Services For Engineers & ContractorsServices For Engineers & Contractors
N
Pier 1 Pier 2
SR3 Cooler, Pier No 2 Photos
DrummySpalledSpalled & drummyCrackCold JointPanel Joint
Photo “Cooler P2-02”
Photo “Cooler P2-05”Photo “Cooler P2-04”
Photo “Cooler P2-03”
Photo “Cooler P2-08”
Photo “Cooler P2-07”
Photo “Cooler P2-06”
Photo “Cooler P2-09”
Photo “Cooler P2-10”
Photo “Cooler P2-11”
Photo “Cooler P2-12”
Photo “Cooler P2-13”
Photo “Cooler P2-01”
Papworth’s Pty LtdNarngulu Synthetic Rutile PlantJanuary 2004 InspectionBy F.Papworth Lyall Murphy
Figure 41
Services For Engineers & ContractorsServices For Engineers & Contractors
Acid Leach FoundationDetail 1 in Area ACover & Samples
x xxx
x xxx
x xxx 39mm40mm
40mm41mm
40mm40mm40mm41mm
42mm41mm41mm41mm 200mm
170mm
160mm
590mm
= ==
x Cover in mm, as measured with cover meter75mm diameter grinding core cutResistance for 4 probe Wenner method with probes at 50mm centres
Vertical 25mm Ø bar cover = 40mmHorizontal 12-15mm bar cover = 67mmDepth of Carbonation = 0mm
A (light to moderate etching)A (light to moderate etching)
630mm
1.29m
….
R=2520ohms
ALF/S4
ALF/S3
ALF/S2
A B C D
EF
GHI
J KL M N O P
QN
….
Detail 1
Detail 1
Papworth’s Pty LtdNarngulu Synthetic Rutile PlantJanuary 2004 InspectionBy F.Papworth Lyall Murphy
Figure 5