Side Stream Filtration Case Study

Paddington Central

Page 2: Side Stream Filtration Case Study - Paddington Central

Side Stream Filtration Case Study Paddington Central

2

Side Stream Filtration for Paddington Central

Client: Paddington Central

Date: 2012

Building: London

Sector: Commercial/Retail

Page 3: Side Stream Filtration Case Study - Paddington Central

3

ABOUT THE PROJECT

Paddington Central is a new prestige commercial and retail site adjacent to the

redeveloped Paddington Station. Chilled Water (CHW) and Low Temperature Hot

Water (LTHW) Side Stream filters were specified by the Contractor to ensure

accurate temperature control at this high profile building complex.

The CHW system volume was particularly large, operating with in excess of

20,000 litres of fluid. One part of the circuit was classified as ‘Critical’ therefore a

secondary ‘boosted pump’ system was installed in the basement to ensure zero

fluid loss and to maintain maximum operating efficiency. This was vitally

important to maintain the comfort of the users and visitors to the complex.

PROJECT CHALLENGES

Due to the critical nature of this building, flushing filters were used during the

commissioning phase to ensure a high level of cleanliness at the start. Once the

system had been commissioned operational filter cartridges were fitted to

maintain the cleanliness levels.

There were project critical deadlines that had to be met, with significant

consequences for not meeting them, therefore delivery of equipment on time was

essential.

Side Stream Filtration Case Study

Page 4: Side Stream Filtration Case Study - Paddington Central

4

“Amazon manufactured and delivered the

filters and housings on time to ensure project

deadlines were met. This was particularly

important due to limited site access. In

addition, a high level of on-site support has

been maintained to this present day to ensure

efficient operation of the installed equipment

and client satisfaction.”

Project Manager