Shortening the Train Headway in Yokosuka Line of JR East...
Transcript of Shortening the Train Headway in Yokosuka Line of JR East...
Shortening the Train Headway
in Yokosuka Line
of JR East Company
Motoki HaradaEast Japan Railway company
RailTokyo2015
24 March 2015
1. Introduction
Outline of Yokosuka Line
Yokosuka Line
Tōkyō
Shinagawa
Ōsaki
Musashi-kosugi
Shin-tsurumi
Shin-kawasaki
Yokohama
Nambu Line
Yokohamahazawa
Shinjyuku
Kurihama
Ōfuna
Hebikubo
Nishi-ōi
Tōkaidō Line
Yokosuka
Odakyu Enoshima Line
Characteristic of Yokosuka Line
Table : Characteristic of Yokosuka Line
Yamanote Freight Line
Outline of Tōkaido Freight Line
Yokosuka Line
Tōkyō
Shinagawa
Ōsaki
Musashi-kosugi
Shin-tsurumi
Shin-kawasaki
Yokohama
Nambu Line
Yokohamahazawa
Shinjyuku
Kurihama
Ōfuna
Hebikubo
Nishi-ōi
Tōkaidō Line
Yokosuka
Odakyu Enoshima Line
Tōkaidō Freight Line
Characteristic of these lines
various trains are operated !
Yamanote Freight LineYokosuka Line
Tōkyō
Shinagawa
Ōsaki
Musashi-kosugi
Shin-tsurumi
Shin-kawasaki
Yokohama
Nambu Line
Yokohamahazawa
Shinjyuku
Kurihama
Ōfuna
Hebikubo
Nishi-ōi
Tōkaidō Line
Yokosuka
Odakyu Enoshima Line
Tōkaidō Freight Line
Mutual Direct Operation between Sotetsu Line and JR East Line
Tōkyō
Shinagawa
Ōsaki
Musashi-kosugi
Shin-tsurumi
Shin-kawasaki
Yokohama
Yokosuka Line
Tōkaidō Freight Line
Nambu Line
Yokohamahazawa
Shinjyuku
Kurihama
Ōfuna
Hebikubo
Nishi-ōi
Tōkaidō Line
Yokosuka
Yamanote Freight Line
Odakyu Enoshima Line
Ebina
Yamato
Shonandai
Futamatagawa
Nishiya
SotetsuIzumino Line
Sotetsu Main Line
Mutual Direct Operation between Sotetsu Line and JR East Line
Through trains could be set up 4 times an hour!
Minimum train headway:
2'30"→2'10" (Hebikubo ~Yokohama)
Tōkyō
Shinagawa
Ōsaki
Musashi-kosugi
Shin-tsurumi
Shin-kawasaki
Yokohama
Yokosuka Line
Tōkaidō Freight Line
Nambu Line
Yokohamahazawa
Shinjyuku
Kurihama
Ōfuna
Hebikubo
Nishi-ōi
Tōkaidō Line
Yokosuka
Yamanote Freight Line
Odakyu Enoshima Line
Ebina
Yamato
Shonandai
Futamatagawa
Nishiya
SotetsuIzumino Line
Sotetsu Main Line
In order to shorten the minimum train headway …
Many signal cables were neededSignal Systems
had to be repaired
T1(1)BEFORE
T2(<T1)
(2)AFTERMove
Increase
Expensive !
Simplification and Integration of Signal Equipment
・Changing the track circuit between stations to the non-insulated one
・The simplification and integration of signal control equipment
・The exchange of decrepit station interlocking devices
Severe environmental condition!
By carrying out both projects at the same time …
moving and increasing
wayside signals
simplification and
integration of
signal equipment
Reduction in cost
was possble !
Schedule
Table : Schedule of the related project
~2009 2010 2011 2012 2013 2014 2015 ~ 2018~
Feb.1st step
Mar.Musashi-kosugi
new station opened
Aug.2nd step
Jan.3rd step
Mutual direct operation project
Mutual direct
operation will
be started
3rd step: Yokohama station
1st step: Hebikubo signal station~ Shin-tsurumi signal station
2nd step: Shin-tsurumi signal station~ Yokohama station
2. Technological background
ATS-P system configuration
Wayside signal (Stop)
Transceiver Controller
Monitoring device or
Setting device of a train number
Display
Switch
etc.
