Sheet List Table Sheet Number Sheet Title 34.00.00 Drawing ...

25
Scale Sheet Date Drawing Name 1 : 2 @ A4 34.00.00 Drawing Register CONFIDENTIALITY: No part of this publication may be reproduced or transmitted other than the intended use by Resene Construction Systems without written consent from the author. TradeSpec™ and RenderSpec™ are Registered Trademarks, both Documents are available on the Resene Construction Systems 18 August 2021 System INTEGRA Lightweight Concrete Intertenancy System Substrate Timber Frame Terraced Houses Sheet List Table Sheet Number Sheet Title 34.00.00 Drawing Register 34.19.01 Typical Uses 34.19.04 Intertenancy Bracket 34.19.05 Vertical Cross Section 34.19.06 Wall Plan 34.19.07 Wall Plan - Panel Join 34.19.08 Wall Elevation 34.19.10 Foundation or Intermediate Floor Slab 34.19.20 Corner - Internal Linings both Sides 34.19.43 Wall Projection - Plan View 34.19.60 T-Junction - Internal Wall meeting Intertenancy Wall 34.19.61 Intertenancy Wall meeting External Wall - Option 1 34.19.62 Intertenancy Wall meeting External Wall - Option 2 34.19.65 T-Junction - Intertenancy Wall meeting Internal Corner 34.19.67 X-Junction - Intersecting Walls 34.19.70 Mid-Floor 34.19.80 Roof Valley 34.19.82 Roof Ridge 34.19.83 Roof Parapet 34.19.84 Roof Apron 34.19.90 Truss Section 34.19.94 Sloping Roof End 34.19.95 Sloping Eave 34.19.96 Eave 36.19.50 Deflection Head Detail (Less than 20mm)

Transcript of Sheet List Table Sheet Number Sheet Title 34.00.00 Drawing ...

Page 1: Sheet List Table Sheet Number Sheet Title 34.00.00 Drawing ...

Scale

Sheet

Date

Drawing Name

1 : 2 @ A4

34.00.00Drawing Register

CONFIDENTIALITY: No part of this publication may be

reproduced or transmitted other than the intended use by

Resene Construction Systems without written consent from

the author.

TradeSpec™ and RenderSpec™ are Registered Trademarks, both Documents are available on the Resene Construction Systems

18 August 2021

System

INTEGRA Lightweight Concrete

Intertenancy System

Substrate

Timber Frame Terraced Houses

Sheet List Table

Sheet Number Sheet Title

34.00.00 Drawing Register

34.19.01Typical Uses

34.19.04Intertenancy Bracket

34.19.05 Vertical Cross Section

34.19.06 Wall Plan

34.19.07 Wall Plan - Panel Join

34.19.08 Wall Elevation

34.19.10 Foundation or Intermediate Floor Slab

34.19.20 Corner - Internal Linings both Sides

34.19.43 Wall Projection - Plan View

34.19.60 T-Junction - Internal Wall meeting Intertenancy Wall

34.19.61Intertenancy Wall meeting External Wall - Option 1

34.19.62 Intertenancy Wall meeting External Wall - Option 2

34.19.65 T-Junction - Intertenancy Wall meeting Internal Corner

34.19.67 X-Junction - Intersecting Walls

34.19.70Mid-Floor

34.19.80 Roof Valley

34.19.82Roof Ridge

34.19.83 Roof Parapet

34.19.84Roof Apron

34.19.90 Truss Section

34.19.94Sloping Roof End

34.19.95 Sloping Eave

34.19.96 Eave

36.19.50Deflection Head Detail (Less than 20mm)

Page 2: Sheet List Table Sheet Number Sheet Title 34.00.00 Drawing ...

Scale

Sheet

Date

Drawing Name

NTS

34.19.01Typical Uses

CONFIDENTIALITY: No part of this publication may be

reproduced or transmitted other than the intended use by

Resene Construction Systems without written consent from

the author.

TradeSpec™ and RenderSpec™ are Registered Trademarks, both Documents are available on the Resene Construction Systems

Resene Construction Systems

Integra Lightweight Concrete

Intertenancy System

System

INTEGRA Lightweight Concrete

Intertenancy System

Substrate

18 August 2021

Timber Frame Terraced Houses

Page 3: Sheet List Table Sheet Number Sheet Title 34.00.00 Drawing ...

75

499

50

3

10

29

10

75mm Screw

45mm Screw

Intertenancy Dampner

Intertenancy Clip

50

Scale

Sheet Drawing Name

1 : 2 @ A4

34.19.04Intertenancy Bracket

CONFIDENTIALITY: No part of this publication may be

reproduced or transmitted other than the intended use by

Resene Construction Systems without written consent from

the author.

TradeSpec™ and RenderSpec™ are Registered Trademarks, both Documents are available on the Resene Construction Systems

Date

System

INTEGRA Lightweight Concrete

Intertenancy System

Substrate

18 August 2021

Timber Frame Terraced Houses

Page 4: Sheet List Table Sheet Number Sheet Title 34.00.00 Drawing ...

