Shippers' guide to maintenance-related capacity reductions

Transcript of Shippers' guide to capacity reductions · 4 1. Introduction When Trading Region South (TRS) was...

Page 1: Shippers' guide to capacity reductions · 4 1. Introduction When Trading Region South (TRS) was created on 01/04/15, the trading interconnection point between the GRTgaz and TIGF

Shippers' guide to

maintenance-related

capacity reductions

Page 2: Shippers' guide to capacity reductions · 4 1. Introduction When Trading Region South (TRS) was created on 01/04/15, the trading interconnection point between the GRTgaz and TIGF

2

Table of contents

1. Introduction ............................................................................................................................ 4

2. Chosen principles .................................................................................................................... 5

2.1 Summary of the principles ......................................................................................................... 5

2.2 Calculating the reduction rates due to work at the interface. ................................................ 5

2.3 Minimum/maximum and effective rates ................................................................................... 7

2.4 PITT PIRINEOS local maintenance ......................................................................................... 7

2.5 Publication schedule ................................................................................................................... 8

2.5.1 Publication schedule at PITT PIRINEOS ................................................................................. 8

2.5.2 Publication schedule at the PITS .......................................................................................... 9

3. Interpreting the TIGF publications ..................................................................................... 10

3.1 Annual publication of 15 November at PITT PIRINEOS .................................................... 10

3.1.1 Publication on the PITT PIRINEOS exit (PITTL) - GRTgaz and TIGF work............................. 11

3.1.2 Publication on the PITT PIRINEOS exit (PITTL) - TIGF work only ......................................... 11

3.1.3 Publication at the PITT PIRINEOS entry - TIGF work only ................................................... 12

3.2 Annual publication of 31 March at the PITS ......................................................................... 12

3.3 Monthly publication in M-2 ..................................................................................................... 13

3.3.1 Publication on the PITT PIRINEOS exit (PITTL) .................................................................... 14

3.3.2 Publication on the PITS exit (PITSL) .................................................................................... 15

3.3.3 Publication on the PITT PIRINEOS entry (PITTE) ................................................................. 15

4. Operational calculations ...................................................................................................... 15

4.1 Breakdown of the reduction rates on the shippers' operational capacities ......................... 15

4.1.1 Calculation of the operational capacities up to D-1 ........................................................... 16

4.1.2 Calculation of the operational capacities at D-1 ................................................................ 18

4.2 Communicating vessels principle ............................................................................................ 20

4.3 Optimisation of the capacities offered .................................................................................... 22

5. APPENDIX 1: Calculation of the reduction rates before D-1 ........................................... 23

5.1 Calculation of the reduced interface capacities ..................................................................... 23

5.1.1 Minimum interface capacity ............................................................................................... 23

5.1.2 Maximum interface capacity .............................................................................................. 23

5.2 Inclusion of local maintenance ................................................................................................ 23

Page 3: Shippers' guide to capacity reductions · 4 1. Introduction When Trading Region South (TRS) was created on 01/04/15, the trading interconnection point between the GRTgaz and TIGF

3

5.2.1 PITT PIRINEOS & PITS minimum capacity ........................................................................... 23

5.2.2 PITT PIRINEOS & PITS maximum capacity .......................................................................... 23

5.3 Calculation of the reduction rates at the PITT PIRINEOS & PITS.................................... 24

5.3.1 Reduction rates on PITT PIRINEOS ..................................................................................... 24

5.3.2 Reduction rates on the PITS ............................................................................................... 24

6. APPENDIX 2: Calculation of the effective rates at D-1 ..................................................... 25

6.1 Calculation of the interface capacities .................................................................................... 25

6.1.1 Effective interface capacity ................................................................................................ 25

6.2 Local maintenance at PITT PIRINEOS ................................................................................. 25

6.2.1 PITT PIRINEOS & PITS effective capacity ............................................................................ 25

6.3 Calculation of the reduction rates at the PITT PIRINEOS & PITS.................................... 25

6.3.1 Reduction rates on the PITT PIRINEOS ............................................................................... 25

6.3.2 Reduction rates on the PITS ............................................................................................... 26

7. APPENDIX 3: Example of a calculation of the capacities at the PITT PIRINEOS and

PITS .............................................................................................................................................. 27

7.1 Calculation of the interface capacities at the PITT PIRINEOS and PITS .......................... 27

7.1.1 Case 1: PIRINEOS capacity via local impact > PIRINEOS capacity via maintenance at the

GRTGaz/TIGF interface & Sum of the PITS & PIRINEOS local impact > Sum of the PITS & PIRINEOS

maintenance impact at the GRTGaz/TIGF interface ........................................................................... 27

7.1.2 Case 2: PIRINEOS capacity via local impact < PIRINEOS capacity via maintenance at the

GRTGaz/TIGF interface & Sum of the PITS & PIRINEOS local impact < Sum of the PITS & PIRINEOS

maintenance impact at the GRTGaz/TIGF interface ........................................................................... 27

7.1.3 Case 3: PIRINEOS capacity via local impact < PIRINEOS capacity via maintenance at the

GRTGaz/TIGF interface & Sum of the PITS & PIRINEOS local impact > Sum of the PITS & PIRINEOS

maintenance impact at the GRTGaz/TIGF interface ........................................................................... 28

Page 4: Shippers' guide to capacity reductions · 4 1. Introduction When Trading Region South (TRS) was created on 01/04/15, the trading interconnection point between the GRTgaz and TIGF

4

1. Introduction

When Trading Region South (TRS) was created on 01/04/15, the trading interconnection point between

the GRTgaz and TIGF grids (PIR Midi on the GRTgazSud side and PITT GRTgazSud on the TIGF side)

disappeared.

The capacity restrictions due to maintenance work at the interface between the two grids can therefore

no longer be directly represented by publishing the reduction at this contractual point, as is the case

today.

According to the principles presented by the French Energy Regulatory Commission (CRE) during its

deliberation of 22 May 2014, such restrictions must therefore be applied to the other contractual exits

(excluding consumption points) of the zones downstream of the congestion.

In keeping with this decision, and in the case of a GRTgazSud physical flow to TIGF (this has been the

almost permanent configuration for several years), the restrictions at the interface will therefore result

in a reduction in the capacities at the PITT PIRINEOS and PITS exit points only.

For a reverse configuration (physical flow from TIGF → GRTgaz), GRTgazSud will apply restrictions to its

zone's trading exits and will be responsible for publishing the maintenance schedule.

TIGF has therefore modified its process for determining capacity restrictions as well as the methods of

publishing the associated reduction rates.

TIGF has produced this guide for shippers, it is intended to explain the principles and mechanisms used

during this process and to provide the necessary keys to correctly analyse the associated publications.

Page 5: Shippers' guide to capacity reductions · 4 1. Introduction When Trading Region South (TRS) was created on 01/04/15, the trading interconnection point between the GRTgaz and TIGF

5

2. Chosen principles

Summary of the principles

The new allocation process introduced during the deployment of the TRS will operate as shown in the

following diagram:

Calculating the reduction rates due to work at the interface.

