The complete journal of captain Cornelis Bouman, master of the ship ...
SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA...
Transcript of SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA...
![Page 1: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was](https://reader035.fdocuments.us/reader035/viewer/2022080721/5f7a5c8faa90ec1a0e56cee4/html5/thumbnails/1.jpg)
SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018
![Page 2: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was](https://reader035.fdocuments.us/reader035/viewer/2022080721/5f7a5c8faa90ec1a0e56cee4/html5/thumbnails/2.jpg)
SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018
Background
• The Ship Point master planning process was initiated in March of 2017 to advance policy direction from Harbour Vitality Principles (2014)
• Ship Point design and initial implementation a key action in the 2015-2018 Strategic Plan
![Page 3: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was](https://reader035.fdocuments.us/reader035/viewer/2022080721/5f7a5c8faa90ec1a0e56cee4/html5/thumbnails/3.jpg)
SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018
The Process
• Phase 1: Detailed Assessment, Design Framework
• Phase 2: Conceptual Design
• 2 open houses with over 300 people in attendance
• Online survey with 147 responses
• Council approved design concept as basis for Phase 3
• Phase 3: Master Plan Document
• Detailed (schematic) design
• Implementation & Phasing Strategy
• Cost estimate and Funding Strategy
![Page 4: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was](https://reader035.fdocuments.us/reader035/viewer/2022080721/5f7a5c8faa90ec1a0e56cee4/html5/thumbnails/4.jpg)
SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018
Draft Design Concept - what we heard
![Page 5: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was](https://reader035.fdocuments.us/reader035/viewer/2022080721/5f7a5c8faa90ec1a0e56cee4/html5/thumbnails/5.jpg)
SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018
Vitality through high quality design
Year-round activation and programming
Strong connectivity and access
Site design that supports a range of active uses
Design Themes
Guiding Principles
![Page 6: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was](https://reader035.fdocuments.us/reader035/viewer/2022080721/5f7a5c8faa90ec1a0e56cee4/html5/thumbnails/6.jpg)
SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018
Site Design and Program – Overview
![Page 7: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was](https://reader035.fdocuments.us/reader035/viewer/2022080721/5f7a5c8faa90ec1a0e56cee4/html5/thumbnails/7.jpg)
SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018
Site Design and Program
The Terraces
![Page 8: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was](https://reader035.fdocuments.us/reader035/viewer/2022080721/5f7a5c8faa90ec1a0e56cee4/html5/thumbnails/8.jpg)
SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018
Site Design and Program
Picnic Site
![Page 9: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was](https://reader035.fdocuments.us/reader035/viewer/2022080721/5f7a5c8faa90ec1a0e56cee4/html5/thumbnails/9.jpg)
SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018
Site Design and Program Harbour Air Plaza
![Page 10: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was](https://reader035.fdocuments.us/reader035/viewer/2022080721/5f7a5c8faa90ec1a0e56cee4/html5/thumbnails/10.jpg)
SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018
Site Design and Program Festival Pier
![Page 11: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was](https://reader035.fdocuments.us/reader035/viewer/2022080721/5f7a5c8faa90ec1a0e56cee4/html5/thumbnails/11.jpg)
SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018
Site Design and Program Wharf Street Promenade
![Page 12: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was](https://reader035.fdocuments.us/reader035/viewer/2022080721/5f7a5c8faa90ec1a0e56cee4/html5/thumbnails/12.jpg)
SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018
Site Design and Program
Ship Point Promenade
![Page 13: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was](https://reader035.fdocuments.us/reader035/viewer/2022080721/5f7a5c8faa90ec1a0e56cee4/html5/thumbnails/13.jpg)
SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018
Site Design and Program
Conceptual Built Form
![Page 14: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was](https://reader035.fdocuments.us/reader035/viewer/2022080721/5f7a5c8faa90ec1a0e56cee4/html5/thumbnails/14.jpg)
SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018
Site Design and Program
Conceptual Built Form
![Page 15: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was](https://reader035.fdocuments.us/reader035/viewer/2022080721/5f7a5c8faa90ec1a0e56cee4/html5/thumbnails/15.jpg)
SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018
Success Stories from Elsewhere
![Page 16: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was](https://reader035.fdocuments.us/reader035/viewer/2022080721/5f7a5c8faa90ec1a0e56cee4/html5/thumbnails/16.jpg)
SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018
Success Stories from Elsewhere
