PFR for Proposed Multi Speciality Chemicals Manufacturing Plant at Plot No. 452, 453, 455/P, 456 & 457, EPC Canal Road, Village Karakhadi, Taluka Padra, District Vadodara, State Gujarat. November 2019
Kadam Environmental Consultants
w w w . kad am en v i r o . c o m
E n vi ro nm en t f o r D ev e l o pm en t
SHIVA PERFORMANCE SPECIALITY PRIVATE
LIMITED
PROPOSED MULTI SPECIALTY CHEMICALS MFG. PLANT AT VILLAGE KARAKHADI, PADRA,
VADODARA, GUJARAT QUALITY SHEET
KADAM ENVIRONMENTAL CONSULTANTS | NOVEMBER 2019 2
SHIVA PERFORMANCE SPECIALITY PRIVATE LIMITED.
PFR for Proposed Multi Speciality Chemicals
Manufacturing Plant at Plot No. 452, 453,455/P, 456
& 457, EPC Canal Road, Village Karakhadi, Taluka
Padra, Distict Vadodara, State Gujarat
© Kadam Environmental Consultants (‘Kadam’), November 2019
This report is released for the use of the Shiva Performance Speciality Private Limited., Regulators and
relevant stakeholders solely as part of the subject project’s Environmental Clearance process. Information
provided (unless attributed to referenced third parties) is otherwise copyrighted and shall not be used for
any other purpose without the written consent of Kadam.
PROJECT DETAILS
Name of Publication
PFR For Proposed Multi Speciality Chemicals Manufacturing Plant At Plot No. 452,
453,455/P, 456 & 457, EPC Canal Road, Village Karakhadi, Taluka Padra, District Vadodara,
State Gujarat
Project Number Report No. 1 Version 0 Released November, 2019
Prepared &
Managed By Arpana Patel Released By Jitixa Upadhyay
CONTACT DETAILS
Vadodara (Head Office)
Vadodara Office: Address: 871/B/3, GIDC Makarpura, Vadodara, India–390 010; T:+91-265-6131000; E:
Delhi / NCR Office: Address: Spaze IT Park, Unit No. 1124, 11th Floor, Tower B3, Sector 49, Near Omaxe City Centre
Mall, Sohna Road, Gurgaon, Haryana, INDIA – 122002; T:0124-4242430 to 436; E: [email protected]
DISCLAIMER
Kadam has taken all reasonable precautions in the preparation of this report as per its auditable quality plan,
believes that the facts presented in the report are accurate as on the date it was written and takes full responsibility
of what has been mentioned. However, we are human: it is impossible to dismiss absolutely, the possibility of
unintended errors or omissions. Kadam therefore specifically disclaims any liability resulting from third party use or
application of the information contained in this report for reasons other than for which this report has been prepared
and such third party users are encouraged to procure latest information prior to applying it. Any reader dis-satisfied
with report quality or facts presented in this report or having suggestions is encouraged to directly contact us at
+91-265-6131-000 or write to us at [email protected].
SHIVA PERFORMANCE SPECIALITY PRIVATE
LIMITED
PROPOSED MULTI SPECIALTY CHEMICALS
MFG. PLANT AT VILLAGE KARAKHADI, PADRA, VADODARA, GUJARAT CONTENTS
KADAM ENVIRONMENTAL CONSULTANTS | NOVEMBER 2019 3
CONTENTS
1 EXECUTIVE SUMMARY ................................................................................................ 7
1.1 INTRODUCTION .......................................................................................................... 7
1.2 PROPOSED PLANT FEATURES AND PRODUCTION CAPACITY ............................................................. 7
1.3 WATER .................................................................................................................. 7
1.4 EFFLUENT GENERATION, TREATMENT AND DISPOSAL ................................................................... 7
1.4.1 Details of Sewage Treatment Plant .......................................................................... 9
1.5 POWER REQUIREMENT .................................................................................................. 9
1.6 AIR EMISSIONS .......................................................................................................... 9
1.6.1 Flue Gas Stacks.................................................................................................. 9
1.6.2 Process Vents .................................................................................................... 9
1.7 SOLID/HAZARDOUS WASTE GENERATION AND DISPOSAL............................................................... 9
2 INTRODUCTION....................................................................................................... 10
2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT .............................................................. 10
2.1.1 Identification of Project Proponent .......................................................................... 10
2.1.2 Identification of Proposed Project ........................................................................... 10
2.2 BRIEF DESCRIPTION OF NATURE OF THE PROJECT ..................................................................... 10
2.3 NEED FOR THE PROJECT AND ITS IMPORTANCE TO REGION ............................................................ 11
2.4 DEMAND SUPPLY GAP .................................................................................................. 11
2.4.1 Global Market ................................................................................................... 11
2.4.2 Domestic Market ............................................................................................... 11
2.5 IMPORT VS. INDIGENOUS PRODUCTION ................................................................................ 11
2.6 EXPORT POSSIBILITY ................................................................................................... 11
2.7 EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO THE PROJECT. .......................................... 11
3 PROJECT DESCRIPTION ............................................................................................ 12
3.1 TYPE OF PROJECT INCLUDING INTERLINKED AND INTERDEPENDENT PROJECTS, IF ANY ................................ 12
3.2 LOCATION (MAP SHOWING GENERAL LOCATION, SPECIFIC LOCATION AND PROJECT BOUNDARY & PROJECT LAY OUT) WITH
COORDINATES .................................................................................................................. 12
3.3 DETAILS OF ALTERNATE SITES CONSIDERED AND THE BASIS OF SELECTING THE PROPOSED SITE, PARTICULARLY THE
ENVIRONMENTAL CONSIDERATIONS GONE INTO SHOULD BE HIGHLIGHTED ..................................................... 15
3.4 SIZE OR MAGNITUDE OF OPERATION................................................................................... 15
3.5 TECHNOLOGY AND PROCESS DESCRIPTION ............................................................................ 15
