Sheet1 · 1295 C1/5/8/1 Moy 5 2014 Summer Short-reach 185.634 1296 C1/5/9 Moy 5 2014 Winter...
Transcript of Sheet1 · 1295 C1/5/8/1 Moy 5 2014 Summer Short-reach 185.634 1296 C1/5/9 Moy 5 2014 Winter...
Sheet1
A B C D E
1249 C1 Sect. A Moy 10 - Summer Long-reach 5642.93 Peg 0/00 to Peg 53/40 outfall C1/13 (1-4)
1848 C1 Sect. B Moy 10 2013 Summer Long-reach 6446.2 Peg 53/40 to 121/00 outfall C1/16 (Sect. 4-11)
1855 C1 Sect. C Moy 10 2015 Summer Long-reach 7515.87 Peg 121/00 to 199/90 outfall C1/18 (Sect. 11-16)
1860 C1 Sect. D Moy 10 2013 Summer Long-reach 3160.79 Peg 199/90 to 232/70 outfall C1/19 (Sect. 16-23)
1869 C1 Sect. E Moy 10 - Summer Long-reach 2165.88 Peg 232/70 to 254/70 outfall from L.Cullen (Sect. 23-25)
1871 C1 Sect. F Moy 10 2014 Summer Long-reach 3672.34 Peg 254/70 to 298/50 oufall C1/23 (Sect. 25-32)
1878 C1 Sect. G Moy 10 2014 Summer Long-reach 4546.25 Peg 298/50 to 346/40 outfall C1/30 (Sect. 32-37)
1883 C1 Sect. H Moy 10 2011 Summer Long-reach 4815.16 Peg 346/40 to 396/70 outfall C1/35 (Sect. 37-43)
1889 C1 Sect. I Moy 10 2011 Summer Long-reach 4343.15 Peg 396/70 to 442/70 outfall C1/39 (Sect. 43-48)
1894 C1 Sect. J Moy 10 - Summer Long-reach 5402.47 Peg 442/70 to 500/00 Cloon. Bridge (Sect. 48-57)
1903 C1 Sect. K Moy 10 - Summer Long-reach 5595.79 Peg 500/00 to 567/20 outfall C1/45 (Sect. 57-63)
1909 C1 Sect. L Moy 10 - Summer Long-reach 5000.12 Peg 567/20 to 628/00 Cloongoongh ft. Bridge (Sect.63-68)
1909 C1 Sect. M Moy 10 - Summer Long-reach 2688.77 Peg 628/00 to 676/50 Curraghboy Ft. Bridge (Sect. 66-74)
1920 C1 Sect. N Moy 10 - Summer Long-reach 4044.77 Peg 676/50 to 697/50 Banada Br. (Sect.74-77)
1923 C1 Sect. O Moy 10 2014 Summer Long-reach 4480.42 Peg 697/50 to 745/60 Annagh Br. (Sect. 77-82)
1928 C1 Sect. P Moy 10 2013 Summer Long-reach 2378.49 Peg 745/60 to 795/85 (Sect. 82-88)
1934 C1 Sect. Q Moy 10 2012 Summer Long-reach 5939.85 Peg 795/85 to 842/50 Cloonacool Br. (Sect. 88-94)
2601 C1 Sect. R Moy 10 2012 Summer Long-reach 3027.27 Peg 842/50 to 875/50 Stirabout Br. (Sect. 94-98)
2605 C1 Sect. S Moy 10 2006 Summer Long-reach 2742.17 Peg 875/50 to 912/50 END (Sect. 98-104)
1250 C1/1 Moy 5 2010 Summer Short-reach 5539.79 0-5800
1251 C1/1/1 Moy 5 2010 Summer Short-reach 1694.03 0-1800
1252 C1/1/1/1 Moy 5 2010 Summer Short-reach 600.016 0-660
1253 C1/1/1/2 Moy 5 2010 Summer Short-reach 621.267 0-700
1254 C1/1/2 Moy 5 2010 Summer Short-reach 559.314 0-600
1255 C1/1/3 Moy 5 2010 Summer Short-reach 187.7 0-300
1256 C1/2 Moy 5 2013 Summer Short-reach 5428.33
1257 C1/2/1 Moy 5 2012 Winter Short-reach 1752.88
1258 C1/2/2 Moy 5 2013 Summer Short-reach 467.447
1259 C1/2/3 Moy 5 2013 Summer Short-reach 2814.77
1260 C1/2/3/1 Moy 5 2012 Summer Short-reach 1474
1261 C1/2/3/2 Moy 5 2013 Summer Short-reach 1116.1
1262 C1/2/4 Moy 5 2013 Summer Short-reach 391.018
1263 C1/2/5 Moy 5 2013 Summer Short-reach 482.422
1264 C1/2/6 Moy 5 2013 Summer Short-reach 770.119
1265 C1/2/6/1 Moy 5 2013 Summer Short-reach 647.214
1266 C1/2/6/2 Moy 5 2013 Summer Short-reach 486.768
2534 C1/3 Moy 5 2012 Summer Short-reach 6070.74
1268 C1/3/1 Moy 5 2012 Summer Short-reach 997.163
1269 C1/3/2 Moy 5 2012 Summer Short-reach 452.508
1270 C1/3/3 Moy 5 2012 Summer Short-reach 492.209
1271 C1/4 Moy 5 2012 Winter Short-reach 3142.83
1272 C1/4/1 Moy 5 2012 Winter Short-reach 851.784
1273 C1/4/2 Moy 5 2012 Winter Short-reach 744.292
1274 C1/5 Sect. A Moy 5 2014 Summer Short-reach 1796.98 Peg 0/00 to 19/00 outfall of C1/5/1
2676 C1/5 Sect. B Moy 5 - Summer Short-reach 3792.47 Peg 19/00 to 56/50 B4 Baly Bridge (Sect. 5-6)
2678 C1/5 Sect. C Moy 5 - Summer Short-reach 3251.02 Peg 56/50 to 87/30 outfall of C1/5/9 (Sect. 7-8)
2680 C1/5 Sect. D Moy 5 2014 Winter Short-reach 2665.6 Peg 87/30 to 115/00 B7 (Sect. 9-10)
2682 C1/5 Sect. E & F Moy 5 2014 Summer Short-reach 7003.12 Peg 115/00 to 135/50 B9 (Sect. 11-12)
1275 C1/5/1 Moy 5 2014 Summer Short-reach 836.085
1276 C1/5/2 Moy 5 2014 Summer Short-reach 357.843
1277 C1/5/3 Moy 5 2014 Summer Short-reach 3467.5
1278 C1/5/3/1 Moy 5 2014 Summer Short-reach 568.795
1279 C1/5/3/2 Moy 2014 Any Short-reach 610.534
1280 C1/5/3/3 Moy 5 2014 Summer Short-reach 1508.72
Machine Type
Type of
Maintenance Length (m) Notes CommentsOverall ID Channel RefScheme
Name
Frequency of
Maintenance
Year of Last
MaintenanceTiming of Works
Page 1
Sheet1
A B C D E
Machine Type
Type of
Maintenance Length (m) Notes CommentsOverall ID Channel RefScheme
Name
Frequency of
Maintenance
Year of Last
MaintenanceTiming of Works
1281 C1/5/3/3/1 Moy 5 2014 Summer Short-reach 256.569
1282 C1/5/3/4 Moy 5 2014 Summer Short-reach 584.346
1283 C1/5/4 Moy 5 2014 Summer Short-reach 1287.93
1284 C1/5/4/1 Moy 5 2014 Summer Short-reach 991.956
1285 C1/5/5 Moy 5 2010 Summer Short-reach 4286.25
1286 C1/5/5/1 Moy 5 2010 Summer Short-reach 716.868
1287 C1/5/5/2 Moy 5 - Summer Short-reach 738.257
1288 C1/5/5/3 Moy 5 2010 Summer Short-reach 3594.61
1289 C1/5/6 Moy 5 2012 Summer Short-reach 7017
1290 C1/5/6/1 Moy 5 2011 Summer Short-reach 4558.62
1291 C1/5/6/1/1 Moy 5 2011 Summer Short-reach 325.628
1292 C1/5/6/1/2 Moy 5 2011 Summer Short-reach 370.686
1293 C1/5/7 Moy 5 2012 Winter Short-reach 1066.83
1294 C1/5/8 Moy 5 2014 Summer Short-reach 2917.75
