shopping center-Model

1
VERTICAL SECTION OF A COLUMN WITH SQUARE FOOTING VERTICAL SECTION OF A COLUMN WITH SQUARE FOOTING PLAN SHOWING THE PROPOSED CONSTRUCTION OF RCC ROOF SHOPPING CENTER BUILDING @ CHENNAI PRO.SITE STREET STREET STREET STREET STREET JOINERY DETAILS : MD : MAIN DOOR- 1.52 X 2.10 D : DOOR - 0.91X 2.10 D1 : DOOR - 0.76X 2.10 W6: WINDOW - 1.37 X 1.37 V: VENTILATOR - 0.91 X 0.61 RAIN WATER HARVESTING UNIT HBG JALLY HBG JALLY COARSE SAND GL INLET AIR HOLES 8'0" 2.44 G L HARD SOIL ORDINARY SOIL 0.61 2.89 GLASS PANNEL BOARD 0.61 OUT LET CYLINDER 1.45 INLET GLASS CYLINDER PANNEL BOARD SOLAR WATER SYSTEM TREAD:0.30M RISE: 0.15M WIDE: 1.52 M STAIR DETAILS & SAND BRICK BATS 0.23 0.23 0.83 0.23 0.23 3.45 0.23 0.83 1.82 0.23 REMOVABLE COVER SLAB PLAN AND SECTION OF WASTE WATER 40MM JELLY SAND JELLY BATS SAND CONCRETE BATS SAND AIR PIPE FILTER UNIT & RECHARGE PIT WASTE WATER FROM BATH SINK & WASH BASINS REMOVABLE COVER SLAB TO ENTER THE RAINWATER INTO THE PERCOLATION PIT 3 .I AGREE TO CLOSE OHT & WELLPERFECTLYAND COWL OFSEPTIC 2.I AGREE TO PROVIDE SOLAR ENERGY WATER HEATER 1.I AGREE TO PROVIDE PERCOLATION PIT TOSAVE THE RAIN WATER CERTIFICATES:- THROUGH THIS METHOD AND THE ARRANGEMENTS WILL BE MADE TANK BY MOSQUITO NET TO PREVENT MOSQUITO PRODUCTION. OVER FOUNDATION CONCRETE IN PCC 1:5:10 JOINERIES : BEST COUNTRY WOOD DOORS&WINDOWS FINISHING : PLASTERING IN CM 1:5 BASEMENT FILLING : SAND AND GRAVEL FILLING BASEMENT :0.46M ABOVE GL IN RCC BEAM & BRICKWORK IN CM 1:5 SUPER STRUCTURE : BRICKWORK IN CM1:5 FLOORING : GLAZED TILES FLOORING ROOFING : RCC WITH1:2:4 MIX - 0.13 M THICK FOUNDATION : 1.52M BELOW GL WITH RCC PILLARS IN RCC 1:2:4 SPECIFICATION:- Shop 1 Shop 4 Shop 3 Shop 2 Shop 5 Shop 7 Shop 6 Showroom 2 Showroom 1 Toi(G) Up Drinking Water Dn Toi(L) Shop 10 ENTRY Lift 3.75m x 5m Entrance Lobby Up Dn GROUND FLOOR Shop 1 Shop 4 Shop 3 Shop 2 Shop 5 Shop 7 Shop 6 Showroom 4 Showroom 3 Toi(G) Up Drinking Water Dn Toi(L) Shop 10 Shop 9 Lift Up Dn Staircase W- 1.5m BASEMENT PLAN FIRST FLOOR Shop 9 Lift Lift D.G Set up Lift Lift FRONT ELEVATION SIDE ELEVATION

Transcript of shopping center-Model

Page 1: shopping center-Model

VERTICAL SECTION OF A COLUMN

WITH SQUARE FOOTING

VERTICAL SECTION OF A COLUMN

WITH SQUARE FOOTING

PLAN SHOWING THE PROPOSED CONSTRUCTION OF RCC ROOF SHOPPING CENTER BUILDING @ CHENNAI

PRO.SITE

STREET

S

TR

EE

T

S

TR

EE

T

S

TR

EE

T

S

TR

EE

T

JOINERY DETAILS :

MD : MAIN DOOR- 1.52 X 2.10

D : DOOR - 0.91X 2.10

D1 : DOOR - 0.76X 2.10

W6: WINDOW - 1.37 X 1.37

V: VENTILATOR - 0.91 X 0.61

RAIN WATER

HARVESTING UNIT

HBG JALLY

HBG JALLY

COARSE SAND

GL

INLET

AIR HOLES

8'0

"

2.4

4

GL

HARD SOIL

ORDINARY SOIL

0.61

2.8

9

GLASS

PANNEL

BOARD

0.6

1

OU

T LE

T

CYLINDER

1.45

INLET

GLASS

CYLINDER

PANNEL BOARD

SOLAR WATER SYSTEM

TREAD:0.30M

RISE: 0.15M

WIDE: 1.52 M

STAIR DETAILS

&

SAND

BRICK

BATS

0.23

0.23

0.83

0.23 0.23

3.45

0.23

0.83

1.82

0.23

REMOVABLE COVER SLAB

PLAN AND SECTION OF WASTE WATER

40MM

JELLY

SAND

JELLY

BATS

SAND

CONCRETE

BATS

SAND

AIR PIPE

FILTER UNIT & RECHARGE PIT

WASTE WATER FROM BATH SINK & WASH BASINS

REMOVABLE COVER SLAB

TO ENTER THE RAINWATER INTO THE PERCOLATION PIT

3 .I AGREE TO CLOSE OHT & WELLPERFECTLYAND COWL OFSEPTIC

2.I AGREE TO PROVIDE SOLAR ENERGY WATER HEATER

1.I AGREE TO PROVIDE PERCOLATION PIT TOSAVE THE RAIN WATER

CERTIFICATES:-

THROUGH THIS METHOD AND THE ARRANGEMENTS WILL BE MADE

TANK BY MOSQUITO NET TO PREVENT MOSQUITO PRODUCTION.

OVER FOUNDATION CONCRETE IN PCC 1:5:10

JOINERIES : BEST COUNTRY WOOD DOORS&WINDOWS

FINISHING : PLASTERING IN CM 1:5

BASEMENT FILLING : SAND AND GRAVEL FILLING

BASEMENT :0.46M ABOVE GL IN RCC BEAM & BRICKWORK IN CM 1:5

SUPER STRUCTURE : BRICKWORK IN CM1:5

FLOORING : GLAZED TILES FLOORING

ROOFING : RCC WITH1:2:4 MIX - 0.13 M THICK

FOUNDATION : 1.52M BELOW GL WITH RCC PILLARS IN RCC 1:2:4

SPECIFICATION:-

Shop 1

Shop 4

Shop 3

Shop 2

Shop 5 Shop 7Shop 6

Showroom 2

Showroom 1

Toi(G)

Up

DrinkingWater

Dn

Toi(L)

Shop 10

ENTRY

Lift

3.75m x 5mEntrance Lobby

Up

Dn

GROUND FLOOR

Shop 1

Shop 4

Shop 3

Shop 2

Shop 5 Shop 7Shop 6

Showroom 4

Showroom 3

Toi(G)

Up

DrinkingWater

Dn

Toi(L)

Shop 10

Shop 9

Lift

Up

DnS

taircaseW

- 1.5

m

BASEMENT PLAN

FIRST FLOOR

Shop 9

Lift

Lift

D.G

Set

up

Lift

Lift

FRONT ELEVATION SIDE ELEVATION