3.6 RAW MATERIAL REQUIRED ALONG WITH ESTIMATED QUANTITY, LIKELY SOURCE, MARKETING AREA OF FINAL PRODUCTS,
MODE OF TRANSPORT OF RAW MATERIAL AND FINISHED PRODUCT ............................................................. 15
3.6.1 Raw Materials Required ....................................................................................... 15
3.7 AVAILABILITY OF WATER ITS SOURCE, ENERGY/POWER REQUIREMENT AND SOURCE SHOULD BE GIVEN ............... 15
3.7.1 Water consumption and Waste Water Generation........................................................ 15
3.7.2 Fuel ............................................................................................................... 16
3.7.3 Power Requirement and Source ............................................................................. 16
3.8 QUANTITY OF WASTE TO BE GENERATED (LIQUID AND SOLID) AND SCHEME FOR THEIR MANAGEMENT /DISPOSAL .... 16
4 SITE ANALYSIS ........................................................................................................ 17
4.1 CONNECTIVITY ......................................................................................................... 17
SHIVA PERFORMANCE SPECIALITY PRIVATE
LIMITED
PROPOSED MULTI SPECIALTY CHEMICALS
MFG. PLANT AT VILLAGE KARAKHADI, PADRA, VADODARA, GUJARAT CONTENTS
KADAM ENVIRONMENTAL CONSULTANTS | NOVEMBER 2019 4
4.2 LAND FORM, LAND USE AND LAND OWNERSHIP ........................................................................ 17
4.3 TOPOGRAPHY (ALONG WITH MAP) ...................................................................................... 17
4.4 EXISTING LAND USE PATTERN (AGRICULTURE, NON-AGRICULTURE, FOREST, WATER BODIES (INCLUDING AREA UNDER
CRZ)), SHORTEST DISTANCES FROM THE PERIPHERY OF THE PROJECT TO PERIPHERY OF THE FORESTS, NATIONAL PARK, WILD
LIFE SANCTUARY, ETC SENSITIVE AREAS, WATER BODIES (DISTANCE FROM THE HFL OF THE RIVER), CRZ. IN CASE OF NOTIFIED
INDUSTRIAL AREA, A COPY OF THE GAZETTE NOTIFICATION SHOULD BE GIVEN. ............................................... 17
4.5 EXISTING INFRASTRUCTURE ............................................................................................ 17
4.6 SOIL CLASSIFICATION .................................................................................................. 17
4.7 CLIMATIC DATA FROM SECONDARY SOURCES ........................................................................... 17
4.7.1 Temperature .................................................................................................... 18
4.7.2 Wind.............................................................................................................. 18
4.7.3 Rainfall ........................................................................................................... 18
4.7.4 Cloud Cover ..................................................................................................... 18
4.7.5 Humidity ......................................................................................................... 18
4.8 SOCIAL INFRASTRUCTURE AVAILABLE ................................................................................... 18
5 PLANNING BRIEF ..................................................................................................... 19
5.1 PLANNING CONCEPT (TYPE OF INDUSTRIES, FACILITIES, TRANSPORTATION ETC.) TOWN AND COUNTRY PLANNING/
DEVELOPMENT AUTHORITY CLASSIFICATION ................................................................................... 19
5.2 POPULATION PROJECTION .............................................................................................. 19
5.3 LAND USE PLANNING (BREAKUP ALONG WITH GREENBELT ETC.) ....................................................... 19
5.4 ASSESSMENT OF INFRASTRUCTURE DEMAND (PHYSICAL AND SOCIAL) ................................................ 19
5.5 AMENITIES/FACILITIES ................................................................................................. 19
5.5.1 Greenbelt Development ....................................................................................... 19
5.5.2 Fire-fighting system ........................................................................................... 20
5.5.3 Storm water management plan .............................................................................. 20
5.5.4 Rainwater harvesting system ................................................................................ 20
6 PROPOSED INFRASTRUCTURE ................................................................................... 21
6.1 INDUSTRIAL AREA (PROCESSING AREA) ................................................................................ 21
6.2 RESIDENTIAL AREA (NON-PROCESSING AREA) ......................................................................... 21
6.3 GREEN BELT ............................................................................................................ 21
6.4 SOCIAL INFRASTRUCTURE .............................................................................................. 21
6.5 CONNECTIVITY (TRAFFIC AND TRANSPORTATION ROAD/ RAIL/METRO/WATER WAYS ETC.) ............................ 21
6.5.1 By Road .......................................................................................................... 21
6.5.2 By Rail ........................................................................................................... 21
6.5.3 By Air............................................................................................................. 21
6.6 DRINKING WATER MANAGEMENT (SOURCE & SUPPLY OF WATER) ...................................................... 22
6.7 SEWAGE SYSTEM ....................................................................................................... 22
6.8 INDUSTRIAL WASTE MANAGEMENT ..................................................................................... 22
6.9 SOLID WASTE MANAGEMENT............................................................................................ 22
6.10 POWER REQUIREMENT & SUPPLY/ SOURCE .......................................................................... 22
7 REHABILITATION AND RESETTLEMENTS (R& R) PLAN .................................................. 23
7.1 POLICY TO BE ADOPTED (CENTRAL/STATE) IN RESPECT OF THE PROJECT AFFECTED PERSONS INCLUDING HOME OUSTEES,
LAND OUSTEES AND LANDLESS LABOURERS (A BRIEF OUTLINE TO BE GIVEN)................................................... 23
8 PROJECT SCHEDULE AND COST ESTIMATE................................................................... 24
SHIVA PERFORMANCE SPECIALITY PRIVATE
LIMITED
PROPOSED MULTI SPECIALTY CHEMICALS
MFG. PLANT AT VILLAGE KARAKHADI, PADRA, VADODARA, GUJARAT CONTENTS