The process used to define the capacity reduction rates due to work at the interface between the two

grids, GRTgaz Sud and TIGF, is as follows:

1. For each of the two physical interconnection points (Castillon and Cruzy), the maximum physical

flow which can transit via the interface is defined by each Transport Grid Manager (GRT) according

to its own constraints. These constraints may be nonexistent for an operator if he does not carry out

work on the date in question.

2. By considering the least favourable constraint at each of the two points (Castillon and Cruzy), a

maximum flow which can transit from one operator to the other is defined.

3. Because the consumption points cannot be affected by the capacity restriction, the consumption

forecast for the TIGF zone (PS TIGF (TIGF exit point)) for the considered day is deducted from the

maximum available flow.

4. The remaining quantity is then distributed to the two exit points, PITT PIRINEOS and PITS, in a non-

discriminatory manner, proportionally to the trading capacities.

5. These reduced capacities, which will be referred to in the remainder of this document by the term

"interface capacities" are used to calculate the reduction rate at each of the grid's two exit points.

Page 6: Shippers' guide to capacity reductions · 4 1. Introduction When Trading Region South (TRS) was created on 01/04/15, the trading interconnection point between the GRTgaz and TIGF

6

EXAMPLE:

Effective technical capacity of 350 GWh/d at the GRTgaz/TIGF interface.

50 GWh/d of consumption planned by TIGF in its zone (PS TIGF).

Trading capacity at PITT PIRINEOS = 165 GWh/d

Trading capacity at the PITS = 277 GWh/d

Reduction rate calculations

Flow available at the PITT PIRINEOS and PITS exits

Distribution proportional to the trading capacities:

Interface capacity at the PITT PIRINEOS exit

Corresponding reduction rate:

This calculation method is a non-discriminatory way to guarantee that the reduction rates at the PITT

PIRINEOS and PITS exit points are identical.

The entries at the PITS (draw off) and the entries at PITT PIRINEOS are not affected.

Page 7: Shippers' guide to capacity reductions · 4 1. Introduction When Trading Region South (TRS) was created on 01/04/15, the trading interconnection point between the GRTgaz and TIGF

7

Minimum/maximum and effective rates

Because it now has to report maintenance carried out on the GRTgaz grid and under the responsibility of

GRTgaz, TIGF has had to adapt its publications to the GRTgaz reduction calculation process.

This is because when work takes place on a GRTgaz grid artery, the GRTgaz operational teams

determine, up to D-1, a range of minimum and maximum capacities also called:

"CMNTt": Minimum Technical Capacity available in case of work

"CMXTt": Maximum Technical Capacity available in case of work

Then at D-1, the GRTgaz operator publishes effective technical capacities or "CTE" which are normally

within the above range of minimum and maximum capacities.

To express these different technical capacities, TIGF had to adapt its publication by introducing:

minimum and maximum reduction rates for the days preceding the gas day D-1 considered

effective reduction rates published only on gas day D-1 considered.

PITT PIRINEOS local maintenance

Work having an impact on the transit of gas to Spain may take place simultaneously with maintenance

work having an impact on the physical capacities at the interface.

E.g.: Work on the LACAL artery or work on the MONT compression installations

Therefore, in the calculation of the reduction rates at the PITTL and PITSL, TIGF must integrate these

"local" maintenance operations by introducing a "PIRINEOS local capacity". These local physical

capacities can have:

a direct effect on the reduced capacity at the PITT PIRINEOS and PITS exits if the local capacity is

more restrictive than the interface capacity at PITT PIRINEOS.

or an indirect effect due to its impact on the "communicating vessels" mechanism offered to

shippers who have capacities at the two exit points (see section 4.2)

Therefore, to give a complete view of the restrictions in progress on a given day, 3 groups of information

are published by TIGF, i.e.:

Min. and max. reduction rates at the PITT PIRINEOS exit linked with the interface work

Min. and max. reduction rates at the PITS exit linked with the interface work

Reduction rate at the PITT PIRINEOS exit linked with the local work

The calculation of these 3 groups of rates is given in appendices 1 & 2 of this document and there are

quantified examples in appendix 3 of the document.

Page 8: Shippers' guide to capacity reductions · 4 1. Introduction When Trading Region South (TRS) was created on 01/04/15, the trading interconnection point between the GRTgaz and TIGF

8

Publication schedule

The TIGF publications can now be broken down according to the following schedule.

2.1.1 Publication schedule at PITT PIRINEOS

Publication of a min. and max. range of monthly reduction rates:

o On 15 November of year Y-1 for the period from 1st January to 31st December of year Y

Publication of a min./max. and local range of daily reduction rates:

o On 15 November of year Y-1 for January of year Y

o Then the 1st day of month M-2 for month M

o Revision of these rates at D-5 for day D with the new consumption forecasts

Publication of the effective and local interface daily reduction rates:

o At D-1 for day D

Figure 1: Publication schedule at PITT PIRINEOS

Page 9: Shippers' guide to capacity reductions · 4 1. Introduction When Trading Region South (TRS) was created on 01/04/15, the trading interconnection point between the GRTgaz and TIGF

9

2.1.2 Publication schedule at the PITS

Publication of a min. and max. range of monthly reduction rates:

o On 15 March of year Y for the period from 1st April to 31st December of year Y

Publication of a min./max. range of daily reduction rates:

o On 15 November of year Y-1 for January of year Y

o Then the 1st day of month M-2 for month M

o Revision of these rates at D-5 for day D with the new consumption forecasts

Publication of an effective daily reduction rate:

o At D-1 for day D

Figure 2: Publication schedule at the PITS

Page 10: Shippers' guide to capacity reductions · 4 1. Introduction When Trading Region South (TRS) was created on 01/04/15, the trading interconnection point between the GRTgaz and TIGF

10

3. Interpreting the TIGF publications

This chapter is designed to provide supplementary information to best interpret the data published by

TIGF via the TIGF website.

Annual publication of 15 November at PITT PIRINEOS

The publications of the monthly reduction rates at PITT PIRINEOS now take place by the publication of

Excel files in the "Transport Publication" intranet space accessible at the following address:

http://www.tigf.fr/en/our-publications/transport-publications/reduction-factors-and-planned-

maintenance.html

The annual publication (cf. figure 3) offers a monthly view of the minimum and maximum capacities

offered for each month with respect to the firm capacities on PITT PIRINEOS.

This formalism is an adaptation of the formalism dictated by ENTSOG for the annual work forecasts.

The monthly exit capacities are calculated according to the chosen principles given in chapter 2. They

are therefore the consequence of the work carried out:

Either by TIGF and GRTGaz

Or by TIGF only

Or by GRTgaz only.

On entry at PITT PIRINEOS and the PITS, the publications remain identical to what they were because

they integrate the TIGF work only.

