Setting the Scene for Change

14
Setting the Scene for Change Richard Murray Office of the Chief Economic Adviser

description

Setting the Scene for Change. Richard Murray Office of the Chief Economic Adviser. Synchronised Global Downturn. Scale of the Recession in Scotland. Fiscal Impact of Recession. Government borrowing. Expenditure. Revenue. Sharp Rise in UK Borrowing. Type of Borrowing. - PowerPoint PPT Presentation

Transcript of Setting the Scene for Change

  • Setting the Scene for ChangeRichard Murray

    Office of the Chief Economic Adviser

  • Synchronised Global Downturn

  • Scale of the Recession in Scotland

  • Fiscal Impact of RecessionGovernment borrowingExpenditureRevenue

  • Sharp Rise in UK Borrowing

  • Type of Borrowing

  • UK Governments Fiscal Mandate

    Chart2

    -0.6-0.6

    -3.1-2.5

    -5.4-4.8

    -4.7-4.6

    -3.3-3.4

    -1.8-2.5

    -0.5-1.8

    0.5-1.3

    0.9-0.47

    OBR - November 2010 Forecasts

    March 2010 Budget

    % of GDP

    UK Cyclically Adjusted Current Budget Balance (% of GDP)

    Sheet1

    UK Cyclically Adjusted Current Budget Balance (% of GDP)

    OBR - November 2010 ForecastsMarch 2010 Budget

    2007/08-0.6-0.6

    2008/09-3.1-2.5

    2009/10-5.4-4.8

    2010/11-4.7-4.6

    2011/12-3.3-3.4

    2012/13-1.8-2.5

    2013/14-0.5-1.8

    2014/150.5-1.3

    2015/160.9-0.5

    Annual Real Growth in Scottish Government DEL Expenditure

    2000/015.1%

    2001/029.1%

    2002/035.2%

    2003/046.5%

    2004/054.9%

    2005/066.7%

    2006/075.8%

    2007/082.7%

    2008/092.4%

    2009/103.3%

    2010/11-2.3%

    2011/12-6.3%

    2012/13-1.0%

    2013/14-2.6%

    2014/15-1.8%

    Sheet1

    % Real Annual Change

    Annual Real Growth in Scottish Government DEL Expenditure

    Sheet2

    6 years of real decline

    OBR - November 2010 Forecasts

    March 2010 Budget

    % of GDP

    UK Cyclically Adjusted Current Budget Balance (% of GDP)

    Sheet3

  • Total Scottish Government BudgetApproximately half the cuts to occur next year

    Chart3

    0.032999408

    -0.023336816

    -0.0628711476

    -0.0100480716

    -0.0258239423

    -0.0181552349

    Real % Change

    Real Growth in the Scottish DEL Budget 2010/11 Prices

    Sheet1

    Money GDPDEL

    1998/99890.27217920.1%

    1999/00944.6318920.0%

    2000/01989.55120520.7%

    2001/021031.45722421.7%

    2002/031092.06623921.9%

    2003/041157.426522.9%

    2004/051214.701283.37823.3%

    2005/061270.835303.08223.8%

    2006/071346.209319.64423.7%

    2007/081418.246343.13224.2%

    2008/091434350.424.4%

    2009/10140837826.8%

    2010/11147438025.8%25.8%UK Departmental Spending as % of GDP

    2011/121539370.224.1%

    2012/131620366.722.6%

    2013/141710363.821.3%

    2014/15180336220.1%

    2015/161902366.519.3%

    Sheet1

    0.20103518921998/99

    0.20003916881999/00

    0.2074708632000/01

    0.21684665482001/02

    0.21918272342002/03

    0.22916709872003/04

    0.23329033242004/05

    0.23849044132005/06

    0.23744010032006/07

    0.24194110192007/08

    0.24435146442008/09

    0.26846590912009/10

    0.25780189960.2578018996

    2011/120.240545809

    2012/130.2263580247

    2013/140.212748538

    2014/150.2007764836

    2015/160.1926919033

    % of GDP

    UK Departmental Spending as % of GDP

    Sheet2

    Scottish Government DEL Budget (Cash)Scottish Government DEL Budget (Real 10/11 Prices)Scottish Government DEL Budget (Cash)Scottish Government DEL Budget (Real 10/11 Prices)Real Growth

    TotalCurrentCapitalTotalCurrentCapitalTotalCurrentCapitalTotalCurrentCapitalTotalCurrentCapital

    2008/0927,62524,7583,26228,96625,9603,4202008/092825329263000

    2009/1029,07925,1553,92429,92225,8844,0382009/1029254302643.3%-0.3%18.1%

    2010/1129,22425,9313,29329,22425,9313,2932010/112926329263-2.3%0.2%-18.4%

    2011/1227,90725,4012,50627,38724,9272,4592011/122825327252-6.3%-3.9%-25.3%

    2012/1328,26225,7872,47527,11124,7372,3742012/132826227252-1.0%-0.8%-3.5%

    2013/1428,24826,0112,23726,41124,3202,0922013/142826226242-2.6%-1.7%-11.9%

    2014/1528,48426,1662,31825,93223,8222,1102014/152826226242-1.8%-2.0%0.9%

    -2.5%0.9%-29.6%-11.3%-8.1%-35.9%

    Scottish Government Capital DEL Forecasts ( Billions) 2010/11 Prices

    Scottish Government Resource DEL Forecasts ( Billions) 2010/11 Prices

    Total Scottish Government DEL Forecasts ( Billions) 2010/11 Prices

    Sheet2

    Billions (10/11 Prices)

    Total Scottish Government DEL ( Billions) 10/11 Prices

    Billions (10/11 Prices)

    Scottish Government Capital DEL ( Billions) 2010/11 Prices

    Billions (10/11 Prices)

    Scottish Government Resource DEL ( Billions) 2010/11 Prices

    Real % Change

    Real Growth in the Scottish DEL Budget 2010/11 Prices

    Real % Change

    Real Growth in the Scottish Capital DEL Budget

    MBD0017E403.xls

    Chart1

    3.262

    3.924

    3.319

    2.6605490251

    2.6692322547

    2.5205226667

    2.6106687216

    Billions

    Scottish Government Capital DEL Forecasts ( Billions)

    Assumptions

    3.2623.9243.3192.66054902512.66923225472.52052266672.6106687216

    Assumptions

    THIS IS THE BASELINE MODEL AND IS CONSISTANT WITH THE CABINET PAPER

    - The budgets reported for 2009/10 and 2010/11 remove non cash items such as the cost of capital- The 100 million over allocation is removed from the reported budget for 2010/11

    - UK current and capital health spending is frozen in real terms for the duration of the next spending review- Overseas Aid spending is increased until it reaches 0.7% of GNI- An AME margin is introduced into the current DEL figures. This is assumed to reach 5 billion by 2014/15 and then remain frozen in cash terms- All other departments receive the same nominal percentage reduction and Scotland gets the resulting consequentials

    - Trend growth after 2015/16 is assumed to be 2.1%

    SG Cost of Capital

    HMT: Cost of Capital removed under Clear Line of Sight

    2003-042004-052005-062006-072007-082008-09

    OutturnOutturnOutturnOutturnOutturnOutturn

    000s248,126388,441374,615398,224447,330449,814

    Millions248388375398447450

    SG Total DEL Budget19,75521,42123,23725,30426,77328,075

    SG Total Del Budget less cost of capital19,50721,03322,86224,90626,32627,625

    SG Resource DEL Budget18,33319,72121,38322,17723,44324,758

    SG Resource Del Budget less cost of capital18,08519,33321,00921,77922,99624,308

    Summary Charts

    Chart A2: Illustrative Public Finance Projections

    Chart XX: UK AME and DEL 2014/15

    Chart A3: UK DEL Illustrative Projections

    Chart A4: Real Annual Growth in Scottish DEL

    Scottish Government DEL Expenditure

    Chart XX: Scottish Government DEL Budget

    Summary Charts

    343.3

    35.32.9

    362.3

    36.52.4

    446.7015341702

    53.510.9872159091

    61.910.1085481682

    67.27.5373619233

    69.85.4938271605

    70.33.5087719298

    69.42.05213533

    67.41.0515247108

    67.10411001781.1185068349

    65.11452236641.1185068349

    Net Debt (Right Hand Scale)

    Net Borrowing (Left Hand Scale)

    % of GDP

    % of GDP

    Section 1 Charts

    0.0224342150.0586527216

    0.0572517861-0.0230408112

    0.0210049464-0.0439543412

    0.0214104718-0.0317246813

    0.0134301427-0.0330490955

    0.0212940906-0.0311078612

    UK Annually Managed Expenditure

    UK Departmental Expenditure Limits

    % Real Annual Change

    Section 2 Charts

    367.4122704

    388.962

    380

    363.2973503435

    351.7718576758

    340.146115963

    329.5648977835

    324.8896777011

    333.5271376863

    342.2982735498

    351.2071468096

    360.2578712989

    369.454615132

    UK DEL

    Billions (10/11 Prices)

    Section 3&4 Charts

    0.0512292931

    0.09063975

    0.0521064589

    0.0789776911

    0.0550191347

    0.0649021854

    0.0576637857

    0.0282909705

    0.0229081631

    0.0164488258

    -0.0227018379

    Scottish Government DEL Expenditure

    % Real Annual Change

    UK - Nominal Change in DEL (B)

