Session presentation - Sharklet Entry into Service

35
Sharklet Entry Into Service Presented by Jean-Paul POURTAU A320neo & Sharklets projects manager Customer Services - A320 Family Programme - SBS

Transcript of Session presentation - Sharklet Entry into Service

Page 1: Session presentation - Sharklet Entry into Service

Sharklet Entry Into ServicePresented by

Jean-Paul POURTAUA320neo & Sharklets projects managerCustomer Services - A320 Family Programme - SBS

Page 2: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Content

Page 2

Technical & project highlights

Sharklet benefits1

2

Entry Into Service 3

Sharklet retrofit solutions4

Summary5

Page 3: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Firm orders for Sharklets so far

Page 3

Orders from 28 customers worldwide

Page 4: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Sharklets reduce fuel burn

Page 4

3.5% fuel burn savings on long sectors

1%

2%

3%

4%

0 1000 2000 3000

A320 Block fuel improvementvs. current Wingtip fences

Sector length (nm)

Fuel burnreduction

Sector length (nm)

$275kfuel savings per year per aircraft

Attractive savings

$150kfuel savings per year per aircraft

Page 5: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Sharklets improve take-off performance

Page 5

• If facing obstacles or climb limitations, Sharklets will increase take-off weight by:• Improving second segment performance• Clearing more obstacles

Quito

Lanzarote Kathmandu Madeira

Canberra

Corfu Washington

Better take-off

capability

Improved operational efficiency around the world

Page 6: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Sharklets reduce engine maintenance costs

Page 6

Up to 2% reduction in engine maintenance coststhanks to improved take-off performance

Reduce take-off thrust for same take-off weight

Longer Time on Wing

Reduced engine maintenance cost

Up to 4% additional take-off derate

up to 4% reduced thrustup to

2%lower costDerate - %

Engine DMC per FH - $

Lower engine DMC

Page 7: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Improved climb performance with Sharklets

Page 7

Higher initial cruise altitude

30000

32000

34000

36000

38000

40000

Altitude (ft)

Sector profile

600nm 530nm

Higher optimum altitude

Page 8: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Sharklets benefits summary

Page 8

Sharklets increase A320 Family value

Fuel burnreduction

Attractive savings

More efficient family

Lower CO2emissions

More payload &

range

Better take-off

capability

Lower engine DMC

Higher optimum altitude

Page 9: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Content

Page 9

Technical & project highlights

Sharklet1

2

Entry Into Service 3

Sharklet retrofit solutions4

Summary5

Page 10: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Sharklets design

Page 10

→Single piece design

→Multi-lug and tension bolt

→Innovative materials

→Lightning strikes protection

→New LED nav & strobe lights

Airbus design with state-of-the-art materials

Page 11: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Sharklets design: new wing-sharklet join

Page 11

Simple connection: tension bolts and barrel nuts; multi-lugs and pins

Rib 27 (wing-side)

x

z

y

x

z

y

Rib 27A (sharklet-side)

Page 12: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Centre wing box changes

Page 12

Minor design changes for adapted centre wing box reinforcement (A319/A320)

ChangesNo changesChanges without assembly jigs modification

Page 13: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Wing changes (A320)

Page 13

Front Spar:Front spar Web thickness increase ~1mm outboard of Rib 9Flange changes outboard of Rib 23

Fixed Leading Edge:Bolting and rivet changes outboard of Slat 4

Fixed Trailing Edge:Aileron Hinge bracket changes

Rib 27:New large machined rib conceptIntroduction of support straps to stringers

Mid and Outer Rear Spars:Front spar Web thickness increase ~ 1mm outboard of Rib 9Flange changes outboard of Rib 25New crack stopper outboard rib 24

Ribs 12 to 26:System penetrations maintained.Thicker web features and taller stringer cut outs.Larger cleats used to fit larger fasteners.

Covers:Skin thickness increase outboard of Rib 11.Topskin material 7449Bottomskin material 2024HDT.Strip milling introduced in change area.

Stringers:Increased height outboard of Rib 11.New btmmaterial 2026.

Systems Installation:New looms for Sharklet, routed outside rib 27.Centre Tank Vent Pipe Modified.

Rib 11y

x

Page 14: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Computers updated for Sharklet

Page 14

No sharklets capability - Std & P/N Sharklets capability - Std & P/N MOD Certif

ELAC B L94 3945128210 or3945129104

B L96 3945128212 or3945129106

160015/P12127

Nov 2012

SEC B’ 122 B372BBM0103 B’ 121 B372BBM0104 160014/P12125

Nov 2012

FCDC 58 15370-1520 59 160051/P12977

Oct 2012

FAC B 620 B397BAM0620 B 622 B397BAM0622 160011/P12126

Nov 2012

FWF H2 F6 350E053021111 H2 F7 350E053021212 153741/P13023

Dec2012

PDBTAV

G2831AAB03 G2831AAC01 160016/P12128

Oct 2012

PDBHWL

PS4087592-902 or HNP53AD06-2002

PS4087592-903 or HNP53AD06-2003

160017/P12129

Oct 2012

Software upgrade via software upload or OBRM

Page 15: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Sharklet introduction – certification

Page 15

• The Sharklet is certified through a significant major change (classification according to EASA Part 21). The target date for the official approval is end of November 2012 for A320.

