SEP 8 J 18 - Ontario...M SEP 8 J 18 S, 5 c^r* b 4tl14NE0e23 eel8 ROBERTS 010 ESTIMATE OF EXCAVATIONS...
Transcript of SEP 8 J 18 - Ontario...M SEP 8 J 18 S, 5 c^r* b 4tl14NE0e23 eel8 ROBERTS 010 ESTIMATE OF EXCAVATIONS...
-,''
MSEP 8 J 18
S, 5 c^r* b4tl14NE0e23 eel8 ROBERTS 010
ESTIMATE OF EXCAVATIONS - SHAFTS. PITS R TRENCHES- completed during sampling program -
FEBRUARY 15, 1969 - to - OCTOBER 20, 1969 NORDIC INDUSTRIES LIMITED ROBERTS RIVER PROPERTY
- on -
CLAIMS Nos. S.149135; S.149137; S.149138; S.153604TOWNSHIP OF ROBERTS Ontario
SUDBURY MINING DIVISIONCanada
Toronto, Canada March 5th, 1970 REVISED:-Ouly 26, 1971
A. S. Bayne i Company Consulting Engineers
-A B. BAYNE li COMPANY. CONSULTING ENGINCCR*. TORONTO. CANADA
*ESTIMATE OF EXCAVATIONS - SHAFTS. PITS 4 TRENCHES PageNORDIC INDUSTRIES LIMITED ~ ROBERTS RIVER PROPERTY - SUDBURY MINING DIV'N
SITE; N.E. CORNER CLAIM S. 149137; S.E. CORNER CLAIM S.149135;CORNER CLAIM S.153604; N.W. CORNER CLAIM S. 149138. These four claims
are part of group of 34 contiguous claims numbered: S.149135 to S.149140 Inclusive; S.153217 to S.153232 Inclusive; S. 153'599 to S.153610 Inclusive.
^INTRODUCTORY NOTES
Due to the physical irregularities of shape inherent in this type of excav ation, the lengths, widths and depths recorded on Pages 243 following, are mainly overall dimensions for statistical purposes. They were not in most cases used for calculation of volumes, which were derived from precise field measurement reduced to 20' - l " sketches of plan and profile, by method generally accepted in assessing mine and foundation contractors' economic performance.
Location of the excavations, as shown on our Sampling Plan of August 20, 1969, enclosed herewith, was carried out by precise 3-dimensional survey by D. W. Endleman, O.L.S. V P.Fng. No. 3 Post .(southwest corner),of Claim No. 149137, was tied in during this survey when Stations A S B were permanently established. No. l Post of S.149137 was precisely tied in to Stations A 8. B on July 24, 1971. .Sjjc Sampling Plan Revised July 26,1971.
SUMMARY OF ESTIMATES
EXCAVATION LOCATIONS MATERIAL EXCAVATED AMOUNT OF MATERIAL EXCAVATED
l
Stripping:Trenches Nos. l to 9 Pits Nos. l to 9TOTAL STRIPPING:
Boulders X gravel
VOLUME (cu. yd.
1,8433,3645,207
WEIGHT (tons)2,5034.5437,046
Mining:Pits Nos. l to 9 Shafts Nos. l 4 2
Mississagi Quartzite
TOTAL MINING:
GRAND TOTAL- STRIPPING 4 MINING: - both -
937776
1,713
6.920
2,1111,745
3,856
10,902
DIMENSIONAL STATISTICS
Strike-length cross-sectioned at intervals(Pit l to Tr. 9): 1,650 feet
TOTAL LENGTH STRIPPED ACROSS STRIKE(Tr.1 to 9)*(Pit l to 9): 1,416 feetWIDTH OF STRIP TRENCHES 10 - to - 30 feetVERTICAL DEPTH OF STRIP TRENCHES 3 - to - 15 feet
TOTAL LENGTH MINED ACROSS STRIKE(Shafts 142)*(PUs l to 9) 759 feetWIDTH OF PIT 4 SHAFT MINING 10 - to - 30 feetVERTICAL DEPTH OF SHAFTS 29 - to - 31 feetVERTICAL DEPTH OF PITS 2 - t tj - 10 feet
A. S. BAYNE A COMPANY, CONSULTING ENGINEERS. TORONTO. CANADA
Bayne, P,Eng, March 5, 1970
Revised July 26,1971.
ESTIMATE OF EXCAVATIONS ~-SHAFTS, .PITS 4 TRENCHES.- NORDIC INDUSTRIES LTD.WORK SITE; See enclosed "Sampling Plan 1.1. The estimates following are calculated
-.Legend--' for definition of Shaft, Pitfrom precise field measurement and precise A- 4 B are steel pins 1n bedrock and are establisPermanent Survey Stations (bench marks) A-& B are steel pins 1n bedrock and are established
celestial observation by D. ,W. Endleman, O.L.S., P.Eng., 1n July, 1969, during which period the shafts, pits and trenches, and No. 3 Post of S. 149137 were also established by precise survej On July 24, 1971, the location of No. 3 Post of S.149137 was again checked by A, S, Bayne, P.Eng and the No. l Post of S .149137,(also the location of No. 2 Post, S.149135; No. 3 Post,S.153604; No. 4 Post S.149138), was located by precise Instrument survey from Stations A S B. This location of No. l Post S.149137 1s 189.63 feet, on a bearing of S.850 Q6' 30" W. from permanent survey Station "B". SEE - "SAMPLING PLAN - part of Roberts River Claims held by Nordic Industries Ltd. dated August 20, 1969, Revised July 26, 1971, by A. S. Bayne i C ompany, Consulting Engineers.
LOCATION
SHAFT No. l
STRIPPING OVERBURDEN-BOULDER 8. GRAVELLENGTH WIDTH DEPTH *VOLUME WEIGHT (feet) (feet) (feet) (cu.yd.) (tons)
HARD-ROCK MINING SHAFTS J PITSLENGTH WIDTH DEPTH *VOLUME WEIGHT (feet) (feet) (feet) (cu.y3T) (tons)
SinkingWall SlashTotal - Shaft No. lSHAFT No. 2: (Sinking only) TOTAL:SHAFT jjfl i i Z:
8"TJ
10
Sinking . Wall Slash
GRAND TOTAL- SHAFTS
29T9-
31
60
172374 5?6230
387841
517
l S
PIT No.n nn nn nM tl
II II
II II
II II
M II
It M
TOTAL-9
1234566A789PITS
4016076
145806770
12011560
933
203012131815 '20n1515
10736
1086324
GRAND TOTAL SHAFTS A PITS:
556 751900 1,215110 149400 540500 675270 365250 338120 162128 173130 175
3,364 4.543
3,364 4,543
IBC50
160553522677065
11560
699
402 904374 841776" l ,7~4T
103012131015151015-11
25635334 33
102758030407070
10019270
236191806890
158158225432158
937 2.111
*Noto: Nominal Length-width-depth ; not for volume calculation,l ,713 3,856
*yne-,P.Eng. March 5^ 970Revised July 26, 1971
- continued from Page 1 - ESTIMATE OF EXCAVATIONS - SHAFTS. PITS t, TRENCHES
NORDIC INDUSTRIES LIMITED - ROBERTS RIVER PROPERTY - SUDBURY MINING DIVISION-- ONTARIO, CAiflfBA ; WORK SITE; N.E.'CORNER-CLAIM S.149137; S.E. CORNER CLAIM S.149135; S.W. CORNER CLAIM S.153604;
N.W. CORNER CLAIM S. 149138. See - "Sampling Plan" dated August 20,1969 Revised July 26, 1971 noted on Page 2 of these Estimates.
STRIPPING OVERBURDEN-BOULDER 4 GRAVEL
LOCATION LENGTH WIDTH DEPTH *VOLUME WEIGHT(feet) (feet )(feet ) (cu.yd.) (tons)
TRENCH No. 1 35 15 12 233 315 2 35 10 10 130 175
"3 17 5 6 19 26 4 30 30 15 500 675
"5 70 14 15 300 405 " 6 20 5 5 19 41
6A 50 7 4 52 70 " "7 140 20 4 415 560 '
"8 25 ' 8 14 104 140 " "9 60 8 4 71 96
TOTALF'w'd
TOTAL
TOTAL
TOTAL
GRAND
-9 TRENCHES: 483 1 ,843 2,503
from Page 1 :- -9 PITS: 933 3,364 4,543
: 9 PITS TRENCHES: 1 |( 416 5.*.?.9Z Z.lAlfc
: SHAFT 9 1 A SHAFT i 2 : -
TOTALSHAFTS * PITS
* TRENCHES: 1 .416 5,207 7,046
e ' - . - ":
HARD-ROCK MINING - SHAFTS 4 PITS
LENGTH WIDTH DEPTH *VOLUME WEIGHT(feet) (feet )(feet ) (cu.yd.)(tons)
M M M m m
m m ' m m m
m m urn mm
m m m mm
m m m^ m w
699 937 2,111
699 . 937 2.111
60 60 776 1,745
A, . - '
759 1 .713 3.856
A. S. Bayne, P.Eng March 5,1970
COMPANY', coNtuLTiNo CNOINCCKS, TORONTO, CANADA ReVlsed'OUly 26 i 197]
NORDIC MINES t INVESTMENTS LIMITED NORDIC INDUSTRIES LIMITED (SUCCESSOR)
SUMMARY OF ANALYSES OF BULK SAMPLES - TAKEN MARCH 18, 1969 to JUNE 15, 1969 - FROM CLAIMS S.149137; S.149138; S.15J604
TOWNSHIP OF ROBERTS - SUDBURY MINING DIVISION -ONTARIO - CANADA
(lAVERAGE ANALYSES - OF -
BULKSAMPLENUMBER
DS-1
BS-2
BS-3
BS-4
BS-5
BS-6
BS-7
BS-8
BS-9
BS-10
88-11
BS-12
BS-13
WEIGHTSHORTTONS
11.6
14.8
i.5
11.3
10.9
10.6
10.3
12.2
9.1
1.3
11.7
0.3
9.7
LAB. A U0 ThO
LAB. B U0 ThO,
LAB. C U308 ThO.
