SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE...
-
Upload
bryan-hawkins -
Category
Documents
-
view
213 -
download
1
Transcript of SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE...
![Page 1: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9f5503460f94ba1bc3/html5/thumbnails/1.jpg)
SHARE Conference
Paris, 17-18 March 2010
Welcome
Axel Börsch-Supan
Introduction, State of the SHARE projects, Budget
Kathrin Axt: Budget, ContractsEva Schneider: Family list, Conferences
![Page 2: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9f5503460f94ba1bc3/html5/thumbnails/2.jpg)
© SHARE-Consortium
Purpose
• Get wave 4 going: Discuss pilot results and continue preparation of wave 4
• Substantive research! Go through all papers of FRB3
• Business:
• Report on state of SHARE projects State of ESFRI process (coordinator, countries) To do list for countries
• Refresher sample set up
• Data dissemination and publication policy (FRB3!)
• Budget matters (PREP-LIFE-LEAP-M4) and related contracts
![Page 3: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9f5503460f94ba1bc3/html5/thumbnails/3.jpg)
SHARE Conference
Paris, 17-18 March 2010
State of the SHARE projects
Axel Börsch-Supan
Introduction, State of the SHARE projects, Budget
![Page 4: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9f5503460f94ba1bc3/html5/thumbnails/4.jpg)
© SHARE-Consortium
What is happening in 2010?
Wave 4 surveyinstrument (LEAP)
Wave 4 surveyagencies
Wave 4 pilots and tests
Concrete long term arrangements
Actual money on the table for wave 4
Wave 3 final data collection (LIFE)
Start setting up data (LIFE)
Analyses: FRB
Wave 1-2 data base maintenance (LEAP, M4)
Memorandum of Understanding (PREP)
Basic engagement
SHARE-ERIC Statutes:Center, Countries, To Dos
![Page 5: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9f5503460f94ba1bc3/html5/thumbnails/5.jpg)
© SHARE-Consortium
Agenda
• Business:
• Report on state of SHARE projects State of ESFRI process (coordinator) Draft Statutes 6.0c: Presubmission OK, Article 1 (3) deleted, VAT exemption from Germany State of ESFRI process (countries) To do list for countries
• Refresher sample set up
• Data dissemination and publication policy (FRB3)
• Budget matters (PREP-LIFE-LEAP-M4) and related contracts
![Page 6: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9f5503460f94ba1bc3/html5/thumbnails/6.jpg)
© SHARE-Consortium
ERIC-Statutes
Article 1
Establishment of a SHARE-ERIC
(1) There shall be a distributed European Research Infrastructure called the Survey of Health,
Ageing and Retirement in Europe (SHARE).
(2) SHARE shall obtain the legal form of a European Research Infrastructure Consortium
(ERIC) incorporated under the provision of Council Regulation 723/2009 of 25 June 2009
and be named “SHARE-ERIC” (hereafter also referred to as “the Organisation”).
(3) SHARE-ERIC shall be an international body within the meaning of Article 151(1)(b) of
Directive 2006/112/EC, and an international organisation within the meaning of the second
indent of Article 23(1) of Directive 92/12/EEC and of Article 15(c), of Directive 2004/18/EC.
![Page 7: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9f5503460f94ba1bc3/html5/thumbnails/7.jpg)
© SHARE-Consortium
• Business:
• Report on state of SHARE projects State of ESFRI process (coordinator) Draft Statutes 6.0c: Presubmission OK Article 1 (3) will probably be deleted Still needed: VAT exemption from Germany two more countries‘ OK State of ESFRI process (countries) To do list for countries
• Refresher sample set up
• Data dissemination and publication policy (FRB3)
• Budget matters (PREP-LIFE-LEAP-M4) and related contracts
Agenda
![Page 8: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9f5503460f94ba1bc3/html5/thumbnails/8.jpg)
IE
PLCZ
IL
ES
PT
SVHU
SE
DK
DE
CH
ATFR
SP IT
GR
BENL
LUX
Memo of Understanding: Warsaw
Austria, Belgium, Czech Republic, Estonia, France, Germany, Israel, Italy, Portugal, Spain, Switzerland, and The Netherlands,
![Page 9: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9f5503460f94ba1bc3/html5/thumbnails/9.jpg)
IE
PLCZ
IL
ES
PT
SVHU
SE
DK
DE
CH
ATFR
SP IT
GR
BENL
LUX
Memo of Understanding: Paris
Austria, Belgium, Czech Republic, Estonia, France, Germany, Israel, Italy, Portugal, Spain, Switzerland, and The Netherlands, U
K
![Page 10: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9f5503460f94ba1bc3/html5/thumbnails/10.jpg)
© SHARE-Consortium
• Business:
• Report on state of SHARE projects State of ESFRI process (coordinator) Draft Statutes 6.0c: Presubmission OK, Article 1 (3) deleted, Still needed: VAT exemption from Germany two more countries´ OK
State of ESFRI process (countries) To do list for countries : Statutes translated, Statutes accepted
• Refresher sample set up
• Data dissemination and publication policy (FRB3)
• Budget matters (PREP-LIFE-LEAP-M4) and related contracts
Agenda
![Page 11: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9f5503460f94ba1bc3/html5/thumbnails/11.jpg)
© SHARE-Consortium
Countries
• Statutes translated? Statutes formally accepted? Money on the table?