Explanation of the main columns in the table:

"FIRM CAPACITY": monthly running total of the firm capacities over the month for the point

concerned.

E.g.: 30 days at 175 GWh/d i.e. 5250 GWh

"MINIMUM PLANNED INTERRUPTION CAPACITY": Running total of the minimum capacities from

the various CMNTt at the interface over the month for the point concerned.

"MAXIMUM REMAINING CAPACITY": "FIRM CAPACITY" - "MINIMUM PLANNED INTERRUPTION

CAPACITY"

"MINIMUM PLANNED INTERRUPTION": "MINIMUM PLANNED INTERRUPTION CAPACITY" /

"FIRM CAPACITY"

"MAXIMUM PLANNED INTERRUPTION CAPACITY": Running total of the maximum capacities

from the various CMXTt at the interface over the month for the point concerned.

"MINIMUM REMAINING CAPACITY": "FIRM CAPACITY" - "MAXIMUM PLANNED INTERRUPTION

CAPACITY"

Page 11: Shippers' guide to capacity reductions · 4 1. Introduction When Trading Region South (TRS) was created on 01/04/15, the trading interconnection point between the GRTgaz and TIGF

11

"MAXIMUM PLANNED INTERRUPTION": "MAXIMUM PLANNED INTERRUPTION CAPACITY" /

"FIRM CAPACITY"

"PERIOD": Number of days of maintenance for the month concerned having an impact on the

firm capacities.

"ORIGIN OF THE INTERRUPTION": GRT(s) responsible for the work.

"NATURE OF PLANNED MAINTENANCE": Projected work dates

3.1.1 Publication on the PITT PIRINEOS exit (PITTL) - GRTgaz and TIGF work

Figure 3: Extract from the publication of 15 November 2014 for the year 2015 at the PITTL - GRTgaz

and TIGF work

3.1.2 Publication on the PITT PIRINEOS exit (PITTL) - TIGF work only

TIGF also wished to inform shippers of the commercial impact of the maintenance carried out under its

responsibility on its grid. For information only, a table shown in figure 3 which indicates the evaluated

minimum and maximum monthly capacities with respect to the firm capacities on PITT PIRINEOS.

These capacities have no operational value (noncontractual) and are given as an indication only.

Figure 4: Extract from the publication of 15 November 2014 for the year 2015 at the PITTL - TIGF work

only

PITT PIRINEOS - EXIT Status : 15/11/2014

Units of measurements : GWh

Month

FIRM

CAPACITY

(A)

GWh

MINIMUM PLANNED

INTERRUPTION

CAPACITY

(B)

GWh

MAXIMUM

REMAINING

CAPACITY

(A - B)

GWh

MINIMUM

PLANNED

INTERRUPTION

(B / A)

%

MAXIMUM PLANNED

INTERRUPTION CAPACITY

(B)

GWh

MINIMUM

REMAINING

CAPACITY

(A - B)

GWh

MAXIMUM

PLANNED

INTERRUPTION

(B / A)

%

APRIL 5250 525 4725 10% 2701 2549 51% 22 GRTgaz & TIGF

TIGF :

Pipeline Shutdown ABE + Maintenance of Gascogne pipeline equipement -->

13/04 to 17/04

Compression maintenance work at MONT --> 20/04 to 24/04

GRTgaz :

Maintenance of Guyenne pipeline + PIG DN800 Chemery Roussines --> 01/04

au 17/04

Compression maintenance work at Roussines --> 20/04 au 24/04

MAY 5425 0 5425 0% 328 5097 6% 4 GRTgaz Maintenance work at Cruzy + MSU St Martin de Crau --> 18/05 au 21/05

JUNE 5250 475 4775 9% 700 4550 13% 5 TIGF Compression maintenance work at SAUVETERRE + PIG LACAL --> 01/06 au 05/06

JULY 5425 0 5425 0% 0 5425 0% 0

AUGUST 5425 0 5425 0% 469 4956 9% 7 GRTgazNew electric line RTE at Chazelle Compression station --> 2 jours

Maintenance of Guyenne pipeline equipement --> 5 jours

SEPTEMBER 5250 0 5250 0% 2376 2874 45% 19 GRTgazMaintenance of Rhône pipeline + Exploration DN800 Chémery Roussines -->

07/09 au 18/09 et du 19/09 au 25/09

OCTOBER 5425 0 5425 0% 0 5425 0% 0

NOVEMBER 4950 0 4950 0% 0 4950 0% 0

DECEMBER 5115 0 5115 0% 0 5115 0% 0

Interconnection Point :

FIRM Capacity PERIOD

(number of days

during the

month affected

by the detailed

maintenance)

ORIGIN OF

INTERRUPTION

NATURE OF PLANNED MAINTENANCE

(on-line inspection; pipeline works; installation works)

period 6:00 - 6:00

PITT PIRINEOS - EXIT Status : 15/11/2014

Units of measurements : GWh

Month

FIRM

CAPACITY

(A)

GWh

MINIMUM PLANNED

INTERRUPTION

CAPACITY

(B)

GWh

MAXIMUM

REMAINING

CAPACITY

(A - B)

GWh

MINIMUM

PLANNED

INTERRUPTION

(B / A)

%

MAXIMUM PLANNED

INTERRUPTION

CAPACITY

(B)

GWh

MINIMUM

REMAINING

CAPACITY

(A - B)

GWh

MAXIMUM

PLANNED

INTERRUPTION

(B / A)

%

APRIL 5250 525 4725 10% 915 4335 17% 10 TIGF

Pipeline Shutdown ABE + Maintenance of Gascogne pipeline equipement -->

13/04 to 17/04

Compression maintenance work at MONT --> 20/04 to 24/04

MAY 5425 0 5425 0% 0 5425 0% 0

JUNE 5250 475 4775 9% 700 4550 13% 5 TIGF Compression maintenance work at SAUVETERRE + PIG LACAL --> 01/06 au 05/06

JULY 5425 0 5425 0% 0 5425 0% 0

AUGUST 5425 0 5425 0% 0 5425 0% 0

SEPTEMBER 5250 0 5250 0% 0 5250 0% 0

OCTOBER 5425 0 5425 0% 0 5425 0% 0

NOVEMBER 4950 0 4950 0% 0 4950 0% 0

DECEMBER 5115 0 5115 0% 0 5115 0% 0

Interconnection Point :

FIRM Capacity PERIOD

(number of days

during the

month affected

by the detailed

maintenance)

ORIGIN OF

INTERRUPTION

NATURE OF PLANNED MAINTENANCE

(on-line inspection; pipeline works; installation works)

period 6:00 - 6:00

Page 12: Shippers' guide to capacity reductions · 4 1. Introduction When Trading Region South (TRS) was created on 01/04/15, the trading interconnection point between the GRTgaz and TIGF

12

3.1.3 Publication at the PITT PIRINEOS entry - TIGF work only

The reductions in the entry capacities on PITT PIRINEOS are from the TIGF work only.

This time, these are operational values.

