September 10, 20 01 1 Task Lead Due Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1. Complete unit level testing– Linda K, Robert, Gavin, Allison 2. Complete build & EEPROM install – Justin, Robert 3. Update HW/SW I/F Document – Chris This build completes code & unit test for the following 4 CSCs:, - CS DCE, CS DIB, CS MCE, DIB CSCI Chris Dorato 1. Sept 14 2. Sept 21 3. Sept 21 COS FSW Build 3.2 HW needs: nothing new FSW support to MEB testing takes no more than 1 week Complete code development: 1. Mechanisms part2 – Robert, Linda 2. Diagnostics – Linda 3. Start Target Acquisition - Robert 4. Complete code walkthrough 5. Complete unit level testing 6. Complete build & EEPROM install – Justin, Linda Chris Dorato 1.Oct 12 2.Oct 26 3.TBD 4.Nov 9 5.Dec 31 6. Jan 4, 2002 HST Software & Operations Task/Action Status

Transcript of September 10, 20011 TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs:...

Page 1: September 10, 20011 TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit.

September 10, 2001 1

Task Lead Due Dates

COS FSW Build 3.1 (Preparation for MEB Functional)

HW needs: fully functional Mechanism Simulator

1. Complete unit level testing– Linda K, Robert, Gavin, Allison

2. Complete build & EEPROM install – Justin, Robert

3. Update HW/SW I/F Document – Chris

This build completes code & unit test for the following 4 CSCs:,

- CS DCE, CS DIB, CS MCE, DIB CSCI

Chris Dorato

1. Sept 14

2. Sept 21

3. Sept 21

COS FSW Build 3.2

HW needs: nothing new

FSW support to MEB testing takes no more than 1 week

Complete code development:

1. Mechanisms part2 – Robert, Linda

2. Diagnostics – Linda

3. Start Target Acquisition - Robert

4. Complete code walkthrough

5. Complete unit level testing

6. Complete build & EEPROM install – Justin, Linda

This build completes code & unit test for the following 2 CSCs:

- Mechanisms & Lamps , Diagnostics

Chris Dorato

1. Oct 12

2. Oct 26

3. TBD

4. Nov 9

5. Dec 31

6. Jan 4, 2002

HST Software & Operations Task/Action Status

Page 2: September 10, 20011 TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit.

September 10, 2001 2

Task Lead Due Dates

COS FSW Build 4

HW needs: nothing new

1. Complete code development

2. Complete code walkthrough

3. Complete unit level testing

4. Complete build & EEPROM install

5. Linkfile updates & general cleanup

This build completes code & unit test for the last CSC: Target Acquisition

Chris Dorato

1. Feb 15, 2002

2. Mar 1, 2002

3. Apr 3, 2002

4. Apr 5, 2002

5. Apr 30, 2002

HST Software & Operations Task/Action Status

Page 3: September 10, 20011 TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit.

September 10, 2001 3

Task Lead Due Dates

COS FSW Component Testing – Build 3.1

1. Complete Memory Load & Copy – Steve

2. Complete CS DIB – Hugh

3. Complete NED – Adam

4. Complete Memory/Image Dump – Steve

5. Complete CS DCE – Adam, Gary

Denise Miller

1. Aug 22

2. Nov 30

3. Oct 5

4. TBD

5. Oct 15

COS FSW Component Testing – Build 3.2

1. Start Diagnostics – Denise

2. Complete Mechanism & Lamps – Tina

3. Complete CS MCE – Denise

4. Complete DIB CSCI – Hugh

Denise Miller

1. Aug 22

2. Aug 21

3. Nov 30

4. Oct 5

COS FSW Component Testing – Build 4

1. Complete Buffer Memory Management – Steve

2. Start Diagnostics – Denise

3. Start Target Acquisition – Hugh

4. Start System Init & Service Functions – Steve

Denise Miller

1. Aug 22

2. Aug 21

3. Nov 30

4. Oct 5

HST Software & Operations Task/Action Status

Page 4: September 10, 20011 TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit.