KADAM ENVIRONMENTAL CONSULTANTS | NOVEMBER 2019 5
8.1 LIKELY DATE OF START OF CONSTRUCTION AND LIKELY DATA OF COMPLETION (TIME SCHEDULE FOR THE PROJECT TO BE
GIVEN) 24
8.2 ESTIMATED PROJECT COST ALONG WITH ANALYSIS IN TERMS OF ECONOMIC VIABILITY OF THE PROJECT. ............. 24
8.2.1 Fixed Capital .................................................................................................... 24
8.2.2 Working Capital ................................................................................................ 24
8.2.3 Revenues ........................................................................................................ 24
8.2.4 Breakeven Point ................................................................................................ 24
8.2.5 Profitability ...................................................................................................... 24
9 ANALYSIS OF PROPOSAL .......................................................................................... 25
9.1 FINANCIAL AND SOCIAL BENEFITS WITH SPECIAL EMPHASIS ON THE BENEFIT TO THE LOCAL PEOPLE INCLUDING TRIBAL
POPULATION, IF ANY, IN THE AREA. ............................................................................................ 25
SHIVA PERFORMANCE SPECIALITY PRIVATE
LIMITED
PROPOSED MULTI SPECIALTY CHEMICALS
MFG. PLANT AT VILLAGE KARAKHADI, PADRA, VADODARA, GUJARAT CONTENTS
KADAM ENVIRONMENTAL CONSULTANTS | NOVEMBER 2019 6
List of Tables Table 1-1: Production Details.............................................................................................................................7
Table 2-1: Production Details........................................................................................................................... 10
Table 3-1: Water Consumption ........................................................................................................................ 15
Table 3-2: Wastewater Generation ................................................................................................................... 15
Table 3-3: Fuel consumption ........................................................................................................................... 16
Table 3-4: Hazardous Waste Generation and disposal Details ............................................................................. 16
Table 4-1: Distance of Project site from Water Bodies ....................................................................................... 17
Table 4-3: Predominant Wind Direction ............................................................................................................ 18
Table 5-1: Proposed land use at project site ..................................................................................................... 19
List of Figures Figure 1-1: ETP Process Block Diagram ..............................................................................................................8
Figure 3-1: Site Location Map .......................................................................................................................... 13
Figure 3-2: The project site boundary Map with coordinates .............................................................................. 14
SHIVA PERFORMANCE SPECIALITY PRIVATE
LIMITED
PROPOSED MULTI SPECIALTY CHEMICALS
MFG. PLANT AT VILLAGE KARAKHADI, PADRA, VADODARA, GUJARAT EXECUTIVE SUMMARY
KADAM ENVIRONMENTAL CONSULTANTS | NOVEMBER 2019 7
1 EXECUTIVE SUMMARY
1.1 Introduction
Shiva's product portfolio of resins, solutions and acrylic emulsions is one of the broadest in the industry and can
deliver a "total package" that is more sustainable, cost-efficient and meet customer preferences around the world.
We design resin systems with tomorrow's environmental requirements in mind, by an awareness of the need for
continuity, and by a strong sense of responsibility. We have an outstanding sustainability record in polymers that
we continue to improve each day.
At Shiva we create products with better technology that helps the printing and packaging industries and meet
specific needs for ecologically friendly solutions without sacrificing functionality and performance.
1.2 Proposed Plant Features and Production Capacity
The proposed project is new project to set up multipurpose - multi specialties chemicals plant to full fill global
requirements of packing industries and supply export qualities products into domestic market also at Plot No. 452,
453,455/P, 456 & 457, Village Karakhadi, Padra, District Vadodara, State Gujarat. The estimated cost of the
proposed project is ~ INR 75 Crores. The Total Production capacity is given in following table.
Table 1-1: Production Details
S. No. Name of Products Production capacity, MT/Annum
1 Styrene Acrylate Co-Polymers Solids (Resins) & Styrene maleic anhydride
solid/derivatives & Styrene AA Terpolymer 50,000
2 Styrene Acrylate Co-Polymers liquid /Emulsions / solutions / PU
Emulsions (Resins) 45,000
3 Ethylene acrylic / acrylate co-polymer 15,000
4 PHOTO INITIATORS (Diphenyl(2,4,6-trimethylbenzoyl) phosphine oxide) 1000
5 UV Monomer(ester of diol and acrylates) 10,000
6 CAB (Cellulose Acetate Butyrate ) 3000
7 Isothiazolinones 10,000
8 Polyester Resin(ester of poly ethylene and aromatic acid) 10,000
9 Alkyl Ketene Diamer (AKD) 20,000
Total 1,64,000
1.3 Water
Total water requirement for the proposed project is 400.2 KLD which will be sourced from Borewell.
1.4 Effluent Generation, Treatment and Disposal
Total Wastewater generation due to the proposed project is 376.4 KLD out of which 10 kld domestic sewage will be
treated in STP and treated sewage will be sued for gardening & 366.4 kld industrial wastewater will be treated in ETP
and treated effluent will be send to EICL for further treatment and final disposal.
SHIVA PERFORMANCE SPECIALITY PRIVATE
LIMITED
PROPOSED MULTI SPECIALTY CHEMICALS
MFG. PLANT AT VILLAGE KARAKHADI, PADRA, VADODARA, GUJARAT EXECUTIVE SUMMARY
KADAM ENVIRONMENTAL CONSULTANTS | NOVEMBER 2019 8
1.4.1 Details of Effluent Treatment Plant
Combined effluent from process, washing and utilities from plant by gravity to be taken in inlet storage tank. Then it
will pass through Oil and grease trap to remove oil and grease. Then it will collect into equalization cum neutralization
tank where hydrated lime will add to increase PH to 10.5, then add alum to reduce PH to 8.5 and polyelectrolyte will
add to it.
Then treated water to be transferred to Primary settling tank to maximum removal of activated sludge from bottom.
Overflow from primary settling tank goes to 1st stage aeration tank. Settled sludge with water to be collected in
Intermediate holding tank.
