SFFD Ambulance Deployment FacilityCivic Design Review Updated Phase 1 Presentation
June 19th 2017
1 LOCATION AND MASSING
SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 3Site Location
N
Proposed Future Ambulance Deployment Facility
Highway 101
SFPD Bayview Station
Cesar Chavez St
Highway 280
AT&T Park
Zuckerberg San Francisco General Hospital
Islais Creek
SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 4Site Location & Long Section
Highway 101 Barneveld Avenue
Bayshore Boulevard
McKinnon Avenue
Jerrold Avenue
N
SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 5Proposed Site Plan
Barneveld Avenue
Kel-Toy, Inc.
J Scott Co
Blood Centers of the Pacific
Payless Plumbing & Fire Sprinkler Supply
Stop N Stor
Academy of Art
First Student
BevMo!
Burger King
Rescino Performance
Earl’s Organic Produce
National Cab
Alioto’s Garage
Bayshore Boulevard
Highway 101
McKinnon Avenue
Jerrold Avenue
N
SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 6Proposed Site Plan
Proposed Parking Structure
ProposedAmbulance Deployment
Facility
Existing Fire Station 9
N
Barneveld Avenue
McKinnon Avenue
213’ 156’ 95’
ROOF @15’
EXISTING BUILDING TOP @31.9’
EXISTING BUILDING TOP @43.0’
EXISTING BUILDING TOP @41.4’ EXISTING BUILDING
TOP @34.7’EXISTING BUILDING TOP @32.5’
EXISTING BUILDING TOP @42.4’
ROOF @54’
STAIR PENTHOUSE @64’100’
213’
Jerrold Avenue
SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 7Neighborhood Vantage Points
Barneveld Avenue
McKinnon Avenue
Jerrold Avenue
FUTURE ADF
SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 8Proposed Building Massing from Jerrold Avenue
SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 9Proposed Building Massing from Barneveld Avenue
SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 10Proposed Building Massing from Bayshore Boulevard
2 SD PHASE UPDATE
SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 12Proposed Site Plan Comparison
DN
FDFD FD
RAMP DN 6�RAMP DN 12�
ELEV 1
01 02 03 04 05 06 07
08 09 10 11 12
RC01
RC02
EV02
STAN
DARD
VAN
02
STAN
DARD 01
STANDARD
03
VISITOR
01 VISITOR
02 VISITOR
03 VISITOR
04 STANDARD
05 STANDARD
06 STANDARD
07 STANDARD
08EV03 EV
04 EV05
FUEL EFFICIENT 01
FUEL EFFICIENT 02
FUEL EFFICIENT 03
FUEL EFFICIENT 04
STANDARD 09
STANDARD 10
STANDARD 11
STANDARD 12
STANDARD 13
STANDARD 14
STANDARD 15
STANDARD 16
STANDARD 45
STANDARD18
STANDARD19
STANDARD20
STANDARD21
STANDARD22
STANDARD23
STANDARD24
STANDARD25
STANDARD26
STANDARD27
STANDARD28
STANDARD17
STANDARD
29 STANDARD
30 STANDARD
31 STANDARD
32 STANDARD
33 STANDARD
34 STANDARD
35 STANDARD
36 STANDARD
37 STANDARD
38 STANDARD
39 STANDARD
40 STANDARD
41 STANDARD
42
STANDARD43
STANDARD
44
EV VAN 01
STANDARD
04
STAIR 2(OPEN)
STAIR 1(OPEN)
⅊
⅊
DN
E�ISTING BUILDING
E�ISTINGBUILDING
5286A � LOT 005
HEIGHT� 31�-11"
E�ISTINGBUILDING
HEIGHT� 43�-0"
E�ISTINGBUILDING
5286A � LOT 017
HEIGHT� 41�-5"
E�ISTINGBUILDING
E�ISTINGBUILDING
E�ISTINGBUILDING
E�ISTINGBUILDING
E�ISTINGBUILDING
E�ISTINGBUILDING
5286A � LOT 019
HEIGHT� 34�-7"
E�ISTING BUILDING
LOT 019 � HEIGHT� 32��5"
E�ISTINGFIRE STATION 09
240'-2"
5286A � LOT 003
LOT 004
5286A � LOT 020
HEIGHT�
5286A � LOT 0075286A �LOT 18
5286A � LOT 007
5286A � 006HEIGHT 31�-5"
20'-0"
12'-0"MIN.