^QUADRUPLICATE MILL-SAMPLES
L 2 'V
LAB. D U,0 n ThO
E , ThO,
LAB. FThO,
l t t
0.046 0.020 0.050
0.021 0,015 0.028
0.038 0.025 0.042
tt tt t t t
- 0.051 0.009 0.051 0.009 0.045 -
- 0.025 trace 0.020 0.030
- 0.045 0.010 0.040 nil
- 0.015 nil -
0.038 trace - -
- 0.032 nil -
- 0.014 nil
- 0.021 trace - -
- 0.013 nil -
- 0.012 nil -
- 0.010 nil -
- 0.490 0.060 - -
- 0.025 nil -
t0.045
LOCATION S, DESCRIPTION
*SEE SAMPLING PLAN, MAR.5/70.REV.JULY 31/71
No. l Shaft muck. Collar to -5 feet depth.
No. l Shaft.Slash E&W faces at -28 ft. depth,
No. l Shaft.Bottom muck fines cleanup.
No. 2 Shaft muck. Collar to -5 ft. depth.
No. l Shaft.Slash EJ.W faces at -5 ft. depth.
No. l Shaft muck. -5 ft. to -15 ft. depth.
No. 2 Shaft muck, -5 ft. to -15 ft. depth.
No. l Shaft muck.-15 ft. to -30 ft. depth.
No. 2 Shaft muck.-15 ft. to -30 ft. depth.
No. 2 Shaft. Bottom muck fines cleanup.
No. l Shaft.Slash N.wall 10 ft, wide.Collar- to -15 ft. depth
No. l Shaft.Overbreak W. wall. Collar to-5 ft. depth.Scaled after BS-5.
Pits 6 d 6A. Representative muck sample -from both pits.
(DNOTE; Bulk samples crushed and mechanically sampled by
Temiskaming Laboratories, Ont. Dept. Mines, Cobalt, Ontario.
T.T.L. end samples assayed in quadruplicate by:-
LAB. A - Ontario Department of Mines, Toronto, Ontario.LAB. B - Sudbury Asday Office, Sudbury, Ontario iLAB. C - Correlation Laboratories, Cobden, Ontario.LAB. D - Technical Service'Laboratories ' Tbronto,- .Ontario.LAB. E - X-Ray Assay Laboratories Ltd., Willowdale, Ontario.LAB. F - Mines Branch, Dept. Mines 6 Technical Surveys, Ottawa, Ontario
* Sampling Plan submitted in duplicate to Fred W. Mathews, Supervisor, Projects Section, Lands Branch, Ont. Dept. Mines.(see letter from A. S .fiayne)(dated September
X S i S ^ ^ Vi V\ ^ ^ ^•V
1s5 ?
^ tli ^•itf
N N Vs
x.^
!V
iV
\
1w0
l 5 vl l i i5.
S.\ \
jV
1t'
V**
*
\
jX
x
^ N \
N \ \ \ \ \ \ V \
S ss s M ' ^s^rr
\
*v
\
•tsi
\f\vj vj u
NV
V:
II-I1H
-
•?mmm
t
* - -' ' - ' .' '•.•••-. •s'fll'M
. - :| .- 5 :^a .,,,,.i ,.,,^ i..NORDIC MINES S, INVESTMENTS LIMITED———34 CONTIGUOUS CLAIMS GROUP———CLAIMS NOS. S. 149135 ^J:o- ?SV 149140
(Succeeded by Nordic Industries Ltd.) AJN. A..Ji^L.?..^.A OF ASSESSMENT, ; W..O.JLJL JT-.1-^ L D L -O C A T I O^S^^and^JjjJ^J^__CLASSIFICATIONS
r/.'/Tn....
i sA&jfa?
3/g. OCX /rf&f/tf
fi. 6 7 /
j ' — ^f . . c-.
REFER TO "SAMPLING PLAN-of part of- 1ROBERTS RIVER CLAIMS -held by-NORDIC -INDUSTRIES -LIMITED-*- Roberts Township - District --of-
Jt 20,1969,Revised July 26,1971.
THE MINING ACT-REPORT OF WORK, SEPT. 15,1*71. jincl. , S.15321t "to- S'; 153232 incl^ , 5^3^99^-to S^j^J-n^l^ ROBERTS TOWNSHIP
LE l -L .E ^ — J? L±Jii- J* O- J-.^..9..™^A^.P..A..PJLA _sJlPjlljjiYJj^ING-^I J ^ir^S'^ETJ'^ E/N T." ^r7~FrK~''~'irir;r's 'S I F I GA T I O N S " per ONTARIO MINING ACj?
oo
'6^*32
7-23
. CO
3. 23
33
M-;__|.^ _____ M|^ - CjSUTIFIKD^ CORRECT ^
15, 1971
i r .
.... .1-.-.
fr
j/* -
P;-'l
3 //r o
THE MINING A -uiMNEeeaa eeta ROBERTS 300
To the Recorder of....5LUDDJJAY.................................,..................,.,..............,,...,...,...,...Mlnlna Division
l, ................. G.P.R.P.Ofi..LELIEVER ( . A.24790
.................J..^ ^..................................,......,.^..^.^
do hereby report the performonce of .........f.P.P........,.,, ,........... doy* of ............?JJAF.7.,.:UJl!y.Ntype of work
not before reported to be opplied on the following eontiguoui cloimi
Cloim No. Doyi Cloim No. Doyi J C loim No. Doy*
S .149135 .J.O/X ,............ .....;. o,30t// ............. ....... ,' g
S, 149137 ...30*V x '•. S .149138 '30*/ ' 3
, *ee*ee**e***- ****** * *****.*t*.*.* **.* i * . S * M*'******'' *e*#**e Z
S,149139 30,/ , 2........ .... ....... . ...........,. ,...... , ...,......... ,...... of
s .4 4.?.l.4..0 ...3.9. i/ ....... 3k
AH the work wo* performed on Mining Cloim (s) .......................r..-. *..^.?.T.T.:..............................................- H(In rhe cose of geologicol ond/or geophysical survey (s) where more tftan 18 cloimi are involved attach o schedule) ^
READ CAREFUL L Y; T H E JQL LO WIN C j N F OR M A T10 N J S JLLSyjJJ P PY THE MINING RECORD^ K
^* r ^onuo lj yor^* Stripping or Opening up of Mines, Sinking Stajfts or Other Actual Mining Ope rot i on s - Nome* and oaddresses of tho men who performed the work ond the dates ond hours of their employment.For Diamond and other Cor* Drilling - Footage, No. ond anal* of holes ond diameter of core. Nome ond oddret* ofowner or operotor of drill. Dates when drilling was done. Signed core log ond sketch in duplicate. For Comprised Air or Other Power Driven or Mechanical EquipmentType of drill or equipment. Nome* ond addresses of men engaged in operating equipment and the date* ond hours of *-
; their employment. *^For Power Stripping - Type of equipment. Name ond address of owner or operotor. Amount expended. Date* on which r-work wat done. Proof of actual cost must be submitted within 30 days of recording. pWith each of the above types of work sketches ore required to show the location ond extent of the work in relation eeto the nearest claim post. In the case of diamond or other core drilling the sketch must be submitted In duplicate. {JJFor Geologicol and Geophysical Survey - The names ond addresses of men employed os well as dates, type of ainstrument used in the case of geophysica, survey. Reports ond mops in duplicate must be filed with the Mini s If* .Owithin 60 days of recording. OFor Land Survey - the name ond address of Ontario Land surveyor. 5
The Requi red Inf ormo t i on isoi j Fol l ows; {Attach o list if this space is insufficient)
Shaft Sinking: Shaft No.l - 40' x 1 3' x 2 9' deep. Sunk byj Sudbury Mining Contractors Ltd. P,O, Box 1045 Above work performed between Feb,18 and Feb.28, 1969
and between Mar.24 and Mar.30, 1969.Personnel Employed: H.Berard; K.Thompsett; T.Kokkgnen; E. V,Perron; E.JutHa; G,Zahodn1k - all of Sudbury Contractors. Also Ab,Jerome and Frank Turcotte of Nordic Industries. SEE ALSO: Letters of even date to Chief Mining Recorder and Mining
.------" dated Mar.C
ot oa.
Sudbury, Ont. "
Hellberg; 3E
Recorder with "Estimate A.S, Bayne, P.Eng.
of Excavations 1970, by
DoteMarch 6, 1970.
The Mining Act Certificote Verifying Report of Work
ecorded Holder or AgentP.tag.
Arthur Stewart Bayne45 Strathallan Blvd. Toronto 305, Ontario
UJ
IU
ML
OZ
oc o
hereby certify:
1, That l hove o personal ond intimale know(e(J(jf)i /ing performed the work or witnessed so fat dmi noJWrtto, havi performed the work or witnessed socafdur.ii
2. Thot the onnexed report is true,
Doted.March 6, 1970, ] ?
NO T E : 5 r t r e v c f s e side
MAR 3
srth in the report of work annexed here-ipletion. GL
IUX
SignatureBayne, P.Eng,
suiting Engineer NORDIC INDUSTRIEJLJ.TD.,
THE MIMING ACT REPORT Of WORK
To th* Recorder
•l, .....QQRDQN..
SUDBURY
A leeeret* tem Itfee.glr**' f** ****i ty*e *f werk lo t*
iV... ' i
el Recorded Holder Miner'* Llctne*
.R0. A.P. .^.?.T./...?^,^!^^;^^^/.., ^?^^!^,,, .CANADA. i iiifitigi ' ' """'PoVt O'ffieeAddrVi'i""""" f " 1"""
do h*r.by rtport th* ptrformonr. ol .1*0............................. doyi of P.QHBO.T.RXfcWfl.6.................. '' ' ,
'not b*for* reported *o be opr;,*4 eontiguou* do.** / see reverse side of Report
Cloim No. g., 153 599 S.153600
S. 1.536 O l
S.153602
D oy*
15.1515
15TOTALS 60
Cloim No. SU.53.6.03 S. 153604S. 153605S. 153606•f
Doy*
251515T6~
Cioim No.