TIGF has chosen to standardise the formalism of its publications by also publishing on the PITT PIRINEOS

entry a table of the minimum and maximum capacities according to the formalism used at the exit.

However, because TIGF does not consider the range of physical capacities for its work, the minimum and

maximum capacities published are identical.

Figure 5: Extract from the publication of 15 November 2014 for the year 2015 at the PITTE - TIGF work

only

Annual publication of 31 March at the PITS

The publications of the monthly reduction rates at PITS now take place by the publication of Excel files in

the "Transport Publication" intranet space accessible at the following address:

http://www.tigf.fr/en/our-publications/transport-publications/reduction-factors-and-planned-

maintenance.html

The annual publication (cf. figure 6) offers a monthly view of the minimum and maximum capacities

offered for each month with respect to the firm capacities on PITS.

This formalism is an adaptation of the formalism dictated by ENTSOG for the annual work forecasts.

The monthly exit capacities are calculated according to the chosen principles given in chapter 2. They

are therefore the consequence of the work carried out:

Either by TIGF and GRTGaz

Or by TIGF only

Or by GRTgaz only.

PITT PIRINEOS - ENTRY Status : 15/11/2014

Units of measurements : GWh

Month

FIRM

CAPACITY

(A)

GWh

MINIMUM

PLANNED

INTERRUPTION

CAPACITY

(B)

GWh

MAXIMUM

REMAINING

CAPACITY

(A - B)

GWh

MINIMUM

PLANNED

INTERRUPTION

(B / A)

%

MAXIMUM

PLANNED

INTERRUPTION

CAPACITY

(B)

GWh

MINIMUM

REMAINING

CAPACITY

(A - B)

GWh

MAXIMUM

PLANNED

INTERRUPTION

(B / A)

%

APRIL 5250 175 5075 3% 175 5075 3% 5 TIGFPipeline Shutdown ABE + Maintenance of Gascogne pipeline equipement -->

13/04 to 17/04

MAY 5425 0 5425 0% 0 5425 0% 0

JUNE 5250 870 4380 17% 870 4380 17% 5 TIGF Compression maintenance work at SAUVETERRE + PIG LACAL --> 01/06 au 05/06

JULY 5425 0 5425 0% 0 5425 0% 0

AUGUST 5425 0 5425 0% 0 5425 0% 0

SEPTEMBER 5250 0 5250 0% 0 5250 0% 0

OCTOBER 5425 0 5425 0% 0 5425 0% 0

NOVEMBER 4950 0 4950 0% 0 4950 0% 0

DECEMBER 5115 0 5115 0% 0 5115 0% 0

Interconnection Point :

FIRM CapacityPERIOD

(number of days

during the

month affected

by the detailed

maintenance)

ORIGIN OF

INTERRUPTION

NATURE OF PLANNED MAINTENANCE

(on-line inspection; pipeline works; installation works)

period 6:00 - 6:00

Page 13: Shippers' guide to capacity reductions · 4 1. Introduction When Trading Region South (TRS) was created on 01/04/15, the trading interconnection point between the GRTgaz and TIGF

13

Figure 6: Extract from the publication of 15 March 2015 for the year 2015 at the PITSL - GRTgaz and

TIGF work

Monthly publication in M-2

It must be noted that from 1 April 2015, the daily reduction rates will be published via the "Maintenance

and capacity reductions" tab of the DATAGAS website.

Pending the deployment of the IS developments linked with the TRS, TIGF has maintained a publication

continuity by publishing Excel files in the "Transport Publication" intranet space available at the

following address:

http://www.tigf.fr/en/our-publications/transport-publications/reduction-factors-and-planned-

maintenance.html

Note: the IS developments introduced for 1st April do not plan to publish the PITT PIRINEOS local

capacity on DATAGAS and TETRA. Until there is a future development to improve this situation, this

capacity will always be accessible in the Excel files indicated above.

The individual local operational capacities can be calculated by each of the shippers using the data

following data:

- PITT PIRINEOS local capacity indicated above

- overall subscribed capacity accessible on DATAGAS

- individual subscribed capacity accessible in the TETRA space

PITS - EXIT Status : 15/03/2015

Units of measurements : GWh

Month

FIRM

CAPACITY

(A)

GWh

MINIMUM

PLANNED

INTERRUPTION

CAPACITY

(B)

GWh

MAXIMUM

REMAINING

CAPACITY

(A - B)

GWh

MINIMUM

PLANNED

INTERRUPTION

(B / A)

%

MAXIMUM

PLANNED

INTERRUPTION

CAPACITY

(B)

GWh

MINIMUM

REMAINING

CAPACITY

(A - B)

GWh

MAXIMUM

PLANNED

INTERRUPTION

(B / A)

%

APRIL 8310 3025 5285 36% 4972 3338 60% 22 GRTgaz & TIGF

TIGF :

Pipeline Shutdown ABE + Maintenance of Gascogne pipeline equipement -->

13/04 to 17/04

Compression maintenance work at MONT --> 20/04 to 24/04

GRTgaz :

Maintenance of Guyenne pipeline + PIG DN800 Chemery Roussines --> 01/04 au

17/04

Compression maintenance work at Roussines --> 20/04 au 24/04

MAY 8587 422 8165 5% 785 7802 9% 5 GRTgaz Maintenance work at Cruzy + MSU St Martin de Crau --> 18/05 au 22/05

JUNE 8310 0 8310 0% 0 8310 0% 0

JULY 8587 0 8587 0% 0 8587 0% 0

AUGUST 8587 485 8102 6% 737 7850 9% 7 GRTgazNew electric line RTE at Chazelle Compression station --> 2 jours

Maintenance of Guyenne pipeline equipement --> 5 jours

SEPTEMBER 8310 1828 6482 22% 3759 4551 45% 19 GRTgazMaintenance of Rhône pipeline + Exploration DN800 Chémery Roussines --> 07/09

au 18/09 et du 19/09 au 25/09

OCTOBER 8587 0 8587 0% 0 8587 0% 0

NOVEMBER 8310 0 8310 0% 0 8310 0% 0

DECEMBER 8587 0 8587 0% 0 8587 0% 0

Interconnection Point :

FIRM CapacityPERIOD

(number of days

during the

month affected

by the detailed

maintenance)

PLANNED

MAINTENANCE

RESPONSABLE

NATURE OF PLANNED MAINTENANCE

(on-line inspection; pipeline works; installation works)

period 6:00 - 6:00

Page 14: Shippers' guide to capacity reductions · 4 1. Introduction When Trading Region South (TRS) was created on 01/04/15, the trading interconnection point between the GRTgaz and TIGF

14

3.1.4 Publication on the PITT PIRINEOS exit (PITTL)

Figure 7: Extract from the publication of 30 January 2015 for April 2015 on the PITT PIRINEOS exit

(PITTL)

Figure 8: Zoom on the rates published in the extract from the publication of 30 January 2015 for April

2015 on the PITT PIRINEOS exit (PITTL)

Figure 6 shows the 2 capacity categories:

"INTERFACE": which is based on the maintenance at the interface

"LOCAL": which is based on the maintenance which has a direct impact on PITT PIRINEOS.

