Pacific Gas and Electric Company Semimonthly Report No. 23 Diablo Canyon Verification Program October 8, 1982 SUMMARY This is PGandE's twenty-third Semimonthly Status Report which summarizes the progress of our design verification program from September 21, 1982, through October 4, 1982. The Teledyne Engineering Services (TES) Independent Design Verification Program (Independent Program or IDVP) has identified 199 items to date. All but 52 items represent TES'eview of work performed by R. L. Cloud Associates (RLCA) and R. F. Reedy, Inc. (RFR) prior to March 25, 1982. Of the 199 items, 147 completion reports have been issued, 25 require action by PGandE, and 27 require action by the Independent Program. PGandE has reviewed the Independent Program's twenty-second Progress Report and has no comments at this time. PGandE's Internal Technical Program has identified to date a total of 33 items. During this reporting period, no new items were identified. To date, six of the 33 items have been closed by PGandE. 8210i50i59 821008 PDR *DOCK 05000275 I R PDR

Transcript of 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp...

Page 1: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Pacific Gas and Electric Company

Semimonthly Report No. 23

Diablo Canyon Verification Program

October 8, 1982

SUMMARY

This is PGandE's twenty-third Semimonthly Status Report which summarizes theprogress of our design verification program from September 21, 1982, throughOctober 4, 1982.

The Teledyne Engineering Services (TES) Independent Design VerificationProgram (Independent Program or IDVP) has identified 199 items to date. Allbut 52 items represent TES'eview of work performed by R. L. Cloud Associates(RLCA) and R. F. Reedy, Inc. (RFR) prior to March 25, 1982. Of the 199 items,147 completion reports have been issued, 25 require action by PGandE, and 27

require action by the Independent Program.

PGandE has reviewed the Independent Program's twenty-second Progress Reportand has no comments at this time.

PGandE's Internal Technical Program has identified to date a total of 33

items. During this reporting period, no new items were identified. To date,six of the 33 items have been closed by PGandE.

8210i50i59 821008PDR *DOCK 05000275

I R PDR

Page 2: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

I'

I'

I, ' ll e I'

Page 3: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

STATUS OF INDEPENDENT PROGRAM

This section provides the status of items identified in the Independent

Program.

Status Of Inde endent Pro ram Items

The items identified by the Independent Program are described inappropriate Independent Program progress reports. A list of the

Independent Program items is given in Attachment I, together with a

brief indication of the status of each item. A summary of Attachment

I is given in Table l. Although Phase II of the IDVP has not been

approved, Stone and Webster Engineering Corporation (SWEC) has been

performing Phase II work under the direction of TES. During thisreport period, SWEC has identified certain items related to Phase

II. These items are listed in Attachment I with file numbers in the

8000 series. PGaE will report Phase II items as a separate list once

Phase II is approved by NRC.

In addition, attachment IA indicates the Project status, includingthe expected Project resolution date, for each of the items that have

not been issued as a Completion Report.

Page 4: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

1

4)" +ci J

I C I'-V

1 J

g'! "p ~ ll

Page 5: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

TABLE 1: SUMMARY OF ATTACHMENT I

NUMBER REPORTED AS NUMBER REPORTED ASTYPE OF INDEPENDENT PROGRAM REPORTS OF SEPT. 20'982* OF OCT. 4 1982*

Open Item Reports

Potential Program Resolution Reports

Closed ItemDeviationOpen Item with future action by PGandESubtotal

5038

10

1213

Program Resolution Reports

Closed ItemDeviationOpen Item with future action by PGandESubtotal

0189

0

189

Potential Error Reports

Class A ErrorClass A or B ErrorClass B ErrorClass C ErrorClass D ErrorSubtotal

11020

150208

Error Reports

Class A ErrorClass A or B ErrorClass B ErrorClass C ErrorClass D ErrorSubtotal

34

110

0

18

351

100

19

Completion Reports

TOTAL NUMBER OF REPORTS

141

189

147

199

* Since the Independent Program's reporting period differs fromPGandE's, these numbers may differ from those reported in theIndependent Program's progress reports.

Page 6: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

~ ~, "IgI

I'~)J~ >»I-

I."t '-Ek f

I

t ~* J

't I'j

»

F

F h

.~ «!»"

jF ~ »

;FI,F,, I

Page 7: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

II> Inde endent Pro ram'"Re uests For Information

Twenty-seven'of 466 Requests For Information by the Independent Program

remain outstanding as of this report (Attachment II). Certain of the

items listed in Attachment II relate to Phase II of the verificationeffort.

III. PGandE's Review of Inde endent Pro ram's Twent -second Pro ress Re orts

PGandE has reviewed the Independent Program's twenty-second Progress

Report and has no comments at this time.

STATUS OF INTERNAL TECHNICAL PROGRAM

This section describes the status of work in PGandE's Internal TechnicalProgram being performed in addition to the Independent Program.

I. Annulus Review

This subsection provides a description of PGandE's progress inresolving concerns identified during review of the annulus design.Issues which were described in this section in previous reports butwhich are not now listed here, such as mechanical, piping, and

conduit supports, are now complete.

Page 8: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

hs~

Page 9: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Civil En ineerin

Structures

The confirmatory analysis of the steel annulus structure iscontinuing. This analysis accounts for loadings from as-builtmechanical equipment and piping. All members and their connections

will be evaluated for Hosgri, DDE, and DE loads. The examination ofthe structure for Hosgri loads is complete, including the design ofmodifications. Confirmatory analyses of this structure for DE and

DDE are in progress. The status of structural review for otherstructures are discussed below.

Corrective Action Pro ram

Status reporting for each particular piping issue, identified as an

Open Item by the Internal Technical Program and listed in Attachment

III, has been discontinued. The status of piping review is now

given on Table 2.

0 en Items Status

To date, a total of 33 open items have been identified by PGandE

(Attachment III). No new open item was identified during thisperiod. To date, six open items generated by the Internal TechnicalProgram have been closed by PGandE.

Page 10: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

1

P

J

i»' I'

Page 11: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

TABLE 2: STATUS OF PIPING REVIEW

Large Bore Piping

Percent~Com lete

Field as-built check

Drawing incorporation of field check results

Establish procedures and criteria

98

80

100

Qualification or reanalysis of seismic andthermal problems 65

Modifications — 0

Large Bore Pipe Supports

Procedures and criteria

Qualification or redesign of pipe supports

Modifications — 4

100

15

Small Bore Piping

Procedures and criteria

Initial sample selections

Computer Analyses Review

Span Criteria Sample Review

Other Review Activities

100

100

12

12

Modifications — 0

Small Bore Pipe Supports

Procedures and criteria

Initial sample selections

Span Criteria Sample Review

Standard Support Details Review

Seismic and Thermal Anchor Movement Review

100

100

Page 12: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

I

II~ ' ~ '

V

t

If

st I ~ N f'I

I ~

ff ~ f.

Page 13: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

TABLE 2 (Continued)

Percent~Cem lete

Code Boundaries Review

Local Pipe Stress From Lugs Review

Modifications — 0

80

John B. HochDiablo Canyon Project Manager

Page 14: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

l

'I

t

I.

1

a

Page 15: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

ATTACHMENT I

STATUS OF IDVP ITEMS

LEGEND

* Asterisk denotes revision or addition since last report.

l. FILE NO: The file number assigned to each item by the IDVP.

2. SUBJECT: Self-explanatory. Detailed description of the concern identifiedfor each item is available in Revision 0 of the Open Item Report associatedwith the same file number.

3. REV. 0 DATE: Date issue initially identified by Open Item Report, Revision0.

4. LATEST REV. NO: Latest revision number received by PGandE.

5. LATEST REV. DATE: Date latest revision received by PGandE.

6. STATUS: Status is indicated by the type of classification of latest reportreceived by PGandE:

OIRPPRRPRR

PER

ER

CR

CIDEV

0IPAB

C

D

Open Item ReportPotential Program Resolution ReportProgram Resolution ReportPotential Error ReportError ReportCompletion ReportClosed ItemDeviationOpen Item with future action by PGandEClass A ErrorClass B ErrorClass C ErrorClass D Error

Details of current actions related to each item are described in the latestrevision of the referenced report with the same file number.

7. ACTION RE(}'D BY: Indicates whether action on an item is needed by eitherIDVP or PGandE. Closed means IDVP Completion Report has been received.

8. PHY NODS: Physical modifications required to resolve the issue. Blankentry indicates that modification has not been determined.

9. PGandE TASK NO: PGandE task number assigned for tracking. Task numbersare not necessarily sequential.

0003L/0005P

Page 16: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

)

Page 17: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IPage 1

STATUS OF IDVP ITEMS

FILENO. SUBJECT

REV. 0DATE

LATESTREV NO.

LATESTREV. DATE STATUS

ACTION PHY. PG&E

~BK 'D BY NODS TASK NO.

