Sentinel Asia Tsunami Working Group€¦ · Sentinel Asia Tsunami Working Group Co-Chairman: Prof....

21
Sentinel Asia Tsunami Working Group Co-Chairman: Prof. Shunichi Koshimura Abdul Muhari, PhD 3 rd Joint Project Team Meeting: Sentinel Asia STEP 3 (JPTM 2016) Abdul MUHARI, PhD Ministry of Marine Affairs and Fisheries Republic of Indonesia January 2016

Transcript of Sentinel Asia Tsunami Working Group€¦ · Sentinel Asia Tsunami Working Group Co-Chairman: Prof....

Page 1: Sentinel Asia Tsunami Working Group€¦ · Sentinel Asia Tsunami Working Group Co-Chairman: Prof. Shunichi Koshimura Abdul Muhari, PhD 3rdJoint Project Team Meeting: Sentinel Asia

Sentinel Asia Tsunami Working GroupCo-Chairman: Prof. Shunichi KoshimuraAbdul Muhari, PhD

3rd Joint Project Team Meeting:Sentinel Asia STEP 3 (JPTM 2016)

Abdul MUHARI, PhD

Ministry of Marine Affairs and Fisheries Republic of IndonesiaJanuary 2016

Page 2: Sentinel Asia Tsunami Working Group€¦ · Sentinel Asia Tsunami Working Group Co-Chairman: Prof. Shunichi Koshimura Abdul Muhari, PhD 3rdJoint Project Team Meeting: Sentinel Asia

Background: Tsunami Disaster and its impacts

Page 3: Sentinel Asia Tsunami Working Group€¦ · Sentinel Asia Tsunami Working Group Co-Chairman: Prof. Shunichi Koshimura Abdul Muhari, PhD 3rdJoint Project Team Meeting: Sentinel Asia

Critical problems since the aftermath

How extensive the tsunami penetrates? Where is the most affected areas?

How many people are exposed, killed, and injured ?How many structures/infrastructures are

damaged ?How extensive disaster relief activities should be

deployed ?How much amount of tsunami debris need to be

removed ?How much economic losses are ?

3

~minutes

~hours

~days

~weeks

Background: Tsunami Disaster and its impacts

Page 4: Sentinel Asia Tsunami Working Group€¦ · Sentinel Asia Tsunami Working Group Co-Chairman: Prof. Shunichi Koshimura Abdul Muhari, PhD 3rdJoint Project Team Meeting: Sentinel Asia

Background: Tsunami Disaster and its impacts

Page 5: Sentinel Asia Tsunami Working Group€¦ · Sentinel Asia Tsunami Working Group Co-Chairman: Prof. Shunichi Koshimura Abdul Muhari, PhD 3rdJoint Project Team Meeting: Sentinel Asia

How extensive the tsunami penetrates ?Optical satellite remote sensing (JAXA ALOS/AVNIR-2)

AVNIR-2 ©JAXA

Koshimura et al. (2012) 5

Page 6: Sentinel Asia Tsunami Working Group€¦ · Sentinel Asia Tsunami Working Group Co-Chairman: Prof. Shunichi Koshimura Abdul Muhari, PhD 3rdJoint Project Team Meeting: Sentinel Asia

Structural damage interpretation using aerial photosGSI (Geospatial Information Authority of Japan)

Gokon et al. (2012) 6

Page 7: Sentinel Asia Tsunami Working Group€¦ · Sentinel Asia Tsunami Working Group Co-Chairman: Prof. Shunichi Koshimura Abdul Muhari, PhD 3rdJoint Project Team Meeting: Sentinel Asia

(B)

0 21km

(A)

0 21km

Damage proportion( :No building) 1.00.0

Damage proportion1.00.0

Towards Quantitative Estimation of Structural Damage using SAR data• Pre and post event satellite data (TSX, CSK, RS-2, PALSAR-2, …)

• Digital elevation models (ASTER GDEM, SRTM)

• Building footprints

Reported damage3,471 (destroyed)

Estimation3,401 (destroyed)

Gokon et al. (2014) 7

Page 8: Sentinel Asia Tsunami Working Group€¦ · Sentinel Asia Tsunami Working Group Co-Chairman: Prof. Shunichi Koshimura Abdul Muhari, PhD 3rdJoint Project Team Meeting: Sentinel Asia

Tsunami Damage Detection using PALSAR

8

Page 9: Sentinel Asia Tsunami Working Group€¦ · Sentinel Asia Tsunami Working Group Co-Chairman: Prof. Shunichi Koshimura Abdul Muhari, PhD 3rdJoint Project Team Meeting: Sentinel Asia

Tsunami Debris Mapping usingLiDAR (Light Detection and Ranging)

www.bluesky-world.com

286,000t(2,381 houses)Fukuoka et al. (2013)

9

Page 10: Sentinel Asia Tsunami Working Group€¦ · Sentinel Asia Tsunami Working Group Co-Chairman: Prof. Shunichi Koshimura Abdul Muhari, PhD 3rdJoint Project Team Meeting: Sentinel Asia

1. Rapid determination of tsunami source model (Rapid estimation of coseismic fault model).

2. Acceleration of tsunami inundation simulation with high-performance computing infrastructure (HPCI) or methodology.

3. Establishing quantitative damage estimation and mapping methods to provide responders with mapping products.

4. Robust information dissemination to the public.

10

Challenges: towards real-time tsunami inundation forecasting and damage mapping for near-field tsunami events