INTEGRA Lightweight Concrete

Intertenancy System

2 Brackets per full size panel,

these should be installed on every

2nd stud with the opposing timber

framed wall having the brackets

installed on the alternating studs

Scale

Sheet

Date

Drawing Name

1:30 @ A4

34.19.05Vertical Cross Section

CONFIDENTIALITY: No part of this publication may be

reproduced or transmitted other than the intended use by

Resene Construction Systems without written consent from

the author.

TradeSpec™ and RenderSpec™ are Registered Trademarks, both Documents are available on the Resene Construction Systems

Refer to detail 34.19.10

Refer to detail 34.19.82

Refer to detail 34.19.70

Plaster Systems AAC Adhesive to be used to Mortar all Panel

Joins

Cavity size to be 20-40mm wide

Studs to be located at a maximum of 600 centre and

dwangs/nogs at 800mm centres.

Where there is a need for fire-stopping, mineral wool or

ceramic fibre cavity insulation must be used, the

wool/insulation should have a minimum density of 100kg/m³,

or as specified by a fire engineer

Where fire separations meet other fire separations or fire

rated parts of external walls, they shall have the junction fire

stopped over its full length

The Integra Intertenancy System shall terminate as close as

possible to the external roof cladding and primary elements

providing roof support, with any gaps fully fire stopped

System

INTEGRA Lightweight Concrete

Intertenancy System

Substrate

18 August 2021

Timber Frame Terraced Houses

Page 5: Sheet List Table Sheet Number Sheet Title 34.00.00 Drawing ...

INTEGRA Lightweight Concrete

Intertenancy System

2 Brackets per full size panel,

these should be installed on every

2nd stud with the opposing timber

framed wall having the brackets

installed on the alternating studs

Scale

Sheet

Date

Drawing Name

NTS

34.19.06Wall Plan

CONFIDENTIALITY: No part of this publication may be

reproduced or transmitted other than the intended use by

Resene Construction Systems without written consent from

the author.

TradeSpec™ and RenderSpec™ are Registered Trademarks, both Documents are available on the Resene Construction Systems

Plaster Systems AAC Adhesive to be used to Mortar all Panel

Joins

Cavity size to be 20-40mm wide

Studs to be located at a maximum of 600 centre and

dwangs/nogs at 800mm centres.

Where there is a need for fire-stopping, mineral wool or

ceramic fibre cavity insulation must be used, the

wool/insulation should have a minimum density of 100kg/m³,

or as specified by a fire engineer

Where fire separations meet other fire separations or fire

rated parts of external walls, they shall have the junction fire

stopped over its full length

The Integra Intertenancy System shall terminate as close as

possible to the external roof cladding and primary elements

providing roof support, with any gaps fully fire stopped

System

INTEGRA Lightweight Concrete

Intertenancy System

Substrate

18 August 2021

Timber Frame Terraced Houses

Page 6: Sheet List Table Sheet Number Sheet Title 34.00.00 Drawing ...

INTEGRA Lightweight Concrete

Intertenancy System

AAC Adhesive to

panel join

2 Brackets per full size panel,

these should be installed on

every 2nd stud with the opposing

timber framed wall having the

brackets installed on the

alternating studs

Scale

Sheet

Date

Drawing Name

1 : 10 @ A4

34.19.07Wall Plan - Panel Join

CONFIDENTIALITY: No part of this publication may be

reproduced or transmitted other than the intended use by

Resene Construction Systems without written consent from

the author.

TradeSpec™ and RenderSpec™ are Registered Trademarks, both Documents are available on the Resene Construction Systems

System

INTEGRA Lightweight Concrete

Intertenancy System

Substrate

Plaster Systems AAC Adhesive to be used to Mortar all Panel

Joins

Cavity size to be 20-40mm wide

Studs to be located at a maximum of 600 centre and

dwangs/nogs at 800mm centres.

Where there is a need for fire-stopping, mineral wool or

ceramic fibre cavity insulation must be used, the

wool/insulation should have a minimum density of 100kg/m³,

or as specified by a fire engineer

Where fire separations meet other fire separations or fire

rated parts of external walls, they shall have the junction fire

stopped over its full length

The Integra Intertenancy System shall terminate as close as

possible to the external roof cladding and primary elements

providing roof support, with any gaps fully fire stopped

18 August 2021

Timber Frame Terraced Houses

Page 7: Sheet List Table Sheet Number Sheet Title 34.00.00 Drawing ...

Ensure 2 brackets per full size panel.

The location of these brackets in the roof

space do not have to meet the same

requirements as the liveable areas

Mineral Wool or other

appropriate method for

fire and acoustic

insulation/protection to

edge of Intertenancy

Wall

2 Brackets per full size panel, these

should be installed on every 2nd stud

with the opposing timber framed wall

having the brackets installed on the

alternating studs

6

0

0

1

2

0

0

1

2

0

0

Firestopping to end of Intertenancy

Wall to prevent horizontal spread of

fire

Scale

Sheet

Date

Drawing Name

1 : 20 @ A4

34.19.08Wall Elevation

CONFIDENTIALITY: No part of this publication may be

reproduced or transmitted other than the intended use by

Resene Construction Systems without written consent from

the author.