PITT PIRINEOS - EXIT Date : 30/01/2015

Units of measurements : GWh

Mois : April 2015

DAY

FIRM

CAPACITY

(A)

GWh

MINIMUM

PLANNED

INTERRUPTION

CAPACITY

(B)

GWh

MAXIMUM

REMAINING

CAPACITY

(A - B)

GWh

MINIMUM

PLANNED

INTERRUPTION

(B / A)

%

MAXIMUM

PLANNED

INTERRUPTION

CAPACITY

(B)

GWh

MINIMUM

REMAINING

CAPACITY

(A - B)

GWh

MAXIMUM

PLANNED

INTERRUPTION

(B / A)

%

PLANNED

INTERRUPTION

(B)

GWh

REMAINING

CAPACITY

(A - B)

GWh

PLANNED

INTERRUPTION

(B / A)

%

1 175 49 126 28% 100 75 57% 0 175 0% GRTgaz : Maintenance of Guyenne pipeline

2 175 49 126 28% 100 75 57% 0 175 0% GRTgaz : Maintenance of Guyenne pipeline

3 175 49 126 28% 100 75 57% 0 175 0% GRTgaz : Maintenance of Guyenne pipeline

4 175 49 126 28% 100 75 57% 0 175 0% GRTgaz : Maintenance of Guyenne pipeline

5 175 49 126 28% 100 75 57% 0 175 0% GRTgaz : Maintenance of Guyenne pipeline

6 175 49 126 28% 100 75 57% 0 175 0% GRTgaz : Maintenance of Guyenne pipeline

7 175 95 80 54% 165 10 94% 0 175 0% GRTgaz : Maintenance of Guyenne pipeline + PIG DN800

8 175 95 80 54% 165 10 94% 0 175 0% GRTgaz : Maintenance of Guyenne pipeline + PIG DN800

Interconnection Point :

ORIGIN OF INTERRUPTION

INTERFACE LOCAL

PITT PIRINEOS - EXIT Date :

Units of measurements : GWh

Mois : April 2015

DAY

FIRM

CAPACITY

(A)

GWh

MINIMUM

PLANNED

INTERRUPTION

CAPACITY

(B)

GWh

MAXIMUM

REMAINING

CAPACITY

(A - B)

GWh

MINIMUM

PLANNED

INTERRUPTION

(B / A)

%

MAXIMUM

PLANNED

INTERRUPTION

CAPACITY

(B)

GWh

MINIMUM

REMAINING

CAPACITY

(A - B)

GWh

MAXIMUM

PLANNED

INTERRUPTION

(B / A)

%

PLANNED

INTERRUPTION

(B)

GWh

REMAINING

CAPACITY

(A - B)

GWh

PLANNED

INTERRUPTION

(B / A)

%

1 175 49 126 28% 100 75 57% 0 175 0%

2 175 49 126 28% 100 75 57% 0 175 0%

3 175 49 126 28% 100 75 57% 0 175 0%

4 175 49 126 28% 100 75 57% 0 175 0%

5 175 49 126 28% 100 75 57% 0 175 0%

6 175 49 126 28% 100 75 57% 0 175 0%

7 175 95 80 54% 165 10 94% 0 175 0%

8 175 95 80 54% 165 10 94% 0 175 0%

9 175 95 80 54% 165 10 94% 0 175 0%

10 175 95 80 54% 165 10 94% 0 175 0%

11 175 95 80 54% 165 10 94% 0 175 0%

12 175 95 80 54% 165 10 94% 0 175 0%

13 175 130 45 74% 175 0 100% 75 100 43%

14 175 130 45 74% 175 0 100% 75 100 43%

15 175 130 45 74% 175 0 100% 75 100 43%

16 175 130 45 74% 175 0 100% 0 175 0%

17 175 95 80 54% 165 10 94% 0 175 0%

20 175 88 87 50% 138 37 79% 30 145 17%

21 175 88 87 50% 138 37 79% 30 145 17%

22 175 88 87 50% 138 37 79% 65 110 37%

23 175 88 87 50% 138 37 79% 30 145 17%

24 175 88 87 50% 138 37 79% 30 145 17%

Interconnection Point :

INTERFACE LOCAL

Page 15: Shippers' guide to capacity reductions · 4 1. Introduction When Trading Region South (TRS) was created on 01/04/15, the trading interconnection point between the GRTgaz and TIGF

15

3.1.5 Publication on the PITS exit (PITSL)

Figure 9: Extract from the publication of 30 January 2015 for April 2015 on the PITS

We note in figure 7 that, as expected, only the "INTERFACE" reductions are published. The local reductions only concern PITT PIRINEOS.

3.1.6 Publication on the PITT PIRINEOS entry (PITTE)

Figure 10: Extract from the publication of 30 January 2015 for April 2015 on the PITT PIRINEOS entry

Figure 8 only shows the "LOCAL" capacity category (no interface effect on the TIGF entry points, see section 1).

4. Operational calculations

Breakdown of the reduction rates on the shippers' operational capacities

The rates shown above are broken down into operational capacities for each shipper at the exit points which concern him:

1. For a shipper who has subscribed to capacities on only one of the two exit points, an interface operational capacity is calculated at this point (min. and max. up to D-1 and effective at D-1)

2. For a shipper who has subscribed to capacities at the two points, interface operational capacities are calculated (min. and max. up to D-1 and effective at D-1) as well as a local operational capacity on PITT PIRINEOS.

PITS - EXIT Date : 30/01/2015

Units of measurements : GWh

Mois : April 2015

DAY

FIRM

CAPACITY

(A)

GWh

MINIMUM

PLANNED

INTERRUPTION

CAPACITY

(B)

GWh

MAXIMUM

REMAINING

CAPACITY

(A - B)

GWh

MINIMUM

PLANNED

INTERRUPTION

(B / A)

%

MAXIMUM

PLANNED

INTERRUPTION

CAPACITY

(B)

GWh

MINIMUM

REMAINING

CAPACITY

(A - B)

GWh

MAXIMUM

PLANNED

INTERRUPTION

(B / A)

%

1 277 78 199 28% 158 119 57% GRTgaz : Maintenance of Guyenne pipeline Pipeline works

2 277 78 199 28% 158 119 57% GRTgaz : Maintenance of Guyenne pipeline Pipeline works

3 277 78 199 28% 158 119 57% GRTgaz : Maintenance of Guyenne pipeline Pipeline works

4 277 78 199 28% 158 119 57% GRTgaz : Maintenance of Guyenne pipeline Pipeline works

5 277 78 199 28% 158 119 57% GRTgaz : Maintenance of Guyenne pipeline Pipeline works

6 277 78 199 28% 158 119 57% GRTgaz : Maintenance of Guyenne pipeline Pipeline works