    26461.168764865

    27987.0199297491

    28778.7998841584

    29438.069325

    29922.291

    29243

    27511.5369355862

    27052.6686822463

    26268.6508884564

    25584.5274818197

    Scottish Government DEL Expenditure

    Millions (2010/11 Prices)

    Consequentials (B) (2)

    UK Public Sector Revenue and Expenditureoe:usa_nlgqaoe:gbr_nlgqaoe:jpn_nlgaexcloe:euro_nlgqaoe:oecd_nlgqa

    United States, Government net lending, as a percentage of GDPUnited Kingdom, Government net lending, as a percentage of GDPJapan, Government net lending, excl social sec, as a percentage of GDPEuro Zone, Government net lending, as a percentage of GDPOECD, Government net lending, as a percentage of GDP

    United StatesUnited KingdomJapanEuro ZoneOECD Average

    2005-3.258528094-3.2853344901-7.039186064-2.5566127774-2.749983268

    2006-2.1768537401-2.6977775599-1.723163831-1.328423168-1.276472002

    2007-2.8069315546-2.7158116267-2.363506523-0.6105119811-1.326323117

    2008-6.4659477856-5.2562956906-2.340515084-1.9809348014-3.474103457

    2009-11.2004899169-12.6261248033-6.557542941-6.1214108622-8.158256363

    2010-10.6885188433-13.3037487144-7.103171692-6.7475010729-8.257418521

    2011-9.4011304026-12.5064525342-8.408839932-6.2239081724-7.602119806

    UK Public Sector Net Borrowing

    Illustrative Public Finance Projections

    Budget 2010 (% of GDP)2008/092009/102010/112011/122012/132013/142014/15

    Structural BorrowingCyclically-adjusted PSNB5.88.47.35.34.13.12.5

    Cyclical Borrowing0.93.43.83.22.72.11.5

    % of Borrowing which is structural644%247%192%166%152%148%167%

    PSNB6.711.811.18.56.85.24

    Composition of Future Consolidation2010/112011/122012/132013/142014/152015/16

    June 2010 Budget Announcements8.115243240

    Policy Inherited from Previous UK Government0.826425773128

    Tax Increases3.61824272929

    Reductions in public spending5.22342638399

    Consequentials (B) (2)

    37.340.5

    38.341.2

    38.640.9

    38.741.1

    37.243.9191073919

    36.647.5355113636

    37.247.2727272727

    Current Receipts

    Total Managed Expenditure

    % of GDP

    SG DEL Budget (B)

    3.3

    2.9

    2.3

    2.4

    6.7015341702

    10.9872159091

    10.1085481682

    7.5373619233

    5.4938271605

    3.5087719298

    2.05213533

    1.0515247108

    UK Public Sector Net Borrowing

    % of GDP

    Real Growth-Chart (B)

    3434

    35.335.3

    3636

    36.536.5

    4443.8

    53.554.1

    61.963.6

    67.269.5

    69.873

    70.374.5

    69.474.9

    67.474

    June UK Budget 2010

    March UK Budget 2010

    % of GDP

    UK DEL Growth

    00

    00

    00

    00

    00

    00

    00

    Structural Borrowing

    Cyclical Borrowing

    % of GDP

    SG DEL-Chart(B) (2)

    00

    00

    00

    00

    00

    0

    Description :United States, Government net lending, as a percentage of GDPSeries :oe:usa_nlgqaSource :OECD EOLOriginal Frequency :YearTransform Frequency:YearStart Obs :30/12/2005End Obs :LASTMissing values :#N/ACurrency :Class :StockScale :0Use scale factor :FalseCalculation :Display :AutoShowDates :TrueRow :FalseLag :0

    Description :United Kingdom, Government net lending, as a percentage of GDPSeries :oe:gbr_nlgqaSource :OECD EOLOriginal Frequency :YearTransform Frequency:YearStart Obs :30/12/2005End Obs :LASTMissing values :#N/ACurrency :Class :StockScale :0Use scale factor :FalseCalculation :Display :AutoShowDates :FalseRow :FalseLag :0

    Description :Japan, Government net lending, excl social sec, as a percentage of GDPSeries :oe:jpn_nlgaexclSource :OECD EOLOriginal Frequency :YearTransform Frequency:YearStart Obs :30/12/2005End Obs :LASTMissing values :#N/ACurrency :Class :StockScale :0Use scale factor :FalseCalculation :Display :AutoShowDates :FalseRow :FalseLag :0

    Description :OECD, Government net lending, as a percentage of GDPSeries :oe:oecd_nlgqaSource :OECD EOLOriginal Frequency :YearTransform Frequency:YearStart Obs :30/12/2005End Obs :LASTMissing values :#N/ACurrency :Class :StockScale :0Use scale factor :FalseCalculation :Display :AutoShowDates :FalseRow :FalseLag :0

    Description :Euro Zone, Government net lending, as a percentage of GDPSeries :oe:euro_nlgqaSource :OECD EOLOriginal Frequency :YearTransform Frequency:YearStart Obs :30/12/2005End Obs :LASTMissing values :#N/ACurrency :Class :StockScale :0Use scale factor :FalseCalculation :Display :AutoShowDates :FalseRow :FalseLag :0

    United States

    United Kingdom

    Japan

    Euro Zone

    OECD Average

    % of GDP

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    Policy Inherited from Previous UK Government

    June 2010 Budget Announcements

    Billions

    SG DEL-Chart(B) (3)

    00

    00

    00

    00

    00

    00

    Reductions in public spending

    Tax Increases

    Billions

    SG DEL-Chart(B) (4)

    -1.4-1.4

    -0.9-0.9

    -0.4-0.4

    -0.6-0.6

    -3.1-2.5

    -5.3-4.8

    -4.8-4.6

    -3.2-3.4

    -1.9-2.5

    -0.7-1.8

    0.3-1.3

    0.8-0.47

    June UK Budget 2010

    March UK Budget 2010

    % of GDP

    Chart3

    36.536.5

    4443.8

    53.554.1

    61.963.6

    67.269.5

    69.873

    70.374.5

    69.474.9

    67.474

    67.104110017872

    65.114522366470

    June UK Budget 2010

    March UK Budget 2010

    % of GDP

    2.42.4

    6.70153417026.7

    10.987215909111.8

    10.108548168211.1

    7.53736192338.5

    5.49382716056.8

    3.50877192985.2

    2.052135334

    1.05152471082.7

    1.11850683491.6

    1.11850683491.6

    June 2010 UK Budget

    March 2010 UK Budget

    % of GDP

    Chart XXXX - Estimated Real Growth in UK Aggregate Public Spending

    Chart XXXX - Projected Path of UK Total Managed Expenditure

    UK Total Managed Expenditure

    Chart XXXX - Projected Path of UK DEL and AME

    0.04290316320.0224342150.0586527216

    0.01174703940.0572517861-0.0230408112

    -0.01442061230.0210049464-0.0439543412

    -0.00683814980.0214104718-0.0317246813

    -0.01026202010.0134301427-0.0330490955

    -0.00538642250.0212940906-0.0311078612

    0.00011552490.0136329746-0.0141860378

    TME

    AME

    DEL

    % Real Annual Change

    660.3774198

    688.7097

    696.8

    686.75171737

    682.0556062381

    675.0563378926

    671.4201992137

    671.4977649621

    685.5992180263

    699.9968016049

    714.6967344386

    729.7053658618

    745.0291785449

    760.6747912943

    776.6489619115

    792.9585901117

    UK Total Managed Expenditure

    Billions (10/11 Prices)

    0.04803001350.1452505489

    -0.0052515288-0.1140322863

    -0.0175002928-0.2126343657

    -0.0273263183-0.0649836372

    -0.0259121083-0.0893338847

    -0.03627839650.0184478539

    -0.01965844320.0265468022

    UK Current DEL

    UK Capital DEL

    % Real Annual Change

    293.0700045367.4122704

    299.6448388.962

    316.8380

    323.4543670265363.2973503435

    330.3796776208351.7718576758

    334.8167238218340.146115963

    341.9463414572329.5648977835

    346.608087261324.8896777011

    352.0720803401333.5271376863

    357.698528055342.2982735498

    363.489587629351.2071468096

    369.4474945629360.2578712989

    375.5745634129369.454615132

    381.873188606378.8016026883

    388.3458452955388.303116616

    394.9950902558397.9634998558

    UK Annually Managed Expenditure

    UK Departmental Expenditure Limits

    Billions (10/11 Prices)

