SHEET AC2.1.1A SHEET AC2.1 - Community Civic Campus
Transcript of SHEET AC2.1.1A SHEET AC2.1 - Community Civic Campus
UP
EVEV EV EV EVEV
UP
2 3 4 5 6 7 8 9 10 11 12 13
D D
C C
BB
A A
B.3
1
B.4B.4
A.9
7.8 9.5
1AC4.3.2
1AC4.3.2
20' - 0" 30' - 0" 30' - 0" 30' - 0" 35' - 0" 15' - 0" 13' - 0" 11' - 9 5/8" 14' - 8 3/8" 14' - 8 3/8" 11' - 9 5/8" 13' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0"
MAINELECTRICAL
WORKROOM
AMH
MED EVENT
KITCHENSTORAGE
KITCHEN
LARGEEVENT
LIB D
ISCA
RDST
OR
MPOE / TR
FACI
LITY
COOR
D
STAFF ALLGENDER
LOADING
SERVICECORRIDOR
VESTIBULE
AV
BLDG
ATTE
ND
STORAGEELEC
AV/IT/TVCCSTORAGE
EVENTPRE-FUNCTION
COUNCILCHAMBERS
STAIR 3
WAT
ERPU
MP
FIRE
PUM
P
CLERK
PARKRECEPTION
LOBBYSEATING
JC
STORAGE
ONEWAY ONEWAY
BIKE
STOR
AGE
STAF
F AL
LGE
NDER
LOCK
ERS CHANGING
CHANGINGSITE
STORAGE
SERV
LOAD
ING
ZONE
ELEC RM
VANRESERVES
2AC4.3.3
2AC4.3.3
C2C3
C4C5
CD
CC
CB
CA
3AC4.3.3
3AC4.3.3
1AC4.3.3
1AC4.3.3
4AC4.3.2
4AC4.3.2
A.2A.2
7.2
3AC4.3.2
3AC4.3.2
7.5
ELEV
SERVICEELEV
STAIR 02
7.4 7.6
DRYSTORAGE
1AC4.3.5
2AC4.3.5
2AC4.3.5
B.7 B.7
15' - 0" 15' - 0"
15' -
6"32
' - 0"
31' -
0"12
' - 0"
12' -
0"8'
- 0"
8' - 2
"22
' - 10
"
12' - 0"
30' - 0"
12' - 0"
8' - 0"
30' - 0"
8' - 0"
MEZZ. STORAGE ABOVE
PARKING
GALLERY
PARK LOBBY
AC4.1.1
3 SHEE
T AC
2.1.1A
SHEE
T AC
2.1.1B
STAIR 04
2AC4.3.1
2AC4.3.1
CLOSEDSESS
AC4.2.22
4
AC1.2.2
2
AC1.2.2 3
5' - 0
"
2AC2.3.01
AC2.3.0
3AC2.3.0
4AC2.3.0
5AC2.3.0
6AC2.3.1
6AC2.3.1
7AC2.3.1
7AC2.3.1
2' - 0"5' - 9" 5' - 9"2' - 0"
MRESTROOM
WRESTROOM
4 5 6 7
D
C
B.4
3AC4.3.2
3AC4.3.2
MEZZ. STORAGEMX1
B.7 SERVICE ELEVATORME1
ELEVATORME2
2AC2.3.0
NORTH NORTH
SHEET NUMBER
PROJECT NUMBER
SHEET TITLE
KEYPLAN
SEALS AND SIGNATURES
ISSUED FOR REV DATE
301 BATTERY STREET7TH FLOORSAN FRANCISCO, CA 94111415.227.0100smithgroup.com
Plot
Date:
A B
COMMUNITY CIVIC CENTERCITY OF SOUTH SAN FRANCISCO
EL CAMINO REAL & CHESTNUT AVE.SOUTH SAN FRANCISCO , CA 94080
PROJECT TRUE
9/3/20
20 8:
38:32
AM
FLOOR PLAN - LEVEL1/1M
AC2.0.1
STAR
T Sh
eet
10609.000
L. PAINT ALL EXPOSED SURFACES INCLUDING CEILINGS, HM DOOR, HMDOOR FRAMES, GRILLES, FIRE HOSE OR EXTINGUISHER CABINETS,EXPOSED PIPING, ETC. UON. TO MATCH WITH ADJACENT WALL ORCEILING WHERE IT OCCURS PER RCP, UON.
M.
ALL WALL BASE AT PARTITIONS TO BE AWB-2 UON. BASESSCHEDULED FOR PAINT SHALL MATCH WITH AWB-2 , UON.
N. ALL CARPETED SURFACES SHALL RECEIVE STRAIGHT BASE. HARDSURFACES SUCH AS VINYL OR RUBBER FLOORING SHALL RECEIVECOVE BASE.
O. COORDINATE CARPET DIRECTION WITH ARCHITECT PRIOR TOINSTALLATION. SUBMIT SEAMING DIAGRAM TO ARCHITECT PRIOR TOCARPET INSTALLATION.
P. COORDINATE STARTING POINT OF FLOOR AND WALL TILE WITHARCHITECT PRIOR TO INSTALLATION. SUBMIT DIAGRAM FOR REVIEWAND APPROVAL.
