SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11...

53
______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules CMAK 1 SHORAPUR CMC Public Disclosure Schedule 2016-17

Transcript of SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11...

Page 1: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 1

SHORAPUR CMC Public Disclosure Schedule 2016-17

Page 2: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 2

Content

Sl.No Particulars Page. No

1 Urban Planning Including Town Planning 4-6

2 Regulation of Land-use and Construction of Buildings 7-9

3 Planning for Economic and Social Development 10-19

4 Roads and Bridges 20-22

5 Water Supply- Domestic, Industrial and Commercial 23-25

6 Public Health, Sanitation, Conservancy and SWM 26-36

8 Urban Forestry, Protection of Environment and Ecology 37

10 Slum Improvement & Up-gradation 38-40

11 Urban Poverty Alleviation 41

12 Provision of Urban Amenities and Facilities- Parks, Gardens and Playgrounds 42-43

13 Promotion of Cultural, Educational, and Aesthetic Aspects 43-44

14 Burials and Burial Grounds, Cremations, Cremation Grounds and Electric Crematoriums 45-46

15 Cattle Pounds, Prevention of Cruelty to Animals 47

16 Vital Statistics Including Registration of Births and Deaths 48-49

17 Public Amenities Including Street Lighting, Parking lots, Bus stops and Public Conveniences 50-52

18 Regulation of Slaughter Houses and Tanneries 53

Page 3: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 3

Formats for Disclosure

Page 4: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 4

Functions under 12th Schedule

1. URBAN PLANNING INCLUDING TOWN PLANNING

Sl.No

Functions as per 12th

Schedule

Agency Responsible with

in their jurisdiction

Data to be Disclosed Period for which

information has to be disclosed

Level of Disclosure

(ULB/Ward)

Frequency of Disclosure

Reference Remarks

1

Urban Planning including town Planning

1. Town Planning Authority 2. Urban Development Authority (UDA) 3. Municipal Planning Authority

(i) Report and Maps of Master Plans including Zoning Regulations.

Plan in force now

ULB

1. Annually 2. To be notified as and when changes done

Table 1.1

(ii) Maps of Planning Districts.

Plan in force now ULB 1. Annually 2. To be notified as and when changes done

(iii) Details of provisional and finally approved layouts (Survey No, name of Owner, Site details).

Previous three financial years including current year

ULB Half Yearly Table.1.2

4. ULB (iv) Report and maps of Comprehensive Development Plan (CDP).

Current plan ULB 1. Annually 2. To be notified as and when changes done

Page 5: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 5

Table 1.1: Report and Maps of Master Plans including Zoning Regulations (Please fill in following information) Sl. No

Name of the reports related to Master Plan, Zoning Regulation and CDP Enclosure in PDF

Maps related to Master Plan, Zoning Regulations, Planning District and CDP Enclosure in PDF

1 Sri. Balappa Enclosure Master plan – 2012, Planning Authority Shorapur. Enclosure – Yes

2 Enclosure Enclosure

3 Enclosure Enclosure

Table 1.2: Number of provisional and final approved layouts (Please fill in following information)

Years Number of provisional layouts Number of approved layouts Details of layout as enclosure

Current year Enclosure as per the format

Current year -1 Enclosure as per the format

Current year-2 Enclosure as per the format

Format: Details of Provisional and final approved layouts

Sl. No Name of Layout Whether provisional / approved Number of sites in the approved layout Name of the owner/developer of the

layout 30*40 40*60 Odd sites

1. Kumbarpet Sy. No. 105

54 1 Acre 5 Guntas

Ramanna S/o Bhimappa Agasar, R/o Kumbarpet, Tq. Shorapur.

2 Hasanapur, Sy. No. 2/2

86 4 Acre 36 Guntas

Mareppa S/o Sharanappa Paaga, R/o Hasanapur, Tq. Shorapur.

3. Hasanapur Sy. No. 13/1

26 1 Acre 9 Guntas

Jagadish S/o Gangappa Gulagi, R/o Hasanapur, Tq. Shorapur.

Page 6: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 6

4 Vanakihall

Sy. No. 116 70 3 Acre

26 Guntas Anand Patil S/o Yamanappa Patil R/o Sytampet, Tq. Shorapur.

5. Industrial estate in Sy. No. 17

26 10 Acres Karnataka State Small Industries Development Corporation Ltd., R/o Tq. Shorapur.

6 Hasanapur Sy. No. 55/1/1

56 2 Acres 36 Guntas

Md. Husaman Sab S/o Khaja Hussain Talikoti, R/o Hasanapur Tq. Shorapur.

7. Hasanapur Sy. No. 64/3

63 3 Acre 34 Guntas

Hanumanth S/o Adivappa Chandankere, R/o Timmapur, Tq. Shorapur.

8. Hasanapur Sy. No. 13/1

29 7 Acres 38 guntas

Jagadish S/o Gangappa Gulagi, R/o Hasanapur, Tq. Shorapur.

9. Vanakihall Sy. No. 120/1 and 121.

53 3 Acres 2 guntas

Smt. Saleema Bagum W/o Abdul Ahmed Raja, R/o. Timmapur, Tq. Shorapur.

Page 7: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 7

2. REGULATION OF LAND-USE AND CONSTRUCTION OF BUILD INGS

Sl.No

Functions as per 12th Schedule

Agency Responsible with

in their jurisdiction

Data to be Disclosed Period for which

information has to be disclosed

Level of Disclosure

(ULB/Ward)

Frequency of Disclosure

Reference Remarks

2 Regulation of Land- use and Construction of Buildings

UDA / ULB (i) Details of Building Commencement & Completion Certificate (Total application received, total permission granted, location details).

Previous three years including current year

ULB Annually Table 2.1 (a) & Table.2.1 (b)

(ii) Details of Industries and commercial complexes approved (Survey No., Type, Name of the owner).

Previous three Financial years including current year

ULB Annually Table 2.2

Table 2.1 (a): Details of Building Commencement & Completion Certificate

Total number of application received for building plan approval from past three years

Total number of License granted from past three years

Current FY Current FY – 1 Current FY – 2 Current FY Current FY – 1 Current FY – 2

225 255 315 220 165 185

Table 2.1 (b): Details of the building plan approval for three years

Page 8: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 8

Format for enclosure Ref Table 2.1.b

Table 2.2: Details of approved Industries/Commercial Areas

Current FY year (year to be displayed in numeric like 2010-11).

Enclosure in the format displayed below

Current FY – 1 (year to be displayed in numeric like 2009-10).

Enclosure in the format displayed below

Current FY – 2(year to be displayed in numeric like 2008-09).

Enclosure in the format displayed below

Current FY year (year to be displayed in numeric like 2010-11).

Enclosure in the format displayed below

Current FY – 1 (year to be displayed in numeric like 2009-10).

Enclosure in the format displayed below

Current FY – 2(year to be displayed in numeric like 2008-09).

Enclosure in the format displayed below

Mention year

Site area (Sq/feet)

Built-up area (Sq/feet)

Location details

Ward Street Name Property Number Survey Number

- - - - - -

Page 9: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 9

Format reference to table 2.2

Details

Ward Number Street Name Survey Number Site Area (Sq/feet) Built-up area

(Sq/feet) Owner name

Cur

ren

t F

Y 1

Cur

rent

FY

-1

Cur

rent

FY

-2

Cur

ren

t F

Y 1

Cur

rent

FY

-1

Cur

rent

FY

-2

Cur

ren

t F

Y 1

Cur

rent

FY

-1

Cur

rent

FY

-2

Cur

ren

t F

Y 1

Cur

rent

FY

-1

Cur

rent

FY

-2

Cur

ren

t F

Y 1

Cur

rent

FY

-1

Cur

rent

FY

-2

Cur

ren

t F

Y 1

Cur

rent

FY

-1

Cur

rent

FY

-2

Details in enclosure - - - - - - - - - - - - - - - - - -

Page 10: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 10

3. PLANNING FOR ECONOMIC AND SOCIAL DEVELOPMENT

Sl.No Functions as per

12th Schedule

Agency Responsible with in their jurisdiction

Data to be Disclosed Period for which

information has to be disclosed

Level of Disclosure

(ULB/Ward)

Frequency of

Disclosure Reference Remarks

3 Planning for Economic and Social development.

ULB List and brief of the Social and Economic Development Schemes.- eg; 18% scheme, Ashraya and such other Govt. programs Details of budget allocation and expenditure of these schemes Details of Beneficiaries.