![Page 17: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was](https://reader035.fdocuments.us/reader035/viewer/2022080721/5f7a5c8faa90ec1a0e56cee4/html5/thumbnails/17.jpg)
SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018
Ship Point will require a combination of repair, replacement and structural stabilization of the sea wall and portions of the site
Shoreline and Structural Approach
![Page 18: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was](https://reader035.fdocuments.us/reader035/viewer/2022080721/5f7a5c8faa90ec1a0e56cee4/html5/thumbnails/18.jpg)
SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018
Retreat: Remove existing damaged sea wall and replace with rip-rap bank
Unload: Removing approx. 1 metre of material approx. 3 metres back from the shoreline to reduce load bearing on existing wall
Support: reinforcing existing wall with vertical strapping in some areas with upfront and ongoing repair and maintenance
Reinforce: A series of interlocking jet grouted columns adjacent to the existing sea wall to contain the unconsolidated fill and materials
Phased Replacement of pier: Full Emergency Repairs in 2018 with Steel Piles and Replace Restricted Portion by 2023
Settlement management: use of geo -grid and resin bound materials to improve site stability and long term maintenance
Shoreline and Structural Approach
Shoreline Strategies
![Page 19: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was](https://reader035.fdocuments.us/reader035/viewer/2022080721/5f7a5c8faa90ec1a0e56cee4/html5/thumbnails/19.jpg)
SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018
Conceptual Phasing, Funding
![Page 20: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was](https://reader035.fdocuments.us/reader035/viewer/2022080721/5f7a5c8faa90ec1a0e56cee4/html5/thumbnails/20.jpg)
SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018
Thank You!
![Page 21: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was](https://reader035.fdocuments.us/reader035/viewer/2022080721/5f7a5c8faa90ec1a0e56cee4/html5/thumbnails/21.jpg)
SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018
The Master Plan
• Design framework
• Schematic design and layout
• Materials and furnishings
• Shoreline and structural approach
• Conceptual built form
• Programming and operations
• Sustainability and resilience strategy
• Implementation and phasing
• Class ‘C’ cost
![Page 22: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was](https://reader035.fdocuments.us/reader035/viewer/2022080721/5f7a5c8faa90ec1a0e56cee4/html5/thumbnails/22.jpg)
SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018
Site Design and Program
• Character
![Page 23: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was](https://reader035.fdocuments.us/reader035/viewer/2022080721/5f7a5c8faa90ec1a0e56cee4/html5/thumbnails/23.jpg)
SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018
Jet grouting is a soil improvement technique that involves injection of water-cement grout and mixing into the existing soil.
Shoreline and Structural Approach
Shoreline Strategies
Site and shoreline structural restoration does not include mitigation for seismic events
Approach premised on management of seawall settlement through on-going operations and maintenance
![Page 24: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was](https://reader035.fdocuments.us/reader035/viewer/2022080721/5f7a5c8faa90ec1a0e56cee4/html5/thumbnails/24.jpg)
SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018
Shoreline Treatment
Rip Rap bank + blocks:• Modular for settling support• Informal gathering at various scales
Benched Seawall:• Softer edge• Habitat and filtering contaminated
surface runoff
Stepped Seawall:• Access to water’s edge• Seating• Views
![Page 25: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was](https://reader035.fdocuments.us/reader035/viewer/2022080721/5f7a5c8faa90ec1a0e56cee4/html5/thumbnails/25.jpg)
SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018
Site Design and Program
Site resilience and storm water ecology
![Page 26: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was](https://reader035.fdocuments.us/reader035/viewer/2022080721/5f7a5c8faa90ec1a0e56cee4/html5/thumbnails/26.jpg)
SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018
Site Design and Program
• Materials
![Page 27: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was](https://reader035.fdocuments.us/reader035/viewer/2022080721/5f7a5c8faa90ec1a0e56cee4/html5/thumbnails/27.jpg)
SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018
Site Design and Program
• Program and Activities
![Page 28: SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018Development... · SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018 Background •The Ship Point master planning process was](https://reader035.fdocuments.us/reader035/viewer/2022080721/5f7a5c8faa90ec1a0e56cee4/html5/thumbnails/28.jpg)
SHIP POINT MASTER PLAN GVHA MEETING | APRIL 18, 2018
Site Design and Program - Overview
Constructed foreshore and marine habitat
Terraced landscape and amphitheatreGrand stair case and ramps
Festival Pier
Playable features
Access to water
Pavilion
Restaurant
Harbour Air Plaza
Improved Circulation
Improved Circulation