![Page 1: Shop plans are the plans of fabricated items, prepared by ... · dimensions, material, and proposed fabrication ... Prestressed Girders Steel Girders Large Concrete Pipe ... not stuck](https://reader034.fdocuments.us/reader034/viewer/2022051601/5ad057447f8b9a8b1e8dcadc/html5/thumbnails/1.jpg)
Shop Plans
Shop plans are the plans of fabricated items, prepared by the shop fabricator, detailing the item’s dimensions, material, and proposed fabrication process.
![Page 2: Shop plans are the plans of fabricated items, prepared by ... · dimensions, material, and proposed fabrication ... Prestressed Girders Steel Girders Large Concrete Pipe ... not stuck](https://reader034.fdocuments.us/reader034/viewer/2022051601/5ad057447f8b9a8b1e8dcadc/html5/thumbnails/2.jpg)
Some items requiring shop drawings
Precast Box Culverts Prestressed Girders Steel Girders Large Concrete Pipe Bridge Railing MSE Retaining Walls Cross-Brace Diaphragms Sign Bridge Truss
Fixed and Breakaway Sign Posts Pavement Terminals Five Bolt Insert Assembly Shim Plates Deck Drains Strip Seal Expansion Joints Steel Diaphragms (Straight)
![Page 3: Shop plans are the plans of fabricated items, prepared by ... · dimensions, material, and proposed fabrication ... Prestressed Girders Steel Girders Large Concrete Pipe ... not stuck](https://reader034.fdocuments.us/reader034/viewer/2022051601/5ad057447f8b9a8b1e8dcadc/html5/thumbnails/3.jpg)
Submittal for review and approval
Content Format Submittal
![Page 4: Shop plans are the plans of fabricated items, prepared by ... · dimensions, material, and proposed fabrication ... Prestressed Girders Steel Girders Large Concrete Pipe ... not stuck](https://reader034.fdocuments.us/reader034/viewer/2022051601/5ad057447f8b9a8b1e8dcadc/html5/thumbnails/4.jpg)
Content
Plans shall include Material type including ASTM and spec. book
references Dimensions and sizes of fabricated items Weld details Paint system Erection details
![Page 5: Shop plans are the plans of fabricated items, prepared by ... · dimensions, material, and proposed fabrication ... Prestressed Girders Steel Girders Large Concrete Pipe ... not stuck](https://reader034.fdocuments.us/reader034/viewer/2022051601/5ad057447f8b9a8b1e8dcadc/html5/thumbnails/5.jpg)
Format
PDF Every page shall include State project number County Structure number Fabricator name and address
![Page 6: Shop plans are the plans of fabricated items, prepared by ... · dimensions, material, and proposed fabrication ... Prestressed Girders Steel Girders Large Concrete Pipe ... not stuck](https://reader034.fdocuments.us/reader034/viewer/2022051601/5ad057447f8b9a8b1e8dcadc/html5/thumbnails/6.jpg)
Submittal
Plans for state designed projects sent to BCE by E-mail Plans for consultant designed projects get E-
mailed to Consultant for review and final set goes to BCE for distribution and fabrication
![Page 7: Shop plans are the plans of fabricated items, prepared by ... · dimensions, material, and proposed fabrication ... Prestressed Girders Steel Girders Large Concrete Pipe ... not stuck](https://reader034.fdocuments.us/reader034/viewer/2022051601/5ad057447f8b9a8b1e8dcadc/html5/thumbnails/7.jpg)
![Page 8: Shop plans are the plans of fabricated items, prepared by ... · dimensions, material, and proposed fabrication ... Prestressed Girders Steel Girders Large Concrete Pipe ... not stuck](https://reader034.fdocuments.us/reader034/viewer/2022051601/5ad057447f8b9a8b1e8dcadc/html5/thumbnails/8.jpg)
![Page 9: Shop plans are the plans of fabricated items, prepared by ... · dimensions, material, and proposed fabrication ... Prestressed Girders Steel Girders Large Concrete Pipe ... not stuck](https://reader034.fdocuments.us/reader034/viewer/2022051601/5ad057447f8b9a8b1e8dcadc/html5/thumbnails/9.jpg)
Shop Plans Status
U:\br\construction\shopplans & Falsework Status\shop Plans Status.xls
This page now has a link to electronic copies of Shopplans
![Page 10: Shop plans are the plans of fabricated items, prepared by ... · dimensions, material, and proposed fabrication ... Prestressed Girders Steel Girders Large Concrete Pipe ... not stuck](https://reader034.fdocuments.us/reader034/viewer/2022051601/5ad057447f8b9a8b1e8dcadc/html5/thumbnails/10.jpg)
What should you do if you receive a prefabricated item on the job and the Project Engineer has not received approved shop drawings?
![Page 11: Shop plans are the plans of fabricated items, prepared by ... · dimensions, material, and proposed fabrication ... Prestressed Girders Steel Girders Large Concrete Pipe ... not stuck](https://reader034.fdocuments.us/reader034/viewer/2022051601/5ad057447f8b9a8b1e8dcadc/html5/thumbnails/11.jpg)
Conclusion
Shop Plans should be used on the job, not stuck in a project file somewhere. Shop Plans MUST be approved by the OBD prior to
fabrication and have this stamp.
![Page 12: Shop plans are the plans of fabricated items, prepared by ... · dimensions, material, and proposed fabrication ... Prestressed Girders Steel Girders Large Concrete Pipe ... not stuck](https://reader034.fdocuments.us/reader034/viewer/2022051601/5ad057447f8b9a8b1e8dcadc/html5/thumbnails/12.jpg)