• SE, DK, EE
• BE, NL, LUX, FR
• DE, CH, AT
• PL, CZ, SV, HU
• PT, ES, IT, GR, IL
• IE, UK
![Page 12: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9f5503460f94ba1bc3/html5/thumbnails/12.jpg)
© SHARE-Consortium
• Business:
• Report on state of SHARE projects State of ESFRI process (coordinator) Draft Statutes 6.0c: Presubmission OK, Article 1 (3) deleted, Still needed: VAT exemption from Germany two more countries´ OK
State of ESFRI process (countries) To do list for countries : Statutes translated, Statutes accepted
• Refresher sample set up
• Data dissemination and publication policy (FRB3)
• Budget matters (PREP-LIFE-LEAP-M4) and related contracts
Agenda
![Page 13: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9f5503460f94ba1bc3/html5/thumbnails/13.jpg)
© SHARE-Consortium
Countries
• Refresher sample: individuals plus partners (not households), oversampling of cohorts 57-60, get gross sample ex ante!
• New possibilities to draw? How large (money on the table)?
• SE, DK, EE
• BE, NL, LUX, FR
• DE, CH, AT
• PL, CZ, SV, HU
• PT, ES, IT, GR, IL
• IE, UK
![Page 14: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9f5503460f94ba1bc3/html5/thumbnails/14.jpg)
© SHARE-Consortium
• Business:
• Report on state of SHARE projects State of ESFRI process (coordinator) Draft Statutes 6.0c: Presubmission OK, Article 1 (3) deleted, Still needed: VAT exemption from Germany two more countries´ OK
State of ESFRI process (countries) To do list for countries : Statutes translated, Statutes accepted
• Refresher sample set up
• Data dissemination and publication policy (FRB3)
• Budget matters (PREP-LIFE-LEAP-M4) and related contracts
Agenda
![Page 15: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9f5503460f94ba1bc3/html5/thumbnails/15.jpg)
© SHARE-Consortium
SHARE-M4Multinational Advancement ofResearch Infrastructures on Ageing
WP1: Management of the contract
WP4: Multi-country
data basemaintenance
WP8: Response behaviour
WP9: Multi-modeinterviewing
facility
WP10: Biomarkers
WP5: User trainingand feedback
WP11: European
healthmodule
WP3: Standards and procedures
WP7: Global access
WP12: Social and
familialembedding
WP13: European
pension claimsdata base
WP15: European time usemodule
WP16: European 50+ exclusion module
WP17: Transnational access services
ScienceInfrastructure service
Management
WP2: Conferences and communication
WP6:Interviewer training and
quality control
WP14: Harmonized
incomemeasures
Pillar 3:
4 years
8 mio €
17 WPs
12 partners
30% cut?
![Page 16: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9f5503460f94ba1bc3/html5/thumbnails/16.jpg)
© SHARE-Consortium
• Business:
• Report on state of SHARE projects State of ESFRI process (coordinator) Draft Statutes 6.0c: Presubmission OK, Article 1 (3) deleted, Still needed: VAT exemption from Germany two more countries´ OK
State of ESFRI process (countries) To do list for countries : Statutes translated, Statutes accepted
• Refresher sample set up
• Data dissemination and publication policy (FRB3)
• Budget matters (PREP-LIFE-LEAP-M4) and related contracts
Agenda
![Page 17: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9f5503460f94ba1bc3/html5/thumbnails/17.jpg)
- release 0 strictly internal
- release 1 in November
- no publications with release 0
- FRB short articles based on release 0
- conference presentations only with disclaimer: „preliminary-not for quotation“ (verbally and on paper)
- acknowledments to sponsors (EU, NIA, national funds), methodology book
- Springer?
