Services/Utility Permits/Sprint PCS CH03XC904...all new metallic aerial strand shall be bonded...

13

Transcript of Services/Utility Permits/Sprint PCS CH03XC904...all new metallic aerial strand shall be bonded...

Page 1: Services/Utility Permits/Sprint PCS CH03XC904...all new metallic aerial strand shall be bonded grounded (preferably to the power company neutral) per local requirements. at a minimum.
Page 2: Services/Utility Permits/Sprint PCS CH03XC904...all new metallic aerial strand shall be bonded grounded (preferably to the power company neutral) per local requirements. at a minimum.
Page 3: Services/Utility Permits/Sprint PCS CH03XC904...all new metallic aerial strand shall be bonded grounded (preferably to the power company neutral) per local requirements. at a minimum.
Page 4: Services/Utility Permits/Sprint PCS CH03XC904...all new metallic aerial strand shall be bonded grounded (preferably to the power company neutral) per local requirements. at a minimum.
Page 5: Services/Utility Permits/Sprint PCS CH03XC904...all new metallic aerial strand shall be bonded grounded (preferably to the power company neutral) per local requirements. at a minimum.
Page 6: Services/Utility Permits/Sprint PCS CH03XC904...all new metallic aerial strand shall be bonded grounded (preferably to the power company neutral) per local requirements. at a minimum.
Page 7: Services/Utility Permits/Sprint PCS CH03XC904...all new metallic aerial strand shall be bonded grounded (preferably to the power company neutral) per local requirements. at a minimum.
Page 8: Services/Utility Permits/Sprint PCS CH03XC904...all new metallic aerial strand shall be bonded grounded (preferably to the power company neutral) per local requirements. at a minimum.
Page 9: Services/Utility Permits/Sprint PCS CH03XC904...all new metallic aerial strand shall be bonded grounded (preferably to the power company neutral) per local requirements. at a minimum.
Page 10: Services/Utility Permits/Sprint PCS CH03XC904...all new metallic aerial strand shall be bonded grounded (preferably to the power company neutral) per local requirements. at a minimum.
Page 11: Services/Utility Permits/Sprint PCS CH03XC904...all new metallic aerial strand shall be bonded grounded (preferably to the power company neutral) per local requirements. at a minimum.
Page 12: Services/Utility Permits/Sprint PCS CH03XC904...all new metallic aerial strand shall be bonded grounded (preferably to the power company neutral) per local requirements. at a minimum.
Page 13: Services/Utility Permits/Sprint PCS CH03XC904...all new metallic aerial strand shall be bonded grounded (preferably to the power company neutral) per local requirements. at a minimum.