TradeSpec™ and RenderSpec™ are Registered Trademarks, both Documents are available on the Resene Construction Systems

System

INTEGRA Lightweight Concrete

Intertenancy System

Substrate

Plaster Systems AAC Adhesive to be used to Mortar all Panel

Joins

Cavity size to be 20-40mm wide

Studs to be located at a maximum of 600 centre and

dwangs/nogs at 800mm centres.

Where there is a need for fire-stopping, mineral wool or

ceramic fibre cavity insulation must be used, the

wool/insulation should have a minimum density of 100kg/m³,

or as specified by a fire engineer

Where fire separations meet other fire separations or fire

rated parts of external walls, they shall have the junction fire

stopped over its full length

The Integra Intertenancy System shall terminate as close as

possible to the external roof cladding and primary elements

providing roof support, with any gaps fully fire stopped

18 August 2021

Timber Frame Terraced Houses

Page 8: Sheet List Table Sheet Number Sheet Title 34.00.00 Drawing ...

2 Brackets per full size panel, these

should be installed on every 2nd stud

with the opposing timber framed wall

having the brackets installed on the

alternating studs

AAC Adhesive

INTEGRA Lightweight Concrete

Intertenancy System

Scale

Sheet

Date

Drawing Name

1 : 5 @ A4

34.19.10Foundation or Intermediate Floor Slab

CONFIDENTIALITY: No part of this publication may be

reproduced or transmitted other than the intended use by

Resene Construction Systems without written consent from

the author.

TradeSpec™ and RenderSpec™ are Registered Trademarks, both Documents are available on the Resene Construction Systems

System

INTEGRA Lightweight Concrete

Intertenancy System

Substrate

Plaster Systems AAC Adhesive to be used to Mortar all Panel

Joins

Cavity size to be 20-40mm wide

Studs to be located at a maximum of 600 centre and

dwangs/nogs at 800mm centres.

Where there is a need for fire-stopping, mineral wool or

ceramic fibre cavity insulation must be used, the

wool/insulation should have a minimum density of 100kg/m³,

or as specified by a fire engineer

Where fire separations meet other fire separations or fire

rated parts of external walls, they shall have the junction fire

stopped over its full length

The Integra Intertenancy System shall terminate as close as

possible to the external roof cladding and primary elements

providing roof support, with any gaps fully fire stopped

18 August 2021

Timber Frame Terraced Houses

Page 9: Sheet List Table Sheet Number Sheet Title 34.00.00 Drawing ...

20

50

20

Acoustic/Fire

Rated Sealant

INTEGRA Lightweight

Concrete Intertenancy

System

2 Brackets per full size panel, these

should be installed on every 2nd stud

with the opposing timber framed wall

having the brackets installed on the

alternating studs

Scale

Sheet

Date

Drawing Name

1 : 5 @ A4

34.19.20Corner - Internal Linings both Sides

CONFIDENTIALITY: No part of this publication may be

reproduced or transmitted other than the intended use by

Resene Construction Systems without written consent from

the author.

TradeSpec™ and RenderSpec™ are Registered Trademarks, both Documents are available on the Resene Construction Systems

System

INTEGRA Lightweight Concrete

Intertenancy System

Substrate

Plaster Systems AAC Adhesive to be used to Mortar all Panel

Joins

Cavity size to be 20-40mm wide

Studs to be located at a maximum of 600 centre and

dwangs/nogs at 800mm centres.

Where there is a need for fire-stopping, mineral wool or

ceramic fibre cavity insulation must be used, the

wool/insulation should have a minimum density of 100kg/m³,

or as specified by a fire engineer

Where fire separations meet other fire separations or fire

rated parts of external walls, they shall have the junction fire

stopped over its full length

The Integra Intertenancy System shall terminate as close as

possible to the external roof cladding and primary elements

providing roof support, with any gaps fully fire stopped

18 August 2021

Timber Frame Terraced Houses

Page 10: Sheet List Table Sheet Number Sheet Title 34.00.00 Drawing ...

Facade

205020

INTEGRA Lightweight Concrete

Intertenancy System

Firestopping to edge of

Intertenancy Wall

2 Brackets per full size panel, these

should be installed on every 2nd stud

with the opposing timber framed wall

having the brackets installed on the

alternating studs

Scale

Sheet

Date

Drawing Name

1 : 5 @ A4

34.19.43Wall Projection - Plan View

CONFIDENTIALITY: No part of this publication may be

reproduced or transmitted other than the intended use by

Resene Construction Systems without written consent from

the author.

