SHRP2 R21 Composite Pavement Systems – Project Overview
Shreenath Rao, Ph.D., PE
Applied Research Associates, Inc.
August 23, 2010MnROAD Open House
![Page 2: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/2.jpg)
Prime contractor: Applied Research Associates, Inc. Sub contractors: U. Minnesota, Mn/DOT, U. California, U. PittsburgKey Staff: Darter, Rao, Khazanovich, Von Quintus, Harvey, Signore,
Worel, Clyne, Watson, Vandenbossche, Tompkins
Duration: 48 monthsContract Start Date: September 2007
R21. Composite Pavement Systems R21. Composite Pavement Systems
This project focuses on two applications of intentionally
designed composite pavement systems:
1. Asphalt over concrete (JPC, CRC, RCC)
2. Concrete surface over concrete (wet on wet)
![Page 3: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/3.jpg)
R21. Composite Pavement Systems (Objectives)R21. Composite Pavement Systems (Objectives)
– Determine the behavior and identify critical material and performance parameters
– Develop and validate mechanistic-empirical performance models and design procedures consistent with the Mechanistic-Empirical Pavement Design Guide (MEPDG)
– Recommend specifications, construction techniques and quality management procedures and guidelines
![Page 4: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/4.jpg)
European Survey of Composite PavementsEuropean Survey of Composite Pavements
• Europe has built composite pavements for many years
• Why?
� Excellent surface characteristics
� High friction
� Low tire/pavement noise
� Low splash and spray
� Rapid renewal (asphalt)
� Long life (concrete)
� Economical (Yes, believe it or not)� Lower layer: thick and low cost
(e.g. recycled, low cement, etc.)
� Upper layer: thin and high quality
(e.g. hard aggregate, high cement)
� Sustainable
� Recycled lower PCC layer
� Lower cost aggregates
� Rapid renewal of top HMA layer
![Page 5: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/5.jpg)
European Survey of Composite PavementsEuropean Survey of Composite Pavements
• Netherlands
• Germany
• Austria
Report published as an online document
http://www.trb.org/Main/Blurbs/2008_Survey_of_European_Composite_Pavements_163693.aspx
![Page 6: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/6.jpg)
• Subgrade and base constructed Fall 2008.
• JPCP constructed August 2009.
• Extensive instrumentation done at same time.
• HMA construction (and instrumentation) in October 2009.
• Currently being tested using the HVS to obtain pavement
responses and measure distresses (rutting, reflection
cracking).
Construction of HMA/PCC Test Sections at
UCPRC for HVS Testing
Construction of HMA/PCC Test Sections at
UCPRC for HVS Testing
Test cells constructed at University of California Pavement Research Center in Davis, CA for accelerated Heavy Vehicle Simulator (HVS) testing
![Page 7: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/7.jpg)
Layout of Test Cells at UCPRCLayout of Test Cells at UCPRC
13.7 m
HMA Mix 1 114 mm HMA Mix 1 –
Dowel Dowel Dowel
PCC 178 mm PCC 178 mm PCC 178 mmA
B
C
D
3.7 m
The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
AC
PCC
AB
Plan
View
Section
View (construction grades)The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted.
Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
64 mm No HMA
Dowel DowelA
B
C
D
The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
AC
PCC
AB
Plan
View
Section
View (construction grades)The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted.
Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
178 mm = 7 in
127 mm = 5 in
114 mm = 4.5 in
64 mm = 2.5 in
13.7 m = 45 ft
3.7 m = 12 ft
–
HMA Mix 1 114 mm HMA Mix 1 –
No Dowel
PCC 178 mm PCC 178 mm PCC 178 mm
64 mm No HMA
No Dowel No Dowel
–
HMA Mix 2 114 mm HMA Mix 2 –
No Dowel
PCC 178 mm PCC 178 mm PCC 178 mm
64 mm No HMA
No Dowel No Dowel
–
HMA Mix 2 114 mm HMA Mix 2 –
No Dowel
PCC 127 mm PCC 127 mm PCC 127 mm
64 mm No HMA
No Dowel No Dowel
–
![Page 8: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/8.jpg)
Instrumentation plan for test cells at UCPRCInstrumentation plan for test cells at UCPRC
A
B
D
C
1
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
H
H
H
H
H
HH
H
5
T
5
T
5
T
5T
5
T
5
T
5
T
5
T
5
T
5
T
5
T
5
T
3
M
3
M
3
M
3
M
2
D
2
D
2
D
2
D
2
S
2
S
2S
2
S
2
H
5
T
5T
5
T
5
T
5
T
5
T
5
T
5
T
5
T
5
T
5
T
5
T
J
J
J
J
J
J
J
J
H
H
H
H
J
J
J
J
J
J
J
J
H
H
H
H
2
S
3
M
3
M
2
D
2
D
2
S
3
M
3
M
3
5
T
5
T
J
J
J
J
J
J
J
J
H
H
H
H
J
J
J
J
J
J
J
J
H
H
H
H
5T
5
T
5
T
5
T
5
T
5
T
5
T
5
T
5
T
5
T
3
M
2
D
2
D
2
S
2
S
3
M
3
M
2
S
2S
3
M
2
S
All nine slabs in each lane are 15 ft. long, center slabs of each group (1,2,3) are widened for display purposes.