910 RACEWAY SUPPORTS INSTALLATIONVARIANCE 01-05-82

930 RACEWAY CRITERIA

931 VALVE 9001A

932 SUPPORT 58S-23R DIRECTION

933 LINE 110 DIMENSION

934 SUPPORT 72-llR DIRECTION

935 LINE 931 CONNECTION TO LINE 1971

936 LINE 1971 DIMENSION

937 LINE 44 FLANGE

938 VALVE 8805B ORIENTATION

939 SUPPORT 73-72R DIRECTION

940 LINE 103 DIMENSION

01-05-82

01-06-82

01-06-82

01-20-82

01-20-82

01-20-82

01-20-82

01-20-82

01-20-82

01-20-82

01-20-82

920 AUX BLDG FLOOR RESPONSE SPECTRA DIFFERENCES 01-06-82

07-08-82

07-08-82

CR

CR

07-23-82 CR

07-22-82 CR

07-23-82 CR

05-24-82 CR

05-10-82 CR

05-24-82 CR

05-24-82 CR

04-09-82 CR

05-24-82 CR

07-08-82 CR

06-19-82 PRR/OIP

CLOSED NO 70000

CLOSED NO 70001

CLOSED NO 70002

CLOSED NO 70003

CLOSED YES 70004

CLOSED NO 70005

CLOSED NO 70006

CLOSED NO 70007

CLOSED NO 70008

CLOSED NO 70009

PG&E NO 70010

CLOSED NO 70011

CLOSED NO 70012

0003L/0005P

Page 18: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

II ~

V ~

Page 19: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IPage 2

STATUS OF IDVP ITEMS

FILENO. SUBJECT

REV 0 LATESTDATE REV. NO.

LATESTREV. DATE STATUS

ACTION PHY PG&E~BK 'D BY NODS TASK NO.

941 SUPPORT 18-4R DIRECTION

942 SUPPORT 18-7R LOCATION

943 SUPPORT 5006V LOCATION

944 SUPPORT 5003V LOCATION

945 SUPPORT 55S-20R DIRECTION & LOCATION

946 LINE 1980 DIMENSION

947 VALVE 8821A ORIENTATION

948 SUPPORT 13-23SL DIRECTION

01-20-82 .

01-20-82

01-20-82

01-20-82

01-20-82

01-20-82

01-20-82

01-20-82

950 VALVE FCV 95 PLATE THICKNESS

951 LINE 593 DIMENSION

952 LINE 593 DIMENSION

953 SUPPORT 58S-69R DIRECTION

954 LINE 574 DIMENSION

955 SUPPORT 55S-57R IDENTIFICATION

01-28-82

01-29-82

01-29-82

01-29-82

01-29-82

01-29-82

949* MAIN ANNUNCIATOR CABINET RIGIDITY & FREQUENCY 01-20-82

05-24-82 CR

05-24-82 CR

05-24-82 CR

05-24-82 CR

05-24-82 CR

05-24-82 CR

05-24-82 CR

05-24-82, CR

09-03-82 OIR

07-01-82 CR

05-24-82 CR

05-24-82 CR

07-08-82 CR

07-08-82 CR

04-09-82 CR

CLOSED

CLOSED

NO 70013

NO 70014

CLOSED NO 70015

CLOSED NO 70016

CZDSED NO 70017

CLOSED NO 70018

CLOSED NO 70019

CLOSED NO 70020

IDVP YES 70021

CLOSED

CLOSED

CLOSED

NO 70024

NO 70025

NO 70026

CLOSED NO 70027

CLOSED YES 70022

CLOSED NO 70023

0003L/0005P

Page 20: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

rl

t ll

L

I, 'I II

1 t,i" ' I

4

l

I

I

~ II

Page 21: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IPage 3

STATUS OF IDVP ITEMS

FILENO. SUBJECT

REV. 0DATE

LATESTREV. NO.

LATESTREV. DATE STATUS

ACTIONREIE'D BY

PHY. PG&EMODS TASK NO.

956 LINE 574 DIMENSION

957 LINES 577 6 578 INSULATION

958 SUPPORT 58S-55V LOCATION

959 SUPPORT 11-49SL LOCATION

960 LINE 19 DIMENSION

961%'UPPORT 11-59SL DIRECTION

962 SUPPORT 48-44R DIRECTION

963%'UPPORT 58S-32R DIRECTION

964 LINE 2519 SUPPORT IDENTIFICATION

965 SUPPORT 55S LOCATION

966 SUPPORT 14-33SL LOCATION

967 INTAKE STRUCTURE ACCELERATIONS

968 HARDING LAWSON ASSOCIATES QA FINDING

969 HARDING LAWSON ASSOCIATES QA FINDING

01-29-82

01-29-82

01-29-82

01-29-82

01-29-82

01-29-82

01-29-82

01-29-82

01-29-82

01-29-82

01-29-82

01-30-82

01-30-82

01-30-82

05-24-82 CR

07-23-82 CR

07-08-82 CR

06-28-82 CR

05-24-82 CR

09-21-82 CR

06-21-82 CR

07-19-82 ER/B

05-10-82 ER/C

06-19-82 CR

05-24-82 CR

09-10-82 CR

05-24-82 CR

05-24-82 CR

CLOSED NO 70028

CLOSED YES 70029

CLOSED

CLOSED

NO 70030

NO 70031

PG6 E

PGS E

YES 70035

70036

CLOSED NO 70037

CLOSED NO 70038

CLOSED 70039

CLOSED NO 70040

CLOSED NO 70041

CLOSED NO 70032

CLOSED NO 70033

CLOSED NO 70034

0003L/0005P

Page 22: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

I l

" JI

I

4

Page 23: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IPage 4

STATUS OF IDVP ITEMS

FILENO. SUBJECT

REV 0 LATESTDATE REV NO.

LATESTREVe DATE STATUS

ACTION PHY. PG&E~BB 'D BY NODS TASK NO.

970 HARDING LAWSON ASSOCIATES QA FINDING

971 EDS NUCLEAR QA OBSERVATION

972 EDS NUCLEAR QA OBSERVATION

973 EDS NUCLEAR QA OBSERVATION

974 EDS NUCLEAR QA OBSERVATION

975 EDS NUCLEAR QA OBSERVATION

976 EXTERIOR CONTAINMENT SPECTRA SUPERSEDED

977 ANNULUS AREA REEVALUATION

978 REGENERATIVE HEAT EXCHANGER SPECTRA

01-30-82 2

01-30-82

01-30-82

01-30-82

01-30-82

01-30-82

02-05-82

02-05-82

02-05-82

981 BURIED PIPELINE IS TO AB QUALIFICATION

982 TURB BLDG BLUME TRANSMITTALS

983* RACEWAY SUPPORT REEVALUATION

(includes files 910 and 930)

02-05-82

02-05-82

02-05-82

979 OTHER EQUIPMENT IN CONTAINMENT NOT REVIEWED 02-05-82

980 ASWP COMPARTMENTS QUALIFICATION DOCUMENTATION 02-05-82

05-24-82 CR

04-09-82 CR

04-09-82 CR

04-09-82 CR

04-09-82 CR

04-09-82 CR

04-17-82 CR

09-10-82 CR

06-21-82 CR

04-17-82 CR

04-17-82 CR

05-11-82 CR

07-23-82 CR

09-10-82 ER/A

CLOSED NO 70042

CIDSED

CIDSED

CLOSED

NO 70043

NO 70044

NO 70045

CIDSED NO 70046

CLOSED NO 70047

CZDSED NO 70048

CLOSED 70049

PG&E 70055

CLOSED NO 70050

CLOSED NO 70051

CLOSED NO 70052

CLOSED NO 70053

CLOSED NO 70054

0003L/0005P

Page 24: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

I

I

l

II "i l II

l

I

1

i

T) , ~

]l~

*

Page 25: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IPage 5

STATUS OF IDVP ITEMS

FILENO. SUBJECT

REV. 0DATE

LATESTREV. NO.

LATESTREV. DATE STATUS

ACTIONREIE'D BY

PHY.MODS

PG&ETASK NO,

984 TURB BLDG INTERFACE PROCEDURES

985 AUX BLDG WEIGHTS

986 CONTROL ROOM SPECTRA

987 AUX BLDG QUALIFICATION DETAILED REVIEW

988 INTAKE STRUCTURE CRANE REVIEW

989 TURB BLDG CRANE REVIEW

990 FH BLDG CRANE DESIGN INFO

991 FH BLDG CRANE MODIFICATIONS

992 OD WATER TANK DESIGN INFO

993 OD WATER TANK DESIGN INFO

994 PIPING CONSULTANT INTERFACE

995 EES TRANSMITTAL COVER SHEETS

02-05-82

02-05-82

02-05-82

02-05-82

02-05-82

02-05-82

02-05-82

02-05-82

02-05-82

02-05-82

02-06-82

02-06-82

07-23-82 CR

04-17-82 CR

07-22-82 CR

04-17-82 CR

09-10-82 CR

07-23-82 CR

07-23-82 CR

07-23-82 CR

09-09-82 CR

09-09-82 PRR/OIP

04-09-82 CR

04-09-82 CR

CLOSED NO 70056

CLOSED NO 70057

CLOSED NO

CLOSED NO

CLOSED

70058

70059

70060

CLOSED

PGE E

70064

70065

CLOSED NO 70066

CLOSED NO 70067

CLOSED NO 70061

CLOSED NO 70062

CLOSED NO 70063

0003L/0005P

Page 26: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

l

'I

II

(~

Page 27: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IPage 6

STATUS OF IDVP ITEMS

FILENO. SUBJECT

REV. 0DATE

LATESTREV. NO.

LATESTREV. DATE STATUS

ACTIONR~R'D BY

PHY. PGEEMODS TASK NO.