    -1.4

    -0.9

    -0.4

    -0.6

    -3.1

    -5.3

    -4.8

    -3.2

    -1.9

    -0.7

    0.3

    0.8

    14 years

    Current Receipts

    Total Managed Expenditure

    % of GDP

    2004/05

    2004/05

    2005/06

    2005/06

    2006/07

    2006/07

    2007/08

    2007/08

    2008/09

    2008/09

    2009/10

    2009/10

    2010/11

    2010/11

    2011/12

    2011/12

    2012/13

    2012/13

    2013/14

    2013/14

    2014/15

    2014/15

    2015/16

    2015/16

    2016/17

    2016/17

    2017/18

    2017/18

    2018/19

    2018/19

    2019/20

    2019/20

    2020/21

    2020/21

    37.3

    40.5

    38.3

    41.2

    38.6

    40.9

    38.7

    41.1

    37.2

    43.9191073919

    36.6

    47.5355113636

    37.2

    47.2727272727

    38

    45.4710851202

    38.4

    43.8888888889

    38.7

    42.2222222222

    38.8

    40.9040488075

    38.7

    39.8264984227

    38.7

    39.8264984227

    38.7

    39.8264984227

    38.7

    39.8264984227

    38.7

    39.8264984227

    38.7

    39.8264984227

    Cyclically Adjusted Surplus on Current Budget

    Chart XXXX Annual Real Growth in the Scottish DEL Budget

    (2000/01 2010/11)

    Scottish Government DEL Expenditure

    Chart XX - Estimated Real Annual Growth in the Scottish Government DEL Budget

    Chart XX - Estimated Scottish Government DEL Budget (2010/11 Prices)

    June Budget 2010 Assumptions

    March Budget 2010 Assumptions

    0.0512292931

    0.09063975

    0.0521064589

    0.0654253507

    0.0490644018

    0.0670845197

    0.0580764721

    0.0272768904

    0.0236221979

    0.032999408

    -0.0227018379

    Scottish Government DEL Expenditure

    % Real Annual Change

    0.0512292931

    0.09063975

    0.0521064589

    0.0654253507

    0.0490644018

    0.0670845197

    0.0580764721

    0.0272768904

    0.0236221979

    0.032999408

    -0.0227018379

    -0.0592094882

    -0.016679121

    -0.0289811627

    -0.02604334

    -0.018486669

    Scottish Government DEL Expenditure

    % Real Annual Change

    -0.0227018379-0.0164891846

    -0.0592094882-0.0338127797

    -0.016679121-0.0336475197

    -0.0289811627-0.0324281413

    -0.02604334-0.0174579598

    -0.0184866690.0066105384

    6 years of real decline

    Scottish Government DEL Expenditure

    Millions (2010/11 Prices)

    1999/00

    2000/01

    2001/02

    2002/03

    2003/04

    2004/05

    2005/06

    2006/07

    2007/08

    2008/09

    2009/10

    2010/11

    2011/12

    2012/13

    2013/14

    2014/15

    2015/16

    18096.2271655709

    19023.2840918905

    20747.5498063068

    21828.6311574074

    23256.7770069178

    24397.856859024

    26034.5753691232

    27546.5716597323

    28297.9564765395

    28966.416405486

    29922.291

    29243

    27511.5369355862

    27052.6686822463

    26268.6508884564

    25584.5274818197

    25111.5547910384

    June Budget 2010 Assumptions

    March Budget 2010 Assumptions

    % Real Annual Change

    29922.29129733.2775

    2924329243

    27511.536935586228254.2128828164

    27052.668682246327303.5286969581

    26268.650888456426418.1260100296

    25584.527481819725956.9194290003

    25111.554791038426128.50864278

    June Budget 2010 Assumptions

    March Budget 2010 Assumptions

    Millions (2010/11 Prices)

    2004/052005/062006/072007/082008/092009/102010/112011/122012/132013/142014/152015/162016/172017/182018/192019/202020/212021/222022/232023/242024/252025/262026/272027/282028/29

    GDP Deflators2.78%1.87%2.96%2.89%2.50%1.90%2.90%1.90%2.30%2.60%2.70%2.70%2.70%2.70%2.70%2.70%2.70%2.70%2.70%2.70%2.70%2.70%2.70%2.70%2.70%

    Index90.492.08794.81197.55100.00101.90104.86106.85109.30112.15115.17118.28121.48124.76128.13131.59135.14138.79142.53146.38150.34154.39158.56162.84167.24

    GDP Growth2.55%2.47%2.68%2.54%-1.50%-3.70%1.8%2.4%2.9%2.8%2.7%2.7%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%

    Output Gap (% of GDP)-1.0-4.1-3.7-3.5-2.8-2.3-1.6-0.90.00.00.00.00.00.00.00.00.00.00.00.00.0

    Money GDP1,214.701,270.841,346.211,418.251,434.001,408.001,4741,5391,6201,7101,8031,9021,9942,0912,1932,2992,4112,5282,6512,7802,9153,0563,2053,3603,523

    Current budget (% of GDP)2004/052005/062006/072007/082008/092009/102010/112011/122012/132013/142014/152015/162016/172017/182018/192019/202020/212021/222022/232023/242024/252025/262026/272027/282028/29

    Current Receipts37.338.338.638.737.236.637.23838.438.738.838.738.738.738.738.738.738.738.738.738.738.738.738.738.7

    Current expenditure37.638.137.737.839.442.743.242.341.039.738.437.437.437.437.437.437.437.437.437.437.437.437.437.437.4

    Depreciation1.21.31.31.31.301.401.421.431.361.351.331.311.31.31.31.31.31.31.31.31.31.31.31.31.3

    Surplus on current budget-3.5-7.5-7.5-5.7-4.0-2.3-0.90.0-0.0-0.0-0.0-0.0-0.0-0.0-0.0-0.0-0.0-0.0-0.0-0.0-0.0

    Cyclically Adjusted Surplus on Current Budget-1.4-0.9-0.4-0.6-3.1-5.3-4.8-3.2-1.9-0.70.30.8-0.0-0.0-0.0-0.0-0.0-0.0-0.0-0.0-0.0-0.0-0.0-0.0-0.0

    Capital budget

    Gross investment12.93.13.23.44.54.94.03.22.92.52.52.42.42.42.42.42.42.42.42.42.42.42.42.42.4

    Less depreciation-1.2-1.3-1.3-1.3-1.3-1.4-1.4-1.4-1.4-1.3-1.3-1.3-1.3-1.3-1.3-1.3-1.3-1.3-1.3-1.3-1.3-1.3-1.3-1.3-1.3

    Net investment1.71.81.92.13.23.52.61.81.51.21.21.11.11.11.11.11.11.11.11.11.11.11.11.11.1

    Net borrowing3.32.92.32.46.711.010.17.55.53.52.11.11.11.11.11.11.11.11.11.11.11.11.11.11.1

    Public sector net debt end year3435.33636.544.053.561.967.269.870.369.467.467.165.163.261.459.758.056.555.053.552.250.949.648.5

    Total Managed Expenditure40.541.240.941.143.947.547.345.543.942.240.939.839.839.839.839.839.839.839.839.839.839.839.839.839.8

    Current budget Billions2004/052005/062006/072007/082008/092009/102010/112011/122012/132013/142014/152015/162016/172017/182018/192019/202020/212021/222022/232023/242024/252025/262026/272027/282028/29

    Current receipts452.6486.6519.2548.7533.8514.65485846226627007377728098498909339781,0261,0761,1281,1831,2401,3001,364

    Current expenditure456.6484.4507.2535.8564.7600.66376516656796937117467828208609029459911,0401,0901,1431,1991,2571,318

    Depreciation15.216.116.917.818.719.721222223242526272930323335373840424446

    Surplus on current budget-19.2-13.9-4.9-4.6-49.7-105.6-110-88-65-40-170-0-0-0-0-0-0-0-0-0-0-0-0-1

    Capital budget

    Gross investment135.839.642.84765.168.759494743454648515356586164677074788185

    Less depreciation-15.2-16.1-16.9-17.8-18.7-19.7-21-22-22-23-24-25-26-27-29-30-32-33-35-37-38-40-42-44-46

    Net investment20.623.525.929.246.44939272420212122232425272829313234353739

    Net borrowing39.837.430.83496.1154.71491168960372022232526272830313334363839

    Public sector net debt end year616.9771.593210591162123512841,3161,3381,3621,3861,4121,4391,4671,4971,5281,5611,5951,6311,6681,708

    TME (Emergency Budget)492.5524550582.8629.8669.3696.8699.8711722737.57587948338739169601,0071,0561,1071,1611,2171,2761,3381,403

    Nominal2004/052005/062006/072007/082008/092009/102010/112011/122012/132013/142014/152015/162016/172017/182018/192019/202020/212021/222022/232023/242024/252025/262026/272027/282028/29

    TME (Emergency Budget)492.5524550582.86306696977007117227387587948338739169601,0071,0561,1071,1611,2171,2761,3381,403

    AME209.1220.918230.356239.4279.5291.2316.8329.60344.40358.10375.60391.00407.89425.59444.16463.63484.05505.45527.90551.43576.11601.99629.12657.58687.41

    Social Security124.8129.6133.5140.5149.7163.7169.3174.2178.2180.8186.5194203.84213.74224.12235.01246.42258.39270.94284.10297.89312.36327.53343.44360.12

    Central Government Debt Interest24.926.828.631.230.530.943.346.552.457.863.066.5067.6368.8170.0571.3572.7174.1475.6477.2178.8680.5882.3984.2986.29

    Other AME59.464.568.367.799.396.6104.2108.9113.8119.5126.1130.1136.42143.0150.0157.3164.9172.9181.3190.1199.4209.0219.2229.8241.0

    DEL283.4303.1319.6343.1350.4378380.00370.20366.70363.80362.00366.50386.40407.27429.15452.10476.16501.39527.84555.58584.66615.16647.14680.67715.83