10'-6"
17'-7"±
UPTON STREET
BARNEVELD AVENUE
JAR
RO
LD A
VE
NU
E
McK
INN
ON
AV
EN
UE
HEIGHT�29�-2"
HEIGHT�22�-1"
FPFH
FPFH
FH
FH
UPTON STREET
BARNEVELD AVENUE
JAR
RO
LD A
VE
NU
E
McK
INN
ON
AV
EN
UE
10'-1
"80
'-0"
24'-4
"16
'-10"
112'-10" 52'-0" 213'-8" 61'-7" 79'-10" 10'-3"52'-0"
216'-
11"
335'-
0"
FDFD FD
RAMP DN 6�RAMP DN 12�
ELEV 1
01 02 03 04 05 06 07
08 09 10 11 12
RC01
RC02
EV02
STAN
DARD
VAN
02
STAN
DARD 01
STANDARD
03
VISITOR
01 VISITOR
02 VISITOR
03 VISITOR
04 STANDARD
05 STANDARD
06 STANDARD
07 STANDARD
08EV03 EV
04 EV05
FUEL EFFICIENT 01
FUEL EFFICIENT 02
FUEL EFFICIENT 03
FUEL EFFICIENT 04
STANDARD 09
STANDARD 10
STANDARD 11
STANDARD 12
STANDARD 13
STANDARD 14
STANDARD 15
STANDARD 16
STANDARD 45
STANDARD18
STANDARD19
STANDARD20
STANDARD21
STANDARD22
STANDARD23
STANDARD24
STANDARD25
STANDARD26
STANDARD27
STANDARD28
STANDARD17
STANDARD
29 STANDARD
30 STANDARD
31 STANDARD
32 STANDARD
33 STANDARD
34 STANDARD
35 STANDARD
36 STANDARD
37 STANDARD
38 STANDARD
39 STANDARD
40 STANDARD
41 STANDARD
42
STANDARD43
STANDARD
44
EV VAN 01
STANDARD
04
STAIR 2(OPEN)
STAIR 1(OPEN)
⅊
⅊
Orig
inal
Dra
win
g S
ize:
30"
x 4
2"D
raw
ing
nam
e: P
:\871
5A�A
DF\
5.0�
Des
ign\
5.01
�C�r
rent
\AC
AD
\Plo
t\AD
F A
1.30
SIT
E P
LAN
.dw
g
Plo
tted
on:
Nov
21,
201
6 - 5
:16�
m
Sheet No.
Drawing Title
Job No.
Proj. Arch.
Proj. Mgr.
Drawn
Project
Scale
Section Head
RevisionsNo. Date
Issue
Consultant
100% SCHEMATIC DESIGN11.18.2016
30 Van Ness AvenueSan Francisco, CA94102-6028 Fax (415) 557-4701
(415) 557-4700Suite 4100
BUILDING DESIGN ANDCONSTRUCTION DIVISION
Phase
8715A
Edgar Lopez - City Architect
Julia Laue - Principal Architect & Manager
10.07.16 50% SCHEMATIC DESIGN
RS/JD
SD
TK
SCALE:12 SITE PLAN
1�32" � 1�-0"
1
2
SITE ENTRANCE - ONE WAY TRAFFIC. SEE SHEET NOTE #5 FOR ADDITIONALINFORMATION. PROVIDE NEW VEHICULAR CURB DRIVEWAY
GENERAL NOTES
3
4
SITE PLANPROPOSED
A1.30
SITE EXIT - ONE WAY TRAFFIC. PROVIDE NEW VEHICULAR CURB DRIVEWAY, STEELBI-FOLD TRACKLESS CHAIN LINK W/ PRIVACY INFILL & SENSOR MOTION FOR EXITING.
INSTALL DRIVEWAY, STEEL BI-FOLD TRACKLESS CHAIN LINK WITH PRIVACY INFILL ATFIRE STATION 9 ENTRANCE/EXIT
EXISTING FIRE STATION 9 WORKSHOP
SHEET NOTES
2
3
5 PROVIDE NEW VEHICULAR CURB DRIVEWAY, STEEL BI-FOLD TRACKLESS CHAIN LINKWITH PRIVACY INFILL . SEE SHEET NOTE #6 FOR ADDITIONAL INFORMATION
6
PROVIDE NEW PAVEMENT ASPHALT, SCD
5
1. VERIFY THAT EXISTING CONDITIONS ARE AS INDICATED ON THE DRAWINGS ANDSPECIFICATIONS. NOTIFY THE CITY REPRESENTATIVE IMMEDIATELY OF VARIATIONSOR DISCREPANCIES. DO NOT PROCEED WITH AFFECTED WORK UNTIL THE VARIATIONSOR DISCREPANCIES ARE RESOLVED BY THE CITY REPRESENTATIVE.