7 277 150 127 54% 260 17 94% GRTgaz : Maintenance of Guyenne pipeline + PIG DN800 Pipeline works / On-line inspection

8 277 150 127 54% 260 17 94% GRTgaz : Maintenance of Guyenne pipeline + PIG DN800 Pipeline works / On-line inspection

9 277 150 127 54% 260 17 94% GRTgaz : Maintenance of Guyenne pipeline + PIG DN800 Pipeline works / On-line inspection

10 277 150 127 54% 260 17 94% GRTgaz : Maintenance of Guyenne pipeline + PIG DN800 Pipeline works / On-line inspection

11 277 150 127 54% 260 17 94% GRTgaz : Maintenance of Guyenne pipeline + PIG DN800 Pipeline works / On-line inspection

12 277 150 127 54% 260 17 94% GRTgaz : Maintenance of Guyenne pipeline + PIG DN800 Pipeline works / On-line inspection

13 277 205 72 74% 277 0 100% GRTgaz : Maintenance of Guyenne pipeline + PIG DN800 TIGF : Pipeline Shutdown ABE + Maintenance of Gascogne pipeline equipmentPipeline works / On-line inspection / Installation works

14 277 205 72 74% 277 0 100% GRTgaz : Maintenance of Guyenne pipeline + PIG DN800 TIGF : Pipeline Shutdown ABE + Maintenance of Gascogne pipeline equipmentPipeline works / On-line inspection / Installation works

15 277 205 72 74% 277 0 100% GRTgaz : Maintenance of Guyenne pipeline + PIG DN800 TIGF : Pipeline Shutdown ABE + Maintenance of Gascogne pipeline equipmentPipeline works / On-line inspection / Installation works

16 277 205 72 74% 277 0 100% GRTgaz : Maintenance of Guyenne pipeline + PIG DN800 TIGF : Maintenance of Gascogne pipeline equipment Pipeline works / On-line inspection / Installation works

17 277 150 127 54% 260 17 94% GRTgaz : Maintenance of Guyenne pipeline + PIG DN800 Pipeline works / On-line inspection

20 277 139 138 50% 219 58 79% GRTgaz : Compression maintenance work at Roussines TIGF : Compression maintenance work at Mont Installation works

21 277 139 138 50% 219 58 79% GRTgaz : Compression maintenance work at Roussines TIGF : Compression maintenance work at Mont Installation works

22 277 139 138 50% 219 58 79% GRTgaz : Compression maintenance work at Roussines TIGF : Compression maintenance work at Mont Installation works

23 277 139 138 50% 219 58 79% GRTgaz : Compression maintenance work at Roussines TIGF : Compression maintenance work at Mont Installation works

24 277 139 138 50% 219 58 79% GRTgaz : Compression maintenance work at Roussines TIGF : Compression maintenance work at Mont Installation works

Interconnection Point :

INTERFACE

ORIGIN OF INTERRUPTION

NATURE OF PLANNED MAINTENANCE

(on-line inspection; pipeline works; installation works)

period 6:00 - 6:00

PITT PIRINEOS - ENTRY Date : 30/01/2015

Units of measurements : GWh

Mois : April 2015

DAY

FIRM

CAPACITY

(A)

GWh

MINIMUM PLANNED

INTERRUPTION

CAPACITY

(B)

GWh

MAXIMUM

REMAINING

CAPACITY

(A - B)

GWh

MINIMUM

PLANNED

INTERRUPTION

(B / A)

%

13 174 34 140 20% TIGF : Pipeline Shutdown ABE + Maintenance of Gascogne pipeline equipment Pipeline works /Installation works

14 174 34 140 20% TIGF : Pipeline Shutdown ABE + Maintenance of Gascogne pipeline equipment Pipeline works /Installation works

15 174 34 140 20% TIGF : Pipeline Shutdown ABE + Maintenance of Gascogne pipeline equipment Pipeline works /Installation works

22 174 49 125 28% TIGF : Compression maintenance work at Mont Installation works

Interconnection Point :

LOCAL

ORIGIN OF INTERRUPTION

NATURE OF PLANNED MAINTENANCE

(on-line inspection; pipeline works; installation works)

period 6:00 - 6:00

Page 16: Shippers' guide to capacity reductions · 4 1. Introduction When Trading Region South (TRS) was created on 01/04/15, the trading interconnection point between the GRTgaz and TIGF

16

The process applied after reception of the nominations will therefore differ according to the shipper's profile:

1. For a shipper who has subscribed to capacities on only one of the two exit points, his nomination is reduced to his effective operational capacity at this point. The optimisation process which is then applied to the two exit points will potentially provide him with all or part of the nominations made beyond what was approved for him during the first step.

2. For a shipper who has subscribed to capacities at the two points, the communicating vessels principle will be applied to allow him to optimise the constraint at the interface between the two exit points (see section 4.2). The optimisation process which is then applied to the two exit points will potentially provide him with all or part of the nominations made beyond what was approved for him during the first step.

4.1.1 Calculation of the operational capacities up to D-1

As seen above, up to D-1, two min. and max. interface rates exist side by side resulting in the calculation of two min. and max. operational capacities. For the shippers concerned, a local operational capacity is also calculated. EXAMINATION of 3 specific cases: By considering the following hypotheses: On the PITT PIRINEOS exit (PITTL)

74 % < Interface reduction rate < 100 %

Local reduction rate = 43 % On the PITS exit (PITSL)

74 % < Interface reduction rate < 100 % The trading capacities below:

PITT PIRINEOS: 175 GWh/d

PITS: 277 GWh/d

Which, in terms of available capacity, gives: → On the PITT PIRINEOS exit (PITTL):

0 GWh/d <Interface capacity < (1-0.74) x 175 = 45 GWh/d

Local capacity = (1-0.43) x 175 = 100 GWh/d

→ On the PITS exit (PITSL)

0 GWh/d <Interface capacity < (1-0.74) x 277 = 72 GWh/d Example 1: Application to a shipper who has subscribed capacities on the two exit points (PITTL & PITSL) Let us take a shipper who has subscribed to:

Page 17: Shippers' guide to capacity reductions · 4 1. Introduction When Trading Region South (TRS) was created on 01/04/15, the trading interconnection point between the GRTgaz and TIGF

17

100 GWh/d of capacity on PITT PIRINEOS out of the 160 GWh/d of capacity subscribed by all the shippers.

80 GWh/d of capacity on the PITS out of the 200 GWh/d of capacity subscribed by all the shippers.

That day, his operational capacities will be reduced proportionally to his subscribed capacities: PITT PIRINEOS interface operational capacity (PITTL)

PITT PIRINEOS local operational capacity (PITTL)

PITS operational capacity (PITSL)

Example 2: Application to a shipper who has subscribed capacities only at the PITS Let us take a shipper who has subscribed to:

60 GWh/d of capacity on the PITS out of the 200 GWh/d of capacity subscribed by all the shippers.

That day, his operational capacities at the PITS exit (PITSL) will be reduced proportionally to his subscribed capacities:

Example 3: Application to a shipper who has subscribed capacities only at PITT PIRINEOS Let us take a shipper who has subscribed to:

80 GWh/d of capacity on the PITT out of the 160 GWh/d of capacity subscribed by all the shippers.

That day, his operational capacities at the PITT PIRINEOS exit (PITTL) will be reduced proportionally to his subscribed capacities:

Note: because his local capacity for that day is

= 50 GWh/d, the operational constraint

associated with this is outweighed by that linked with the reduction at the interface and is thus not

considered (22.5 GWh/d chosen).