    Current258.5277.7291.3310.0313.5334.8342.7343.1341.4341.2337.7340.0358.6378.1398.6420.1442.6466.2490.9516.9544.1572.6602.5633.9666.7

    Capital32.835.238.844.148.556.651.641.439.637.038.740.842.844.947.049.351.754.256.959.662.565.668.772.175.6

    Depreciation-7.9-9.8-10.4-10.9-11.6-13.4-14.3-14.3-14.3-14.4-14.4-14.3-15.0-15.7-16.5-17.3-18.1-19.0-19.9-20.9-21.9-23.0-24.1-25.3-26.5

    Real (10/11 Prices)2004/052005/062006/072007/082008/092009/102010/112011/122012/132013/142014/152015/162016/172017/182018/192019/202020/212021/222022/232023/242024/252025/262026/272027/282028/29

    TME (Emergency Budget)571.3596.7608.3626.5660.4688.7696.8686.8682.1675.1671.4671.5685.6700.0714.7729.7745.0760.7776.6793.0809.6826.6844.0861.7879.8

    AME242.6251.5254.8257.3293.1299.6316.8323.5330.4334.8341.9346.6352.1357.7363.5369.4375.6381.9388.3395.0401.8408.8416.0423.4431.0

    Social Security144.7147.6147.6151.0157.0168.4169.3171.0170.9169.0169.8172.3175.9179.6183.4187.3191.2195.2199.3203.5207.8212.1216.6221.1225.8

    Debt Interest28.930.531.633.532.031.843.345.650.354.057.458.958.457.857.356.956.456.055.655.355.054.754.554.354.1

    Other AME68.973.575.572.8104.199.4104.2106.9109.2111.7114.8115.3117.8120.2122.7125.3128.0130.6133.4136.2139.0142.0145.0148.0151.1

    DEL328.7345.1353.5368.8367.4389.0380.0363.3351.8340.1329.6324.9333.5342.3351.2360.3369.5378.8388.3398.0407.8417.8427.9438.3448.8

    Current299.8316.2322.2333.2328.7344.5342.7336.7327.5319.0307.4301.4309.5317.8326.2334.7343.4352.2361.1370.2379.5388.9398.4408.1418.0

    Capital38.040.142.947.450.958.251.640.638.034.635.236.236.937.738.539.340.141.041.842.743.644.545.546.447.4

    % Real2004/052005/062006/072007/082008/092009/102010/112011/122012/132013/142014/152015/162016/172017/182018/192019/202020/212021/222022/232023/242024/252025/262026/272027/282028/29

    TME (Emergency Budget)4.4%1.9%3.0%5.4%4.3%1.2%-1.4%-0.7%-1.0%-0.5%0.0%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%

    AME3.7%1.3%1.0%13.9%2.2%5.7%2.1%2.1%1.3%2.1%1.4%1.6%1.6%1.6%1.6%1.7%1.7%1.7%1.7%1.7%1.7%1.8%1.8%1.8%

    Social Security2.0%0.0%2.3%4.0%7.3%0.5%1.0%-0.0%-1.1%0.4%1.5%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%

    Debt Interest5.7%3.7%6.0%-4.6%-0.6%36.2%5.4%10.2%7.5%6.1%2.8%-1.0%-0.9%-0.9%-0.8%-0.8%-0.7%-0.7%-0.6%-0.6%-0.5%-0.4%-0.4%-0.3%

    Other AME6.6%2.8%-3.6%43.0%-4.5%4.8%2.6%2.2%2.3%2.7%0.5%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%

    DEL5.0%2.4%4.3%-0.4%5.9%-2.3%-4.4%-3.2%-3.3%-3.1%-1.4%2.7%2.6%2.6%2.6%2.6%2.5%2.5%2.5%2.5%2.5%2.4%2.4%2.4%

    Current5.5%1.9%3.4%-1.4%4.8%-0.5%-1.8%-2.7%-2.6%-3.6%-2.0%2.7%2.7%2.6%2.6%2.6%2.6%2.5%2.5%2.5%2.5%2.5%2.4%2.4%

    Capital5.4%7.0%10.4%7.4%14.5%-11.4%-21.3%-6.5%-8.9%1.8%2.7%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%

    % of GDP2004/052005/062006/072007/082008/092009/102010/112011/122012/132013/142014/152015/162016/172017/182018/192019/202020/212021/222022/232023/242024/252025/262026/272027/282028/29

    TME (Emergency Budget)41%41%41%41%44%47.5%47.3%45.5%43.9%42.2%40.9%39.8%39.8%39.8%39.8%39.8%39.8%39.8%39.8%39.8%39.8%39.8%39.8%39.8%39.8%

    AME17%17%17%17%19%20.7%21.5%21.4%21.3%20.9%20.8%20.6%20.5%20.4%20.3%20.2%20.1%20.0%19.9%19.8%19.8%19.7%19.6%19.6%19.5%

    Social Security10.3%10.2%9.9%9.9%10.4%11.6%11.5%11.3%11.0%10.6%10.3%10.2%10.2%10.2%10.2%10.2%10.2%10.2%10.2%10.2%10.2%10.2%10.2%10.2%10.2%

    Debt Interest2%2%2%2%2%2.2%2.9%3.0%3.2%3.4%3.5%3.5%3.4%3.3%3.2%3.1%3.0%2.9%2.9%2.8%2.7%2.6%2.6%2.5%2.4%

    Other AME4.9%5.1%5.1%4.8%6.9%6.9%7.1%7.1%7.0%7.0%7.0%6.8%6.8%6.8%6.8%6.8%6.8%6.8%6.8%6.8%6.8%6.8%6.8%6.8%6.8%

    DEL23%24%24%24%24%26.8%25.8%24.1%22.6%21.3%20.1%19.3%19.4%19.5%19.6%19.7%19.7%19.8%19.9%20.0%20.1%20.1%20.2%20.3%20.3%

    Current21%22%22%22%22%23.8%23.2%22.3%21.1%20.0%18.7%17.9%18.0%18.1%18.2%18.3%18.4%18.4%18.5%18.6%18.7%18.7%18.8%18.9%18.9%

    Capital3%3%3%3%3%4.0%3.5%2.7%2.4%2.2%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%

    Real GDP (money GDP in 2008/09 prices)1343.69579646021380.03735597861419.88693295081453.91042266814341381.74681059861405.74945806161440.37268556641482.09362099751524.78767592341565.44763871941607.98831377771641.75606836711676.23294580281711.43383766461747.37394825561784.0688011691821.53424599351859.78646515941898.84198092771938.71766252721979.43073344032020.99877884252063.43975319822106.7719880154

    Real GDP growth2.7%2.9%2.4%-1.4%-3.6%1.7%2.5%2.9%2.9%2.7%2.7%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%2.1%

    UK DEL Cumulative Loss-9.0-34.6-71.8-120.6-180.0-244.1-299.5-346.2-384.0-412.7-432.2-442.3-443.0-434.0

    Scottish DEL Cumulative Loss-0.7-3.1-6.0-9.6-14.0-18.8-23.1-27.1-30.6-33.7-36.2-38.3-39.9-41.0

    8%9%8%8%8%8%8%8%8%8%8%9%9%9%

    7.7%7.7%7.6%7.7%7.7%7.8%7.7%7.7%7.6%7.5%7.5%7.4%7.3%7.3%7.2%

    -0.406018745

    -50.4

    -0.9%

    1.9%

    51.651.123580997650.651560736850.18389860440.1%

    7.3%

    2.5%

    0.0%

    -3.5%

    239.4310.671.2

    140.717029.3

    31.242.511.3

    67.598.130.6

    Simon Fuller:Figures to 2007/08 are taken from PESA.

    2008-09 to 2015-16 taken from Table C13 emergency budget

    000

    000

    000

    000

    000

    000

    000

    000

    000

    TME

    AME

    DEL

    % Annual Real Growth

    000

    000

    000

    000

    000

    000

    000

    000

    000

    TME

    AME

    DEL

    % Annual Real Growth

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    Net Debt (Right Hand Scale)

    Net Borrowing (Left Hand Scale)

    % of GDP

    % of GDP

    000

    000

    000

    000

    000

    000

    TME

    AME

    DEL

    % Annual Real Growth

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    Simon Fuller:Cash values from 2004/05 to 2007-08 are taken from HMT GDP Deflators and Budget 2010

    2008-09 to 2015-16 taken from Emergency budget table c5.

    For future years, GDP is assumed to grow by X% (GDP deflator) plus 2.1% trend growth

    Simon Fuller:GDP Deflators up to 2007-08 are taken from HMT website and Budget 2010.

    2008-09 to 2015-16 taken from table C5 emergency budget

    In future years, deflators are assumed to remain constant at 2.7%, their long run average

    Simon Fuller:Output gap figures to 2015-16 are taken from Emergency budget table table C6

    In future years, output gap is assumed to fall by 0.8% a year and then remain fixed at 0.