Previous three financial years including current year

ULB Annually Table 3.1

Table 3.1

List and brief of the social and economic Development Schemes for three years

Current FY 1

Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed 1. 22.75% - 2015-16 86.52 41.76 Enclosure 2. 7.25% - 2015-16 26.02 12.10 Enclosure 3. 3% - 2015-16 10.77 - Enclosure

Current FY-1

Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed

1. BRGF - 2015-16 116.00 - Enclosure

Current FY-2 Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed

1. 13thFin. Gen. Basic Grant – 2014-15 97.51 76.96 Enclosure 2. 13th Fin. Rd & Bridge – 2015-16 25.50 16.00 Enclosure 3. 13th Fin. Gen. Performance Grant – 2015-16 0.00 - Enclosure 4. SFC - 2016-17 293.46 - Enclosure 5. CMSMTDP – 2015-16 472.92 446.48 Enclosure

6. 14th Fin. Gen. Basic Grant – 2015-16 172.00 - Enclosure

7. 14th Fin. Gen. Basic Grant – 2016-17 153.00 - Enclosure

Page 11: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 11

NULM Beneficiary List 2016-17: C£ÀĨsÀAzÀ

PÀæ. À̧A f É̄èAiÀÄ

ºÉ¸ÀgÀÄ

£ÀUÀgÀ À̧ܽÃAiÀÄ ¸ÀA¸ÉÜAiÀÄ

ºÉ¸ÀgÀÄ

vÀgÀ¨ÉÃw «µÀAiÀÄzÀ

ºÉ À̧gÀÄ

¤zÉðñÀ£Á®AiÀÄ¢

AzÀ

¤UÀ¢¥Àr¹gÀĪÀ

¨sËwPÀ UÀÄj

vÀgÀ¨ÉÃwAiÀÄ£ÀÄß

¥ÀqÉzÀÄPÉƼÀÄîwÛgÀĪÀ

¥sÀ¯Á£ÀĨsÀ«UÀ¼À

¸ÀASÉå

vÀgÀ¨ÉÃw

¥ÁægÀA¨sÀªÁzÀ

¢£ÁAPÀ

vÀgÀ¨ÉÃw

¥ÀÆtðUÉƼÀÄîªÀ

¢£ÁAPÀ

¥Àæw

¥sÀ¯Á£ÀÄ s̈À«UÉ

vÀUÀ®ÄªÀ ªÉZÀÑ

MlÄÖ vÀgÀ¨ÉÃw

ªÉZÀÑ(6*9)

JgÀqÀ£Éà PÀAw£À

±ÉÃ.20gÀµÀÄÖ C£ÀÄzÁ£À

01 AiÀiÁzÀVgÀ £ÀUÀgÀ ¸À¨sÉ PÁAiÀiÁð®AiÀÄ

¸ÀÄgÀ¥ÀÆgÀ

GARMENTS/PACKERS/IR

ONER/FUSIN

TECHNICIAN 30 30 03/02/2017 31/03/2017 10,800 3,24,000 64,800

02 AiÀiÁzÀVgÀ £ÀUÀgÀ ¸À¨sÉ PÁAiÀiÁð®AiÀÄ

¸ÀÄgÀ¥ÀÆgÀ

HAND

EMBROIDERY/ZARDOSH

I WORK 30 30 02/02/2017 08/04/2017 12,900 3,87,000 77,400

03 AiÀiÁzÀVgÀ £ÀUÀgÀ ¸À¨sÉ PÁAiÀiÁð®AiÀÄ

¸ÀÄgÀ¥ÀÆgÀ BEAUTICIAN 15 15 02/02/2017 08/04/2017 12,900 1,93,500 38,700

MlÄÖ 180900/-

AiÉÆÃd£Á ¤zÉÃð±ÀPÀgÀÄ ¥ËgÁAiÀÄÄPÀÛgÀÄ

f¯Áè £ÀUÀgÁ©üªÀÈ¢Þ PÉÆñÀ £ÀUÀgÀ¸À¨sÉ ¸ÀÄgÀ¥ÀÄgÀ AiÀiÁzÀVj

C£ÀĨsÀAzÀ

PÀæ.

¸ÀA

f¯ÉèAiÀÄ

ºÉ¸ÀgÀÄ £ÀUÀgÀ ¸ÀܽÃAiÀÄ ¸ÀA¸ÉÜAiÀÄ ºÉ¸ÀgÀÄ

vÀgÀ¨ÉÃw «µÀAiÀÄzÀ

ºÉ¸ÀgÀÄ

¤zÉðñÀ£Á®

AiÀÄ¢AzÀ

¤UÀ¢¥Àr¹gÀÄ

ªÀ ¨sËwPÀ

UÀÄj

vÀgÀ É̈ÃwAiÀÄ£ÀÄß

¥ÀqÉzÀÄPÉƼÀÄîwÛgÀ

Ī
¥sÀ¯Á£ÀĨsÀ«UÀ¼À

¸ÀASÉå

vÀgÀ¨ÉÃw

¥ÁægÀA¨sÀªÁzÀ

¢£ÁAPÀ

vÀgÀ¨ÉÃw

¥ÀÆtðUÉƼÀÄîªÀ

¢£ÁAPÀ

¥Àæw

¥sÀ¯Á£ÀĨsÀ«

UÉ vÀUÀ®ÄªÀ

ªÉZÀÑ

MlÄÖ

vÀgÀ¨ÉÃw

ªÉZÀÑ(6*9)

ªÉÆzÀ® PÀAw£À

±ÉÃ.10gÀµÀÄÖ

C£ÀÄzÁ£À

01 AiÀiÁzÀVgÀ £ÀUÀgÀ ¸À s̈É PÁAiÀiÁð®AiÀÄ À̧ÄgÀ¥ÀÆgÀ GARMENTS/PACKERS/IRO

NER/FUSIN TECHNICIAN 30 30 03/02/2017 31/03/2017 10,800 3,24,000 32,400

02 AiÀiÁzÀVgÀ £ÀUÀgÀ ¸À s̈É PÁAiÀiÁð®AiÀÄ À̧ÄgÀ¥ÀÆgÀ

HAND

EMBROIDERY/ZARDOSHI

WORK 30 30 02/02/2017 08/04/2017 12,900 3,87,000 38,700

03 AiÀiÁzÀVgÀ £ÀUÀgÀ ¸À s̈É PÁAiÀiÁð®AiÀÄ À̧ÄgÀ¥ÀÆgÀ BEAUTICIAN 15 15 02/02/2017 08/04/2017 12,900 1,93,500 19,350

MlÄÖ 90450/-

AiÉÆÃd£Á ¤zÉÃð±ÀPÀgÀÄ ¥ËgÁAiÀÄÄPÀÛgÀÄ

f¯Áè £ÀUÀgÁ©üªÀÈ¢Þ PÉÆñÀ £ÀUÀgÀ¸À¨sÉ ¸ÀÄgÀ¥ÀÄgÀ

Page 12: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 12

National Urban Livelihoods Mission

Ministry of Housing and Urban Poverty Alleviation

Beneficiary Selection Letter

04 Feb 2017

To

Shorapur

City Municipal Council, Yadgiri

Subject : Selection of candidates for the Course Beauty Therapy and Hair Styling level-1 which

commences on (02 Feb 2017 - 08 Apr 2017) - (9:00 - 5:00)

The following candidate has been selected for the above said Training program.

