Shiraz Urban Railway Organization Shiraz Traffic Studies 16 corridors and 27 scenarios in basic...

18
Shiraz Urban Railway Organization hiraz Metro Project

Transcript of Shiraz Urban Railway Organization Shiraz Traffic Studies 16 corridors and 27 scenarios in basic...

Page 1: Shiraz Urban Railway Organization Shiraz Traffic Studies 16 corridors and 27 scenarios in basic study 16 corridors and 27 scenarios in basic study 6.

Shiraz Urban Railway Organization

Shiraz Metro Project

Page 2: Shiraz Urban Railway Organization Shiraz Traffic Studies 16 corridors and 27 scenarios in basic study 16 corridors and 27 scenarios in basic study 6.

Shiraz Traffic Studies

16 corridors and 27 scenarios in basic study

6 corridors approvedPassengers in 2020 (phpd)

Lines

17500 Line 1

12500 Line 2

21481 Line 3

12845 Line 4

7564 Line 5

20223 Line 62100000 Trip generation

per day

Trip Vehicles

%50 Private

%2 Motor and bicycle

%22 Taxi

%26 Bus

Page 3: Shiraz Urban Railway Organization Shiraz Traffic Studies 16 corridors and 27 scenarios in basic study 16 corridors and 27 scenarios in basic study 6.

Shiraz Metro Project Lines

Page 4: Shiraz Urban Railway Organization Shiraz Traffic Studies 16 corridors and 27 scenarios in basic study 16 corridors and 27 scenarios in basic study 6.

Status of Shiraz Metro Project

Page 5: Shiraz Urban Railway Organization Shiraz Traffic Studies 16 corridors and 27 scenarios in basic study 16 corridors and 27 scenarios in basic study 6.

Shiraz Metro LinesStatus Color Length

( Km)Line

Under Construction( Physical Progress :

%52)

---------- 24.5 Line 1

Basic Study ( EPC) (Progress : % 37 )

---------- 14 Line 2

Basic Study ---------- 10 Line 3 Basic Study ---------- 17.2 Line 4 Basic Study ---------- 9.5 Line 5 Basic Study ---------- 14.8 Line 6

90 Total Length

Page 6: Shiraz Urban Railway Organization Shiraz Traffic Studies 16 corridors and 27 scenarios in basic study 16 corridors and 27 scenarios in basic study 6.

12

34

56

78

910

111213

1415

16

17

18

19

20

21

Nam

azi

Stat

ion

Valias

r st

atio

n

Dou

ran

Sation

Total length of line one : 24.5 KmN

TBM Tunneling

Depot

Connectio

n line

Ehsa

n

Dep

ot

Mai

n Dep

ot

Under constructionCon

trol

cent

er

Shiraz Metro Line 1

Total budget : 1.06 billion USD

Page 7: Shiraz Urban Railway Organization Shiraz Traffic Studies 16 corridors and 27 scenarios in basic study 16 corridors and 27 scenarios in basic study 6.

Stations Of Line One

13 Island platform Stations

Stations Side platform 7

Page 8: Shiraz Urban Railway Organization Shiraz Traffic Studies 16 corridors and 27 scenarios in basic study 16 corridors and 27 scenarios in basic study 6.

Typical profile of Shiraz metro Stations

Page 9: Shiraz Urban Railway Organization Shiraz Traffic Studies 16 corridors and 27 scenarios in basic study 16 corridors and 27 scenarios in basic study 6.

Characteristics of line One

24.5 km Length :20 No. of stations :102 m platforms length : 3000 m min of vertical curve :250 m min of horizontal curve :

3 minutes headway :38 km traditional speed :30 sec. stop time in stations :1500 DC. V OCS type :

Page 10: Shiraz Urban Railway Organization Shiraz Traffic Studies 16 corridors and 27 scenarios in basic study 16 corridors and 27 scenarios in basic study 6.

High floor car type :5 No. of cars in a trainset :290 person car capacity :1450 person trainset capacity :

17500 personmax. of line capacity in one direction :

9.5 km first phase length :

15 km second phase length :

Characteristics of Line One

Page 11: Shiraz Urban Railway Organization Shiraz Traffic Studies 16 corridors and 27 scenarios in basic study 16 corridors and 27 scenarios in basic study 6.

Types of Tunneling in Shiraz metro

MAIN TUNNEL– SUPPORT SYSTEM

Tunnel center

Road center

Page 12: Shiraz Urban Railway Organization Shiraz Traffic Studies 16 corridors and 27 scenarios in basic study 16 corridors and 27 scenarios in basic study 6.

TBM Tunneling

Page 13: Shiraz Urban Railway Organization Shiraz Traffic Studies 16 corridors and 27 scenarios in basic study 16 corridors and 27 scenarios in basic study 6.

NATM Tunneling

Page 14: Shiraz Urban Railway Organization Shiraz Traffic Studies 16 corridors and 27 scenarios in basic study 16 corridors and 27 scenarios in basic study 6.

Cut & Cover Tunneling

Page 15: Shiraz Urban Railway Organization Shiraz Traffic Studies 16 corridors and 27 scenarios in basic study 16 corridors and 27 scenarios in basic study 6.

Station's

Page 16: Shiraz Urban Railway Organization Shiraz Traffic Studies 16 corridors and 27 scenarios in basic study 16 corridors and 27 scenarios in basic study 6.

Diaphragm Walls

Page 17: Shiraz Urban Railway Organization Shiraz Traffic Studies 16 corridors and 27 scenarios in basic study 16 corridors and 27 scenarios in basic study 6.

Control Center

Page 18: Shiraz Urban Railway Organization Shiraz Traffic Studies 16 corridors and 27 scenarios in basic study 16 corridors and 27 scenarios in basic study 6.

Depot & Workshops