996 BLUME PIPING CORRESPONDENCE

997 VALVES TRANSMITTALS TO EES

998 VALVES TRANSMITTALS TO EDS

999 VALVES TRANSMITTALS TO EDS

1000 VALVES TRANSMITTALS TO WESTINGHOUSE

1001 VALVES VERIFICATION OF ACCELERATIONS

1002 SUPPLY FANS S67, 68 6 69 INPUT

1003 4 KV SW RM HVAC DUCT SUPPORT

1004 WESTINGHOUSE CONTAINMENT ELEC EQUIP

1005 ALE LABS TRANSMITTALS OF SPECTRA

1006 ELEC EQUIP QUALIFIED BY ANALYSIS

1007 ELEC EQUIP TRANSMITTAL OF INFO

1008 MAIN ANNUNCIATOR CABINET SPECTRA

02-06-82

02-06-82

02-06-82

02-06-82

02-05-82

02-05-82

02-05-82

02-05-82

02-05-82

02-05-82

02-05-82

02-05-82

02-09-82

05-10-82 CR

04-09-82 CR

04-09-82 CR

04-09-82 CR

04-17-82 CR

04-17-82 CR

06-23-82 CR

08-25-82 PER/C

06-22-82 CR

04-17-82 CR

04-21-82 CR

04-21-82 CR

06-08-82 ER/C

CLOSED NO 70068

CLOSED NO 70069

CLOSED

CLOSED

NO 70070

NO 70071

CLOSED NO 70072

CLOSED NO 70073

CLOSED NO 70074

IDVP NO 70075

IDVP NO 70080

CLOSED NO 70076

CLOSED NO 70077

CLOSED NO 70078

CLOSED NO 70079

0003L/0005P

Page 28: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

1l

Page 29: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IPage 7

STATUS OF IDVP ITEMS

FIIE

NO. SUBJECTREV 0 LATEST LATEST ACTION

DATE REV;-NU. REV. DATE STATUS ~RE 'D BYPHYMODS

PG&ETASK NO.

09-10-82 CR

07-23-82 CR

07-09-82 CR

04-21-82 CR

07-23-82 CR

09-10-82 ER/AB

02-09-82 6

02-09-82 6

02-09-82 3

02-0 9-82 1

02-09-82 7

02-09-82 7

1009 CONTAINMENT INTERIOR ABOVE 140 SPECTRA

1010 TURB BLDG ABOVE 140 SPECTRA

1011 DG OIL PRIMING TANK SPECTRA

1012 DG OIL PRIMING TANK 158 DIFFERENCE

1013 WYLE LAB SPECTRA

1014* CONTAINMENT SEISMIC REVIIÃ

(includes files 977 and 1009)

1015 DG OIL PRIMING TANK DAMPING

1016 ANCHOR ALLONABLES

1017 DG OIL PRIMING TANK SG WEIGHT

1018 SUPPLY FAN S-31 SUPPORT

2 04-17-82 CR

2 06-21-82 PRR/OIP

3 07-09-82 CR

02-11-82

02-11-82

02-11-82

02-18-82 CR3 07-13-82r

2 04-09-82 CR1019 CVCS SYSTEM SEPARATOR/STABILIZER DOCUMENTATION 02-18-82

CLOSED

CLOSED NO

70081

70082

PG&E 70086

CLOSED NO 70087

IDVP NO 70088

CLOSED NO 70089

CLOSED NO 70110

CLOSED NO 70090

CLOSED NO 70083

CLOSED NO 70084

CLOSED NO 70085

Page 30: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

l

II

1

,0

gJeg

e q

I „

k

gF

II

Jl

4 4'

(M(Rlt"'

Iht

I

t1% I r

! l

Page 31: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IPage 8

STATUS OF IDVP ITEMS

FIIENO. SUBJECT

REV 0DATE

LATEST LATEST ACTION PHYT PG&EREV NO 'EV DATE STATUS ~RE

' EY NODS TASK NO

1020 AUX SALTWATER PUMP PRELIM SPECTRA

1021* CCWHX ANALYSIS AS RIGID ANCHOR

1022* INTAKE STRUCTURE SEISMIC REVIEW

(includes files 967 and 988)

1023 3" VELAN VALVE DOCUMENTATION

1024 PIPE SUPPORT NOMENCLATURE

1025 VERTICAL SPECTRA FOR TURB BLDG ELEV104'026*

TURBINE BUILDING SEISMIC REVIEW (includesfiles 982, 984, 989, 1010, and 1025)

1027 FUEL HANDLING CRANE SUPPORT

1028 AUX BLDG HORIZONTAL ACCELERATION

1029 AUX BLDG MODEL DISCREPANCIES

1030 BORIC ACID TANK ANALYSES

1031 VALVES FCV-37 AND LCV-115 DOCUMENTATION

1032 PIPE SUPPORT 73/70R DIRECTION

02-18-82

02-18-82

02-18-82

02-19-82

02-20-82

02-20-82

02-20-82

02-23-82

02-23-82

02-25-82

02-25-82

03-02-82

03-02-82

3 06-29-82 CR CLOSED NO 70091

6 09-21-82 CR CLOSED NO 70092

5 09»10-82 ER/AB PG&E 70093

NO 700946 07-17-82 CR

3 06-07-82 CR

6 07-23-82 CR

5 07-23-82 ER/AB

CLOSED

CLOSED NO 70095

CLOSED NO 70096

70097PG&E

6 07-23-82 CR CLOSED NO 70111

5 07-13-82 PRR/OIP IDVP NO 70112

3 07-22-82 CR CLOSED NO 70113

3 07-09-82 CR CASED NO 70114

7 07-17-82 CR CLOSED NO 70115

5 07-07-82 CR CLOSED NO 70116

0003L/0005P0

Page 32: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

\ M

M

lf

I III I tl M I

t

M

I

I

f t

C 't

Page 33: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IPap,e 9

STATUS OF IDVP ITEMS

FILENO. SUBJECT

REV. 0DATE

LATESTREV. NO.

LATESTREV. DATE STATUS

ACTION~RR 'D BY

PHY. PG6 EMODS TASK NO.

1033 EES (CYGNA) QA OBSERVATIONS

1034 EES (CYGNA) QA OBSERVATIONS

1035 EES (CYGNA) QA OBSERVATIONS

1036 EES (CYGNA) QA OBSERVATIONS

1037 EES (CYGNA) QA OBSERVATIONS

1038 EES (CYGNA) QA OBSERVATIONS

1039 EES (CYGNA) QA OBSERVATIONS

1040 EES (CYGNA) QA FINDINGS

1041 FES (CYGNA) QA FINDINGS

1042 ANCO QA FINDINGS

1043 PIPE SUPPORTS 512/7R 6 512/6R LOCATION

1044 SMALL BORE LINES LOCATION

1045 SUPPORT 99/9R DIRECTION

1046 SUPPORTS 99/7R 6 99/9R DIMENSION

1047 SMALL BORE LINES LOCATION

1048 SUPPORT 99/101R LOCATION

03-02-82

03-02-82

03-02-82

03-02-82

03-02-82

03-02-82

03-02-82

03-02-82

03-02-82

03-02-82

03-08-82

03-08-82

03-08«82

03-08-82

03-08-82

03-08-82

04-09-82 CR

04-09-82 CR

04-09-82 CR

04-09-82 CR

04-09-82 CR

04-09-82 CR

04-09-82 CR

05-24-82 CR

05-24-82 CR

05-24-82 CR

07-28-82 CR

08-11-82 CR

07-28-82 CR

07-28-82 CR

09-11-82 PPRR/CI

06-10-82 CR

CLOSED NO 70117

CLOSED NO 70118

CLOSED NO 70119

CLOSED

CLOSED

NO 70120

NO 70121

IDVP

CLOSED

NO 70133

NO 70134

CLOSED NO 70122

CLOSED NO 70123

CLOSED NO 70124

CLOSED NO 70125

CLOSED NO 70126

CLOSED NO 70129

CLOSED NO 70130

CLOSED NO 70131

CLOSED NO 70132

0003L/0005P

Page 34: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

I

V

h'E p

Page 35: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IPage 10

STATUS OF IDVP ITEMS

FILENO. SUBJECT

REV. 0DATE

LATEST LATESTREV. NO. REV. DATE STATUS

ACTIONREIE'D BY

PHY.MODS

PG6 E

TASK NO.

1049 MAIN ANNUNCIATOR TYPEWRITER SPECTRA

1050 LINE 279-8 INSULATION

1051 INSULATION SPEC FOR LINES 264-8 S 2519-8

1052 WYLE LABORATORIES QA FINDINGS

03-08-82

03-08-82

03-08-82

03-09-82

1055 CONTAINMENT ANNULUS SPECTRA

1056 NO SIGNATURES ON SEVERAL PGSE CALCULATIONS

1057

1058+

ANALYSIS 106 DIFFER FROM THE PGBE ANALYSIS

SMALL BORE PIPING LUG DESIGN

1059%'MALL BORE PIPE REPORT OVERSTRESS

1060~ PIPES AND ADPIPE CODES

1061 HVAC FAN S31 FABRICATION DRAWING

1062 RLCA PIPING ANALYSIS 100-STRESS DIFFERENCE

1063 RLCA PIPING ANALYSIS 107-STRESS DIFFERENCE

03-10-82

03-10-82

03-15-82

03-15-82

03-15-82

03-15-82

03-15-82

03-15-82

03-15-82

1053 DIESEL GEN STARTING AIR RECEIVER TANK DAMPING 03-09-82

1054 DIESEL GEN STARTING AIR RECEIVER TANK ANALYSIS 03-09-82

07-23-82 CR

07-08-82 CR

06-07-82 CR

05-24-82 CR

07-09-82 CR

06-22-82 CR

05-24-82 CR

05-24-82 CR

04-17-82 CR

09-21-82 CR

09-21-82 CR

09-21-82 CR

05-11-82 CR

08-05-82 ER/C

07-22-82 ER/C

CLOSED NO 70135

CLOSED NO '0136CLOSED NO

CLOSED NO

CLOSED NO

70137

70138

70139

PG6E

PG6 E

70156

70157

CLOSED NO 70140

CLOSED NO 70149

CLOSED NO 70150

CLOSED NO 70151

CLOSED NO 70152

CLOSED NO 70153

CLOSED NO 70154

CLOSED NO 70155

0003L/0005P

Page 36: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

J

Page 37: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IPage ll

STATUS OF IDVP ITEMS

FILENO. SUBJECT

REV. 0bATE

LATESTREV. NO.

