82 17.24 13.4 11.79 6.01 371.50

HZG 9.06 7.09 5.48 6.76 5.95 4.61 4.65 3.08 1.32 0.4 48.40

HPG 7.34 7.29 7.38 7.4 7.52 7.76 7.32 5.5 3.29 60.80

TLP 9.04 9.21 9.04 9.12 8.9 9.03 9.14 9.02 8.78 8.67 7.25 7.15 7.27 7 6.73 5.64 4.1 3.03 2.28 0.55 140.95

LM East 7.23 7.97 5.69 4.34 3.79 4.77 4.51 2.55 2.26 1.48 1.21 0.36 46.16

LM West 11.54 12.12 12.18 12.04 10.84 10.44 13.69 12.51 9.68 9.63 9.59 9.17 9.23 8.69 7.89 7.85 7.71 7.16 7.34 189.30

Total Mining 77.98 74.95 71.35 59.78 51.05 53.64 55.81 50.68 41.45 35.62 35.18 36.76 36.73 35.3 30.91 29.31 29.05 23.59 21.41 6.56 857.11

US$ (M)

SGX 4.89 4.53 4.58 2.92 2.04 2.47 2.39 2.61 2.34 2.24 2.48 2.96 2.88 2.84 2.36 2.29 2.50 1.94 1.71 0.87 53.84

HZG 1.31 1.03 0.79 0.98 0.86 0.67 0.67 0.45 0.19 0.06 7.01

HPG 1.06 1.06 1.07 1.07 1.09 1.12 1.06 0.80 0.48 8.81

TLP 1.31 1.33 1.31 1.32 1.29 1.31 1.32 1.31 1.27 1.26 1.05 1.04 1.05 1.01 0.98 0.82 0.59 0.44 0.33 0.08 20.43

LM East 1.05 1.16 0.82 0.63 0.55 0.69 0.65 0.37 0.33 0.21 0.18 0.05 6.69

LM West 1.67 1.76 1.77 1.74 1.57 1.51 1.98 1.81 1.40 1.40 1.39 1.33 1.34 1.26 1.14 1.14 1.12 1.04 1.06 27.43

Total Mining 11.30 10.86 10.34 8.66 7.40 7.77 8.09 7.34 6.01 5.16 5.10 5.33 5.32 5.12 4.48 4.25 4.21 3.42 3.10 0.95 124.22

Drilling Program 2.02 2.03 1.93 1.75 1.54 3.59 1.23 1.09 1.01 0.97 0.74 0.62 0.62 0.59 0.63 0.52 0.48 0.41 0.25 0.13 22.18

Surface Facilities 1.02 0.87 0.43 0.58 0.58 0.58 0.43 0.58 0.73 0.43 0.43 0.43 0.43 0.43 0.51 0.29 0.29 0.29 0.14 0.08 9.58

Total 14.33 13.76 12.71 11.00 9.53 11.95 9.76 9.02 7.74 6.57 6.28 6.38 6.38 6.14 5.62 5.06 4.98 4.13 3.50 1.16 155.98

Page 226: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 226

21.3 Summary of operating costs

Operating costs are summarized by mine in Table 21.6. In a similar fashion to the mining capital costs, the mining method and quantities described in Section 16, together with the contract rates tabulated above, provide the basis for the mining operating costs.

Table 21.6 Operating cost summary (2016 US$)

Cost Item (US$/t ore) SGX HZG HPG TLP LME LMW

Mining cost 48.27 50.97 41.84 46.26 43.60 58.74

Hauling cost 3.87 4.68 3.98 3.10 3.10 3.18

Milling cost 8.90 8.90 8.90 8.90 8.90 8.90

G&A and other cost 8.76 8.76 8.76 8.76 8.76 8.76

Totals 69.80 73.32 63.48 67.03 64.36 79.54

Note: 1 US$ = 6.9 RMB

The principal components of the milling costs are utilities (power and water), consumables (grinding steel and reagents) and labour, each approximately one third of the total cost.

“G&A and Other” cost includes an allowance for tailings dam and other environmental costs. The major capital expenditure on the two tailings storage facilities has already been expended and the ongoing costs associated with progressively raising the dam with tailings as described in Section 18 are regarded as an operating cost.

In addition, effective July 1 2016, the previous mineral resources tax was switched to a levy based on percentage of sales. At the Ying mine, the government fee and other taxes, including mineral resources, are approximately 3% to 4% of the sales. Such costs are not included in Table 21.6 above.

AMC considers the operating costs to be reasonable relative to the methods and technology used and to the scale of the operations.

Page 227: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 227

22 Economic analysis 22.1 Introduction

Although Silvercorp is a producing issuer and, therefore, does not require an economic analysis for the purposes of this report, AMC believes it is reasonable to include a summary-level analysis to illustrate the potential economic impact relative to the latest Mineral Reserve estimations and to the associated production schedules.

The Ying District is largely a mature operation. A 20-year LOM is envisaged for the resource as currently understood, with average silver equivalent grades projected to be greater than or close to 400 g/t for the first 13 years and then to fall steadily through to the end of mine life. Operating and capital costs are anticipated to be reasonable. For the summary economic assessment, AMC has used the same metal prices as in the Mineral Reserve estimation, namely:

Gold US$1,250/oz

Silver US$19.0/oz

Lead US$0.90/lb

Zinc US$0.1.00/lb

Some alternative price scenarios are considered as part of the sensitivity analysis.

A provision for government fees and mineral resource taxes at 3.5% of net revenue is made in the summary economic analysis.

An exchange rate of 1US$ = 6.90RMB has been used for the economic analysis.

22.2 Annual production schedule

The LOM ore production schedule by mine is shown in Table 22.1.

AMC notes that the gold grade (originating from HPG ore fed through Plant 2) does not reach grades that would normally be payable in a total Pb concentrate product. In practice, and with appropriate blending, AMC considers that a small volume of payable gold concentrate could be produced intermittently; and assuming a conservative 70% Au recovery, an additional product value of up to $12M could be added to the discounted cash flow. As is seen in considering the cash flow forecast in Section 22.3, this would amount to approximately 2% of the total base case pre-tax NPV of the Ying Property.