Page 11: Sentinel Asia Tsunami Working Group€¦ · Sentinel Asia Tsunami Working Group Co-Chairman: Prof. Shunichi Koshimura Abdul Muhari, PhD 3rdJoint Project Team Meeting: Sentinel Asia

10-10-10 Challenge

11

Complete tsunami source estimationin 10 minutes

Complete inundation simulation with 10 m gridsin 10 minutes

Challenges: towards real-time tsunami inundation forecasting and damage mapping for near-field tsunami events

Page 12: Sentinel Asia Tsunami Working Group€¦ · Sentinel Asia Tsunami Working Group Co-Chairman: Prof. Shunichi Koshimura Abdul Muhari, PhD 3rdJoint Project Team Meeting: Sentinel Asia

12

Challenges: towards real-time tsunami inundation forecasting and damage mapping for near-field tsunami events

Page 13: Sentinel Asia Tsunami Working Group€¦ · Sentinel Asia Tsunami Working Group Co-Chairman: Prof. Shunichi Koshimura Abdul Muhari, PhD 3rdJoint Project Team Meeting: Sentinel Asia

Wooden houses

Others (Steel, RC)

13

Challenges: towards real-time tsunami inundation forecasting and damage mapping for near-field tsunami events

Koshimura et al. 2014

Page 14: Sentinel Asia Tsunami Working Group€¦ · Sentinel Asia Tsunami Working Group Co-Chairman: Prof. Shunichi Koshimura Abdul Muhari, PhD 3rdJoint Project Team Meeting: Sentinel Asia

Sentinel Asia STEP3 Evolution

Page 15: Sentinel Asia Tsunami Working Group€¦ · Sentinel Asia Tsunami Working Group Co-Chairman: Prof. Shunichi Koshimura Abdul Muhari, PhD 3rdJoint Project Team Meeting: Sentinel Asia

Horspool et al. 2014

• Multi scenario hazard analysis• Identification of influential source area• Number of simulation ~ 500 simulations

South of Bali, Indonesia

Strunz et al. 2010, Wegscheider et al. 2011, Muhari et al. 2014

Implementation: Pre-disaster situation, estimating exposed people

Page 16: Sentinel Asia Tsunami Working Group€¦ · Sentinel Asia Tsunami Working Group Co-Chairman: Prof. Shunichi Koshimura Abdul Muhari, PhD 3rdJoint Project Team Meeting: Sentinel Asia

Implementation: Post-disaster situation

What was missing in 2004 process? Land use regulation!An example of the reconstruction after 2011 Japan tsunami

2002

2005

2014

Banda Aceh

Muhari et al. 2014

Page 17: Sentinel Asia Tsunami Working Group€¦ · Sentinel Asia Tsunami Working Group Co-Chairman: Prof. Shunichi Koshimura Abdul Muhari, PhD 3rdJoint Project Team Meeting: Sentinel Asia

Sentinel Asia Tsunami WG

Proposal for Sentinel Asia Tsunami WG

Kickoff Meeting Results30 Nov. 2015

Page 18: Sentinel Asia Tsunami Working Group€¦ · Sentinel Asia Tsunami Working Group Co-Chairman: Prof. Shunichi Koshimura Abdul Muhari, PhD 3rdJoint Project Team Meeting: Sentinel Asia

Purpose/Goal

Contribution to enhancing capabilities of tsunami disaster management in Asia-Pacific countries

– Tsunami Risk Assessment– Tsunami Forecasting/Warning– Mapping Tsunami Inundation/Impact– Tsunami Evacuation Plan– Emergency Observation– Tsunami Risk Awareness/Education– Training Program/capacity building

Page 19: Sentinel Asia Tsunami Working Group€¦ · Sentinel Asia Tsunami Working Group Co-Chairman: Prof. Shunichi Koshimura Abdul Muhari, PhD 3rdJoint Project Team Meeting: Sentinel Asia

Activities of WG• Review of tsunami disaster response protocols of each

country (including forecasting, early warning, emergency observation, monitoring, mapping)

• Review of past tsunami events• Making plan of emergency observation for mapping

impact in disaster response• Making plan of using archive data for disaster response

and recovery• Making plan of success story (Definition of success

story)– End to end system/services for tsunami disaster mitigation

• Web-based information sharing (Activities/Efforts/Outcomes) in Sentinel Asia web site

Page 20: Sentinel Asia Tsunami Working Group€¦ · Sentinel Asia Tsunami Working Group Co-Chairman: Prof. Shunichi Koshimura Abdul Muhari, PhD 3rdJoint Project Team Meeting: Sentinel Asia

To Do & comments

• To invite related inst. to be the WG members• Be more comprehensive (increasing members from different

organization, but needs to nominate at least one focal point from each country)

• Define Users of the information, more specific. Each member should define the users. Sentinel Asia’s definition … User is basically national organization.

• Keep in mind “User-oriented approach”, not “Providers-oriented”.• Collaboration with developing agencies (ADB, JICA) and national

project• Classifying the implementation phases. • Sharing information including slides via Sentinel Asia Server• Exchange, collaborating with other organizations, groups• Next web-meeting, beginning of 2016 (not all members).• Needs WG webpage for outreach.

Page 21: Sentinel Asia Tsunami Working Group€¦ · Sentinel Asia Tsunami Working Group Co-Chairman: Prof. Shunichi Koshimura Abdul Muhari, PhD 3rdJoint Project Team Meeting: Sentinel Asia

Thank youAbdul Muhari, PhD

Co-Chairman Tsunami Working Group Sentinel Asia

Ministry of Marine Affairs and Fisheries Republic of IndonesiaJanuary 2016