    Simon Fuller:Years to 2014/15 are taken from HMT Public Finance Databank table B2

    In future years, current expenditure is equal to the value of spending in previous years, plus any additional cyclical improvement, or fiscal tightening specified in rows 14 and 15

    Simon Fuller:For years to 2007-08, taken from HMT Public Finance Databank table B2

    2008-09 to 2015-160 from table c13 Emergency budget

    costant share in future yrs

    Simon Fuller:For years to 2014/15, taken from HMT Public Finance Databank table B2

    In future years it is assumed to remain constant at 1.3% of GDP

    Simon Fuller:The inverse of row 22

    Simon Fuller:Years to 2007-08 are taken from HMT Public Finance Databank table C1

    2008-09 to 2015-16 taken from emergency budget table C6

    In future years, current receipts are equal to the value of receipts in previous years, plus any additional cyclical improvement, or fiscal tightening specified in rows 14 and 15

    Simon Fuller:Years to 2014/15 are taken from HMT Public Finance Databank table B2

    In future years net investment is assumed to remain constant as a share of GDP

    Simon Fuller:Years to 2014/15 are calculated by adding depreciation to net investment.

    In future years, gross investment is assumed to remain constant as a share of GDP

    Simon Fuller:To 2014/15, taken from Budget 2010 table C4

    In future years it is equal to the surplus on current budget minus net investment

    Simon Fuller:Years to 2007-08 are taken from Budget 2010 table C4.

    2008-09 to 2015-16 taken from emergency budget table 1.3 w

    In future years, net debt constant share of GDP

    Simon Fuller:Years to 2014/15 are taken from HMT Public Finance Databank table C1 and Budget 2010 table C3.

    Future years are derieved from row 10

    Simon Fuller:Years to 2014/15 are taken from HMT Public Finance Databank table B1 and Budget 2010 table C3.

    Future years are derieved from row 13

    Simon Fuller:Years to 2014/15 are taken from HMT Public Finance Databank table B1 and Budget 2010 table C3.

    Future years are derieved from row 16

    Simon Fuller:Years to 2014/15 are taken from HMT Public Finance Databank table B1 and Budget 2010 table 'key'.

    Future years are derieved from row 18

    Simon Fuller:Years to 2014/15 are calculated by adding depreciation to net investment.

    In future years it is derieved from row 21

    Simon Fuller:Years to 2014/15 are taken from HMT Public Finance Databank table B1 and Budget 2010 table C3.

    Future years are derieved from row 22

    Simon Fuller:Years to 2014/15 are taken from HMT Public Finance Databank table B1 and Budget 2010 table C3.

    Future years are derieved from row 23

    Simon Fuller:Years to 2014/15 are taken from HMT Public Finance Databank table 'Key' and Budget 2010 table C3.

    Future years are derieved from row 24

    Simon Fuller:Years to 2014/15 are taken from Budget 2010 table C3.

    2015/16 to 2017/18 are derieved from row 25.

    In future years net debt is assumed to grow in line with net borrowing

    Simon Fuller:Years to 2007-08 are taken from HMT Public Finance Databank table B1 and Budget 2010 table C9.

    2008-09 to 2015-16 taken from Emergency Budget table 2.3

    future = assume constant share of GDP

    Simon Fuller:From row 42

    Simon Fuller:Years to 2010/11 are taken from PESA and Budget 2010 table C9

    For 2011/12 to 2014/15, social security is assumed to grow at the rate specified in the 'AME Estimates' worksheet.

    For 2015/16 and 20016/17, Social Security is assumed to grow in line with inflation.

    From 2017/18 it is assumed to remain constant as a share of GDP

    Simon Fuller:figures to 2007/08 are taken from PESA, 08/09 to 2014/15 are calculated in the 'AME Estimate' spreadsheet

    For 2015/16 onwards, debt interest is assumed to grow in line with public sector net debt

    Simon Fuller:Up to 2010/11 Other AME is the differrence between total AME and social security and debt interest.

    From 2011/12 to 2014/15 it is assumed to grow in line with the assumptions in the AME estimate spreadsheet

    Simon Fuller:2004/05 to 2010/11 are taken from PESA and Budget 2010 table C9

    From 2011/12 to 2016/17, capital DEL moves in line with gross investment.

    From 2017/18 onwards it remains constant as a share of GDP

    Simon Fuller:Figures to 2010/11 are taken from PESA and Budget 2010 table C9

    In future years total DEL is the difference between TME and AME

    Simon Fuller:

    table C13 emergency budget

    For 2015-06, current DEL is the difference between total DEL and capital DEL

    Simon Fuller:For 2008/09 to 2010/11 DEL depreciation is taken from Budget 2010 table C11

    For future years DEL's share of total depreciation (row 22) is assumed to remain constant at its 2010/11 level

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    Annually Managed Expenditure

    Total UK Departmental Expenditure Limits

    Billions (10/11 Prices)

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    Annually Managed Expenditure

    Billions (10/11 Prices)

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    Billions (10/11 Prices)

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    Billions (10/11 Prices)

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    AME

    DEL

    % of GDP

    000

    000

    000

    000

    000

    000

    000

    000

    000

    000

    000

    000

    000

    000

    000

    000

    000

    000

    000

    000

    000

    Social Security

    Debt Interest

    Other AME

    % of GDP

    0

    0

    0

    0

    0

    0

    0

    % of GDP

    Barnett Consequentials from Current Spending

    MillionsEmerg Budget 2010-112011-122012-132013-142014-152015-162016-172017-182018-192019-202020-20212021-20222022-20232020-20242024-20252025-20262026-20272027-20282028-2029Scotland2011-122012-132013-142014-152015-162016-172017-182018-192019-202020-20212021-20222022-20232020-20242024-20252025-20262026-20272027-20282028-2029

    CompPopBudgetConsequentialsConsequentialsConsequentialsConsequentialsConsequentialsConsequentialsConsequentialsConsequentialsConsequentialsConsequentialsConsequentialsConsequentialsConsequentialsConsequentialsConsequentialsConsequentialsConsequentialsConsequentials

    Children Scools & Families50,900.050,15848,68947,54845,69445,93448,49951,18854,00756,96460,06463,31466,72370,29774,04477,97482,09486,41590,945100.0%10.1%-74.581-147.643-114.662-186.28424.127257.719270.236283.361297.123311.553326.684342.550359.187376.632394.923414.104434.215455.304

    Health (Protected from cuts)101,500.0103,429105,807108,558111,489112,075118,332124,893131,772138,985146,549154,480162,797171,517180,660190,248200,302210,843221,89799.3%10.1%192.458237.401274.539292.51158.456624.407654.733686.531719.874754.836791.496829.937870.244912.509956.8271,003.2981,052.0251,103.118

    Transport6,400.06,3076,1225,9795,7455,7766,0986,4366,7917,1627,5527,9618,3898,8399,3109,80410,32210,86611,43591.5%10.1%-8.581-16.986-13.192-21.4322.77629.65031.09032.60034.18435.84437.58539.41041.32443.33145.43647.64249.95652.382

    Communities3,800.03,7453,6353,5503,4113,4293,6213,8214,0324,2534,4844,7274,9815,2485,5285,8216,1296,4516,79099.6%10.1%-5.546-10.978-8.526-13.8521.79419.16320.09421.07022.09323.16624.29125.47126.70828.00529.36630.79232.28733.855

    Local Government26,000.025,62124,87124,28823,34123,46424,77326,14727,58729,09730,68132,34134,08235,90837,82239,82941,93444,14146,45519.4%10.1%-7.391-14.631-11.363-18.4602.39125.53926.77928.08029.44430.87432.37333.94535.59437.32339.13541.03643.02945.119

    Business Innovation & Skills19,200.018,92018,36617,93617,23617,32718,29419,30920,37221,48722,65723,88325,16826,51727,93029,41330,96732,59734,30576.2%10.1%-21.437-42.438-32.958-53.5446.93574.07777.67581.44885.40389.55193.90098.461103.243108.257113.514119.028124.808130.870

    Home Office9,400.09,2638,9928,7818,4398,4838,9579,4539,97410,52011,09211,69312,32212,98213,67414,40015,16115,95916,79599.8%9.5%-12.994-25.722-19.976-32.4544.20344.90047.08149.36751.76554.27956.91559.67962.57865.61768.80472.14575.64979.323

    Justice9,100.08,9678,7058,5018,1698,2128,6719,1519,65610,18410,73811,31911,92912,56813,23813,94014,67715,44916,25999.7%9.5%-12.566-24.877-19.319-31.3874.06543.42345.53247.74450.06252.49455.04357.71760.52063.45966.54169.77373.16176.715

    Law Officers700.06906706546286326677047437838268719189671,0181,0721,1291,1881,25199.7%9.5%-0.967-1.914-1.486-2.4140.3133.3403.5023.6733.8514.0384.2344.4404.6554.8815.1195.3675.6285.901

    Defence36,000.035,47534,43633,62932,31832,48834,30236,20338,19840,28942,48144,78047,19149,71952,36955,14958,06361,11964,3230.0%0.0%0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000

    Foreign and Commonwealth Office2,000.02,1452,3312,5432,6212,7322,8693,0133,1643,3223,4883,6623,8444,0354,2364,4464,6674,8985,1400.0%0.0%0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000

    of which overseas aid1,309.11,464.31,670.41,897.82,000.32,108.32,210.72,318.12,430.72,548.72,672.52,802.32,938.43,081.13,230.83,387.73,552.23,724.73,905.6

    of which other FCO spending690.96816616456206246586957337738158599069541,0051,0581,1141,1731,234