Page 228: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 228

Table 22.1 Ying property LOM production schedule

SGX 2016 July-Dec 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 Total

Production (kt) 154 263 263 261 266 272 271 271 264 291 298 293 296 295 298 260 264 265 253 236 180 5,514

Ag (g/t) 356 316 322 322 285 290 290 276 267 291 291 262 275 254 225 222 210 187 168 177 156.4 260

Pb (%) 7.36 5.51 6.28 5.87 5.96 5.54 5.54 5.29 5.80 5.22 5.03 4.82 5.01 4.87 3.83 4.69 4.37 3.91 3.66 4.25 4.30 5.06

Zn (%) 2.01 2.41 2.32 2.50 2.56 2.58 2.10 2.32 2.50 2.28 2.06 2.40 2.30 2.34 2.73 2.36 2.16 2.31 2.40 2.30 1.87 2.34

Eq-Ag(g/t) 647 556 585 576 543 535 524 506 518 517 506 479 495 470 416 433 406 371 346 372 343 483

HZG 2016 July-Dec 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Total

Production (kt) 26 50 55 60 60 60 60 60 60 60 33 586

Ag (g/t) 355 338 329 338 341 327 303 289 284 269 272 312

Pb (%) 1.22 1.04 1.19 0.81 0.54 0.65 0.98 1.17 0.78 0.93 0.47 0.89

Zn (%) 0.21 0.20 0.16 0.16 0.17 0.14 0.16 0.18 0.16 0.14 0.16

Eq-Ag(g/t) 393 371 367 364 358 348 334 327 309 299 287 340

HPG 2016 July-Dec 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Total

Production (kt) 36 72 74 80 82 82 84 87 83 83 763

Au (g/t) 1.13 1.08 0.93 1.57 1.18 1.23 1.14 1.37 0.82 0.79 1.12

Ag (g/t) 128.18 114 118 116 119 75 96 96 72 57 97

Pb (%) 4.21 4.80 4.90 3.57 3.68 3.71 3.32 2.47 3.27 2.29 3.55

Zn (%) 0.73 0.86 1.20 1.33 1.03 1.59 1.09 0.70 1.10 1.63 1.15

Eq-Ag(g/t) 347 353 357 349 329 298 292 268 249 208 301

TLP 2016 July-Dec 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 Total

Production (kt) 64 123 124 120 123 130 129 124 128 126 123 119 120 118 123 117 117 116 119 111 100 2,476

Ag (g/t) 211.1 271 274 255 240 233 219 198 207 197 196 201 188 184 191 184 141 138 120 104 102 195

Pb (%) 2.4 3.84 3.18 2.80 2.70 3.00 3.69 3.17 3.84 3.16 3.00 3.41 3.39 2.99 3.42 2.89 2.66 2.78 2.66 2.40 2.73 3.08

Zn (%) 0.27 0.26 0.34 0.29 0.24 0.24 0.32 0.29 0.26 0.29 0.25 0.22 0.23 0.25 0.26 0.32 0.32 0.40 0.28 0.23 0.27

Eq-Ag(g/t) 291 402 382 351 332 336 345 306 338 305 299 317 303 286 308 283 232 233 211 186 195 300

LM East 2016 July-Dec 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Total

Production (kt) 21 52 70 81 81 79 85 85 83 83 78 78 76 953

Ag (g/t) 396 355 340 328 320 305 294 292 288 294 266 267 217 298

Pb (%) 1.87 1.88 1.60 1.90 1.86 2.05 2.10 1.97 2.27 1.83 2.23 2.46 1.55 1.98

Zn (%) 0.3 0.3 0.4 0.4 0.4 0.4 0.5 0.5 0.5 0.5 0.6 0.3 0.42

Eq-Ag(g/t) 460 419 394 392 383 375 365 359 365 356 342 351 270 365

LM West 2016 July-Dec 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 Total

Production (kt) 49 91 90 100 99 98 98 99 100 105 102 100 99 100 100 104 99 110 105 103 90 2,042

Ag (g/t) 313 314 325 362 318 291 352 333 291 298 282 279 295 276 204 179 166 124 103 149 112 253

Pb (%) 3.64 3.71 3.69 2.46 3.30 3.89 2.08 2.25 3.28 2.61 2.94 3.02 2.44 1.90 3.02 3.16 2.40 2.71 2.76 1.76 1.54 2.76

Zn (%) 0.26 0.19 0.18 0.23 0.34 0.22 0.20 0.20 0.28 0.35 0.29 0.26 0.35 0.43 0.51 0.33 0.24 0.30 0.30 0.14 0.28

Eq-Ag(g/t) 439 443 453 447 433 426 424 411 405 388 385 384 379 342 309 289 250 217 199 210 166 349

Ying Mine 2016 July-Dec 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 Total

Production (kt) 350 651 677 703 712 721 727 727 718 749 634 590 592 513 520 481 480 491 477 451 370 12,334

Au (g/t) 0.12 0.12 0.10 0.18 0.14 0.14 0.13 0.16 0.10 0.09 0.07

Ag (g/t) 303 289 293 295 272 260 265 252 241 249 267 253 253 242 213 204 184 161 142 153 131 241

Pb (%) 4.81 4.23 4.32 3.70 3.84 3.86 3.71 3.44 3.98 3.46 3.72 3.92 3.80 3.85 3.58 3.92 3.55 3.37 3.21 3.22 3.20 3.75

Zn (%) 0.96 1.07 1.03 1.08 1.07 1.16 0.91 0.95 1.05 1.07 0.97 1.19 1.15 1.34 1.56 1.27 1.19 1.25 1.27 1.21 0.91 1.12

Eq-Ag(g/t) 493 462 467 454 432 423 418 398 404 393 414 412 407 401 367 364 330 302 277 288 259 396

Page 229: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 229

22.3 Cash flow forecast

Based on the LOM production profile and the metal price and other assumptions shown above, pre-tax and post-tax cashflow projections have been generated as presented in Table 22.2. Over the LOM, 63.1% of the net revenue is projected to come from silver, 31.4% from lead and 5.5% from zinc.

A base case NPV at 8% discount rate of $714M (pre-tax), $535M (post-tax) is projected.