2. NEW CURBS, GUTTERS, SITE DRAINAGE AND SIDEWALK INCLUDED IN SCOPE OF WORK,SCD.
3. COORDINATE ALL WORK W/ MECHANICAL, ELECTRICAL, STRUCTURAL AND CIVILDISCIPLINES.
4. VERIFY SITE DRAINAGE AT REAR YARD OF FIRE STATION 09. PROVIDE NEW CATCHBASIN AS REQUIRED, SCD
7 PROVIDE SIDE WALK
8 PROVIDE ACCESSIBLE CURB CUT. SCD FOR EXTEND OF WORK
9 PROVIDE STRIPING AREA FOR PEDESTRIAN ACCESS, SEE A2.01 AND A2.11
10 INSTALL 7'-0" TALL FENCE WITH PRIVACY INFILL OVER CONCRETE CURB
11 PROVIDE DETECTABLE WARNING
8
7
8
8
LEGEND
PROPERTY LINE
NEW FENCE
EXISTING BUILDING TO REMAIN
14
13
7
8
14
15
16
169
EXISTING CELL TOWER AT NEIGHBOR PROPERTY
10
17
17 17
INSTALL PEDESTRIAN ACCESS, STEEL MAN GATE, WITH KEY CARD ACCESS ANDAUDIO-VISUAL SYSTEM
INSTALL GENERATOR, LOCATED ON GARAGE FACILITY18
PLANTING POCKET WITH VINES, TRELLIS AND DIP IRRIGATION19
INSTALL TRANSFORMER20
20
13
INSTALL METERED SWITCHGEAR21
22
15
1
INSTALL GAS METER FOR ADF BUILDINGS
INSTALL BACK FLOW PREVENTER AND FIRE DEPARTMENT CONNECTION
INSTALL FUEL PUMPING STATIONS OVER CONCRETE CURB
4
21
EXISTING FIRE HYDRANT
12 INSTALL UNDERGROUND FUEL TANK, (1) 3,000 GA GASOLINE AND (1) 1,000 DIESEL,SMD
FIRE PRESSURE HYDRANT FPFH
FIRE HYDRANT FH
23 EXISTING FIRE PRESSURE HYDRANT
23
23
22
22
24
18
24
PROVIDE FIRE DEPARTMENT CONNECTION, STANDPIPE TYP.
17911
EXTERIOR BICYCLE PARKING. SEE A2.01 SHEET NOTE 125
INSTALL 4" DIAM. STEEL CONCRETE FILLED BOLLARD26
PROVIDE "AMBULANCE DEPLOYMENT FACILITY" SIGN27
BUILDING SITE PATH EGRESS. SEEA0.31 THROUGH A0.34 AND A0.41 THROUGH A0.43
SECOND EXIT - VEHICLES EMERGENCY EXIT28
28
INSTALL UNDERGROUND FUEL TANK FOR EMERGENCY GENERATOR29
12
29
10
19 19
10 10
DN
FDFD FD
RAMP DN 6�RAMP DN 12�
ELEV 1
01 02 03 04 05 06 07
08 09 10 11 12
RC01
RC02
EV02
STAN
DARD
VAN
02
STAN
DARD 01
STANDARD
03
VISITOR
01 VISITOR
02 VISITOR
03 VISITOR
04 STANDARD
05 STANDARD
06 STANDARD
07 STANDARD
08EV03 EV
04 EV05
FUEL EFFICIENT 01
FUEL EFFICIENT 02
FUEL EFFICIENT 03
FUEL EFFICIENT 04
STANDARD 09
STANDARD 10
STANDARD 11
STANDARD 12
STANDARD 13
STANDARD 14
STANDARD 15
STANDARD 16
STANDARD 45
STANDARD18
STANDARD19
STANDARD20
STANDARD21
STANDARD22
STANDARD23
STANDARD24
STANDARD25
STANDARD26
STANDARD27
STANDARD28
STANDARD17
STANDARD
29 STANDARD
30 STANDARD
31 STANDARD
32 STANDARD
33 STANDARD
34 STANDARD
35 STANDARD
36 STANDARD
37 STANDARD
38 STANDARD
39 STANDARD
40 STANDARD
41 STANDARD
42
STANDARD43
STANDARD
44
EV VAN 01
STANDARD
04
STAIR 2(OPEN)
STAIR 1(OPEN)
⅊
⅊
DN
E�ISTING BUILDING
E�ISTINGBUILDING
5286A � LOT 005
HEIGHT� 31�-11"
E�ISTINGBUILDING
HEIGHT� 43�-0"
E�ISTINGBUILDING
5286A � LOT 017
HEIGHT� 41�-5"
E�ISTINGBUILDING
E�ISTINGBUILDING
E�ISTINGBUILDING
E�ISTINGBUILDING
E�ISTINGBUILDING
E�ISTINGBUILDING
5286A � LOT 019
HEIGHT� 34�-7"
E�ISTING BUILDING
LOT 019 � HEIGHT� 32��5"
E�ISTINGFIRE STATION 09
240'-2"
5286A � LOT 003
LOT 004
5286A � LOT 020
HEIGHT�
5286A � LOT 0075286A �LOT 18
5286A � LOT 007
5286A � 006HEIGHT 31�-5"
20'-0"
12'-0"MIN.