September 10, 2001 4

Component Test Plan & Peer Review

Test Procedure & Peer Review

I&T w/FSW & Dry Run

Run for Record

Memory Load & Copy (SP)

CS DIB

(HM)

NED

(AT)

Memory/Image Dump

(SP)

CS DCE

(AT, GW)

Diagnostics

(DM)

Mechanisms & Lamps (TF)

CS MCE

(DM)

DIB CSCI

(HM)

Target Acquisition

(HM)

System Init & Service Functions (SP)

HST Software & Operations Task/Action Status

FSW Bld 3.1

FSW Bld 3.2

FSW Bld 4

Page 5: September 10, 20011 TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit.

September 10, 2001 5

HST Software & Operations Task/Action Status

Sept Oct Nov Dec Jan Feb Mar Apr May Jun July Aug Sept

Mech & Lamp (Tina)

Mech & Lamp (Tina)

COS WFC3

2001 2002

Page 6: September 10, 20011 TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit.

September 10, 2001 6

Task Lead Due Dates

COS Non-Flight Software

1. Get the FUV detector simulator working – Dina, Allison

- verify simulator responses for Door commands + 3 others

- review all needed Ops changes w/Linda R

2. Mechanism test software ready for Aperture testing – Jeff

3. CM control for non-flight software – Justin

Chris Dorato

1. August 29

2. November 1

3. August 31

COS MEB Functional Test

1. Mech Sim test and certify – Mike M

2. CEDER Training - Stephane

3. Test Set Equip. (Cables, LVPS loads, etc.) – Chuck Yanoski

4. FUV Detector Simulator ready – Dina, Allison

5. Test procedure development – Sue, Tina

6. Ops product development & database certification – Linda R

7. Flight Electronics Ready ************ - Virg

8. Flight database build complete – Chris B

9. Flight software build complete – Justin, Robert

10. Dry run test on SW/Ops Test Bench – Sue, Linda, Ken, Soraya

11. Test readiness review – Sue

12. Standalone backup – Adam

13. Rebuild flight software & database if necessary

14. Load Build 3.1x onto flight hardware – Justin, Robert, Soraya

Sue Ross

1. Aug 28

2. Aug 24

3. Aug 29

4. Aug 29

5. Aug 29

6. Sept 7

7. Aug 24

8. Sept 20

9. Sept 21

10. Oct 5

11. Oct 5

12. Oct 8

13. Oct 10

14. Oct 10

HST Software & Operations Task/Action Status

Page 7: September 10, 20011 TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit.

September 10, 2001 7

HST Software & Operations Task/Action StatusTask Lead Due Dates

COS FUV ETU HW/SW Integration Test

1. Receive ETU from Berkeley – Ken

2. FSW Bld 3.02 (CS DIB) load & checkout on bench – Chris D.

3. Generate test plan – Ken

4. Complete Test #2 with new DCE & CS DCE code

5. Update both benches with DCE code - Justin

6. Send image data to STScI – Ken

Ken Brownsberger 1. Aug 15

2. Aug 13

3. Aug 17

4. Aug 24

5. Sept 3

6. Sept 3

COS OSM2 I/F Test

AI: GB – resolve schedule/resource conflict

AI: TF – contact cleanroom people for flow bench certification

AI: TF – coordinate w/Chuck Y. on cable needs

HW needs: Ops test bench w/ new mech sim, Flow bench, OSM2, cable, scope (in cal) w/prob

1. OSM2 available for test (binding problem)

2. Complete test procedure and conduct peer review – Tina, Jeff

3. FSW Build 3.1 image ready – Chris D.

4. Dry run procedure

5. Run test bench certification procedure – Tina, Jeff

6. Test Readiness Review – Tina, Jeff

7. Perform test – Tina, Jeff

Tina Fredo

1. Sept 20

2. Sept 7

3. Sept 21

4. Sept 24

5. Sept 27

6. Oct 1

7. Oct 1

Page 8: September 10, 20011 TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit.