Page 230: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 230

Table 22.2 Ying property cash flow projection

Notes: *Exclusive of 17% VAT.

Item Unit / Yr 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 Total

Silver Price US $/oz 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19

Lead Price (US $0.90/lb) US $/t 1,984 1,984 1,984 1,984 1,984 1,984 1,984 1,984 1,984 1,984 1,984 1,984 1,984 1,984 1,984 1,984 1,984 1,984 1,984 1,984 1,984

Zinc Price (US $1.00/lb) US $/t 2,205 2,205 2,205 2,205 2,205 2,205 2,205 2,205 2,205 2,205 2,205 2,205 2,205 2,205 2,205 2,205 2,205 2,205 2,205 2,205 2,205

Silver Revenue (gross) US$M 107.83 113.69 118.70 110.63 107.42 110.32 104.83 98.98 106.53 96.92 85.65 85.72 71.12 63.34 56.07 50.68 45.34 38.68 39.37 27.79 1,639.59

Lead Revenue (gross) US$M 52.03 55.21 49.18 51.57 52.61 50.98 47.28 54.00 48.91 44.51 43.74 42.49 37.38 35.19 35.61 32.15 31.26 28.94 27.44 22.40 842.87

Zinc Revenue (gross) US$M 9.45 9.48 10.31 10.39 11.32 8.98 9.36 10.23 10.84 8.33 9.55 9.24 9.38 11.04 8.31 7.73 8.31 8.23 7.38 4.57 182.42

Total Gross Revenue US$M 169.31 178.38 178.19 172.59 171.35 170.28 161.46 163.20 166.28 149.76 138.94 137.45 117.87 109.57 99.99 90.56 84.91 75.85 74.18 54.76 2,664.88

Silver Net % Payable % 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90%

Lead Net % Payable % 87% 87% 87% 87% 87% 87% 87% 87% 87% 87% 87% 87% 87% 87% 87% 87% 87% 87% 87% 87% 87%

Zinc Net % Payable % 70% 70% 70% 70% 70% 70% 70% 70% 70% 70% 70% 70% 70% 70% 70% 70% 70% 70% 70% 70% 70%

Silver Revenue (net) US$M 97.05 102.32 106.83 99.57 96.68 99.29 94.34 89.08 95.88 87.23 77.09 77.15 64.00 57.01 50.46 45.61 40.80 34.81 35.43 25.01 1,475.63

Lead Revenue (net) US$M 45.27 48.03 42.79 44.87 45.77 44.35 41.13 46.98 42.55 38.73 38.05 36.97 32.52 30.62 30.98 27.97 27.20 25.18 23.87 19.49 733.30

Zinc Revenue (net) US$M 6.62 6.64 7.21 7.27 7.93 6.29 6.55 7.16 7.59 5.83 6.69 6.47 6.56 7.73 5.82 5.41 5.82 5.76 5.16 3.20 127.70

Total Net Revenue US$M 148.93 156.99 156.84 151.71 150.37 149.93 142.02 143.22 146.02 131.78 121.83 120.58 103.09 95.35 87.26 78.99 73.82 65.75 64.46 47.70 2,336.62

Operating Costs                                            

Mining US $/t 48.63 48.63 48.63 48.63 48.63 48.63 48.63 48.63 48.63 48.63 48.63 48.63 48.63 48.63 48.63 48.63 48.63 48.63 48.63 48.63 48.63

Hauling US $/t 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65 3.65

Milling US $/t 8.90 8.90 8.90 8.90 8.90 8.90 8.90 8.90 8.90 8.90 8.90 8.90 8.90 8.90 8.90 8.90 8.90 8.90 8.90 8.90 8.90

General & Administration US $/t 8.76 8.76 8.76 8.76 8.76 8.76 8.76 8.76 8.76 8.76 8.76 8.76 8.76 8.76 8.76 8.76 8.76 8.76 8.76 8.76 8.76

*Gov fees & tax (~3.5% of Net Rev.) US $/t 6.85 6.94 6.68 6.38 6.23 6.17 5.85 5.97 5.83 6.22 6.17 6.10 6.01 5.48 5.43 4.92 4.50 4.12 4.28 3.85 5.70

Total Operating Cost US$M 49.97 52.05 53.84 54.32 54.96 55.35 55.06 54.49 56.73 48.30 44.93 44.98 38.99 39.25 36.22 35.93 36.53 35.34 33.44 27.34 908.03

Capital Costs                                            

Mining US$M 11.30 10.86 10.34 8.66 7.40 7.77 8.09 7.34 6.01 5.16 5.10 5.33 5.32 5.12 4.48 4.25 4.21 3.42 3.10 0.95 124.22

Drilling Program US$M 2.02 2.03 1.93 1.75 1.54 3.59 1.23 1.09 1.01 0.97 0.74 0.62 0.62 0.59 0.63 0.52 0.48 0.41 0.25 0.13 22.18

Surface facilities US$M 1.02 0.87 0.43 0.58 0.58 0.58 0.43 0.58 0.73 0.43 0.43 0.43 0.43 0.43 0.51 0.29 0.29 0.29 0.14 0.08 9.58

Total Capital Cost US$M 14.33 13.76 12.71 11.00 9.53 11.95 9.76 9.02 7.74 6.57 6.28 6.38 6.38 6.14 5.62 5.06 4.98 4.13 3.50 1.16 155.98

Undiscounted Pre-tax Cash flow US$M 84.62 91.18 90.29 86.39 85.88 82.63 77.20 79.70 81.54 76.92 70.62 69.21 57.72 49.96 45.42 38.00 32.30 26.29 27.52 19.20 1,272.61

Undiscounted Post-tax Cash flow US$M 63.47 68.38 67.72 64.79 64.41 61.97 57.90 59.78 61.16 57.69 52.96 51.91 43.29 37.47 34.06 28.50 24.23 19.72 20.64 14.40 954.46

Pre-tax NPV @ 8% US$M 713.97

Post-tax NPV @ 8% US$M 535.48

Page 231: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 231

22.4 Sensitivity analysis

Table 22.3 shows impact on pre-tax NPV of a 20% adverse change in individual metal prices, operating cost and capital cost. Most sensitivity is seen in silver price. The NPV is moderately sensitive to lead price and operating cost, and only slightly sensitive to zinc price and capital cost.