10'-6"
17'-7"±
UPTON STREET
BARNEVELD AVENUE
JAR
RO
LD A
VE
NU
E
McK
INN
ON
AV
EN
UE
HEIGHT�29�-2"
HEIGHT�22�-1"
FPFH
FPFH
FH
FH
UPTON STREET
BARNEVELD AVENUE
JAR
RO
LD A
VE
NU
E
McK
INN
ON
AV
EN
UE
10'-1
"80
'-0"
24'-4
"16
'-10"
112'-10" 52'-0" 213'-8" 61'-7" 79'-10" 10'-3"52'-0"
216'-
11"
335'-
0"
FDFD FD
RAMP DN 6�RAMP DN 12�
ELEV 1
01 02 03 04 05 06 07
08 09 10 11 12
RC01
RC02
EV02
STAN
DARD
VAN
02
STAN
DARD 01
STANDARD
03
VISITOR
01 VISITOR
02 VISITOR
03 VISITOR
04 STANDARD
05 STANDARD
06 STANDARD
07 STANDARD
08EV03 EV
04 EV05
FUEL EFFICIENT 01
FUEL EFFICIENT 02
FUEL EFFICIENT 03
FUEL EFFICIENT 04
STANDARD 09
STANDARD 10
STANDARD 11
STANDARD 12
STANDARD 13
STANDARD 14
STANDARD 15
STANDARD 16
STANDARD 45
STANDARD18
STANDARD19
STANDARD20
STANDARD21
STANDARD22
STANDARD23
STANDARD24
STANDARD25
STANDARD26
STANDARD27
STANDARD28
STANDARD17
STANDARD
29 STANDARD
30 STANDARD
31 STANDARD
32 STANDARD
33 STANDARD
34 STANDARD
35 STANDARD
36 STANDARD
37 STANDARD
38 STANDARD
39 STANDARD
40 STANDARD
41 STANDARD
42
STANDARD43
STANDARD
44
EV VAN 01
STANDARD
04
STAIR 2(OPEN)
STAIR 1(OPEN)
⅊
⅊
Orig
inal
Dra
win
g S
ize:
30"
x 4
2"D
raw
ing
nam
e: P
:\871
5A�A
DF\
5.0�
Des
ign\
5.01
�C�r
rent
\AC
AD
\Plo
t\AD
F A
1.30
SIT
E P
LAN
.dw
g
Plo
tted
on:
Nov
21,
201
6 - 5
:16�
m
Sheet No.
Drawing Title
Job No.
Proj. Arch.
Proj. Mgr.
Drawn
Project
Scale
Section Head
RevisionsNo. Date
Issue
Consultant
100% SCHEMATIC DESIGN11.18.2016
30 Van Ness AvenueSan Francisco, CA94102-6028 Fax (415) 557-4701
(415) 557-4700Suite 4100
BUILDING DESIGN ANDCONSTRUCTION DIVISION
Phase
8715A
Edgar Lopez - City Architect
Julia Laue - Principal Architect & Manager
10.07.16 50% SCHEMATIC DESIGN
RS/JD
SD
TK
SCALE:12 SITE PLAN
1�32" � 1�-0"
1
2
SITE ENTRANCE - ONE WAY TRAFFIC. SEE SHEET NOTE #5 FOR ADDITIONALINFORMATION. PROVIDE NEW VEHICULAR CURB DRIVEWAY
GENERAL NOTES
3
4
SITE PLANPROPOSED
A1.30
SITE EXIT - ONE WAY TRAFFIC. PROVIDE NEW VEHICULAR CURB DRIVEWAY, STEELBI-FOLD TRACKLESS CHAIN LINK W/ PRIVACY INFILL & SENSOR MOTION FOR EXITING.
INSTALL DRIVEWAY, STEEL BI-FOLD TRACKLESS CHAIN LINK WITH PRIVACY INFILL ATFIRE STATION 9 ENTRANCE/EXIT
EXISTING FIRE STATION 9 WORKSHOP
SHEET NOTES
2
3
5 PROVIDE NEW VEHICULAR CURB DRIVEWAY, STEEL BI-FOLD TRACKLESS CHAIN LINKWITH PRIVACY INFILL . SEE SHEET NOTE #6 FOR ADDITIONAL INFORMATION
6
PROVIDE NEW PAVEMENT ASPHALT, SCD
5
1. VERIFY THAT EXISTING CONDITIONS ARE AS INDICATED ON THE DRAWINGS ANDSPECIFICATIONS. NOTIFY THE CITY REPRESENTATIVE IMMEDIATELY OF VARIATIONSOR DISCREPANCIES. DO NOT PROCEED WITH AFFECTED WORK UNTIL THE VARIATIONSOR DISCREPANCIES ARE RESOLVED BY THE CITY REPRESENTATIVE.