Page 13: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 13

Beauty Therapy

Application Code Beneficiary Code

Name Father/Spo use Name

DOB Sex Mobile No

29558700003 BEN295587000001 SHILPA NAGAPPA 04 Nov 1997 Female 9972126297

29558700004 BEN295587000002 JYOTI RAJASHEKHAR 18 Jan 1997 Female 9880677928

29558700005 BEN295587000003 JAYALAXMI DURAGAPPA 20 Jan 1997 Female 9901366414

29558700006 BEN295587000004 SUMALATA SUDARSHAN 13 Jul 1998 Female 9731969788

29558700007 BEN295587000005 MASABIBEGUM MAHMADK ASIMALI 15 Sep 1998 Female 8105694786

29558700008 BEN295587000006 SHAKUNTALA M BASAVARA J 01 Jun 1998 Female 9886539698

29558700009 BEN295587000007 RENUKA PARAMANNA 10 Jun 1998 Female 9731289963

29558700010 BEN295587000008 RATNA LAXMAN 10 Jun 1997 Female 9731289963

29558700011 BEN295587000009 DEEPA GANGADHARA 07 Mar 1993 Female 9945105116

29558700012 BEN295587000010 CHAITRA CHANDRAKANT 10 Jun 1998 Female 8792984854

29558700013 BEN295587000011 SHRUTI RAMAKRSI SHNA CHAWHAN 02 Sep 1994 Female 8123888952

29558700014 BEN295587000012 ASHWINI RAMAKRISHNA 17 May 1996 Female 8123888952

29558700015 BEN295587000013 SUSHMITA PATIL NEELAKANTH S PATIL 01 Jan 1997 Female 9739000338

29558700016 BEN295587000014 SMITA PATIL NEELAKANTH S PATIL 01 Jun 1989 Female 9448745257

29558700017 BEN295587000015 NEHA DARAK NARESH KUMAR 20 Jun 1996 Female 9341041352

MAHESH PATIL

(Training Centre In charge) VISHWAGANGA SHORAPUR 9972803936

Developed by National Informatics Centre(NIC)

Page 14: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 14

National Urban Livelihoods Mission

Ministry of Housing and Urban Poverty Alleviation

Beneficiary Selection Letter

04 Feb 2017 To

Shorapur

City Municipal Council, Yadgiri

Subject : Selection of candidates for the Course Garment Packer-Ironer-Fusing Technician which

commences on (03 Feb 2017 - 31 Mar 2017) - (9:30 - 5:30)

The following candidate has been selected for the above said Training program.

Page 15: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 15

Garment Packer-Ironer-Fusing Technician

Application Code Beneficiary Code

Name Father/Spo use Name

DOB Sex Mobile No

29558700076 BEN295587000049 REKHA GANGADHAR 20 Jul 1982 Female 9535949583

29558700077 BEN295587000050 KAVYA KSHAHABADI

KALAPPA SHAHABADI

18 Jul 1997 Female

9972325780

29558700078 BEN295587000051 NEHA JAIRUDDIN 04 May 1998 Female 9535938292

29558700079 BEN295587000052 NAGMA BEGUM ABDULHAMEED 12 Oct 1996 Female 9916448819

29558700080 BEN295587000053 SANIYA TABASUM MIRJA RASHEED BEG 14 Sep 1997 Female 9535388205

29558700081 BEN295587000054 NASAREENBANU CHANDPASH 10 Sep 1997 Female 7829560440

29558700082 BEN295587000055 BHAGYASHREE ESHWARAPPA 10 Jun 1994 Female 8880229380

29558700083 BEN295587000056 SUJATA BALABHEE MARAY 05 May 1997 Female 9591609221

29558700084 BEN295587000057 PRIYANKA MOTIRAM 14 Jul 1997 Female 9964832775

29558700085 BEN295587000058 SUMANGALA SOOGAYY ASWAMY 05 Jun 1997 Female 9972563752

29558700086 BEN295587000059 JYOTI MANAPPA 25 Dec1998 Female 9620307182

29558700087 BEN295587000060 NAGAVENI MAREPPA 30 Nov 1996 Female 8139960453

29558700088 BEN295587000061 SHREEDEVI NANAPPA 15 Jun 1991 Female 7022130364

29558700089 BEN295587000062 SHWETA BHEEMAPPA 30 Jul 1994 Female 9900243122

29558700090 BEN295587000063 RADHA RAMACHANDRAPPA 11 May 1993 Female 9880677928

29558700091 BEN295587000064 HARSHIYABEGUM SARMODDIN 05 Jan 1997 Female 9845787590

29558700092 BEN295587000065 MEENAKSHI BASAPPA 02 Jun 1990 Female 9686642334

29558700093 BEN295587000066 BHAVANI RAJAPIDDA NAYAK 29 Oct 1998 Female 7204657160

Page 16: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 16

29558700094 BEN295587000067 MADDI RUPANAG

ADURGA MADDI SRINIVAS RAO

29 Sep 1992 Female 9916041600

29558700095 BEN295587000068 BI BI AMEENA PARVEEN

KHAJA KHALEEL AHMAD ARIKERI

12 Feb 1998 Female

9448577666

29558700096 BEN295587000069 CHANDAMMA SIDDANNA 01 Jun 1993 Female 9900201605

29558700097 BEN295587000070 ASHMA KHAJAMAI NODDIN 28 Aug 1998 Female 9449693930

29558700098 BEN295587000071 RENUKA BHEEMARAYA 10 Jul 1993 Female 9845051028

29558700099 BEN295587000072 ASHAPARVIN MAHAMAD MUKTAR 03 Nov 1995 Female 9945494253

29558700100 BEN295587000073 TASLIM JANIMIYA 09 Jul 1996 Female 9945494253

29558700101 BEN295587000074 SANGEETA BHIMANA GOUDA 01 Jun 1987 Female 9972620201

29558700102 BEN295587000075 LAXMIBAI MAREPPA 30 Jul 1990 Female 8722204367

29558700103 BEN295587000076 NIKITA MAREPPA 01 Jun 1996 Female 9880693968

29558700104 BEN295587000077 PARAVEEN BANU MAHIBOOB SAB 01 Jul 1988 Female 9035241169

29558700105 BEN295587000078 RASHMI DEVINDRA 25 Apr 1995 Female 9901983143

8MAHESH PATIL

(Training Centre In charge) VISHWAGANGA SHORAPUR 9972803936

Developed by National Informatics Centre(NIC)

Page 17: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 17

National Urban Livelihoods Mission

Ministry of Housing and Urban Poverty Alleviation

Beneficiary Selection Letter

04 Feb 2017

To

Shorapur

City Municipal Council, Yadgiri

Subject : Selection of candidates for the Course Zardosi Work which commences on (02 Feb 2017

- 08 Apr 2017) - (9:15 - 5:15)

The following candidate has been selected for the above said Training program.