S. 153608S. 153609S. 1536104
Doy* -
15, 151515
"T5 — - 190
2ato
THESE CLAIMS ARJK HART OF A GROUP BF 34 CONTIGUOUS CLAIMS NUMBERED————— y SV1-4-91-35-4O.i-ncl; S . 153217"32 incl; S;153599-15361Q-Jricl. in •Roberta Twp. 2All the work wo* performed on Mining Cloim (t) S.. 15.360.4.;...UflAeM.;...lA913.7.;...I.43.Qa*.y^^l^O * (In the col* of g*ologicol ond/or geophysical survey (s) where more than IB claim* or* involved otto* i a schedule)
READ CAR E FULL Y: THE IPJAOW IN C INFORMATION is REQVJREp9? THE MJHINO RECO^PER,B
F^e^jr^yoj^W^rk^trjopina o* Opening up of Mines, Sinking Shafts or Other Actupj Mining Operations - Nome* ond caddresses o5 the men who performed the work ond th* dons ond hovrs of their employment. *For Diamond ond orhe^Core Dr^Minj^ - Footoge, No. ond angle of holes ond diameter of core, Nome and odrlret* of Sowner or operator of drill. Dotet when drilling was don*. Signed cor* log ond (ketch in duplicate. ^For Compressed Ajr or Other Power Driven or Machonicol Equipment *Type of drill or equipment Nnm*s ond addresses of men engaged in operating equipment ond th* dot** ond hour* of ttheir employment. *For Power Stripping - Type of equipment. Nome ond address of owner or operator. Amount expended. Da t* t on which jwork was don*. Proof of actual cost mutt be tubmitted within 30 dcyt of recording. JWith each of the obov* types of work (ketches or* required to show th* location ond extent of th* work in relation ltp the nearest claim jwtt In the cat* of diamond or oth*r core drilling the tketch must b* tubmitted in duplicate. |For Geological ond 9*5P^Il' eo L^!i!^*Jt. * ^* nomt * o n^ addresses of men employed at well o* dote*. Typ* of (Instrument u**d m the cose of geophysical survey. Reports ond mops in duplint* mu*t.b* filed with th* Mini*t*r jwithin 60 days of recording i^F or L ond Survey - rh* now* ond obd'ess of Ontario Land surv*yor. \
InffTOOtion i i o i Follpwi: (Atloch o li*t if (hi* *poc* i* in*uffici*nt)
1. Type of Equipment: Intln'l diesel-powered tracked bulldozer.2. Name S, address of owner -and operator: SEE ATTACHED SHEET NO. l3. Amount Expended: SEE ATTACHED SHEET No. 1.
4. Dates on which work was done:-(SEE ENCLOSURES COVERING LETTER DATED(JULY 17,1971 TO MINING RECORDEE-from-
5. Proof of Actual Cost:--------(A. S. Bayne.
Date 'ULY .
^h* Mirvng Act Ce* 1 ' ' oit Ve*'*ying Report of Work
l Arthur M ewart Bayne
45 Strathalian Blvd., Toronto 305, Ontario, Canada.
hereby certify:
1. That l hove a personal ond intimol* knowledge of th* fact* set forth in th* rtpert of work Oflfttmd performed th* work or witnessed sum* during ond/or oftw it* completion.
2. Thot the onn*x*d report is tru*.
.19ULY 1971 i ti ^^
Sionotur*Bayne, P.Eng.
-for NORDIC INUISTRIES LIMITED -successors to Nordic Mines 6 Investments Ltd.
CALCULATION OF ASSESSMENT WORK
perTHE MXNING AC T-REPORT OF WORK
dated.July 17, 1971________
TOTAL COST OF POWER STRIPPING BY BULLDOZERPeriod Feb. 1,1969 to March Ji, 1563 {SEE ACCOMPANYING SHEET 11*
•s 56, 650.42
TOTAL DAYS OF ASSESSMENT CREDIT - 6,85010
LESS: Reported June 18,1-971 t, applied on Claims S.153217 to 153230 inclusive 336 days
LESS: 159 days distributed in error forBulldozer operator i Mechanis, FrankTurcotte as follows:- (see Sheet l 6Sheets 2 6 3) .CREDITED TO S. 153599-153610**
KMK.A 103 days
Mar. 1-15,1969. 84 hrs X 4/6 * 56 days-.159 day**Total deductions: " 495 days*
665 .days
495 days
NET ASSESSMENT CREDIT TO S.153599 to S. 153610 incl.per this Report of Work July 17,1971 * 190 days
**159 days for shaft-sinking credited in error of distributionto S.15399-153610 inclusive, in Report of Work dated June 18,1970.
ayne, P.Eng,
m
THE MINING ACT REPORT OF WORK
rtom* of Recorded Holder
do hwoby report th* p*rformorte* of .....J.3.fc.,..,.. (1 ..... ...... doyi of
not b* f or* rtpoftd to b* opplitd on fh* following contiguov* cloimt
Miner't Licence
^^Pott OHic* Address
.. STRIPPING.... l y p* of w*rk
Claim No.
s.,.X5-UJ 7S. 153218
S. 151219
S. 1 53220
5*153221S. 153222
Doyt
2424
24
24....2.4..,2 i
Cloim No.
- 153223 S. 15.3.2.2.4.S. 153225S. 153226
S. 153227S. 153228
ino Cloim (s) 8
Dayl
24 . 242424
2424
,.A.4.9.U7l
Cloim No.
S. 15)229 1.153230
V*V*
\ief-S-if.l. C\y V r .S.,.1.49138.i..Ar4ftW^
Dovi
2.4;.... ,*24 //yj' . ....., 1
l' A'..MU tiff
,* r ""y;V^S * 1 '* 3 C*G 4
(In ffi* cat* of geological ond/or geophysical survey (s) whore mor* than 18 claims or* involved attoc'h o scK*duU)
READ CAREJFULL Y:m THE f 0 1 LOWING INFOP.J*ATION IS R E Qgi B E O PY, Tf
For Mongol Work, Stripping or Op-em no, up of Min*i, Sinkinfl Shofti or Oth*r Actuol Mining Oytrotiofit - No**** ondoddretttt of tH* men who performed the work and the dotet ond hour* of 'heir employment.F of Diamond ond other Cor* Drilling - Footoge, No. ond angle of hole* ond diameter of cor*. Nom* o**** oddrei* ofowner or operator of drill. Dot** when drilling wo* don*. Signed core log ond tfcetch in duplicate.Fw Compr**ied Ajj- or Orhy Pow*r Drjy*n or Mtchonicol EquipmentTyp* of drill or equipment. Nome* and oddr*i**i of men engaged in operating equipment ond the dotet and h*vr* oftn*if employment.For Power *tr[pcmg - Type of equipment. Nome ond oddtei* of o*n*' v operoto' Amount expended. Dotet oft whichwork wot done. Proof of actual colt mutt be tubm:tt*d within 30 doyt ol recording.Wjtfi *och of the obov* type* of work sketches oro required to ihow (he location ond extent of th* work in relationto th* neorett claim post. In the cote of diamond or other core drilling (tie (ketch mult b* submitted in duplicate.For Gsolojicol and^yeoph^iical Survey - Th* nomei ond oddreiies of men employed os well as doles. Type ofinstrument used m the cote of geophysical survey. Reports ond mops in duplicate must be filed witK th* Minitterwithin 60 doyt of recording.For Lond Survey - the name ond address of Ontorio Lond Surveyor.
Th* Re-quired Information is os FoHows: (Attach o list if this space is insufficient)
DIESEL POWERED 3ULLDOZER AND DIESEL POWERED BACK-HOE USED TO STRIP.
THIS STRIPPING WAS PART OF A WORK PROJECTTCOMFLETED FROM FEB. 1/69 to OCTOBER 20/69, ON 34 CONTIGUOUS CLAIMS (SEE ATTACKED COPY OF LETTER FROM
. A. S. Bayne to GORI/'N LELIEVER, DATED JUNE 18, 1970 , OF WHICH THE 14 CLAIMS, S.153217 to S.153230 INCLUSIVE, FORM A PAHT.
SEE ATTACKED /HKKT : ATED JUNE 18, 1^1, LISTING THE NAMES AND ADDRESS*.." OF THE PERSONNU, K M i : .WFP ON THIS f*-'JECT.
MORE THAN 5i.lt> DATA l? -'
• S -'WE P•s pt/ .
THIS PROJECT. -vv' BY ."'LY
Dote .....JUNK...JU* r.- .............Signoture
Th* Mining Act C*i*ificot* Verifying Report ot Work
Arthur Stewart Bayne
(Pott Office Address)hereby certify:
1. That l have a personal ond md to, having performed th* work or witness*
2. That tfv# annexed report is true.y i''/
,71Doted .19
SUDBURYMINI** fti
e during ona/of o tter
JUN21 1371
t forth in turf report of wofV (MmtYt4 hett-:ompletion.
ignotur*A. S. Bayne, P.Eng
l
\
x91
(K IM
I
w*
t-
i
Ou lil
E
,:\
Wv
\
. .-X'
THE MINING ACT REPORT OF WORK
A itetret* tttrm It ree.vlr**' te* eeeb type *' **fi f* V*
.............................................Mlnlnj Dlvfiiofi
.s™...,,,,,,,,..,,.,,..,,,,,,,..,,,,,.,..,.,,,.^ 'no m* of Recorded Holder Mmer'i Lic*nC*
^./...PNTARIO X...CA.N.AP.A..........................
do hw.by report rh. performs, of .......9.63...//...,.............. doyl of ...'.""""..V.^*.1:* *""................^K' ^ typ* of wi
not before reported to be applied on th* following eontiguoul claimi
Claim No. S.149135 S.T49T36
Day l
\t/.yl x
40-Claim No.
S. 153599
(*scc reverse side of Report)Doy* S id *^
CloirA No.