2. NEW CURBS, GUTTERS, SITE DRAINAGE AND SIDEWALK INCLUDED IN SCOPE OF WORK,SCD.
3. COORDINATE ALL WORK W/ MECHANICAL, ELECTRICAL, STRUCTURAL AND CIVILDISCIPLINES.
4. VERIFY SITE DRAINAGE AT REAR YARD OF FIRE STATION 09. PROVIDE NEW CATCHBASIN AS REQUIRED, SCD
7 PROVIDE SIDE WALK
8 PROVIDE ACCESSIBLE CURB CUT. SCD FOR EXTEND OF WORK
9 PROVIDE STRIPING AREA FOR PEDESTRIAN ACCESS, SEE A2.01 AND A2.11
10 INSTALL 7'-0" TALL FENCE WITH PRIVACY INFILL OVER CONCRETE CURB
11 PROVIDE DETECTABLE WARNING
8
7
8
8
LEGEND
PROPERTY LINE
NEW FENCE
EXISTING BUILDING TO REMAIN
14
13
7
8
14
15
16
169
EXISTING CELL TOWER AT NEIGHBOR PROPERTY
10
17
17 17
INSTALL PEDESTRIAN ACCESS, STEEL MAN GATE, WITH KEY CARD ACCESS ANDAUDIO-VISUAL SYSTEM
INSTALL GENERATOR, LOCATED ON GARAGE FACILITY18
PLANTING POCKET WITH VINES, TRELLIS AND DIP IRRIGATION19
INSTALL TRANSFORMER20
20
13
INSTALL METERED SWITCHGEAR21
22
15
1
INSTALL GAS METER FOR ADF BUILDINGS
INSTALL BACK FLOW PREVENTER AND FIRE DEPARTMENT CONNECTION
INSTALL FUEL PUMPING STATIONS OVER CONCRETE CURB
4
21
EXISTING FIRE HYDRANT
12 INSTALL UNDERGROUND FUEL TANK, (1) 3,000 GA GASOLINE AND (1) 1,000 DIESEL,SMD
FIRE PRESSURE HYDRANT FPFH
FIRE HYDRANT FH
23 EXISTING FIRE PRESSURE HYDRANT
23
23
22
22
24
18
24
PROVIDE FIRE DEPARTMENT CONNECTION, STANDPIPE TYP.
17911
EXTERIOR BICYCLE PARKING. SEE A2.01 SHEET NOTE 125
INSTALL 4" DIAM. STEEL CONCRETE FILLED BOLLARD26
PROVIDE "AMBULANCE DEPLOYMENT FACILITY" SIGN27
BUILDING SITE PATH EGRESS. SEEA0.31 THROUGH A0.34 AND A0.41 THROUGH A0.43
SECOND EXIT - VEHICLES EMERGENCY EXIT28
28
INSTALL UNDERGROUND FUEL TANK FOR EMERGENCY GENERATOR29
12
29
10
19 19
10 10
Proposed Parking Structure
ProposedADF
ProposedADF
Existing Fire Station 9
N
Proposed Parking Structure
2016 Bridging Documents Site Plan
June 2017 Schematic Design Site Plan
1
3
3
2
2
1
4
Project Information
Project Information
Building Area 32,100 SF
Building Height T.O. Roof 48’-0”
Garage Area 82,680 SFGarage Height T.O. Roof 36’-6”
Site Work Area 60,000 SF
Building Area 23,980 SF
Building Height T.O. Roof 54’-0”
Garage Area 21,016 SFGarage Height T.O. Roof 15’-0”
Site Work Area 60,000 SF
*All square footages are gross.
SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 13Proposed Elevation Comparison
⅊
FIRST LEVEL T.O. SLAB0'-0" (14'-4" SURVEY
DATUM)
SECOND LEVEL T.O. SLAB21'-0"
THIRD LEVEL T.O. SLAB34'-6"
T.O. PARAPET52'-8"
ROOF LEVEL T.O. SLAB48'-0"
PENTHOUSE T.O. SLAB59'-6"
OBLIQUEELEVATION
FIRST LEVEL T.O. SLAB0'-0" (14'-4" SURVEY
DATUM)
SECOND LEVEL T.O. SLAB21'-0"
THIRD LEVEL T.O. SLAB34'-6"
ROOF LEVEL T.O. SLAB48'-0"
T.O. PARAPET52'-8"
PENTHOUSE T.O. SLAB59'-6"
OBLIQUEELEVATION
Orig
inal
Dra
win
g S
ize:
30"
x 4
2"D
raw
ing
nam
e: P
:\871
5A�A
DF\
5.0�
Des
ign\
5.01
�C�r
rent
\AC
AD
\Plo
t\AD
F A
3.00
BU
ILD
ING
ELE
VA
TIO
NS
- FA
CIL
ITY
.dw
g
Plo
tted
on:
Nov
21,
201
6 - 5
:17�
m
Sheet No.
Drawing Title
Job No.
Proj. Arch.
Proj. Mgr.
Drawn
Project
Scale
Section Head
RevisionsNo. Date
Issue
Consultant
100% SCHEMATIC DESIGN11.18.2016
30 Van Ness AvenueSan Francisco, CA94102-6028 Fax (415) 557-4701
(415) 557-4700Suite 4100
BUILDING DESIGN ANDCONSTRUCTION DIVISION
Phase
8715A
Edgar Lopez - City Architect
Julia Laue - Principal Architect & Manager
10.07.16 50% SCHEMATIC DESIGN
RS/JD
SD
TK
SCALE:12 EAST ELEVATION - FACILITY
1�8" � 1�-0"
ELEVATIONSFACILITY
A3.00
SCALE:8 NORTH ELEVATION - FACILITY
1�8" � 1�-0"
1 METAL SIDING, TYPE 1
SHEET NOTES
2 METAL SIDING, TYPE 2
3 GALVANIZED SHEET METAL PARAPET COPING, TYP.
14
STAIR AND ELEVATOR EQUIPMENT ROOM12
METAL PIPE BOLLARD, TYP.