    International Development6,100.06,8237,7848,8439,3219,82410,30110,80211,32611,87612,45313,05813,69214,35715,05515,78616,55217,35618,1990.0%0.0%0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000

    Energy & Climate Change1,200.01,1831,1481,1211,0771,0831,1431,2071,2731,3431,4161,4931,5731,6571,7461,8381,9352,0372,14433.5%10.1%-0.589-1.166-0.906-1.4710.1912.0352.1342.2382.3472.4612.5802.7052.8372.9753.1193.2713.4293.596

    Environment Food & Rural Affairs2,400.02,3652,2962,2422,1552,1662,2872,4142,5472,6862,8322,9853,1463,3153,4913,6773,8714,0754,28891.0%10.1%-3.200-6.335-4.920-7.9931.03511.05811.59512.15812.74913.36814.01714.69815.41216.16016.94517.76818.63119.536

    Culture Media & Sport1,500.01,4781,4351,4011,3471,3541,4291,5081,5921,6791,7701,8661,9662,0722,1822,2982,4192,5472,68095.8%10.1%-2.106-4.168-3.237-5.2590.6817.2767.6298.0008.3888.7969.2239.67110.14110.63311.14911.69112.25912.854

    Work & Pensions8,800.08,6728,4188,2207,9007,9428,3858,8509,3379,84810,38410,94611,53612,15312,80113,48114,19314,94015,7230.8%10.1%-0.103-0.204-0.159-0.2580.0330.3560.3740.3920.4110.4310.4520.4740.4970.5210.5460.5730.6010.630

    Scotland25,700.025,32524,58424,00723,07223,19324,48825,84527,26928,76230,32731,96833,68935,49437,38639,37041,45043,63245,9190.0%0.0%0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000

    Wales13,900.013,69713,29612,98512,47812,54413,24413,97914,74915,55616,40217,29018,22119,19720,22021,29322,41923,59924,8360.0%0.0%0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000

    Northern Ireland Executive8,600.08,4758,2268,0347,7207,7618,1948,6499,1259,62510,14810,69711,27311,87712,51013,17413,87114,60115,3660.0%0.0%0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000

    Northern Ireland Office1,200.01,1831,1481,1211,0771,0831,1431,2071,2731,3431,4161,4931,5731,6571,7461,8381,9352,0372,1440.0%0.0%0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000

    Chancellors4,100.04,0403,9223,8303,6813,7003,9074,1234,3504,5884,8385,1005,3755,6625,9646,2816,6136,9617,3260.8%10.1%-0.048-0.095-0.074-0.1200.0160.1660.1740.1830.1910.2010.2110.2210.2310.2430.2540.2670.2800.293

    Cabinet Office2,300.02,2662,2002,1492,0652,0762,1912,3132,4402,5742,7142,8613,0153,1763,3463,5233,7103,9054,1107.2%10.1%-0.243-0.480-0.373-0.6060.0780.8380.8790.9220.9671.0141.0631.1141.1691.2251.2851.3471.4131.481

    Independent Bodies1,000.0985.42956.56934.14897.739029531,0061,0611,1191,1801,2441,3111,3811,4551,5321,6131,6981,787

    Modernisation Funding200.0197.08191.31186.83179.55180191201212224236249262276291306323340357

    Reserve600.0591.25573.93560.49538.645415726036376717087467878298739199681,0191,072

    AME Margin0.01,0002,5003,5005,0005,0005,0005,0005,0005,0005,0005,0005,0005,0005,0005,0005,0005,0005,000

    TOTAL (Excluding Health, Overseas Aid and AME Margin)233,691230,284223,539218,301209,791Consequentials42.107-60.23743.389-83.024107.0961,143.9511,199.5091,257.7661,318.8521,382.9041,450.0681,520.4931,594.3391,671.7711,752.9641,838.1001,927.3712,020.978

    Total (Excluding Overseas Aid)335,191333,712329,346326,859321,280322,968340,998359,904379,729400,516422,312445,167469,132494,261520,611548,240577,211607,589639,443

    TOTAL SPENDING342,600343,000341,300341,100337,601339,901358,511378,024398,486419,941442,438466,028490,763516,700543,896572,414602,316633,670666,548

    Nominal change (From HMT Projections)0.12%-0.50%-0.06%-1.03%0.68%5.48%5.44%5.41%5.38%5.36%5.33%5.31%5.28%5.26%5.24%5.22%5.21%5.19%

    Double Check342,600343,000341,300341,100337,601339,901358,511378,024398,486419,941442,438466,028490,763516,700543,896572,414602,316633,670666,548

    0.12%-0.50%-0.06%-1.03%0.68%5.48%5.44%5.41%5.38%5.36%5.33%5.31%5.28%5.26%5.24%5.22%5.21%5.19%

    Assumed real increase in health0.00%

    Barnett Consequentials from Capital Spending

    MillionsEmerg Budget 2010-112011-122012-132013-142014-152015-162016-172017-182018-192019-202020-20212021-20222022-20232020-20242024-20252025-20262026-20272027-20282028-2029Scotland2011-122012-132013-142014-152015-162016-172017-182018-192019-202020-20212021-20222022-20232020-20242024-20252025-20262026-20272027-20282028-2029

    CompPopBudgetConsequentialsConsequentialsConsequentialsConsequentialsConsequentialsConsequentialsConsequentialsConsequentialsConsequentialsConsequentialsConsequentialsConsequentialsConsequentialsConsequentialsConsequentialsConsequentialsConsequentialsConsequentials

    Children Scools & Families6,7005,1364,8114,3594,5714,8195,0535,2995,5565,8266,1096,4056,7167,0437,3857,7438,1198,5148,927100.0%10.1%-157.145-32.732-45.39721.30924.93723.52224.66425.86227.11828.43529.81631.26532.78334.37536.04537.79539.63141.556

    Health4,9004,9935,1085,2415,3825,6745,9506,2396,5426,8607,1937,5427,9098,2938,6959,1189,56010,02510,51299.3%10.1%9.29111.46113.25414.12129.15727.50328.83930.23931.70833.24834.86236.55638.33140.19342.14544.19246.33848.588

    Transport7,2005,5205,1704,6844,9125,1795,4305,6945,9716,2616,5656,8837,2187,5687,9368,3218,7259,1499,59391.5%10.1%-154.518-32.185-44.63820.95324.52023.12924.25225.43026.66527.96029.31830.74232.23533.80135.44237.16338.96840.861

    Communities6,2004,7534,4524,0344,2304,4594,6764,9035,1415,3915,6535,9276,2156,5176,8347,1667,5147,8788,26199.6%10.1%-144.836-30.168-41.84119.64022.98321.68022.73323.83724.99426.20827.48128.81630.21531.68333.22134.83536.52738.301

    Local Government000000000000000000019.4%10.1%0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000

    Business Innovation & Skills2,0001,5331,4361,3011,3641,4391,5081,5821,6581,7391,8231,9122,0052,1022,2042,3112,4242,5412,66576.2%10.1%-35.745-7.445-10.3264.8475.6725.3505.6105.8836.1686.4686.7827.1127.4577.8198.1998.5979.0159.452

    Home Office8006135745205465756036336636967297658028418829259691,0171,06699.8%9.5%-17.701-3.687-5.1142.4002.8092.6502.7782.9133.0553.2033.3593.5223.6933.8724.0604.2574.4644.681

    Justice60046043139040943245347549852254757460163166169372776279999.7%9.5%-13.263-2.763-3.8311.7982.1051.9852.0822.1832.2892.4002.5162.6392.7672.9013.0423.1903.3453.507

    Law Officers000000000000000000099.7%9.5%0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000

    Defence10,1007,7437,2526,5716,8917,2657,6177,9878,3758,7829,2099,65610,12510,61711,13211,67312,24012,83413,4580.0%0.0%0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000

    Foreign and Commonwealth Office2001992172352472612732863003153303463633813994194394604830.0%0.0%0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000

    of which overseas aid131146167190200211221232243255267280294308323339355372391

    of which other FCO spending69535045475052555760636669737680848892

    International Development1,6001,7902,0422,3202,4452,5772,7022,8332,9713,1153,2663,4253,5913,7663,9494,1414,3424,5524,7740.0%0.0%0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000

    Energy & Climate Change1,9001,4571,3641,2361,2961,3671,4331,5031,5761,6521,7321,8161,9051,9972,0942,1962,3032,4142,53233.5%10.1%-14.929-3.110-4.3132.0242.3692.2352.3432.4572.5762.7012.8332.9703.1143.2663.4243.5913.7653.948

    Environment Food & Rural Affairs50038335932534136037739541543545647850152655157860663566691.0%10.1%-10.672-2.223-3.0831.4471.6931.5971.6751.7561.8421.9312.0252.1232.2262.3342.4482.5672.6912.822

    Culture Media & Sport50038335932534136037739541543545647850152655157860663566695.8%10.1%-11.235-2.340-3.2461.5231.7831.6821.7631.8491.9392.0332.1322.2352.3442.4582.5772.7022.8332.971