SHARE Conference: Data dissemination and publication policy
Paris, 17 March 2010
![Page 18: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9f5503460f94ba1bc3/html5/thumbnails/18.jpg)
SHARE Conference
Paris, 17-18 March 2010
Budget matters
Axel Börsch-Supan
Introduction, State of the SHARE projects, Budget
![Page 19: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9f5503460f94ba1bc3/html5/thumbnails/19.jpg)
© SHARE-Consortium
• Business:
• Report on state of SHARE projects State of ESFRI process (coordinator) Draft Statutes 6.0c: Presubmission OK, Article 1 (3) deleted, Still needed: VAT exemption from Germany two more countries´ OK
State of ESFRI process (countries) To do list for countries : Statutes translated, Statutes accepted
• Refresher sample set up
• Data dissemination and publication policy (FRB3)
• Budget matters (PREP-LIFE-LEAP-M4) and related contracts
Agenda
![Page 20: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9f5503460f94ba1bc3/html5/thumbnails/20.jpg)
Payment plan to survey agencies for Dec 2009
Still to pay ded advance Still to pay RestSubCon WP8 Status Verification(rest of FW) NIA LIFE LEAP
AT 43.027€ 43.027€ 26.425€ 16.602€
BE_FR 52.835€ 52.835€ 32.449€ 20.386€
BE_NL 88.353€ 88.353€ 54.262€ 34.091€
CH 146.811€ 146.811€ 90.164€ 56.647€
CZ 40.784€ 40.784€ 25.047€ 15.736€
DE 46.378€ 46.378€ 28.483€ 17.895€
DK 58.997€ 58.997€ 36.233€ 22.764€
ES 160.015€ 100.000 60.015€ 36.858€ 23.157€
FR 101.091€ 101.091€ 62.085€ 39.006€
GR 147.305€ 100.000 47.305€ 29.052€ 18.253€
IT 96.882€ 96.882€ 59.500€ 37.382€
NL 106.701€ 106.701€ 65.530€ 41.170€
PL 66.419€ 66.419€ 40.791€ 25.628€Total 1.155.597€
SE 1.179.243,32 SEK
115.554 € 60.000 55.554€ 34.119€ 21.435€adjustments 4.760€
TOTAL 1.271.151€ 260.000€ 1.011.151€ 621.000€ 394.911€
Budget 621.000€ 691.851€Leftover 0€ 296.940€at risk 49.400€
1. still to pay after NIA
2. divide leftover LIFE subcons in
proportion to what is left to pay3. rest out of LEAP
spent in Dec. 09
![Page 21: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9f5503460f94ba1bc3/html5/thumbnails/21.jpg)
WP6 Pilots&Pretest Blue: in own budget as personnelYellow: in budget Tilburg Orange: In own budget as subcontracting
pilot pretest leftovers total budget
Austria 30.000
Belgium 15.000 28.500 0 43.500 € 30.547,52
BE-NL need to share BE money
Switzerland 45.000
Czech Rep. 0 0 0 0
Germany 0 0 15.000 15.000
Denmark 45.233 € 45.233,36
Spain 10.000 30.750 40.750
France 27.634 € 12.692,18
Greece 25.000
Italy 32.050
Netherlands 12.900 20.500 33.400
Poland 8.415 25.000
Sweden 42.222 € 42.221,86should be adjusted b/o doesn't do pilot
Total 362.567€ 296.940€ available in LEAP
Ireland 0 € 51.698,00 use for HACs?
Israel 45.892 € 45.891,67 adjustment?
Slovenia 41.155 € 41.154,79 adjustment?Total 0€ 0€ 0€ 449.614€ 435.685€ available in LEAP
NIA fundingMar2010 Jun2010 Sep2010 Sep2011 TOTAL
Agencies US$ 21.546 43.092 1.073.150 728.414 1.866.2031,40 € 15.390 30.780 766.536 520.296 1.333.002
NIA fundingMar2010 Jun2010 Sep2010 Sep2011 TOTAL
Agencies US$ 21.546 43.092 1.073.150 728.414 1.866.2031,40 € 15.390 30.780 766.536 520.296 1.333.002
![Page 22: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9f5503460f94ba1bc3/html5/thumbnails/22.jpg)
© SHARE-Consortium
Countries
• Costs for pilot – pretest – any remaining panel care
• Paid by country (part of ESFRI deal)?
• SE, DK, EE
• BE, NL, LUX, FR
• DE, CH, AT
• PL, CZ, SV, HU
• PT, ES, IT, GR, IL
• IE, UK
WP6 Pilots&Pretest Blue: in own budget as personnelYellow: in budget Tilburg Orange: In own budget as subcontracting
pilot pretest leftovers total budget
Austria 30.000
Belgium 15.000 28.500 0 43.500 € 30.547,52
BE-NL need to share BE money
Switzerland 45.000
Czech Rep. 0 0 0 0
Germany 0 0 15.000 15.000
Denmark 45.233 € 45.233,36
Spain 10.000 30.750 40.750
France 27.634 € 12.692,18
Greece 25.000
Italy 32.050
Netherlands 12.900 20.500 33.400
Poland 8.415 25.000
Sweden 42.222 € 42.221,86should be adjusted b/o doesn't do pilot
Total 362.567€ 296.940€ available in LEAP
Ireland 0 € 51.698,00 use for HACs?
Israel 45.892 € 45.891,67 adjustment?
Slovenia 41.155 € 41.154,79 adjustment?Total 0€ 0€ 0€ 449.614€ 435.685€ available in LEAP
![Page 23: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9f5503460f94ba1bc3/html5/thumbnails/23.jpg)
© SHARE-Consortium
• Business:
• Report on state of SHARE projects State of ESFRI process (coordinator) Draft Statutes 6.0c: Presubmission OK, Article 1 (3) deleted, Still needed: VAT exemption from Germany two more countries´ OK
State of ESFRI process (countries) To do list for countries : Statutes translated, Statutes accepted
• Refresher sample set up
• Data dissemination and publication policy (FRB3!)
• Budget matters (PREP-LIFE-LEAP-M4) and related contracts
Agenda