4 ALUMINUM WINDOWS. TYP.
5 ALUMINUM SPANDREL PANEL
10 METAL ENTRANCE CANOPY
8 METAL DOOR, TYP.
11 METAL OVERHEAD COILING DOOR
7 PASS THROUGH WINDOW AND SERVICE COUNTER
15 TRASH AND RECEYCLING ENCLOSURE, SEE SITE PLAN
6 EMERGENCY RESCUE WINDOWS
2
1
1
1
3
4 5
4 5
66
77
9 ALUMINUM STOREFRONT
CONCRETE BASE, TYP.13
8 910
11
12
1314
15
12
32
1
2
45
9 1314
1
5
2016 Bridging Documents North Elevation June 2017 SD North Elevation
Cantileverd canopy replaces two-story void space for covered ambulance restocking.
64’-0” STAIR PENTHOUSE59’-6” STAIR PENTHOUSE T.O. SLAB
52’-8” T.O. PARAPET
11
2016 Bridging Documents West Elevation
Added & enlarged fenestration for work spaces.
Parapet angled to conceal stair tower.
June 2017 SD West Elevation
FIRST LEVEL T.O. SLAB0'-0" (14'-4" SURVEY
DATUM)
SECOND LEVEL T.O. SLAB21'-0"
THIRD LEVEL T.O. SLAB34'-6"
ROOF LEVEL T.O. SLAB48'-0"
T.O. PARAPET52'-8"
OBLIQUEELEVATION
SECOND LEVEL T.O. SLAB21'-0"
THIRD LEVEL T.O. SLAB34'-6"
T.O. PARAPET52'-8"
ROOF LEVEL T.O. SLAB48'-0"
OBLIQUEELEVATION
SECOND LEVEL T.O. SLAB21'-0"
THIRD LEVEL T.O. SLAB34'-6"
T.O. PARAPET39'-2"
Orig
inal
Dra
win
g S
ize:
30"
x 4
2"D
raw
ing
nam
e: P
:\871
5A�A
DF\
5.0�
Des
ign\
5.01
�C�r
rent
\AC
AD
\Plo
t\AD
F A
3.01
BU
ILD
ING
ELE
VA
TIO
NS
- FA
CIL
ITY
.dw
g
Plo
tted
on:
Nov
21,
201
6 - 5
:17�
m
Sheet No.
Drawing Title
Job No.
Proj. Arch.
Proj. Mgr.
Drawn
Project
Scale
Section Head
RevisionsNo. Date
Issue
Consultant
100% SCHEMATIC DESIGN11.18.2016
30 Van Ness AvenueSan Francisco, CA94102-6028 Fax (415) 557-4701
(415) 557-4700Suite 4100
BUILDING DESIGN ANDCONSTRUCTION DIVISION
Phase
8715A
Edgar Lopez - City Architect
Julia Laue - Principal Architect & Manager
10.07.16 50% SCHEMATIC DESIGN
RS/JD
SD
TK
SCALE:12 WEST ELEVATION - FACILITY
1�8" � 1�-0"
ELEVATIONSFACILITY
A3.01
1 METAL SIDING, TYPE 1
SHEET NOTES
2 METAL SIDING, TYPE 2
3 GALVANIZED SHEET METAL PARAPET COPING, TYP.
STAIR AND ELEVATOR EQUIPMENT ROOM6
4 ALUMINUM WINDOWS. TYP.
5 ALUMINUM SPANDREL PANEL
8 NEIGHBORING BUILDINGS BEHIND
CONCRETE BASE, TYP.7
1
22
3
3
3
5
6
7
8
SCALE:1 WEST COURTYARD ELEVATION - FACILITY
1�8" � 1�-0"
13
3
SCALE:2 NORTH COURTYARD ELEVATION - FACILITY
1�8" � 1�-0"
22
1
2
N
SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 14Proposed Elevation Comparison
2016 Bridging Documents East Elevation w/Parking Structure
*2016 Bridging Documents South Elevation Not Available
June 2017 SD East Elevation w/Parking Structure
June 2017 SD East Elevation w/Parking Structure
Green screen / planting opportunity
Cantilever canopy may hold Solar PV
57’-6” T.O. PARAPET
17’-6” T.O. PARKING STRUCTURE PARAPET
⅊
FIRST LEVEL T.O. SLAB0'-0" (14'-4" SURVEY
DATUM)
SECOND LEVEL T.O. SLAB21'-0"
THIRD LEVEL T.O. SLAB34'-6"
T.O. PARAPET52'-8"
ROOF LEVEL T.O. SLAB48'-0"
PENTHOUSE T.O. SLAB59'-6"
OBLIQUEELEVATION
FIRST LEVEL T.O. SLAB0'-0" (14'-4" SURVEY
DATUM)
SECOND LEVEL T.O. SLAB21'-0"
THIRD LEVEL T.O. SLAB34'-6"
ROOF LEVEL T.O. SLAB48'-0"
T.O. PARAPET52'-8"
PENTHOUSE T.O. SLAB59'-6"
OBLIQUEELEVATION
Orig
inal
Dra
win
g S
ize:
30"
x 4
2"D
raw
ing
nam
e: P
:\871
5A�A
DF\
5.0�
Des
ign\
5.01
�C�r
rent
\AC
AD
\Plo
t\AD
F A
3.00
BU
ILD
ING
ELE
VA
TIO
NS
- FA
CIL
ITY
.dw
g
Plo
tted
on:
Nov
21,
201
6 - 5
:17�
m
Sheet No.