TradeSpec™ and RenderSpec™ are Registered Trademarks, both Documents are available on the Resene Construction Systems

System

INTEGRA Lightweight Concrete

Intertenancy System

Substrate

Plaster Systems AAC Adhesive to be used to Mortar all Panel

Joins

Cavity size to be 20-40mm wide

Studs to be located at a maximum of 600 centre and

dwangs/nogs at 800mm centres.

Where there is a need for fire-stopping, mineral wool or

ceramic fibre cavity insulation must be used, the

wool/insulation should have a minimum density of 100kg/m³,

or as specified by a fire engineer

Where fire separations meet other fire separations or fire

rated parts of external walls, they shall have the junction fire

stopped over its full length

The Integra Intertenancy System shall terminate as close as

possible to the external roof cladding and primary elements

providing roof support, with any gaps fully fire stopped

18 August 2021

Timber Frame Terraced Houses

Page 11: Sheet List Table Sheet Number Sheet Title 34.00.00 Drawing ...

205020

INTEGRA Lightweight Concrete

Intertenancy System

2 Brackets per full size panel,

these should be installed on

every 2nd stud with the

opposing timber framed wall

having the brackets installed

on the alternating studs

Scale

Sheet

Date

Drawing Name

1 : 5 @ A4

34.19.60T-Junction - Internal Wall meeting Intertenancy Wall

CONFIDENTIALITY: No part of this publication may be

reproduced or transmitted other than the intended use by

Resene Construction Systems without written consent from

the author.

TradeSpec™ and RenderSpec™ are Registered Trademarks, both Documents are available on the Resene Construction Systems

System

INTEGRA Lightweight Concrete

Intertenancy System

Substrate

Plaster Systems AAC Adhesive to be used to Mortar all Panel

Joins

Cavity size to be 20-40mm wide

Studs to be located at a maximum of 600 centre and

dwangs/nogs at 800mm centres.

Where there is a need for fire-stopping, mineral wool or

ceramic fibre cavity insulation must be used, the

wool/insulation should have a minimum density of 100kg/m³,

or as specified by a fire engineer

Where fire separations meet other fire separations or fire

rated parts of external walls, they shall have the junction fire

stopped over its full length

The Integra Intertenancy System shall terminate as close as

possible to the external roof cladding and primary elements

providing roof support, with any gaps fully fire stopped

18 August 2021

Timber Frame Terraced Houses

Page 12: Sheet List Table Sheet Number Sheet Title 34.00.00 Drawing ...

205020

Facade

INTEGRA Lightweight Concrete

Intertenancy System

Timber batten to prevent

Horizontal Fire Spread in the

cavity

2 Brackets per full size panel, these

should be installed on every 2nd stud

with the opposing timber framed wall

having the brackets installed on the

alternating studs

Scale

Sheet

Date

Drawing Name

System

Substrate

34.19.61Intertenancy Wall meeting External Wall - Option 1

CONFIDENTIALITY: No part of this publication may be

reproduced or transmitted other than the intended use by

Resene Construction Systems without written consent from

the author.

TradeSpec™ and RenderSpec™ are Registered Trademarks, both Documents are available on the Resene Construction Systems

1 : 5 @ A4INTEGRA Lightweight Concrete

Intertenancy System

Plaster Systems AAC Adhesive to be used to Mortar all Panel

Joins

Cavity size to be 20-40mm wide

Studs to be located at a maximum of 600 centre and

dwangs/nogs at 800mm centres.

Where there is a need for fire-stopping, mineral wool or

ceramic fibre cavity insulation must be used, the

wool/insulation should have a minimum density of 100kg/m³,

or as specified by a fire engineer

Where fire separations meet other fire separations or fire

rated parts of external walls, they shall have the junction fire

stopped over its full length

The Integra Intertenancy System shall terminate as close as

possible to the external roof cladding and primary elements

providing roof support, with any gaps fully fire stopped

18 August 2021

Timber Frame Terraced Houses

Page 13: Sheet List Table Sheet Number Sheet Title 34.00.00 Drawing ...

205020

Facade

INTEGRA Lightweight Concrete

Intertenancy System

Mineral Wool or Ceramic Fibre

Cavity Insulation for fire and

acoustic insulation/protection

to edge of Intertenancy Wall

2 Brackets per full size panel, these

should be installed on every 2nd stud

with the opposing timber framed wall

having the brackets installed on the

alternating studs

Scale

Sheet

Date

Drawing Name

1 : 5 @ A4

34.19.62Intertenancy Wall meeting External Wall - Option 2

CONFIDENTIALITY: No part of this publication may be

reproduced or transmitted other than the intended use by

Resene Construction Systems without written consent from

the author.

TradeSpec™ and RenderSpec™ are Registered Trademarks, both Documents are available on the Resene Construction Systems

System

INTEGRA Lightweight Concrete

Intertenancy System

Substrate

Plaster Systems AAC Adhesive to be used to Mortar all Panel

Joins

Cavity size to be 20-40mm wide

Studs to be located at a maximum of 600 centre and

dwangs/nogs at 800mm centres.