S. 153608 49
S. 1536014-9 49
S.149138 S.-14^1-3 9 S.149140
S.153231 S ."i'53'2'3'2
40 r/40^V40,64
S.1536J0.3. 3.153604 S.133605 S.153606
5.1536095.153610
49*/-O
2 S
ARE. PAST OF A.-GROUP OF NUMBEMD-S.149135-40 inclj S.15.3212-32;J incl! S .153599-15.' ' incl) in Roberta Twp
All th* work wn* perlormeoon Mining Cloim (*) 3 ; j^SQJ ;. -l 4J4 JC l ' * *ti-3-7-}"-I49i'36-f""""""" 1 "' (In tho co*e of geol&gicol ond 'or geophysical lurvirt \ fi WlrVle more than IB , •r"***' invoffVTVTTvch o ich*dule)
For Manual Work L S''jpp ir| 5) or Opening up of Mi net, Sinking Shof 1 1 or Orhe* Actual Mintnj O p* ration i - Nome* ar\Aaddreiie* of the n*n who performed th* work ond th* dale* ond hou' t of thor employment.For Diamond and orfi*f^Cor* Ojij|ing - Footog*, No. ond onglt o' holei ond diomeltr of cor*. No mf o no* oddren ofowner c" operator of drill. Dotet when drilling wot done. Signed core log ond tketch in duplicate.For Compr*ii*d Air or Olhw Power^jDriven^or W*^chpnjeoJ^E(jujpmentType of drill of equipment. Mama* and addrettei of men engaged in operating equipment ond tht date* ond hour i offtoeif employment.^ O..r. P9w *L^ lf iPPin fl ' ^VP* o' equipment. Nome ond addr*it of owner or operator. Amount •ipendtd. Dotei on whichwork woi done, Proof of actual coil mud b* lubmilted within 30 doyl of recording.With each of the obovt type* of work iketcfint ore required to thow the location and er'ent o' the word in relationto the neoreit claim potl. In the cai* of diamond or other cor* drilling th* tkttch mult b* tubmitted In duplicate.F^t Ge-olojical ond ueor^hjiico! Su/**^ ' Th* nom*i ond oddr*i**i of men employed 01 well 01 dot*i. Typ* ofinitrumeot u**d in th* cote of geophyiicol lurvey. Report* ond mop* in duplicate mutt b* died with th* Miniiterwithin 60 doyl of recording.F c* Lo^d Survey - the noms ond oddreii of Ontario Lond lurveyo'. j ** - " *.' " ~ .* '.' V' * -? y* *
it O
The Required Information if o* Followt;
l1. Type of Equifjment: John Deere 1/2 cu.yd. diesol-powered bac-and Drott l 40, 3/4 cu.yd. " " |
.2. Name f, address of owner S operator : (SEE ATTACHED3. Amount Expended:
e*
(SEE ATTABHED SHEETS)
4,19n to
i hJ "A Q. Dates on which work was done:With John Deere B-H- Mar. l fT/69-Apr. 10/69 5j
With DrottHO B-H- Apr. 14/69-June 20/69 J. Proof Of Actual Cost: (SEE ENCLOSURES WITH LETTER Sept,
MINING RECORDER from A. S.n 4 September 1971Uot* .,...................................... ............... ,...,.....................
Signo*ure o ii _______________________________ A. S. ~r~
Th* Mining Act - C*rlificot* Verifying Report of Work
i Arthur Stewart Baynei, . . .. .. . . . , . . . . . . . . . ,. . , , . .. . , . . .. . . . . . . . . . . .. . .. .. . . ... . .. . .. .. ... .. -^. . .. . . ,, . . ,. ... . . . . . . ,. . . . . . . . .. . ,. . . . .. ... . .... .. ...........,.. .... .....,..45 Strathallan Blvd., Toronto 305, Ontario, Canada.
............,........................................Mr^.^
hereby certify;
1. That l hove a penonol ond intimate knowledge of the facti let forth in the report of work annexed h*f*- to, hoving per formed the work or witneiied tom* during ond/or o'ter iti completion.
2. That the onr.exed report li true.
i
SignatureA. S. B^yfie, P.Eng.
-for Nordic Industries Limited •successors to Nordic Mines * Investments Ltd. * IQ) **'
TO ACCOMPANY: THE WINING ACT-PkriMT OF WORK -dated September 4,1971 HNPATENTED CLAIMS Nos. S.149135 to 149140 incl; S.15J231 6 153232;
S.153599 to 153610 incl.
(2)
NO.
252934
34
34
(l)SUMMARY OF COST OF JOHN DEERE 1/2 cu.yd.DIESEL DACKHOEOPERATOR T.KOKKONEN (3)PAID IN ADDITION TOEQUIPMENT RENTAL -——————^
SUDBURY MINING CONTRACTORS LTD. INVOICE
DATE
27 Mar.19693 Apr.1969
28 Apr.1969
28 Apr.1969
Dates Worked
Mar.18,20,21,22,1969 Mar.24,25,26,27,28,29 Mar.31,Apr.3,7,9,1969
To t ill Hours Rate
Total Wages
.25 S 86.13do S 156.00do $ 104.00
Total Wages $ 346.13Levies{Unempl.Ins.,Wkmns Comp,etc.(13*) 45.00Equipment Repairs l Maintenance,Mar.20/69, Apr.10 4~Apr.15/69 ^ 223.82Equipment Rental by SudburyContractors Ltd. from HarrisonEquipment Co.Ltd..SudburyMar. 18 to Apr. 10,1969 S 1680.00
Total Direct Operating Cost: $2,294.95 Add Sudbury Contractors Ltd. Overhead: (15*) $ 344.24
TOTAL C OST PAID DY NORDIC MINES f, I NVESTMENTSLimited:$2,639.19
{4- SUMMARY OF COST OF DROTT l'40 3/4 cu.yd. DIESEL BACKHOE -
34 28 Apr.196941 7 Kay.196943 21 May.196948 6 June.196961 4 July.1969
Rental including operator Apr.l 4-18/69 " " " Apr. 19-May4xb9 " " " M.'iy. 5-16/69
K.iy 21-31/69 June 1-20/69
Total Direct, Operat iruj flos t v, Add Sudbury Contractors Ltd, Ovor head: (15ft)
TOTAL COST PAID BY NORDIC MINES i, INVESTMENTS
$ 850.00$ 1400.00$ 1660.00$ 1 395.81$ 7 80.00$ 6,085.81S 912.87
Limited: $ 6 ,998.68
GRAND TOTAL COST OF POWER STRIPPING BY DI LSl-L-POWl.Hll) BACKHOFS 3 9,637.87
NOTES: -
The John Doerc Backhoe was rentdd by Sudbury Mining Contractors and run by the latter's operator, T. Kokkonen, 440 Mabel Ave., Sudbury.
* 2 *Sudbury Mining Contractors, P.O. Box 1045, Sudbury, Ontarid). SFH AT.SO the "Job Cost Control Record" attached to pertinent Invoices. iV. TLICATE COPIES OF WHICH ART ENCLOSED HEREWITH.
(3)For T. Kokkonen's address sec (1) above.
The John Deere flackhoe was found o'f insufficient power to m we heavy overburden.Therefore, the Drott i 40 was rented from Chisneil-Hanton, General Contractors, Sudbury ,0nt. , who supplied their own
t II,
' ' ' '''*
\fv\
Dates Worked Total Hours Rate
Mar. 18, 20, 21, 22, 1969 26-1/2 S3. 25 Mar. 24, 25, 26, 27, 28, 29 48 do Mar. 31, Apr. 3, 7, 9, 1969 32 doTotal Wages Levies (Unempl. Ins. ,Wkmns Comp,etc . (13*)
Total Wages
$ 86.13 $ 156.00 $ 104.00$ 346.13
45.00
TO ACCOMPANY! THE MINING ACT-J&rUftT OF WORK -dated September 4,1971 UNPATENTED CLAIMS Nos. S.149135 to 149140 incl; S.153231 t 1 53232;
_________________.5.153599 to 153610 incl.-——^-M——-i—-^M.1^1
d)SUMMARY OF COST OF JOHN DEERE 1/2 cu.yd.DIESEL BACKHOE—————————————————————————————*————————————— SUDBURY MINING . OPERATOR T.KOKKONEN (35CONTRACTORS LTD. INVOICE PAID IN ADDITION TO NO. DATE EQUIPMENT RENTAL
25 27 Mar.196929 3 Apr.196934 28 Apr.1969
34 28 Apr. 1969 Equipment Repairs l Maintenance,Mar. 20/69, Apr. 10 fc'Apr. 15/69 ^ 223.82
34 " " " Equipment Rental by SudburyContractors Ltd. from HarrisonEquipment Co. Ltd. , SudburyMar. 18 to Apr. 10,1969 g 1 68.0.. O C
Total Direct Operating Cost: 32,294.95 Add Sudbury Contractors Ltd. Overhead: (15fc) S 344^24
TOTAL C OST PAID BY NORDIC MINES l, INVESTMENTSLimited: $2 > 639.15
(4)- SUMMARY OF COST OF DROTT K 40 3/4 cu.yd. OIESEL BACKHOE -
34 28 Apr. 1969 Rental including operator Apr. 14-18/69 $ 850. Of•11 7 May. 1969 " " " Apr . 19-May4X69 3 1400. OC43 21 May. 1969 " " " May. 5-16/69 $ 1660. OC48 6 June. 1969 " " " Kay 21-31/69 $ 1395,8)61 4 July. 1 969 " " " June 1-20/69 5 --780.-0(
Total Direct Operating Cost? T 6, 085. fAdd Sudbury Contractors Ltd. Overhead : (l 5*) ^ 912. {
TOTAL COST PAID BY NORDIC MINES fc INVESTMENTSLimited: $ 6,998.(
TOTAL COST OF POWER STRIPPING RY DI LSCL-POWERID BACKHOES $ 9, 6 37. t
NOTES : -
The John Deere Dackhoe was rented by Sudbury Mining Contractors and run by the latter 's operator, T. Kokkonon , 440 Mabel Ave., Sudbury.
^Sudbury Mining Contractors, P.O. Box 1045, Sudbury, Ontarift. SFE ALSO the "Job Cost Control Record" attached to pertinent Invoices, I)l.?'LlCATt COPIES OF WHICH ARF. ENCLOSED HEREWITH.
(3) For T. Kokkonen's address see (1) above.
