Shooting schedule & risk assessment
-
Upload
laurendarvall -
Category
Documents
-
view
36 -
download
0
Transcript of Shooting schedule & risk assessment
Idea 1:What? High angle shot of my little sister dress as a modern pop artist When? January Where? Long Barn lane ParkIdea 2:What? Mason sawyer holding his guitar When? January Where? Outside Idea 3:What? High angle shot of a pile of colourful clothesWhen? JanuaryWhere? In my house Idea 4:What? Medium close up of my little sister in an edgy lookWhen? JanuaryWhere? Back gardenIdea 5:What? Close up of a fashion statement shoesWhen? JanuaryWhere? Town or Friends house Idea 6:What? Extreme close up of my little sisters eye make-upWhen? JanuaryWhere? In my houseIdea 7:What? Money just dropped on the floorWhen? January Where? In my houseIdea 8:What? Long shot of my little sister in her perfect party outfitWhen? January Where? Back garden
Idea 9:What? Medium shot of my little sister in a dance look When? January Where? Long Barn Lane Park Idea 10:What? Very long shot of my little sister in a field holding a flowerWhen? January Where? Outside Idea 11:What? Very long Shot of the field/grass When? January Where? Outside Idea 12:What? Glitter falling towards to ground When? January Where? Inside the play shed Idea 13: What? Close up of a flower When? January Where? Outside Idea 14:What? Extreme close up of leaves When? January Where? Outside Idea 15:What? Side angle of the yellow railing gateWhen? JanuaryWhere? At Long Barn Lane Park
Shooting schedule
Location Possible problems Risk assessment
Long barn lane recreation ground
-weather-little hills-other people in the park -finding sharp objects on the field.
-check area before doing photo shoot.-make sure park is more or less empty.-Have the photo shoot around the hills not on them-choose a day will good weather conditions.
My back garden -The pond-uneven ground -the different types of ground e.g. gravel, grass and mud.-lighting
-sensible shoes-away from any danger by the pond.-making sure that I take the photo’s at an earlier time to receive better lighting.
The Oracle -very busy during the day-lighting of shops
-allowing myself to do the photo’s early when it’s less busy.-making sure the place is well lit enough so my photo’s turn out how I would like them.
Play shed in my back garden -toys everywhere-lighting could be dull
-making sure that the play shed is tidy or set out in a way that no one is at risk of injury.-the windows may be covered which will restrict my light source for my photo’s.
Outside -lots of people around-weather -little ditches-lighting
-take photo’s at a less busy time.-make sure the weather conditions aren’t terrible e.g. Raining or snow.-keep an eye out in case of little ditches to avoid injury.-make sure trees don’t block out vital light for my pictures.