1295 C1/5/8/1 Moy 5 2014 Summer Short-reach 185.634
1296 C1/5/9 Moy 5 2014 Winter Short-reach 726.587
1297 C1/5/9/1 Moy 5 2014 Winter Short-reach 314.558
1298 C1/5/10 Moy 5 2014 Winter Short-reach 1239.53
1299 C1/5/11 Moy 5 2014 Winter Short-reach 1828.17
1300 C1/5/12 Moy 5 2014 Summer Short-reach 4145.35
1301 C1/5/12/1 Moy 5 2014 Summer Short-reach 779.451
1302 C1/5/13 Moy 5 2014 Winter Short-reach 1319.65
1303 C1/5/13/1 Moy 5 2014 Winter Short-reach 218.128
1304 C1/5/13/2 Moy 5 2014 Winter Short-reach 473.103
1305 C1/5/13/3 Moy 5 2014 Winter Short-reach 710.048
1306 C1/6 Sect. A Moy 1 2015 Winter Short-reach 1821.31 Peg 0/00 to 20/00 B9 Old Railway Bridge (Sect. 1-2)
2687 C1/6 Sect. B Moy 5 2012 Winter Short-reach 4614.73 Peg 20/00 to End (Sect. 3-4)
1307 C1/6/1 Moy 5 2015 Winter Short-reach 973.763
1308 C1/6/2 Moy 5 2012 Winter Short-reach 596.507
1309 C1/6/3 Moy 5 2015 Winter Short-reach 1091.24
1310 C1/6/3/1 Moy 5 2012 Winter Short-reach 333.754
1311 C1/6/4 Moy 5 2012 Winter Short-reach 733.5
1312 C1/6/5 Moy 5 2012 Winter Short-reach 1196.18
1313 C1/6/5/1 Moy 5 2012 Winter Short-reach 547.274
1314 C1/6/6 Moy 5 2012 Winter Short-reach 933.873
1315 C1/6/7 Moy 5 2012 Winter Short-reach 285.484
1316 C1/6/7/1 Moy 5 2012 Winter Short-reach 510.83
1317 C1/6/8 Moy 5 2012 Winter Short-reach 945.628
1318 C1/6/9 Moy 5 2012 Winter Short-reach 429.774
1768 C1/6/9A Moy 5 2009 Any Short-reach 522.666 Scheme - Exhibition Maps
1319 C1/7 Moy 5 2013 Summer Short-reach 5660.24
1320 C1/7/1 Moy 5 2013 Summer Short-reach 1231.3
1321 C1/7/2 Moy 5 2013 Summer Short-reach 1186.79
1322 C1/7/3 Moy 5 2013 Summer Short-reach 1114.22
1323 C1/7/4 Moy 5 2013 Winter Short-reach 3226.84
1324 C1/7/5 Moy 5 2013 Winter Short-reach 1370.19
1325 C1/7/6 Moy 5 2013 Winter Short-reach 1498.09
1326 C1/7/6/1 Moy 5 2013 Winter Short-reach 607.43
1327 C1/8 Moy 5 2014 Any Short-reach 814.943
1328 C1/9 Moy 5 2013 Winter Short-reach 2145.19
1329 C1/9/1 Moy 5 2013 Winter Short-reach 325.684
1330 C1/9/2 Moy 5 2013 Winter Short-reach 727.443
1331 C1/10 Moy 5 2013 Summer Short-reach 949.436
1332 C1/11 Moy 5 2010 Winter Short-reach 1220.2
Page 2
Sheet1
A B C D E
Machine Type
Type of
Maintenance Length (m) Notes CommentsOverall ID Channel RefScheme
Name
Frequency of
Maintenance
Year of Last
MaintenanceTiming of Works
1333 C1/12 Moy 5 2013 Summer Short-reach 1642.54
1334 C1/13 Moy 5 2013 Summer Short-reach 2587.14
1335 C1/13/1 Moy 5 2013 Summer Short-reach 2086.94
1336 C1/13/1/1 Moy 5 2014 Summer Short-reach 2032.05
1337 C1/13/1/1/1 Moy 5 2013 Summer Short-reach 1718.39
1338 C1/13/2 Moy 5 2013 Winter Short-reach 1581.32
1339 C1/14 Moy 5 2014 Summer Short-reach 9379.23
1340 C1/14/1 Moy 5 2013 Summer Short-reach 1678.53
1341 C1/14/1/1 Moy 5 2013 Summer Short-reach 957.728
2979 C1/14/1/2 Moy 5 2013 Winter Short-reach 1576.78
1342 C1/14/2 Moy 5 2014 Winter Short-reach 553.925
1343 C1/14/3 Moy 5 2014 Winter Short-reach 511.505
1344 C1/14/4 Moy 5 2013 Summer Short-reach 2724.13
1345 C1/14/5 Moy 5 2013 Winter Short-reach 2333.75
1347 C1/14/6 Moy 5 2013 Winter Short-reach 585.693
1348 C1/14/6/1 Moy 5 2013 Winter Short-reach 196.67
1349 C1/14/7 Moy 1 2015 Winter Short-reach 4578.08
1351 C1/14/8 Moy 5 2005 Winter Short-reach 788.147
1352 C1/14/9 Moy 5 2014 Winter Short-reach 968.761
1353 C1/14/10 Moy 5 2014 Winter Short-reach 163.111
1353 C1/14/10 Moy 5 2014 Winter Short-reach 1465.37
1354 C1/14/10/1 Moy 5 2014 Winter Short-reach 481.274
1355 C1/15 Moy 5 - Any Short-reach 1117.26
1356 C1/16 Moy 5 - Summer Short-reach 4569.46
1357 C1/16/1 Moy 5 2014 Winter Short-reach 2941.79
1358 C1/16/2 Moy 5 2013 Winter Short-reach 2060.98
1359 C1/16/2/1 Moy 5 2014 Winter Short-reach 478.733
1360 C1/17 Moy 10 2012 Any Long-reach 2871.6
1361 C1/17/1 Moy 5 2014 Any Short-reach 1558.08
1362 C1/18 Moy 5 2014 Any Short-reach 1930.08
1363 C1/18/1 Moy 5 2014 Any Short-reach 1463.98
1364 C1/19 Moy 5 2014 Any Short-reach 662.429
1365 C1/20 Moy 5 2013 Any Short-reach 2609.96
1366 C1/21 Moy 10 2012 Any Long-reach 229.244
2614 C1/21A Moy 5 - Any Short-reach 297.088
1367 C1/21/1 Sect. A Moy 10 2012 Winter Long-reach 633.376 Peg 0/00 to 5/00 Muckanagh Bridge
2698 C1/21/1 Sect. B Moy 10 2012 Winter Long-reach 5887.47 Peg 5/00 to 65/00 outfall of C1/21/1/5
2700 C1/21/1 Sect. C Moy 5 2007 Winter Short-reach 5136.28 Peg 65/00 to 120/50 Park Bridge
2705 C1/21/1 Sect. D Moy 5 2012 Winter Short-reach 5298.37 Peg120/50 to 176/00 End
1368 C1/21/1/1 Moy 5 2013 Winter Short-reach 2489.69
1369 C1/21/1/1/1 Moy 5 2013 Winter Short-reach 281.912
1370 C1/21/1/2 Moy 5 2013 Winter Short-reach 3675.73
1371 C1/21/1/2/1 Moy 5 2008 Winter Short-reach 1092.07
1372 C1/21/1/3 Moy 5 2014 Winter Short-reach 938.743
1373 C1/21/1/4 Moy 5 2014 Winter Short-reach 1094.44
1374 C1/21/1/5 Sect. A Moy 10 2013 Winter Long-reach 2925.51 Peg 0/00 to Peg 53/70 outfall C1/21/1/5/2 (1-5)
2619 C1/21/1/5 Sect. B Moy 10 2013 Winter Long-reach 2786.52 Peg 53/70 to Peg 82/50 Moyhenna Br. B5 (5-11)
2625 C1/21/1/5 Sect. C Moy 10 - Winter Long-reach 1570.44 Peg 82/50 to Peg 98/80 Greeve Br. B6 (11-16)
2630 C1/21/1/5 Sect. D Moy 10 - Winter Long-reach 4712.92 Peg 98/80 to Peg 149/20 outfall C1/21/1/5/13 (16-20)
2634 C1/21/1/5 Sect. E Moy 10 2005 Winter Long-reach 3399.73 Peg 149/20 to Peg 187/20 Belcarra Br. (20-26)
2640 C1/21/1/5 Sect. F Moy 10 - Winter Long-reach 6564.29 Peg 187/20 to Peg 257/40 Ballinafad Br. (26-35)
2649 C1/21/1/5 Sect. G Moy 10 2013 Winter Long-reach 7290.56 Peg 257/40 to Peg 340/70 outfall C1/21/1/5/22 (35-44)
2657 C1/21/1/5 Sect. H Moy 5 2010 Winter Short-reach 2841.92 Peg 340/70 to Peg 369/00 Namino Lake (44-45)
2659 C1/21/1/5 Sect. I Moy 5 2010 Winter Short-reach 4829.44 Peg 380/00 to Peg 432/00 END (45-49)
Page 3
Sheet1
A B C D E
Machine Type
Type of
Maintenance Length (m) Notes CommentsOverall ID Channel RefScheme
Name
Frequency of
Maintenance
Year of Last
MaintenanceTiming of Works
1375 C1/21/1/5/1 Moy 5 2009 Summer Short-reach 1430.62
1376 C1/21/1/5/2 Sect. A Moy 1 2014 Summer Long-reach/Weed-cutting boat 2768.12 Peg 0/00 to 32/10 B3
2713 C1/21/1/5/2 Sect. B Moy 1 2013 Summer Long-reach/Weed-cutting boat 6402.84 Peg 32/10 to 105/00 B6
2722 C1/21/1/5/2 Sect. C Moy 1 2014 Summer Weed-cutting boat 2804.83 Peg 105/00 to 118/00 Lough Lannagh
1377 C1/21/1/5/2/1 Moy 5 2014 Winter Short-reach 993.221
1378 C1/21/1/5/2/2 Moy 5 2012 Summer Short-reach 6452.21
1379 C1/21/1/5/2/2/1 Moy 5 2008 Summer Short-reach 479.419
1380 C1/21/1/5/2/2/2 Moy 5 2012 Summer Short-reach 2111
1381 C1/21/1/5/2/2/2/1 Moy 5 2012 Summer Short-reach 774.202
1383 C1/21/1/5/2/2/3 Moy 5 2012 Summer Short-reach 1115.94
1384 C1/21/1/5/2/2/4 Moy 5 2012 Summer Short-reach 1845.2
1385 C1/21/1/5/2/2/5 Moy 5 2012 Summer Short-reach 1137.91
1386 C1/21/1/5/2/2/6 Moy 5 2012 Summer Short-reach 1154.86
1387 C1/21/1/5/2/3 Moy 5 2010 Any Short-reach 333.62
1388 C1/21/1/5/2/4 Moy 5 2010 Winter Short-reach 391.648
1389 C1/21/1/5/2/5 Moy 5 2010 Winter Short-reach 414.211
1390 C1/21/1/5/2/6 Moy 5 2010 Winter Short-reach 360.27
1391 C1/21/1/5/2/7 Moy 5 2009 Summer Short-reach 321.776
1392 C1/21/1/5/2/8 Moy 5 2009 Summer Short-reach 665.237
1393 C1/21/1/5/2/9 Moy 5 2007 Summer Short-reach 200.205
1394 C1/21/1/5/2/10 Moy 5 2009 Summer Short-reach 256.962
1395 C1/21/1/5/2/11 Moy 5 2010 Winter Short-reach 730.507
1396 C1/21/1/5/2/11/1 Moy 5 2010 Winter Short-reach 272.841
1397 C1/21/1/5/2/12 Moy 5 2002 Winter Short-reach 656.332
1398 C1/21/1/5/2/13 Moy 5 2011 Any Short-reach 2310.42
1399 C1/21/1/5/2/13/1 Moy 5 2011 Any Short-reach 1358.2
1400 C1/21/1/5/2/13/1/1 Moy 5 2011 Winter Short-reach 778.441
1401 C1/21/1/5/2/13/1/2 Moy 5 2011 Winter Short-reach 388.003
1402 C1/21/1/5/2/13/1/3 Moy 5 2006 Winter Short-reach 373.643
1403 C1/21/1/5/2/13/2 Moy 5 2010 Winter Short-reach 565.907
1404 C1/21/1/5/2/13/2/1 Moy 5 2010 Winter Short-reach 130.333
1405 C1/21/1/5/2/13/3 Moy 5 2010 Winter Short-reach 720.582
1406 C1/21/1/5/2/13/4 Moy 5 2010 Winter Short-reach 676.841
1407 C1/21/1/5/2/13/4/1 Moy 5 2006 Winter Short-reach 251.425
1408 C1/21/1/5/2/14 Moy 5 2005 Summer Short-reach 444.777
1409 C1/21/1/5/2/15 Moy 5 2010 Winter Short-reach 1335.27
1410 C1/21/1/5/2/16 Moy 5 2009 Summer Short-reach 399.835
1411 C1/21/1/5/2/17 Moy 5 2009 Summer Short-reach 3439.77
1412 C1/21/1/5/2/17/1 Moy 5 2006? Summer Short-reach 636.782
1413 C1/21/1/5/2/17/2 Moy 5 2006 Summer Short-reach 2184.77
1414 C1/21/1/5/2/17/2/1 Moy 5 2006 Summer Short-reach 829.248
1415 C1/21/1/5/2/18 Moy 10 2009 Any Long-reach 3232.12
1416 C1/21/1/5/2/18/1 Moy 5 2010 Winter Short-reach 2593.08
1417 C1/21/1/5/2/19 Moy 5 2014 Winter Short-reach 3242.96
1418 C1/21/1/5/2/19/1 Moy 5 2013 Winter Short-reach 402.427
1419 C1/21/1/5/2/19/2 Moy 5 2014 Winter Short-reach 1086.47
1420 C1/21/1/5/2/19/3 Moy 5 2014 Winter Short-reach 616.254
1421 C1/21/1/5/2/20 Moy 5 2014 Winter Short-reach 4041.45
1422 C1/21/1/5/2/20/1 Moy 5 2013 Winter Short-reach 960.078
1423 C1/21/1/5/2/20/1/1 Moy 5 2013 Winter Short-reach 612.436
1424 C1/21/1/5/2/20/2 Moy 5 2013 Winter Short-reach 604.784
1425 C1/21/1/5/2/20/2/1 Moy 5 2013 Winter Short-reach 659.993
1427 C1/21/1/5/2/20/2/3 Moy 5 2013 Any Short-reach 447.147
1428 C1/21/1/5/2/20/3 Moy 5 2013 Winter Short-reach 556.947
Page 4
Sheet1
A B C D E
Machine Type
Type of
Maintenance Length (m) Notes CommentsOverall ID Channel RefScheme
Name
Frequency of
Maintenance
Year of Last
MaintenanceTiming of Works
1429 C1/21/1/5/2/20/4 Moy 5 2013 Winter Short-reach 1087.75
1430 C1/21/1/5/2/20/5 Moy 5 2008 Winter Short-reach 229.856
2862 C1/21/1/5/2/20/6 Moy 5 2013 Winter Short-reach 1351.21
1432 C1/21/1/5/2/20/7 Moy 5 2008 Winter Short-reach 368.8
1433 C1/21/1/5/2/20/8 Moy 5 2008 Winter Short-reach 491.127
1434 C1/21/1/5/2/20/9 Moy 5 2008 Winter Short-reach 757.284
1435 C1/21/1/5/2/20/10 Moy 5 2008 Winter Short-reach 380.117
1436 C1/21/1/5/2/20/11 Moy 5 2014 Winter Short-reach 847.697
1437 C1/21/1/5/2/20/11/1 Moy 5 2014 Winter Short-reach 351.808
1438 C1/21/1/5/2/20/11/2 Moy 5 2014 Winter Short-reach 110.524
1439 C1/21/1/5/3 Moy 5 2014 Summer Short-reach 3217.78
1440 C1/21/1/5/3/1 Moy 5 2014 Summer Short-reach 2284.37
1441 C1/21/1/5/3/2 Moy 5 2014 Summer Short-reach 475.157
1442 C1/21/1/5/4 Moy 5 2014 Summer Short-reach 4171.44
1443 C1/21/1/5/4/1 Moy 5 2014 Winter Short-reach 540.358
1444 C1/21/1/5/4/2 Moy 5 2014 Summer Short-reach 1467.63
1446 C1/21/1/5/4/3 Moy 5 2014 Summer Short-reach 1263.77
1447 C1/21/1/5/4/4 Moy 5 2014 Summer Short-reach 945.537
1448 C1/21/1/5/5 Moy 5 2014 Winter Short-reach 355.244
1449 C1/21/1/5/6 Moy 5 2012 Summer Short-reach 1575.8
1450 C1/21/1/5/6/1 Moy 5 2012 Summer Short-reach 1032.04 Important salmonid channel
1451 C1/21/1/5/7 Moy 5 2009 Summer Short-reach 1572.71
1452 C1/21/1/5/7/1 Moy 5 2009 Any Short-reach 1282.25
1453 C1/21/1/5/7/2 Moy 5 2009 Summer Short-reach 2906.76
1454 C1/21/1/5/8 Moy 5 2013 Any Short-reach 3949.75
1455 C1/21/1/5/8/1 Moy 5 2009 Any Short-reach 733.455
1456 C1/21/1/5/8/2 Moy 5 2009 Any Short-reach 1081.34
1457 C1/21/1/5/9 Moy 5 2009 Winter Short-reach 865.605
1458 C1/21/1/5/10 Moy 5 2009 Winter Short-reach 950.136
1459 C1/21/1/5/11 Moy 5 2010 Winter Short-reach 668.797
1460 C1/21/1/5/12 Moy 5 2010 Winter Short-reach 3874.67
2922 C1/21/1/5/12/1 Moy 5 2010 Winter Short-reach 2669.62
1462 C1/21/1/5/12/1/1 Moy 5 2010 Winter Short-reach 2526.93
1463 C1/21/1/5/12/1/1/1 Moy 5 2010 Winter Short-reach 378.411
1464 C1/21/1/5/12/2 Moy 5 2011 Winter Short-reach 4378.78
1464 C1/21/1/5/12/2/1 Moy 5 2011 Winter Short-reach 1272.79
1466 C1/21/1/5/12/3 Moy 1 2015 Winter Short-reach 3028.15
1467 C1/21/1/5/12/3/1 Moy 1 2015 Winter Short-reach 2052.6
1468 C1/21/1/5/12/3/1/1 Moy 5 2011 Any Short-reach 1052.36
1469 C1/21/1/5/12/3/1/2 Moy 5 2011 Winter Short-reach 428.471
1470 C1/21/1/5/12/3/1/3 Moy 5 2011 Any Short-reach 730.698
1471 C1/21/1/5/12/3/2 Moy 5 2011 Winter Short-reach 705.079
1472 C1/21/1/5/13 Moy 5 2011 Winter Short-reach 555.028
1473 C1/21/1/5/14 Moy 5 2005 Winter Short-reach 779.627
1473 C1/21/1/5/14 Moy 5 2005 Winter Short-reach 450.458
1474 C1/21/1/5/15 Moy 5 2009 Winter Short-reach 755.743
1475 C1/21/1/5/16 Moy 5 2009 Winter Short-reach 1659.54
1476 C1/21/1/5/16/1 Moy 5 2015 Winter Short-reach 1801.52
1477 C1/21/1/5/17 Moy 5 2009 Winter Short-reach 1205.98
1478 C1/21/1/5/18 Moy 5 2010 Any Short-reach 10082.68
1479 C1/21/1/5/18/1 Moy 5 2014 Winter Short-reach 2596.65
1480 C1/21/1/5/18/2 Moy 5 2014 Winter Short-reach 1706.66
1481 C1/21/1/5/18/3 Moy 5 2014 Winter Short-reach 1365.89
1482 C1/21/1/5/18/4 Moy 1 2014 Winter Short-reach 2328.24
Page 5
Sheet1
A B C D E
Machine Type
Type of
Maintenance Length (m) Notes CommentsOverall ID Channel RefScheme
Name
Frequency of
Maintenance
Year of Last
MaintenanceTiming of Works
1483 C1/21/1/5/18/4/1 Moy 5 2014 Winter Short-reach 1106.32
1484 C1/21/1/5/18/5 Moy 5 2014 Winter Short-reach 3468.59
1485 C1/21/1/5/18/5/1 Moy 5 2014 Winter Short-reach 2562.69
1486 C1/21/1/5/18/6 Moy 5 2014 Winter Short-reach 1324.85
1487 C1/21/1/5/19 Moy 5 2008 Winter Short-reach 1677.5
1488 C1/21/1/5/20 Moy 5 2010 Winter Short-reach 1175.54
1489 C1/21/1/5/21 Moy 5 2010 Any Short-reach 315.454
1491 C1/21/1/5/23 Moy 5 2010 Winter Short-reach 2601.5
1492 C1/21/1/5/24 Moy 5 2010 Summer Short-reach 592.074
1493 C1/21/1/5/25 Moy 5 2013 Summer Short-reach 1359.91
1494 C1/21/1/6 Moy 5 2014 Winter Short-reach 844.109
1495 C1/21/1/7 Moy 5 2014 Winter Short-reach 530.238
1496 C1/21/1/8 Moy 5 2014 Winter Short-reach 536.345
1497 C1/21/1/9 Moy 5 2014 Winter Short-reach 714.831
1498 C1/21/1/10 Moy 5 2009 Winter Short-reach 1848.09
1500 C1/21/2 Moy 5 2013 Winter Short-reach 847.507
2737 C1/21/3 Moy 5 2009 Winter Short-reach 3814.19
1501 C1/21/3 Moy 5 2009 Winter Short-reach 1711.98
1502 C1/21/3/1 Moy 5 2014 Winter Short-reach 954.135
1503 C1/21/3/1/1 Moy 5 2015 Winter Short-reach 850.568 Important salmonid channel
1504 C1/21/3/1/1/1 Moy 5 2014 Winter Short-reach 948.345 Important salmonid channel
1505 C1/21/4 Moy 5 2012 Winter Short-reach 1315.45 Important salmonid channel
1506 C1/21/5 Moy 5 2010 Summer Short-reach 1880.17 Important salmonid channel
1507 C1/21/6 Moy 5 - Any Short-reach 904.9 Important salmonid channel
1508 C1/21/7 Moy 10 2011 Winter Long-reach 8125.54 Important salmonid channel
1509 C1/21/7/1 Moy 5 2011 Summer Short-reach 1598.65 Important salmonid channel
1510 C1/21/7/1/1 Moy 5 2010 Summer Short-reach 958.309
1511 C1/21/7/1/1/1 Moy 5 2010 Summer Short-reach 938.419
1512 C1/21/7/1/1/2 Moy 5 2010 Winter Short-reach 460.703
1513 C1/21/7/1/2 Moy 5 2010 Summer Short-reach 2742.97
1514 C1/21/7/1/2/1 Moy 5 2010 Summer Short-reach 1234.92
1515 C1/21/8 Moy 5 - Any Short-reach 3748.72
1516 C1/21/9 Moy 5 2011 Winter Short-reach 2659.1
1517 C1/21/9/1 Moy 5 2013 Winter Short-reach 1544.31
1518 C1/21/10 Moy 5 2013 Summer Short-reach 1213.04
1519 C1/21/10/1 Moy 5 2013 Summer Short-reach 587.745
1520 C1/21/11 Moy 5 2013 Winter Short-reach 2448.28
1521 C1/21/12 Moy 5 2013 Summer Short-reach 2458.99
1522 C1/21/13 Moy 5 2008 Summer Short-reach 1426.75
1523 C1/21/13/1 Moy 5 2008 Summer Short-reach 1095.91
1524 C1/21/14 Sect. A Moy 10 2013 Summer Long-reach 5240.48 Peg 3/00 to B2 (sect.'s 1-5)
2745 C1/21/14 Sect. B Moy 10 2013 Any Long-reach 6240.68 Includes Sections 6-8
1525 C1/21/14/1 Moy 5 2015 Winter Short-reach 4959.53
1526 C1/21/14/1/1 Moy 5 2014 Winter Short-reach 1049.07
1527 C1/21/14/2 Moy 5 2011 Winter Short-reach 2317.96
2748 C1/21/14/2/1 Moy 5 2012 Summer Short-reach 8660.74
1529 C1/21/14/2/1/1 Moy 5 2011 Summer Short-reach 1075.58
1530 C1/21/14/2/1/2 Moy 5 2011 Winter Short-reach 5074.98
1531 C1/21/14/2/1/2/1 Moy 5 2011 Summer Short-reach 899.462
1532 C1/21/14/2/1/3 Moy 5 2012 Summer Short-reach 1089.06
1533 C1/21/14/2/1/4 Moy 5 2011 Winter Short-reach 2217.69
1534 C1/21/14/2/1/4/1 Moy 5 2011 Winter Short-reach 219.532
1535 C1/21/14/2/1/4/1/1 Moy 5 2006 Winter Short-reach 268.179
1536 C1/21/14/2/1/5 Moy 5 2011 Winter Short-reach 570.905
Page 6
Sheet1
A B C D E
Machine Type
Type of
Maintenance Length (m) Notes CommentsOverall ID Channel RefScheme
Name
Frequency of
Maintenance
Year of Last
MaintenanceTiming of Works
1537 C1/21/14/2/1/6 Moy 5 2011 Winter Short-reach 823.856
1538 C1/21/14/2/2 Moy 5 2011 Winter Short-reach 3843.14
1539 C1/21/14/3 Moy 5 2007 Summer Short-reach 853.455
1540 C1/21/14/4 Moy 5 2004 Winter Short-reach 1099.37
1541 C1/21/14/5 Moy 5 2005 Winter Short-reach 3354.43
1542 C1/21/14/5/1 Moy 5 2004 Winter Short-reach 1469.3
1543 C1/21/14/5/2 Moy 5 2004 Winter Short-reach 2427.61
1544 C1/21/14/6 Moy 5 2012 Summer Short-reach 5944.25
1545 C1/21/14/6/1 Moy 5 2008 Summer Short-reach 918.305
1546 C1/21/14/6/2 Moy 5 2008 Summer Short-reach 1473.75
1547 C1/22 Moy 5 2014 Any Short-reach 1422.94
1548 C1/23 Moy 5 2014 No records Short-reach 10004.44
1549 C1/23/1 Moy 5 2015 Winter Short-reach 2440.35
1550 C1/23/1/1 Moy 5 2015 Winter Short-reach 344.981
1551 C1/23/2 Moy 5 2014 Summer Short-reach 1556.19
1552 C1/23/2/1 Moy 5 2013 Summer Short-reach 448.71
1554 C1/23/3 Moy 5 2009 Summer Short-reach 4069.51
1555 C1/23/4 Moy 5 - Summer Short-reach 646.375
1556 C1/24 Moy 5 2013 Any Short-reach 1183.87
1557 C1/25 Moy 5 2013 Summer Short-reach 6976.14
1558 C1/25/1 Moy 5 2012 Summer Short-reach 1182.51
1559 C1/25/2 Moy 5 2012 Summer Short-reach 486.327
1560 C1/25/3 Moy 5 2014 Summer Short-reach 1917.87
1561 C1/25/3/1 Moy 5 2014 Summer Short-reach 704.314
1562 C1/26 Moy 5 2013 Any Short-reach 1670.2
1563 C1/26/1 Moy 5 2013 Any Short-reach 669.026
1564 C1/27 Moy 5 2014 Any Short-reach 5160.38
1565 C1/27/1 Moy 5 2015 Summer Short-reach 357.728
1566 C1/27/2 Moy 5 2014 Any Short-reach 572.098
1567 C1/27/3 Moy 5 2013 Any Short-reach 1175.54
1568 C1/27/3/1 Moy 5 2013 Any Short-reach 469.556
1569 C1/27/4 Moy 5 2014 Any Short-reach 277.614
1570 C1/27/5 Moy 5 2014 Any Short-reach 857.629
1571 C1/28 Moy 5 2013 Any Short-reach 6258.96
1572 C1/28/1 Moy 1 2013 Winter Short-reach 3634.77
1573 C1/28/1/1 Moy 5 2013 Winter Short-reach 366.037
1574 C1/28/1/2 Moy 1 2013 Winter Short-reach 474.137
1575 C1/28/1/3 Moy 1 2013 Winter Short-reach 447.342
1576 C1/28/1/4 Moy 1 2013 Winter Short-reach 400.867
1577 C1/28/2 Moy 5 2013 Winter Short-reach 2850.03
1578 C1/28/3 Moy 5 2013 Winter Short-reach 380.984
1579 C1/28/4 Moy 5 2008 Winter Short-reach 713.178
1580 C1/29 Moy 5 2013 Any Short-reach 928.353
1581 C1/30 Sect. A Moy 5 2014 Summer Short-reach 5140.7 Peg 0 - 51 Ballymiles Bridge (sect.'s 1-5)
2753 C1/30 Sect. B Moy 10 2012 Summer Long-reach 6196.66 Peg 51-116 B7 D/Stream of Mill
2760 C1/30 Sect. C Moy 10 2010 Summer Long-reach 5211.75 Peg 116-170 B12
2766 C1/30 Sect. D Moy 1 2014 Summer Long-reach/Weed-cutting boat 6492.76 Peg 170-238 B15
2772 C1/30 Sect. E Moy 1 2015 Summer Long-reach/Weed-cutting boat 3484.5 Peg 238-274 B17 Manin Bridge
2774 C1/30 Sect. F Moy 1 2015 Summer Weed-cutting boat 5928.99 Peg 274/00-334/50 B18 Annagh Bridge
2776 C1/30 Sect. G Moy 1 2013 Summer Weed-cutting boat 5896.42 Peg334/50 to End
1582 C1/30/1 Moy 5 2013 Any Short-reach 1524.28
1583 C1/30/2 Moy 5 2014 Summer Short-reach 695.139
1584 C1/30/2/1 Moy 5 2014 Any Short-reach 585.822
1585 C1/30/3 Moy 5 2013 Summer Short-reach 3946.81
Page 7
Sheet1
A B C D E
Machine Type
Type of
Maintenance Length (m) Notes CommentsOverall ID Channel RefScheme
Name
Frequency of
Maintenance
Year of Last
MaintenanceTiming of Works
1586 C1/30/3/1 Moy 5 2013 Any Short-reach 641.915
1587 C1/30/4 Moy 5 2015 Summer Short-reach 1089.14
1588 C1/30/4/1 Moy 5 2014 Summer Short-reach 849.134
1589 C1/30/5 Sect. A Moy 10 2012 Summer Long-reach 5150.69 Peg 00/0 to 54/00 B8 Kinaffe Bridge (Sect. 1-5)
2782 C1/30/5 Sect. B Moy 10 2013 Summer Long-reach 5402.34 Peg 54/00 to 111/00 B10 Rina Bridge (Sect. 6-9)
2786 C1/30/5 Sect. C Moy 10 2012 Summer Long-reach 7034.85 Peg 111/00 to 180/00 B15 Kilkelly Bridge (Sect. 10-16)
2793 C1/30/5 Sect. D Moy 10 2008 Summer Long-reach 7006.92 Peg 180/00 to 264/00 B10 End (Sect. 17-21)
1590 C1/30/5/1 Moy 5 2014 Summer Short-reach 1017.79
1591 C1/30/5/2 Moy 5 2014 Summer Short-reach 4019.28
1592 C1/30/5/3 Moy 5 2013 Summer Short-reach 1774.57
1593 C1/30/5/4 Moy 5 2014 Summer Short-reach 6085.15
1594 C1/30/5/4/1 Moy 5 2014 Summer Short-reach 769.596
1595 C1/30/5/4/2 Moy 5 2013 Any Short-reach 1254.55
1596 C1/30/5/5 Moy 5 2014 Winter Short-reach 1112.45
1597 C1/30/5/5/1 Moy 5 2014 Summer Short-reach 3169.93
1598 C1/30/5/5/2 Moy 5 2008 Winter Short-reach 364.017
1599 C1/30/5/6 Moy 5 2014 Summer Short-reach 901.869
1600 C1/30/5/7 Moy 5 2013 Summer Short-reach 1350.98
1601 C1/30/5/8 Moy 5 2004 Summer Short-reach 424.504
1602 C1/30/5/9 Moy 5 2013 Summer Short-reach 651.262
1603 C1/30/5/9/1 Moy 5 2013 Summer Short-reach 1267.83
1604 C1/30/5/10 Moy 5 2013 Summer Short-reach 939.919
1605 C1/30/5/11 Moy 5 2013 Winter Short-reach 5144.55
1606 C1/30/5/11/1 Moy 5 2012 Winter Short-reach 743.887
1607 C1/30/5/11/2 Moy 5 2013 Winter Short-reach 1299.37
1608 C1/30/5/12 Moy 5 2013 Winter Short-reach 1457.87
1609 C1/30/5/13 Moy 5 2013 Winter Short-reach 1166.36
1610 C1/30/6 Moy 5 2014 Any Short-reach 2596.12
1611 C1/30/7 Sect. A Moy 10 2014 Any Long-reach 3320.32 Peg 0/00 to Peg 35/00 B3 (Sect. 1-4)
2802 C1/30/7 Sect. B Moy 10 2012 Any Long-reach 5399.38 Peg 35/00 to 92/00 B6 (Sect. 4-8)
2806 C1/30/7 Sect. C Moy 10 2009 Summer Long-reach 4260.85 Peg 92/00 to 137/00 Cuiltybo Lake (Sect. 9-13)
2810 C1/30/7 Sect. D Moy 10 2009 Any Long-reach 5345.28 Peg 137/00 to 199/00 B12 (Sect.13-15)
2813 C1/30/7 Sect. E Moy 10 2010 Any Long-reach 5729.36 Peg 199/00 to 259/00 B15 (Sect. 15-20)
2818 C1/30/7 Sect. F Moy 10 - Summer Long-reach 4736.27 Peg 259/00 to 308/00 B17 (Sect. 20-24)
2821 C1/30/7 Sect. G Moy 10 2007 Any Long-reach 3172.2 Peg 308/00 to 344/00 END
1612 C1/30/7/1 Moy 5 2011 Any Short-reach 369.97
1613 C1/30/7/2 Moy 5 2012 Summer Short-reach 2173.82
1614 C1/30/7/3 Moy 5 2012 Summer Short-reach 4927.4
1615 C1/30/7/4 Moy 5 2015 Summer Short-reach 1370.13
1616 C1/30/7/4/1 Moy 5 2011 Summer Short-reach 1222.84
1617 C1/30/7/4/2 Moy 5 2015 Summer Short-reach 760.077
1618 C1/30/7/5 Moy 5 2011 Summer Short-reach 1489.88
1619 C1/30/7/5/1 Moy 5 2011 Summer Short-reach 1403.47
1620 C1/30/7/6 Moy 5 2015 Any Short-reach 852.189
1621 C1/30/7/7 Moy 5 2015 Winter Short-reach 3570.87
1622 C1/30/7/8 Moy 5 2015 Winter Short-reach 5651.68
1623 C1/30/7/8/1 Moy 5 2011 Summer Short-reach 2506.66
1624 C1/30/7/8/1/1 Moy 5 2015 Summer Short-reach 831.881
1625 C1/30/7/8/1/2 Moy 5 2011 Summer Short-reach 2203.61
1626 C1/30/7/8/1/2/1 Moy 5 2007 Summer Short-reach 861.402
1627 C1/30/7/9 Moy 5 2011 Winter Short-reach 4928.99
1628 C1/30/7/9/1 Moy 5 2011 Winter Short-reach 1086.25
1629 C1/30/7/9A Moy 5 2014 Summer Short-reach 641.985
1630 C1/30/7/10 Moy 5 2014 Winter Short-reach 5209.69
Page 8
Sheet1
A B C D E
Machine Type
Type of
Maintenance Length (m) Notes CommentsOverall ID Channel RefScheme
Name
Frequency of
Maintenance
Year of Last
MaintenanceTiming of Works
1631 C1/30/7/10/1 Moy 5 2012 Winter Short-reach 2009.92
1632 C1/30/7/11 Moy 5 2008 Summer Short-reach 1849.31
1633 C1/30/7/12 Moy 10 2013 Any Long-reach 8478.09
1634 C1/30/7/12/1 Moy 5 2008 Summer Short-reach 1564.95
1635 C1/30/7/12/2 Moy 5 2012 Winter Short-reach 4877.65
1636 C1/30/7/12/2/1 Moy 5 2013 Winter Short-reach 2605.79
1637 C1/30/7/12/2/2 Moy 5 2012 Winter Short-reach 2179.97
1638 C1/30/7/12/3 Moy 5 2013 Winter Short-reach 1211.98
1639 C1/30/7/13 Moy 5 2014 Any Short-reach 954.171
1640 C1/30/7/13/1 Moy 5 2014 Any Short-reach 2151.34
1641 C1/30/7/14 Moy 5 2014 Winter Short-reach 1257.92
1642 C1/30/7/15 Moy 5 2014 Any Short-reach 3627.57
1643 C1/30/7/15/1 Moy 5 2015 Winter Short-reach 3955.93
1644 C1/30/7/15/1/1 Moy 5 2015 Winter Short-reach 3619.93
1645 C1/30/7/15/1/2 Moy 5 2014 Winter Short-reach 977.884
1646 C1/30/7/15/2 Moy 5 2014 Winter Short-reach 741.438
1647 C1/30/7/15/3 Moy 5 2014 Winter Short-reach 1315.4
1648 C1/30/7/16 Moy 5 2012 Summer Short-reach 6757.81
1649 C1/30/7/16/1 Moy 5 2012 Summer Short-reach 2901.04
1650 C1/30/7/16/1/1 Moy 5 2012 Summer Short-reach 1763.57
1651 C1/30/7/17 Moy 5 2015 Winter Short-reach 3941.95
1652 C1/30/7/18 Moy 5 2012 Winter Short-reach 2061.37
1653 C1/30/7/19 Moy 5 2014 Winter Short-reach 4039.66
1654 C1/30/8 Moy 5 - Winter Short-reach 393.901
1655 C1/30/9 Moy 5 2013 Winter Short-reach 575.018
1656 C1/30/10 Moy 5 2013 Winter Short-reach 551.655
1657 C1/30/11 Moy 5 2013 Winter Short-reach 1320.36
1658 C1/30/12 Moy 5 2013 Any Short-reach 437.612
1659 C1/30/13 Moy 5 2014 Winter Short-reach 727.393
1660 C1/30/14 Moy 5 2013 Winter Short-reach 564.73
1661 C1/30/15 Moy 5 2013 Winter Short-reach 210.944
1662 C1/30/16 Moy 5 2013 Winter Short-reach 565.792
1663 C1/30/17 Moy 5 2013 Winter Short-reach 642.614
1664 C1/30/18 Moy 5 2013 Winter Short-reach 342.532 Important salmonid channel
1665 C1/30/19 Moy 5 2013 Winter Short-reach 2081.85
1666 C1/30/19/1 Moy 5 2013 Winter Short-reach 2303.8
1667 C1/30/19/1/1 Moy 5 2013 Winter Short-reach 1200.75
1668 C1/30/20 Moy 5 2013 Winter Short-reach 925.005
1669 C1/30/21 Moy 5 2006 Winter Short-reach 707.295
1670 C1/31 Moy 5 2008 Any Short-reach 8341.1
1671 C1/31/1 Moy 5 2014 Summer Short-reach 744.975
1672 C1/31/2 Moy 5 2013 Any Short-reach 8543.64
1673 C1/31/2/1 Moy 5 2012 Summer Short-reach 2356.01
1674 C1/32 Moy 5 - Winter Short-reach 409.145
1675 C1/33 Moy 5 - Any Short-reach 204.865
1676 C1/34 Moy 5 - Winter Short-reach 252.136
1677 C1/35 Moy 5 2011 Summer Short-reach 13056.35
1678 C1/35/1 Moy 5 2008 Any Short-reach 1035.39
1679 C1/35/2 Moy 5 2008 Winter Short-reach 1334.66
1680 C1/36 Moy 5 2014 Summer Short-reach 6575.18
1681 C1/37 Moy 5 2014 Any Short-reach 751.688
1682 C1/38 Moy 5 2014 Winter Short-reach 1723.68
1683 C1/39 Moy 5 2012 Any Short-reach 10454.22
1684 C1/39/1 Moy 5 2011 Winter Short-reach 554.245
Page 9
Sheet1
A B C D E
Machine Type
Type of
Maintenance Length (m) Notes CommentsOverall ID Channel RefScheme
Name
Frequency of
Maintenance
Year of Last
MaintenanceTiming of Works
1685 C1/39/2 Moy 5 - Winter Short-reach 612.525
1686 C1/39/3 Moy 5 2014 Winter Short-reach 2423.52
1687 C1/39/4 Moy 5 2013 Any Short-reach 669.423
1688 C1/40 Moy 5 2011 Any Short-reach 4110.94
1689 C1/41 Moy 5 2014 Any Short-reach 4762.57
1690 C1/41/1 Moy 5 2009 Any Short-reach 1714.2
1691 C1/41/1/1 Moy 5 2009 Any Short-reach 455.545
1692 C1/41/1/2 Moy 5 2009 Any Short-reach 476.215
1693 C1/41/1/3 Moy 5 2009 Any Short-reach 820.016
1694 C1/41/2 Moy 5 2014 Any Short-reach 3318.64
1695 C1/41/2/1 Moy 5 2013 Any Short-reach 668.476
1696 C1/41/2/2 Moy 5 2014 Any Short-reach 1502.96
1697 C1/41/2/2/1 Moy 5 2014 Any Short-reach 913.911 Important salmonid channel.
1698 C1/41/2/3 Moy 5 2014 Any Short-reach 855.073
1699 C1/41/3 Moy 5 2014 Any Short-reach 1131.21
1700 C1/42 Moy 5 2013 Any Short-reach 2785.84
1701 C1/42/1 Moy 5 2013 Any Short-reach 554.986
1702 C1/43 Moy 5 2015 Summer Short-reach 561.003
1703 C1/44 Sect. A Moy 10 - Any Long-reach 1480.61 Peg 0/00 to Peg 15/40 B1 (Sect. 1-4)
2841 C1/44 Sect. B Moy 10 2005 Any Long-reach 2878.54 Peg 15/40 to Peg 42/00 END (Sect. 3-6)
1704 C1/44/1 Moy 5 2008 Winter Short-reach 2500.04
1705 C1/45 Sect. A Moy 10 2009 Any Long-reach 4048.02 Peg 0/00 to Peg 46/50 B2 (Sect. 1-3)
2847 C1/45 Sect. B Moy 10 2009 Any Long-reach 5491.41 Peg 46/50 to Peg 111/50 outfall C1/45/2 (Sect. 4-8)
2851 C1/45 Sect. C Moy 5 - Any Short-reach 1150.54 Peg 111/50 to Peg 124/50 B9 (Sect. 9-10)
2853 C1/45 Sect. D Moy 5 2012 Any Short-reach 4352.93 Peg 124/50 to Peg 170/00 END (Sect. 11-14)
1706 C1/45/1 Moy 5 2008 Winter Short-reach 969.491
1707 C1/45/2 Moy 5 2012 Any Short-reach 5048.41
1708 C1/45/2/1 Moy 5 2013 Winter Short-reach 3017.19
1709 C1/45/2/1/1 Moy 5 2013 Winter Short-reach 1014.5 Blockages removal
1710 C1/45/2/2 Moy 5 2012 Winter Short-reach 847.273
1711 C1/45/3 Moy 5 2007 Summer Short-reach 900.028
1712 C1/45/4 Moy 5 2014 Summer Short-reach 1984
1713 C1/46 Moy 5 2014 Winter Short-reach 4794.78
1714 C1/47 Moy 5 2012 Winter Short-reach 3883.94
1715 C1/47/1 Moy 5 2012 Winter Short-reach 1384.03
1716 C1/48 Sect.A Moy 10 2015 Summer Long-reach 2361.88 Peg 0/00 to 23/35 B1 Dawros Bridge
2857 C1/48 Sect. B Moy 10 2015 Summer Long-reach 2688.61 Peg 23/35 to 48/85 B2
2859 C1/48 Sect. C Moy 10 2010 Summer Long-reach 3741.49 Peg 48/85 to 87/80 B3 Curry Bridge
2862 C1/48 Sect. D Moy 10 2005 Summer Long-reach 3548.02 Peg 87/80 to 122/60 B5 Botunny Bridge
2865 C1/48 Sect. E Moy 10 2005 Summer Long-reach 5019.98 Peg 122/60 to 176/00 B9
2871 C1/48 Sect. F Moy 10 2008 Summer Long-reach 6346.39 Peg 176/00 to 243/00 (End) No potential for fishery enhancement works.
1717 C1/48/1 Moy 5 2010 Summer Short-reach 4274.55
1718 C1/48/2 Moy 5 2006 Summer Short-reach 1132.05
1719 C1/48/3 Moy 5 2010 Summer Short-reach 5993.21
1720 C1/48/4 Moy 5 2007 Summer Short-reach 809.148
1721 C1/48/5 Moy 5 2007 Summer Short-reach 3199.85
1722 C1/48/6 Moy 5 2008 Summer Short-reach 1053.83
1723 C1/48/6/1 Moy 5 2008 Summer Short-reach 1112.2
1724 C1/48/7 Moy 5 2009 Summer Short-reach 6963.41
1725 C1/48/7/1 Moy 5 2009 Summer Short-reach 1279.34
1726 C1/48/8 Moy 5 2008 Summer Short-reach 1090.71
1727 C1/49 Sect. A Moy 10 2014 Any Long-reach 1532.17 Peg 0/00 to 51/40 B2 Aclare
2885 C1/49 Sect. B Moy 10 2012 Any Long-reach 4797.31 Peg 59/00 to End
1728 C1/49/1 Moy 5 2013 Summer Short-reach 1816.97
Page 10
Sheet1
A B C D E
Machine Type
Type of
Maintenance Length (m) Notes CommentsOverall ID Channel RefScheme
Name
Frequency of
Maintenance
Year of Last
MaintenanceTiming of Works
1729 C1/49/2 Moy 5 2012 Summer Short-reach 1497.73
1730 C1/49/3 Moy 5 2014 Summer Short-reach 1129.05
1731 C1/49/4 Moy 5 2013 Summer Short-reach 1428.99
1732 C1/49/5 Moy 5 2014 Summer Short-reach 1265.51
1733 C1/49/6 Moy 5 2013 Summer Short-reach 1018.29
1734 C1/50 Moy 5 2014 Summer Short-reach 4656.14
1735 C1/50/1 Moy 5 2011 Summer Short-reach 737.555
1736 C1/50/2 Moy 5 2015 Summer Short-reach 3480.19
1737 C1/51 Moy 5 2011 Any Short-reach 2108.45
1738 C1/52 Moy 5 2014 Winter Short-reach 6156.33
1739 C1/52/1 Moy 5 2014 Winter Short-reach 1576.53
1740 C1/52/2 Moy 5 2014 Winter Short-reach 4345.91
1741 C1/53 Moy 5 2014 Any Short-reach 2867.79
1742 C1/54 Moy 10 2011 Any Long-reach 3013.48
1743 C1/54/1 Moy 5 2011 Any Short-reach 985.92
1744 C1/55 Moy 5 2010 Winter Short-reach 6892.04
1745 C1/55/1 Moy 5 2010 Summer Short-reach 2472.97
1746 C1/55/1/1 Moy 5 2010 Any Short-reach 1285.57
1747 C1/55/2 Moy 5 2011 Winter Short-reach 3475.34
1748 C1/55/2/1 Moy 5 2011 Winter Short-reach 866.424
1749 C1/55/3 Moy 5 2010 Winter Short-reach 367.692
1750 C1/56 Moy 5 2011 Summer Short-reach 1056.06
1751 C1/57 Moy 5 2010 Summer Short-reach 4869.23
1752 C1/57/1 Moy 5 2010 Summer Short-reach 3125.15
1753 C1/57/2 Moy 5 2010 Summer Short-reach 1612.08
1754 C1/57/2/1 Moy 5 2010 Summer Short-reach 500.402
1755 C1/57/3 Moy 5 2010 Winter Short-reach 1224.69
1756 C1/57/4 Moy 5 2006 Any Short-reach 382.943
1757 C1/58 Moy 5 2011 Winter Short-reach 740.551
1758 F/191 Moy 5 2012 Winter Short-reach 449.472
1759 F/152 Moy 5 2007 Summer Short-reach 234.969 Scheme - Exhibition Maps
1760 F/210A Moy 5 2011 Summer Short-reach 3580.65 Scheme - Exhibition Maps
1761 F/210B Moy 5 2011 Summer Short-reach 1546.42 Scheme - Exhibition Maps
1762 F/312 Moy 5 2005 Winter Short-reach 2143 Scheme - Exhibition Maps