Table 22.3 Ying property sensitivity analysis

Item Variant Unit Pre-tax NPV ($US M)

Base Case (Pre-tax NPV @ 8% discount rate) - - 714

Lead price - 20% decrease 0.72 US$/lb 638

Zinc price - 20% decrease 0.80 US$/lb 701

Silver price – 20% decrease 15.20 US$/oz 554

Capex increase 20 % 696

Opex increase 20 % 619

Page 232: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 232

23 Adjacent properties Silvercorp now controls all the significant silver-lead-zinc properties and known mineralized occurrences within the Ying Property. There are no known adjacent properties with similar types of mineralization.

Page 233: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 233

24 Other relevant data and information AMC is not aware of any additional information or explanation that is necessary to make the technical report understandable and not misleading.

Page 234: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 234

25 Interpretation and conclusions 25.1 General

Silvercorp has been active on the Ying Property, which includes the SGX, HZG, HPG, TLP, LME and LMW mines, since 2004. Annual production has ranged between 574,000 tonnes and 757,000 tonnes in the fiscal years 2012 to 2016.

Mineralization in the Ying district comprises numerous steeply-dipping silver-lead-zinc veins with widths varying from a few centimetres to a few metres and with strike lengths up to a few thousand metres. To date, significant mineralization has been defined or developed in at least 224 discrete vein structures, and many other smaller veins have been found but not, as yet, well explored. Exploration is by underground drilling, surface drilling and chip sampling of underground workings. Silvercorp’s logging, surveying, sampling, sub-sampling and assaying procedures follow common industry practice. QA / QC programs have been in place since 2004 and the results are deemed satisfactory by AMC.

Because of the pinch and swell nature of Ying veins, there is often significant uncertainty in location of potentially economic mineralization within the veins, and in the grade and tonnage of that mineralization. However, the large number of veins and active mining areas within each vein means that economic risk related to this uncertainty is likely to be low. Silvercorp has a history of profitable mining, which demonstrates its ability to successfully manage this uncertainty.

The 2016 Mineral Resource estimates for the Ying property were prepared by independent Qualified Person, Dr Adrienne Ross, P.Geo., with the assistance of Ms Kathy Zunica of AMC and with input from Mr Pat Stephenson, P.Geo., who takes QP responsibility for the additional geological sections in this Technical Report. Datamine software was used, and, as a result of a recommendation in AMC’s 2012 Technical Report, the June 2016 Resources were estimated using a block modelling approach, with 3D ordinary kriging. Because of the numerous veins (194) for which Resource estimates were prepared, this proved to be an extremely time-consuming process. After interpolation, the grade was averaged across the full width of mineralization and a 0.3 m minimum mining width calculation was applied, whereby mineralization widths < 0.3 m had a dilution envelope of zero grade added to make up the difference. The Mineral Resources were then reported above a cut-off grade.

For the purposes of cut-off grade and silver equivalent calculations, AMC has used recent reported individual metal processing recoveries and operating costs for each site, and the following long-term metal prices for both Mineral Resources and Mineral Reserves: Au US$1,250/oz, Ag US$19/oz, Pb US$0.90/lb, Zn US$1.00/lb.

Measured and Indicated Resources total 16.3 Mt averaging 243 g/t Ag, 3.87% Pb and 1.31% Zn, while Inferred Resources total 10.5 Mt averaging 227 g/t Ag, 3.91% Pb and 1.10% Zn. Mineral Resource cut-off grades are SGX 140 g/t AgEq; HZG 125 g/t AgEq; HPG 125 g/t AgEq; LME 125 g/t AgEq; LMW 130 g/t AgEq; TLP 120 g/t AgEq.

Proven and Probable Reserves total 12.3 Mt averaging 240 g/t Ag, 3.75% Pb and 1.27% Zn. Mineral Reserve cut-off grades are SGX – 190 g/t AgEq resuing, 170 g/t AgEq shrinkage; HZG – 170 g/t AgEq resuing; HPG – 200 g/t AgEq resuing, 175 g/t AgEq shrinkage; LME -175 g/t AgEq resuing, 145 g/t AgEq shrinkage; LMW -180 g/t AgEq resuing, 135 g/t AgEq shrinkage; TLP - 155 g/t AgEq resuing, 130 g/t AgEq shrinkage.

AMC has tested the sensitivity of Mineral Reserve estimates to an increase in cut-off grade, and has found only a 6% decrease in total projected AgEq ounces for a 20% increase in cut-off grades.

Mineral Reserve estimates are based on the assumption that the current stoping practices of cut and fill resuing and shrinkage stoping will continue to be predominant. The sub-vertical veins, generally competent ground, reasonably regular vein width, and hand-mining techniques using short rounds, allows a significant degree of selectivity and control in the stoping process. Minimum extraction widths of 0.3 m for resuing and 0.8 m for shrinkage are assumed, with 0.8 m being the minimum mining width for both methods. AMC has observed the mining methods at Ying and considers these widths to be reasonable.

Page 235: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 235

Mining dilution and recovery factors vary from mine to mine, dependent on vein width and mining method. Calculated dilution factors average 17% for both resuing and shrinkage, while assumed recovery factors are 95% for resue stopes and 92% for shrinkage stopes.

Average silver and lead grades for the total combined Ying Mines Mineral Reserves are of the order of 20% lower than reported mined grades from operations for January to November 2016. This is consistent with the mining plan generally moving into lower grade areas as the LOM progresses. AMC notes that the grade distribution of the Mineral Reserves allows opportunity to mine at above-overall-average grades in the first part of the projected remaining LOM. AMC advises that best mining practices and a continuing focus on tight dilution control will be key to optimizing grade throughout the extraction of the Ying Mineral Reserves.

The Ying mine complex has a projected LOM through to 2036 based on Proven and Probable Reserves. The potential exists for an extended LOM via further exploration and development, particularly in areas of Inferred Resources.