September 10, 2001 8

HST Software & Operations Task/Action Status

Task Lead Due Dates

COS Software & Mechanism I/F Testing

1. OSM1 – Tina, Jeff

2. Aperture – Tina, Jeff

Tina Fredo

1. October 26

2. November 22

COS Documentation

1. DM-01 SI Commands List – Chris B

2. DM-02 Engineering Data List – Chris B

3. DM-03 FSW Everything Document – Chris D

- Update requirements, hold CCB & re-release

4. DM-04 GSE Software – Dina

5. DM-05 Command Definition – Linda R

6. DM-06 Science Data Format – Linda K

7. DM-08 FSW Test Procedure – Denise

8. DM-14 Telemetry Calibration List – Chris B

9. OP-04 Constraints And Restrictions Document (CARD) – Hugh

10. OP-04 Operations Limitations Document (OLD) – Hugh

Grant Blue

1. Sept 2002

2. Sept 2002

3. Sept 2002

Sept 2001

4. Sept 2002

5. Oct 31, 2001

6. Sept 2002

7. Dec. 15, 2001

8. Sept 2002

9. TBD

10.TBD

SI Delivery Date: Sept 29, 2002

Page 9: September 10, 20011 TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit.

September 10, 2001 9

COS Action Item List1. GB – Remind Electronics group that the Test Bench MEB must stay current

with the flight MEB ** COMPLETE **

2. GB – Get Mike Malone to update both COS Mechanism simulators.

3. JS – Learn how to modify the Mechanism simulator for future changes

4. GB – Update the plan for COS component test activities.

HST Software & Operations Task/Action Status

Page 10: September 10, 20011 TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit.

September 10, 2001 10

HST Software & Operations Task/Action Status

Task Lead Due Dates

WFC3 Flight Software Build 2.1 (finish on WFC3 Test Bench)

HW needs: MEB CS (in place)

1. Execute performance testing on Operate code

2. Complete unit test documentation

3. Operate 2.1 Build, EEPROM load & verification

4. Database build & SITS install – Mike

This build completes code & unit test for the following 7 CSCs:

- Command, Telemetry, Error, Limits,

- Memory/Image Dump, Memory Load & Copy,

- Buffer Memory Management

Chris Dorato

1. Aug 29

2. Aug 31

3. Aug 31

4. Aug 31

BOOT Code Development & Test

HW needs: MEB CS (in place), SES1 (10/29)

1. Complete code walkthrough – Dominic

2. Complete I&T on test bench – Dominic

3. Burn PROM, install on benches and verify– Dominic, Jason

This effort completes code & unit test for the BOOT CSC

Chris Dorato

1. Oct 15

2. Nov 12

3. Nov 16

Page 11: September 10, 20011 TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit.

September 10, 2001 11

HST Software & Operations Task/Action StatusTask Lead Due Dates

WFC3 Flight Software Build 2.2

HW needs: SES2 (10/19), SES3 (9/14), SES4(9/7), MecSim1 (10/1)

1. Complete code development:

- Mechanisms (SOFA, Shutter, Correctors) – TBD, TBD

- Service Functions - TBD

2. Complete code walkthrough – Jason, Dominic

3. Complete unit level testing – J, D, G

4. Complete build & EEPROM install – Gavin, Jason, Dominic

This build completes code & unit test for the Service Functions CSC

Chris Dorato

1. Oct 1

2. Oct 15

3. Nov 15

4. Nov 17

WFC3 Flight Software Build 2.3

HW needs: SES1 (10/29), SES2 (10/19), MecSim2 (11/15)

1. Complete code development:

- Mechanisms (CSM, IR, FSM, Lamps) – TBD

- NED – TBD

- Diagnostics - TBD

2. Complete code walkthrough – J, D, G

3. Complete unit level testing – J, D, G

4. Complete build & EEPROM install – Gavin, Jason, Dominic

This build completes code & unit test for the following 3 CSCs:

- Mechanisms & Lamps, NED, Diagnostics

Chris Dorato

1. Nov 30

2. Dec 15

3. Jan 15, 2002

4. Jan 17, 2002

Page 12: September 10, 20011 TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit.

