Sg.Labu WTP

13
30 SEPT 2011

description

Tempat kerja ku...

Transcript of Sg.Labu WTP

Page 1: Sg.Labu WTP

30 SEPT 2011

Page 2: Sg.Labu WTP

Summary Of Contract

Name of Project : Alternative Water Supply to KLIA,

Design and Build Water Treatment Plant and

Associated Works at Sg.Labu,Selangor

Contract No. : PAAB/B002-D&B/W/B/K/01/10

Employer : Pengurusan Aset Air Berhad (PAAB)

Supervising Consultant : SMHB Sdn. Bhd

Design & Build Contractor : Salcon Engineering Berhad

Design & Build Consultant : GHD Perunding Sdn. Bhd

2

Page 3: Sg.Labu WTP

Commencement Date : 16 June 2010

Completion Date : 15 December 2011

Contract Period : 12 Mth - Stage 1 (52.5 MLD)

: 12 + 6 Mth - Stage 2 (105 MLD)

Defect Liability Period : 24 Months

Contract Value : RM 84,213,297.00

Summary Of Contract

3

Page 4: Sg.Labu WTP

Brief Description of Project Scope

To design, procure, construct, install, commissioning, operate,

maintain, handover and training as follows:

• A new raw water gravity main of about 400 m length from off-

river storage to the water treatment plant

• A new water treatment plant located at Sg.Labu, Selangor

which will be designed for nominal output of 105MLD

• The treated water pumping main of about 3.5 km length from

the water treatment plant to the services reservoir at KLIA

4

Page 5: Sg.Labu WTP

PROCESS SCHEMATIC

5

Page 6: Sg.Labu WTP

6

Page 7: Sg.Labu WTP

WTP LOCATION

7

Page 8: Sg.Labu WTP

LOCATION PLAN

8

Page 9: Sg.Labu WTP

Sg. Labu

ORSR

WTP

MAB Reservoirs

LOCATION MAP

9

Page 10: Sg.Labu WTP

PROPOSED WTP LAYOUT

10

Page 11: Sg.Labu WTP

Entrance

Detention PondCW Tank

Store/w.shop

Residual Lagoon

Residual Treatment Building

Waste Washwater Tank

Page 12: Sg.Labu WTP

Detention Pond = 147m x 98m

Effective vol. = 89,586m3

Emergency Residual Lagoon = 65m x 52m

Effective vol. = 10,053m3

12

Page 13: Sg.Labu WTP

13

Thank You