Transcript of Side Stream Filtration Case Study Walbrook Building - Central London
Side Stream Filtration Case Study
Walbrook Building - Central London
Side Stream Filtration Case Study Walbrook Building
2
Side Stream Filtration for Walbrook Building
Client: Walbrook Building
Date: 2012
Building: Central London
Sector: Business Centre
3
ABOUT THE PROJECT
Due to the prestigious nature of this building the main consultants needed to
ensure the environmental systems worked perfectly. Therefore as part of the
design process Amazon Filters Side Stream systems were specified to protect the
Chilled Water (CHW) and Low Temperature Hot Water (LTHW) circuits.
For this project a faster than usual system clean-up was required and this high
level of performance needed to be maintained for the on-going normal operation.
This requirement resulted in a system that needed to be designed for 10 bar
operating pressure.
PROJECT CHALLENGES
To achieve the rapid clean up the system needed to be designed for a higher than
usual flow rate and the system required operation at this elevated flow rate on an
on-going basis. The specially designed system then needed to be delivered in a
short period of time.
Side Stream Filtration Case Study
4
“The equipment was manufactured to a high
quality standard and delivered on time to
meet our project schedule.”
Site Project Manager
What the client said:
Products used for this project:
5
Contact us
6
Amazon Filters Ltd.
Albany Park Estate, Frimley Road
Camberley, Surrey
GU16 7PG
UK
Tel: +44 (0) 1276 670600
Email: [email protected]
Visit our website:
www.amazonfilters.com
Visit our blog:
www.amazonfilters.com/blog
Connect with us on social media: