SHEET PILE - United States Army
Transcript of SHEET PILE - United States Army
E 1
,550
,500
N 1,840,500
E 1
,549
,750
E 1
,550
,750
N 1,841,750
E 1
,549
,750
E 1
,550
,750
N 1,841,250
N 1,840,750
N 1,840,500
E 1
,551
,000
E 1
,550
,000
N 1,841,500
N 1,841,000
N 1,840,750
E 1
,550
,000
E 1
,550
,250
N 1,841,000
N 1,841,750
E 1
,551
,000
E 1
,550
,250
E 1
,550
,500
N 1,841,250
N 1,841,500
MOORING BASINPROJECT DEPTH:
0 FT MLLW
10+00.00
11+00.00
12+00.00
13+00.00
14+00.00
15+00.00
16+00.00
17+00.00
18+00.00
19+00.00
20+00.00
21+00.00
22+00.00
23+00.00
EN
TRA
NC
E C
HA
NN
EL
PR
OJE
CT
DE
PTH
:0
FT M
LLW
GRAPHIC SCALE IN FEET
0 15010050 5025
VOLUME COMPUTATIONSAREA A: DILLINGHAM HARBOR MLLW=0 CU. YD.AVAILABLE TO PROJECT DEPTH (PD) 0.0 56,624
AVAILABLE TO MAX PAY DEPTH (MP) -2.0 74,339
AVAILABLE SIDE SLOPES (SS) AT 8:1 (H:V) VARIES 28,445
TOTAL VOLUME AVAILABLE (MP+SS) 102,785
OVERDREDGE VOLUME WITHIN HARBOR BASIN N/A
OVERDREDGE VOLUME WITH SIDE SLOPES N/A
SHEET PILE
RAMP
PILING
SHEET PILE
RAMP
SURVEY CONTROL DATA
STATION
1277-1 1984
1277-2 1984
1277-3 1984
5374 A 2007
5374 B 2007
DILL 1998
DILLINGHAM1947
DILLINGHAMAZ MK
PICKEL1998
WDS-2 2001
NORTHING
1,841,622.39
1,840,494.00
1,840,427.98
1,843,934.80
1,843,934.80
1,840,505.33
1,849,383.08
1,841,347.21
1,841,509.51
1,841,419.33
EASTING
1,550,745.71
1,550,879.74
1,550,887.60
1,546,941.00
1,546,941.00
1,550,674.26
1,551,809.45
1,553,844.91
1,550,437.81
1,549,910.66
MLLW
32.11
30.86
30.21
25.62
24.87
29.80
0.00
0.00
28.82
22.77
DESCRIPTION
3.25 INCH USACE SBC
3.25 INCH USACE SBC
3.25 INCH USACE SBC
NOAA/NOS TIDAL BM
NOAA/NOS TIDAL BM
3.25 INCH FLAT ALCAP
3.5 INCH USCGS SBC
2 INCH USCGS IRON PIPE
3.25 INCH FLAT ALCAP
3.25 INCH DOMED ALCAP
NOTES1. PRIMARY PROJECT HORIZONTAL CONTROL IS ALASKA STATE PLANE, ZONE 6, NAD83 (2011), IN US SURVEY
FEET BASED ON NGS PUBLISHED VALUES, HOLDING USC&GS STATION "DILLINGHAM 1947" (PID UV7691) AS N1,849,383.08', E 1,551,809.45' AND USC&GS AZIMUTH MARK "DILLINGHAM AZ MK 1947" (PID UV7690) AS N1,841,347.21', E 1,553,844.91'.
LOCAL PROJECT HORIZONTAL CONTROL IS ALASKA STATE PLANE, ZONE 6, NAD83 (2011), IN US SURVEY FEETHOLDING USACE DOMED BC "1277-3 1984" AS N 1,840,427.98', E 1,550,887.60'.
2. VERTICAL CONTROL IS MEAN LOWER LOW WATER (MLLW=0.0'), BASED ON THE NOAA/NOS TIDAL BENCHMARK LIST: "946 5374, SNAG POINT, NUSHAGAK BAY, DILLINGHAM, ALASKA" PUBLISHED 04/29/2013. THIS TIDALDATUM IS BASED ON THE 1983-2001 TIDAL EPOCH AND IS REFERENCED BY HOLDING NOAA/NOS TIDAL BENCHMARK "5374 D 2007" AS 60.45'.
3. VERTICAL TIES TO THE NATIONAL SPATIAL REFERENCE SYSTEM ARE BASED ON PUBLISHED NAVD88 (GEOID12B) ELEVATIONS HOLDING NOAA BENCHMARK "946 5374 B 2007" (PID BBBF17) AS 18.46'.
4. SOUNDINGS ARE IN FEET AND ARE MINUS UNLESS OTHERWISE INDICATED.
5. BATHYMETRY WAS COLLECTED MAY 12-13, 2017. SOUNDINGS WERE COLLECTED USING AN CEESCOPE ECHOSOUNDER OPERATING AT 200 KHZ. SOUND VELOCITY THROUGH THE WATER COLUMN WAS DETERMINEDWITH AN DIGIBAR PRO SOUND VELOCITY PROBE. POSITION AND TIDES WERE PROVIDED IN REAL TIME USINGA TRIMBLE R8 RTK GPS RECEIVER OPERATING ON KINEMATIC CORRECTIONS BROADCAST FROM A TRIMBLER8 RTK BASE RECEIVER SET AT CONTROL STATION , "1277-3". DATA WAS COLLECTED AND PROCESSEDUSING HYPACK 2017 INTEGRATED SOFTWARE. HORIZONTAL CONTROL WAS SURVEYED USING RTK GNSSEQUIPMENT AND TECHNIQUES. VERTICAL CONTROL WAS SURVEYED USING DIFFERENTIAL LEVELINGTECHNIQUES.
6. THIS DRAWING INDICATES GENERAL CONDITIONS AT THE TIME OF THE SURVEY.
7. MAP SOUNDINGS ARE SORTED ON 10 FEET AND ARE SHOAL-BIASED. CONTOURS ARE BASED ON 10 FEETSORTED SHOAL-BIASED SOUNDINGS. VOLUME SOUNDINGS ARE SORTED AT 10 FEET CENTERS.
DREDGE LIMITS
CORNER#
DL-1
DL-2
DL-3
DL-4
DL-5
NORTHING
1,840,656.89
1,840,645.10
1,840,669.87
1,841,364.89
1,841,318.54
EASTING
1,550,430.66
1,550,447.69
1,550,654.63
1,550,571.44
1,550,184.21
DREDGE LIMITS
CORNER#
DL-6
DL-7
DL-8
DL-9
DL-10
NORTHING
1,840,930.19
1,840,662.40
1,840,535.05
1,840,531.77
1,840,653.73
EASTING
1,550,305.22
1,550,337.15
1,550,329.96
1,550,369.82
1,550,376.57
SURVEY LIMITS
CORNER#
SL-1
SL-2
SL-3
SL-4
SL-5
SL-6
SL-7
SL-8
SL-9
NORTHING
1,840,423.95
1,840,458.17
1,840,564.87
1,840,610.25
1,841,437.06
1,841,461.80
1,841,405.12
1,841,432.20
1,841,432.01
EASTING
1,550,449.36
1,550,413.54
1,550,408.42
1,550,787.66
1,550,688.69
1,550,593.75
1,550,578.98
1,550,396.29
1,550,133.89
SURVEY LIMITS
CORNER#
SL-10
SL-11
SL-12
SL-13
SL-14
SL-15
SL-16
SL-17
NORTHING
1,841,362.83
1,840,909.22
1,840,362.44
1,840,166.00
1,839,293.60
1,839,293.60
1,840,166.00
1,840,166.00
EASTING
1,550,065.66
1,550,207.01
1,550,272.21
1,550,359.57
1,550,359.57
1,551,455.40
1,551,455.40
1,550,808.47
DISPOSAL LIMITS
CORNER#
DS-1
DS-2
DS-3
DS-4
NORTHING
1,839,502.58
1,839,739.66
1,839,644.47
1,839,407.39
EASTING
1,551,238.87
1,551,159.55
1,550,875.05
1,550,954.38
App
rove
d:
CO
NTR
AC
TOR
CO
NTR
AC
T N
O.
Rec
omm
ende
d:
CIT
Y PR
IME
CO
NTR
AC
TOR
STA
TE
Dat
e:
CH
IEF
GE
OM
ATI
CS
SE
CTI
ON
Sheet of
DE
SC
RIP
TIO
N
SHEETIDENTIFICATION
U.S
. AR
MY
CO
RP
S O
F E
NG
INE
ER
S
P.O
. BO
X 6
898
ALA
SK
A D
ISTR
ICT
UP
C:
FILE
NA
ME
:
DR
AW
N B
Y:
CH
EC
KE
D B
Y:
SU
RV
EY
ED
BY
:D
ATE
:
JOB
NO
.:
SIZ
E:
AP
PR
OV
ED
BY
:
SC
ALE
:P
LOT
DA
TE:
CO
NTR
AC
T N
O.:
AN
SI E
JBE
R, A
LAS
KA
995
06-0
898
US Army Corps
of Engineers ®
RE
VIS
ION
DA
TEA
PP
VD
BY
DE
SC
RIP
TIO
NR
EV
ISIO
ND
ATE
AP
PV
DB
Y
5-DIL-92-07-44
1 4
DIL
LIN
GH
AM
, ALA
SK
AD
ILLI
NG
HA
M H
AR
BO
RP
RE
DR
ED
GE
HY
DR
OG
RA
PH
IC S
UR
VE
YM
AY
10
- 13
, 201
7X
XX
X-X
X
11 A
ugus
t 201
7
2017
DIL
LIN
GH
AM
_PR
E-D
RE
DG
E_2
0170
511_
FIN
AL.
DW
G
BTH
& D
CA
1" =
50'
BTH
& D
CA
CS
H
05/1
6/20
17
W91
1KB
-17-
C-0
005
DH
A00
7
HU
GH
ES
& A
SS
OC
IATE
S
2970
CO
TTLE
LO
OP
WA
SIL
LA, A
K 9
9654
W91
1KB
-17-
C-0
005
ALA
SK
A M
AR
INE
EX
CA
VA
TIO
N L
LC
AN
CH
OR
PO
INT
ALA
SK
A
MM
/DD
/YY
YY
DREDGE DISPOSALAREA
GRAPHIC SCALE IN FEET
0 15010050 5025
E 1
,551
,000
N 1,838,750
E 1
,550
,250
E 1
,551
,250
N 1,840,000
E 1
,550
,250
E 1
,551
,250
N 1,839,500
N 1,839,000
N 1,838,750
E 1
,551
,500
E 1
,550
,500
N 1,839,750
N 1,839,250
N 1,839,000
E 1
,550
,500
E 1
,550
,750
N 1,839,250
N 1,840,000
E 1
,551
,500
E 1
,550
,750
E 1
,551
,000
N 1,839,500
N 1,839,750
0
0
0
0
0
SURVEY CONTROL DATA
STATION
1277-1 1984
1277-2 1984
1277-3 1984
5374 A 2007
5374 B 2007
DILL 1998
DILLINGHAM1947
DILLINGHAMAZ MK
PICKEL1998
WDS-2 2001
NORTHING
1,841,622.39
1,840,494.00
1,840,427.98
1,843,934.80
1,843,934.80
1,840,505.33
1,849,383.08
1,841,347.21
1,841,509.51
1,841,419.33
EASTING
1,550,745.71
1,550,879.74
1,550,887.60
1,546,941.00
1,546,941.00
1,550,674.26
1,551,809.45
1,553,844.91
1,550,437.81
1,549,910.66
MLLW
32.11
30.86
30.21
25.62
24.87
29.80
0.00
0.00
28.82
22.77
DESCRIPTION
3.25 INCH USACE SBC
3.25 INCH USACE SBC
3.25 INCH USACE SBC
NOAA/NOS TIDAL BM
NOAA/NOS TIDAL BM
3.25 INCH FLAT ALCAP
3.5 INCH USCGS SBC
2 INCH USCGS IRON PIPE
3.25 INCH FLAT ALCAP
3.25 INCH DOMED ALCAP
NOTES1. PRIMARY PROJECT HORIZONTAL CONTROL IS ALASKA STATE PLANE, ZONE 6, NAD83 (2011), IN US SURVEY
FEET BASED ON NGS PUBLISHED VALUES, HOLDING USC&GS STATION "DILLINGHAM 1947" (PID UV7691) AS N1,849,383.08', E 1,551,809.45' AND USC&GS AZIMUTH MARK "DILLINGHAM AZ MK 1947" (PID UV7690) AS N1,841,347.21', E 1,553,844.91'.
LOCAL PROJECT HORIZONTAL CONTROL IS ALASKA STATE PLANE, ZONE 6, NAD83 (2011), IN US SURVEY FEETHOLDING USACE DOMED BC "1277-3 1984" AS N 1,840,427.98', E 1,550,887.60'.
2. VERTICAL CONTROL IS MEAN LOWER LOW WATER (MLLW=0.0'), BASED ON THE NOAA/NOS TIDAL BENCHMARK LIST: "946 5374, SNAG POINT, NUSHAGAK BAY, DILLINGHAM, ALASKA" PUBLISHED 04/29/2013. THIS TIDALDATUM IS BASED ON THE 1983-2001 TIDAL EPOCH AND IS REFERENCED BY HOLDING NOAA/NOS TIDAL BENCHMARK "5374 D 2007" AS 60.45'.
3. VERTICAL TIES TO THE NATIONAL SPATIAL REFERENCE SYSTEM ARE BASED ON PUBLISHED NAVD88 (GEOID12B) ELEVATIONS HOLDING NOAA BENCHMARK "946 5374 B 2007" (PID BBBF17) AS 18.46'.
4. SOUNDINGS ARE IN FEET AND ARE MINUS UNLESS OTHERWISE INDICATED.
5. BATHYMETRY WAS COLLECTED MAY 12-13, 2017. SOUNDINGS WERE COLLECTED USING AN CEESCOPE ECHOSOUNDER OPERATING AT 200 KHZ. SOUND VELOCITY THROUGH THE WATER COLUMN WAS DETERMINEDWITH AN DIGIBAR PRO SOUND VELOCITY PROBE. POSITION AND TIDES WERE PROVIDED IN REAL TIME USINGA TRIMBLE R8 RTK GPS RECEIVER OPERATING ON KINEMATIC CORRECTIONS BROADCAST FROM A TRIMBLER8 RTK BASE RECEIVER SET AT CONTROL STATION , "1277-3". DATA WAS COLLECTED AND PROCESSEDUSING HYPACK 2017 INTEGRATED SOFTWARE. HORIZONTAL CONTROL WAS SURVEYED USING RTK GNSSEQUIPMENT AND TECHNIQUES. VERTICAL CONTROL WAS SURVEYED USING DIFFERENTIAL LEVELINGTECHNIQUES.
6. THIS DRAWING INDICATES GENERAL CONDITIONS AT THE TIME OF THE SURVEY.
7. MAP SOUNDINGS ARE SORTED ON 10 FEET AND ARE SHOAL-BIASED. CONTOURS ARE BASED ON 10 FEETSORTED SHOAL-BIASED SOUNDINGS. VOLUME SOUNDINGS ARE SORTED AT 10 FEET CENTERS.
DREDGE LIMITS
CORNER#
DL-1
DL-2
DL-3
DL-4
DL-5
NORTHING
1,840,656.89
1,840,645.10
1,840,669.87
1,841,364.89
1,841,318.54
EASTING
1,550,430.66
1,550,447.69
1,550,654.63
1,550,571.44
1,550,184.21
DREDGE LIMITS
CORNER#
DL-6
DL-7
DL-8
DL-9
DL-10
NORTHING
1,840,930.19
1,840,662.40
1,840,535.05
1,840,531.77
1,840,653.73
EASTING
1,550,305.22
1,550,337.15
1,550,329.96
1,550,369.82
1,550,376.57
SURVEY LIMITS
CORNER#
SL-1
SL-2
SL-3
SL-4
SL-5
SL-6
SL-7
SL-8
SL-9
NORTHING
1,840,423.95
1,840,458.17
1,840,564.87
1,840,610.25
1,841,437.06
1,841,461.80
1,841,405.12
1,841,432.20
1,841,432.01
EASTING
1,550,449.36
1,550,413.54
1,550,408.42
1,550,787.66
1,550,688.69
1,550,593.75
1,550,578.98
1,550,396.29
1,550,133.89
SURVEY LIMITS
CORNER#
SL-10
SL-11
SL-12
SL-13
SL-14
SL-15
SL-16
SL-17
NORTHING
1,841,362.83
1,840,909.22
1,840,362.44
1,840,166.00
1,839,293.60
1,839,293.60
1,840,166.00
1,840,166.00
EASTING
1,550,065.66
1,550,207.01
1,550,272.21
1,550,359.57
1,550,359.57
1,551,455.40
1,551,455.40
1,550,808.47
DISPOSAL LIMITS
CORNER#
DS-1
DS-2
DS-3
DS-4
NORTHING
1,839,502.58
1,839,739.66
1,839,644.47
1,839,407.39
EASTING
1,551,238.87
1,551,159.55
1,550,875.05
1,550,954.38
App
rove
d:
CO
NTR
AC
TOR
CO
NTR
AC
T N
O.
Rec
omm
ende
d:
CIT
Y PR
IME
CO
NTR
AC
TOR
STA
TE
Dat
e:
CH
IEF
GE
OM
ATI
CS
SE
CTI
ON
Sheet of
DE
SC
RIP
TIO
N
SHEETIDENTIFICATION
U.S
. AR
MY
CO
RP
S O
F E
NG
INE
ER
S
P.O
. BO
X 6
898
ALA
SK
A D
ISTR
ICT
UP
C:
FILE
NA
ME
:
DR
AW
N B
Y:
CH
EC
KE
D B
Y:
SU
RV
EY
ED
BY
:D
ATE
:
JOB
NO
.:
SIZ
E:
AP
PR
OV
ED
BY
:
SC
ALE
:P
LOT
DA
TE:
CO
NTR
AC
T N
O.:
AN
SI E
JBE
R, A
LAS
KA
995
06-0
898
US Army Corps
of Engineers ®
RE
VIS
ION
DA
TEA
PP
VD
BY
DE
SC
RIP
TIO
NR
EV
ISIO
ND
ATE
AP
PV
DB
Y
5-DIL-92-07-44
2 4
DIL
LIN
GH
AM
, ALA
SK
AD
ILLI
NG
HA
M H
AR
BO
RP
RE
DR
ED
GE
HY
DR
OG
RA
PH
IC S
UR
VE
YM
AY
10
- 13,
201
7X
XX
X-X
X
11 A
ugus
t 201
7
2017
DIL
LIN
GH
AM
_PR
E-D
RE
DG
E_2
0170
511_
FIN
AL.
DW
G
BTH
& D
CA
1" =
50'
BTH
& D
CA
CS
H
05/1
6/20
17
W91
1KB
-17-
C-0
005
DH
A00
7
HU
GH
ES
& A
SS
OC
IATE
S29
70 C
OTT
EL
LOO
PW
AS
ILLA
, AK
996
54
W91
1KB
-17-
C-0
005
ALA
SK
A M
AR
INE
EX
CA
VA
TIO
N L
LC
AN
CH
OR
PO
INT
ALA
SK
A
MM
/DD
/YY
YY