The John Deere iiackhoe was found of insufficient power to tn.-.ve heavy overburden. Therefore, the Drott i 40 was rented from Chisnei.l -r. General Contractors, Sudbury ,0nt . , who supplied their own opor
o f"N"D* JL c
...:
-Jjl,j.::-;
fel-;.,'.
r ' ^4
CALCULATION OF ASSESSMENT WORK
-PER- THE MINING ACT-REPORT OF WORK -dated -September 4 , 1971
TOTAL COST OF STRIPPING BY DIESEL-POWERED BACK-HOE:- f 9 r 637.
Period March 18,1969 to June 20, 1969(SEE ATTACHED SHEETS)
NO. OF DAYS OF ASSESSMENT WORK REPORTED;
Distributed as follows:-
Claims S. 149135 to S.149140; (5 x 40)*(1 x 20)(incl.)
DAYS
Claims S. 153232 i S.153^32; (2 x 64)^&V
Claims S. 153599 to S.153610 (incl) : -
(11 x 49)^(1 x 76)* 539+76
TOTAL:
0 128 days
* 6 15 days
963 .toys
ng.
CNTA'llfj
THE MINING ACT REPORT OF WORK
A ivpatefe form It rvqulud for toeh lyp* cf work to b* tt to tt! t ii.
.Mining DivUlr**
,, . .............................f#.YWL........................^^nome of Recorded Holder Minor'* Licence
R. J?. { it pKHW nOAD l/KST, STR^KTfJVILI/K, ONWiKIO, CANADA. ••••••••••••••••••••"•"••""••"•••"""••••"••••••••^
do hereby report the prrformonco of ..7./.H..../..T.M..,.......:......... doys of WOKK.IHGS..EOR.WILL,.TEST .6 ASSAYE, SHIPPING TO TEMISKAMING
not before reported to bo applied on tho following contiguous claims TESTING LABORATORIES ,ONT . DEPT .Claim No. OF MINEfo^OBj^r, ONT
76.00 ' t- 76"."00
76"."00
6'dV'OO
Claim No. S. 153217S. 1532106. 153219S. 1532203,i5'3'22i
Days 76.00
76.0076.0070076VOO
Claim No. S. 153222
S. 1532235.153224S. 153225G. IS 3i 2 6
Days 76.00
76.0076.00VSV'OO7BVDO
Claim No. U J S. 153227
S. 153228S. 153229s'.is'jijo
ir, C }"A'IVS A RiJ ^VAT'X/fA GUOWOJ'1 34 COWTIKUtyc/S CLAlr.S";iUMl)KRBDj- .{?.14913.5.-40 innl; r|...1532l7-32 incl.; S.153599.-.-U-
RF:AD CARRFULLY: THE FOLLOWING.INF^ ' ATIQN |S REQUIRED BY THE MIMINGRECORD]:]?.,
For Monuol Work, Stripping or Opening up of Minos, Sinking Shafts or Olhcr Actual Mining Operations — Names ondaddresses of the men who performed the work and the dotes and hours of their employment.for D iamond and other Core Drilling - Footoge, No. and angle of holes and diomelcr of core. Nome and oddress ofowner or operator of drill. Dales when drilling was done. Signed core log and sketch in duplicate.for ComprosscjJj\[rjor Oihcr Power Driven or Mechanical EquipmentType of drill or equipment. Nomes and addresses of men engaged in operating equipment and tho dotes and hours oftheir employment.For Power ..Stripping - Typo of equipment. Nome and oddress of owner or operator. Amount expended. Dates on whichwork was done. Proof of actual cost must be submitted within 30 days of recording.With each of tho above typos of work sketches oro required to show the location and extent of the work in relationto tho nearest claim post. In the case of diamond or other core drilling tho sketch must be submitted in dujplicato.For Geological and Geophysical Survey - Tho names and addresses of men employed os v/ell os dotos. Typo ofinstrument used in the case of geophysical survey. Reports and mops in duplicate must bo filed with the Ministerwithin 60 days of recording.For Land Survey - the name end address of Ontario Land surveyor.
The Required Information is os Foljows: (Attach a list if this space is insufficient}
SEE SHEETS ATTACHED 70 LETTER SEPTEMBER 15, 1971 TO MIMING RSCORDKR
PRO?* A. S. UAYNE, P.Eng.
DoteSBPTSM/JER 15, 1971 J^f-
^9( Rjcord^c(:H-qidc;r
All the work wes performed on Mining Claim (s) ..^.WVlLZ'W^. J.'.A^o04 r....................... g(In the cose of geological and/or geophysical survey (s) where more ihon 18 claims ore involved attach o schedule)
Xt/5CIo8*
t LI
U
orDJ O ft:
O0- IUttV)".s. t" y.
zUl
Sfc UlJU.< o7.
a Oli.
.J5w ex. ui3C
. . , CertifArthur {JtfcThe Mining Ac)^^ .Verifying Report of Worknay no K
--3Q
hereby certify:
1. Thot l hove a personal and intimate knowledge of ihe facts set forlh in the report of work annexed here to, having performed the work or witnessed fame during and/or aflcr its completion,
2. Thot the annexed report is true.
SRi'Ti;.vjBr:n 15, 1 97 1.......19 ........................o........x.............,......................^ -^.
sorn to .Sorel i c M .voat.ircntr; LV.cl.
PflO;ECTS SECTION DEPARTMENT O f M INES AND NORTHERN AFFAIRS - 2 .60?
TECHNICAL ASSESSMENT WORK CREDITS
Recorder Holder
Township or Area
Cordon Lcliever
Roberts Township
Type of Survey and number of Assessment Days Credits per claim
GEOPHYSICAL
Magnetometer ....................................days
Electromagnetic .................................days
Radiometric............ . .......................days
Section 86 (18, 19 fi 20) i see. .across
GEOCHEMICAL..,., .................................days
Man days
Special Provision
Ground
Airborne! _ )
NOTICE OF INTENT TO BE ISSUED
Credits have been reduced because of partial coverage of claims.
Credits have been reduced because of corrections to work dates and figures of applicant.
NO CREDITS have been allowed for the following mining claims as they were not sufficiently covered by the survey:
l l
Mining Claims
Bulk Sampling from (2) Shafts,(9) Pita
and (9) Trenches
13 Bulk Samples taken from Mining Claims
S, 149137 149138 153604
Amc ;;it expended:- $16,023,34
Total assessment days credit a llowed:- 1,068
The above mining claims may be grouped
under Section 85 (6) for the purposes of recording the work credits of
1,068 days.
The Mining Recorder mty rtc'uct the tbove creditt if ntcetury in order thit the t or*/ number of approved ttteament dtyl recorded on tech cltim don not exceed the mtximum el/owtd n follow*: Geophyiicit - SO; Geologic*! - 40; Gtochtmicel -40;
T/"^ [(iAr.\A- e /- l ' r
W)* *- * * ^
THE MINING ACT REPORT OF WORK
A ittert'* Urm lif tefti
a' wark le t*
.M.n.ngD.vi.ioo
24790.. ..... . . ...nome of Recorded Holdet Miner's Licence
R. R. l a DERRY RiAD WKST, STRKBTSyiLLE , ONTARIO, CANADA." ' " """""""Poit OH, f e'Vddff'nPOCK MJNJNCrv rb"
do hereby repo'. (h* perfo-monr. o' J.3 ..P.O.................. . , . ,. doy, o6UHFACJU-.by .-Mtype T! work
not before repealed to bf applied on the following contiguous r. l o. in
Cloim No.
S. 1 5 321 8
8.153219 87153220
S'. 153221
DoyS 7
3.00 ''j 3. 00 7 3. O O// 3 . 00"' ,' 3" ."00.'
Cloim No.
S. 153222 S.153223 S.1332246.153225 S."15 32 2 6
Days 7 3.00/,
3.0.0 x 3.00/03.00'y'
Cloim No.
5.1532275.153228
S. 153229
S. 153230
Ddyl
3.00
3.00' O'O'
e Cl-li 3C
HfN,R". THESE CLAIMS ARE PAW W A GROUP OP 34 CONTKGUOUS CLAIMS" NUMBERED l- B
S.149135-40 incl; 8,153217-32 incl.; S.153599rl53610 inc^Rob^rts TVfV
All the work wos performed on Minmg Cloim (s) . . 3. , . \ 4 91 37 /' . S , 14.91 3 B ; . S.. .15.3 6.0 4., .................. - '(In the coir of geological ond or geophysical survey (s) where more than 18 claims ore involved ottoch o s chedule)
READ CARF.F ULL Y. im f 01 I.O*INC is ucouiRt ;i OY TH{ MININGs
For Monuol Work, Stopping or Open.ny up of Minetj Sjnkmg Shofu or Other Ac'uol Wining Opernt^ons - Nomei ondoddressei of thr men who prrlofmeri the work ond the dates ond hours of their employmentFor Diamond and other Core Drilling - Footoge, No. ond angle of holes ond diomeler o! core. Nome ond oddress ofowner of operoto/ o( drill. Dotes when drilling wos done Signed core log ond sketch in duplicol*For Compressed Air or O'het Power Driven or Meclionicol EquipmentType of drill or equipment Nomes ond oddresses of men engoged in operotmg equipment or,d the dotes ond hoon oftheir employri'entFor Power Stripping . Type of equipment. Nome ond oddress of owner or operator Amount e*p*nd*d, D^'ei On whichwork wos done, f'roof of ocluol colt must be submitted within 30 days of recording.With eoch of the ot'ove types of work sketches ore required to sho* the location ond extent of the work m relation tlo the nearest cl'iim post. In the cose of diamond or other core drilling the sketch must be submitted m duplicate. ^Pot Geological and Geophysical Survey - The names ond addresses of men employed os well os dates, lyp* of (instrument uied ir' the cose of geophysical survey. Reports ond mops in duplicate must be filed with the Minister 5within 60 day J of recording. fFof Land Survey - the nome and oddress of Ontorio L did Surveyor *
The Required informotion is os Follows; 'Attach o list if this space is insufficient)
SEE SHEETS ATTACHED TO LETTER SEPTEMBER 15, 1971 TO MINING RECORDER FROM A. S. BAYNE, P.Eng. - . .^.
