newsletter VALDARNO engineers are applying to this press all the current systems, concerning electric, electronic, lubrica- tion and pneumatic systems. The mechanic details will be checked in all their parts to guarantee the absence of breakages. The press will be tested at VALDARNO site, completely in working, disassem- bled and re-assembled at customer’s premises for the final testing. Industrial economic recovery is coming true. VALDARNO have several requests both for complete equipment and for single machines from all around the world. At the moment, several customers purchased considerably large- sized presses and committed VALDARNO for complete overhauling, fit for making the machines safe for their production, and mostly for updating them with the current safety regulations. 6000 ton hot forging press AJAX VALDARNO September 2011 At a glance: At a glance: At a glance: At a glance: 6000 ton hot forging press AJAX 4000 ton press brand EUMUCO VALDARNO engagement aims to render this press with all its features in order to consider it as new, with a realization cost that is about 50% compared with a new machine. VALDARNO supplies to its customers all the necessary assistance for the assembly of the press. The personnel is conscious that suitable foundations are needed, that’s why they are calcu- lated ad hoc for each machine. This project takes about 6 months of work.

Transcript of September 2011 newsletter - valdarnopresse.comnewsletter VALDARNO engineers are applying to this...

newsletter

VALDARNO engineers are applying to this press all the current systems, concerning electric, electronic, lubrica-tion and pneumatic systems. The mechanic details will be checked in all their parts to guarantee the absence of breakages. The press will be tested at VALDARNO site, completely in working, disassem-bled and re-assembled at customer’s premises for the final testing.

Industrial economic recovery is coming true. VALDARNO have several requests both for complete equipment and for single machines from all around the world. At the moment, several customers purchased considerably large-sized presses and committed VALDARNO for complete overhauling, fit for making the machines safe for their

production, and mostly for updating them with the current safety regulations.

6000 ton hot forging press AJAX

VALDARNO September 2011

At a glance:At a glance:At a glance:At a glance:

• 6000 ton

hot forging press

AJAX

• 4000 ton

press brand

EUMUCO

VALDARNO engagement aims to render this press with all its features in order to consider it as new, with a realization cost that is about 50% compared with a new machine. VALDARNO supplies to its customers all the necessary assistance for the assembly of the press. The personnel is conscious that suitable foundations are needed, that’s why they are calcu-lated ad hoc for each machine. This project takes about 6 months of work.

newsletter

At the moment VALDARNO is over-hauling an important machine with nominal force 4000 tons. The objective is to return to the customer a machine similar to a new one. Also in this case, all the mechanic parts component the press will be inspected and guaran-

teed by VALDARNO.

The replacement of the systems besides the press and a modern electronic control system of all the stages will allow, if necessary, the installation of robots for automatic

production.

Several VALDARNO customers ask to take care of the manufacturing of complete lines. In the case of this EUMUCO 4000 tons, VALDARNO will supply and install a complete line

for hot forging.

4000 ton press brand EUMUCO

The main components of this line will be:

◊ One completely automated hot

shear for billets with 140 mm

section. This machine is equipped

with a 2000 kW induction heater.

◊ One trimming press will be placed

after the forging operation. This

press will be automated by an

anthropomorphic robot.

◊ A second mechanical press will be

placed as final stage for the hot

coining of the pieces coming from

forging and trimming operations.

VALDARNO is able to place, or better, to palletize the pieces coming from the line in an ordered way in apposite containers, suitable for being inserted in heat treatment

furnaces.

VALDARNO September 2011

newsletter

VALDARNO September 2011

In 2009 the VALDARNO staff has moved into the new offices building, where are performed all the design, purchase and foreign trade activities, post-

selling assistance and accounting department.

New offices building for VALDARNO staff

Forging solutions since 1949

Established in 1949, VALDARNO develops, designs, builds

and supplies machines, equipment and lines mainly for the

close die forging industry.

During many years of close and daily contact with companies

and industry operators, in Italy and abroad, VALDARNO has

aquired knowledge and competences which enable its specialists

and engineers to study, realize and propose manufacturing solu-

tions expressively designed for specific fields, such as, for

example, the production of leaf springs, spiral springs, high

resistance bolts, motor valves, tube fittings by hydro forming.

VALDARNO Cesoie Punzonatrici e Presse s.r.l.

Via Laghetto, 2

21020 Mornago (VA)

Italy

Tel.: +39 0331 901 130

Fax: +39 0331 904 377

E-mail: [email protected]

VALDARNO

Forging solutions since 1949

Hall 14 - Stand B60

September 2011