Signaling Programme - Laboratory Test · F-Banen signaling programme and migration strategy Rail...

15
1 Signaling Programme Signaling Programme - Laboratory Test 05.05.2015 Gitte Oberbossel

Transcript of Signaling Programme - Laboratory Test · F-Banen signaling programme and migration strategy Rail...

Page 1: Signaling Programme - Laboratory Test · F-Banen signaling programme and migration strategy Rail data ... Alstom (Onboard) Customer for customer testing External interface integration

1

Signaling Programme

Signaling Programme - Laboratory Test

05.05.2015 Gitte Oberbossel

Page 2: Signaling Programme - Laboratory Test · F-Banen signaling programme and migration strategy Rail data ... Alstom (Onboard) Customer for customer testing External interface integration

2

Agenda

– F-Banen signaling programme and migration strategy

– Simple solution overview of signaling programme and scope of Joint

Test Lab (JTL) test

– Signaling programme organization

– Who is using the JTL laboratory and what is being tested?

– Test organizations

– JTL test phase & cycle

– Test environments

– Laboratory programme test strategy

– Configurations management - test baselines

– JTL test schedule

– Entering & exiting each test cycle

TEST I SP

Page 3: Signaling Programme - Laboratory Test · F-Banen signaling programme and migration strategy Rail data ... Alstom (Onboard) Customer for customer testing External interface integration

3

F-Banen signaling programme and migration strategy

A replacement of all signaling on the entire Banedanmark railway network with ERTMS by the end of 2021

That is the objective of the Danish signaling programme decided by the Danish parliament in 2009. The decision to fund a total replacement programme was made by a broad political majority.

It was a historic decision. A total renewal of all signaling on a national rail network in a single programme has never been attempted on this scale before in Europe. Denmark will be the first country to carry out a countrywide implementation of ERTMS level 2, the newest European common signaling standard.

The programme represents a major change in technology intended to maximize the possibilities and benefits of re-signaling the Danish railway network. It is unique in its approach of focusing on economies of scale and creating a competitive market situation to ensure optimized price and quality. This may be a normal market situation in many other businesses but unusual in the signaling business.

Page 4: Signaling Programme - Laboratory Test · F-Banen signaling programme and migration strategy Rail data ... Alstom (Onboard) Customer for customer testing External interface integration

4

F-Banen signaling programme and migration strategy

Rail data (F-Banen + S-Banen)

– 2.700 trains/day

– 40.000 daily departures

– + 190 mio. passengers

– + 15 mio. tonnes freight

– Line: 2.132 km / track: 3.240 km

– Bridges: 2.342

– Interlockings: 480

– Remote control/signalbox: 16

– Stations: 307

– Level crossings: 1096

– Commercial trains: 590

F-Banen solutions

ERTMS 2 Baseline 3 and modern centralized signalling infrastructure and Onboard

More interfacing projects:

2 major infrastructure contracts

All Onboard equipment

Fixed transmission network

DK-STM

GSM-R: voice and GPRS

Traffic Control Centres

New operational rules

All training activities

All safety approvals

Enterprise Service Bus

Page 5: Signaling Programme - Laboratory Test · F-Banen signaling programme and migration strategy Rail data ... Alstom (Onboard) Customer for customer testing External interface integration

5

Simple solution overview of signaling programme and scope of Joint Test Lab (JTL) test

TMS

Point Machine

Axle Counter

LX/ PWS/SC

IXL RBC

Balise

SIL2

TMS

Point Machine

Axle Counter

LX/ PWS/SC

RBC IXL

Balise

SIL2

On-line Scheduler

Key Management

Server

Long Time Planner

Decision Support System

Hand Held Terminal

Hand Held Terminal

TRIS

Enterprise Service

Bus

External

GSM-R

Integration between different suppliers

Page 6: Signaling Programme - Laboratory Test · F-Banen signaling programme and migration strategy Rail data ... Alstom (Onboard) Customer for customer testing External interface integration

6

Who is using the JTL laboratory and what is being tested?

Who is using the JTL laboratory

All suppliers – Alstom, Thales, Alstom (Onboard)

Customer for customer testing

External interface integration tests

ESB – external interface tests

Demo’s, inspections, witnessing

What is being tested?

All integration testing between the different deliveries from Supplier and Customer.

End-to-end tests

Performance tests

Security IT tests

Failover/recovery tests

Customer operation tests

Customer usability tests

Customer acceptance tests e.g. within ETCS & IXL

Customer’s own system integration test

Maintenance processes

Page 7: Signaling Programme - Laboratory Test · F-Banen signaling programme and migration strategy Rail data ... Alstom (Onboard) Customer for customer testing External interface integration

7

Test organizations

Page 8: Signaling Programme - Laboratory Test · F-Banen signaling programme and migration strategy Rail data ... Alstom (Onboard) Customer for customer testing External interface integration

8

JTL test phase & cycles

JTL test phase – split into x number of test cycles

JTL runs in accordance with a joint test schedule constituting that

all tests are grouped into one test cycle

Page 9: Signaling Programme - Laboratory Test · F-Banen signaling programme and migration strategy Rail data ... Alstom (Onboard) Customer for customer testing External interface integration

9

Test environments

Joint test Lab (Lysgårdsvej)

ESB TEST &

External interface(Otto Busses Vej)

Interface

Supplier Test(At there own adress)

Supplier test(At there own address)

F-BanenIn

terf

ace

Page 10: Signaling Programme - Laboratory Test · F-Banen signaling programme and migration strategy Rail data ... Alstom (Onboard) Customer for customer testing External interface integration

10

Laboratory programme test strategy

A test model & process used for all test phases running like a

factory as it uses the same overall process in which the only

content is change

Definition of process Tools to do it the right way

Page 11: Signaling Programme - Laboratory Test · F-Banen signaling programme and migration strategy Rail data ... Alstom (Onboard) Customer for customer testing External interface integration

11

JTL test process

Page 12: Signaling Programme - Laboratory Test · F-Banen signaling programme and migration strategy Rail data ... Alstom (Onboard) Customer for customer testing External interface integration

12

Configurations management - test baselines

– All test cycles are under configurations management responsibility

– All test cycles are baselined in the the Baseline Log on SharePoint

EMO entry document

for each test cycle Baseline IDIs documented in

the following documents

Entry baseline ID

New

bas

elin

e ID

du

rin

g te

st

exec

uti

on

s

Defect reports

JTL test schedule

JTL test schedule

Final baseline ID

EMO exit document for

each test cycle

Test reports

Test procedure result

Page 13: Signaling Programme - Laboratory Test · F-Banen signaling programme and migration strategy Rail data ... Alstom (Onboard) Customer for customer testing External interface integration

13

JTL test schedule

– JTL primavera project will be used to show 3 views:

o Full JTL schedule: A primavera schedule which is to document

all activities during the JTL test phase

o 8 week JTL schedule: An excel sheet showing this week’s and

the next 7 weeks’ test activities within installations, smoke test

and test executions

o Test cycle F-Banen E/W schedule: For both Alstom & Thales,

it shows the test cycle planned/running from FAT test to

completed review of test report

Page 14: Signaling Programme - Laboratory Test · F-Banen signaling programme and migration strategy Rail data ... Alstom (Onboard) Customer for customer testing External interface integration

14

JTL test schedule – updated processes

Page 15: Signaling Programme - Laboratory Test · F-Banen signaling programme and migration strategy Rail data ... Alstom (Onboard) Customer for customer testing External interface integration

15

Entering & exiting each test cycle