Shyam_CV_Mar'15 after modification.compressed
-
Upload
shyam-kumar -
Category
Documents
-
view
73 -
download
0
Transcript of Shyam_CV_Mar'15 after modification.compressed
![Page 1: Shyam_CV_Mar'15 after modification.compressed](https://reader036.fdocuments.us/reader036/viewer/2022071706/55c76f0ebb61eb6e578b4875/html5/thumbnails/1.jpg)
Shyam_CV_Mar’15 Page 1of3
CURRICULUM VITAE
Name : Shyam Kumar
Permanent Address Current Contacts
: Qtr.NO.G-7 New Colony Kharikabad P.O-Kusunda, Dist.-Dhanbad P.S-Kenduhdih JHARKHAND 828116 INDIA Mobile :+91 901 490 1923 Email : [email protected] Skype: shyam_50
Present Employer : Protecon BTG Pvt. Ltd.
Present Employment Title
: Management Trainee (Project Management & Controls)
Date of Birth : 18th June’1989
Nationality : Indian
Education Qualification/ Institution/ Year
: B.Tech (MECH) in 2014 from Jawahar Lal Nehru Technical University, Hyderabad.
Objective : To work as Project Engineer, Project Controls Engineer, Planning Engineer, Cost Engineer, Procurement Engineer or in an equivalent capacity utilizing my strong Project Management & Controls and Computer skills.
CAREER SUMMARY
After doing my graduation in Mechanical Engineering, I have undergone 3 months structured training on Project Management & Controls in the field ranging predominantly in various phases of project execution for manufacturing & construction industry related projects. The training consists of 4 modules as below:
- Project Management Basics – Theoretical understanding of Project Management Processes & Knowledge Areas. This module also included the specialized subjects like Project Planning, Scheduling, Monitoring, Progress Measurement & Earned Value Management System, Budgeting,
Cost Estimation, Invoicing, Change Management, Risk Management / Analysis, Engineering Management, Procurement Management & Construction Management;
- Industry Overview – Under this module, I was given detailed understanding of various industrial projects, viz. O&G (Upstream), Refineries, Petrochemicals, Fertilizers, Pipeline & Infrastructure;
- Inter-Disciplinary Relationship – This module consisted of various engineering experts explaining the various deliverables prepared by respective disciplines & inputs required in order to sequence the deliverables for effective planning.
- Software tools – In this module, I was given an opportunity to have hands-on experience and expertise on internationally recognized Project management software tools viz. Primavera P6-R8.4, MS Projects, MS Office & Quantitative Risk Analysis in Primavera Risk Analysis (formerly PERT Master).
I possess good knowledge on Project management, Budgeting, Planning, Scheduling, Monitoring, Reporting, Cost Estimation, Procurement & Contract management and Invoice certification processes for portfolio of Projects, right from Project Initiation to Commissioning / Hand-over including Basic Engineering, Detailed Engineering, Procurement, Construction activities using Primavera Project Planner P6 / MS Project as a Planning & Scheduling Tool. With my this background and experience, I plan to expand my international experience by working for reputed companies, especially in the fields of hydrocarbons and/or petrochemicals / chemicals / Mining /
![Page 2: Shyam_CV_Mar'15 after modification.compressed](https://reader036.fdocuments.us/reader036/viewer/2022071706/55c76f0ebb61eb6e578b4875/html5/thumbnails/2.jpg)
Shyam_CV_Mar’15 Page 2of3
Power Projects / Intelligent Buildings / Roads & Highways etc, in order to accomplish the Art of Project Management & Controls. Assignments during the Training
- Prepared Company Organization Charts - Prepared Project Organization Charts - Prepared multiple Work Breakdown Structure (WBS) - Prepared Management Level Schedules - Prepared Overall Project Schedule for a Pipeline Project in MS Project - Prepared Overall Project Schedule for a Process Plant in P6, R8.4 - Prepared standard templates for Weekly / Monthly Progress Reports - Developed monthly progress review Presentation - Developed Progress Measurement System for an EPIC Contract - Developed Invoicing (Billing) System for an EPIC Contract - Prepared Manpower Deployment Charts & Histograms (Sch Vs Act) - Prepared Progress S Curves (Early Sch Vs Late Sch Vs Act) - Prepared Cash Flow (In / Out) curves for an EPIC contract - Estimate the cost of Pump with the help of Past Data - Estimate the cost of the Air Compressor - Estimate the Cost of the Heat Exchanger Equipment.