Overflow from 1st stage aeration tank is transferred to secondary setting tank to remove remaining activated sludge
from this stage. clearer water to be overflowed and goes to Secondary aeration to for effluent polishing and
ascertaining optimized Biodegradation. Settled sludge with water further to be collected in intermediated holding
tank.
Clear water further transfers to final settle tank to get complete removal of activated sludge from water. Whatever
settled sludge with water further to be collected in intermediated holding tank.
Clear water from final settling tank to be collected in intermediate storage tank. Now these waters are further taken
for PSF & ACF Filtration. Filtered Effluent will be stored in final tank till it is analyzed for COD, TDS & PH. Final Treated
effluent to be send to EICL for final disposal.
Figure 1-1: ETP Process Block Diagram
Total Design Flow - 375 KL/DayInlet parameter COD 10000 - 15000BOD 3100-5000TDS 10000 – 15000PH 4.5 to 6.5
Combined
effluent from
process, washing
and utilities from
plant by gravity
INLET
STORAGE
SUMP
Oil and
grease
trap
EqualizationCum neutralization Tank
Primary Settling Tank
1st Stage Aeration Tank
Secondary Settling Tank
Lime alum Polyelectrolyte
INTERMEDIATE HOLDING TANK
MECHANICAL DEWATERING Raw Water for Backwash
2nd Stage Aeration Tank
Final Settling Tank
Intermediate holding tank
Pressure Sand Fil ter
Activated Carbon Filter
Final Collection Tank
Send to EICL
SHIVA PERFORMANCE SPECIALITY PRIVATE
LIMITED
PROPOSED MULTI SPECIALTY CHEMICALS
MFG. PLANT AT VILLAGE KARAKHADI, PADRA, VADODARA, GUJARAT EXECUTIVE SUMMARY
KADAM ENVIRONMENTAL CONSULTANTS | NOVEMBER 2019 9
1.4.1 Details of Sewage Treatment Plant
Sewage water to be collected in inlet tank. Then it will pass through bar screen chamber and strainer. Will inject to Modular Sewage Treatment Plant based on trans Bio-Filter Technology for treatment.
Treated water is collected in final storage tank after disinfected and will use further to agriculture purpose.
1.5 Power Requirement
Total estimated power requirement is around 2000 KW & will be sourced from Madhya Gujarat Vij Company Limited
(MGVCL).
Standby Emergency DG Sets:
There will be one DG set of 800 KVA. DG set will be operated only during power failure.
1.6 Air Emissions
1.6.1 Flue Gas Stacks
There will be 3 nos. of flue gas stacks, 1 attached to boilers, 1 attached to thermic fluid heater and 1 attached to DG
Set.
1.6.2 Process Vents
There will be 16 nos. of process vents attached to following,
10 attached to blow down reactor
2 attached to outlet of the dryers and mils
1 attached to SO2 Scrubber
2 attached to HCl Scrubber
1 attached to propene nitrile storage tank vent to scrubber
1.7 Solid/Hazardous Waste Generation and Disposal
Both Municipal Solid Wastes (MSW) and Hazardous Wastes gets generated at the proposed facility. No residential
facility is planned within the project site and consequently MSW will be mainly from offices and canteens.
Hazardous wastes like Used Oil, Contaminated discarded container/bags, Chemical sludge from Waste water
treatment, Wastes or residues generated during the production. These will be managed as per the Hazardous Wastes
(Management, Transport and Trans boundary) Rules 2016 as amended till date and will be disposed off as detailed
in Table 3-4.
SHIVA PERFORMANCE SPECIALITY PRIVATE
LIMITED
PROPOSED MULTI SPECIALTY CHEMICALS
MFG. PLANT AT VILLAGE KARAKHADI, PADRA, VADODARA, GUJARAT INTRODUCTION
KADAM ENVIRONMENTAL CONSULTANTS | NOVEMBER 2019 10
2 INTRODUCTION
2.1 Identification of Project and Project Proponent
2.1.1 Identification of Project Proponent
Shiva's product portfolio of resins, solutions and acrylic emulsions is one of the broadest in the industry and can
deliver a "total package" that is more sustainable, cost-efficient and meet customer preferences around the world.
We design resin systems with tomorrow's environmental requirements in mind, by an awareness of the need for
continuity, and by a strong sense of responsibility. We have an outstanding sustainability record in polymers that
we continue to improve each day.
Shiva Performance Speciality Private Limited is a part of Shiva Pharmachem Limited. Shiva Pharmachem Limited,
which is involved in chlorination chemistry and is manufacturing intermediates for the pharmaceutical, agrochemical
and polymer industry.
At Shiva we create products with better technology that helps the printing and packaging industries and meet specific
needs for ecologically friendly solutions without sacrificing functionality and performance.
2.1.2 Identification of Proposed Project
The proposed project is new project to set up multipurpose - multi specialities chemicals plant to full fill global
requirements of packing industries and supply export qualities products into domestic market also at Plot No. 452,
453,455/P, 456 & 457, Village Karakhadi, Padra, District Vadodara, State Gujarat. The estimated cost of the
proposed project is ~ INR 75 Crores. The Total Production capacity is given in Table 2-1.
Table 2-1: Production Details
S. No. Name of Products Production capacity,
MT/Annum
1 Styrene Acrylate Co-Polymers Solids (Resins) & Styrene maleic anhydride
solid/derivatives & Styrene AA Terpolymer 50,000
2 Styrene Acrylate Co-Polymers liquid /Emulsions / solutions / PU Emulsions
(Resins) 45,000
3 Ethylene acrylic / acrylate co-polymer 15,000
4 PHOTO INITIATORS (Diphenyl(2,4,6-trimethylbenzoyl) phosphine oxide) 1000
5 UV Monomer(ester of diol and acrylates) 10,000
6 CAB (CELLULOSE ACETATE BUTYRATE ) 3000
7 Isothiazolinones 10,000
8 Polyester Resin(ester of poly ethylene and aromatic acid) 10,000
9 Alkyl Ketene Diamer (AKD) 20,000
10 Total 1,64,000
2.2 Brief Description of nature of the Project
Shiva Performance Limited has been manufacturing a wide range of resins, solutions and acrylic emulsions. The
proposed project is new project to set up multipurpose - multi specialities chemicals plant to full fill global
requirements of packing industries and supply export qualities products into domestic market also at at Plot No. 452,
453,455/P, 456 & 457, Village Karakhadi, Padra, Vadodara, Gujarat. Plot area of the project site is 26133 m2.