A
B
D
C
1
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
H
H
H
H
H
HH
H
5
T
5
T
5
T
5T
5
T
5
T
5
T
5
T
5
T
5
T
5
T
5
T
3
M
3
M
3
M
3
M
2
D
2
D
2
D
2
D
2
S
2
S
2S
2
S
2
H
5
T
5T
5
T
5
T
5
T
5
T
5
T
5
T
5
T
5
T
5
T
5
T
J
J
J
J
J
J
J
J
H
H
H
H
J
J
J
J
J
J
J
J
H
H
H
H
2
S
3
M
3
M
2
D
2
D
2
S
3
M
3
M
3
5
T
5
T
J
J
J
J
J
J
J
J
H
H
H
H
J
J
J
J
J
J
J
J
H
H
H
H
5T
5
T
5
T
5
T
5
T
5
T
5
T
5
T
5
T
5
T
3
M
2
D
2
D
2
S
2
S
3
M
3
M
2
S
2S
3
M
2
S
All nine slabs in each lane are 15 ft. long, center slabs of each group (1,2,3) are widened for display purposes.
T – Thermocouple J – Vertical JDMD H – Horizontal JDMD
D – Dynamic Strain Gauge M – Moisture Gauge S – Static Strain Gauge
![Page 9: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/9.jpg)
UCPRC Instrumentation: ThermocouplesUCPRC Instrumentation: Thermocouples
![Page 10: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/10.jpg)
UCPRC Instrumentation: Strain Gages and
Cables
UCPRC Instrumentation: Strain Gages and
Cables
![Page 11: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/11.jpg)
UCPRC Construction: PCC PlacementUCPRC Construction: PCC Placement
![Page 12: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/12.jpg)
UCPRC Construction: Texturing, Curing, Saw-
Cutting
UCPRC Construction: Texturing, Curing, Saw-
Cutting
![Page 13: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/13.jpg)
PG64-28PM (left two lanes) and Gap Graded
Rubber mix RHMA-G (right two lanes)
UCPRC Construction: HMA Placement and
Compaction
UCPRC Construction: HMA Placement and
Compaction
![Page 14: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/14.jpg)
UCPRC HVS TestingUCPRC HVS Testing
0 0.5 1 1.5 2 2.5
x 105
0
5
10
15
20
25
Repetition
Ma
xim
um
Ru
t (m
m)
612HB609HB610HB611HB
![Page 15: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/15.jpg)
UCPRC HVS Testing – Parametric AnalysisUCPRC HVS Testing – Parametric Analysis
• Effect of various parameters on deflections and strains
• JDMDs (joint deflections) various positions
• Strain gages (tire center and tire edge)
• Various sections
• 50-75 load repetitions at each combination
![Page 16: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/16.jpg)
UCPRC HVS Testing – Parametric AnalysisUCPRC HVS Testing – Parametric Analysis
![Page 17: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/17.jpg)
UCPRC HVS Testing – Parametric AnalysisUCPRC HVS Testing – Parametric Analysis
![Page 18: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/18.jpg)
UCPRC HVS Testing – Parametric AnalysisUCPRC HVS Testing – Parametric Analysis
![Page 19: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/19.jpg)
• Plans, specifications, and estimates were prepared in
winter 2008/09.
• Bids let in July 2009 and lowest price (of two bids) was
acceptable.
• Construction: April/May 2010.
• Currently open to freeway traffic.
Construction of HMA/PCC and PCC/PCC Test
Sections at MnROAD
Construction of HMA/PCC and PCC/PCC Test
Sections at MnROAD
Full-length two-lane test sections constructed at MnROAD in Albertville, MN on Interstate 94.
![Page 20: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/20.jpg)
Experimental Plan for Construction at MnROADExperimental Plan for Construction at MnROAD
144 m (474 ft)
Clay Subgrade
152-mm (6-in) PCC, 4.6-m (15-ft) joints32-mm (1.25-in) dia. dowels driving
lane, nondoweled passing lane.Recycled PCC
433 m (1420 ft)
76-mm (3-in) HMA (S & S jointsexcept for a few joints)
76-mm (3-in) Granite(~145 m (475 ft) diamond grind; ~145 m (475 ft) exposed aggregate)
203-mm (8-in) Class 5 Special (Granular Base)
289 m (947 ft)
152-mm (6-in) PCC, 4.6-m (15-ft) joints, 32-mm (1.25-in) dia. dowels.