September 10, 2001 12

HST Software & Operations Task/Action Status

Task Lead Due Dates

WFC3 Flight Software Build 3

HW needs: complete test bench (December)

GSE SW needs: Detector Simulator, Science Data Generator

1. Complete code development:

- UVIS Detector (BOE: ACS MCE/MIE) – TBD

- IR Detector – TBD

2. Complete code walkthrough – J, D, G

3. Complete unit level testing – J, D, G

4. Complete build & EEPROM install – Gavin, Jason, Dominic

This build completes code & unit test for the last CSCs:

- UVIS Detector, IR Detector

Chris Dorato

1. Dec 31

2. Jan 15, 2002

3. Mar 15, 2002

4. Mar 30, 2002

IR: 100 days Start: 11/1/01 BOE: ACS MCE & MIE

UVIS: 40 days

Page 13: September 10, 20011 TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit.

September 10, 2001 13

Component Test Plan & Peer Review

Test Procedure & Peer Review

I&T w/FSW & Dry Run

Run for Record

Command August 22

Steve & Chris

Telemetry August 22

Steve & Chris

Error November 30

Hugh & Jeff

Limits November 30

Hugh & Jeff

Memory/Image Dump

November 30

Hugh & Jeff

Memory Load & Copy

November 30

Hugh & Jeff

Buffer Memory Mgt

October 5

Adam & TBD

Boot October 5

Adam & TBD

HST Software & Operations Task/Action Status

FSW Bld 2.1

Page 14: September 10, 20011 TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit.

September 10, 2001 14

Component Test Plan & CCL Development

Peer Review Procedure Testing

Run for Record

Service Functions August 22

Steve & Chris

NED August 22

Steve & Chris

Diagnostics November 30

Hugh & Jeff

Mechanisms & Lamps

October 5

Adam & TBD

IR Detector TBD

Steve

UVIS Detector October 15

Gary & Allison

HST Software & Operations Task/Action Status

FSW Bld 2.3

FSW Bld 4

FSW Bld 2.2

Page 15: September 10, 20011 TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit.

September 10, 2001 15

HST Software & Operations Task/Action Status

Task Lead Due Dates

WFC3 FSW Component Test – Build 2.1

1. Start Telemetry – Adam

2. Start Buffer Memory Management – Gary

3. Start Limit Checking – Denise

4. Start Memory/Image Dump – Steve

5. Complete Command – Todd, Denise

6. Complete Memory Load & Copy – Steve

7. Complete Telemetry – Adam

8. Complete Buffer Memory Management – Gary

9. Complete Limit Checking – Denise

10. Complete Error Handling – Gary

11. Complete Memory/Image Dump – Steve

Denise Miller

1. TBD

2. TBD

3. TBD

4. TBD

5. October

6. October

7. October

8. October

9. October

10. October

11. October

WFC3 FSW Component Test – Boot

1. Complete Boot – Denise, Todd

Denise Miller

1. Dec 15

Page 16: September 10, 20011 TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit.

September 10, 2001 16

HST Software & Operations Task/Action Status

Task Lead Dates

WFC3 FSW Component Test – Build 2.2

1. Start Mechanisms & Lamps (Part 1) – Gary

2. Start Sys Init & Service Functions – Adam, Steve

3. Complete Mechanisms & Lamps (Part 1) – Gary

4. Complete Sys Init & Service Functions – Adam, Steve

Denise Miller

1. TBD

2. TBD

3. January

4. January

WFC3 FSW Component Test – Build 2.3

1. Start NED – Adam

2. Start Diagnostics – Denise

3. Start Mechanisms & Lamps (Part 2) – Gary

4. Complete NED – Adam

5. Complete Diagnostics – Denise

6. Complete Mechanisms & Lamps (Part 2) – Gary

Denise Miller

1. December

2. December

3. December

4. February

5. February

6. March

WFC3 FSW Component Test – Build 3

1. Start IR Detector – Gary

2. Start UVIS Detector – Steve

3. Complete IR Detector – Gary

4. Complete UVIS Detector – Steve

Denise Miller

1. TBD2. TBD 3. September

4. September

Page 17: September 10, 20011 TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit.