Drawing Title
Job No.
Proj. Arch.
Proj. Mgr.
Drawn
Project
Scale
Section Head
RevisionsNo. Date
Issue
Consultant
100% SCHEMATIC DESIGN11.18.2016
30 Van Ness AvenueSan Francisco, CA94102-6028 Fax (415) 557-4701
(415) 557-4700Suite 4100
BUILDING DESIGN ANDCONSTRUCTION DIVISION
Phase
8715A
Edgar Lopez - City Architect
Julia Laue - Principal Architect & Manager
10.07.16 50% SCHEMATIC DESIGN
RS/JD
SD
TK
SCALE:12 EAST ELEVATION - FACILITY
1�8" � 1�-0"
ELEVATIONSFACILITY
A3.00
SCALE:8 NORTH ELEVATION - FACILITY
1�8" � 1�-0"
1 METAL SIDING, TYPE 1
SHEET NOTES
2 METAL SIDING, TYPE 2
3 GALVANIZED SHEET METAL PARAPET COPING, TYP.
14
STAIR AND ELEVATOR EQUIPMENT ROOM12
METAL PIPE BOLLARD, TYP.
4 ALUMINUM WINDOWS. TYP.
5 ALUMINUM SPANDREL PANEL
10 METAL ENTRANCE CANOPY
8 METAL DOOR, TYP.
11 METAL OVERHEAD COILING DOOR
7 PASS THROUGH WINDOW AND SERVICE COUNTER
15 TRASH AND RECEYCLING ENCLOSURE, SEE SITE PLAN
6 EMERGENCY RESCUE WINDOWS
2
1
1
1
3
4 5
4 5
66
77
9 ALUMINUM STOREFRONT
CONCRETE BASE, TYP.13
8 910
11
12
1314
15
12
32
1
2
45
9 1314
1
5
3
4
3
FIRST LEVEL T.O. SLAB0'-0" (13.5' SURVEY DATUM)
SECOND LEVEL T.O. SLAB17'-6"
THIRD LEVEL T.O. SLAB31'-6"
T.O. PARAPET35'-6"
⅊
FIRST LEVEL T.O. SLAB0'-0" (13.5' SURVEY DATUM)
SECOND LEVEL T.O. SLAB17'-6"
THIRD LEVEL T.O. SLAB31'-6"
⅊⅊
T.O. PARAPET35'-6"
Orig
inal
Dra
win
g S
ize:
30"
x 4
2"D
raw
ing
nam
e: P
:\871
5A�A
DF\
5.0�
Des
ign\
5.01
�C�r
rent
\AC
AD
\Plo
t\AD
F A
3.02
BU
ILD
ING
ELE
VA
TIO
NS
- G
AR
AG
E.d
wg
P
lotte
d on
: N
ov 2
1, 2
016
- 5:1
7�m
Sheet No.
Drawing Title
Job No.
Proj. Arch.
Proj. Mgr.
Drawn
Project
Scale
Section Head
RevisionsNo. Date
Issue
Consultant
100% SCHEMATIC DESIGN11.18.2016
30 Van Ness AvenueSan Francisco, CA94102-6028 Fax (415) 557-4701
(415) 557-4700Suite 4100
BUILDING DESIGN ANDCONSTRUCTION DIVISION
Phase
8715A
Edgar Lopez - City Architect
Julia Laue - Principal Architect & Manager
10.07.16 50% SCHEMATIC DESIGN
RS/JD
SD
TK
SCALE:20 SECTION - GARAGE
1�8" � 1�-0"
GENERAL NOTES
ELEVATIONSGARAGE
A3.02
SHEET NOTES
SCALE:19 SECTION - GARAGE
1�8" � 1�-0"
