Sept. 2020 Van Buren Traffic Control Plan€¦ · Van Buren Interchange Knife River MWHC...
Transcript of Sept. 2020 Van Buren Traffic Control Plan€¦ · Van Buren Interchange Knife River MWHC...
Project Number
Sheet Number
Owner
Prime Contractor Traffic Control Contractor
Project Name
Date
Prepared By
Phone
Montana Dept. of Transportation
Van Buren Interchange
Knife River MWHC
(406)782-1422 1 9/1/2020
Cody Cunningham
SPEEDLIMIT
80
ROADWORKAHEAD
FINESDOUBLEWHEN
WORKERSPRESENT
SPEEDLIMIT
55
SPEEDLIMIT
55
2,880’
*Barrels to be spaced at 60’
RIGHT LANECLOSED1 MILE
320’
NOTES:Single lane closures as shown above will be used in bothEB and WB directions during milling and paving of ramps.
See Sheets 2 & 3 for details related to each ramp.
RO
AD
CLO
SED
See Sheet 1
Project Number
Sheet Number
Owner
Prime Contractor Traffic Control Contractor
Project Name
Date
Prepared By
Phone
Montana Dept. of Transportation
Van Buren Interchange
Knife River MWHC
(406)782-1422 2 9/1/2020
Cody Cunningham
Variable message board to be placedin advance of the Orange St exit towarn motorists of the Van Buren closureand allow them an opportunity to exit prior.
EXIT 105CLOSEDAHEAD
DETOUREXIT 104
Project Number
Sheet Number
Owner
Prime Contractor Traffic Control Contractor
Project Name
Date
Prepared By
Phone
Montana Dept. of Transportation
Van Buren Interchange
Knife River MWHC
(406)782-1422 3 9/1/2020
Cody Cunningham
RO
AD
CLO
SED
ROAD
WORK
AHEAD
ROAD
WORK
AHEAD