LATESTREV. DATE STATUS

ACTION~RR 'D BY

PHY.MODS

PG&ETASK NO.

1064 PG&E, QA FINDINGS

1065 PG&E, QA FINDINGS

1066 PG&E, QA FINDINGS

1067 URS/BLUME QA FINDINGS

1068 URS/BLUME QA FINDINGS

1069 VALVES LCV 113 AND LCV 115 UNSUPPORTED

1070 HORIZONTAL SOIL SPRING CALC DIFFER BY 507

1071 RLCA PIPING ANALYSIS 109-OVERSTRESS

1072 TURBINE-DRIVEN AUX FEEDWATER PUMP

1073 AUX SALTWATER PUMP BOLT STRESSES

03-15-82

03-15-82

03-15-82

03-15-82

03-15-82

03-15-82

03-15-82

03-23-82

03-23-82

03-23-82

1075 SUPPORTS 5007-R & 18-5R DIRECTION 03-31-82

1074 RLCA PIPING ANALYSIS 101-STRESS DIFFERENCE 03-23-82

05-24-82 CR

05-24-82 CR

05-24-82 CR

05-24-82 CR

05-24-82 CR

06-30-82 ER/A

07-22-82 CR

09-09-82 CR

09-10-82 CR

07-08-82 CR

08-05-82 ER/C

06-19-82 CR

CLOSED NO 70158

CLOSED NO 70159

CLOSED NO

CLOSED NO

CLOSED NO

70160

70162

70163

PG&E 70169

CLOSED NO 70170

PG&E YES 70164

CLOSED NO 70165

CLOSED NO 70166

CLOSED NO 70167

CLOSED NO 70168

0003L/0005P

Page 38: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

tl

Page 39: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IPage 12

STATUS OF IDVP ITFMS

FILENO. SUBJECT

REV. 0DATE

LATESTREV. NO.

LATESTREV. DATE STATUS

ACTIONREIE'D BY

PHY.MODS

PG8 E

TASK NO.

1076 SUPPORT 55S-3R DIRECTION

1077 HVAC DUCT SUPPORT

1078 VENTILATION SYSTEM LOGIC PANEL POV1, POV2

1079 AUX BLDG — FUEL HANDLING STRUCTURE

03-30-82

04-06-82

04-19-82

04-19-82

1082 VALVE FCV-95 ANALYSIS

1083 HVAC VOLUME DAMPER 7A

1084~ RLCA PIPING ANALYSIS 102

1085+ RLCA PIPING ANALYSIS 105

1086 RLCA PIPING ANALYSIS 108

1087 HOT SHUTDOWN REMOTE CONTROL PANEL

1088 COMPONENT CLG WATER HEAT EXCHANGER

1089 PIPE SUPPORT 3/30A

04-22-82

04-22-82

05-14-82

05-14-82

05-14-82

05-14-82

05-14-82

05-21-82

1080 RLCA PIPING ANALYSIS 103 — STRESS DIFFERENCE 04-22-82

1081 RLCA PIPING ANALYSIS 104 — STRESS DIFFERENCE 04-22-82

05-24-82 CR

08-11-82 PRR/OIP

07-13-82 CR

07-23-82 CR

09-03-82 ER/C

08-31-82 ER/C

07-01-82 CR

09-10-82 CR

09-10-82 ER/C

08-31-82 ER/C

09-10-82 ER/C

06-23-82 CR

08-17-82 OZR

06-19-82 CR

CLOSED NO 70171

PGSE NO 70173

CLOSED NO 70177

CLOSED NO

PG6 E

PG8 E

70178

70179

70180

PG8 E

PG&E

YES 70187

YES 70188

70189

CLOSED NO 70190

IDVP NO 70191

CLOSED NO 70199

CLOSED NO 70181

CLOSED NO 70182

0003L/0005P

Page 40: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

J

Page 41: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IPage 13

STATUS OF IDVP ITEMS

FILENO; SUBJECT

REV 0DATE

LATESTREV NO

LATESTREV. DATE

ACTION PHY PG&ESTATUS ~BB

' BY NODS TASK NO.

1090 PIPE SUPPORT ll/92SL1091 AUX BLDG —FUEL HANDLING BUILDING

1092* FUEL HANDLING BUILDING REEVALUATION

05-21-82

05-21-82

06-11-82

3 06-19-82 CR

6 08-10-82 CR

6 08-10-82 ER/A

CLOSED

PG&E

NO 70201

70204

CLOSED NO 70200

1094 INTAKE STRUCTURE SOILS REVIEW

1095 AUX BLDG — FLOOR RESPONSE SPECTRA

1096 SUPPLY FAN S-31

07-07-82

07-0 9-82

07-09-82

1097* AUXILIARYBUILDING SEISMIC REEVALUATION 07-13-82

(includes files 920, 986, 1029, 1070, and 1093)

(includes files 990, 991, 1027, 1079, and 1091)

1093 AUX BLDG — FAN RM AND VENTILATION RM 06-18-82 6 07-22-82 CR CLOSED NO 70205

3 07-09-82 PRR/OIP PG&E NO 70206

0 07-09-82 OIR IDVP 70207

1 07-13-82 PER/A IDVP 70208

4 07-22-82 ER/AB PG&E 70209

1098* PIPING SEISMIC REEVALUATION 07-14-82 5 09-22-82 ER/AB PG&E 70210

(includes files 961, 1021, 1058, 1059, 1060, and 1104)

1099* CCW HX FIELD INSPECTION DEFICIENCY

1100 HLA SOILS REVIEW —OD WATER STORAGE TANKS

1101 HLA SOILS REVIEW — OD WATER-STORAGE TANKS

1102 HVAC DAMPER 7A

1103 PIPE SUPPORTS ATTACHED TO AUXILIARYSTEEL

08-04-82

08-16-82

08-16-82

08-19-82

08-31-82

1104* RLCA PIPING ANALYSIS 110 LINES 4260 AND 3078 09-03-82

2 08-20-82 PRR/OIP PG& E 70211

2 09-10-82 PRR/DEV PG&E 70215

2 09-10-82 PRR/OIP PG&E 70216

1 08-19-82 PER/C IDVP 70217

1 08-31-82 PP~OIP IDVP 70218

3 09-22-82 CR CIDSED NO 70219

0003L/0005P

Page 42: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

N

n

'p

Page 43: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IPago 14

STATUS OF IDVP ITEMS

FILENO. SUBJECT

REV. 0DATE

LATESTREV. NO.

LATESTREV. DATE

ACTIONSTATUS REIE'D BY

PHY.MODS

PG8 E

TASK NO.

3000 HARDING LAWSON ASSOCIATES QA REPORT

3001 EES (CYGNA) QA REPORT

3002 ANCO QA REPORT

3003 WYLE LABORATORIES QA REPORT

3004 PGLE QA REPORT

3005 URS/BLUME QA REPORT

05-24-82

05-24-82

05-24-82

05-2a-82

05-24-82

05-24-82

06-22-82 CR

06-22-82 CR

06-22-82 CR

06-22-82 CR

06-22-82 CR

06-22-82 CR

CLOSED NO

CLOSED NO

CLOSED NO

70194

70195

70196

CLOSED NO 70197

CLOSED NO 70192

CLOSED NO 70193

0003L/0005P

Page 44: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

t

f

Page 45: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IPage 15

STATUS OF IDVP ITEMS

FILENO. SUBJECT

REV~ 0DATE

LATEST LATESTREV. NO. REV DATE STATUS

ACTION PHY PG&E~BS 'D BY NODS TASK NO.

8001* NSC ENVIRONMENTS — COMPUTER CODE

8002* NSC MASS-ENERGY RELEASE CALCULATION

8003* NSC VALUE OF BIDWDOWN ENTHALPY

8004* NSC INITIALTEMPERATURES

8005* ASSUMPTIONS FOR SUBMERGENCE ANALYSIS

8006* NSC PRESSURES AND TEMPERATURES

8007* PIPE RESTRAINT 1030 — 14RT

8008* PIPE RESTRAINT 1031-llRT8009* AFWS DISCHARGE PIPING PRESSURE

8010* AFW TURBINE THROTTLE VALVE

8011* AFW AND CRVP SYSTEMS CABLE

8012* CLASS 1 PORTIONS OF THE CRVP SYSTEMS

8013* EMERGENCY DIESEL GEN NOS. 11,12 and 13

09-09-82

09-09-82

09-09-82

09-09-82

09-09-82

09-09-82

09-13-82

09-13-82

09-13-82

09-13-82

09-23-82

09-23-82

09-23-82

8015* AFW SYSTEM FLOW CAPACITY

8016* POWER SUPPLIES TO CRVP EQUIPMENT

09-27-82

90-27-82

8014* AFW SYSTEM VV. LCV 108,109s113,115KFCV 436K 09-23-82

437

1 09-09-82 PER/AB

10-01-82 PER/AB

IDVP

IDVP

10-01-82

10-01-82

10-01-82

10-01-82

PER/AB

PER/AB

PPRR/OIP

PPRR/OIP

IDVP

IDVP

IDVP

IDVP

10-01-82 PPRR/OIP IDVP

10-01-82 PPRVOIP IDVP

10-01-82

10-01-82PPRR/OIP

PPRR/OIP

IDVP

IDVP

10-01-82 PPRR/OI P IDVP

10-01-82 PPRR/OIP IDVP

10-01-82 PPRR/OIP

10-01-82 PER/AB

IDVP

IDVP

1 10-01-82 PPRR/OIP IDVP

1 10-01-82 PPRR/OIP IDVP

70220

70221

70222

70223

70224

70225

70226

70227

70228

70229

70230

70231

70232

70233

70234

70235

0003L/0005P

Page 46: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

N 4

n II

I II

t

II ~ (

f II

I

~ I

Page 47: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IAPage 1

STATUS OF OPEN EOIsS

IDENTIFIED BY THE IDVP

EOIFILE NO. TITLE

ACTIONRE 'D

IDVPREPORTSTATUS

SCHEDULED RESOLUTIONDATE FOR PROJECT

REQUIREMENTSANALYSIS MODIFICATION*

938

949

963

964

983

993

1003

1008

Valve 8805B Orientation

Main Annunciator Cabinet Rigidity and Frequency

Support 58S — 32R Direction

Line 2519 Support Identification

Raceway Support Reevaluation

(includes files 910 and 930)