Page 18: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 18

Zardosi Work

Application Code Beneficiary Code

Name Father/Spo use Name

DOB Sex Mobile No

29558700045 BEN295587000018 NEHA GOODUSAB 06 May 1998 Female 8861592813 29558700046 BEN295587000019 MUMTAZ

PARVEEN MOHAMMED GESUDRAZ

19 Jan 1992 Female

9886891215

29558700047 BEN295587000020 POOJA BABU 31 Jan 1995 Female 9972558710

29558700048 BEN295587000021 BHEEMA BAI MAREPPA 10 Sep 1995 Female 9986168826

29558700049 BEN295587000022 MEENAKS HI MAREPPA 08 Jun 1994 Female 9741092705

29558700050 BEN295587000023 SHANTA DEVAPPA 18 Nov 1999 Female 8296394983

29558700051 BEN295587000024 MANANDAMMA DEVAPPA 16 Sep 1997 Female 8296394983

29558700052 BEN295587000025 MEGHA MANIKAPPA 10 Nov 1998 Female 9008753324

29558700053 BEN295587000026 RADHA DEVINDRA 28 Aug 1989 Female 8792702095

29558700054 BEN295587000027 VIDYASHREE BASAVARAJ GOGI 01 Dec 1992 Female 9741674643

29558700055 BEN295587000028 MANJULA SHIVARAJ 15 Oct 1992 Female 9901444438

29558700056 BEN295587000029 SHAHENAZ PARVEEN

MOHAMME D HUSSAIN

10 Jun 1994 Female

7406709919

29558700057 BEN295587000030 RESHMA BEGUM ISMAILSAB 20 Jun 1994 Female 9845947453

29558700058 BEN295587000031 PARVEEN BEGUM CHAND PASHA 24 Jul 1991 Female 7337798118

29558700059 BEN295587000032 NASEEMIRSHADA MOHMAD TAHERHUSEN

10 Jun 1982 Female

9986978279

29558700060 BEN295587000033 SHABANA TABBASUM

MOHAMMED MINYA 01 Feb 1993 Female 9986320211

29558700061 BEN295587000034 ROHINI VENKATESH 24 Oct 1995 Female 7259634374

29558700064 BEN295587000035 BASAMMA SHARABANNA

NAYIKODI

04 Feb 1990 Female 8197747044

Page 19: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 19

29558700062 BEN295587000036 SAMRINNAAJ M SIRAJUDDIN 19 Aug1997 Female 9739918151

29558700063 BEN295587000037 SABIHA KOUSAR MOHAMMAD SIRAJUDDIN

19 Jun 1999 Female 9845420448

29558700065 BEN295587000038 MAHANAND GANAPATI 01 Jun 1982 Female 9845420448 29558700066 BEN295587000039

SIMARAN BEGUM

MAHAMAD SARAMUD DIN

29 Aug 1996

Female 9901288241

29558700067 BEN295587000040 SUMRINISA MOHAMME D SALEEM 31 Jul 1998 Female 9743722708

29558700068 BEN295587000041 NASEEMA BEGUM MAHMADK ASIMALI 18 Aug 1995 Female 8197546697

29558700069 BEN295587000042 SUSHMITA VENKATESH 16 Mar 1997 Female 9743422284

29558700070 BEN295587000043 SNEHAS DEVINDRAPPA 10 Jun 1996 Female 7996652396

29558700071 BEN295587000044 WASIYA TABASSUM

SHAIK ABDUL WAJEED

02 Jun 1998 Female

9632740156

29558700072 BEN295587000045 CHITRA D NATIKAR

DEVANAND 20 Aug 1996 Female

9632740156

29558700074 BEN295587000047 SYEDA MARYAM BIBI

SYED YOUNUS 01 Jan 1996 Female

9008607086

29558700075 BEN295587000048 RENUKA ESHWARAPPA 05 Aug 1999 Female 9008607086

8MAHESH PATIL

(Training Centre In charge) VISHWAGANGA SHORAPUR 9972803936

Developed by National Informatics Centre(NIC)

Page 20: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 20

4. ROADS & BRIDGES

Sl.No

Functions as per 12th Schedule

Agency Responsible with in their jurisdiction

Data to be Disclosed Period for which

information has to be disclosed

Level of Disclosure

(ULB/Ward)

Frequency of Disclosure

Reference Remarks

4. Roads and Bridges ULBs & UDA (i) Total Road Length (type of road, its length and width).

Current status ULB / Ward Annually Table 4.1 MIS

(ii) Details of Roads proposed & executed for carpeting/re- carpeting.

Current year ULB Annually Table 4.2 (a) and 4.2 (b)

(iii) Percentage of footpath to the total road length of main roads.

current status ULB Annually Table 4.3

Table 4.1: Road types

Total existing road length in kms Total

Water bound macadam (WBM) Bituminous Cement Concrete (CC) Mud road

5.00 9.00 20 10 43

Page 21: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 21

Table 4.2.a: Abstract of roads approved for carpet ing and re-carpeting in current Financial year

(year to be mentioned numeric like 2012-13)

Type of road Total Road length approved and

tendered for carpeting in kms

Total Road length approved and

tendered for re-carpeting in km

Water Bound Macadam (WBM) 5.00 -

Bituminous - -

Cement Concrete (CC) 20 -

Mud Road 10 -

Total Automatic sum Automatic sum

Table 4.2.b: Details of roads approved and tendere d for carpeting and recarpeting in current financia l year (year to be mentioned

numeric like 2012-13)

Type of road Total Road length approved and

tendered for carpeting in kms

Total Road length approved and tendered for

re-carpeting in km

Water bound macadam (WBM) Enclosure as per the format given below

Enclosure as per the format given below

Bituminous Enclosure as per the format given below

Enclosure as per the format given below

Cement Concrete (CC) Enclosure as per the format given below

Enclosure as per the format given below

Mud road Enclosure as per the format given below

Enclosure as per the format given below

Page 22: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 22

Format for enclosure reference table 4.2.b

Road length Approved and tendered for carpeting, W BM, Bituminous

and CC road (newly surfacing of the roads)

Road length Approved and Tendered for re-carpeting , WBM,

Bituminous and CC road

Type of Road

Ward Number Street Name

Length of Road in Kms

Type of Road

Ward Number Street Name

Length of Road in

Kms

CC Road

1 – 27

Kumbarapet, Donegeara, Shamsirpur, Uppar Mohalla, Dhobi Mohalla, Zandadakere, Mojumadaragalli,Kabadagera, Mojumapura, Sheety Mohalla, Qureshi Mohalla, Dhakani Mohalla, Venkatapur, Bhoovi Mohalla, Maydargalli, Hasanapur, Pranala Mohalla Rangumpet, Beach Mohalla Rangampet, Dhoolapet, Mangal Bazar Rangampet, Sherki Mohalla Rangumpet, Mheboobho Nagar Colony, Waddar Colony, Devalaguda, Satyampet

18 Kms

CC Road

1 - 27

Kumbarapet, Donegeara, Shamsirpur, Uppar Mohalla, Dhobi Mohalla, Zandadakere, Mojumadaragalli,Kabadagera, Mojumapura, Sheety Mohalla, Qureshi Mohalla, Dhakani Mohalla, Venkatapur, Bhoovi Mohalla, Maydargalli, Hasanapur, Pranala Mohalla Rangumpet, Beach Mohalla Rangampet, Dhoolapet, Mangal Bazar Rangampet, Sherki Mohalla Rangumpet, Mheboobho Nagar Colony, Waddar Colony, Devalaguda, Satyampet

18 Kms

Table 4.3: Footpath Coverage to Main Roads

Total length of the main roads in ULB Jurisdiction : 81 kms

Total length of the footpath built against main road : 4 kms

Page 23: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 23

5. WATER SUPPLY DOMESTIC, COMMERCIAL & INDUSTRIAL

Sl.No

Functions as per 12th Schedule

Agency Responsible with

in their jurisdiction

Data to be Disclosed Period for which

information has to be disclosed

Level of Disclosure

(ULB/Ward)

Frequency of Disclosure

Reference Remarks

5. Water Supply- Domestic, Industrial and Commercial

Water Board / ULB

(i) Percentage of total water supply (Surfaced, Underground and external source).

current status ULB Level Half yearly Table 5.1 SLB1

(ii) Total number of connection & percentage of Coverage (Household / public stand posts / Commercial and Industrial Connection), quantity of w/s.

current status ULB Level Half yearly Table 5.2 SLB

(iii) Frequency & Timing for Water Supply.

current status ULB Level Half yearly Table 5.3 SLB

(iv) Quality of Water Supply (percentage of samples complied with the Water Act norms).

current status ULB Level Half yearly Table 5.4 SLB

(v) Cost Recovery in Water Supply Services (Revenue Generated per KL of water/Cost incurred per KL of Water Supplied).

Previous three financial years including current year

ULB Level Annually Table 5.5 SLB

(vi) Water tariff . Current status ULB Level Annually Table 5.6

1 Service Level benchmarking by DMA, GoK

Page 24: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 24

Format 5.1 -Per capita production of water Water supplied through Surface Source---3.04---in MLD Water supplied through Underground Source----Nill ----in MLD Water supplied through external Source---0.620---in MLD Format 5.2- Water Supply Coverage Total Number of Households…5514…..in numbers Number of house holds with direct water supply connections….2700….in numbers Total number of Public Stand Posts .…62.… in numbers Total number of industrial connections… …Nill …in numbers Format 5.3- Frequency & Timings of water supply

Frequency and Timing for Water Supply

Number of days of water supply per week in Normal

season

Number of hours of water supply on any supplied day (Normal season)

3 days 3 Hours / day

Format 5.4- Quality of water supply Total number of water samples collected at the consumer end-- Nill --in Numbers / 6 months Number of water samples that meet potable water standards--- Nill --in Numbers / 6 months

Page 25: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 25

Format 5.5- Cost recovery in water supply (same as in SLB) Format 5.6- Water Tariff

Water Tariff

Present water charges (which ever is applicable)

Flat rate ( mention the rate)

slab Rate (Mention the slab)

Enclosure

Enclosure

Enclosure

Expenditure

1 Total contractual (if outsourced) cost for Bore wells, O & M of piped network, O & M of vented dam/ Impounding structure/ Jack well/ Intake well, valves, replacement of distribution network, supplying of spare materials, salaries of Contract labours, vehicles etc).

Current Year

Current FY-1

(April to Sept.)

Current FY -2 (Sept.

to Dec.)