^
- " , -
C ' ~
Dote SEPTEMBER 15, 1971
1 ^. 3
lf w
' f 1 ^
JionotDre of B^orded HoWw o/ Anent X^S. BAYNE, P.finq.
The Mining Act CertifiCOte Verifying Report of Work
Arthur Stewart Bayne45 strathollan Blvd., Toronto 305, Ontario, Canada.
(Pott Office Address) hereby certify:
l, Thot i hove o pnrsonol and mtimote knowledge ol the facts jet forth in :ne report of work annexed h*f*- to, hoving performed the work or witnessed some Juring ond-or after its completion.
Doted
2. That the annexed report is hue.
SEPTEMBER 15, 19,2.1.gnoture A. 8.
-for Nordic Industries Ltd. -•successors to Nordic Mines t Investments Ltd.
..
sTo lh* Recorder
OQRDp
R. R.
WW: - . t 4 r* , t
THE MINING ACT REPORT OF
N LCL^EVERnome of Recorded Holder
1 t DERRY MAD KE8T,
do hereby report the performonre o'
oof before repealed to be applied on
Claim No. Days f 5453217 1.00 •'f
0.
0.
8.S.
y.
All
153211 153219153220153221
1.00'r.'bo//i .'bo' , VVO'o.'
ft". TBK8I CLXIKB ARE . 8.149135.-.40 incl;
the work was performed on Mmir
2^,33
8TRBET8\TLJJI
, . , , A n \j
the following contiguous claims
Claim No. ^"/^A 78.153222 1-00'y8.1532238.153224S. 1532258.Til2'2'(
l.OO//1 . OO'y
i.db* f r; oo y
FXWWA GROUP OF 34 SU3.JJ17-32 incl.; S
o Claim (t) ...8f.i4..H.37/. ..S.
WORK
A.
A itf erele ftrm li t*ivht4 Itt * *eti tfpt o f *o'k td k* rtfcrrftij.
...,. . ......Mining Diviiion
Minvr'i Licence , ONTARIO, CANApA..; 1 'ftO'C^"MfKnw.Kio TRET nn;ow
hiv-MJsNUAL LABOURtypf of work
Claim No. Doys ,3.153227 l.OO*// : JS. 15322S. 15322
8 i.oo^/ ;9 iVob'^ !
8.153230 9.53'' ''"""/x t ij.^t. "T^t^ i
COhfTICUOXJS CLAIMS MUHBBRZDi- ,153599.-153*10 inc., Robert* Tw149138) 8.153604.
(In the cojo of geologifol oid 01 geophysical survey (s) where more thon 18 claims or* involved utiorh o schedule)V J 's f ' . -
Rf AD CAREFUL l. Y: in? fOl (OWING INFp?MATigNJSJ{EOUl,REppy JHf MININC,
For Manual Work, Strippinj or Opening up^of Min*s ( Sinking^Shafts or Other Actual Mining Operations - Names ondaddresses of the men who performed the work ond the dates ond hauis of their employmentFor Diamond and other Co'e Drilling - Footage, No, ond angle of holes and diameter nf tore. Name ond address ofowne* or o perate* o' dnll. Dotes when drilling was done. Signed core log ond sketch m duplicate. For Compressed Air o' Othw Power Driven o' Mechanical fqoipmentTyp* of drill or equipment Names and addresses of men engaged in operating equipment ond the dates ond hour* oftheir employmen'For Pu 1 tr Sir') pmg . Typ*s of equipment. Nome ond address of owner or operator. Amount expended. Doles on which
work r/ai do-if ^roof of actual cost must be Submitted within 30 do) s o! recordingWith each of ihe above types of work sketches ore required 'o sl'o* the location ond extent of the *ork m re'otionto the neoreit drum post. In the case of diamond or other core drilling the sketch must be Submitted m duplicate.For Geological and Geophysical Survey - The names ond addresses of men employed as weM os dot*\. Type ofinstrument us*d n the cose o( geophysical survey. Reports ond mops in duplicate must b* filed with the Ministerwithin 60 doys o) recordingFor Land Svrvry - the nome ond address of Ontario Lond Surveyor.
The Requ"ed .^formation is as Followi: 'Attach o list 'f this space is insufficient)
BKE SHEETS ATTACHED TO LETTER SEPTEMBER 15, i.971 TO MINING RBCORDSR
FROM A. S . liAYNE , P . Eny. "i'"
•. ' i i ' r
Date3E?TEKaER 15, 1971
The Mining Act ^ C*rtificote Verifying Repo" of Work
Arthur Qtavtrt Bayn*'^
(Pott Office Address) hereby certify.
1. Thot l hove a personal ond intimate knowledge o' the facts t*t forth ir tSe report of vorli annexed her* to, having performed the work or witnessed some durin ; and'or oftet its completion.
2. Thot tht onne*ed report ts true.
Doted.SEPTEMBER 15, 19J1
-for Nordic to Kordic Mine* *v
THE MINING ACT REPORT OF WORK
A t*M'*'* 'a"* l* (•Hvlnrf fa' eeeh ryp* of *o'V t* k*
MINING DIVISION u n. . ........... ...,.... ..... .. . ....... ,............. . .. ..,Mining D ivit;on
GORDON LEU EVER ' A; 24790ol RsccxJed Holder Miner's Licence
.R. ft s DERRY ROAD WEST, STRKETSVTM,K, ONTARIO, CANADA.
do h*reby rnpT' td
not bofore reported
Cloim No
S . 1 5 3 21 7 4
S . 1 'j i 2 l R 4
S. 15 32 1 9 -I
S. 153220 4
S. li? 2 21 '1
e ,,,lo.*.M.
to be oppi
Doys 7
5.00- f
5 . 0 0 ' 'f) .no/
5.00 - f
5 . 0 0 '
034.38
ied o" th* followi'- ^
C'oim No.
S. 153222
F. 15322 3
S. 153224
S. 153225
S. 153226
Po.t Office Add-es
contiguous ci-nis
Do^s S 45.00^
45.00.x\
•55.00 X
45.00 ' j
4^.00
t ' ••L7V.'TKAt'.';T*OrK0 , oi ;, MO P i; UF;I,O
Cloim No. S. 153227
S. 153228
S. 153229
S. 153230
" A.''-
W SURFACE.1 W DSii*et...ft4.fcU
DOYS y 45.00^
•45.00- X
4 5. CO,' x
4 'J. 3ft '
, , f , 7',,..,,
t, t* i
D,)
*** tiri 1l
i —— 1K'.JV; I'M r. i; i, CLAIM.' ARE P A Ut Of A ..Hi'i'l OF 34 CC'N'! 1 1 liUOU:; CLAIMS NUMB K Rf! D : - .. . . .:i.] 4'U lfi-40 ir-.-l; S. 153217-32 iucl . ; S. 103SU9rl5 J6J O inc.., Roberts
All the wo- 1 ~,:, s Mf,loM,eH on M.n.ng C loim (*) .S., .149 l 3.7. J .S. ,. 1.43 1.3 6 ;. . .S.. 15.360.4.. ............(In thr (t. s r o' gf o log n. o! O'lrj 01 grophyiicol lurvey (i) wher^ more than 13 iloims or* involved atio^h o schedule)
RE AD CAr?t FULL Y- fur r' U'*itJ'j INFORMATION
For Moiiva
D H v Tt'| MINIS', Pf,C.OPDFR.
Stripping . - 'J;IK' i rm MO o( Mi ne i S in li mg Shol". O' Oihr' Ai ) v ioi Mining Op^ roll on* — Norn f * ondo( llif rnen wlif p^'o"^* i trif *orl and the Hotes ond I'ouii of l he i' fm ploy"1 '' '
Tor Diamond nnH othc' Co'r D"ll'-g - Footage, No. on-1 cnglr ;.' liolei ond domrter ri ' o-e Nome on-J /jddr*ii o( owner of opcraUx o f H -.ll Dcjtn when drilling wot donf Siynfd core ,oy - j " ' s ketch in duflx-ji^ For Comp" '. '•fi A n o ! Ot'i'S' f'.iwfr Driven or *^echam(':' f. g-ji pme'i*
No M e s ond oddrei*o4 of rr.fn md thr dotes ond hewn ofTyp* o( J' l i-.' eqinf1 "l he i r employ i"" 1For Power ''i i r , , ing ^yp r o* equipment. Nome ond o^ ' '.s o ' j* i-r o 1 i:r'Toi Amount "upendod Dotei on whichwork v/js do'i' •"'•oo' o( jctuc 1 colt must be lubir^'fd withi" J'J ii'i/s o' letordmgW i (K c o f h o' ihr dl.ove 'vi f ^ it wo'li it, etchei tut ' rqio red to s 1 .' * t lie lor o 1 1. in on rt r i tent o l the *o'l" in relationto the neu'riM . i j m post In *h(! :Tse of diamond '" other A-e d' Hmg the stetr'i must be suhmitted in duplicote.For Geoloyicu 'inrj GropKyv.r il Survey Th* -o-iei ond ^^.•J•esles o' me" ^,T|il')yrd os we' ns dotes. Type ofins tfumen' t,^ni ,'i ttie f.^se i,' grophysicol Sur.i, Rep^''s "'"J TICIDI in dupi'CTf ""jst de (ii*il with the MinMtnfwithin 60 Joy-, o' 'ecoMincF o* L tind Sin . r y - the "nn e o'l.i o fid i e s s o t Onfii i o l. Ond sin *ryor .
T li e P e; ' - s n s Follow j: Attach c list i! thi s spot e is
SEE S HI 1; FITS AT'iACHKD TO l.KTTIJK SF.PTKMBKH Ib, l r' l l TO MINING RECORDER FROM A. :; . BAYNn, I'.F.r., - ~ -
n , SEPTF.MiJKR 3 r; , 107]Dot* .,...... . . . . .... .
1.
The Mining Act Certificate Verifying Rees' 1 of
Arthur Stewart Bayne45 strathallan Blvd., Toronto 305, Ontario, Canada.