OD Water Tank Design

4 kV SW RM HVAC Duct Support

Main Annunciator Cabinet Spectra

Project PRR/OIP

IDVP OIR

Project

Project

Project

ER/C

ER/A

IDVP PER/C

IDVP ER/C

Project PRR/OIP

10/15

Done

10/31

10/31

12/07

10/15

Done

Done

M/E

M/E

N/I

N/I

N/A

N/A

* N/A = Not Applicable,

N/E = Not Expected,

N/I = Not Identified,

M/E = Modifications Expected

Page 48: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

II''i

Eli5

I

C

0t"f~~4

V

D

,r

E

VN

h

Page 49: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

4ttachment IAPage 2

EOIFILE NO TITLE

ACTIONRE AD

IDVPREPORTSTATUS

SCHEDULED RESOLUTIONDATE FOR PROJECT

REQUIREMENTSANALYSIS MODIFICATION

1014 Containment Seismic Review

(includes files 977 and 1009)

Project ER/AB 11/05 N/I

1016 Anchor Allowables IDVP PRR/OIP Done N/A

1022 Intake Structure Seismic Review

(includes files 967 and 988)

Project ER/AB 11/19 N/I

1026 Turbine Building Seismic Review

(includes files 982, 984, 989, 1010, and 1025)

Project ER/AB TBD N/I

1028 Auxiliary Building Horizontal Acceleration

1047 Small Bore Lines Location

1062 RLCA Piping Analysis 100 Stress Difference

1063 RLCA Piping Analysis 107 Stress Difference

1069 Valves LCV 113 a LCV 115 Unsupported

1074 RLCA Piping Analysis 101 Stress Difference

IDVP

IDVP

PRR/OI P

PPRR/CI

Project ER/C

Project ER/C

Project ER/A

Project ER/C

9/30

Done

10/15

10/15

10/15

10/15

N/I

N/A

N/E

N/N

N/A

N/E

Page 50: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

ll

I

t

'IlI

Page 51: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IAPage 3

EOIFILE NO. TITLE

ACTIONRE 'D

IDVPREPORTSTATUS

SCHEDULED RESOLUTIONDATE FOR PROJECT

REQUIREMENTSANALYSIS MODIFICATION

1077 HVAC Duct Support

1080

1081

1084

1085

1086

1088

1092

1094

1095

1096

1097

RLCA Piping Analysis 103 Stress Difference

RLCA Piping Analysis 104 Stress Difference

RLCA Piping Analysis 102

RLCA Piping Analysis 103

RLCA Piping Analysis 108

Component CLG Water Heat Exchanger

Fuel Handling Building Reevaluation

(includes files 990, 991, 1027, 1079, and 1091)

Intake Structure Soils Review

Auxiliary Building — Floor Response Spectra

Supply Fan S-31

Auxiliary Building Seismic Reevaluation

(includes files 920, 986, 1029, 1070, and 1093)

Project

Project

Project

Project

Project

Project

PRR/OIP ll/01

ER/C 10/15

ER/C 10/15

ER/C 10/15

ER/C 10/15

ER/C 10/15

IDVP OIR Done

Project ER/A 11/30

Done

IDVP OIR 11/16

IDVP PER/A

Project ER/AB

IDVP

11/16

Project PRR/OIP

N/I

N/E

N/E

N/E

N/E

N/A

N/I

N/A

N/I

N/I

N/I

Page 52: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

C

~ ( It'

It

I'

I''V

f II

. ~,I

f ll

If

r"

3

Msl

f

flijlf I"f

I

f

lfI t» =

, ~

I'' I

VC'„I a ~

\ l

f ~ I 'f

I Ile'

~

t'

g

fff

I

g~

I- t

I

~-p alC*

;.a

fl ~

It

~ \f 4 f

~t

Page 53: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IAPage 4

EOIFILE NO. TITLE

ACTIONRE 'D

IDVPREPORTSTATUS

SCHEDULED RESOLUTIONDATE FOR PROJECT .

REQUIREMENTSANALYSIS MODIFICATION

1098 Piping Seismic Reevaluation Project ER/AB 10/15 N/I

1099 CCW HX Field Inspection Deficiency

1100 HLA Soils Review-OD Water Tanks

1101

1102

1103

8001

8002

8003

8004

8005

8006

HLA Soils ReviewWD Water Tanks

HVAC Damper 7A

Pipe Supports attached to Auxiliary Steel

NSC Environments — Computer Code

NSC Mass-Energy Release Calculation

NSC Value of Blowdown Enthalpy

NSC Initial Temperatures

Assumptions for Submergence Analysis

NSC Pressures and Temperatures

(includes files 961, 1021, 1058, 1059, 1060, and 1104)

Project

Project

Project

IDVP

IDVP

IDVP

IDVP

IDVP

IDVP

IDVP

IDVP

PRR/OIP

PRR/DEV

PRR/OIP

PER/C

PPRR/OIP

PER/AB

PER/AB

PER/AB

PER/AB

PPRR/OI P

PPRR/OIP

Done

IDVP

IDVP

Done

IDVP

IDVP

IDVP

IDVP

IDVP

IDVP

IDVP

N/I

N/I

N/I

N/I

N/I

N/I

N/I

N/I

N/I

N/I

N/I

Page 54: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

,tl

T

II > ~

Page 55: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IAPage 5

EOIFILE No. TITLE

ACTIONRE 'D

IDVPREPORTSTATUS

SCHEDULED RESOLUTIONDATE FOR PROJECT

REQUIREMENTSANALYSIS MODIFICATION

8007

8008

8009

8010

8011

8012

8013

8014

8015

8016

Pipe Restraint 1030-14RT

Pipe Restraint 1031-llRT

AFWS Discharge Piping Pressure

AXW Turbine Throttle Valve

AFW and CRVP Systems Cable

Class 1 Portions of the CRVP Systems

Emergency Diesel Generator Nos. 11, 12, & 13

AXW System Valves LCVs, 108, 109, 113, 115,

FCVS 436'37

AXW System Flow Capacity

Power Supplies to CRVP Equipment

IDVP

IDVP

IDVP

IDVP

IDVP

IDVP

IDVP

IDVP

IDVP

IDVP

PPRR/OIP

PPRR/OIP

PPRR/OIP

PPRR/OI P

xxaa/ozp

PPRR/OI P

xxaa/ozp

PER/AB

x xaa/ozp

xxaa/ozp

IDVP

IDVP

IDVP

IDVP

IDVP

IDVP

IDVP

IDVP

IDVP

IDVP

N/I

N/I

N/I

N/I

N/I

N/I

N/I

N/I

N/I

N/I

Page 56: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

C

l 4

"I4

4

4

'PW,P

4 II

Ih

«4

LCd5

l- ~

I

4

I/1

lg

lP,

t)

I

4 II

t

I

ls

C'.

lI

II

4)li l

4

44

I~''

1 ~ 4

~4

Pr~

Page 57: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

ATTACHMENT II

OUTSTANDING

IDVP REQUESTS FOR INFORMATION

LEGEND

* One asterisk denotes a revision since the last report.

** Two asterisks denote an addition since the last report.

0003L/0005P

Page 58: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

l

Page 59: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IIPage 1

OUTSTANDING IDVP RE UESTS FOR INFORMATION

REQUEST DATE OFNO. ~HH VEST DESCRIPTION OF RE UEST

ESTIMATEDDELIVERY DATE

RESPONSIBLEGROUP

RLCA-291* 08-18-82 16 design valve accelerations. 10-15-82 PIPING

RLCA-294 08-19-82 Procedures and results of the comparison ofcontrolled spectra against all Hosgri quali-fications and implementation of the recom-mendations in Section 3.5 of ITR 4.

11-01-82 I a CELEC

RLCA-306 08-24-82 Computer code documentation and benchmarking forall codes being used for the current seismicreevaluation.

10-15-82 EQC

RLCA-317* 08-27-82 All piping line numbers related to Table 1 andTable 2 (Section II) of PGaE's 8/24/82 letterto NRC.

10-15-82 VERIF

RLCA-323* 09-10-82 Additional copy of the information providedfor RFI No. 75.

10-15-82 PIPING

RLCA-325** 09-21-82 List of all completed isometrics for large andsmall bore computer analysed piping.

10-13-82 PIPING

RLCA-328** 09-22-82 Pipe size and schedule for the pipe attach tothe pipe support 58S/23R.

10-15-82 PIPING

- RLCA-329** 09-22-82 Supported pipe masses for lines 319 and 594 acting 10-15-82on supports 58N/3R and 58S/69R.

PIPING

Page 60: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

N

I 'f )il

I

Page 61: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IIPage 2

OUTSTANDING IDVP RE UESTS FOR INFORMATION

REQUEST DATE OFNO. ~RE UEST

RLCA-330** 09-22-82

DESCRIPTION OF RE UEST

Detailed criteria, procedures and methodologyfor the containment exterior applicable to theITP

ESTIMATEDDELIVERY DATE

To be determinedat a later date.