An increase in annual production to around 750,000 by 2025 is planned, followed by a relatively steady decline to around 450,000 by 2035. Development and infrastructure to allow access to, and mining in, a greater number of working places is either in place, in development or is planned. AMC notes that the ability to achieve the projected production increases will, to a large degree, be dependent on the consistent availability of resources, particularly skilled manpower. AMC considers that there is a certain amount of risk associated with the provision of those resources and recommends that Silvercorp maintain particular focus in this area.

AMC notes that projected metal grades through to around 2023 are largely in-line with grades reported in 2015 and 2016 to June 30. In order to maintain optimum metal grades, AMC recommends that Silvercorp continue its recent and current efforts on dilution and grade control via the Mining Quality Control Department.

The two processing plants, Plant 1 and Plant 2, are situated within 2 km of each other and have a total current design capacity of 2,600 tpd, comprising 600 tpd for Plant 1 and 2,000 tpd for Plant 2. Plant 1 feed comprises mainly low grade ore from LM, HPG and HZG, while Plant 2 feed comprises mostly higher grade ore from SGX and TLP. To optimize profitability, blending of concentrates is practiced. SGX / HPG also contains high grade ore which is hand-sorted at the mine sites, milled in a dedicated facility, and then sold directly or mixed with flotation lead concentrate for sale. Ore from the SGX / HZG mine is carried in trucks by boat across the Guxian Reservoir to the mills. Other ore is trucked by road.

Historically, higher grade feed from SGX has enhanced plant performance but, with the grades of SGX ore gradually decreasing, the challenge will be to maintain a similar metallurgical performance on lower grade feedstock. Maintaining recovery seems achievable but with a moderate adverse impact on concentrate lead grades. These are still marketable, but incur higher treatment charges and lower % payables. Each processing plant has an associated TMF. The TMFs were designed based on then-current Mineral Resource / Mineral Reserve estimates and LOM production projections. Subsequent Mineral Resource expansion indicate that the current tailings capacity will not be adequate for the full Ying LOM. Additional tailings capacity will thus be required in the later period of the LOM production, although Silvercorp anticipates that there will be no problem in receiving necessary approvals for that capacity expansion.

Flood and safety calculations have been performed in accordance with Chinese standards. While the calculated factors of safety are consistent with Chinese practice requirements, they are somewhat lower than those required by international practice.

Silvercorp has all the required permits for its operations on the Ying Property. The Mineral Resource and Mineral Reserve estimates include material (about 25% of the Indicated Resources) that is currently below the elevation approved in the mining permits. However, AMC is satisfied that there is no material risk of Silvercorp not receiving approval to mine these resources when access is required in the future.

Silvercorp has established an environmental protection department which is responsible for environmental and rehabilitation management work in the Ying Property. Monitoring results to date indicate, with relatively minor

Page 236: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 236

exceptions, that discharges have met required standards. In accordance with Chinese national regulatory requirements, Silvercorp will complete a site decommissioning plan at least one year before mine closure.

The principal capital cost requirement is for continued mine development, with the total mining capital over the LOM estimated at approximately US$156M. Future processing plant capital requirements are minimal as plant capacity has already been expanded to meet the forecast mine production. The majority of capital expenditure will be required for continuing mine development ($124M). Exploration drilling and overall surface sustaining capital have been estimated at about $22M and $10M respectively. Estimated site operating costs range from US$63/t of ore mined for HPG to US$80/t of ore mined for LMW. AMC considers both operating and capital cost estimates to be reasonable.

Using long-term metal prices of silver US$19.0/oz, lead US$0.90/lb, zinc US$1.00/lb and gold US$1,250/oz, and a USD: RMB exchange rate of 6.90, AMC has estimated a pre-tax NPV at an 8% discount rate of $714M ($535M post-tax). Over the LOM, 63.1% of the net revenue is projected to come from silver, 31.4% from lead and 5.5% from zinc (gold value has minimal effect). Most sensitivity to NPV is seen in silver price. The NPV is moderately sensitive to lead price and operating cost, and only slightly sensitive to zinc price and capital cost. Ying mines safety is governed by Chinese statutory requirements. AMC understands that, in certain areas, Silvercorp has moved above and beyond those requirements. AMC advises, however, that to minimize both personnel and corporate risk, Silvercorp should continue with a focus on safety improvement, inclusive of implementation of a policy where the more stringent of either Chinese or Canadian safety standards is employed.

25.2 Mineral Resource / Reserve estimation process

As noted above, the June 2016 Mineral Resources were estimated using a 3D block modelling approach. Because of the large number of veins (194) for which estimates were prepared, this was an extremely time-consuming process, particularly for the Resource modelling. The time taken from commencement of the project to completion of the report was seven months. In AMC’s opinion, this is too long a timeframe, and merits a close examination of how Ying Mineral Resource / Reserve estimates are prepared for the purpose of public (NI 43-101) reporting.

Silvercorp has, for the last two years, been employing its own version of block modelling on the mines for the purpose of preparing internal Mineral Resource / Reserve estimates and for short term mine planning. AMC has not reviewed this process in detail, but recommends that Silvercorp and AMC work together to assess whether an alternative modelling approach for external reporting might reduce the time required to more reasonable levels.

Page 237: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 237

26 Recommendations AMC makes the following recommendations:

1. Review the Mineral Resource modelling approach prior to the next NI 43-101 Technical Report, with a specific focus on the respective merits of the AMC block modelling approach and the Silvercorp on-site block modelling approach. The aim should be to appropriately balance the complexity, work and time involved with the estimation accuracy required to (a) correctly report results in the public domain, and (b) provide a sound basis for operational planning and scheduling on a short to long term basis.

2. Depending on the results of Recommendation 1, consider having Silvercorp take Qualified Person responsibility for the next NI 43-101 Technical Report6, subject to the Mineral Resource and Mineral Reserve estimates being audited by a recognized consultant.

3. For the next NI 43-101 Technical Report, review each section of the current report with a view to aligning the level of detail to that described in Form 43-101F1, bearing mind that “The objective of the technical report is to provide a summary of material scientific and technical information concerning mineral exploration, development, and production activities ….” (Instruction (1) in Form 43-101F1).

4. Continue with current efforts to fully integrate the Resource estimation, Reserve estimation and mine planning processes

5. Maintain particular focus on consistent provision of the skilled resources that will be necessary to achieve targeted production over the LOM.

