Shift2Rail 2020 Call –Austria Regional Info Day
Carlo M Borghini – Executive Director
0
50
100
150
200
250
300
350
400
450
500
8 FoundingMembers
19AssociatedMembers
Open Calls
AN OPEN and ACTIVE
ORGANISATION
Valu
es a
s a
t 1 S
ept
2016 in M
illion E
UR
*incl. at least 120M€ of additional activities
AN OPEN and ACTIVE
ORGANISATION
…opening up new Capabilities coming from emerging technologies or concepts!
Railway - System of SystemsIP1 Cost-efficient and Reliable Trains, including high-capacity trains and high speed trains
IP2 Advanced Traffic Management and Control System
IP3 Cost-efficient, Sustainable and Reliable High Capacity Infrastructure
IP4 IT Solutions for Attractive Railways Services
IP5 Technology for Sustainable and Attractive European Rail Freight
CCA Cross Cutting Activities
TimetableForward / backwardAccelerate - brake
Operation Rolling Stock
Infrastructure
IPx: looking beyond S2R currently planned technology applications and integrating them with disruptive innovations
• Concepts for the autonomous railway vehicles “train-centric”• Disruptive technologies impacting automation systems and
maintenance• industry 4.0 (automated industry and industry as a service),
railway clouds and decentralised ownership • A.I. for railways Digital solutions
S2R System Architecture and Conceptual Data Model : 1. comprehensive model/architecture, technologies
and strategy for implementation of a new encompassing railway system approach
2. aligning all ongoing modelling initiatives in terms of modelling principles and digital data integration
Activities just launched
Going for global performance definitely
requires to master, design and simulate
the Railway System as a whole
definition of an overall architecture
Programme approach and future/current projects
The S2R Programme implementation
AWP 2020 S2R Programme specificitiesMillion of EUR Total Members
only
Open to
non-Members
Value of the Call for Proposals R&I 146.6 123.8 22.8
S2R Maximum Co-funding 75.4 55.4 20
In-Kind Contribution 71.2 68.4 2.8
No of topics 19 8 11
Value of Call for tender R&I 4.4 0 4.4
No of topics 3 0 3
Value of Prizes 0.5 0 0.5
No of topics 4 0 4
AWP S2R Programme specificitiesHow to read the topic acronyms
Topic number -
IPTopic name
Type of action
and expected
TRL
Value of action
(*)
EUR
Maximum S2R
co-funding (*)
EUR
Other contributions
from non-Members
(*)
EUR
S2R-OC-CCA-
01-2020
Noise &
Vibration
RIA
TRL 3/4950,000 950,000 0
Number of topic
Who can applyOC (open call)CFM (call for member)
Which area(IP/CCA)
RIA – Research & Innovation Action (100%)Innovation Action (70%)
Technology Readiness Level
Number IP1 IP2 IP3 IP4 IP5 CCA IPX
CFM topic 2 1 1 1 1 1 1
OC topic 3 2 3 1 1 1
Linked tender topic 1 1 1
Technology Readiness Levels definition
Where a topic description refers to a TRL, the following definitions apply, unless
otherwise specified:
• TRL 1 – basic principles observed
• TRL 2 – technology concept formulated
• TRL 3 – experimental proof of concept
• TRL 4 – technology validated in lab
• TRL 5 – technology validated in relevant environment (industrially relevant
environment in the case of key enabling technologies)
• TRL 6 – technology demonstrated in relevant environment (industrially relevant
environment in the case of key enabling technologies)
• TRL 7 – system prototype demonstration in operational environment
• TRL 8 – system complete and qualified
• TRL 9 – actual system proven in operational environment (competitive
manufacturing in the case of key enabling technologies; or in space)
Programme approach, future/current projects• EACH PROJECT contributes to the achievement of the Master Plan and the
MAAP objectives
• EACH PROJECT is part of a programme and cooperation with other projects must be ensured Through the collaboration and input to the JU Members, EACH PROJECT will support the realization of long-term S2R technological demonstrations or innovative break-through
• Particular attention is given to ensure that there is no duplication of work between EACH PROJECT and current/future R&I activities
• EACH PROJECT results are taken into consideration for the next annual work plans to ensure sufficient complementarity and coherence
Complementarity & Collaboration Agreement
1. Complementary is defined at topic level
2. Complementarity between topics is compulsory established inthe Grant Agreement (need for a Collaboration Agreement)
3. IP/CCA SteCos, high level synchronization points: Project Coordinators may attend the SteeCo meetings as observer and IP Coordinators cooperate with project coordinator to foster/promote synergies
4. S2R Programme Managers: Central Contact Point for both projects
Complementarity & Collaboration Agreement
Issues to be tackled in the Collaboration Agreement (COLA) (examples/non-exhaustive list)
• Rules for collaboration, “who does what?”; Point of Contacts etc.