Q. ALL INTERSECTIONS OF FLOOR FINISH MATERIALS SHALL BELOCATED DIRECTLY UNDER CENTER OF DOOR, WHERE OCCURS,UON.
R. SEALANTS AND CAULKING ARE TO MATCH THE SURFACE IN WHICHTHEY APPEAR. GC TO COORDINATE WITH ARCHITECT PRIOR TOINSTALLATION.
S. RECEPTACLE COVER PLATE TO BE WHITE TYP, STAINLESS STEEL ONNON WHITE FEATURE WALL INCLUDING WOOD VENEER AND PANTRYBACK SPLASH.
T. ALIGN WALL REVEALS WITH ADJACENT FLOOR TRANSITION AND/ ORADJACENT CEILING TRANSITION - REF. RCP, ELEVATIONS, WALL ANDFLOOR FINISH PLANS FOR INFORMATION
U. MECHANICAL ENCLOSURE AND MECHANICAL PENTHOUSE SHALL BEPAINTED WITH UPGRADED EXTERIOR PAINT AND COATINGS.
V. ALL FINISH SHALL MEET OR EXCEED CLASS B FLAME SPREAD ANDSMOKE DEVELOPED INDICES.
A. REFER TO THE AC0.X SERIES SHEETS FOR ARCHITECTURALGENERAL NOTES, DRAWING, REFERENCE AND MATERIAL SYMBOLS,ABBREVIATIONS, AS WELL AS DIMENSIONING CONVENTIONS USEDON THIS SHEET.
B. REFER TO AND COORDINATE WITH STRUCTURAL, MECHANICAL,ELECTRICAL, PLUMBING, AV, AND SIGNAGE DRAWINGS FORADDITIONAL INFORMATION NOT SHOWN ON THIS SHEET.
C. FOR BASIC LIFE SAFETY AND CODE INFORMATION APPLYING TO THISPROJECT, REFER TO THE GC2.X.X SERIES SHEETS LOCATED PER THEPROJECT SHEET INDEX.
D. REFER TO THE "REFERENCE ELEVATION DEFINITIONS" LOCATED INTHE AC0.X SERIES SHEETS FOR ROOF ELEVATION DEFINITIONS.
E. REFER TO THE AC5.X SERIES SHEETS FOR ROOFING DETAILS.
F. ROOF ASSEMBLIES SHALL BE MINIMUM OF CLASS B FIRECLASSIFICATION, OR AS SPECIFIED IN THE PROJECT MANUAL.
G. ROOFING TPO, TYP. SEE SPEC 075423
H. CONTRACTOR TO NOTIFY ARCHITECT OF ANY CONFLICTS WITH WALLMOUNTED DEVICES INCLUDING LIGHT SWITCHES AND FIRE ALARMSTROBES WITH NON WHITE, ACCENT FINISH APPLIED WALLS.
I. CONTRACTOR SHALL BE RESPONSIBLE FOR ALLOWING FORDELIVERY LEADTIMES FOR ALL FABRICS AND OTHER CUSTOMFINISHES WITHIN THE CONSTRUCTION SCHEDULE. ALL DELIVERYTIMES MUST BE CONFIRMED AND ANY EXCESSIVE LEAD TIME MUSTBE BROUGHT TO THE ARCHITECT'S ATTENTION IMMEDIATELY TOALLOW FOR RESPECIFICATION IF NECESSARY.
J. FOR SURFACES WITH MORE THAN ONE FINISH NOTES, REFER TO THEELEVATION FOR EXTENT OF FINISH.
K. ALL WALLS AND GWB SOFFITS TO BE PAINTED PNT-0 UON.
GENERAL NOTES
SCALE: 1/16" = 1'-0"1 LEVEL 1 - FLOOR PLAN
SCALE: 1/16" = 1'-0"2 MEZZANINE LEVEL
Spaces are numbered using a three (3) digit identifier. Front-of-house spaces are those used by the public or building users. Back-of-house spaces are those typcially accessed by facilities personnel. Explanation below represents the phylosophy for both space types. Numbers are assigned starting at main entrances (or elevators) and working in a clockwise rotation, or linearly from east to west.
For front-of-house spaces2 01 .A| | || | Space or internal room option - 1 digit alpha| Space or suite number - 2 digit numericLevel number – 1 digit numeric
Ex. 110 111 112.A 112.B 201 202 203 311 312
For back-of-house spaces2 X 6| | || | Space sequential number - 1 digit numeric| Room symbol - 1 digit alpha (see table below)Level number – 1 digit numeric
Room Symbol Table:Symbol Room DescriptionC CirculationE ElevatorsF Telephone/Data, IDFJ Janitorial ClosetsL Electrical roomsM Mechanical roomsP Enclosed ParkingS Enclosed StairsSS Major Mechanical ShaftsT ToiletsX Rooms that don’t fit above, ie. Storage
Ex. 1T1 1T2 1T3 1L1 1L2 1S1 1S2
ROOM # PROTOCOLS
SSF PERMIT SET BC#3 / BID SET 1 2020-09-04