Where there is a need for fire-stopping, mineral wool or

ceramic fibre cavity insulation must be used, the

wool/insulation should have a minimum density of 100kg/m³,

or as specified by a fire engineer

Where fire separations meet other fire separations or fire

rated parts of external walls, they shall have the junction fire

stopped over its full length

The Integra Intertenancy System shall terminate as close as

possible to the external roof cladding and primary elements

providing roof support, with any gaps fully fire stopped

18 August 2021

Timber Frame Terraced Houses

Page 14: Sheet List Table Sheet Number Sheet Title 34.00.00 Drawing ...

Firewall

20 50 20

INTEGRA Lightweight Concrete

Intertenancy System

Fire stopping to edge of

Intertenancy Wall

2 Brackets per full size panel, these

should be installed on every 2nd stud

with the opposing timber framed wall

having the brackets installed on the

alternating studs

Scale

Sheet

Date

Drawing Name

1 : 5 @ A4

34.19.65T-Junction - Intertenancy Wall meeting Internal Corner

CONFIDENTIALITY: No part of this publication may be

reproduced or transmitted other than the intended use by

Resene Construction Systems without written consent from

the author.

TradeSpec™ and RenderSpec™ are Registered Trademarks, both Documents are available on the Resene Construction Systems

System

INTEGRA Lightweight Concrete

Intertenancy System

Substrate

Plaster Systems AAC Adhesive to be used to Mortar all Panel

Joins

Cavity size to be 20-40mm wide

Studs to be located at a maximum of 600 centre and

dwangs/nogs at 800mm centres.

Where there is a need for fire-stopping, mineral wool or

ceramic fibre cavity insulation must be used, the

wool/insulation should have a minimum density of 100kg/m³,

or as specified by a fire engineer

Where fire separations meet other fire separations or fire

rated parts of external walls, they shall have the junction fire

stopped over its full length

The Integra Intertenancy System shall terminate as close as

possible to the external roof cladding and primary elements

providing roof support, with any gaps fully fire stopped

18 August 2021

Timber Frame Terraced Houses

Page 15: Sheet List Table Sheet Number Sheet Title 34.00.00 Drawing ...

205020

INTEGRA Lightweight Concrete

Intertenancy System

2 Brackets per full size panel, these

should be installed on every 2nd stud

with the opposing timber framed wall

having the brackets installed on the

alternating studs

Sheet Drawing Name

34.19.67X-Junction - Intersecting Walls

CONFIDENTIALITY: No part of this publication may be

reproduced or transmitted other than the intended use by

Resene Construction Systems without written consent from

the author.

TradeSpec™ and RenderSpec™ are Registered Trademarks, both Documents are available on the Resene Construction Systems

Plaster Systems AAC Adhesive to be used to Mortar all Panel

Joins

Cavity size to be 20-40mm wide

Studs to be located at a maximum of 600 centre and

dwangs/nogs at 800mm centres.

Where there is a need for fire-stopping, mineral wool or

ceramic fibre cavity insulation must be used, the

wool/insulation should have a minimum density of 100kg/m³,

or as specified by a fire engineer

Where fire separations meet other fire separations or fire

rated parts of external walls, they shall have the junction fire

stopped over its full length

The Integra Intertenancy System shall terminate as close as

possible to the external roof cladding and primary elements

providing roof support, with any gaps fully fire stopped

Scale

Date

Drawing Name

1 : 5 @ A4

System

INTEGRA Lightweight Concrete

Intertenancy System

Substrate

18 August 2021

Timber Frame Terraced Houses

Page 16: Sheet List Table Sheet Number Sheet Title 34.00.00 Drawing ...

INTEGRA Lightweight Concrete

Intertenancy System

2 Brackets per full size panel, these

should be installed on every 2nd stud

with the opposing timber framed wall

having the brackets installed on the

alternating studs

Scale

Sheet

Date

Drawing Name

1 : 5 @ A4

34.19.70Mid-Floor

CONFIDENTIALITY: No part of this publication may be

reproduced or transmitted other than the intended use by

Resene Construction Systems without written consent from

the author.

TradeSpec™ and RenderSpec™ are Registered Trademarks, both Documents are available on the Resene Construction Systems

System

INTEGRA Lightweight Concrete

Intertenancy System

Substrate

Plaster Systems AAC Adhesive to be used to Mortar all Panel

Joins

Cavity size to be 20-40mm wide

Studs to be located at a maximum of 600 centre and

dwangs/nogs at 800mm centres.

Where there is a need for fire-stopping, mineral wool or

ceramic fibre cavity insulation must be used, the

wool/insulation should have a minimum density of 100kg/m³,

or as specified by a fire engineer

Where fire separations meet other fire separations or fire

rated parts of external walls, they shall have the junction fire

stopped over its full length

The Integra Intertenancy System shall terminate as close as

possible to the external roof cladding and primary elements

providing roof support, with any gaps fully fire stopped

18 August 2021

Timber Frame Terraced Houses

Page 17: Sheet List Table Sheet Number Sheet Title 34.00.00 Drawing ...