6. Continue recent and current focus on dilution and grade control via the Mining Quality Control Department.

7. Maintain the highly focused development approach that will be necessary throughout the Ying operation for LOM development targets to be achieved.

8. Continue with a focus on safety improvement, including implementation of a policy where the more stringent of either Chinese or Canadian safety standards are employed.

9. Consider the application of more bulk-mining methods, such as long-hole benching, where applicable, while recognizing that significant technological change would certainly be required.

10. Place a strong focus on stockpiling and record keeping procedures, and ensure that the summation of individual ore car weights by stope and zone is, as far as practicable, fully integrated into the tracking and reconciliation process.

11. Undertake periodic mill audits aimed at ensuring optimum process control and mill performance.

12. Continue exploration tunnelling and diamond drilling at the Ying Property. The exploration tunnelling is used to upgrade the drill-defined Resources to the Measured category, and the diamond drilling is used to expand and upgrade the previous drill-defined Resources, explore for new mineralized zones within the unexplored portions of vein structures, and test for the down-dip and along-strike extensions of the vein structures. The proposed exploration work is as follows:

SGX

Exploration Tunnelling:

25,000 m exploration tunnelling on vein structures S1, S2, S2W, S4, S6, S6E1, S7, S7-1, S7-2, S7E2, S7W, S8, S8E, S10, S14, S14-1, S14-2, S16E, S19, S21, S21W, and S22 between levels 110 m and 710 m.

Diamond Drilling:

30,000 m underground diamond drilling on vein structures S2, S2W2, S7, S7-1, S8, S10, S11, S12, S16W, S18, S19, S21 and S29.

HZG

Exploration Tunnelling:

5,000 m exploration tunnelling on vein structures HZ20, HZ20E, HZ22, HZ23, and HZ5 and H22 between levels 450 m and 810 m.

6 Since Silvercorp is a “producing issuer” in terms of NI 43-101, it is not necessary for its Technical Reports to be prepared by Independent Qualified Persons unless one of several triggers described in Section 5.3 of NI 43-101 applies.

Page 238: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 238

Exploration Drilling:

5,000 m underground exploration drilling on vein structures HZ5, HZ22 and HZ22E.

HPG

Exploration Tunnelling:

5,000 m exploration tunnelling on major vein structures H4, H5, H13, H14, H15, H16, H16E and H17 between levels 100 m and 700 m.

Underground Drilling:

9,000 m underground diamond drilling on vein structures H5, H5W, H16 and H17 as well as their subzones.

LMW

Exploration Tunnelling:

6,500 m on vein structures LM7, LM8, LM10, LM11, LM12, LM13, LM16, LM17 and LM19 as well as their parallel subzones between levels 500 m and 900 m. LM2, LM3, LM5 and LM6 between levels 500 m and 750 m at LME, and LM7, LM8, LM10, LM11, LM12, LM13, LM14, LM16, LM19, and LM20 between levels 650 m and 900 m at LMW.

Diamond Drilling:

5,000 m underground drilling on LMW6, LM17, LM19 and W6 and their parallel vein structures.

LME

Exploration Tunnelling:

4,000 m on vein structures LM2, LM2-1, LM4, LM4W2, LM5, LM5E, LM5W, LM5W2, LM6, LM6W, LM6E and LM6E2 between levels 450 m and 790 m.

Diamond Drilling:

6,000 m underground diamond drilling on vein groups LM4, LM5, LM6 and LM21.

TLP

Exploration Tunnelling:

7,500 m exploration tunnelling on vein structures T1 vein group, T2, T3E, T4, T5 vein group, T11 vein group, T14, T14branch, T15 vein group, T16 vein group, T17 vein group, T21 vein group, T22 vein group, T23, T27, T28E, T33 vein group, and T35 vein group between levels 500 m and 790 m.

Diamond Drilling:

12,000 m underground drilling on vein structures T11, T14, T16, T21 and T35E.

The estimated cost for all of the above exploration work is:

Tunnelling: RMB 63,600,000 (US$9.2M)

Drilling: RMB 20,100,000 (US$2.9M)

Page 239: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 239

27 References AMC Mining Consultants (Canada) Ltd (2012) Technical Report for Ying Gold-Silver-Lead-Zinc Property, Henan Province, China. Prepared for Silvercorp Metals Inc. Effective date 1 May 2012, signing date 13 June 2012.

AMC Mining Consultants (Canada) Ltd (2012) Technical Report for Ying Gold-Silver-Lead-Zinc Property, Henan Province, China. Prepared for Silvercorp Metals Inc. Effective date 1 May 2012 (Revised 30 April 2013).

AMC Mining Consultants (Canada) Ltd (2012) Technical Report for Ying Gold-Silver-Lead-Zinc Property, Henan Province, China. Prepared for Silvercorp Metals Inc. Effective date 31 December 2013, signing date 29 July 2014.

Broili et al. (2006) Technical Update for Silvercorp Metals Inc. on the Ying Silver-Lead-Zinc Project Henan Province Peoples Republic of China, 18 April 2006

Broili et al. (2006) Technical Update for Silvercorp Metals Inc. on the Ying Silver-Lead-Zinc Project Henan Province Peoples Republic of China, 26 May 2006

Broili et al. (2008) NI 43-101 Technical Report and Pre-Feasibility Study November 2008 for Silvercorp Metals Inc. TP-LM Silver-Lead Project, Henan Province, Peoples Republic of China; prepared for Silvercorp Metals Inc. by BK Exploration Assoc., Washington USA

Broili et al. (2010) Ying District Silver-Lead-Zinc Project for Silvercorp Metals Inc., 26 February 2010

Broili and Klohn (2007) Technical Update on the Ying Silver-Lead-Zinc and the HPG Gold-Silver-Lead Projects, Henan Province, China, 16 August 2007; Report prepared for Silvercorp Metals Inc., by BK Exploration Assoc., Washington USA

Chen A (Jun He Law Offices, Beijing, 2016) Re: Summary of Mining Licenses and Exploration Licenses, Letter to Silvercorp dated 29 July, 2016.