The total capacity will be 1,64,000 MT/Annum. The estimated cost of the entire project is Rs. 75 crores.
SHIVA PERFORMANCE SPECIALITY PRIVATE
LIMITED
PROPOSED MULTI SPECIALTY CHEMICALS
MFG. PLANT AT VILLAGE KARAKHADI, PADRA, VADODARA, GUJARAT INTRODUCTION
KADAM ENVIRONMENTAL CONSULTANTS | NOVEMBER 2019 11
2.3 Need for the project and its importance to region
May be unique project in this region to export supply specialities chemicals to global level as well as local market in
india.
2.4 Demand Supply Gap
Huge demand of such specialties chemical in packing industries.
2.4.1 Global Market
70 % Global Market for such specialities chemicals.
2.4.2 Domestic Market
30% Domestic Market for such specialities chemicals.
2.5 Import vs. Indigenous Production
30% domestic and 70% export.
2.6 Export Possibility
30% domestic and 70% export.
2.7 Employment Generation (Direct and Indirect) due to the project.
It is anticipated that about 300 – 400 persons will be employed at the site for the purpose of construction activities
and 300 (100 direct & 200 indirect) persons will be engaged once operations commence.
SHIVA PERFORMANCE SPECIALITY PRIVATE
LIMITED
PROPOSED MULTI SPECIALTY CHEMICALS
MFG. PLANT AT VILLAGE KARAKHADI, PADRA, VADODARA, GUJARAT PROJECT DESCRIPTION
KADAM ENVIRONMENTAL CONSULTANTS | NOVEMBER 2019 12
3 PROJECT DESCRIPTION
3.1 Type of Project including interlinked and interdependent projects, if any
The proposed project is new project to set up multipurpose - multi specialities chemicals plant to full fill global
requirements of packing industries and supply export qualities products into domestic market also at Plot No. 452,
453,455/P, 456 & 457, Village Karakhadi, Padra, Vadodara, Gujarat. Plant will have total Production Capacity of
1,64,000 MTPA. There is no interlinked and interdependent project.
3.2 Location (map showing general location, specific location and project boundary & project lay
out) with coordinates
Location:
Plot No: 452, 453,455/P, 456 & 457,
Village: Karakhadi,
State: Gujarat
District: vadodara
Tehsil / Taluk / Mandal: Padra
Project site location map is shown as Figure 3-1. The project site boundary with coordinates is shown in Error!
Reference source not found..
SHIVA PERFORMANCE SPECIALITY PRIVATE LIMITED PROPOSED MULTI SPECIALTY CHEMICALS MFG. PLANT AT VILLAGE
KARAKHADI, PADRA, VADODARA, GUJARAT PROJECT DESCRIPTION
KADAM ENVIRONMENTAL CONSULTANTS | NOVEMBER 2019 13
Figure 3-1: Site Location Map
SHIVA PERFORMANCE SPECIALITY PRIVATE LIMITED PROPOSED MULTI SPECIALTY CHEMICALS MFG. PLANT AT VILLAGE
KARAKHADI, PADRA, VADODARA, GUJARAT PROJECT DESCRIPTION
KADAM ENVIRONMENTAL CONSULTANTS | NOVEMBER 2019 14
Figure 3-2: The project site boundary Map with coordinates
SHIVA PERFORMANCE SPECIALITY PRIVATE
LIMITED
PROPOSED MULTI SPECIALTY CHEMICALS
MFG. PLANT AT VILLAGE KARAKHADI, PADRA, VADODARA, GUJARAT PROJECT DESCRIPTION
KADAM ENVIRONMENTAL CONSULTANTS | NOVEMBER 2019 15
3.3 Details of alternate sites considered and the basis of selecting the proposed site, particularly
the environmental considerations gone into should be highlighted
Not applicable
3.4 Size or Magnitude of Operation
Product details and production capacities are given in Table 2-1 .
3.5 Technology and Process Description
Technology and Manufacturing Process description is given in Form 1 with TOR, Annexure 6.
3.6 Raw material required along with estimated quantity, likely source, marketing area of
final products, mode of transport of raw material and finished product
3.6.1 Raw Materials Required
The consumption figures and mode of storage for the major raw materials are given in Annexure 7 of additional
document of Form-1.
3.7 Availability of water its source, energy/power requirement and source should be given
3.7.1 Water consumption and Waste Water Generation
Water supply: Borewell
Table 3-1: Water Consumption
S. No. Area of Consumption Fresh Water Quantity, KLD Source of Water
1 Domestic 10
Borewell water
2 Gardening 20
3 Processing (Raw water) 290.2
4 Washing (Reactor and Floor) 20
5 D M Water 30
6 Boiler 25 DM water
7 Cooling Tower 30 Borewell water
Total 400.2
Table 3-2: Wastewater Generation
S. No. Area of Generation Wastewater generation in KLD Remark
1 Domestic 10 To STP for treatment and treated water
will be used for gardening
2 Processing 328.4
To ETP for treatment and treated effluent
will be sent to EICL for further treatment
and final disposal
3 Washing (Reactor and Floor) 20
4 D M Water 5
5 Boiler 8
6 Cooling Tower 5
Total Industrial 366.4
Total 376.4
SHIVA PERFORMANCE SPECIALITY PRIVATE
LIMITED
PROPOSED MULTI SPECIALTY CHEMICALS
MFG. PLANT AT VILLAGE KARAKHADI, PADRA, VADODARA, GUJARAT PROJECT DESCRIPTION
KADAM ENVIRONMENTAL CONSULTANTS | NOVEMBER 2019 16
3.7.2 Fuel
The fuel consumption data is given in Table 3-3.
