May 2010
1
SG Communications Overview
Matt Gillmore02/27/2012
![Page 2: SG Communications Overview Matt Gillmore 02/27 /2012](https://reader035.fdocuments.us/reader035/viewer/2022062408/56813bd0550346895da4f648/html5/thumbnails/2.jpg)
SG Boot Camp Agenda
• SG Communications structure within UCAiug• Overview of this weeks meeting schedule• Overview of SG-Network• Walkthrough of SG-Networks work
– Requirements– Architecture reference diagram– System Requirements Specification overview
![Page 3: SG Communications Overview Matt Gillmore 02/27 /2012](https://reader035.fdocuments.us/reader035/viewer/2022062408/56813bd0550346895da4f648/html5/thumbnails/3.jpg)
Open SG Organization
![Page 4: SG Communications Overview Matt Gillmore 02/27 /2012](https://reader035.fdocuments.us/reader035/viewer/2022062408/56813bd0550346895da4f648/html5/thumbnails/4.jpg)
SG Communications AgendaFeb 27th Mon 2-4 SG Comm Boot CampFeb 28th Tues 10:30-noon SG Comm
Feb 28th Tues 1-3pm SG Network SRS Working SessionFeb 28th Tues 3:30-4:30pm SG Network / SG Simulations
Feb 29th Wed 8-10am SG Network SRS Working Session
Feb 29th Wed 10:30-noon SG Network SRS Working Session
Feb 29th Wed 1-3pmPAP2 Model Area Characteristics by density category: terrain, foliage, endpoint densities
March 1st Thur 8-10amSRS or more Model Area work e.g. finalizing the assessment profile and scaling the payloads, payloads splits baseload
March 1st
t Thur 10:30-noonSG Network / PAP2 Model Issues: Payload aggregation and lose of payload volumetrics especially on latency.
![Page 5: SG Communications Overview Matt Gillmore 02/27 /2012](https://reader035.fdocuments.us/reader035/viewer/2022062408/56813bd0550346895da4f648/html5/thumbnails/5.jpg)
SG-Network Overview• Previously started as AMI-Network with a focus on
network management.• Scope and Charter for SG-Network within UCAiug– NIST PAP 2 (Wireless standards for the Smart Grid)• Supply functional requirements for Smart Grid
Networks from a utility perspective• Define functional domains within the Smart Grid
– Create a System Requirements Specification• Provide information to SDO’s (e.g., IEEE P2030)
• Participation– Utilities, Academia, Vendors
![Page 6: SG Communications Overview Matt Gillmore 02/27 /2012](https://reader035.fdocuments.us/reader035/viewer/2022062408/56813bd0550346895da4f648/html5/thumbnails/6.jpg)
SG-Network Overview Continued• Deliverables– Communications Requirements
• Latency, How Often, Payload size, etc– Database for using the requirements– System Requirements Specification
• Pulls all of the work together– Reference Architecture Diagram
![Page 7: SG Communications Overview Matt Gillmore 02/27 /2012](https://reader035.fdocuments.us/reader035/viewer/2022062408/56813bd0550346895da4f648/html5/thumbnails/7.jpg)
SG-Network Output• Progress to date:– System Requirements Specification V5 complete• Key stats: • 19 payload-groupings (usecases) • 204 payloads • 500 payload-parent-sets • 7877 requirement rows (including parents and 2 rows
flagged for deletion) – Database matches requirements capture from SRS V5
![Page 8: SG Communications Overview Matt Gillmore 02/27 /2012](https://reader035.fdocuments.us/reader035/viewer/2022062408/56813bd0550346895da4f648/html5/thumbnails/8.jpg)
Examples of work accomplished to date• Sample Actors– Smart Meter– Load Management System (LMS)
• Sample Requirement for a Smart MeterUse Case Requirement How Often Reliability Latency
Meter reading
Smart Meter shall be able send on demand read information
1 transaction per meter on demand
> 98% < 5s
Meter reading
Smart Meter shall be able to report on demand read communication failure
1 transaction per meter on demand
> 98% < 5s
Meter reading
Residential Electric Smart Meter shall be able to report when scheduled
All meters report 4-6 times per day
> 98% < 4hr
![Page 9: SG Communications Overview Matt Gillmore 02/27 /2012](https://reader035.fdocuments.us/reader035/viewer/2022062408/56813bd0550346895da4f648/html5/thumbnails/9.jpg)
![Page 10: SG Communications Overview Matt Gillmore 02/27 /2012](https://reader035.fdocuments.us/reader035/viewer/2022062408/56813bd0550346895da4f648/html5/thumbnails/10.jpg)
NIST Conceptual Model
![Page 11: SG Communications Overview Matt Gillmore 02/27 /2012](https://reader035.fdocuments.us/reader035/viewer/2022062408/56813bd0550346895da4f648/html5/thumbnails/11.jpg)
Reference Architecture from NISTIR
![Page 12: SG Communications Overview Matt Gillmore 02/27 /2012](https://reader035.fdocuments.us/reader035/viewer/2022062408/56813bd0550346895da4f648/html5/thumbnails/12.jpg)
P2030 Smart Grid Comms Reference Architecture
![Page 13: SG Communications Overview Matt Gillmore 02/27 /2012](https://reader035.fdocuments.us/reader035/viewer/2022062408/56813bd0550346895da4f648/html5/thumbnails/13.jpg)
SG-Networks Reference Architecture
![Page 14: SG Communications Overview Matt Gillmore 02/27 /2012](https://reader035.fdocuments.us/reader035/viewer/2022062408/56813bd0550346895da4f648/html5/thumbnails/14.jpg)
SG-Networks Reference Architecture
![Page 15: SG Communications Overview Matt Gillmore 02/27 /2012](https://reader035.fdocuments.us/reader035/viewer/2022062408/56813bd0550346895da4f648/html5/thumbnails/15.jpg)
Deliverables• Interim Release 1.0 was published in December 2009
– Requirements and some volumetric and latency requirements• Interim Release 2.0 was published in February 2010
– Requirements, volumetric, latency requirements, security, implications and more use cases
– Reference Architecture Diagram first published– System requirements specification published
• Interim Release 3.0 was published in May 2010– Addition of the following use cases: Pre-Payment, Meter Events, DA and
Outage Management– System requirements specification updates
• Interim Release 4.0 was published in June 2010– Addition of the following use cases: DRLC, DA fault isolation and
reconfiguration– System requirements specification re-write
• Interim Release 5.0 was published in October 2011
![Page 16: SG Communications Overview Matt Gillmore 02/27 /2012](https://reader035.fdocuments.us/reader035/viewer/2022062408/56813bd0550346895da4f648/html5/thumbnails/16.jpg)
Work Plan for the week• System requirements Specification working
sessions• Review• Plan scope of the next interim release• NIST SGIP Priority Action Plan 2 joint
meeting Thursday
![Page 17: SG Communications Overview Matt Gillmore 02/27 /2012](https://reader035.fdocuments.us/reader035/viewer/2022062408/56813bd0550346895da4f648/html5/thumbnails/17.jpg)
Questions?