Henan Luoyang (2006) Yuxi Hydrological and Geological Reconnaissance Company, Reconnaissance Report upon Geotechnical Engineering, 4 July 2006

San-Men-Xia Gold Mining Engineering Ltd (Report dated Jan 2011). Original report prepared for Silvercorp Metals Inc., in Mandarin.

Sinosteel Institute of Mining Research Co., Ltd (2006) Report dated March 2006.

Xu et al. (2006) Technical Review on HPG Silver-Lead Project, Luoning County, Henan Province, People’s Republic of China; Report prepared for Silvercorp Metals, Inc., by SRK Consulting, Beijing, China.

Various Silvercorp files and documents not specifically referenced

Broili (2004) Technical Report for SKN Resources Ltd on the Ying Silver-Lead-Zinc Project, Henan Province, China, 21 April 2004; Report prepared for Silvercorp Metals Inc., by BK Exploration Assoc., Washington, USA

Broili (2005) Technical Report for SKN Resources Ltd on the Ying Silver-Lead-Zinc Project Henan Province, Shina, 18 April 2005; Report prepared for Silvercorp Metals Inc., by BC Exploration Assoc. Washington USA

Cullen (2011) Technical Report on the BYP Property, Hunan Province, China, Report prepared for Silvercorp Metals Inc., 24 June 2011

Klohn et al. (2011) Technical Report Resources and Reserves Update HPG Mine Ying Silver-Lead-Zinc District Report prepared for Silvercorp Metals Inc., 20 May 2011

Page 240: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 240

Klohn et al. (2011) Technical Report Resources and Reserves Update TLP & LM Mine Ying Silver-Lead-Zinc District Report prepared for Silvercorp Metals Inc., 20 May 2011

Klohn et al. (2011) Technical Report Resources and Reserves Update SGX Mine Ying Silver-Lead-Zinc District Report prepared for Silvercorp Metals Inc., 20 May 2011

Maanshan Engineering Exploration and Design Institute (Report dated March 2006). Original report prepared for Silvercorp Metals Inc., in Mandarin.

Page 241: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 241

28 Certificates

Page 242: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 242

CERTIFICATE OF AUTHOR I, Patrick R. Stephenson, P.Geo., of Vancouver, British Columbia, do hereby certify that:

1. I am the Principal of P R Stephenson Consulting Inc., with an office at 301, 1490 Pennyfarthing Drive, Vancouver, British Columbia, V6J 4Z3. I am currently employed as a subconsultant by AMC Mining Consultants (Canada) Limited (AMC), with an office at Suite 202, 200 Granville Street, Vancouver British Columbia, V6C 1S4. I was previously, until 16 January 2017, employed by AMC as a Director and Principal Geologist.

2. This certificate applies to the technical report titled “Ying NI 43-101 Technical Report.”, with an effective date of 31 December 2016, (the “Technical Report”) prepared for Silvercorp Metals Inc.(“the Issuer”);

3. I am a graduate of Aberdeen University in Scotland (Bachelors of Science (Hons) in Geology in 1971). I am a registered member in good standing of the Association of Professional Engineers and Geoscientists of British Columbia (License #37100) and Saskatchewan (Reg. #28984). I have practiced my profession for a total of 45 years since my graduation and have relevant experience in the preparation of Resource and Reserve statements, due diligence reviews, mining and exploration property valuations, expert witness reports, and independent technical reports across a broad range of metalliferous mining projects.

I have read the definition of "qualified person" set out in National Instrument 43-101 (NI 43-101) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a "qualified person" for the purposes of NI 43-101.

4. I visited the Ying Property from 13-16 July 2016 for 3 days;

5. I am responsible for Sections 1-12, 20, 27 and parts of 1, 25 and 26 of the Technical Report;

6. I am independent of the Issuer and related companies applying all of the tests in Section 1.5 of the NI 43-101;

7. I have had prior involvement with the property that is the subject of the Technical Report in that I was a qualified person for previous AMC Technical Reports on the Ying property in 2012 (filed 15 June 2012, effective date 1 May 2012), and in 2013 (minor update to 2012 report, filed 30 April 2013, effective date 1 May 2012).

8. I have read NI 43-101, and the Technical Report has been prepared in compliance with NI 43-101 and Form 43-101F1.

9. As of the effective date of the Technical Report and the date of this certificate, to the best of my knowledge, information and belief, this Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading;

Effective 31 December 2016 Signing Date: 15 February 2017

(original signed by) Patrick R. Stephenson, P.Geo.

Patrick R. Stephenson, P.Geo. Principal – P R Stephenson Consulting Inc.

Page 243: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 243

CERTIFICATE OF AUTHOR I, Herbert A. Smith, P.Eng. of Vancouver, British Columbia, do hereby certify that:

1. I am currently employed as General Manager / Principal Mining Engineer with AMC Mining Consultants (Canada) Ltd., with an office at Suite 202, 200 Granville Street, Vancouver, British Columbia V6C 1S4;

2. This certificate applies to the technical report titled “Ying NI 43-101 Technical Report.”, with an effective date of 31 December 2016, (the “Technical Report”) prepared for Silvercorp Metals Inc. (“the Issuer”);

3. I graduated with a degree of B.Sc. in Mining Engineering in 1972 and a degree of M.Sc. in Rock Mechanics and Excavation Engineering in 1983, both from the University of Newcastle upon Tyne, England. I have worked as a Mining Engineer for a total of 38 years since my graduation and have relevant experience in underground mining, feasibility studies and technical report preparation for mining projects.

I have read the definition of "qualified person" set out in National Instrument 43-101 (NI 43-101) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a "qualified person" for the purposes of NI 43-101.

4. I visited the Ying Property from 13-16 July 2016 for 3 days;

5. I am responsible for Sections 15, 16, 18, 21, 22 and parts of 1, 25 and 26 of the Technical Report;

6. I am independent of the Issuer and related companies applying all of the tests in Section 1.5 of NI 43-101;

7. I have had prior involvement with the property that is the subject of the Technical Report in that I was a qualified person for previous AMC Technical Reports on the Ying property in 2012 (filed 15 June 2012, effective date 1 May 2012), and in 2013 (minor update to 2012 report, filed 30 April 2013, effective date 1 May 2012).