" """(Post'Office Addrossi
hereby ceit. \ \:
l Thct l hove o personol ond i-Mimatt knowledge of the 'octs set ?orth i the report o ' work onntxtd h*r*- to, hoving pcrfoimed tho *oik or witnessed some during ond or o'ter its corrpledr -.
2. Thot the on^fied reoorf is true.
c;r. p-rpupt.'}) ir \ (\-i l Doted...r.t",.'. ' . '.".. . .... .'....- ri* ~ -
-for Nordi. Dayne.P.Enl Ltd.
to Nordic Mines (, I nvestments Ltd. ^J5" /r^.3
9 o-
I tr n o •z. o M a
3-
o a. o
o
^ <
* -o
t —
— o
^ 3
•* c.
5- (*
yf~
^g 3
S•o
ex
.
a o^
o
- o
o
o V* O
S"
i2
o™
5:
- t:
o
^
Q
3
— .0
O-o
5
.1
?
-
* S
": —
80
O
,,C
U "
T p.
-•
O
3-
~-
—
Orr
o
S"
~ o
2.; 5-
"
*O
^i
vOo
z -
**
*T)
d.
2
J,1*
™
o' o
-
Mil
ri
f
'
L s
g- r2.
? 5
i Q-
O5-
3
' 2
o S
—~
CL-
THE
PE
NA
LTY
FO
R M
AK
ING
A F
ALS
E S
TATE
ME
NT
IH T
HIS
REP
OR
T A
ND
'OR
CE
RTI
FIC
ATE
IS
1500
. OR
SIX
MO
HTH
V1M
PR1S
OM
MEM
T O
R B
OTH
a.l
S3-
-o K
O
" O
5
z
r-
m r* re rt
5J3
—
c^
*-in
o c—
-"S
3O
-rt
:OtT
O
4 -i •^
Z;
-- ^^
*V
" -
o
en
c: o
to G 53 ^
m z
o S 5
o 7*
i-
o f 5"
w
A l*?*'*" 'efm d (Mt/ir**1 IB' t*eK if** e' werli M b* recorded,THE MINING ACT REPORT OF WORK
To 0* Recorder of......... .***™.. .?.1VX * I.C*. .....,...... ,. . .....,.,,.. ,.. ,,,M,n.n fl Divi.ion
.0^*00*...WMIY**.A. 24790nome of R ecorded H oldor Miner's L icence
.**..It * * P.1 *** *-JSD.'*!f*T? ITWIKTfiVIUJt ' ONTARIO, CAADA. """ "'" ""'' " Poti Office"
do hereby report the perform inn- ,,' ,. 1..'.f!^.8 .'. 0.?........... ..... ,. doyt of WORK l N-G S.. FOB.' WILL. TEST .6 AS
not before reported to be applied tn the following contiguous
C 888
'8'
loim No
.133217
.133^11
.133219
.133220 ;153221
Da 76
7676
7b
iys ^.00 /x.00 ^. 0 0 J f
.00' ,
8
88
8
Claim No..133222.1S3223.133224.is'32'2'3
Day! 76.76.76.fs: 75;
ooAQ O/ j
GO' S00DO/
i, SKIPPING TO TEMISKAMING TLSTING LABORATORIES,ONT.DEClaim No. O F M 1NE^y,C3D^f. ON
8.153227 76.Cy ;uir "3.153228 76.DO ;:'. *
7 6'.bo/8". i 3.'li 30
tr.trV"THB8K CLAIH8 A Ri f AUT O? A GROUP Of 34 COKTir,OOU8 CLAIMS NUMlllDID l- ...,. S,. 145135-40 incli 8 .,l.J.3.2;7-32 ^cl.* 8 . 1
All the work was performed on M, rung Cloim (l) ...* ?.1*JA.?.?.?'.. A:!.f ' .1.?. .8 ,; ,8.rA?.^.*.9.f ! .................,-(In the cos* of gfologicol ond 'or geophyiicol survey (*) where more thon 18 claim! ore involved ottocK o schedule)
RE AD CARERJL l. Y: nu rOi i o*mc iNrpRMAjK)Nj^RE-p^yiftCU - pY THt WINING
For Manuol Work, ^trippmy o- Op*nirijj up^of Mmes y Sinking Shofts or Other Actual Mining Operotipjis - Nornet ondaddresses of the men who pr'formeH 'he work ond the dotes ond hours of their employmentFor Diornond ond other Core P'lH^ng - Footoge, No. ond angle of holes ond diameter of core. Nome ond address ofownef or operator of drill. Dotes when drilling woi done. Signed core log ond sketch i n d uplicate.For Compressed Air or Other Power Driven or Mechanical EquipmentType of drill or equipment Nome* ond addresses of men engaged m operating equipment and the dates ond houfi oftheir employment.For Powei Str pping - Type of equipment. Nome ond address of owner or operator. Amount expended. Dotes on whichwork was donf P'oof of ocfuo! cost must be submitted within 30 days of recording.W i ffi each of the above types of work sketches ore required to show the location ond extent o' the work in relationlo the nearest claim post. In the cose of diamond o' other core drilling the sketch must be submitted in duplicate.For Geological ond Geophysical Survey - The names ond addresses of men employed os woll os dotct. Type ofinstrument ui*d in the cose o' geophysical survey. Reports and maps in duplicate must be f. led *ith (h* Mini*t*rwithin 60 day i of recording.Fof Land Survey - the nome and address of Ontario Land Surveyor.
The Requi'eH i'lformotion is os Follows: /Attach o hit if this space is insufficient)-. .-.tt**... '^ . . t - ' ~- i ' .- --.--n-y.pfum- ^**'*u
SEE gKJLKTfl ATTACHED TO LITTIH 8KJrTEMBCR 15, 1971 TO KINXNG
FROM A. S. UAYNE, F.Zng. - -
DoteSXfrTCMBER 15, 1 971
c^^Th* MiningArthur cirtiteiWiilriw.R ' porl o ( W orkStrrthallmn 'llvd. i "Toronto 'SOS; -Ontmriai
(Pott Office Address) hereby certify:
1. That l hove o personal ond in'imole knowledge of the facts set forth m the report of work annexed here to, hoving performed the work or witnessed some during and' or oft*r tts completion.
2. That the annexed report is true.
SBraKBlR 13, 1971Doted.......,............................!?.....--.--" •••••• ————-i
-•ncotator* to uordio Minea
November 26 , 1969 .
TO: Nordic Miner, b. I nvestments Limited, Suite 2200, Box 62, 401 Bay St. , Toronto l, Ontario.
IN, ACCOUNT WITH: SUDBURY MINING CONTRACTORS LIMITED,P.O. BOX 1045,
______________ SUDBURY.. ONTARIO. ———-^——.——.......
PERIOD FEBRUARY 15. 1969 TO OCTOBER 22, 1969. INCLUSIVE.
To: Shaft sinking, stripping, rock trenching, sampling, preparation and packaging of bulk (rock) samples for shipment and trans portation of bulk samples Nos. BS-1 t-o BS-14 inclusive to Temiskaming Testing Laboratories, Cobalt, Ontario, on Mining Claims Nos. S.149137;S.149138; S.139135; S.153604 in Roberts Twp., per instructions Mr. A.S. Bayne, P.Eng.
per Invoices submitted as follows:-
. Iny. No... Date (1969) . - Amount
15 Feb. 28 # 7,618.0016 " 28 2,464.0017 " 28 2,226.0519 " 28 2,749.9220 Mar. 14 1,072.4821 " 17 9,962.0024 ' " 19 1,237.5425 " 27 4,769.252? " 31 1,338-5928 Apr. 2 5,580.0029 " 3 1,571.9830 " 7 5,236.0031 " 17 1,284.2632 " 17 3,180.0033 " 28 6,208.2634 " 28 3,804.6140 May 6 1,284.2641 " 7 2,589.7242 " 9 1,424.8543 " 21 7,391.8044 " 21 1,284.2646 " 26 1,000.0048 June 6 6,961.2649 " - 5 1,298.4054 ' " 19 4,191.9755 " 19 1,284.2661 July 4 2,405.3962 " 4 1,284.2667 " 31 4,845.9775 Sept. 2 1,586.7990 Oct. 22 562.70
Total #99,698.83
PAYMENT RECEIVED IN FULL - WITH THANKS ' '
NOVEMBER 26, 1969.
SUDBURY MINING CONTRACTORS LIMITED/t/ ' i " ^ PPer v/7/,. \ _l.f' i \ -/,/' *,-; ,^ f', , r ' (f.f± ( title)
I CERTIFY THIS IS A TRUE FHOTOCOPY OF THE
ORIGINAL STATEMENT
September 22, 1971
fc-'JJ/'VlV.V- '. V
MSfc.^
A. S. Bayne^^P-T Eng.
.
''A* S. BAYNE ft COMPANY CONtut-tiNO
eo RICHMOND mm wtrrTORONTO i. CANADA
166.3*0*ADDIU6B AU. CORKCerONDtMCe * 45 6TRATHALUAN BLVD.. TORONTO 12, CANADA * 405.6799
March 5, 1970
The President i Directors, Nordic Industries Limited, Suite 420, 159 Bay Street TORONTO, Ontario, Canada.
Re: Roberts River Property - Township of Robert: ___3 icj.ajjv^ j) r pu p , S ud bu r y M1 n j n g DJ y i s'i on .
Gentl crnen :
In accordance v/ith the request of your Presides Mr. Lelievcr, on February 16, 1970, to prepare the filing of the required assessment work on your 34-claim group 1n Roberts Towns the attached "Estimate of Excavations - Shafts, Pits A Trenches, of even date, has been prepared and is being submitted to the Ontario Department of Mines.
Yours very truly,
A. S. BAYNE 6 COMPANY
ASB/j
^A.''S, Bavn'c, P.Eng.