• Handling review of documents
• Agreement on action to be performed by both sides + linked timing (e.g. project A provides “user requirements” by M6 to project B; project B provides input by M18 to project A project A uses input for deliver their deliverable 2.3).
• Participation to restricted meetings (for specific purpose) or to public meetings (including Advisory Groups, etc…).
Overview of the IPs and CCA Achievements & Call for
proposal
S2R-CFM-IP1-01-2020 Demonstrators for the next generation of traction systems, smart maintenance, virtual validation and eco-friendly Heating, Ventilation Air conditioning and Cooling (HVAC) and Technical research on battery and hydrogen powered regional trains (BEMU/ HMU) (IP1/IP3)- (EU funding: 9.142M €)
S2R-CFM-IP1-02-2020: Validation of new technologies for the TCMS - (EU funding: 3.812M €)
S2R-CFM-IP2-01-2020 [Completion of activities for Adaptable Communication, Moving Block, Fail safe Train Localisation (including satellite), Zero on site Testing, Formal Methods and Cyber Security] (EU funding 14.970M€), TRL 6/7
S2R-CFM-IP3-01-2020: Research into optimised and future railway infrastructure - (EU funding: 11.408M €)
S2R-CFM-IP4-01-2020: Enhanced end-user centric travel ecosystem (EU funding 5.207M€), TRL 7
S2R-CFM-IP5-01-2020: Use-centric rail freight innovation for Single European Railway Area – IA (EU funding 7.879 M€)
S2R-CFM-IPX-01-2020: Advanced Functions towards Autonomous Trains - (EU funding: 2.021M€)
S2R-CFM-IPX and CCA-02-2020: Evolution of Railways System Architecture and Conceptual Data Model (CDM)- (EU funding: 1.041M€)
AWP 2020, targets and content – CFM
IP1: Cost-efficient and reliable trains, including high-capacity trains and high-speed trains
IP1: key achievements and ongoing activitiesTraction: Technical Demonstrator with innovative components for energy saving, weight and size reduction, using mainly SiC technology
TCMS: Wireless Technology for train communication network, Drive by Data and Functional Open Coupling concept.
Doors: next gen doors, PRM access, noise attenuation and increased accessibility
Interiors: new modularity concepts, easier upgrades
up to 20% of Energy saving for Traction chain on Regional Platform
Prove of concept for integration of SIL4 functions in TCMS, significant reduction of wires (Installation and Maintenance Costs)
InnoTrans 18 – Virtual Coupling Demo
Carbody Shell and Running Gear: Introduction of composite material for hybrid consist’sstructure.
Brakes : Design of Electro-Mechanical Brakes, High SIL Electronics and wheelset slide protection.
Weight reduction - impact on vehicle’s payload -> capacity increase
No pneumatic pipes for brakes management -> LCC
Braking distance reduction in poor adherence, from +25% to 15%
Spoke Wheel for Metro Bogie- Wheel wear (use of new materials) and
rail wear- Weight (by 10%)- Noise emission
Antenna Beam- Carbon Fibre laminate- 13 kg vs 60 kg for
conventional solution
IP1: key achievements and ongoing activities
S2R-0C-IP1-01-2020: Support to Development of next generation of Traction systems (TD1.1) - (EU funding: 2,300,000 €)
• Research on 3D additive manufacturing and new manufacturing technologies for traction components - TRL 3
• Research on Wireless Dynamic Charging for urban vehicles based on SiC semi-conductors – TRL3
• Investigations on reliability of traction components and lifetime mechanisms – TRL4
• Research on Big Data, Artificial Intelligence (AI) applied to Traction systems smart and predictive maintenance – TRL4
S2R-OC-IP1-02-2020: Technical solutions for the next generation of TCMS - (EU funding: 4,600,000 €)• Antenna installation study to optimize transmission/reception in Wireless TCMS
• Functional Distributed Framework related research activities and Subsystem functions adapted to Application Profiles –TRL6
• Safety and Cybersecurity studies, methodology and tools to support SIL4 application.