Table 3-3: Fuel consumption
S.
No. Stack Attached to Capacity
No. of
working hrs
Type of Fuel
used Fuel consumption
1 Boiler 3 TPH 24 Briquette 20.0 MT/DAY
3 Thermic Fluid Heater 5 lakh Kcal/Hr 24 Briquette 20.0 MT/DAY
2 DG set 800 kVA - Diesel 180 LTR/DAY
Note: DG Sets will be used only during Power failure.
3.7.3 Power Requirement and Source
Total estimated power requirement is around 2000 KW & will be sourced from Madhya Gujarat Vij Company Limited
(MGVCL).
Standby Emergency DG Sets:
There will be one DG set of 800 KVA. DG set will be operated only during power failure.
3.8 Quantity of waste to be generated (liquid and solid) and scheme for their management
/disposal
Table 3-4: Hazardous Waste Generation and disposal Details
S.
No. Type of Waste
Hazardous
Waste
Category
Quantity per
Year MT Source
Method of
Collection
Treatment /
Disposal
1 Used Oil 5.1 5 KL equipment & hot oil
system Drum sent to recycler
2
Contaminated
discarded
container/bags
33.3 12000 Nos plant internal usage Stored sent to recycler
3 Chemical sludge from
Waste water treatment 34.3 240 MT from process plant HDPE Bag
sent to TSDF for
landfilling
4 Wastes or residues 23.1 3600 MT from process plant HPDE Bag sent for TSDF
Incinerator
SHIVA PERFORMANCE SPECIALITY PRIVATE
LIMITED
PROPOSED MULTI SPECIALTY CHEMICALS
MFG. PLANT AT VILLAGE KARAKHADI, PADRA, VADODARA, GUJARAT SITE ANALYSIS
KADAM ENVIRONMENTAL CONSULTANTS | NOVEMBER 2019 17
4 SITE ANALYSIS
4.1 Connectivity
The study area is well connected by roads to Padra.
One nearest Railway stations are available from the site. Vadodara (30.40 Kms away).
4.2 Land Form, Land Use and Land ownership
The total plot area of the proposed unit will be 26133 m2. The landuse of the project site is industrial.
4.3 Topography (along with map)
The Vadodara district can be divided in two main geomorphic units – the eastern hilly, medium to high relief terrain
and the western plain area. The eastern portion of the district comprises the ChhotaUdepur, Jambugam and
Nasvaditalukas. The hilly areas have two types of topography. In the north there are irregular hills and ridges with
intervening valleys forming a high relief whereas in the south the low flat topped hills of Deccan Traps along with
rolling mounds give rise to a medium relief. The western plain has got a flat, low lying surface and a thick pile of
alluvium. The Narmada and the Mahi are the major rivers of the district. Besides these two rivers, the Jambuva, the
Surya, the Vishwamitri and the Dhadhar flow through the district and end into the Gulf of Cambay (Khambhat).
4.4 Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including area
under CRZ)), shortest distances from the periphery of the project to periphery of the forests,
national park, wild life sanctuary, etc sensitive areas, water bodies (distance from the HFL of
the river), CRZ. In case of notified industrial area, a copy of the Gazette notification should be
given.
Land use pattern: Industrial
No Forest land is involved in the subject Project
No clearance under Forest, CRZ and agriculture and Non- agriculture and water bodies are required.
Table 4-1: Distance of Project site from Water Bodies
Water body Distance in km Direction
Dhadhar River 13.72 SE
Mahi River 4.44 NW
Narmada Minor Canal 0.25 N
Narmada Canal 3.82 ESE
4.5 Existing Infrastructure
Well-developed infrastructure is available at site and around the site.
4.6 Soil classification
Not done
4.7 Climatic data from secondary sources
The general agro-climatic zone of the study area is Semi-Arid.
SHIVA PERFORMANCE SPECIALITY PRIVATE
LIMITED
PROPOSED MULTI SPECIALTY CHEMICALS
MFG. PLANT AT VILLAGE KARAKHADI, PADRA, VADODARA, GUJARAT SITE ANALYSIS
KADAM ENVIRONMENTAL CONSULTANTS | NOVEMBER 2019 18
Information presented in subsequent paragraphs is from the Indian Meteorological Department (IMD), Long Term
Climatological Tables, 1961-1990, Vadodara. These tables give useful information about a region’s weather, since
they are collected over a 30-year period.
4.7.1 Temperature
Summer season comprises March, April and May months. Mean daily maximum temperature during season
remainbetween 36.9 to 40.7 °C, while mean daily minimum temperature remain between 19.0 to 26.7 °C. May is the
hottest month of the season with Maximum temperature 44.1°C. Temperature remains normal during monsoon and
post monsoon. It ranges Mean maximum between 31.6 to 37.4 °C and Mean minimum temperature between 17.5 to
27.3 °C. Winter season comprises December, January and February months. January is generally the coldest month,
with minimum temperature recorded 8.6 °C. During the season mean maximum temperature remains between 31.2
to 32.7 °C and Mean minimum temperatures remain between 12.7 to 14.6 °C.