RESPONSIBLEGROUP

CIVIL

RLCA-331** 09-22-82 Detailed criteria, procedures and methodologyfor the containment interior applicable to theITP

To be determinedat a later date.

CIVIL

RLCA-332** 09-22-82 Detailed criteria, procedures and methodologyfor the turbine building applicable to theITP.

To be determined CIVILat a later date.

RLCA-333** 09-22-82 Detailed criteria, procedures and methodologyfor the intake structure applicable to theITP.

To be determined CIVILat a later date.

RLCA-334** 09-22-82 Detailed criteria, procedures and methodologyfor the auxiliary building (shear wall portion)applicable to the ITP.

10-15-82 CIVIL

RLCA-335** 09-22-82 Detailed criteria, procedures and methodologyfor the fuel handling building applicable to theITP

10-15-82 CIVIL

RLCA-340** 09-22-82 Detailed criteria, procedures and methodologyfor mechanical equipment applicable to theITP.

10-13-82 MECHSYSTEM

Page 62: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

tC

N

]I

r

II

tr

W

V

8

II

II

II

w

Page 63: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IIPage 3

OUTSTANDING IDVP RE UESTS FOR INFORMATION

REQUEST DATE OFNO. ~RE UEST

RLCA-341** 09-22-82

DESCRIPTION OF RE UEST

Detailed criteria, procedures and methodologyfor electrical equipment applicable to theITP.

ESTIMATEDDELIVERY DATE

11-01-82

RESPONSIBLEGROUP

ELEC

RLCA-342** 09-22-82 Detailed criteria, procedures and methodologyfor HVAC equipment applicable to theITP

11-01-82 HVAC

RLCA-343** 09-22-82 Detailed criteria, procedures and methodologyfor electrical raceways applicable to theITP

10-15-82 CIVIL

RLCA-344** 09-22-82 Detailed criteria, procedures and methodologyfor instrument tubing applicable to theITP

11-01-82 I&C

RLCA-346** 09-24-82 List of all qualification calculations relatedto the current Hosgri review for the containmentauxiliary, intake, turbine and fuel handlingbuildings.

10-15-82 CIVIL

RLCA-347** 09-24-82 List of all large bore piping supports(restricted to the Hosgri evaluation only) forwhich the ITP review and reanalysis (wherenecessary) have been completed.

10-15-82 PIPING

RLCA-349** 09-24-82 List and description of samples of small borepiping qualified by span criteria, small borepiping supports and instrument tubing and tubingsupports (restricted to the Hosgri evaluation)selected for the Internal Technical Program.

TO BE DETERMINEDAT A LATER DATE

PIPING

Page 64: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

II

I'P

Page 65: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IIPage 4

OUTSTANDING IDVP RE UESTS FOR INFORMATION

REQUEST DATE OFNO. ~RE VEST

TES-0100** 09-16-82

TES-0102** 09-17-82

DESCRIPTION OF RE VEST

Reanalysis packages for piping problems 6-11and/or 4A-26 that were sent to BNL.

Computer Input/Output for piping models 6-11and 4A-26 sent to BNL.

ESTIMATEDDELIVERY DATE

10-13-82

10-13-82

RESPONSIBLEGROUP

PIPING

PIPING

TES-0103** 09-21-82

TES-0105** 09-23-82

PGandE and M. W. Kellogg piping drawings.

Clarification of PGandE supplied envelopespectra. Annulus stress calculations.

10-15-82

10-15-82

PIPING

CIVIL

TES-0106** 09-24-82 Stiffness calculations for Elev. 140'fAnnulus Structure. Provide drawings referencedin hand calculations (JAB-8168-02-CA-06).

10-15-82 CIVIL

Page 66: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

I

MO

'4

I

N

t

I

It

a

fi

I

l

)f

1o

'II

f

1t

I

)

4I

f.l

ii.

(

f II

«)

liI 4 )

' f

IA

I

f) „

tt

Y

f'

rI'

I

I

'I

I

Il

I'I

II'~

'If'

If

IIY

Page 67: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

ATTACHMENT 111

OTHER FINDINGS (OPEN ITEMS)

LEGEND

* Asterisk denotes item with revisions this reporting period.

** Status is reflected in Table 2.

l. TASK: The number assigned by PGandE for tracking.

2. INITIATING DOCUMENT: The document which first identified theopen item.

3. IDENT DT: The date the problem was identified (year-month-day) .

4. ECD: Estimated completion date. The computer will enter 999999until a date is entered.

Note ls Task numbers are not necessarily sequential for thislisting. All 70000 series task numbers are dedicated toIDVP items or OIs.

0003L/0005P

Page 68: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

q~

*

V

Page 69: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment II IPage 1

IHITIATIHGTASK DOCNEHT

IOEHTDATE ECD 0 ESCR IPTIO H

STATUS OF PGandE OPEH ITEMS

5TAlllSDESCRIPTIOH OF RESOLUTIOH

COICLUSIVE 'EFEREICE TQ ERROR I 'L liODIFI-STATIliEHT ITP PHASE I CLASS AHALTSIS CATIOI6

OF RESOLUTIOH 'IHAL REPORT PER IDVP CNPLETE CNPLE

70098* 5 emi san th1yStatus ReportHo. 7Other Findings,Item 1

70099* 5 eminonth ly5 ta tv s R epe'tHo. 7Other Findings,Item 2

820212 821130 PGSE Open Item:Hodeling of all annulus areavalves uas reviewed. Six verefound to he modeledinca.rectly. The valvemodeling in all Unit 1 pipinganalyses wf 11 be revieved. Ifmodeling errors are found,affected piping analysesHII be rerun.

820212 820521 PQE Open Item:The digitization of theeast-uest translational Hosgrispectra for the 140 ft elevationin the auxiliary building hasbeen found to contain ane r or. All affected pipinganalyses Nill be rerun andpipe suppa ts requalified.

The initial conc e nadd~essed inapp op.iatemodeling of valveeccentric masses at thepipe center line and allanalyses were revieNed tolocate modeling errors ofthis type. The modelshave been corrected andanalyses rerun. Theinternal technicalprogram includes revimand reanalysis, asnecessary, for othervalve modeling issuessuch as extendedstructure stiffness,valve weights andlocation of the extendedmass center of gr avity.

All piping analysesvere revi eNed to identifyaffected piping. Oneanalysis was found toneed r eana lysi s. Thispiping analysis was rerun.

Reanalysis iscomplete, andsupport redesignand quali ficationare complete.This iten isclosed (8205211.

Section A2.2.1,2.2.1.3.3.2,2.2.22.2.2.3.1.2

Section A2.1.2

100 100

n1n7 hlnn7 lh

Page 70: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

I

1I

/if

Page 71: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IIIPage 2

IHITIATINGTlSK DOC WENT

IDENTDATE ECD DESCRIPTIOH

STATUS OF PGandE OPEN ITOfS

STATUSDESCRIPTIOH OF RESOLUTION

COKLUSIVE REFEREICE TO ERROR X X ffODIFI-STATEHENT ITP PHASE I CLASS AHALTSIS CATIONS

OF RESOLUTION FINAL REPORT PER IDYP CWPLETE CO1PLETE ~70100+ 5 emf month ly

S tatus Reps.tNo. 7

Other Findings,Item 3

820212 821215 PQE Open Item:The method used to calculateraceway weights may haveresulted fn an underestfmatfonof the weights of someconduf ts. A thoroughreve.kffcatfon programfor all raceway suppm.ts willbe conducted.

A review of all safety-c lass raceway supports fsbeing conduc ted. Thesuppm ts either wf 11 bequalfffed by analysfs orwill he modf fied.

Section A or B 50 02.4

70101* S earlmonthlyStatusKo. 7Othe Ffndfngs,Item 4

70102* S emf month lyStatus Reps tNo. 7Othe Ffndfngs,I tem 5

820212 820315 PQE Open Item:Review of all Unit 1 smallbae piping has fdentfffed40 supports requiringvertical restraint where onlya single rod was utflfzed.ffodfffcatfon of these suppo tswill be made.

820212 821130 PG&E Open Item:One valve lfst fn theHosgrf report was not updatedas required by the secondphase. All design Class 1

active valves wf 11 be reviewedto nake use they are quaif fied.

All small ba e pfpfngt

single r od supportsrequired to function asvertfcal restraints willbe fdentf ffed,andand modfffed to providerestraint to both upwardand down~a~d movement.

A complete lfstfng of allactive valves requfredfor cold shutdownfollowfng a sefsrrfc eventwill be prepar ed andthese v a ives wf 11 bereviewed to assure theyare qualf ffed to Hosgrfcrf ter f a.

100 100

Section2.2. 1

2.2. 1.3.42.2.2.3 .2.2

A or 8 15

Forty sing le Section Arod supports were 2.2.4.1.1found fn

I'ocationswhichr equfred verticalrestr af nt andthese supportshave beenmodfffed to pre-vent uplift. Thisitem is closed(8203 15 I.

nVn Amn7 >A

Page 72: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

jX

I I

k'

Page 73: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IIIPage 3

INITIATINGTASK DOC IHEHT

70103* S emk monthlyStatus ReportNo. 7Othe'indings,Item 6

IOEHTDATE ECD D ESC RIP TIDE

STATUS OF PGandE OPEN ITEHS

STATUSDESCRIPTIOH OF RESOLUTIOH

A large sample of smallbore piping has beenreviewed and me spanskdentk fied. Analysis hasbeen completed toidentify those spanswhich may incur seismicstresses exceedingal 1owab les. Th e percent-age of spans kn thisclass relative to thetotal population ks 0.19%Design requirements havebeen issued to correctthe few ove'stressesfound. Yerk fication ofsupport quali ficationsassociated with overspansis complete and allsupports reviewed werefound to comply with thewith the originalacceptance criteria. Asample review to addressthe curaiatkve effect ofoverspans coupled withother issues ks knprogress.