• Development of equipments (TRL 6-7) to support the CFM demonstrators.
S2R-OC-IP1-03-2020: Innovative technologies for Carbodies and Running Gear of the future (EU funding: 2,420,000 €)
• Inspection methods for new materials adapted for the maintenance in railway environment (TRL4-5)
• Development of new elastomeric materials with enhanced lifetime for running gear application (TRL3-4)
• Development of new Journal Bearings with enhanced LCC and lifetime (TRL3-4)
AWP 2020, targets and content – IP1
IP2: Advanced Traffic Management and Control Systems
IP2: Key achievements so farRailway System Architecture under preparation• Relationship with RCA initiative is ongoing in order to coordinate the actions.
ATO for mainline railways; GoA4 will reduce human error and increase service availability• GoA2 draft specifications available (reviewed by sector + ERA); • Pilot tests for GoA2 in first half of 2020 in the UK; • Use cases/specifications for GoA4 are ongoing.
Moving Block based on ERTMS/ETCS specifications and opportunity to remove trackside fixed signalling systems . Different kind of MB application including Hybrid.
GNSS/ positioning systems applied to rail to remove physical balises and facilitating the application of moving block
• System Requirements Specification and system architecture to be delivered. Extension of the SoW to new vehicle localization principle
Adaptable communication for railways, technology and bearer independent• Cooperation UIC FRMCS (+ ERA) on use cases; • Specifications development and prototypes preparation
Dynamic control of train management – based on Virtual Coupling
• S2R-OC-IP2-01-2020: Modelling of the Moving Block system specification and support for Railway Minimum Operational Performance Standards, TRL 3 (EU funding 1.340.000€)
Within the framework of the Moving Block the proposal has to carry out the following work:
To create semi-formal or formal models of the Moving Block systems, using the Formal Method methodologydeveloped in X2RAIL-2, in order to examine the system behaviour, and check for additional hazards arising fromthe use of Moving Block.
To create semi-formal or formal models of the enhancements to the Moving Block architectures, as proposed bythe “Future Moving Block Architectures” topic within the project S2R X2Rail-3.
Within the framework of the Fail Safe Train Localisation, the proposal has to carry out the following work:
• Definition and Development of Railway Fault Detection and Exclusion (FDE) algorithms for coping with railway system and local feared events in the context of both mono/dual constellations and mono/dual frequencies
• Definition and Development of Data Fusion algorithms among different possible technologies such as for example EGNSS, IMU, Kinematics, Digital Map suitable for providing a safe position in the position domain along with the associated integrity
• Select candidate techniques and algorithms for the implementation of a Proof of Concept
• Test and assess performances in a real or simulated railway environment
• Contribution to the definition of the Railway Minimum Operational Performance Standards and the trade-off analysis about the use of the Standard SBAS (e.g. EGNOS) augmentation systems
AWP 2020, targets and content – IP2 (1/2)
• S2R-OC-IP2-02-2020: Study on alternative bearers and on communication protocols, TRL 4/5 (EU funding 350.000€)
For what concerns the study of the communication bearers the action shall: Describe the alternative bearers from a technology perspective; Qualify the benefits and challenges of the bearers, taking into account operational and
economic considerations; Compare the expected communication characteristics with well-established wireless
technologies Provide recommendations and classification.
For what concerns the study of the communication protocols the action shall:
• Identify the appropriate transport protocol for ensuring communication characteristics and capabilities during application development
• Analyse the different options for the transport layer (UDP, TCP, SCTP , etc.) and the application layer protocols (HTTP, QUIC, SIP, etc.) with the aim to narrow the selection for certain application requirements, qualifying the protocols in terms of technology features like flexibility, latency and prioritization as well as operational considerations including engineering and implementation complexity, monitoring and debugging capabilities;
• Analyse the security of the transport and application layer with using the secure version of protocols, e.g. SFTP or SCP instead of FTP, or HTTPS instead of HTTP or combining the protocols with application security.