2 Total expenditure borne by ULB on Bore wells, O & M of piped network, O & M of vented dam / Impounding structure / Jack well / Intake well, valves, replacement of distribution network, supplying of spare materials, vehicles etc.

5.32 3.26 2.06

3 Salaries of employees under water supply (Permanent and Daily wages. 9.86 6.54 3.32

4 Purchase of items (for water treatment, for pumping machinery and spare parts if any).

7.35 1.12 6.23

5 Electricity Bill for water supply (Surface source and Ground water). 79.68 53.11 26.57

Revenue

1 Amount collected out of current year demand. 6.26 - -

2

Amount collected for providing new connection. 0.08 - -

Page 26: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 26

6. PUBLIC HEALTH, SANITATION, CONSERVANCY and SOLID WASTE MANAGEMENT

Sl.No

Functions as per 12th Schedule

Agency Responsible with

in their jurisdiction

Data to be Disclosed Period for which

information has to be disclosed

Level of Disclosure

(ULB/Ward)

Frequency of Disclosure

Reference Remarks

(i) Street Sweeping (road wise street sweeping schedule).

Current status as per action plan

ULB/Ward Half Yearly Table 6.(a).1 & 6.(a).2

SWM Action Plan

6 Public Health, Sanitation, Conservancy and SWM

ULBs / Water Board / UDA

(ii) General statistics on Solid Waste Management (Generation quantity, Details of the Secondary Collection Points, landfill location, user fee).

current status ULB Annually Table 6.(a).3.1& 6.(a).3.2

SWM MIB

(iii) Percentage of HH covered under Door- to-Door Collection.

current status ULB Half Yearly Table 6.(a).4

SLB and MIB

Zones Zone 2 (** Areas where door to door waste collection can be done through pushcart).

House holds : 10273 Shops : 1286

TMC Surpur

(iv) Percentage of households participating in segregation.

current status ULB Half Yearly Table 6.(a).5

(v) Extent of Scientific treated and Disposal of MSW (%).

current status ULB Annually Table 6.(a).5

SLB and MIB

(vi) Cost recovery under SWM (Revenue generated per ton of SW/ Expenditure per ton of SWM (in Rs.).

Previous three financial years including current year

ULB Annually Table 6.(a).6

SLB

Sewerage & Drainage:

(vii) Percentage of coverage of UGD.

current status ULB Annually Table 6.(b).1 SLB

Page 27: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 27

(viii) Percentage of Waste Water Treated.

current status ULB Annually Table 6.(b).2 SLB

(ix) Percentage of extent of reuse and recycle of treated waste water.

current status ULB Annually Table 6.(b).3 SLB

(x) Cost recovery under UGD (Revenue generated under UGD/ Expenditure under UGD (in Rs.).

previous three financial years including current year

ULB Annually Table 6.(b).4 SLB

Storm Water Drains (xi) Statistics of storm Water Drains (location, length and its cleaning frequency).

current status ULB Annually Table 6.(c).1

(xii) % age roadside drains to road length (Paved and unpaved).

current status ULB Annually Table 6.(c).2 SLB

(xiii) Incidences of Water Logging and Flooding (No.s of cases per year/ total number of identified points).

current status ULB Annually Table 6.(c).3 SLB

Public Health (if applicable) (xiv) No of Municipal Hospitals and its Location details.

Current Status ULB Annually Table 6.(d).1.1 And 1.2

(xv) Facilities available & OPD Timings.

Current Status ULB Annually

(xvi) Number of cases of vector Born Diseases per 1000 population.

ULB Annually Table 6.(d).2

(xvii) Number of cases of Water Born Diseases per 1000 population.

Annually

Page 28: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 28

Table 6(a).1 Private sector participation details for SWM

Package Number Scope of work Name of the contractor

Contract period (dd/mm/yyyy to dd/mm/yyyy)

Contract value in Rs. In lakhs

- - - - -

Table 6 (a).2 Street Sweeping Schedule

Package number

Ward number

Road ID if avaliable

Road name Road length in

Kms Sun Mon Tue Wed Thu Fri Sat

A* type A type: Daily Sweeping Nayakan Bhavi to Old

Bus Stand 500 √ √ √ √ √ √ √

Nayakan Bhavi to Gandhi Chuck

600 √ √ √ √ √ √ √

Bus Stand to main road 700 √ √ √ √ √ √ √ Gandhi Chuck to

Dharbar Road 800 √ √ √ √ √ √ √

Gopal Rao Hotel to Post Office via Panduranga Temple

800 √ √ √ √ √ √ √

Parkash Guthedar house to Kaleel Ahamada Dhakani House

500 √ √ √ √ √ √ √

Vegetable Market Area 600 √ √ √ √ √ √ √ Balaji Bhavan to

Chandrapal Mill 700 √ √ √ √ √ √ √

Siddamma Shop to Kadalappan Matta

530 √ √ √ √ √ √ √

Parkash Guthedar House to Mochi Bhavi

700 √ √ √ √ √ √ √

Kamatagalli Road 300 √ √ √ √ √ √ √ Vegetable Market to

Cattel Market 320 √ √ √ √ √ √ √

Parki Masizd to Bade Masizd

300 √ √ √ √ √ √ √

Vegetable Market to Mattan Market

150 √ √ √ √ √ √ √

Page 29: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 29

Chandrakanth Kadechour House to Timmapur Bus Stand

600 √ √ √ √ √ √ √

Dhakan peth House to Mariyamma Temple

400 √ √ √ √ √ √ √

Mariyamma Temple to Timmapur Bus Stand

500 √ √ √ √ √ √ √

Ramesh Shetty House to Henchette Mill (Venkatapur Road)

600 √ √ √ √ √ √ √

Thangamma bhavi to Kotrappa house

200 √ √ √ √ √ √ √

Chandrakanth Kadechour House to Mariyamma Temple

200 √ √ √ √ √ √ √

Sub total 10070 B type : Twice in a

week Sweeping

Donagere Street Roads 500 √ √ Kurubargalli Road 300 √ √ Kumbarapet Road 300 √ √ Police Colony Road 600 √ √ Uppara Mohalla Road 1000 √ √ ZP, Tashil, Forest TP,

PWD, Degree College 1300 √ √

Bechekethkere Street Road

1000 √ √

Upper Mohalla Street (RL-Nayak Quarters area)

1000 √ √

Gandhi circle to Govt. Boy’s High School

500 √ √

Doobi Mohalla Street Road

300 √ √

Page 30: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 30

Mulla Mohella Street

Road 700 √ √

Haripur Mohella Street Road

300 √ √

Santhrasawadi Street Road

400 √ √

Zandadakere 700 √ √ Bramingalli Street road 500 √ √ Narashima Devara

Temple Road 500 √ √

Shetty Mohella Street Road

100 √ √

Kabadagere Street road 1600 √ √ Sarnaubhata street road 400 √ √ Pakkira Mohalla Street

Road 500 √ √

Rajaputagalli Street Road 1000 √ √ Kureshi Mohella Street

Road 600 √ √

Gogikere Street Road 500 √ √ Nandavati bai house to

Cycle Babu house 500 √ √

Dhakani Mohalla Street Road

1100 √ √

Bade Qureshi Mohalla Street Road

500 √ √

Medargalli Street Road 1000 √ √ Dasaragalli Street road 500 √ √ Gudalakere Street road 800 √ √ Bhovigalli street road 800 √ √ Gandhi Nagar Street

Road 500 √ √

Venkatapur Street road 100 √ √ Kumabarpeth Street Road 1200 √ √ Hasanapur Street Road 300 √ √