820212 821130 PGEE Open Item:Certain small bore pipingspans have been identifiedas deviating from seismiccriteria. Review and analysiswill be performed to dete mineextent and skgni fkcance.

COICLUSIYESTATUE NT

OF RESOLUTIOHI

This item wasclosed on April20, 1982 for thespecific issueidentified. How-ever, the statusof piping reviewbeing performedas a part of thecorrective actionprogram, Akchincludes recon-sideration ofthis issue isr eflected inTable 2.

REFERECE TO ERROR X C HODIFI-ITP PHASE I CLASS ANAL'%IS CATIOl5FINAL REPORT PER IDYP CNPLETE CNPLETE~

Section A2 2.2.2 2 2.3 3.2.2.4,2.2.4.3.2.2

0

'7

87 A/007 lA

Page 74: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

I

Pcw

L

Page 75: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IIIPage 4

STATUS OF PGandE OPEN ITIMS

IHITIATIHG

TASK OOCll1EHT

70104* S emimonthlyStatus Repa tHo. 7Othe. Findings,Item 7

IOEHTOATE EC0 DESCRIPTION

820212 821130 PGSE Open Item:I Piping revie~ of the annulus

revealed two thermal analyseswhich used incorrect modelingof supports. A sample of otherthermal analyses will beper formed.

STATUSOESCRIPTION OF RESOLUTIOH

The two thermal analyseswill be rerun andsupports qualified. Also,all thermal analyses willbe reviewed and thosefound to contain supportmodeling ere s will bererun and associatedsupports will berequali fied.

The two therma'1analyses havebeen re un andsuppl'tsqua lified.

Section2.2.1,Z.Z.1.3.2. 1,2.2 2.2.2.2.3.2. 1

2.2.2.3.3

A or 8

COCLUSIVE ', REFERECE 10 ERROR

STATEMEHT ITP PHASE I CLASSOF. REEOLUTIOR FIRRL REPORT PER IOTP

C MOOIFI-ANALYSIS CATIONSCNPLETE COMPLETE

** **

70105+ 5 emi monthlyStatus Repm tHo. 7Othe Findings,Item 8

820212 821130 PGEE Open Item:Piping with supports attachedto the containment internalstructure above elevation 140ft we e dynamically analyzedusing 140 ft spectra. Piping,electrical r aceways andsuppa ts attached tocontainment exteri or pipewaywere analyzed usingcontainment exterior spectra.Further analysis is beingperformed to verify appro-

priatenesss

of theseassumptions.

Appropriate spectra weredeveloped. The newspectra are beingcompared to spectra usedin the previous qualifi-cations. lhere qualifyingspectra do not envelopethe new spectra, analyseswill be performed toqua'li fy piping systemsand electrical raceway tocri te'1 a. Modi ficatfonswill be performed, asrequired.

The app.opriatespectra have beendev eloped.

Section2.2.1,2.2.1.3.2-2,2 2 2R2.2.2.3.2.1.2.2.2.3.3

35(non-pipingt50

(piping'787

A/007 1A

Page 76: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

h

~I

Page 77: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IIIPage 5

I HIT I ATI HG

TASK DOCIMENTIOEHTDATE ECO DESCRIPTION

STATUS OF PGandE OPEN ITEHS

STATUSDESCRIPTION OF RESOLUTIOH

COICLUSIVE; REFEREICE TD ERROR I X HODIFI-STATB/ENT,'TP PHASE I CLASS AHALTSIS CATIOI6

OF RESOLUTION FINAL REPORT PER IOYP CNPLETE CNPLETE

70106* 5 emf amnthlyStatus Repa tHo. 7Other Findings,Item 9

70107* 5 emf monthlyStatus Repa.tHo. 7Othe Findings,Item 10

820212 821130 PQE Open Item:One case of a pipe supportdesign with fewer pfpe lugsthan required by designcrfterfa, r esultfng fn localpfpe overstress, has beenidentified. All pipe supportdesigns wfll be reviewed tofdentf fy any devi atfons.

820212 821 130 PGEE Open Item:Seven analyses were fdentf ffedfor which the spectra sets usedwere not enveloped by theappropriate revised reorfentedspectra. The analyses will herun with appropriate spectra.

All welded pipe attach-ment designs will bereviewed and qualf fiedor redesfgned. Includedfn this review are localpfpe stress effects.

The seven analyses wfllbe rerun using appro-priate spectra sets andall remaining pfpinganalyses will be reviewedto assure use of allapproprfate spectra.lhere required, analyseswf 11 be rerun. ffodfff-catfon will be performedas required.

,Section A

2.2.3.3.1,1 2.2.42.2.4.3.1.4

The seven pfpfng 'Section Aanalyses hav e 2.2.1,been rerun. 2.2.1.3.2.2,

2.2.22.2.2.3.2.12.2.2.3.3

70108* S emf aenth lyS tatvs R epor tHo. 7Othe Findings,Item 11

820212 820910 PGEE Open Item:Dynamic propertfes used fn thesefsmfc qualfffcatfon of theplant exhaust vent will berev f ewed.

The plant vent desfgn waswas revf ewed. Anappropriate model wasdeveloped. A dynamicanalysis was performed.

A dynamicanalysis of theplant vent hasbeen completed.The vent and ftssupports havebeen determfnedto neet criterf a.

None 100 HIA

07 87 A/007 1A

Page 78: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

'1

I

', ~

/

Page 79: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IIIPage 6

IHITIATIKG

TASK DOC NEHTIOEHTDATE ECO D ESC RIP TIO N

STATUS OF PGandE OPEN ITIMS

STATUS( DESCRIPTIOH OF RESOLUTION

COICLUSIVE 'EFEREKE TO ERROR X C HODIFI-STATEHEHT ITP PHASE I CLASS AHALTSIS CATIOS ~

OF RESOLUTIOH FINAL REPORT PER IDVP CNPLETE CNPLET~70109* Semimonthly

Status ReportNo. 7Other FindingsItem 12

820212 820604 PGEE Open Item:Some masses sere rep'esentedincorrectly in the forrulationof the vertical dynamic modelof the containment interiorstruc tur e. An investigationoil'I be made to determine thesignificance of this matter.

A design revie~ of thevertical dynamic modelhas been made to deter-mine the significance fathe containment interiorstructure. Revised floorresponse specb a havebeen generated for threeframes: fi arne 2 and 3at elevation 101 ft, andfi arne 5 at elevation 140ft of the model. Pipingand equipment Ail be re-i~ed fa the effect ofthese spectra changes andwhere requir ed, reanalysisH11 be performed.

Piping analyses Section~ere found to be 2.1.1unaffected by thespectra changes,quali fying spec-

traa

are found toenvelope the ne~spectra. Thisitem is closedfor piping(820604 I. Equi p-,ment review iscontinuing .

8 100 H/A( forpiping i

70141* S emf monthlyStatus ReportHo. 8Open Item 13

820127 821130 PQE Open Iten:RLCA has identified nuns'ousdiscrepancies between the as-built piping configurations andthe piping isometric drawings.Audits, drawing revisions and,as necessary, plant modifica-tions will be performed.

Audits, draHng revisionsand, as necessary, plantmodifications «f 11 beperformed. Field as-built checks Q11 beconducted to verifydesign information.

Section A2.2.1,2.2.1.3.2. 1,2 2 2.2.2.2.3.2.1,2.2.2.3.3

n7AT A/nn71A

Page 80: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

I '

f )

P'A

Page 81: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IIIPage 7

STATUS OF PGandE OPEN ITOfS

IKITIATIHGTASfl DOGIE HT

70142* S emfmonthlyStatus R epor tHo. 8Open Item 14

70143~ SemfmonthiyStatus Repe tHo. 9Open Item 15

IDENTDATE ECO DESCRIPT IOH

820224 820430 PGK Open Item:A deficiency fn the small bo esefsmfc anchN movement designcri to'f a document was foundduring revfew 5 requalfffcatfonof small bo e piping faattached large bore pfpfngrevf sed sef smfc df splacenents.The instruction for p'ojectfonof skewed lines into effectivelengths fl the appropriateplanes resulted fn gr eater spanlengths than the true projectedlength. The instruction willbe revised and all small borepiping r evfewed and qualfffed.

820309 821130 PGSE Open Item:Documentation for qualf ffcatfonof ce tafn sma'll bl e pfpfngsupport standard details forbfdfrectfonal loading cannot helocated . The exfstfng standarddetaf ls wf 11 be requalf ffed.

STATUSDESCRIPTIOH OF RESOLUTIOH

The fnsfructfon wascarected. Small borepfpfng was reviewed andreanalyzed using cl'rectprojected span lengths.

The stande'd suppl tdetails will be qualifiedand modf ffcatfons pe-for med, f f requfred. Theeffects of spectrarevfsfons and insulationweight will be includedfn the review.

Small bore piping Sectionattached to 2.2.2dynamfcallyanalyzed 'largebore piping hasbeen reviewed andanalyzed. Hored f ffcatfonswere found to be,required. Thisitem fs closed(820421a.