INTEGRA Lightweight Concrete

Intertenancy System

Mineral Wool or Ceramic

Fibre Cavity Insulation for

fire and acoustic

insulation/protection to

edge of Intertenancy Wall

2 Brackets per full size panel, these

should be installed on every 2nd stud

with the opposing timber framed wall

having the brackets installed on the

alternating studs

Scale

Sheet

Date

Drawing Name

1 : 5 @ A4

34.19.80Roof Valley

CONFIDENTIALITY: No part of this publication may be

reproduced or transmitted other than the intended use by

Resene Construction Systems without written consent from

the author.

TradeSpec™ and RenderSpec™ are Registered Trademarks, both Documents are available on the Resene Construction Systems

System

INTEGRA Lightweight Concrete

Intertenancy System

Substrate

Plaster Systems AAC Adhesive to be used to Mortar all Panel

Joins

Cavity size to be 20-40mm wide

Studs to be located at a maximum of 600 centre and

dwangs/nogs at 800mm centres.

Where there is a need for fire-stopping, mineral wool or

ceramic fibre cavity insulation must be used, the

wool/insulation should have a minimum density of 100kg/m³,

or as specified by a fire engineer

Where fire separations meet other fire separations or fire

rated parts of external walls, they shall have the junction fire

stopped over its full length

The Integra Intertenancy System shall terminate as close as

possible to the external roof cladding and primary elements

providing roof support, with any gaps fully fire stopped

18 August 2021

Timber Frame Terraced Houses

Page 18: Sheet List Table Sheet Number Sheet Title 34.00.00 Drawing ...

INTEGRA Lightweight Concrete

Intertenancy System

Mineral Wool or Ceramic

Fibre Cavity Insulation for

fire and acoustic

insulation/protection to

edge of Intertenancy Wall

2 Brackets per full size panel, these

should be installed on every 2nd stud

with the opposing timber framed wall

having the brackets installed on the

alternating studs

Scale

Sheet

Date

Drawing Name

1 : 5 @ A4

34.19.82Roof Ridge

CONFIDENTIALITY: No part of this publication may be

reproduced or transmitted other than the intended use by

Resene Construction Systems without written consent from

the author.

TradeSpec™ and RenderSpec™ are Registered Trademarks, both Documents are available on the Resene Construction Systems

System

INTEGRA Lightweight Concrete

Intertenancy System

Substrate

Plaster Systems AAC Adhesive to be used to Mortar all Panel

Joins

Cavity size to be 20-40mm wide

Studs to be located at a maximum of 600 centre and

dwangs/nogs at 800mm centres.

Where there is a need for fire-stopping, mineral wool or

ceramic fibre cavity insulation must be used, the

wool/insulation should have a minimum density of 100kg/m³,

or as specified by a fire engineer

Where fire separations meet other fire separations or fire

rated parts of external walls, they shall have the junction fire

stopped over its full length

The Integra Intertenancy System shall terminate as close as

possible to the external roof cladding and primary elements

providing roof support, with any gaps fully fire stopped

18 August 2021

Timber Frame Terraced Houses

Page 19: Sheet List Table Sheet Number Sheet Title 34.00.00 Drawing ...

INTEGRA Lightweight

Concrete Intertenancy

System

Mineral Wool or Ceramic

Fibre Cavity Insulation for

fire and acoustic

insulation/protection to

edge of Intertenancy Wall

2 Brackets per full size panel, these

should be installed on every 2nd stud

with the opposing timber framed wall

having the brackets installed on the

alternating studs

Ensure 2 brackets per full size

panel.

The location of these brackets in

the roof space do not have to

meet the same requirements as

the liveable areas

Scale

Sheet

Date

Drawing Name

1 : 5 @ A4

34.19.83Roof Parapet

CONFIDENTIALITY: No part of this publication may be

reproduced or transmitted other than the intended use by

Resene Construction Systems without written consent from

the author.

TradeSpec™ and RenderSpec™ are Registered Trademarks, both Documents are available on the Resene Construction Systems

System

INTEGRA Lightweight Concrete

Intertenancy System

Substrate

Plaster Systems AAC Adhesive to be used to Mortar all Panel

Joins

Cavity size to be 20-40mm wide

Studs to be located at a maximum of 600 centre and

dwangs/nogs at 800mm centres.

Where there is a need for fire-stopping, mineral wool or

ceramic fibre cavity insulation must be used, the

wool/insulation should have a minimum density of 100kg/m³,

or as specified by a fire engineer

Where fire separations meet other fire separations or fire

rated parts of external walls, they shall have the junction fire

stopped over its full length

The Integra Intertenancy System shall terminate as close as

possible to the external roof cladding and primary elements

providing roof support, with any gaps fully fire stopped

18 August 2021

Timber Frame Terraced Houses

Page 20: Sheet List Table Sheet Number Sheet Title 34.00.00 Drawing ...