Recycled PCC(84 m, 275 ft)
152-mm (6-in) PCC, 4.6-m (15-ft) joints, 32-mm (1.25-in) dia. dowels.
Low-cost (high fly ash content) PCC(205 m, 672 ft)
![Page 21: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/21.jpg)
MnROAD Recycling and Salvage OperationsMnROAD Recycling and Salvage Operations
RCA Percent Absorption 2.93%
![Page 22: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/22.jpg)
MnROAD Demonstration SlabMnROAD Demonstration Slab
![Page 23: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/23.jpg)
Instrumentation Plan for Construction at
MnROAD
Instrumentation Plan for Construction at
MnROAD
12'
10' Bit Shoulder
15' 15' 15' 15' 15'
Static PannelsDynamic Pannels
Spacing Pannel-No Sensors
P1P2P3P4P5
Cab
Vault
Vault
![Page 24: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/24.jpg)
MnROAD Instrumentation: Thermocouples, Moisture
Gages, Static and Dynamic Strain Gages
MnROAD Instrumentation: Thermocouples, Moisture
Gages, Static and Dynamic Strain Gages
![Page 25: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/25.jpg)
MnROAD Instrumentation: Moisture Gages, and
Static and Dynamic Strain Gages
MnROAD Instrumentation: Moisture Gages, and
Static and Dynamic Strain Gages
![Page 26: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/26.jpg)
MnROAD Paving Wet-on-Wet PCC/PCCMnROAD Paving Wet-on-Wet PCC/PCC
![Page 27: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/27.jpg)
MnROAD Construction: PCC PlacementMnROAD Construction: PCC Placement
![Page 28: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/28.jpg)
Exposed Aggregate Concrete TextureExposed Aggregate Concrete Texture
![Page 29: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/29.jpg)
MnROAD HMA/PCC DesignMnROAD HMA/PCC Design
Section Cell 70 HMA/ PCC (145 m [475 ft])
HMA
Thickness 75 mm (3 in) placed in 2 lifts
Binder PG 64-34
Mix Superpave wearing course designated SPWEB440F with 12.5 mm (0.5 in) nominal maximum aggregate size (SP 12.5)
PCC
Thickness 150 mm (6 in)
Mix Low portland cement (~150 kg/m3 [250 lb/yd3]) 60% fly ash
Aggregate 50% RCA, 50% Mn/DOT Class A Maximum aggregate size 32 mm (1.25 in)
Base 200 mm (8 in) Class 5 unbound
Subgrade Clay
Joint Spacing 4.6 m (15 ft)
Dowels 32 mm (1.25 in) placed on baskets in driving lane at PCC middepth and undoweled passing lane
Joints Saw and seal HMA over PCC joints (except last 6
joints)
![Page 30: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/30.jpg)
MnROAD HMA/PCC ConstructionMnROAD HMA/PCC Construction
![Page 31: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/31.jpg)
MnROAD HMA/PCC Sawing and SealingMnROAD HMA/PCC Sawing and Sealing
![Page 32: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/32.jpg)
MnROAD Test SectionsMnROAD Test Sections
![Page 33: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/33.jpg)
• Data collected from many HMA/PCC & PCC/PCC sites in USA, Canada, and Europe
• Database set up and sections evaluated• Key sections selected for further field testing
and evaluation• Possible construction of HMA/PCC sections
at the Illinois Tollway
Other Field SitesOther Field Sites
![Page 34: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/34.jpg)
What are the next steps for R21?What are the next steps for R21?
UCPRC and MnROAD Construction and Field Sections
• UCPRC - Continue HVS loading and data collection until: Spring/Summer 2011
• MnROAD - Monitoring instrumentation and performance data collection (including ride and noise) until: Summer 2011
• Field Sections - Field data collection (distress surveys, materials data, IRI, etc.): Fall 2010
![Page 35: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/35.jpg)
What are the next steps for R21?What are the next steps for R21?
Modeling
• 2-layer concrete pavement modeling• PCC lab modeling and materials testing• Rutting model• Reflection cracking model• MEPDG model modifications and calibration
(results from monitoring and instrumentation @ MnROAD and UCPRC; other field sections)
![Page 36: SHRP2 R21 Composite Pavement Systems – Project Overvie · SHRP2 R21 Composite Pavement Systems – Project Overview Shreenath Rao, Ph.D., PE Applied Research Associates, Inc. August](https://reader033.fdocuments.us/reader033/viewer/2022042804/5f5811bbec2a851ff706f557/html5/thumbnails/36.jpg)
Anticipated R21 products?Anticipated R21 products?
a.Refined and validated structural & performance models
b.Design procedures and guidelines (manual, recommended additions to AASHTO MEPDG manual)
c.Construction specifications (MnROAD, UCPRC, Europe, other)
d.Life-cycle cost procedures.e.Composite pavement training materials to aid
in implementation