AWP 2020, targets and content – IP2 (2/2)
IP3: Cost-Efficient and Reliable High-Capacity Infrastructure
Intelligent Asset Management: Shift from reactive to proactive maintenance based on innovativemonitoring/ measuring & processing technologies
Innovative technologies in asset measuring & monitoring (satellite, drones, robotics), data processing &decision support (IoT, Artificial Intelligence)
Demonstration & evaluation of asset management, maintenance strategies: Thermal Stress Monitoring,and Lean Tamping
Intelligent Energy Management: mapping of all energy flows in railway system for managementstrategies. Future traction power supply system in integration with public grid
Proof-of-Concept in light-train environment (tramway)
Design of an intelligent substation, 66% savings on transmission losses,25% reduction on dimensioning
IP3: key achievements and ongoing activities
Optimized & Future Infrastructure Design:Track and S&C System: Analysis of deformation mechanisms & introduction of advancedcapabilities to existing systems. Design of radically new designs & systems
Novel concept for locking & detection capabilities
Conceptual designs for radical switch actuation, locking and detection
Bridges & Tunnels: Improved inspection & repair methods → service life extension,disruption time reduction, N&V reduction
Digital Imaging for asset monitoring + BIM-based asset management for remaining life estimation &bridge prediction behavior
Investigation of bridge-rolling stock interface & contribution to standards
Stations: New designs enhancing mobility, accessibility & crowd management
Analysis of the passenger needs and expectations at railway stations
Conceptual design of Platform-Train Interface (PTI) solution
IP3: key achievements and ongoing activities
S2R-0C-IP3-01-2020: Next Generation Track Transition Zones - (EU funding: 1,350,000 €)• Detailed design and technical specification for physical transition zone demonstrators (->CFM)
• Protypes and small-scale demonstrators of next generation transition zone components and sub-systems - TRL5
S2R-OC-IP3-02-2020: Technology Development for Railway Systems Asset Management (TD3.6)- (EUfunding: 1,710,000 €)
• Prescriptive data analytics tools to implement a Decision Support System, with man in the loop, for IAMS – TRL4-5
• Multi-objective decisions’ optimization tools for IAMS – TRL 4-5
S2R-OC-IP3-03-2020: Advanced tools and equipment: collaborative robots & wearable mobile machines(TD3.8)- (EU funding: 2,700,000 €)
• Development of standalone demonstrator of an improved existing plant (machines and equipment) byintegrating robot technology (Robot Operating System) to support future inspection and execution ofmaintenance actions – TRL 5-6
• Development and validation of a prototype of exoskeleton suitable for outside considtions which can performa set of different maintenance task– TRL 6-7
AWP 2020, targets and content – IP3
IP4: IT Solutions for Attractive Railway Services
Customer experience applications: providing to the user the engine to search its travel accordinglyto his/her specific needs/preferences + providing an useful companions guiding the user across theright platform or across a service disruption through an automatic re-routing, etc.
inclusion of new Mobility Services in the ecosystem
Starting on MaaS, for a European « roaming service »
Business analytics: providing to the operating companies the means to understand and adapt theiroffer to a real time multi-modal demand
IP4: key achievements and ongoing activities
29
Interoperable framework: semantic based IT solution capable of making interoperable differentdatabases using different standards, without the need of changing the legacy systems – creating amultimodal framework
First converter demonstrating semantic interoperability using FSM and TAP-TSI
Enhance the Interoperability Framework with AI
Multimodal travel services: providing to the passenger the easy interface, masking the complexityof technical and financial interaction among the several services provider, for shopping, bookingand retrieving their right to travel
First demonstration of the IP4ecosystem at Innotrans 2018
IP4: key achievements and ongoing activities
30
S2R-OC-IP4-01-2020: Supporting the implementation of the IP4 ecosystem, TRL 6-7 (EU funding 2.000.000€)
• The action addresses the “non-technical” part of the Overall IP4 Coordination and demonstration. The overallintegration of a great number of travel services and modes all over IP4 is the only way to demonstrate added valueon the market.