4.7.2 Wind
Table 4-2: Predominant Wind Direction
Predominant First Second Third
Month Morning Evening Morning Evening Morning Evening
January NE NW CALM NE N CALM
February CALM NW NE NE N W
March CALM NW SW SW NE W
April SW NW CALM SW/W NW CALM
May SW SW W W S NW
June SW SW W W S S
July SW SW S S/W W/CALM CALM
August SW SW W W S/CALM S
September SW SW CALM W W NW
October CALM CALM NE NW SW NE
November CALM CLAM NE NE N NW
December NE NE CALM N/NW/CALM N W
4.7.3 Rainfall
The total rainfall in year is observed to be 841.8 mm. Distribution of rainfall by season is 6.1 mm in winter (December,
January, February), 8.8 mm in summer (March, April, May), 783.1 mm in monsoons (June, July, August, September)
and 43.8 mm in post-monsoons (October - November).
4.7.4 Cloud Cover
The area remains cloudy between the months of July – August, which is the active period of the monsoon season.
Generally cloud cover ranges from 4-8 Oktas during the monsoon season. During the post-monsoon season the low
and medium cloud cover is predominantly zero Oktas.
4.7.5 Humidity
Most humid conditions are found in the monsoons, followed by post-monsoons, winter and summer in that order.
Mornings are more humid than evenings and humidity ranges from a high of 75-89% in monsoon mornings to a low
of 20-28% in summer evenings. During post-monsoon season, in morning humidity remains between 64-71% and in
the evening it remains between 38-40%.
4.8 Social infrastructure available
Not applicable
SHIVA PERFORMANCE SPECIALITY PRIVATE
LIMITED
PROPOSED MULTI SPECIALTY CHEMICALS
MFG. PLANT AT VILLAGE KARAKHADI, PADRA, VADODARA, GUJARAT PLANNING BRIEF
KADAM ENVIRONMENTAL CONSULTANTS | NOVEMBER 2019 19
5 PLANNING BRIEF
5.1 Planning Concept (type of industries, facilities, transportation etc.) Town and Country
Planning/ Development authority Classification
The tentative chart for the plant commissioning is as follows:
Activity Planned Completion Date
Pre Study December 2019
Basic engineering June 2020
Detail engineering & Procurement with Mechanical Completion September 2020
Testing/commission and commercial production March 2021
5.2 Population Projection
It is anticipated that about 300 – 400 persons will be employed at the site for the purpose of construction activities
and 300 (100 direct & 200 indirect) persons will be engaged once operations commence.
5.3 Land Use Planning (breakup along with greenbelt etc.)
The proposed Landuse at project site will be as given in Table 5-1.
Table 5-1: Proposed land use at project site
S. No. Title Area, m2 % of total Area
1 ETP 1117 4.27
2 Warehouse 2010 7.69
3 Plant Area 1544 5.91
4 Raw Material Storage Area 773 2.96
5 Utility Area 872 3.34
6 EO Storage 564 2.16
7 Security Cabin 55 0.21
8 (1B) Greenbelt Area 11522 44.1
9 (1C) Roads 5296 20.3
10 OPEN AREA (Future Expansion) 2380 9.11
Total 26133 100
5.4 Assessment of Infrastructure Demand (Physical and Social)
Temporary site office and stores will be provided during construction phase. Specified first-aid box with all necessary
facilities will be maintained at site office. Medical facilities, primary health centers are available in nearby villages for
advance medical facilities. Communication services like post office, telephone, mobiles are available in nearby villages.
5.5 Amenities/Facilities
5.5.1 Greenbelt Development
Adequate land will be available for open spaces and other non-building purposes. Approx. 44.1 % (11522 m2) area
of total plot area will be reserved for green cover / lawn development in the proposed facility.
SHIVA PERFORMANCE SPECIALITY PRIVATE
LIMITED
PROPOSED MULTI SPECIALTY CHEMICALS
MFG. PLANT AT VILLAGE KARAKHADI, PADRA, VADODARA, GUJARAT PLANNING BRIEF
KADAM ENVIRONMENTAL CONSULTANTS | NOVEMBER 2019 20
5.5.2 Fire-fighting system
Fire protection system will be designed considering the requirements at the site & vendor recommendations. Fire-
fighting system will among other things consist of:
1. Fire Hydrant Hose System.
External Yard Hydrant System.
Fire Escape Hydrant with Hose reel system wherever the building has more than one floor.
2. Automatic Sprinkler System for RM Ware House (Solids), FG Storage & Admin Block.
3. Automatic Water Spray System
4. Portable fire extinguishers for Entire Plant.
5. Pumping system for Fire Fighting as per Indian Standard.
6. Static Water Storage tank capacity as per Indian Standard.
Foam is also considered at high hazard areas, unloading & storage
5.5.3 Storm water management plan
Storm water drains will be provided and Storm water from the entire plot will be collected through network of storm
drains. Most of storm water from plot area will be collected in the rainwater harvesting structures/recharge wells
provided for better utilization of available rainwater. The excess storm water will be discharged through the storm
water drainage facility provided in the industrial complex.
5.5.4 Rainwater harvesting system
The rain water harvesting system design will be based on the plot area & statutory requirements. Rainwater from the
roofs will be discharged directly into catch basins to avoid the flooding into the surrounding areas. From the catch
basins the rain water flows through underground pipes to recharging pits for harvesting. The over flow from recharge
pits shall be connected to storm water drain. The rainwater harvesting arrangement helps in replenishing the
underground water column.
SHIVA PERFORMANCE SPECIALITY PRIVATE
LIMITED
PROPOSED MULTI SPECIALTY CHEMICALS
MFG. PLANT AT VILLAGE KARAKHADI, PADRA, VADODARA, GUJARAT PROPOSED INFRASTRUCTURE
KADAM ENVIRONMENTAL CONSULTANTS | NOVEMBER 2019 21
6 PROPOSED INFRASTRUCTURE
6.1 Industrial Area (processing area)
Total Plot area is 26133 m2. Out of it, approx. 1544 m2 will be processing area.
6.2 Residential Area (non-processing area)
No residential facilities will be proposed.
6.3 Green belt
44.1 % of total plot area will be developed as greenbelt with three layers of tree in the periphery of the proposed
Plant.