Page 31: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 31

Rajakumar Nayak

Colony 150 √ √

Gandhi Nagar 150 √ √ Ahsraya Colony and

Qureshi Mohalla 250 √ √

Paraki Masizd Area 500 √ √ Parnai Mohella Street

Road 800 √ √

Bade Masizd Street Roads

700 √ √

Beach Mohalla 800 √ √ Dhoolpeth Street Road 700 √ √ Bade Masizd Street

Road 300 √ √

Eka Minar Masizd 600 √ √ Kemmangade 850 √ √ Behind Timmapur Bus

Stand Street Road 400 √ √

Mehabooba Subani Darga Area

500 √ √

Parat of Paraki Masizd Area

350 √ √

Kumbar Oni 500 √ √ Eligera Galli 900 √ √ Waddar Galli 500 √ √ Chudamma Temple

Area 500 √ √

Sytampet street road 1600 √ √ Devalagudda 1000 √ √ Petrol Pump 600 √ √ Gunj 600 √ √ Sub Total 35350 C type : Once in a

week Sweeping

Kumbarapeth Road to Old Bus Stand

1000 √

Page 32: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 32

Old Bus Stand Road to

Tashil Office Cross 600 √

Badegree Bhavi to Tashil Office Cross

500 √

TMC Office to Rangampet Street

900 √

Venkatapura to Gunj Area Road

1000 √

Kumbarapeth to Filter bed

1000 √

Shivanna Sindigi house to Basavanna Temple

200 √

Rangampet Auto Stand to Timmapur Auto Stand

1000 √

Petrol Bunk Straight Highway

500 √

Devalgudda to Laxmipura Nala Highway

1000 √

Sub Total 7700

Page 33: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 33

Table 6 (a).3.1

Details Handled by SHG

(No.s) Handled by Service Provider, if

applicable (No.s) Handled by ULB (No.s)

Handled by RWA/NGO (No.s)

Non slum Household’s - - - -

Slum Household’s - - - -

Commercial establishments - - - -

Bulk generators - - - -

Expected User fee generation (demand) - - - -

Table.6 (a) 3.2

General statistics on Solid Waste Management

Total Quantity of waste generated in the city per day (TPD)

Total Quantity of waste Collected (TPD)

User fee Slab details enclosed

Resolution date passed from Council

Land fill location

Number of secondary transportation

vehicles under SWM

16 Tonus 16 Tonus - - SH Khanapur -

Secondary storage containers Location Map

-

Source: SWM Action Plan Table 6 (a).4

Number of Households participating in segregation 12576

Page 34: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 34

Table 6(a).5 Scientific Disposal of MSW

Total waste collected & transported to disposal si tes…16…..in tones/day

Total waste processed in scientific manner…… Nill ……in tones/day Table 6(a).6 Cost recovery under SWM i n Rs Lakhs

Expenditure 1. Salary of the employees under SWM In Rs Lakhs --

2. Total Contractual cost if outsourced under MSWM for hiring services, vehicles or equipments,

O& M of vehicles, fuel cost, labour cost etc.

In Rs Lakhs 0.25

3. Total expenditure borne by ULB on SWM for O &M of vehicles, purchase of tools and

equipments, insurance cost for vehicles, landfill management cost like tipping fee etc.

In Rs Lakhs 80.55

Revenue 1. Total Revenue generated under SWM --

Sewerage Table.6 (b) 1. UGD Coverage Total Number of households with direct UGD Connections… Nill ...in Numbers

Table.6 (b) 2 Percentage Waste Water treated

Total waste water collected at sewage treatment plant… Nill…in MLD

Quantity of waste water treated…… Nill….in MLD Table.6 (b) 3 extent of reuse and recycle of waste water Quantity of waste water recycled & reused out of treated waste water… Nill…. in MLD (when mouse is moved on MLD then it should show “million Liters per day”) Table.6 (b) 4 Cost recovery under UGD (Input scree n)

Expenditure 1. Electricity bill for sewage treatment plant In Rs Lakhs --

2. Total salaries of ULB employees working in STP & UGD system In Rs Lakhs --

3. Total O& M Contractual cost (if Outsourced) under UGD and STP (purchase of items, repair and replacement of spares, labour cost etc.)

In Rs Lakhs --

Total O& M cost born by ULB under UGD and STP (purchase of items, repair and replacement of spares etc.)

Revenue 1 Total revenue collected from UGD In Rs Lakhs --

Page 35: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 35

Storm Water Drains Table.6 (c).1

Statistics of storm water drains

Name of major storm water drains Length in kms Cleaning frequency per annum

- - -

Table.6 (c) 2

Length of road side drains -

Table.6 (c) 3

Number of water logging and flooding cases per year……in numbers -

Total number of identified points….in Numbers -

Public Health to be filled by the ULBs if they are managing this function Table 6 (d).1.1

Public Health

Name of the Municipal hospitals

Location details

Detail of facilities

Number of beds

Number of staff

OPD2 Timings of the OPD

Lab Facility (yes/No)

Others if any

- - - - - - -

Table 6 (d).1.2

Number of vector borne disease cases per 1000 population Number of water borne disease cases per 1000 population

Nill Nill

Function 7 is not managed by ULB in Karnataka State hence the details are not mentioned

2 Out Patient department

Page 36: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 36

Format of SBM

S. No.

Name and

contact no of the person

with designati

on

Individual Household Toilets, Nos.

Community toilets (No. of seats)

Public toilets (No. of seats)

Total Community and Public

toilets (No. of seats)

Total number of

wards ready

to declar

e ODF

Municipal Solid Waste Management

Applicatio

n received

Work

commenced

Completed

Work

Commenced

Completed

Work

Commenced

Completed

Work Commenc

ed

Completed

Ward with 100% door

to door

collection, Nos.

Total ward, Nos.

Total waste generation (MT/D)

Total waste processing (%)

status of landfill site ex:

details regarding the area of

landfilling site, status of

compound wall, roads,

borewells, wathcman shed,

platform for composting,

electricity, etc..

1 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

1

Sri. Jeevan

Kumar

Kattimani,

Sr. H.I.

CMC

Shorapur

1870 102 101 - - - - - - 27 18

Ward 27 18.5 14.5

Compound Wall, Bore well,

aprochment Road, Internal

Road, Watchman Shed ,

Segration Plat Form.

Page 37: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 37

8. URBAN FORESTRY, PROTECTION OF ENVIRONMENT AND EC OLOGY

Sl. No Functions as per 12th Schedule

Agency Responsible with in their jurisdiction

Data to be Disclosed Period for which information has to be disclosed

Level of Disclosure

(ULB/Ward)

Frequency of Disclosure

Reference Remark

s

8 Urban forestry, protection of environment and ecology

ULB Trees (if applicable)

(i) Number of tree cut/uprooted to the number of existing trees.

Current status ULB Half Yearly Table 8.1

(ii) Number of sapling planted to the number of trees cut/ uprooted to the number of existing trees .

Current year ULB Half Yearly

Water bodies (if applicable)

(iii) Existing number, New Proposals for Revival of water bodies, budget and expenditure.

Current status ULB Annual Table 8.2

Table.8.1 (To be filled by the ULBs if they are managing this function) Urban forestry Total Number of existing trees Total Number of trees cut/uprooted Total Number of new saplings planted

Nill Nill Nill

Table.8.2 Protection of Environment and Ecology

Sl. No Name existing water bodies like lake,

tanks, pond etc. Proposed for revival in Yes/No

Amount budgeted for revival in Rs. in lakhs

Expenditure met in Rs. in Lakhs

- - - -

Function 9 is not managed by ULB in Karnataka State hence the details are not mentioned

Page 38: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 38

10. SLUM IMPROVEMENT & UP-GRADATION

Sl. No

Functions as per 12th

Schedule

Agency Responsible with in their jurisdiction

Data to be Disclosed Period for which

information has to be disclosed

Level of Disclosure

(ULB/Ward)

Frequency of

Disclosure Reference Remarks

10 Slum Improvement & Up-gradation

ULB/UDA (i) Details on declared and undeclared slums (numbers, location, number of households, population, area)

current status ULB/Ward Half yearly Table 10.1

(ii) Details of slum improvement schemes (schemes, slums benefited, budget and expenditure)

Previous three financial years including current year

ULB/Ward Half yearly Table 10.2.