35m

m

Building Underlay

Apron Flashing supplied and installed

by the main contractor, building

underlay wrapped over flashing

(75mm cover to cladding)

External Firewall

INTEGRA Lightweight Concrete

Intertenancy System

2 Brackets per full size panel, these

should be installed on every 2nd stud

with the opposing timber framed wall

having the brackets installed on the

alternating studs

Scale

Sheet

Date

Drawing Name

System

Substrate

1 : 2 @ A4

34.19.84Roof Apron

CONFIDENTIALITY: No part of this publication may be

reproduced or transmitted other than the intended use by

Resene Construction Systems without written consent from

the author.

TradeSpec™ and RenderSpec™ are Registered Trademarks, both Documents are available on the Resene Construction Systems

Integra Facade System

Plaster Systems AAC Adhesive to be used to Mortar all Panel

Joins

Cavity size to be 20-40mm wide

Studs to be located at a maximum of 600 centre and

dwangs/nogs at 800mm centres.

Where there is a need for fire-stopping, mineral wool or

ceramic fibre cavity insulation must be used, the

wool/insulation should have a minimum density of 100kg/m³,

or as specified by a fire engineer

Where fire separations meet other fire separations or fire

rated parts of external walls, they shall have the junction fire

stopped over its full length

The Integra Intertenancy System shall terminate as close as

possible to the external roof cladding and primary elements

providing roof support, with any gaps fully fire stopped

18 August 2021

Timber Frame Terraced Houses

Page 21: Sheet List Table Sheet Number Sheet Title 34.00.00 Drawing ...

INTEGRA Lightweight Concrete

Intertenancy System

2 Brackets per full size panel, these

should be installed on every 2nd stud

with the opposing timber framed wall

having the brackets installed on the

alternating studs

Mineral Wool or Ceramic

Fibre Cavity Insulation for

fire and acoustic

insulation/protection to

edge of Intertenancy Wall

Scale

Sheet

Date

Drawing Name

System

Substrate

1 : 2 @ A4

34.19.90Truss Section

CONFIDENTIALITY: No part of this publication may be

reproduced or transmitted other than the intended use by

Resene Construction Systems without written consent from

the author.

TradeSpec™ and RenderSpec™ are Registered Trademarks, both Documents are available on the Resene Construction Systems

Integra Facade System

Plaster Systems AAC Adhesive to be used to Mortar all Panel

Joins

Cavity size to be 20-40mm wide

Studs to be located at a maximum of 600 centre and

dwangs/nogs at 800mm centres.

Where there is a need for fire-stopping, mineral wool or

ceramic fibre cavity insulation must be used, the

wool/insulation should have a minimum density of 100kg/m³,

or as specified by a fire engineer

Where fire separations meet other fire separations or fire

rated parts of external walls, they shall have the junction fire

stopped over its full length

The Integra Intertenancy System shall terminate as close as

possible to the external roof cladding and primary elements

providing roof support, with any gaps fully fire stopped

18 August 2021

Timber Frame Terraced Houses

Page 22: Sheet List Table Sheet Number Sheet Title 34.00.00 Drawing ...

INTEGRA Lightweight Concrete

Intertenancy System

RCS Intertenancy Bracket to

be installed so that is

staggered from the opoosing

wall

Mineral Wool or Ceramic

Fibre Cavity Insulation for

fire and acoustic

insulation/protection to

edge of Intertenancy Wall

Ensure 2 brackets per full size

panel.

The location of these brackets in

the roof space do not have to meet

the same requirements as the

liveable areas

Scale

Sheet

Date

Drawing Name

1 : 5 @ A4

34.19.94Sloping Roof End

CONFIDENTIALITY: No part of this publication may be

reproduced or transmitted other than the intended use by

Resene Construction Systems without written consent from

the author.

TradeSpec™ and RenderSpec™ are Registered Trademarks, both Documents are available on the Resene Construction Systems

System

INTEGRA Lightweight Concrete

Intertenancy System

Substrate

Plaster Systems AAC Adhesive to be used to Mortar all Panel

Joins

Cavity size to be 20-40mm wide

Studs to be located at a maximum of 600 centre and

dwangs/nogs at 800mm centres.

Where there is a need for fire-stopping, mineral wool or

ceramic fibre cavity insulation must be used, the

wool/insulation should have a minimum density of 100kg/m³,

or as specified by a fire engineer

Where fire separations meet other fire separations or fire

rated parts of external walls, they shall have the junction fire

stopped over its full length

The Integra Intertenancy System shall terminate as close as

possible to the external roof cladding and primary elements

providing roof support, with any gaps fully fire stopped

18 August 2021

Timber Frame Terraced Houses

Page 23: Sheet List Table Sheet Number Sheet Title 34.00.00 Drawing ...