In the opposite case, his max. operational capacity will be taken as being equal to his local

operational capacity.

Page 18: Shippers' guide to capacity reductions · 4 1. Introduction When Trading Region South (TRS) was created on 01/04/15, the trading interconnection point between the GRTgaz and TIGF

18

According to his subscribed capacities (on one or two exit points), each shipper must thus consider

the information which concerns him:

Table of locations of the publications at A-1 / M-2 / D-5

CASE DATA ACCESSIBLE ON:

Subscribed capacities on PITS only

Min. and max.

operational capacities

on the PITS

TETRA

Subscribed capacities on PITT

PIRINEOS only

Min. and max.

operational capacities

on PITT PIRINEOS

TETRA

Subscribed capacities on the two

points

Min. and max.

operational capacities

on the PITS

TETRA

Min. and max.

operational capacities

on PITT PIRINEOS

TETRA

Local operational

capacity on PITT

PIRINEOS

Calculated by the

shipper from the rate

on the trading and

subscribed capacities

and sent via an Excel

file available on the

www.tigf.fr website*

* After entry into service of a development of the IS system envisageable from 2016, this information

will be accessible to shippers via the TETRA customised space.

4.1.2 Calculation of the operational capacities at D-1

The day before the gas day, because the effective technical capacity (CTE) is known, a new reduction

rate will be published on the PITS and the PITT PIRINEOS. This rate is now used to calculate the new

operational capacities for gas day D.

EXAMINATION of 3 specific cases: By considering the following hypotheses: On the PITT PIRINEOS exit (PITTL)

Interface reduction rate = 25 %

Local reduction rate = 11.5 %

Page 19: Shippers' guide to capacity reductions · 4 1. Introduction When Trading Region South (TRS) was created on 01/04/15, the trading interconnection point between the GRTgaz and TIGF

19

On the PITS exit (PITTSL)

Interface reduction rate = 25 %

The trading capacities below: PITT PIRINEOS: 175 GWh/d

PITS: 277 GWh/d

Which, in terms of available capacity, gives: On the PITT PIRINEOS exit (PITTL):

Interface capacity = (1-0.25) x 175 = 130 GWh/d

Local capacity = (1-0.115) x 175 = 155 GWh/d

On the PITS exit (PITSL)

Interface capacity = (1-0.25) x 277 = 207 GWh/d Example 1: Application to a shipper who has subscribed capacities on the two exit points (PITTL & PITSL)

100 GWh/d of capacity on PITT PIRINEOS out of the 173 GWh/d of capacity subscribed by all the shippers.

80 GWh/d of capacity on the PITS out of the 276 GWh/d of capacity subscribed by all the shippers.

That day, his operational capacities will be reduced proportionally to his subscribed capacities:

Example 2: Application to a shipper who has subscribed capacities only at the PITS Let us take a shipper who has subscribed to:

60 GWh/d of capacity on the PITS out of the 276 GWh/d of capacity subscribed by all the shippers.

That day, his operational capacity will be reduced proportionally to his subscribed capacity:

Example 3: Application to a shipper who has subscribed capacities only at PITT PIRINEOS Let us take a shipper who has subscribed to:

80 GWh/d of capacity on the PITT out of the 173 GWh/d of capacity subscribed by all the shippers.

That day, his operational capacity will be reduced proportionally to his subscribed capacity:

Page 20: Shippers' guide to capacity reductions · 4 1. Introduction When Trading Region South (TRS) was created on 01/04/15, the trading interconnection point between the GRTgaz and TIGF

20

Note: because his local capacity for that day is

= 71.7 GWh/d, the operational constraint

associated with this is outweighed by that linked with the reduction at the interface and is thus not

considered (60.1 GWh/d chosen).

In the opposite case, his effective operational capacity would be taken as being equal to his local

operational capacity.

According to his subscribed capacities (on one or two exit points), each shipper must thus consider

the information which concerns him:

Table of locations of the publications at D-1

CASE DATA ACCESSIBLE ON:

Subscribed capacities on PITS only Effective operational

capacity on the PITS TETRA

Subscribed capacities on PITT

PIRINEOS only

Effective operational

capacity on PITT

PIRINEOS

TETRA

Subscribed capacities on the two

points

Effective operational

capacity on the PITS TETRA

Effective operational

capacity on PITT

PIRINEOS

TETRA

Local effective

operational capacity

on PITT PIRINEOS

Calculated by the

shipper from the rate

on trading and

subscribed capacities

and sent via an Excel

file available on the

www.tigf.fr * website

* After entry into service of development of the IS system envisageable from 2016, this information will

be accessible to shippers via the TETRA customised space.

Communicating vessels principle

As stated above, for the shippers who have subscribed to delivery capacities on the PITS & the PITT PIRINEOS, TIGF offers the possibility to benefit from a communicating vessels principle within the limit of their subscribed capacities and of their local operational capacity on PIRINEOS. EXAMINATION of a specific case:

Page 21: Shippers' guide to capacity reductions · 4 1. Introduction When Trading Region South (TRS) was created on 01/04/15, the trading interconnection point between the GRTgaz and TIGF

21

Figure 11: Summary of the chosen example Block 1 figure 11 The shipper has subscribed to the following capacities:

80 GWh/d on the PITS

100 GWh/d on PITT PIRINEOS Due to maintenance at the interface and locally, the shipper has the following operational capacities for the considered day, (See section 4.1.2):

Interface operational capacity on the PITT PIRINEOS exit (PITTL): 75 GWh/d

Local operational capacity on the PITT PIRINEOS exit (PITTL): 90 GWh/d

Interface operational capacity on the PITS exit (PITSL): 60 GWh/d This shipper therefore has a capacity at the interface of 135 GWh/d (75 + 60) which he can distribute on the two exit points as he wishes, as long as his chosen distribution respects his subscribed capacities at each point and the local constraint on PITT PIRINEOS. Block 2 figure 11 Let us suppose he nominates 120 GWh/d on PITT PIRINEOS and 40 GWh/d on the PITS. To differentiate what is part of the optimisation process, let us initially consider his nominations within the limit of his subscribed capacities, i.e.:

100 GWh/d on PITT PIRINEOS

Block 1 Block 2

Block 3 Block 4

Page 22: Shippers' guide to capacity reductions · 4 1. Introduction When Trading Region South (TRS) was created on 01/04/15, the trading interconnection point between the GRTgaz and TIGF

22

40 GWh/d on the PITS. Block 3 figure 11 The nomination of 40 GWh/d made on the PITS is less than the interface operational capacity at this point, TIGF can thus accept them. The 20 GWh/d not used (60 GWh/d of operational interface capacity – 40 GWh/d of accepted nominations) can be transferred to PITT PIRINEOS, which would thus allow 95 GWh/d (75 GWh/d of operational interface capacity to be delivered on PITT PIRINEOS + 20 GWh/d of transfer) at this point. But because the local operational capacity is 90 GWh/d, TIGF has to cap to this value and only approve one nomination of 90 GWh/d at this point . Block 4 figure 11

The difference between the nomination made at PITT PIRINEOS (120 GWh/d) and what is approved at this stage (90 GWh/d) can be allocated during the optimisation process, as long as the other shippers do not use the totality of their operational interface capacity on the 2 points PITT PIRINEOS and PITS.