K t,
' •'•-i'i'iVt '?;; '; W^'-- - 'r.' WA^S. BAYNE a COMPANY
S^ /-ii CONSULTINO tNOINItRS '
•;.,',^--v -iia**i•o KtcrtMOMD rrwttr Wtet
TORONTO f. CANADA; i
ADDRESS ALL conRrsPOMDKNCt * 45 OTHATHALLAN OLVD.. TORONTO ;... CANADA * 405-9703
July 28, 1971
The President 6 Directors, Nordic Industries Limited,' Suite 715, 159 Bay Street, TORONTO, Ontario, Canada.
Re: Roberts River Property - Township of Roberts 34-c1a1m group, Sudbury Mining Division.
Gentlemen:
In accordance with the Instructions of your Presld Mr. Gordon Lellever, the undersigned proceeded to your mining claim 1n Roberts Township on July 23rd and 24th, 1971, at which time the common claim post of Claims Nos .S.149135 , S.149137, S.149138 and S.153604, was located by precise survey relative to the permanent- 'bonch mark' survey Stations A and B at the main work-site.
Attached you will find the "Estimate of Excavation Shafts, Pits S Trenches," originally submitted to you on March 5,19 which is.now revised as at July 26, 1971, to show the additional th claims on which ports of this work was done.
These estimates were based on the precise survey c D. W. Endleman, O.L.S., P.Eng. and a duplicate check of measurement of the excavations by our engineer, with locations relative to the above-noted survey Stations A and B , estab!i shed by celestial obser at i on in July, 1969.
In the pocket at the back of the attached, you w11 find our "Sampling Plan - of Part of - Roberts River Claims - held Nordic Industries Limited - Rcberts Township - District of Sudbury, Ontario 1 , dated August 20, 1969, which details the locations and size of the workings. This is now revised as of July 26, 1971, to show the above-noted common claim corner as precisely located on July 24 th, 1971.
We arc submitting copies of the attached and endc plan to the Mining Recorder at Sudbury, as required to verify the assessment work locations.
Yours very truly,A. S. BAYNE 4 COMPANY
ASB/j att'ch.cc. The Mining Recorder,
Sudbury Mining Division
.Eng.
BWiS:
A. S. BAYNE ft COMPANY' CONSULTING ENGINEERS
60 RICHMOND rTRCCT WESTTORONTO 1, CANADA
388-8283
ADDRESS ALL CORRESPONDENCE * 48 STRATHALLAN BLVD.. TORONTO 12, CANADA * 488.8793
I97J
'I\'C LAN y 5
^ September Mr. Fred W. Matthews, Supervisor, SPECIAL PROJECTS SECTION, LANDS BRANCH, ONTARIO DEPARTMENT OF MINES E. NORTHERN AFFAIRS, Whitney Block, Parliament Bldgs, QUEEN'S PARK, TORONTO, Ontario, Canada,
.^Re: The Mining Act-Report of Work (Sect. 84(14)), September 15;'1971.
Claims Nos. S.153217 to S,153230 inclusive. Roberts Township, Sudbury Minina Division.1,068 DAYS OF ASSESSMENT WORK FOR PERFORMANCE OF BULK SAMPLING OF MINE WORKINGS FOR MILL TEST S, ASSAY S, SHIPPING TO TEMISKAMING TESTING LABORATORIES, ONTARIO DEPT. OF MINES, COBALT, Ontario.
Dear Sir:Enclosed herewith you will find the following
documents, RELATIVE TO THE ABOVE NOTED REPORT OF WORK:-
ONE PHOTOCOPY OF; The Mining Act-Report of Work(noted above), which was submitted to the Mining Recorder, Sudbury, on September 15, 1971.
IN DUPLICATE:
ft~.- i
PROOF OF PERFORMANCE OF WORK, being a title d index sheet and 13 sheets of shipping notices and bills of lading between Sudbury Mining Contractors Limited and Temiskaming Testing Laboratories, (except Sheet l, which is a tabulation of the work sites and claims from which the bulk samples were taken).
LETTER OF JULY 17.1971 ATTACHING A STATEMENT DATED NOVEMBER 26,1969, FROM SUDBURY : MINING /CONTRACTORS LIMITED to NORDIC MINES S, INVESTMENTS LIMITED. The latter Statement is in the amount of $ 99,698.83, of which $ 16,023.34 was expended for the bulk sampling. {We calculated the days.per Sect.84(14) at the rate of one day for each $15.00 expended).
ESTIMATE OF EXCAVATIONS - SHAFTS, PITS fc TRENCHES completed during sampling program- February 15,1969 to October 20,1969 - NORDIC INDUSTRIES LIMITED (successors to Nordic Mines s, Investments Ltd.)....with accompanying SAMPLING PLAN..dated March 5/70 REVISED July 261971.
Yours very truly, ASB/jcc. Mining Recorder A. S .^&Gfyne, P .Eng. co. G. Leliever
'Nat y ra! letources
Toronto 182
May 8, 1972
( parllament Bulldlng8
Dear Sir:Re: Mining Claims S 149137 et al,
Roberts Township. File 2.608
The Minister has, under the provisio r . of Section 86 (subsections 18, 19 6 20) of the Ontario Mining Ace, approved assessment work credits for Bulk Sampling (Assaying) as shown on the attached statement.
Please inform the recorded holder and so indicate on your records.
Yours very truly,
O J/row
encl.
Fred W. MatthewsSupervisor
Projects Section
cc: Mr. Gordon Leliever R. R. l, Derry Road W., Streetsville, Ontario
cc: A. S. Bayne i Company504 - 80 Richmond Street W,, Toronto l, Ontario
cc: Resident Geologist .^ Sudbury, Ontario ^
416:965-6918
Mr. J. A. Stocking Mining Recorder 118 Cedar Street Sudbury, Ontario
2.608
).^-i\X!'"T' V"^^ l \\ \l ......' 1*1141. i**14*
^X."1:" ~ T ,- ~ -
IJ1JI9 ISJJI7 . ,^^ l /l' - - -l ^ S -J/'l
.|2*5J5? |Q .---A-l ^H
' " '•o-- ;
l:;
, , MINING DIVISIC
f,: . 4 '
SCALE: l-
!; v . r '"LEGENH^
CROWN. ;LANO SALELEASES; 1 ^ /V LOCATED LAND LICENSE OF OCCUPATION MINING RISHTS ONLY ^ SURFACE . RIGHTS .pN'LY ' ROADSIMPROVED ROADS, KING'S -* HIGHWAYS ^., ,.', RAILWAYS -' , - !' '
LINES ."rMARSH OR MUSKEG
:VMINES /, -'w..-,' CANCELLED
t
NOTE'S',400' Suf foce
- "
L o Ho s S Rivers
• '".'Are OF ISSUE
SEP 271971' ; i'J -l- :,
OHT! 'OEPT. OF'MINES * AND NORTHERN AFFAIRS' -
^ - i t i
r PLAN, NO.-
ONTARIOW^NT. pF
AND NORTHERN Af
I/N/ "T^e//v/ THE
5EQUENC6 C X)
^2 /V A P 't
STATION "B"
SHAFT No. 2 Trench No. l
^0-20/S' 0 .40/5' 0-36/0' 0-40/5' 0-50/5'
Q.40/5'Trench No. 4
s——\^ ., \ P t No.T. H. Z T.H. 3 T.H. 5D.D.H. No,l l
t o-97/ae11-06/40
O 26/4-5' G'80/4' 480/2'
40/ C' O 30/4'
lx \ Trench No. 5
f/ Trench No. 3\ Pit No.
LEGEND
— REVISIONS -
OCT. S, 1969
1. CHANNEL SAMPLES 8 AVERAGES
2. TEST HOLES a ASSAYS
3 BULK SAMPLES TO DATE.
JULY 26, I97(
l. TIE IN CLAIM S. 149)37 POST l TO STATION A
2 CLAIM LINES ON MAGNETIC N-S, E-W BEARINGS
3. ADD CLAIM CORNER 8 SURVEY STATIONIN LEGEND. o
LINE A-A' —— PROFILE OF
HORIZONTAL i
BULK SAMPU^STONS
O, J
o,•o, oo(D
S
STATION "A"..D. D. H. No. 3
l?fc
french No. 9i—x-\^tt
'.Vi! VUo"
f \' \ O 54/5'
036/5'
o ae/4-s' o-eo/4'4-80/2' l 40/8' O 3O/4'
\ Trench No.7
*Uj
OCT. S
1. CHi
2. TES
3 8UL
JULY
t. TIE
2. CLAiJo/*/r/ ——————
^^^ 0/^^-^^^ o/t J- ^^^ */^^^ *o/.^7^ 3- ADCIN
PROFILE OF LINE A
ELEVATION 6430
SCALE : HORIZONTAL t40
VERTICAL 10
x - ^iX^ J i \Ol \
| 0-50
0 20
-
0 50
,i
0 -10
'020
-
0.30
0 30
•"
0 20
0-20
040
-
080
0 50
060
030
0 20
—
1
h
Qy i
020
020
020
0 2C
020
0'5O
0 30
0-20
04O
020
0-30
04O
03O
030
0 30
030
0 20
v-*
:*^
•B
v (
LO
^ (
(r'1o-^o
—
^•^^^0 30
0-30
O' 30
-
O-40
——
040
C'20 0-50
1-10
——
06(
080
06C
, ..
030!
0.50
0 20
040
— ~
0-60
0 30
020
0-30
050
O-50
0-30
0 20
t)~*.
\
ti—
"1--^
t
\
'
n^n
020
020
,—
—
0-30
—
o-?o
0'30
0-20
020
0 2O
0-30
.
0-20
p-
——
030
-
,
O 21
0 30
— CHANNE^A M PL F e
E B W FA^0 ^.U 3 Og^ Wl[
. -:
0 30
1-32 / 2 C0-73/ 3C
0 30
0-56/ 2
0-2O
0-20
0 30
050/3O 30
0 30
O 30
.
O 20
w
O 40
0-30
.
0 80
0-50
-
0-50
-
030
IV
28'—l
i:k: 10
C-J30L 30' ^ TOTAL BUL1"
^io 785 0-58
0-30
O 5O
O 4O
0'30
0-30
O'6O
O 5O
0-30
5:K
41I14NE®*23 8018 ROBERTS 200 6280
6270
O O o
oCM
O O4-
to
o o4-
Oo
o o