Project Number Sheet Number Owner Prime Contractor Traffic Control Contractor Project Name Date Prepared By Phone Montana Dept. of Transportation Van Buren Interchange Knife River MWHC (406)782-1422 1 9/1/2020 Cody Cunningham SPEED LIMIT 80 ROAD WORK AHEAD FINES DOUBLE WHEN WORKERS PRESENT SPEED LIMIT 55 SPEED LIMIT 55 2,880’ *Barrels to be spaced at 60’ RIGHT LANE CLOSED 1 MILE 320’ NOTES: Single lane closures as shown above will be used in both EB and WB directions during milling and paving of ramps. See Sheets 2 & 3 for details related to each ramp.

Transcript of Sept. 2020 Van Buren Traffic Control Plan€¦ · Van Buren Interchange Knife River MWHC...

Page 1: Sept. 2020 Van Buren Traffic Control Plan€¦ · Van Buren Interchange Knife River MWHC (406)782-1422 2 9/1/2020 Cody Cunningham Variable message board to be placed in advance of

Project Number

Sheet Number

Owner

Prime Contractor Traffic Control Contractor

Project Name

Date

Prepared By

Phone

Montana Dept. of Transportation

Van Buren Interchange

Knife River MWHC

(406)782-1422 1 9/1/2020

Cody Cunningham

SPEEDLIMIT

80

ROADWORKAHEAD

FINESDOUBLEWHEN

WORKERSPRESENT

SPEEDLIMIT

55

SPEEDLIMIT

55

2,880’

*Barrels to be spaced at 60’

RIGHT LANECLOSED1 MILE

320’

NOTES:Single lane closures as shown above will be used in bothEB and WB directions during milling and paving of ramps.

See Sheets 2 & 3 for details related to each ramp.

Page 2: Sept. 2020 Van Buren Traffic Control Plan€¦ · Van Buren Interchange Knife River MWHC (406)782-1422 2 9/1/2020 Cody Cunningham Variable message board to be placed in advance of

RO

AD

CLO

SED

See Sheet 1

Project Number

Sheet Number

Owner

Prime Contractor Traffic Control Contractor

Project Name

Date

Prepared By

Phone

Montana Dept. of Transportation

Van Buren Interchange

Knife River MWHC

(406)782-1422 2 9/1/2020

Cody Cunningham

Variable message board to be placedin advance of the Orange St exit towarn motorists of the Van Buren closureand allow them an opportunity to exit prior.

EXIT 105CLOSEDAHEAD

DETOUREXIT 104

Page 3: Sept. 2020 Van Buren Traffic Control Plan€¦ · Van Buren Interchange Knife River MWHC (406)782-1422 2 9/1/2020 Cody Cunningham Variable message board to be placed in advance of

Project Number

Sheet Number

Owner

Prime Contractor Traffic Control Contractor

Project Name

Date

Prepared By

Phone

Montana Dept. of Transportation

Van Buren Interchange

Knife River MWHC

(406)782-1422 3 9/1/2020

Cody Cunningham

RO

AD

CLO

SED

ROAD

WORK

AHEAD

ROAD

WORK

AHEAD