September 10, 2001 17

Task Lead Due Dates

WFC3 Non-Flight Software

1. MEB sim CEB/DEB cmds (MEB Com board testing w/ Proto)

2. UVIS & IR Detector Sim (runs on PC in SW Test Bench)

- supports HW Detector Simulator & FSW testing

3. MEB sim UVIS & IR image cmd & data capture

- supports HW Detector Simulator testing using Proto

4. UVIS/IR Science Data Generator

- supports FSW testing

5. Det Sim HW checkout with SES1 board (Proto sw update)

6. [DEB/CEB] Test Controller (MEB sim) – Dina

- need direction from I&T to start (Mark B: “Hold off”)

7. Mech test software: UVIS Corrector – Jeff

8. Mech test software: IR Filter Wheel – Jeff

9. Mech test software: Channel Select – Jeff

10. Mech test software: UVIS Shutter – Jeff

11. Mech test software: IR Corrector – Jeff

Chris Dorato

1. Aug 31

2. Sept 21

3. Sept 21

4. Dec 1

5. TBD

6. Sept 13

7. Oct 17

8. Oct 19

9. Nov 19

10. Oct 17

11. Oct 17

HST Software & Operations Task/Action Status

Dates driven by Mech hw & test set development

Current date: Oct 17

Page 18: September 10, 20011 TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit.

September 10, 2001 18

HST Software & Operations Task/Action Status

Task Lead Due Dates

WFC3 Documentation

1. DM-01 SI Commands List (IR: 3/27/01) – Mike

2. DM-02 Engineering Data List – Mike

3. DM-03 FSW Design Document – Chris D

4. DM-04 GSE Software – Dina

5. DM-05 Command Definition (IR: 5/17/01) – Mike

6. DM-06 Science Data Format (IR SER: 6/29/01) – Mike

7. DM-08 FSW Test Procedure – Denise

8. DM-14 Telemetry Calibration List – Mike

9. OP-04 Constraints & Restrictions Doc (CARD) – Tim, Todd

10.OP-04 Operations Limitations Document (OLD) – Tim, Todd

Grant Blue

1. Aug 15, 2002

2. Sept 10, 2001

3. Aug 29, 2001

4. Aug 15, 2002

5. Sept 30, 2001

6. Oct 15, 2001

7. TBD

8. Nov 30, 2001

9. TBD

10.TBD

SI Delivery Date: Aug 15, 2002

Page 19: September 10, 20011 TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit.

September 10, 2001 19

Task Lead Due Dates

Schedules

1. Update Master Schedule – Grant

Grant Blue

1. Aug 24

COS/WFC3 Transition Plan

1. COS/WFC3 Transition Plan: Generate Initial Release

2. STScI Memo of Understanding (COS images)

Grant Blue

1. Aug 31

2. Aug 31

WFC3 Descope List:

Need 6 ideas for each IPT

- Cost: Low <$250, Med, >$1M High

- Schedule: Low <5 days, Med, >25 days High

1. Send data to Mike Davis

Grant Blue

1. Aug 30

HST Software & Operations Task/Action Status

Page 20: September 10, 20011 TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit.

September 10, 2001 20

WFC3 Action Item List1. GB – Resolve date conflict: Build 2.3 and 3.0

2. GB/JP replan the Mechanism test schedule

3. GB present COS/WFC3 Risk list at next staff meeting (9-10-01)

4. GB define date for DM-08 & OP-04