On-board antenna
Tacho-generator
Velocity check pattern
Implemen
box
Trace of a train
Distance information to a stop signal
Ground coil
RepeaterEncoder
Repeater
Ground coil
On-vehicle equipmentOn-board antenna, Transceiver, Controller and so on
Ground equipmentEncder, Repeater, Ground coil and so on
Train identification information
Brakecommand
Aspect up function (the additional function of ATS-P)
Train identification information (HDC, MDC and LDC)
ECRP
EC EC
Aspect can be improved!Train identification
information
Basic sequence
MDC sequence
HDC sequence
Aspect sequenceG
Y
G
Y
YYR RR
Y
GG
Y
R
How to shorten the minimum train headway
R Y YG G
R Y G
YR G
R Y G
R Y G
R Y G
t2t1
T1
B
A
t0
U1
U2
U3
U4
U5
U6
Distance
Time
Succeeding trainPreceding train
A Sta.A Sta.
Speed(km/h)
Distance
75
Stop time
t2t1
T2
Un
YG G
Y G
R Y GA Sta.
B
A
Distance
Speed(km/h) 75
(1) Moving the related signalsIt is the easiest method of shortening the minimum train headway.
(2) Increasing the related signals (especially the mid-platform signal)
YG
Y
R Y
R
YR G
R Y G
R Y G
R Y G
t0
U1
U2
U3
U4
U5
U6
Distance
Time
Succeeding trainPreceding train
A Sta.
G
G
T2 < T1
B
A
t0
75 55
A Sta.
(3) YG assumption
R Y YG G
R Y G
YR G
R Y G
R Y G
R Y G
U1
U2
U3
U4
U5
U6
Distance
Time
A Sta.
Un
R Y GA Sta.
Distance
Speed(km/h)
t2t1
T3
R Y YG G
R Y G
YR G
R Y G
R Y G
R Y G
t2t1
B
A
t0
U1
U2
U3
U4
U5
U6
Distance
Time
A Sta.
Un
R Y GA Sta.
Distance
Speed(km/h) 75
T2
The mid-platform signal has already been increased !
T3 < T2
Time △T
Operating time come to be longer
How to shorten the minimum train headway
3. Case studies
Musashi-kosugi
Shin-tsurumi
Yokohama
Nishi-ōi
Hebikubo
Megurogawa
Shin-kawasaki
→Tōkaidō Freight Line
Tōkaidō Line
Revision and abolition of signals 【Legend】
: Newly Established
: Removed
Newly established signals
⇒ 62 signals
Removed signals
⇒ 35 signals
Replacement of aspects
⇒ 11 signals
Newly established air sections
⇒ 4 air sections
The amount of revision and abolition
Nishi-ōi Nishi-ōi
30″
HDC HDC
Figure : HDC after improvement
Nishi-ōi Nishi-ōi
HDC HDC
30″
Figure : HDC before improvement
Nishi-ōi station in up line
2′24″ 1′59″
Mehod : Moving and increasing the related signals
Increase
Increase
Move
Yokohama Yokohama
HDC MDC
40″
Figure : MDC after improvement
Yokohama
HDC MDC
Yokohama
40″
Figure : MDC before improvement
Yokohama station in down line
2′31″
2′20″
Mehod : Moving and increasing the related signals
40″
Increase
Increase
Move
Move
Yokohama Yokohama
HDC MDC(YG)
40″
Figure : MDC(YG assumption) after improvement
Mehod : YG assumption
Yokohama station in down line for MDC(YG assumption)
2′20″
Yokohama Yokohama
HDC MDC
40″
Figure : MDC after improvement
75(km/h/s)
55(km/h/s)
Speed
D1 2RS 16R 41R13R
2′05″ △13(sec)
4. Consideration and conclusion
In order to estimate the result of …
• The delay data was evaluated
every fiscal year from 2007 to 2013
• Data collection period
: From August to February (184 days)
• Delay time is recorded at …
TōkyōUp Line
Ōfuna
Down Line
Consideration
* 𝑇2, 𝑇5 , 𝑇6 , ~, 𝑇182, 𝑇184 < 1.0* N : Number of days in normal operating condition
𝑇1, 𝑇2 , 𝑇3 , ~, 𝑇183, 𝑇184 (min)
: Delay time per one passenger train per day
MDT =𝑇1+𝑇2+𝑇3+ ~+𝑇183+𝑇184
184(min)
MDT(in NC) =𝑇2+𝑇5+𝑇6+ ~+𝑇182+𝑇184
𝑁(min)
• Mean delay time (MDT)
• Mean delay time in normal operating condition
(MDT(in NC))
Consideration
1st step
(Feb. 2010)
2nd step(Aug. 2011)
MDT(min)
MDT(in NC)(min)
• MDT(in NC) had risen to some extent after 1st step.
The congestion at Musashi-kosugi station is
supposed to affect the train diagram.
• MDT(in NC) had nearly unchanged after 2nd step.
• MDT has not developed the characteristic tendency.
Conclusion
• The minimum train headway has been
shortened to be 2'10" and some regular
trains are actually operated at under 2'30"
intervals.
• The remarkable troubles have not ever
occurred and the safe and reliable
transportation service have been provided
in Yokosuka Line.
Thank you for your attention