(iii) Beneficiary list under each scheme

current status ULB/Ward Half yearly Table 10.2

(iv) Status of Basic Services in Slums (a) No of connections – Water Supply & sanitation (% coverage) (b) Length of Roads and drains (paved and unpaved). (c) No and % of houses (pacca and katcha houses).

current status ULB/Ward Half yearly Table 10.3

Table 10.1 Details on declared and undeclared slums (Input Screen & Output screen are same) Details of declared slums Enclosure as per the format given Below

Details of un declared slums Enclosure as per the format given Below

Page 39: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 39

Format for enclosure as mentioned in table 10. 1

Details of declared and undeclared slums

Name of the slum Declared / Undeclared

Extent in Sq. mt

Population Number of Households

Mukadankeri Declared 7.10 714 215 Municipla Dag Bangalow Declared 7.35 480 158

Gonalakari Declared 6.25 301 131 Kaddappamatta Declared 7.35 885 95 Fhakir Mohalla Declared 14.15 1793 289 Bade Kasab Mohalla Declared 8.28 1200 238 Hullkal Block Declared 5.35 375 74 Dasar Mohalla Declared 5.15 1020 150

Bhovi Mohalla Declared 13.10 1144 75

Gandhi Nagar Declared 7.15 803 77 Dhoolpeta Declared 7.35 985 199 Dhor and Godikar Mohalla Declared 18.25 1880 597

Vanakihal Keri (Ashray Colony) Non Declared 3.15 492 191 Venkatapur Non Declared 5.22 948 328

Uddar Mohalla Non Declared 4.20 904 119

Zandadakera Non Declared 1.28 405 105

Small Kasaba Mohalla Rangampet, Non Declared 2.35 438 92

Gandhi Nagar, Rangampet Non Declared 1.25 344 100

Raja Kumar Naik Colony Non Declared 3.25 890 193

Paranalla Mohalla Non Declared 2.26 375 58

Waddar Mohalla Non Declared 2.20 675 110

Page 40: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 40

Table.10.2 Details of slum improvement Schemes (Inp ut & Output Screen are same)

Current Year Name of the slum Improvement Schemes

Total Number of Budget and under each Scheme (in Rs Lakhs)

Expenditure met under each scheme (in Rs Lakhs)

Beneficiary list as enclosure Slums Beneficiaries

enclosure Current Year - 1 Name of the slum Improvement Schemes

Total Number of Budget and under each Scheme (in Rs Lakhs)

Expenditure met under each scheme( in Rs Lakhs)

Beneficiary list as enclosure

Slums Beneficiaries enclosure Current Year - 2 Name of the slum Improvement Schemes

Total Number of Budget and under each Scheme (in Rs Lakhs)

Expenditure met under each scheme( in Rs Lakhs)

Beneficiary list as enclosure

Slums Beneficiaries enclosure

Table 10.3 Basic Service status in Slums

Status of Basic services in Slums

Total number of households with

direct water supply connections

(numeric)

Total number of public taps/mini water cisterns

(numeric)

Total length of roads paved

and unpaved in Kms

Total households

connected to UGD

(numeric)

Total length of road side drains in

Kms

Total number of HH with individual

toilets (numeric)

Number of Functional Community

Toilets (numeric)

Total number of pacca / kaccha

houses (numeric)

Note: ULBs needs to disclose information under tabl e 10.2, 10.3 and 10.4 with a note that “All the information in this table are the works undertaken by ULB” (plz Insert this without fail)

Page 41: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 41

11. URBAN POVERTY ALLEVIATION

Sl. No

Functions as per 12th Schedule

Agency Responsible with

in their jurisdiction

Data to be Disclosed

Period for which information has to

be disclosed

Level of Disclosure

(ULB/Ward)

Frequency of

Disclosure Reference Remarks

11 Urban Poverty Alleviation

ULBs / DMA / UDA

(i) Details of the Urban Poverty Alleviation Schemes (eg. Components of SJSRY )

Current status ULB Annually Table 11.1

Table 11.1 Details of Urban Poverty Alleviation

Name of Schemes under urban poverty alleviation (multiple

entries)

Budget for the schemes

Expenditure met for the

scheme

Number of beneficiaries under the scheme

list of the beneficiaries to be enclosed

NULM 29.40 -- -- (Enclosure)

All the information in this table are the works und ertaken by ULB” (plz Insert this without fail)

Page 42: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 42

12. PROVISION OF URBAN AMENITIES AND FACILITIES-PA RKS, GARDENS & PLAY GROUNDS

Sl. No

Functions as per 12th Schedule

Agency Responsible with in their jurisdiction

Data to be Disclosed Period for which information has to be disclosed

Level of Disclosure

(ULB/Ward)

Frequency of

Disclosure Reference Remarks

12 Provision of urban amenities and facilities- parks, gardens and playgrounds

ULBs / UDAs Playground/ Parks / Gardens.

(i) Percentage of area under parks and gardens to the total ULB area

Current status ULB Annually Table 12.1

(ii) Percentage of developed parks and gardens (%)

Current status ULB Annually Table 12.1

(iii) Number, Location, Area, Amenities, details of the maintaining agency

Current Status ULB Annually Table 12.2 (a) and 12.2 (b)

Table.12.1. Area reserved under Parks & Gardens

1. Total ULB area…18.53…in Sq. kms

2. Area reserved under Parks & Gardens… 40950... in sq. mts

3. Area of developed parks and gardens … 40950 …in sq. mts

Page 43: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 43

Table.12.2 (a) Amenities under Parks & Gardens

Locations of

the park

Park Area

in sq. mt

Amenities available under each park (Yes/No) Contact details

of the Maintaining Agency

Children

play area

Seating

facility

Track for

walking / jogging

Facility for

exercise Name

Contact Number

(Numeric)

- (multiple entries) - - - - - -

Table 12.3. (b) Play Ground Details

Locations of the playgrounds Playground Area in sq. mt Contact details of the Maintaining Agency

- - Name Contact number (numeric)

13. PROMOTION OF CULTURAL, EDUCATIONAL AND AESTHETI C ASPECTS

Sl. No

Functions as per 12th Schedule

Agency Responsible with in their jurisdiction

Data to be Disclosed Period for which information has to be disclosed

Level of Disclosure

(ULB/Ward)

Frequency of

Disclosure Reference Remarks

13 Promotion of cultural, educational, and aesthetic aspects

ULBs (i) Details of Community halls, Cultural Centers, marriage halls, municipal educational institutes

Current Status ULB Annually Table 13.1 (a) and 13.1.

(ii) Details of advertisement hoardings, rates, revenue generated

Current Status ULB Annually Table 13.2.1 and 13.2.2

Page 44: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 44

Table 13.1.a Details of cultural Centers

Community Halls/Auditorium Details

Name Address Booking office address and contact details

Dr. Babashayab Ambedkar Hall. Zandadakere Shorapur Zandadakere Shorapur

Veerashiva Khayan Mantap Rangampet, Shorapur Rangampet, Shorapur

Sumadhay Bhavan Donigere, Near Vallmuki Temple, Shorapur.

Donigere, Shorapur

Dr. Babashayab Ambedkar Bhavan Paladakeri, Shorapur. Paladakeri, Shorapur.

Dr. Ambedkar Bhavan Near Buddhavihar, Surpur. Near Buddhavihar Shorapur Table 13.1 (b) Details of educational institutes (o nly if applicable)

Name of the Municipal Educational Institutes Number of teachers in each municipal

Educational Institutes (in numbers)

Name Address Numbers

- - -

Table13.2.1 Details of Advertisement Hoardings (Inp ut & Output screens are same)

Details of Advertisement hoardings

Number of Hoardings Slab rates for advertisement (As Enclosure)

Advertisement tax demand for the current year in Rs. in lakhs

Advertisement tax collected in the current year in

Rs. in lakhs

- - - -

Page 45: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 45

14. BURIALS AND BURIAL GROUNDS, CREMATIONS, CREMATI ON GROUNDS AND ELECTRIC CREMATORIUMS

Sl. No

Functions as per 12th Schedule

Agency Responsible with in their jurisdiction

Data to be Disclosed Period for which information has to be disclosed

Level of Disclosure

(ULB/Ward)

Frequency of Disclosure

Reference Remarks

14 Burials and burial grounds, cremations, cremation grounds and electric crematoriums

ULBs (i) Numbers, type, Location of burial grounds and cremation facilities available, fee charged if any

Current Status ULB Annually Table 14.1 (a). and 14.1(b)

(ii) Details of facility of “Herse / Corpse Vehicles”(number and contact details)

Current Status ULB Annually Table 14.2

Table.14.1 (a) Details of Burial grounds, cremation grounds & electric crematoriums

Name of the Community

burial ground with locations

Details of Burial grounds, cremation grounds & electric crematoriums

Name and location of the

Crematoriums / Burial ground

Facilities available in the Crematoriums ( Yes / No)

Electric Burning Burial Availability

of wood Water facility

Cleaning facility

Others if any

Maintaining agency

Name Contact details

Multiple (entries)

- - - - - - - - - -

Page 46: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 46

Table 14.1 (b) Fee slab for each crematorium (Input and Out put sc reens are same)

Fee slab for each crematoriums and burial grounds E nclosure

- -

Table 14.2: Details of Hearse Vehicles

Hearse / Corpse vehicle details

Number of hearse vehicles available Fee details for the vehicle (in Rs)

Contact details to hire the vehicle Maintaining agency

Contact Number Name Contact Number

Auto Tipper – 4 CMC

Shorapur

08443256300

Tractor & Tailor – 3

JCB – 2

Sucking cum Jetting – 1

Page 47: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 47

15. CATTLE PONDS, PREVENTION OF CRUELTY TO ANIMALS

Sl. No

Functions as per 12th Schedule

Agency Responsible with in their jurisdiction

Data to be Disclosed Period for which information has to be disclosed

Level of Disclosure

(ULB/Ward)

Frequency of

Disclosure Reference Remarks

15 Cattle ponds, prevention of cruelty to animals

ULBs (i) Numbers of stray animals, vaccinated

Current Status ULB Annually Table 15.1 (a) and 15.1 (b)

(ii) List of ‘Kanji House’ (care centers for stray animals).