• Define relevant use-cases together with the CFM project members
• Provide real data supporting the implementation of the use-cases
• Clarify the adequate business rules needed to implement these use-cases
• Support when requested -in the field- demonstrations
• Collect the needs and expectations of future users of the solutions in order for Travel
• Service Providers to manage the offer of the travelers.
AWP 2020, targets and content – IP4
CCA: Cross Cutting Activities
Long-term needs and socio-economic research: to what extent rail can be a catalyst intransformational societal changes
Specifications for the 4 S2R System Platform Demonstrators (SPDs) high-speed, regional, urbanpassenger rail (metro) and rail freight
First result of the attractiveness model mainly focusing on the benefits coming from IP4
KPI method development: based on the 3 quantitative KPIs of the S2R regulation and assessmentof the S2R innovation technologies against those
High-level KPI architecture is completed and the first quantification is under assessment
Safety, Standardisation, Smart Maintenance, Smart Materials & Virtual certification
Standardisation Rolling Development Plan lists the potential needs andopportunities of the S2R innovations those feeds into standardisation
CCA: key achievements and ongoing activities
33
Noise & Vibration: N&V management to be applied on an overall system approach and enablemitigation actions
Auralisation and visualisation technology InnoTrans
Tools and methods to improve prediction of noise from differentsources on a system level and to rank railway noise mitigationoptions together with assessment of their cost-effectiveness
Human Capital: management of technological & demographicalChanges from the human factor’s aspect
Impacts of the S2R innovations on rail employment and future skills
I2M: Integration layer for data exchange between traffic management system,freight operations and asset management services
Use-cases and business rules for high-efficient freight operations
CCA: key achievements and ongoing activities
34
S2R-OC-CCA-01-2020: Noise and Vibration call - (EU funding: 950,000 €)
Ground vibration:
• To develop a commonly accepted, practical and validated prediction tool for ground vibrationimpact studies during environmental impact assessment of new or upgraded railway projects.
New Technologies Auralisation and Visualisation:
• The development of a fully functional system for auralisation and visualisation based onphysically correct synthesized railway noise and interfaces to a virtual reality visualisationsoftware.
• The tool shall be able to meet three basic main requirements:
Demonstration of the results of the work on noise reduction in the S2R JU.
Demonstration of vehicle performance for customers and development engineers
Demonstration of the acoustic situation and the effect of noise mitigation measures inlarge-scale projects preferable with an interface to commercial 3D Visualisation software
AWP 2020, targets and content - CCA
S2R-OC-IPX-01-2020: Innovation in guided transport - (EU funding: 0.25M€)
• Define the enhanced / innovative modes in term of: Concept of operations
Safety cases
Functional specification
Operational conditions and testing methodologies / environment.
• Identify the potential transferability and synergies with Railways solutions,processes and procedures in general, and in particular for a technologicalperspective with the S2R innovations (Technology Demonstrators and IPx activities).
AWP 2020, targets and content – IPx
54 SOLUTIONS
FINAL USER
OPER ATOR
INFRAMAN
SUPPLIER
CU
ST
OM
ER
S
W ho benefi t s?
DELIVERY DATE FOR INDUSTRIALIZATION
https://shift2rail.org/publications/catalogue-of-solutions/
Funding type: HE rules
Funding type: HE, to becomplemented in
implementation by CEF/EIB/etc.
Flat rate on entity accounting rules
FUNDAMENTAL RESEARCHTRL: 0 -> 2
ad-hoc governanceopen to all
Rail
APPLIED RESEARCHTRL: 3 -> 7
PPP membership with third parties
« BlueSky »
R&I
DEPLOYMENTCOORDINATION
open to all
DEMOERA
authorization
S2R solutions with S2R JU supervision
No participation barriers between R&I&D areasTRL 7 Demos included in Applied Research, Live Large Scale Demos in Deployment Coordination
Membership’s agile funding
MEMBERSHIP
Mega-Project
Mega-Project
R&I BEYOND 2020
R&I BEYOND 2020
Shift2Rail JULighthouse
Projects
Market Uptake
Market Uptake
Market Uptake
Shift2Rail 2030
Market Uptake S2R L
ast
Call for
Pro
posals
H2020
New
R&
I EU
Pro
gra
mm
e
FOUNDING MEMBERS ASSOCIATED MEMBERS