    Work & Pensions2001531441301361441511581661741821912002102202312422542660.8%10.1%-0.038-0.008-0.0110.0050.0060.0060.0060.0060.0060.0070.0070.0070.0080.0080.0090.0090.0090.010

    Scotland3,2002,4532,2982,0822,1832,3022,4132,5312,6542,7822,9183,0593,2083,3643,5273,6983,8784,0664,2640.0%0.0%0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000

    Wales1,7001,3031,2211,1061,1601,2231,2821,3441,4101,4781,5501,6251,7041,7871,8741,9652,0602,1602,2650.0%0.0%0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000

    Northern Ireland Executive1,1008437907167507918308709129561,0031,0521,1031,1561,2121,2711,3331,3981,4660.0%0.0%0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000

    Northern Ireland Office10077726568727579838791961001051101161211271330.0%0.0%0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000

    Chancellors3002302151952052162262372492612742873013153313473643814000.8%10.1%-0.056-0.012-0.0160.0080.0090.0080.0090.0090.0100.0100.0110.0110.0120.0120.0130.0140.0140.015

    Cabinet Office3002302151952052162262372492612742873013153313473643814007.2%10.1%-0.507-0.106-0.1460.0690.0800.0760.0800.0830.0870.0920.0960.1010.1060.1110.1160.1220.1280.134

    Independent Bodies100.07772656872757983879196100105110116121127133

    Modernisation Funding1,5001,1501,0779761,0231,0791,1311,1861,2441,3041,3681,4341,5041,5771,6531,7341,8181,9061,999

    Reserve0000000000000000000

    TOTAL (Excluding Health and overseas aid)45,06934,55132,36029,32230,748Consequentials-551.351-105.317-148.71090.146118.123111.422116.834122.508128.458134.696141.238148.098155.290162.832170.741179.033187.728196.846

    Total Excluding Overseas Aid49,96939,54437,46834,56236,13038,09139,94141,88143,91546,04848,28450,63053,08855,66758,37061,20564,17867,29570,563

    TOTAL Spending51,70041,48039,67737,07238,77540,87942,86444,94647,12949,41851,81854,33556,97459,74162,64265,68468,87572,22075,727

    Nominal change (From HMT Projections)-19.77%-4.35%-6.57%4.59%5.43%4.86%4.86%4.86%4.86%4.86%4.86%4.86%4.86%4.86%4.86%4.86%4.86%4.86%

    Double Check51,70041,48039,67737,07238,77540,87942,86444,94647,12949,41851,81854,33556,97459,74162,64265,68468,87572,22075,727

    -19.77%-4.35%-6.57%4.59%5.43%4.86%4.86%4.86%4.86%4.86%4.86%4.86%4.86%4.86%4.86%4.86%4.86%4.86%

    Analaysis based on June Budget 2010Emerg Budget 2010-112011-122012-132013-142014-152015-162016-172017-182018-192019-202020-20212021-20222022-20232020-20242024-20252025-20262026-20272027-20282028-2029

    Overseas Aid (Cash)9,14010,22411,66313,25113,96614,72015,43516,18516,97117,79518,65919,56620,51621,51222,55723,65324,80126,00627,269

    GNI1,632,1431,703,9571,794,2671,892,9521,995,1712,102,9102,205,0422,312,1342,424,4282,542,1752,665,6412,795,1032,930,8533,073,1963,222,4523,378,9563,543,0623,715,1383,895,571

    Assumed Nominal Growth in GNI1.0441.0531.0551.0541.054

    Overseas Aid as a % of GNI0.560%0.600%0.650%0.700%0.700%0.700%0.700%0.700%0.700%0.700%0.700%0.700%0.700%0.700%0.700%0.700%0.700%0.700%0.700%

    Source: http://www.parliament.uk/briefingpapers/commons/lib/research/briefings/snep-03714.pdf

    Appendix 1

    Overseas Aid9,140.010,223.711,662.713,250.713,966.2

    Health106,400.0108,421.6110,915.3113,799.1116,871.7

    AME Margin0.01,000.02,500.03,500.05,000.0

    Other278,760.0264,834.8255,899.1247,622.4240,538.6

    GDP Index104.86106.85109.30112.15115.17

    Overseas Aid9,14010,03311,18812,38912,71539.1%

    Health106,400106,400106,400106,400106,4000.0%

    AME Margin0.09812,3983,2724,552

    Other284,760259,897245,482231,522218,986-23.1%

    Total400,300377,311365,468353,584342,653-14.4%

    2009/102010/112011/122012/132013/142014/15

    Total DEL378385.8370.2366.7363.8362

    of which international development7.49.110.211.713.314.0

    of which heatlh103106108111114117

    of which AME margin002345

    of which other267.6270.3249.6241.1232.8226.2

    GDP Deflators100.00101.90104.86106.85109.30112.15115.17

    Real Terms (10/11 Prices)

    Total Fall Since 2010/11

    Total DEL389.0385.8363.3351.8340.1329.6-14.6%

    of which international development7.79.110.011.212.412.739%

    of which heatlh106.0106.4106.4106.4106.4106.40%

    of which AME margin0.00.02.02.93.74.6

    of which other275.3270.3244.9231.3217.6205.9-24%

    Simon Fuller:DEL Figures are taken from Budget 2010 table C11

    Simon Fuller:DEL Figures are taken from Budget 2010 table C11

    Simon Fuller:AME Margin moves in line with total DEL after this point

    Simon Fuller:Health moves in line with total DEL from this point onwards

    Simon Fuller:ODA continues to grow in line with GDP

    Simon Fuller:ODA continues to grow in line with GDP

    1999/002000/012001/022002/032003/042004/052005/062006/072007/082008/092009/102010/112011/122012/132013/142014/152015/162016/172017/182018/192019/202020/212021/222022/232023/242024/252025/262026/272027/282028/29

    GDP Deflators80.00281.05382.86385.53687.94790.39292.07994.80397.55100.00101.90104.86106.85109.30112.15115.17118.28121.48124.76128.13131.59135.14138.79142.53146.38150.34154.39158.56162.84167.24

    Table A1 - Baseline Budget Millions1999/002000/012001/022002/032003/042004/052005/062006/072007/082008/092009/102010/112011/122012/132013/142014/152015/162016/172017/182018/192019/202020/212021/222022/232023/242024/252025/262026/272027/282028/29

    Current Consequentials-21842-6043-831071,1441,2001,2581,3191,3831,4501,5201,5941,6721,7531,8381,9272,021

    Capital Consequentials-114-551-105-14990118111117123128135141148155163171179188197

    Non Recurring consequentials to remove from the 2011/12 Baseline (Finance Sheet)

    Current Consequentials-3218

    Capital Consequentials-76114

    Scottish Government DEL Budget (Cash)13,80714,70516,39617,80719,50721,03322,86224,90626,32627,62529,07929,24328,03428,20128,09528,10328,32829,58330,89932,28033,72735,24536,83638,50540,25442,08944,01246,03048,14550,363

    Current16,14518,08519,33321,00921,77922,99624,75825,15525,92425,37425,53125,57525,49225,59926,74327,94229,20030,51931,90233,35234,87236,46738,13939,89241,73043,65745,678

    Capital1,6621,4221,7001,8543,1273,3293,2623,9243,3192,6612,6692,5212,6112,7292,8402,9573,0803,2083,3433,4843,6323,7873,9504,1214,3004,4884,685

    Scottish Government DEL Budget (Real 10/11 Prices)18,09619,02320,74821,82923,25724,39826,03527,54728,29828,96629,92229,24327,51227,05326,26925,58525,11225,53525,97026,41726,87627,34727,83028,32628,83429,35629,89030,43931,00031,576

    Current19,79221,56222,42623,92424,08824,71825,96025,88425,92424,90124,49223,91223,20822,69323,08323,48523,89724,31924,75325,19825,65426,12126,60127,09227,59528,11128,639

    Capital2,0371,6951,9722,1113,4583,5783,4204,0383,3192,6112,5612,3572,3772,4192,4522,4852,5202,5562,5942,6322,6722,7132,7552,7992,8432,8902,937

    Growth Rates

    Total DEL Budget

    % change year on year (cash)6.5%11.5%8.6%9.5%7.8%8.7%8.9%5.7%4.9%5.3%0.6%-4.1%0.6%-0.4%0.0%0.8%4.4%4.4%4.5%4.5%4.5%4.5%4.5%4.5%4.6%4.6%4.6%4.6%4.6%

    % change year on year (real)5.1%9.1%5.2%6.5%4.9%6.7%5.8%2.7%2.4%3.3%-2.3%-5.9%-1.7%-2.9%-2.6%-1.8%1.7%1.7%1.7%1.7%1.8%1.8%1.8%1.8%1.8%1.8%1.8%1.8%1.9%

    % change vs 09-10 (real)-2.3%-8.1%-9.6%-12.2%-14.5%-16.1%-14.7%-13.2%-11.7%-10.2%-8.6%-7.0%-5.3%-3.6%-1.9%-0.1%1.7%3.6%5.5%

    Change vs 09-10 Cash164-1,045-878-984-976-7515041,8203,2014,6486,1667,7579,42611,17513,01014,93316,95119,06621,284

    Change vs 09-10 Real-679-2,411-2,870-3,654-4,338-4,811-4,387-3,952-3,505-3,047-2,576-2,092-1,597-1,088-566-325161,0781,653