Optimisation of the capacities offered

During the gas day allocations, the optimisation principles are applied as usual, i.e. Optimisation / UBI / Incorporation of reverse capacity. In particular, during the optimisation and UBI process , the nominations accepted for draw-off at the PITS or at the entry on PITT PIRINEOS will be added to the flows authorised on PITT PIRINEOS and the PITS for the allocation of the injection capacities on the PITS and at the exit on PIRINEOS. Important: the prorata temporis basis will be applied to each exit point separately and to the trading flow at the interface TIGF/GRTGaz.

Page 23: Shippers' guide to capacity reductions · 4 1. Introduction When Trading Region South (TRS) was created on 01/04/15, the trading interconnection point between the GRTgaz and TIGF

23

5. APPENDIX 1: Calculation of the reduction rates before D-1

Calculation of the reduced interface capacities

5.1.1 Minimum interface capacity

5.1.2 Maximum interface capacity

Inclusion of local maintenance

5.1.3 PITT PIRINEOS & PITS minimum capacity

5.1.4 PITT PIRINEOS & PITS maximum capacity

Page 24: Shippers' guide to capacity reductions · 4 1. Introduction When Trading Region South (TRS) was created on 01/04/15, the trading interconnection point between the GRTgaz and TIGF

24

Calculation of the reduction rates at the PITT PIRINEOS & PITS

The reduction rates on the tradables are then calculated from the reduced capacities calculated

previously on the PITT PIRINEOS and the PITS.

5.1.5 Reduction rates on PITT PIRINEOS

5.1.6 Reduction rates on the PITS

Page 25: Shippers' guide to capacity reductions · 4 1. Introduction When Trading Region South (TRS) was created on 01/04/15, the trading interconnection point between the GRTgaz and TIGF

25

6. APPENDIX 2: Calculation of the effective rates at D-1

Calculation of the interface capacities

6.1.1 Effective interface capacity

Local maintenance at PITT PIRINEOS

6.1.2 PITT PIRINEOS & PITS effective capacity

Calculation of the reduction rates at the PITT PIRINEOS & PITS

The reduction rates on the tradables are then calculated from the reduced capacities calculated

previously on the PITT PIRINEOS and the PITS.

6.1.3 Reduction rates on the PITT PIRINEOS

Page 26: Shippers' guide to capacity reductions · 4 1. Introduction When Trading Region South (TRS) was created on 01/04/15, the trading interconnection point between the GRTgaz and TIGF

26

6.1.4 Reduction rates on the PITS

Page 27: Shippers' guide to capacity reductions · 4 1. Introduction When Trading Region South (TRS) was created on 01/04/15, the trading interconnection point between the GRTgaz and TIGF

27

7. APPENDIX 3: Example of a calculation of the capacities at the PITT

PIRINEOS and PITS

Calculation of the interface capacities at the PITT PIRINEOS and PITS

To determine the reduced capacities at PIRINEOS and at the PITS, the PIRINEOS capacity linked with the

maintenance at the TIGF/GRTGaz interface must be compared to that linked with the local maintenance

on the TIGF grid.

The flow which can transit at the link in addition to the capacity due to local maintenance on the TIGF

grid must be compared to the tradable capacity at the PITS.

There are then 3 possible cases:

By considering a capacity which can transit via the PIRINEOS & PITS exits of 300 GWh/d.

7.1.1 Case 1: PIRINEOS capacity via local impact > PIRINEOS capacity via maintenance

at the GRTGaz/TIGF interface & Sum of the PITS & PIRINEOS local impact > Sum of

the PITS & PIRINEOS maintenance impact at the GRTGaz/TIGF interface

The chosen capacity on PIRINEOS will be that resulting from the maintenance at the GRTGaz/TIGF link. The chosen capacity on PITS will be that resulting from the maintenance at the GRTGaz/TIGF link.

PITT Tradable Capacity

Local maintenance

impact

Maintenance impact at the GRTGaz/TIGF

link

Chosen capacity

Reduction rate

PIRINEOS 165 120 112 112 32 %

Injection PITS 277 277 188 188 32 %

PITS & PIRINEOS 442 397 300 300

7.1.2 Case 2: PIRINEOS capacity via local impact < PIRINEOS capacity via maintenance

at the GRTGaz/TIGF interface & Sum of the PITS & PIRINEOS local impact < Sum of

the PITS & PIRINEOS maintenance impact at the GRTGaz/TIGF interface

The chosen capacity on PIRINEOS will be that resulting from the local maintenance. The chosen capacity on PITS will be the tradable capacity on the PITS

PITT Tradable Capacity

Local maintenance

impact

Maintenance impact at the GRTGaz/TIGF

link

Chosen capacity

Reduction rate

PIRINEOS 165 10 112 10 94 %

Injection PITS 277 277 188 277 0 %

PITS & PIRINEOS 442 287 300 287

Page 28: Shippers' guide to capacity reductions · 4 1. Introduction When Trading Region South (TRS) was created on 01/04/15, the trading interconnection point between the GRTgaz and TIGF

28

7.1.3 Case 3: PIRINEOS capacity via local impact < PIRINEOS capacity via maintenance

at the GRTGaz/TIGF interface & Sum of the PITS & PIRINEOS local impact > Sum of

the PITS & PIRINEOS maintenance impact at the GRTGaz/TIGF interface

The chosen capacity on PIRINEOS will be that resulting from the local maintenance. The chosen capacity on PITS will be the supplement to the chosen capacity on PIRINEOS with respect to the capacity which can transit via the PIRINEOS & PITS exits

PITT Tradable Capacity

Local maintenance

impact

Maintenance impact at the GRTGaz/TIGF

link

Chosen capacity

Reduction rate

PIRINEOS 165 100 112 100 40 %

Injection PITS 277 277 188 200 28 %

PITS & PIRINEOS 442 377 300 300

In this case, the reduction rates at the PITS & PITT PIRINEOS are not similar due to the PIRINEOS local

constraint.