INTEGRA Lightweight

Concrete Intertenancy

System

2 Brackets per full size panel, these

should be installed on every 2nd stud

with the opposing timber framed wall

having the brackets installed on the

alternating studs

Facade

Small section of Integra to be cut and

installed to rafter ends. Fasten the

Integra to the panel before securing to

the rafter/truss ends

Firestopping to the cavity

where the Intertenancy

Wall is located

Integra Panel to be taken as closed to

the underside of the underlay as

possible, any gaps to be packed with a

Mineral Wool

Purlins should be not be continued

across the Intertenancy Wall

Scale

Sheet

Date

Drawing Name

1 : 2 @ A4

34.19.95Sloping Eave

CONFIDENTIALITY: No part of this publication may be

reproduced or transmitted other than the intended use by

Resene Construction Systems without written consent from

the author.

TradeSpec™ and RenderSpec™ are Registered Trademarks, both Documents are available on the Resene Construction Systems

System

INTEGRA Lightweight Concrete

Intertenancy System

Substrate

Plaster Systems AAC Adhesive to be used to Mortar all Panel

Joins

Cavity size to be 20-40mm wide

Studs to be located at a maximum of 600 centre and

dwangs/nogs at 800mm centres.

Where there is a need for fire-stopping, mineral wool or

ceramic fibre cavity insulation must be used, the

wool/insulation should have a minimum density of 100kg/m³,

or as specified by a fire engineer

Where fire separations meet other fire separations or fire

rated parts of external walls, they shall have the junction fire

stopped over its full length

The Integra Intertenancy System shall terminate as close as

possible to the external roof cladding and primary elements

providing roof support, with any gaps fully fire stopped

18 August 2021

Timber Frame Terraced Houses

Page 24: Sheet List Table Sheet Number Sheet Title 34.00.00 Drawing ...

INTEGRA Lightweight

Concrete Intertenancy

System

Firestopping to the cavity

of the Intertenancy Wall

2 Brackets per full size panel, these

should be installed on every 2nd stud

with the opposing timber framed wall

having the brackets installed on the

alternating studs

Facade

Integra Panel to be taken as closed to

the underside of the underlay as

possible, any gaps to be packed with a

Mineral Wool

Purlins should be not be continued

across the Intertenancy Wall

Scale

Sheet

Date

Drawing Name

1 : 5 @ A4

34.19.96Eave - Corrugated Iron

CONFIDENTIALITY: No part of this publication may be

reproduced or transmitted other than the intended use by

Resene Construction Systems without written consent from

the author.

TradeSpec™ and RenderSpec™ are Registered Trademarks, both Documents are available on the Resene Construction Systems

Plaster Systems AAC Adhesive to be used to Mortar all Panel

Joins

Cavity size to be 20-40mm wide

Studs to be located at a maximum of 600 centre and

dwangs/nogs at 800mm centres.

Where there is a need for fire-stopping, mineral wool or

ceramic fibre cavity insulation must be used, the

wool/insulation should have a minimum density of 100kg/m³,

or as specified by a fire engineer

Where fire separations meet other fire separations or fire

rated parts of external walls, they shall have the junction fire

stopped over its full length

The Integra Intertenancy System shall terminate as close as

possible to the external roof cladding and primary elements

providing roof support, with any gaps fully fire stopped

System

INTEGRA Lightweight Concrete

Intertenancy System

Substrate

18 August 2021

Timber Frame Terraced Houses

Page 25: Sheet List Table Sheet Number Sheet Title 34.00.00 Drawing ...

INTEGRA Lightweight

Concrete Intertenancy

System

Firestopping to the cavity

of the Intertenancy Wall

2 Brackets per full size panel, these

should be installed on every 2nd stud

with the opposing timber framed wall

having the brackets installed on the

alternating studs

Facade

Integra Panel to be taken as closed to

the underside of the underlay as

possible, any gaps to be packed with a

Mineral Wool

Scale

Sheet

Date

Drawing Name

System

Substrate

1 : 2 @ A4

34.19.97Eave - Metal Tile

CONFIDENTIALITY: No part of this publication may be

reproduced or transmitted other than the intended use by

Resene Construction Systems without written consent from

the author.

TradeSpec™ and RenderSpec™ are Registered Trademarks, both Documents are available on the Resene Construction Systems

Integra Facade System

Integra Panel 50mm (20mm Cavity)1 November 2017

Plaster Systems AAC Adhesive to be used to Mortar all Panel

Joins

Cavity size to be 20-40mm wide

Studs to be located at a maximum of 600 centre and

dwangs/nogs at 800mm centres.

Where there is a need for fire-stopping, mineral wool or

ceramic fibre cavity insulation must be used, the

wool/insulation should have a minimum density of 100kg/m³,

or as specified by a fire engineer

Where fire separations meet other fire separations or fire

rated parts of external walls, they shall have the junction fire

stopped over its full length

The Integra Intertenancy System shall terminate as close as

possible to the external roof cladding and primary elements

providing roof support, with any gaps fully fire stopped