• The sharklet doesn’t create any new model. For that reason, it remains as part of the existing EASA TC.

• Schedule

20111Q 2Q 3Q 4Q

20121Q 2Q 3Q 4Q

20131Q 2Q 3Q 4Q

20141Q 2Q 3Q 4Q

Page 16: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Sharklets and provisions ramp-up

Page 16

From 2014, every A320 Family delivery can benefit from Sharklets

2012 2013 2014

Q2 2012Provisioned wings EIS

Start of ramp-up

Q4 20121st Sharklets certification, EIS and start of ramp-up

Q4 2013Provisioned Aircraft

reach full production rate

Q1 2014Sharklets available

for all deliveries

Provisions ramp-up

Sharklets ramp-up

Page 17: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Content

Page 17

Technical & project highlights

Sharklet benefits1

2

Entry Into Service 3

Sharklet retrofit solutions4

Summary5

Page 18: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

EIS preparation with Airlines

• Dedicated communication to every Operator delivered with Sharklet

Page 18

EIS plan under deployment, reviewed with every sharklet Operator

→Provides detailed information

→ Allows tailored support to sharklet Operators

→ Very useful feedback gathered

• Maintenance• Technical Publications• Ground Support Equipments• Scheduled maintenance• Structure Repair Manual (SRM)

• Flight Ops & Training• Aircraft Flight Manual (AFM) & Flight Crew manuals (FCOM)• Perfo databases• Configuration Deviation List (CDL)• Master Minimum Equipment List (MMEL)• Weight & Balance Manual (WBM)• Training

• Others• Spares support• Transportation• Supplier contract

Page 19: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Tech Pubs

• Minor adaptations for reinforced Aircraft and sharklet Aircraft

• AMM• Removal / Installation tasks (sharklet, nav and strobe lights)

• Trial performed on Aircraft (see dedicated slide) : AMM validated with minor adaptations needed.

• Sharklet removal / installation duration: around 6 h (excluding sealant curing time)

• Inspections for Schedule maintenance • No or minor update identified on Aircraft structure • New tasks for Rib 27 and sharklet inspections.

• Other minor adaptations

• TSM: no impact identified to this date• IPC: 80 items identified as modified further review on-going.• ASM / AWM: 6 items identified( ATA 33) on-going.

Page 19

Page 20: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

GSE

Page 20

• 7 specific tools considered for Sharklet Removal / installationHoist – Sharklet - 98D57356715

Extractor - Lower Pins - 98D57304000

Grid - Nut Torque - 98D57304001

Collar - Aileron - 98D27104005

Protector - Manhole - 98F57004049

Protector - Sharklet - 98D57304003

Torque Tool - TBC

+ Fuel LEL measuring device

• No specific tools needed for lights

Fuel LEL measuring tool*

* Picture given as illustration only

GSE are planned available for loan and sales stock

Page 21: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

AMM & GSE on Aircraft validation

Page 21

• Maintenance trial performed 24-26 sept 2012 on Flight Test Aircraft• Sharklet Removal/Installation• Lights and PSU Removal/Installation

→ Final draft AMM and GSE final concept used

AMM & GSE validated with minor update needed (ongoing)

Sharklet removal / installation in less than one shift

Page 22: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Scheduled Maintenance

• Reinforced a/c with WTF: no maintenance program change considered.

• Sharklet Aircraft: preliminary assessment done• Minimum impact on existing inspection

• update of interval / threshold• No new task except for sharklet

• New inspections on sharklet and RIB27• RIB 27 lug inspection• Sharklet inspection (borescope)• Threshold/Interval considered: 12 YE / 12 YE

• MRBR/ALS part2 dossier under preparation for Certification

• Reviewed during A318 / A319 / A320 / A321 STRUCTURE WORKING GROUP - SAFAM SWG MEETING 27• 11th – 12th September 2012, Toulouse, France

Page 22 Minimum impact is targeted for sharklet Aircraft

Page 23: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

SRM

Page 23

• Complete revalidation of existing SRM is ongoing for both reinforced Aircraft and Sharklet Aircraft• Objective is to complete all SRM task revalidation by end 2013

• Outlook today indicated 65% temporary & ADL revalidated for SharkletAircraft A320 EIS:

• Nose Fwd fuselage (s11/12), Fwd fuselage (s13/14), Aft fuselage (s18), Aft Tail cone (s19.1), PAX doors, landing gear doors, belly fairings, VTP,THS, rudder, elevator, pylons

• SRM introduction includes Aircraft reinforcement and sharkletmodifications into repairs / ADL effectivity list.• Repairs shown as not applicable would need RAS in case-by-case basis• Sharklet device ADL/Repairs on-going:

• Metallic Leading Edge ADL (Scratches, Gouges, Abrasions, Corrosion and Dents)

• Lightning Strike damage• Sharklet composite structure repairs

• Sharklet SRM coverage will be maintained vs current A320.