6.4 Social Infrastructure
The impacts by Shiva performance will be assessed and an appropriate plan of Corporate Social Responsibility (CSR)
activity will be planned. Some activities which were noted and will contribute in the social activities of nearby villages
are as follows:
a) Repair and expansion of school building
b) Providing study material to school children
c) Repair of roads
d) Tree plantation
e) Free medical camp
f) Free eye check-up camp
g) Funds for social and cultural programs in village
h) Women empowerment
6.5 Connectivity (Traffic and transportation road/ rail/metro/water ways etc.)
6.5.1 By Road
The Effluent Channel Project (ECP) inspection road leads to the site. It is connected to state highway No 5 that
is about 0.26 km towards NNW direction from proposed site.
A small District road from Mahuvad to Mujpur connects this state highway no. 5 with the Vadodara -Jambusar
State Highway No. 6 that is about 1.80 km towards ENE direction from proposed site.
6.5.2 By Rail
Vadodara is a nearest railway station on this route that is about 30.40 km towards ENE direction from proposed
site.
6.5.3 By Air
Vadodara Domestic Airport is about 34.67 km towards ENE direction from proposed site. Daily multiple flights
for Mumbai & Delhi are available from here.
Sardar Vallabhbhai Patel International Airport (domestic & International, Ahmedabad is about 101.43 km
towards NNW direction from project site.
SHIVA PERFORMANCE SPECIALITY PRIVATE
LIMITED
PROPOSED MULTI SPECIALTY CHEMICALS
MFG. PLANT AT VILLAGE KARAKHADI, PADRA, VADODARA, GUJARAT PROPOSED INFRASTRUCTURE
KADAM ENVIRONMENTAL CONSULTANTS | NOVEMBER 2019 22
6.6 Drinking water management (source & supply of water)
Drinking water will be sourced from Borewell.
6.7 Sewage system
Domestic wastewater will be disposed in soak pit.
6.8 Industrial waste management
Industrial Waste water will be treated in ETP and treated water will be send to EICL for final disposal.
6.9 Solid waste management
The solid wastes generated from the plant operations will be disposed off in nearby Waste Management landfill
facility.
6.10 Power requirement & supply/ source
Total estimated power requirement is around 2000 KW & will be sourced from Madhya Gujarat Vij Company Limited
(MGVCL)
Standby Emergency DG Sets:
There will be one DG set of 800 KVA. DG set will be operated only during power failure..
SHIVA PERFORMANCE SPECIALITY PRIVATE
LIMITED
PROPOSED MULTI SPECIALTY CHEMICALS
MFG. PLANT AT VILLAGE KARAKHADI, PADRA, VADODARA, GUJARAT R&R PLAN
KADAM ENVIRONMENTAL CONSULTANTS | NOVEMBER 2019 23
7 REHABILITATION AND RESETTLEMENTS (R& R) PLAN
7.1 Policy to be adopted (central/state) in respect of the project affected persons including home
oustees, land oustees and landless labourers (a brief outline to be given)
Not applicable as rehabilitation and resettlement will not be required, since the project lies in an Industrial Area.
SHIVA PERFORMANCE SPECIALITY PRIVATE
LIMITED
PROPOSED MULTI SPECIALTY CHEMICALS
MFG. PLANT AT VILLAGE KARAKHADI, PADRA, VADODARA, GUJARAT PROJECT SCHEDULE AND COST ESTIMATE
KADAM ENVIRONMENTAL CONSULTANTS | NOVEMBER 2019 24
8 PROJECT SCHEDULE AND COST ESTIMATE
8.1 Likely date of start of construction and likely data of completion (time schedule for the project
to be given)
The construction work for the plant would start subsequent to receipt of Environmental Clearance (E.C) and Consent
to Establish (CTE) from State Pollution Control Board. Tentatively, construction work is expected to start in September
2020 and commissioning of the project is expected in March 2021.
8.2 Estimated project cost along with analysis in terms of economic viability of the project.
8.2.1 Fixed Capital
INR 75 Cr.
8.2.2 Working Capital
INR 25 Cr.
8.2.3 Revenues
INR 250 Cr in next five years.
8.2.4 Breakeven Point
50%
8.2.5 Profitability
20%
SHIVA PERFORMANCE SPECIALITY PRIVATE
LIMITED
PROPOSED MULTI SPECIALTY CHEMICALS
MFG. PLANT AT VILLAGE KARAKHADI, PADRA, VADODARA, GUJARAT ANALYSIS OF PROPOSAL
KADAM ENVIRONMENTAL CONSULTANTS | NOVEMBER 2019 25
9 ANALYSIS OF PROPOSAL
9.1 Financial and Social Benefits with special emphasis on the benefit to the local people including
tribal population, if any, in the area.
Due to proposed project, there will be development of communication facilities in the area. In the nearby plant area,
the skilled/semi-skilled employees and the managerial supervisory personnel will stay.
The plant site area will be equipped with sufficient infrastructural facilities including drinking water, toilets, sanitation
facilities, health centres etc.
During operation, plant will generate direct and indirect employment. The preference will be given for local population
for employment in the semi-skilled and unskilled category. Indirect employment is created by the plant for supply of
daily domestic goods, loading/unloading operations etc.
From the above analysis it would be clear that the project is attractive and would bring in high value addition to the
feedstock thereby benefiting the industry and the nation. Project has excellent connectivity through Road and Railway.
CONTACT DETAILS
Vadodara (Head Office)
871/B/3, GIDC Makarpura, Vadodara, India – 390 010.
E: [email protected]; T:+91-265-6131000
Delhi / NCR
Spaze IT Park, Unit No. 1124, 11th Floor, Tower B-3, Sector 49, Near Omaxe City
Center Mall, Sohna Road, Gurgaon, India – 122 002
E: [email protected]; T: 0124-424 2430-436
Kadam Environmental Consultants w w w . kad am en v i r o . c o m
E n v i ron m ent f o r D ev e l o pm en t