Current Status ULB Annually Table 15.1 (a)

Table.15.1.1 Details of stray animals (input & out put screen are same)

Number of stray animals Number of stray dogs vaccinated

Location of Kanji House (care centers for Stray animals) if

applicable Dogs Cows Pig Others if applicable Nill Nill Nill Nill Nill Nill

Table 15.1.2 Details of Veterinary & Animal Welfare Centers (inp ut & output screen are same)

List of Location of Veterinary Hospitals As Enclosure - 01

List of Animal Welfare Association (if available) As Enclosure - Nill

Name and Location of NGOs working for animal welfar e (if

available). As Enclosure - Nill

Page 48: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 48

16. VITAL STATISTICS INCLUDING REGISTRATION OF BIRT HS AND DEATHS

Sl.No

Functions as per 12th Schedule

Agency Responsible with

in their jurisdiction

Data to be Disclosed Period for which

information has to be disclosed

Level of Disclosure

(ULB / Ward)

Frequency of

Disclosure Reference Remarks

16 Vital Statistics including registration of births and deaths

ULBs (i) General information pertaining to city (population, area, households etc.)

Current Status and recent census details

ULB Annually Table 16.1 City website

(ii) List of citizen service centers with location

Current status ULB Annually Table 16.2

(iii) Total Births and Deaths recorded along with Birth and Death rates.

Current status ULB Half Yearly Table 16.3

(iv) Citizen Charter to be published

Current status ULB Annually Table 16.4

Table 16.1: City General information as per recent census detai ls (should be added in their respective ULB website

City General information

Present population

Present area in sq.km

Total number of households

Population density

Total male population

Total female population

Total SC/ST Population

Total Slum population

Literacy rate

55465 18.53 12576 Nill 23307 22315 10985 17253 46%

Table 16.2: List of Citizen Service centers

Sl. No Address of the Citizen Service centers if applicable

Enclosure

Page 49: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 49

Table 16.3: Details of Birth & Death

Total Births Recorded Total Deaths Recorded

648 394

Table 16.4 Citizen Charter (ULBs who have already maintaining the Charter can enclose the same, other ULBs can f ollow the below format

Service Details Period of catering

the service Procedure to Apply

Officer incharge

Designation Contact Number

Birth Certificate 3 Days By Applicant S.I 9900467874

Death certificate 3 Days By Applicant S.I 9900467874

Still Birth Certificate 3 Days By Applicant S.I 990 0467874

Transfer of Extract of Property Tax 40 Days By Appl icant Municipal Commissioner

9880351904

Building license 30 Days By Applicant Municipal Commissioner

9880351904

License to industrial undertakings, hotel, shops etc.

7 Days By Applicant Municipal Commissioner

9880351904

Water supply new connection 15 Days By Applicant Municipal Commissioner

9880351904

Others 45 Days By Applicant Municipal Commissioner

9880351904

Enclosure if already citizen charter being

maintained Enclosure

Page 50: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 50

17. PUBLIC AMENITIES INCLUDING STREETLIGHTING, PARK ING LOTS, BUS STOPS AND PUBLIC CONVENIENCES

Sl.No Functions as per 12th

Schedule

Agency Responsible with in their jurisdiction

Data to be Disclosed Period for which information has to be disclosed

Level of Disclosure

(ULB/Ward)

Frequency of

Disclosure Reference Remarks

17 Public amenities including street lighting, parking lots, bus stops and public conveniences

ULBs (i) Number of street lights Current status ULB Annually Table 17.1 SLB

(ii) No. of Street Lights/ Km of Road Length (No.s)

Current status ULB Annually Table 17.1 SLB

(iv) Details of agency maintaining street lights (name and contact details)

Current status ULB Annually Table 17.2

(v) List of Authorized Parking Areas along with parking capacities and fee

Current status ULB Annually Table 17.3

(vi) Number and locations of bus stops and public toilets (Community and commercial) with its user charge.

Current status ULB Annually Table 17.4

Table. 17.1: Details of Streetlights

Total number of streetlights Types of streetlights with number

Tube light High Mast Incandescent Mercury vapor Sodium vapor

2560 1820 8 Nill 700 82

Page 51: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 51

Table. 17.2: Details of Agency Maintaining Streetlight

Package Number Wards Covered Details of the agency Maintaining the streetlights

Name Phone Number

Nill Nill - -

Table. 17.3: Details of Parking Lots

Details of parking lots Enclosure as per the format

Format

Parking lot location

Parking Capacity Fee Slab

Two wheeler Four wheeler Two wheeler Four wheeler

Nill Nill Nill Nill Nill

Page 52: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 52

Table.17.4 Details of toilets Table 17.5: Details of Bus Stop

Location of Bus stop ( As Enclosure) Area : Ward No. 7 Address: Zandadakere,

Shorapur Area : Ward No. 6 Address: Timmapur

Shorapur

Public Toilets Community Toilets

Location Fee slab Location Fee slab Ward No.5, Uppar Mohalla, Shorapur Not applicable Not applicable

Ward No.7, Mulla Mohalla, Shorapur Not applicable Not applicable

Ward No.9, Kabadagera, Shorapur Not applicable Not applicable

Ward No.10, Muzumpura & Asar Mohalla, Shorapur Not applicable Not applicable

Ward No.12, Qureshi Mohalla, Shorapur Not applicable Not applicable

Ward No.17, Hasanapur, Shorapur Not applicable Not applicable

Ward No.19, Rangumpet Auto Stand, Shorapur Not applicable Not applicable

Ward No.21, Dholapet, Shorapur Not applicable Not applicable

Ward No.22, Sharaki Mohalla, Shorapur Not applicable Not applicable

Ward No.25, Elegara Mohalla, Shorapur Not applicable Not applicable

Ward No. 27, Saytampet, Shorapur. Not applicable Not applicable

Page 53: SHORAPUR CMC Public Disclosure Schedule 2016-17 · 10 Slum Improvement & Up-gradation 38-40 11 Urban Poverty Alleviation 41 12 Provision of Urban Amenities and Facilities- Parks,

______________________________________________________________________________________________________________ Manual On Public Disclosure Schedules

CMAK 53

18. REGULATION OF SLAUGHTER HOUSES AND TANNERIES

Sl. No Functions as per

12th Schedule

Agency Responsible with in their jurisdiction

Data to be Disclosed Period for which

information has to be disclosed

Level of Disclosure

(ULB / Ward)

Frequency of Disclosure

Reference

Remarks

18 Regulation of slaughter houses and tanneries

ULBs (i) Number, Location of Slaughter House / Tanneries along with facilities available and capacity

Current status ULB Annually Table 18.1 (a) and (b)

Table. 18.1(a): List of Slaughter Houses

Number of Slaughter Houses Functional Number of slaughter houses Non functional

3 8

Table 18.1 (b): Details of Slaughter House

Location of the slaughter House

Whether the Slaughter house is been regulated

by KSCB (Yes / No)

Capacity Number of animals

slaughtered per week

Facilities

Washing Medical Examination

Removal of Waste

Others if any

Nill Nill Nill Nill Nill Nill Nill Nill

Location of Public toilets User charges for Pay and Use toilets in Rs.

Pay and use toilets Community based Toilets Pay and use toilets Community based Toilets

Nill 12 Nill 12