1
2
8" THICK CONCRETE GUARDRAIL. T.O. GUARDRAIL 44" AFF, SSD
3
4
5
CONCRETE BEAM, SSD
CMU WALL INFILL, TYP., SSD
CONCRETE COLUMN TYP., SSD
CONCRETE WALL, TYP., SSD
6 FIRE STATION 9 WORKSHOP, BEHIND
7 ADJACENT NEIGHBOR'S BUILDING
8 3"X3" HSS FRAMES, PTD, USED FOR FIRE FIGHTER TRAINING
9
10 TRAINING BALCONY WITH 44" HIGH METAL PIPE GUARD RAIL
4
2
1
1
1
1
1
1
5
6
7
10
8
6
PLANTING POCKET WITH VINES AND DRIP IRRIGATION ALONG CONCRETE WALL
11 OPEN AIR METAL FENCE ENCLOSURE
12 STEEL BI-FOLD VEHICULAR DOORS FOR SECONDARY EMERGENCY EXIT
1112 11
OPEN TO BEYOND OPEN TO BEYOND
OPEN TO BEYOND
OPEN TO BEYOND
4
13 ELEVATOR WALL BEYOND
13
7
3
3
7
7
555
14
14 PHOTOVOLTAIC CANOPY SYSTEM WITH STEEL TUBE STRUCTURE, TYP.
15 PROVIDE RESILIENT SURFACE FOR LADDER TRAINING, RUBBER OR EQUAL
15 15
15
5
5555
4
3
N
SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 15Planting Opportunities
Mesh Screen PlanterEgress Drive Planting Mesh Screen Planter Wire Trellis
UP
MC
KIN
NO
N A
VEN
UE JE
RR
OLD
AVE
NU
E
(EV)
MOTO
(E) FIRE STATION #9
(N) 4 STORYAMBULANCE
DEPLOYMENTFACILITY
(N) 2 STORY PARKINGSTRUCTURE
C R T
ELEC. EQUIP. AREA
FUELING STATIONDECONTAMINATION AREA
(EV)
(EV)
(EV)
(EV)
PEDESTRIANACCESS STRIPING
DETECTABLEWARNING STRIP
C
DETECTABLE WARNING STRIP
A0-23
A0-21
A0-22
N
3 FACADE & FENESTRATION
SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 17
SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 18Daylight Access
D E F H
1
2
10
S
G
4
5
8
R1
106
RESTOCKSTORAGE
ROOM
105
LOGISTICS104
CONTROLLEDSUBSTANCE
103
TOILET(UNISEX)
102
TOILET(UNISEX)
EL101
EMR
EL1-101
ELEVATOR
101
AMBULANCERESUPPLY
ST1 - 101
STAIR 1
ST2 - 101
STAIR 2
E102
IT
E101
ELECTRICAL
107
GURNEYREPAIR/
STORAGE
108
OCR UTILITY
1 First Floor
FULL HEIGHT GLAZING
CLERESTORY GLAZING
D E F H
1
2
10
S
G
4
5
8
R1
OPEN BELOW
207
EQUIPMENTROOM 208
MCI
209
BIOMEDICALREPAIR
210
STATIONOFFICE
E210
IT
SHAFT
206
TOILET(UNISEX)
205
TOILET(UNISEX)
204
JAN
203
EL1-201
ELEVATOR
ST1-201
STAIR 1
E202
ELEC.
211
RESCUECAPTAINOFFICE
ST2-201
STAIR 2
SHAFT
C201
CORRIDOR
M207
MECH
2 Second Floor
SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 19Daylight Access
FULL HEIGHT GLAZING
CLERESTORY GLAZING
D E F H
1
2
10
S
G
4
5
8
C301
CORRIDOR
ST1-301
STAIR 1
E301
ELEC.
304
DAY ROOM
303
KITCHEN/DININGEL1-301
ELEVATOR
306
TOILET(UNISEX)
308
SHOWER(UNISEX)
307
MENSLOCKER
ROOM (234LOCKERS) 315
WOMENSLOCKER
ROOM (66LOCKERS)
310
MENSSHOWER
309
MENSRESTROOM
311
WOMENSRESTROOM
312
WOMENSSHOWER
316
SHOWER(UNISEX)
E302
IT
SHAFT
ST2-301
STAIR 2
314
STAFF ROOM
305
EXERCISE
313
JAN
SHAFT
3 Third Floor
D E F H
1
2
10
S
G
4
5
8
E401
ELEC
AV402
AV
C401
CORRIDOR
SHAFT
ST1-401
STAIR 1
402
CLASSROOMEL1-401
ELEVATOR
403
JAN
404
MENS TOILET
406
TOILET(ALL-GENDER)
407
BREAK ROOM409
IN-SERVICETRAINING
410
EMS 6
408
COM STAFFASST/
RECEPTION411
WORK ROOM
405
CONFERENCE
412
OPEN OFFICE
413
MEDICALDIRECTOR
414
MEDICALRECORDS
E402
IT
415
EMS1COMMAND
STAFF OFFICE
416
EMS 2SECTION
CHIEF
417
ESO STAFF
418
CQI
SHAFT
ST2-401
STAIR 2
4 Fourth Floor
SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 20
N
Perspective from Fire Station 9
SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 21Perspective from Jerrold Avenue
N
SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 22South Facade Perspective Views
N
SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 23Perspective from McKinnon Avenue
N
SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 24Perspective from Visitor Entrance
N
SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 25Material Palette Options
A B Planar Metal PanelCorrugated Metal Panel
SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 26Material Palette Options
B Planar Metal Panel - Regular vs Ashlar / Barcode
Uniform Pattern Uniform Pattern with Scattered Color Variation
Running Bond Punctuated Uniform Pattern
Unidirectional Modular Pattern
Bidirectional Modular Pattern
THANKYOUProject Contact
San Francisco Public Works
Kathleen O’DayProject [email protected]
MEI / YamaMar
Michael WangProject [email protected]