While working in all the above-mentioned areas, I have worked, all the time, on various computer packages to suite the work requirement. TRAININGS & WORKSHOPS
- 2 Weeks Advance Training in HEAT VENTILATION AND AIR CONDITIONING in Advance Training Institute Vidyanagar, Hyderabad.
- 5 Weeks Practical Training in the organization of STEEL AUTHORITY OF INDIA LIMITED (SAIL), BOKARO.
- 2 Weeks full time course of Advance Training in MACHINE TOOL MAINTENANCE in the Advance Training Institute Vidyanagar, Hyderabad.
ACHIEVEMENTS & AWARDS
- Secured Highest Marks in Mathematics during my Matriculation.
Computer Knowledge
Software Proficiency MS Excel Very Good MS Powerpoint Very Good MS Word Very Good Primavera 6 Good MS Project Good Oracle’s Risk Analysis Beginner Job Profile as Project Controls Engineer
As a Project Control Engineer, I am capable of developing following:
- To Develop an Overall Project Master Schedule in Bar Chart by Indicating Unit wise Schedules Based on Owner's Time Schedule.
- Preparation of a Summarized Overall Project Schedule Comprising Main Project Milestones after Taking care of Total Scope of Work & integrating All Executing Agency’s Schedules.
![Page 3: Shyam_CV_Mar'15 after modification.compressed](https://reader036.fdocuments.us/reader036/viewer/2022071706/55c76f0ebb61eb6e578b4875/html5/thumbnails/3.jpg)
Shyam_CV_Mar’15 Page 3of3
- Preparation & Finalization of Level -I Schedule (Overall Project Schedule) & Level -II Schedules (Functional Schedules Viz. Process, Engineering, Ordering, Tendering, Manufacturing & Delivery and Construction)
- Monitoring of all Project activities of Various Executing Agencies.
- Resource (Man-hour/Manpower/Machine & Materials) planning.
- Preparation of Monthly / Weekly / Daily Progress Reports.
- Preparation of Presentation Slides to convene Project Review Meetings, to be Attended by Client & PMC, Analyzing Critical Areas/Problems and Identifying Corrective Action Plan.
- Setting up detailed progress measurement / Earned Value Management System for all type of contracts.
- Assist Project Manager in Qualitative & Quantitative Risk Analysis.
- Assist Project Manager in managing changes / variations.
- Organize & Attend Monthly Progress Review Meetings for Finalizing Activity List & Highlighting Holdups & Slippage.
- Coordination & follow-up between different Departments.
- Preparation of Engineering Billing Schedule based on Drawings/Document flow, Supply-billing schedule based on item/equipment delivery schedules & Construction Billing Schedule based on Quantities and raising Invoices based on progress of the work.
- Preparation of Cash Flow analysis, Material status report (Piping Material, and Analyze potential & imminent delays and develop action plan for eliminating delays.
- Monitor & control all cost elements on each activity of work, which includes preparation of claims to clients & payments to suppliers & sub-contractors.
- Change Order analysis by keeping track of extra & additional efforts required during project execution & Budget analysis, Preparation of Contract documents.
Additional Personal Details
Extra-Curricular:-
- School Captain during School Days.
- Worked as a Class Representative in first year of engineering.
- Participated in different culture activities during my engineering. References: -
- Mr. Manish Khilauria, PgMP® President, Protecon BTG Email : [email protected] Mob : +91 852 730 7575
- Mr. Ajay Kumar Saxena, Sr. Vice President, Protecon BTG Email : [email protected] Mob : +91 783 838 1483
- Mr. MP Singh Project Director Email : [email protected] Mob : +91 965 421 6728