    Current DEL Budget

    % change year on year (cash)12.0%6.9%8.7%3.7%5.6%7.7%1.6%3.1%-2.1%0.6%0.2%-0.3%0.4%4.5%4.5%4.5%4.5%4.5%4.5%4.6%4.6%4.6%4.6%4.6%4.6%4.6%

    % change year on year (real)8.9%4.0%6.7%0.7%2.6%5.0%-0.3%0.2%-3.9%-1.6%-2.4%-2.9%-2.2%1.7%1.7%1.8%1.8%1.8%1.8%1.8%1.8%1.8%1.8%1.9%1.9%1.9%

    % change vs 09-10 (real)0.2%-3.8%-5.4%-7.6%-10.3%-12.3%-10.8%-9.3%-7.7%-6.0%-4.4%-2.7%-0.9%0.9%2.8%4.7%6.6%8.6%10.6%

    Change vs 09-10 Cash7692193764203374441,5882,7874,0455,3646,7478,1979,71711,31212,98414,73716,57518,50220,523

    Change vs 09-10 Real40-984-1,392-1,972-2,677-3,192-2,801-2,400-1,988-1,565-1,132-687-2312377161,2071,7112,2262,754

    Capital DEL Budget

    % change year on year (cash)-14.4%19.6%9.1%68.7%6.5%-2.0%20.3%-15.4%-19.8%0.3%-5.6%3.6%4.5%4.1%4.1%4.1%4.2%4.2%4.2%4.3%4.3%4.3%4.3%4.3%4.4%4.4%

    % change year on year (real)-16.8%16.3%7.1%63.8%3.5%-4.4%18.1%-17.8%-21.3%-1.9%-8.0%0.9%1.8%1.3%1.4%1.4%1.4%1.5%1.5%1.5%1.5%1.6%1.6%1.6%1.6%1.6%

    % change vs 09-10 (real)-17.8%-35.3%-36.6%-41.6%-41.1%-40.1%-39.3%-38.4%-37.6%-36.7%-35.8%-34.8%-33.8%-32.8%-31.8%-30.7%-29.6%-28.4%-27.3%

    Change vs 09-10 Cash-605-1,263-1,255-1,403-1,313-1,195-1,084-967-844-716-581-440-292-13726197376564761

    Change vs 09-10 Real-719-1,427-1,477-1,681-1,661-1,619-1,586-1,552-1,518-1,481-1,444-1,406-1,366-1,325-1,283-1,239-1,194-1,148-1,101

    Cumulative Loss-679-3,090-5,960-9,613-13,951-18,762-23,149-27,101-30,607-33,654-36,229-38,322-39,918-41,006-41,573-41,605-41,088-40,010-38,357

    Cumulative Loss (Rounded)-0.7-3.1-6.0-9.6-14.0-18.8-23.1-27.1-30.6-33.7-36.2-38.3-39.9-41.0-41.6-41.6-41.1-40.0-38.4

    Annual Cash Change in DEL ( Billions)164-1,209166-10572251,2551,3161,3801,4471,5181,5911,6691,7501,8351,9242,0172,1152,218

    Cumulative Cash Change Vs 09/10164-1,045-878-984-976-7515041,8203,2014,6486,1667,7579,42611,17513,01014,93316,95119,06621,284

    -0.2711718791

    -900

    Steps to estimating the Scottish Budget in 2011/12-1,731-0.1251059234

    -0.0592094882

    Scottish Government DEL Budget (Cash) 2010/1129,243-3.3%

    Current25,924-3.0%

    Capital3,319-2.9%

    Add back in capital acceleration to 2011/12 baseline347

    Current0

    Capital347

    Remove EYF-303

    Current-153

    Capital-150

    Remove non recurring consequentials received in 20101/11-79

    Current-3

    Capital-76

    Remove 330 million from the baseline (share of 6.2bn cuts)-332

    Current-218

    Capital-114

    Scottish baseline for 2011/1228,876

    Current25,550

    Capital3,326

    Deduct the impact of deferring 330 million of cuts to 2011/12-332

    Current-218

    Capital-114

    Include Consequentials Received in 2011/12-509

    Current42

    Capital-551

    Scottish Government DEL Budget in 2011/1228,03528,034

    Current25,37425,374

    Capital2,6612,661

    Simon Fuller:Taken from UK Nominal change worksheet

    Simon Fuller:Taken from the consequential spreadsheet

    Simon Fuller:Taken from the consequential spreadsheet

    Simon Fuller:Figures for 2007/08 to 2010/11 were provided by Finance

    In future years the budget is equal to the previous years value plus the consequentials received

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    Millions (2010/11 Prices)

    1

    % Real Annual Change

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    Millions (10/11 Prices)

    0.02362219790.0229081631

    0.0329994080.0339101345

    -0.0227018379-0.0128325641

    -0.0592094882-0.0338127797

    -0.016679121-0.0336475197

    -0.0289811627-0.0324281413

    -0.02604334-0.0174579598

    -0.0184866690.0066105384

    0.01686081280.009625922

    0.01703646120.0214993448

    0.01720531140.0218065742

    0.01736757150.0220261809

    0.01752344790.0222357566

    0.0176731450.0224356531

    0.01781686460.0226262187

    0.01795480550.0228077972

    Millions (2010/11 Prices)

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    Simon Fuller:Baseline for 11/12 is

    Budget in 10/11 minus EYF, minus non recurring consequentials and minus the 332 million in cuts. To this we had the consequentials received in 11/12 plus the 332 million in negative consequentials which were defferred.

    Simon Fuller:

    Baseline for 12/13 is the budget for 2011/12, plus 332 million in cuts which were deffered from 2010/11 to 2011/12. These have allready been removed from the baseline for 2011/12. If we don't add them back in it would produce double counting

    Simon Fuller:Baseline for 12/13 is the budget for 2011/12, plus 332 million in cuts which were deffered from 2010/11 to 2011/12. These have allready been removed from the baseline for 2011/12. If we don't add them back in it would produce double counting

    Simon Fuller:Accelerated capital is put back in the baseline for 2011.12

    10/11 to 14/15

    15/16 - 16/17

    17/18 onwards

    June Budget Scenario

    UK Budget 2010 Scenario

    % Real Annual Change

    -0.0038682256

    0.0586527216

    -0.0230408112

    -0.0439543412

    -0.0317246813

    -0.0330490955

    -0.0311078612

    -0.0141860378

    0.0265858246

    0.0262981175

    0.026026638

    0.0257703312

    0.0255282245

    0.0252994202

    0.025083088

    0.0248784592

    0.0246848212

    5 years of real decline

    2 years to reach trend growth

    Total UK Departmental Expenditure Limits

    Billions (10/11 Prices)

    28297.9564765395

    28966.416405486

    29922.291

    29243

    27511.5369355862

    27052.6686822463

    26268.6508884564

    25584.5274818197

    25111.5547910384

    25534.9560166622

    25969.9813052926

    26416.8029207665

    26875.5986331861

    27346.5517848954

    27829.8513591478

    28325.692051487

    28834.2743438643

    Scottish Government DEL Expenditure

    Millions (2010-11 Prices)

    28297.956476539528554.9139068859

    28966.41640548629209.05453125

    29922.29130199.5375

    2924329812

    27511.536935586228803.973411159

    27052.668682246327834.7911470682

    26268.650888456426932.1606063332

    25584.527481819726461.9800300022

    25111.554791038426636.9079663016

    25534.956016662226893.3127641017

    25969.981305292627471.5013687908

    26416.802920766528070.5607005318

    26875.598633186128688.847947222

    27346.551784895429326.7661874828

    27829.851359147829984.7313414564

    28325.69205148730663.1724309094

    28834.274343864331362.5318477174

    UK Budget 2010 Scenario Plus 6.2 billion cuts

    UK Budget 2010 Scenario

    Millions (2010-11 Prices)

    29922.291

    29243

    27511.5369355862

    27052.6686822463

    26268.6508884564

    25584.5274818197

    25111.5547910384

    25534.9560166622

    25969.9813052926

    26416.8029207665

    26875.5986331861

    27346.5517848954

    27829.8513591478

    28325.692051487

    28834.2743438643

    29355.8045815178

    29890.4950526395

    30438.5640708578

    2009-10

    2025-26

    16 years

    42 billion

    UK Budget 2010 Scenario Plus 6.2 billion cuts

    Millions (2010-11 Prices)

    29243

    27511.5369355862

    27052.6686822463

    26268.6508884564

    25584.5274818197

    25111.5547910384

    1.7bn

    500m

    800m

    700m

    500m

    Scottish Government DEL Expenditure

    Millions (2010/11 Prices

  • Long-Term Budgetary Impact16 years39 billion2009-10 2025-26Scottish Government DEL Expenditure (2010-11 prices)

  • Stage of the Recovery

  • Unemployment Remains High

  • Gradual Recovery in Scottish GDP

  • Significant Risks RemainImpact of the fiscal consolidation

    Rising inflationary pressures

    Sovereign debt concerns in Euro Area

  • Concluding ThoughtsScottish economy in early stages of recoveryEffects of the recession still being feltSignificant uncertainty remains over strength of the recoveryImpact on the public finances over the medium to long term

    **************