Same level of reparability vs current A320 family

Page 24: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Impact Flight Ops & Training Domain

• AFM / FCOM: • To be updated to reflect Perfo improvements• Minor adaptation to reflect sharklet impact on systems

• WBM : no change for A320 possible minor changes on Weight and CG data for A319 or

A321

• MMEL: • Update of perfo charts• Possible update due to introduction of LAF (Load Alleviation Function)

• Maintenance & Flight training: Minor update (mainly on Familiarization training)

• No impact on crew qualification – same type rating

Page 24

Page 25: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Impact Flight Ops & Training Domain - dispatch

• Dispatch after sharklet heavy damage (out of SRM and CDL scope)• Ferry Flight with damaged sharklet removed and replaced by a complete

wingtip (modified wingtip compatible with reinforced wing). • Benefit: Wingtip & fence can be transported in A320 Family. Sharklet can’t.• Will be managed through AFM specific instructions. Targeted at 1Q13• Perfo penalties under definition→ Flight Tests to be completed by end Oct2012

• CDL : complete scope under review• Available at 1st EIS: static discharger.• Other CDL items under review: nav & strobe lights glazing's , PSU access

door

Page 25

Page 26: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Flight Ops : performance tools update

• Impact on performance applications • PEP [Performance Program]

→ new version 5.2.1 with new performance Database• FlySmart with Airbus (former LPC NG)

→ new version L3.2 with new performance DatabasePre-requisite: version L3.0 shall be already in service in the Airline

• Availability• PEP 5.2.1 and PAADMIN 7.1 20 Nov 2012• FlySmart with Airbus 10 Dec 2012• with same performance database as AFM / pending AFM approval

A320 CFM (A320-216 & -214): 30 Nov 2012A320 IAE (A320-232 & -233): 20 Dec 2012

Page 26

Page 27: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Spare & transportation

Page 27

• Spare sharklets• Two sets of sharklets planned to be available at EIS in Airbus to

support the fleet. One set in Singapore and one in Hamburg at EIS.

• Out of production securedParts that will be out of production after Aircraft reinforcement is standard in production have been identified and secured for aftermarket (Airbus Material, Logistics and Suppliers in Hamburg).

• Sharklet transportation• Airworthy box defined→ (H)1186mm X (W)1722mm x (L)4572mm

• Fits in A330/A340 and cargo• Do not fit into A320 Family Aircraft

Page 28: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Content

Page 28

Technical & project highlights

Sharklet benefits1

2

Entry Into Service 3

Sharklet retrofit solutions4

Summary5

Page 29: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Sharklets for the A320 Family

Page 29

New-build aircraft delivered with:• Modified structure (centre wing box and wing)• Required flight computers functionality • Sharklets

Production line

New-build aircraft delivered with modified structureTo be retrofitted post-delivery:

• Flight computers functionality • Sharklets

Production retrofit

Retrofit:• Wing structure reinforcement• Sharklets• Flight computer functionality

In-service retrofit

Page 30: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Sharklet “production” retrofit: Airbus solution

Page 30

Production retrofit availability target : H1 2013

Page 31: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Sharklet “in-service” retrofit: Airbus solution

Page 31

In-service retrofit availability target : end 2013

Page 32: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Sharklet in-service retrofitImpact on the aircraft

Page 32

Pre-requisites(flight computers):• FMGC• SEC• ELAC• FAC• FCDC• FWC

Embodiment time : 10 daysAircraft downtime : 15 days

Page 33: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Content

Page 33

Technical & project highlights

Sharklet benefits1

2

Entry Into Service 3

Sharklet retrofit solutions4

Summary5

Page 34: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Key messages

Page 34

2012 2013 2014

Q2 2012Provisioned wings EIS

Start of ramp-up

Q4 20121st Sharklets certification, EIS and start of ramp-up

1H2013Retrofit solution for Provisioned

Aircraft

Provisions ramp-up

Sharklets ramp-up

1Q2014Retrofit solution for non

Provisioned Aircraft

EIS preparation with Airlines

Page 35: Session presentation - Sharklet Entry into Service

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document. This document and all information contained herein is the sole property of AIRBUS S.A.S. No intellectual property rights are granted by thedelivery of this document or the disclosure of its content. This document shall not be reproduced or disclosed to a third party without the express written consent of AIRBUS S.A.S. This document and its content shall not beused for any purpose other than that for which it is supplied. The statements made herein do not constitute an offer. They are based on the mentioned assumptions and are expressed in good faith. Where the supportinggrounds for these statements are not shown, AIRBUS S.A.S. will be pleased to explain the basis thereof.AIRBUS, its logo, A300, A310, A318, A319, A320, A321, A330, A340, A350, A380, A400M are registered trademarks.

Page 35