1763 F/243 Moy 5 2014 Winter Short-reach 1178.85 Scheme - Exhibition Maps
1764 F/585 Moy 5 2014 Winter Short-reach 1472.97 Scheme - Exhibition Maps
1765 F/306 Moy 5 2011 Winter Short-reach 1136.58 Scheme - Exhibition Maps
1767 F/159 Moy 5 2013 Summer Short-reach 282.946 Scheme - Exhibition Maps
1769 F/121/59 Moy 5 - Any Short-reach 479.743 Scheme - Exhibition Maps
1770 F/323 Moy 5 2012 Winter Short-reach 186.173 Scheme - Exhibition Maps
1771 F/149 Moy 5 2012 Winter Short-reach 1532.28 Scheme - Exhibition Maps
1772 F/277 Moy 5 2014 Winter Short-reach 90.2847
1773 F/1155 Moy 5 2013 Summer Short-reach 999.445
1775 F/144 Moy 5 2003 Summer Short-reach 1028.1
1776 F/242 Moy 5 2009 Any Short-reach 950.456 Scheme - Exhibition Maps
1779 F/1701 Moy 5 2012 Winter Short-reach 1390.18
1780 F/1141 Moy 5 2012 Winter Short-reach 891.616
1782 F/374 Moy 5 2010 Summer Short-reach 950.476
1783 F/1597 Moy 5 2013 Winter Short-reach 1257.34
1785 F/1021 Moy 5 2011 Winter Short-reach 811.447 Moy SE Mayo
1786 F/749 Moy 5 - Any Short-reach 461.364
1790 F/1599 Moy 5 2014 Winter Short-reach 1426.87
1794 F/623 Moy 5 2013 Winter Short-reach 363.726
1796 F/827 Moy 5 2013 Summer Short-reach 195.422
Page 11
Sheet1
A B C D E
Machine Type
Type of
Maintenance Length (m) Notes CommentsOverall ID Channel RefScheme
Name
Frequency of
Maintenance
Year of Last
MaintenanceTiming of Works
1797 F/2284 Moy 5 2011 Any Short-reach 516.939
1798 F/937 Moy 5 2012 Winter Short-reach 328.018
1799 F/959 Moy 5 2011 Winter Short-reach 765.18
1800 F/939 Moy 5 2011 Winter Short-reach 414.769
1801 F/957 Moy 5 2011 Winter Short-reach 582.654
1802 F/1161 Moy 5 2011 Any Short-reach 235.723
1803 F/919 Moy 5 2009 Winter Short-reach 1020.28
1804 F/1011 Moy 5 2006 Winter Short-reach 546.49
1805 F/2064 Moy 5 2006 Winter Short-reach 375.15
1806 F/412 Moy 5 2010 Winter Short-reach 217.648
1807 F/1314 Moy 5 2010 Winter Short-reach 623.847
1808 F/897 Moy 5 - Any Short-reach 30.8259
1809 F/1390 Moy 5 2011 Winter Short-reach 2853.84
1810 F/1385 Moy 5 2014 Winter Short-reach 817.372
1811 F/1477 Moy 5 2015 Winter Short-reach 1591.59
1812 F/1374 Moy 5 2014 Winter Short-reach 562.004
1813 F/940 Moy 5 2005 Winter Short-reach 260.847
1814 F/961 Moy 5 - Any Short-reach 961.861
1818 F/1316/1 Moy 5 - Any Short-reach 55.5672
1819 F/1147 Moy 5 2011 Winter Short-reach 269.463
1821 F/1480 Moy 5 2011 Summer Short-reach 711.383
1822 F/1745 Moy 5 2012 Winter Short-reach 557.622
1823 F/1635 Moy 5 2014 Winter Short-reach 857.917
1824 F/2082 Moy 5 2013 Winter Short-reach 473.502
1825 F/2174 Moy 5 2013 Winter Short-reach 361.683
1826 F/1973 Moy 5 2013 Winter Short-reach 288.37
1827 F/839 Moy 5 2014 Winter Short-reach 1047.7
1828 F/1998 Moy 5 2014 Summer Short-reach 1203.64
1829 F/1564 Moy 5 2012 Winter Short-reach 755.521
1830 F/1518 Moy 5 2014 Summer Short-reach 1311.94
1831 F/1465 Moy 5 2011 Winter Short-reach 556.383
1832 F/444 Moy 5 2008 Summer Short-reach 625.943
1833 F/1536 Moy 5 2013 Winter Short-reach 759.697
1834 F/1408 Moy 5 2010 Any Short-reach 1472.73
1835 F/2100 Moy 5 2013 Winter Short-reach 487.819
1836 F/1507 Moy 5 2013 Winter Short-reach 376.261
1837 F/1181 Moy 5 - Any Short-reach 187.825
1838 F/909/1 Moy 5 2015 Any Short-reach 744.71
1839 F/909/2 Moy 5 2015 Winter Short-reach 488.264
1840 F/211 Moy 5 2013 Summer Short-reach 756.091
1866 F/673 Moy 5 2012 Any Short-reach 791.921
1867 F/290 Moy 5 2012 Any Short-reach 641.876
2611 F/200 Moy 5 - Summer Short-reach 418.477
2612 F/582 Moy 5 2013 Summer Short-reach 73.1821 Scheme - Exhibition Maps
2614 C1/21A Moy 5 - Any Short-reach 297.088
2663 F/104 Moy 5 2012 Summer Short-reach 1412.1
2668 F/907 Moy 5 2011 Any Short-reach 766.597
2748 C1/21/14/2/1 Moy 5 2012 Summer Short-reach 1869.93
2894 F/1238 Moy 5 - Winter Short-reach 665.459
2895 F/1303/1 Moy 5 2012 Any Short-reach 49.4508
2899 F/1303/2 Moy 5 2012 Any Short-reach 144.961
2900 F/1303/3 Moy 5 - Any Short-reach 231.119
2927 F/2048 Moy 5 2012 Any Short-reach 237.834
2929 F/952 Moy 5 2013 Any Short-reach 58.2595
Page 12
Sheet1
A B C D E
Machine Type
Type of
Maintenance Length (m) Notes CommentsOverall ID Channel RefScheme
Name
Frequency of
Maintenance
Year of Last
MaintenanceTiming of Works
2930 F/841 Moy 5 2014 Winter Short-reach 267.456
2931 F/494 Moy 5 - Summer Short-reach 1069.39 No record
2932 F/282 Moy 5 2013 Winter Short-reach 217.166
2934 F/1346 Moy 5 2014 Any Short-reach 692.967
2935 F/1303 Moy 5 2014 Any Short-reach 727.149
2937 F/1070 Moy 5 2014 Any Short-reach 842.446
2938 F/1070A Moy 5 2015 Summer Short-reach 963.813 Scheme - Exhibition Maps
2939 F/1070B Moy 5 2015 Summer Short-reach 938.694
2940 F/909 Moy 5 2009 Winter Short-reach 843.99
2943 F/1316/2 Moy 5 - Any Short-reach 85.1416
2944 F/1316/3 Moy 5 - Any Short-reach 281.328
2945 F/1316/4 Moy 5 - Any Short-reach 53.6126
2946 F/299/1 Moy 5 - Any Short-reach 227.428
2947 F/299/2 Moy 5 - Any Short-reach 665.096
2980 C1/21/5/2/13 Moy 5 - Any Short-reach 2974.97
2981 F/1070C Moy 5 - Any Short-reach 593.116
2983 C1/21/5/18 Moy 5 - Any Short-reach 2227.15
2984 F/2062 Moy 5 2012 Winter Short-reach 344.638
2985 C1/21/5/22 (F/2097) Moy 5 2013 Any Short-reach 1152.77
3001 C1/30/7/9A Moy 5 2008 Any Short-reach 316.814
Page 13