Sheet 2 - etenders.gov.za · Sheet 2 Of 5 Light Pole Sign Board M/H ... 2nd Floor 5 St. Georges...

1
FOR CONTINUATION REFER TO DRAWING 120296-W-23 FOR CONTINUATION REFER TO DRAWING 120296-W-21 Rising Main Long Section Sheet 2 Of 5 Light Pole Sign Board Manhole M/H - Directional Drilling Point DDP- Sheet 2 Scale 1:200 SETTING OUT DATA FOR 250mm 5,6,1* 0$,1 POSITION X POSITION Y POINT DDP6 DDP7 +37 608.401 +37 609.538 +3 759 636.931 +3 759 677.106 Note: contractor to expose all existing services, ascertain invert level & position and advise the engineer prior to trench excavation. Drawing Number Scale at A0 As Shown Title Project Title Coordination Eng check Date Rev Drawn Description Reference drawings Client Status Rev B Approved TEN Dwg check Designed Drawn SJ Ch'k'd App'd Key to symbols Notes ZM RH SJ SJ KF 30/09/16 B SJ ZM For Tender KF 30/09/16 MMD120296-W-DR-SL-01 - Site Plan MMD 120296-W-DR-S-02-05 Survey MMD 120296-W-DR-RM-21-25 - Rising Main long Sections Mott MacDonald Africa Reg. No. 1997/014139/07 2nd Floor 5 St. Georges Mall Cape Town Tel: 021 820-5900 Fax: 086 550 4320/086 550 4907 E-mail: [email protected] MMD 120296-C-DR-RM-02 CTIA Pump Station Sheet Key Plan 0RWW 0DF'RQDOG This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties. 30/09/16 30/09/16 30/09/16 30/09/16 30/09/16 3URSRVHG PP FODVV 12 PVCU rising main

Transcript of Sheet 2 - etenders.gov.za · Sheet 2 Of 5 Light Pole Sign Board M/H ... 2nd Floor 5 St. Georges...

FO

R C

ON

TIN

UA

TIO

N R

EF

ER

TO

D

RA

WIN

G 120296-W

-23

FO

R C

ON

TIN

UA

TIO

N R

EF

ER

TO

D

RA

WIN

G 120296-W

-21

Rising Main Long Section

Sheet 2 Of 5

Light Pole

Sign Board

ManholeM/H -

Directional Drilling Point

DDP-

Sheet 2

Scale 1:200

SETTING OUT DATA FOR 250mm

Ø RISING MAIN

POSITION X POSITION YPOINT

DDP6

DDP7

+37 608.401

+37 609.538

+3 759 636.931

+3 759 677.106

Note:

contractor to expose all existing services, ascertain invert level & position

and advise the engineer prior to trench excavation.

Drawing Number

Scale at A0

As Shown

Title

Project Title

Coordination

Eng check

DateRev Drawn Description

Reference drawings

Client

StatusRev

B

Approved

TEN

Dwg check

Designed

Drawn

SJ

Ch'k'd App'd

Key to symbols

Notes

ZM

RH

SJ

SJ

KF

30/09/16B SJZM For Tender KF

30/09/16

MMD120296-W-DR-SL-01 - Site Plan

MMD 120296-W-DR-S-02-05 Survey

MMD 120296-W-DR-RM-21-25 - Rising Main long Sections

Mott MacDonald Africa

Reg. No. 1997/014139/07

2nd Floor 5 St. Georges Mall

Cape Town

Tel: 021 820-5900

Fax: 086 550 4320/086 550 4907

E-mail: [email protected]

MMD 120296-C-DR-RM-02

CTIA Pump Station

Sheet Key Plan

© Mott MacDonald

This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.

We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.

30/09/16

30/09/16

30/09/16

30/09/16

30/09/16

Proposed 250mm Ø class

12 PVCU rising main