8. I have read NI 43-101, and the Technical Report has been prepared in compliance with NI 43-101 and Form 43-101F1.

9. As of the effective date of the Technical Report and the date of this certificate, to the best of my knowledge, information and belief, this Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading;

Effective 31 December 2016 Signing Date: 15 February 2017

(original signed by) Herbert A. Smith, P.Eng.

Herbert A. Smith, P. Eng. General Manager / Principal Mining Engineer AMC Mining Consultants (Canada) Limited

Page 244: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 244

CERTIFICATE OF AUTHOR I, Adrienne A Ross, P.Geo., of Vancouver, British Columbia, do hereby certify that:

1. I am currently employed as a Principal Geologist with AMC Mining Consultants (Canada) Limited, with an office at Suite 202, 200 Granville Street, Vancouver British Columbia, V6C 1S4.

2. This certificate applies to the technical report titled “Ying NI 43-101 Technical Report.”, with an effective date of 31 December 2016, (the “Technical Report”) prepared for Silvercorp Metals Inc.(“the Issuer”);

3. I am a graduate of the University of Alberta in Edmonton, Canada (Bachelors of Science (Hons) in Geology in 1991). I am a graduate of the University of Western Australia in Perth, Australia (Ph.D. in Geology). I am a registered member in good standing of the Association of Professional Engineers and Geoscientists of British Columbia (License #37418) and Alberta (Reg. #52751). I have practiced my profession for a total of 23 years since my graduation and have relevant experience in precious and base metal deposits.

I have read the definition of "qualified person" set out in National Instrument 43-101 (NI 43-101) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a "qualified person" for the purposes of NI 43-101.

4. I visited the Ying Property from 13-21 July 2016 for 8 days;

5. I am responsible for Section 14 of the Technical Report;

6. I am independent of the Issuer and related companies applying all of the tests in Section 1.5 of the NI 43-101;

7. I have had prior involvement with the property that is the subject of the Technical Report in that I assisted the qualified persons with respect to a previous AMC Technical Report on the Ying property in 2013 (filed 30 April 2013, effective date 1 May 2012).

8. I have read NI 43-101, and the Technical Report has been prepared in compliance with NI 43-101 and Form 43-101F1.

9. As of the effective date of the Technical Report and the date of this certificate, to the best of my knowledge, information and belief, this Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading;

Effective 31 December 2016 Signing Date: 15 February 2017

(original signed by) Adrienne A Ross, P.Geo.

Adrienne Ross, P.Geo. Principal Geologist AMC Mining Consultants (Canada) Limited

Page 245: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com 245

CERTIFICATE OF AUTHOR I, Harald Muller, FAusIMM, Queensland, do hereby certify that:

1. I am currently employed as a Principal Consultant with AMC Consultants Pty Ltd, with an office at Level 21, 179 Turbot Street, Brisbane, Queensland, 4000, Australia.

2. This certificate applies to the technical report titled “Ying NI 43-101 Technical Report.”, with an effective date of 31 December 2016, (the “Technical Report”) prepared for Silvercorp Metals Inc.(“the Issuer”);

3. I am a graduate of the Pretoria University in South Africa (Bachelors of Engineering (Chemical) in 1983). I am a registered Fellow in good standing of the Australasian Institute of Mining and Metallurgy (Membership #303667), the Institute of Chemical Engineers (British) (Membership #2052 3858) and the South African Institution of Chemical Engineering (Membership #01979). I have practiced my profession for a total of 33 years since my graduation and have relevant experience in minerals processing and extractive metallurgy, including process engineering, technical process design and auditing, project evaluation and development, process plant operations management and maintenance planning, plant start-up and commissioning, technical review, and audits. My experience covers across a broad range of metalliferous mining projects, including gold.

I have read the definition of "qualified person" set out in National Instrument 43-101 (NI 43-101) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a "qualified person" for the purposes of NI 43-101.

4. I have not visited the Ying Property;

5. I am responsible for Sections 13, 17, 19 and parts of 22 of the Technical Report;

6. I am independent of the Issuer and related companies applying all of the tests in Section 1.5 of NI 43-101;

7. I have not had prior involvement with the property that is the subject of the Technical Report.

8. I have read NI 43-101, and the Technical Report has been prepared in compliance with NI 43-101 and Form 43-101F1.

9. As of the effective date of the Technical Report and the date of this certificate, to the best of my knowledge, information and belief, this Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading;

Effective 31 December 2016 Signing Date: 15 February 2017

(original signed by) Harald Muller FAusIMM

Harald Muller, FAusIMM, Principal Consultant AMC Consultants Pty Ltd

Page 246: Silvercorp ying-technical-report-master 23-feb_2017-final

Ying NI 43-101 Technical Report Silvercorp Metals Inc. 716018

amcconsultants.com

Our offices Australia

Adelaide

Level 1, 4 Greenhill Road Wayville SA 5034 Australia T +61 8 8201 1800 E [email protected]

Brisbane

Level 21, 179 Turbot Street Brisbane Qld 4000 Australia T +61 7 3230 9000 E [email protected]

Melbourne

Level 19, 114 William Street Melbourne Vic 3000 Australia T +61 3 8601 3300 E [email protected]

Perth

Level 1, 1100 Hay Street West Perth WA 6005 Australia T +61 8 6330 1100 E [email protected]

Canada

Toronto

Suite 300, 90 Adelaide Street West Toronto, Ontario M5H 3V9 Canada T +1 416 640 1212 E [email protected]

Vancouver

Suite 202, 200 Granville Street Vancouver BC V6C 1S4 Canada T +1 604 669 0044 E [email protected]

Singapore United Kingdom

Singapore

Registered Office 16 Raffles Quay, #33-03 Hong Leong Building Singapore 048581 T +65 8620 9268 E [email protected]

Maidenhead

Registered in England and Wales Company No. 3688365

Level 7, Nicholsons House Nicholsons Walk, Maidenhead Berkshire SL6 1LD United Kingdom T +44 1628 778 256 E [email protected]

Registered Office: Monument House, 1st Floor, 215 Marsh Road, Pinner, Greater London, HA5 5NE, United Kingdom