C 100 H/A

Section A or 8 10 *~2.2.4,2.2.4.3.1. 1

CO fC LOS IYE REFEREK E TO ERROR I % HODIFI-STATEHEHT ITP PHASE I CLASS AHALTSIS CATIOHS

OF RESOLUTION FINAL REPORT PER IDVP COfPLETE COMPLETE ~

0787 A/007 lA

Page 82: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

I'1

Page 83: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IIIPage 8

IHlTIATIHG

TASK DOGIE HT

IDENTDATE ECD DESCRIPTION

STA1US OF PGandE OPEN IT&IS

STATUSDESCRIPTIOH OF RESOLUTIOH

COKLUSIVE REFERElCE TO ERROR C C NODIFI-STATENEHT -ITP PHASE I CLASS ANALYSIS CATIONS

OF RESOLUTION FINAL REPORT PER IDVP COlPLETE CNPLETEk

70144» S emimonthlyStatus ReportHo. 9Open Item 16

820309 821130 PG5E Open Iten:The existing fi1e 44 Hosgrihorizontal sei smic coef ficientfo. the auxiliary bui 1dingat elevation 163 ft is 5 ft. Itshou1d be 8.5. The fi1e 44horizontal and vertical seismiccoefficients All be veri fiedfor current spectra.

The file 44 horizonta1and vertical seismiccoefficients are beingveri fied for consistency4 th current spectra.Changes wf 1 I be reviewedfor effect on design andmodi fications performed,i f required.

Section2.2.4,2.2.4.3.1. 1,2.2.4.3.2.2

Aor8

70145* S emimonthlyStatus ReportHo. 9Open Item 17

820309 821130 PRE Open Item:Seismic anchor movement (SR$ ~

effects ~ere not addressedfa'argebore PGIE design Class I

lines that vere installed byspan criteria and attached tocomputer analyzed lines. Theselines &11 be identified andanalyzed for SN.

IA11 large bore piping%11 be analyied bycomputer and the effectof SN %11 bec onsid er ed.

Section A or 8 *»,2.2.1,2.2.1.3.1. 1

, 70146* SemimonthlyStatus ReportHo. 9Open Item 18

820309 821015 PGIE Open I ten:Class I equipment for theauxi1iary saltwater systemin the intake structure verequalified to the Nosgr i gr oundf1oor response spectra.

Seismic. analyses forC1ass I equipment andpiping for the auxiliary-saIt~ater system ar ebeing reviewed to assurethat the equipmentseismic qualification ismaintained .

Section2.2.1,2.2.1.3.2.2,2o3 ~

2.4,2.5

A or 8 ~ 85

n7fn a/nn7 lh

Page 84: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

IL~

Page 85: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IIIPage 9

IHITIATIHGTASK OXIDEHT

IDENTDATE ECO D ESC RIPTIDE

STATUS OF PGandE OPEN ITEIfS

STATUSDESCRIPTION OF RESOLUTION

COfCLUSIVE REFERElCE TO ERROR t t HODIFI-STATEHENT, ITP PHASE I CLASS ANALYSIS CATIOHS

OF RESOLUTIOH FINAL REPORT PER IOVP CNPLETE COMPLETE

70148* SemimonthlyStatus Repo tHo. 9Open Item 19

820309 82103'1 PGEE Open Item:The NRC considers that the 3D

analysis of the contafnmentpolar crane shous that theresults of the 20 non-linearana'lysis included fn the Hosgrfreport are not conservative.

The polar crane fs befngreanalyzed to assure thatdesfgn complfes wf thseismic crf terfa. The 3Danalysf s being performedhas identified some areasthat may requirestreng thenfng.

Section to A or B. 50be addedlater II

70147* Semimonthly 820309 821115 PGIIE Open Iten:Status Repa.t The sefsmfc analysfs of theHo. 9 containment dome serv fce craneOpen Item 20 utflfzed some results of the

30 nonlinear polar craneanalysfs. These analyses havenot yet been submitted for NRC

revf ew.

The dome s~ fee craneuf 11 be reanalyzed.Since input from thepolar crane fs needed forthese analyses, theseanalyses vf ll hecompleted Ken the polarcr ane analysis fscomplete.

Section to A I 8.," 50be added

. laterJ

07 f17 A/007 1A

Page 86: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

I

P

I

Page 87: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment I I IPage 10

IHITIATIHG

TJSK DOC NE NT

7016 7* S emi ron thlyStatus Repa tHo. 10

Open Item 21

IDENTDATE ECD DESCRIPTIOH

STATUS OF PGandE OPEN ITD4S

STATUSDESCRIPTION OF RESOLUTIOH

Floor response spectra atelevation 163 ft in theturbine building havebeen developed by PQE.The NVlC duct and itssuppe'ts have been r e-analyzed for theseappropriate spectra. Theturbine building has beenchecked fe'he newsupport loads resultingfrom the reanalyzed HVACduct supports.

820322 821015 PGSE Open Iten:Calculations made by EDS fo l4in. HYLIC duct support loadingsused incorrect seismic responsespecb a in some cases. This mayhave resulted because thespectra provided by PQE(shown in Appendix A of the EDScalcu'lati on fi 'l ee inadvertentlyomitted designating the eleva-tion 163 ft spectra as pertain-ing to the aux'ia y bui ldfngonly. Apparently, EDS pe.sonne1mistakenly assumed that thosespectra could be used forseismic loading at elevation163 ft in the turbine building.

,t'OKLUSIVEREFEREICE TD ERROR C t NODIFI-STATEHENT ITP PHASE I CLASS ANALTSIS CATI0%

OF RESOLUTION FINAL REPORT PER IDVP COMPLETE CNPLETE ~Results of the Section A or 8 % H/Areanalysis thus 2.5.3far indicate thatqualifications of;the HVAC ductwill be main-tained and nomodifications

are„'ecessary.

n7av ainn7 >n

Page 88: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

lI

jIj

Page 89: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachnent III'Page 11

IHITIATIHG" TASK DOCUMENT

IDEHTDATE ECD DESCRIPTIOH

STATUS OF PGandE OPEN ITEMS

STATUSDESCRIPTIOH OF RESOLUTIOH

COICLUSIYE REFEREfCE TO ERROR % % ffODIFI-STATEHENT ITP PHASE I CLASS ANALYSIS CATIONS

OF RESOLUTION FINAL REPORT PER IDVP COMPLETE COMPLETE

70172* SemimonthlyStatus Repo tHo. 11

Open Iten 22

70174* S emf son th lyStatus Repa tHo. 12

Open Item 23

820405 821130 PQE Open Iten:The reacto coolant systenpressurizer suppor ts and theconponent cooling wate heatexchanger we e modeled fncompany scope piping analysesas rigid. Additional analyseswfll be pe f9ned with actualequfpnent stfffnesses to ve ffythe approp.fateness of thisnod elf ng technique, orreanalysis and requalf ffcatfonof associated piping systemswill be performef.

820412 821015 PfIE Open Item:The Blune fnternal review hasdete ninedthat seve al computeranalyses were perforned beforeft was required that allcomputer analyses be OAve.f fied. Each such progr anfs being fnvestfgated thoroughly.

Revfew of the pressurizersuppo t dete mined by thestfffness to be 2.04 x108 lb/fn., which fsconsistent wfth theDiablo Canyon criteriafo nodelfng as rigid.The analysis of pipingwith the actual componentcooling wate heatexchanger stiffnessresulted fn suppe't Toadincreases but acceptablepfpe stress. Actions arefn progress to fdentffyall equfpnent that doesnot qualify for rigidnodelfng and reanalysfswill be pe formed.

The p ograms are beingv erf f fed. Reanalyseswill be pe famed, ffrequired.

Section A2.2.1,2.2.1.3.3.2,2 2.2.2.2.2.3.2.1

Appendix 1A A or 8 70 H/A

0787A/007 1A

Page 90: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

A'

t~

Page 91: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment II IPage 12

IHITIATIHG

TASK DOC WENT

IDENTDATE ECD D ESC R IPTIO N

STATUS OF PGandE OPEN IT035

STAIUS3 DESCRIPTION OF RESOLUTION

C03CLUSIYE 'EFERE3CE TO ERROR X % HODIFI-STATEHENT ITP PHASE I CLASS ANALTSIS CATI035

OF RESOLUTION, FINAL REPORT PER IDVP CNPLETE CO3PLE

70175» SemfrenthlyStatus ReportNo. 12Open Item 24

70176» SemimonthlyStatus Repo'tHo. 12Open Item 25

820414 821015 PGEE Open Item:The Blume into.nal revfew hasidentified several questionsconcerning the turbine buf ldfnganalysf s. These questions arerelated to the mathematfcalmodeling and computer analysisof some of the Hosgr 3 and post-INI modfffcatfons on thebuf ldfng response.

820420 821015 PGSE Open Item:The Blume internal review hasidentf fied questfons related tothe seismic analysts of thecontainment inter f or. Thesequestions are fnsufffcfentlyaddressed in the existingdocumentation of the analyses,and relate to the mass, shearvalues, stiffness, and to thecenters of mass and r fgfdfty ofthe model as well as to 'thefnterp etatfon of some of ther esu its.

URS/8 lume 3 s r ev 3 ewi ngeach area of conce.n todetermine fts resolution.PG5E fs continuing tomonitor the resolution ofthe BIR issues. Inaddition, PGSE fsperfo ning parametrfcstudies fn fts effort tomonite'ny reanalysfsand modfffcatfonsconsidered necessary toassure that qualf ffcatfonis mafntafned.

URS/Blume fs revfewfngeach area of concern todetermine 3 ts resolution.PQE fs continuing tomonitor the resolution ofthe BIR. In addftfon,PGSE fs perfo mfngparametrfc studies fn itseffort to monitor anyreanalysis and

modificat-

ionss considerednecessary to assure thatqualiffcation fsma3ntaf ned.

. Section Open item 70 02.1.4

Section Open Item2.1.1

n7n7 hlnn7 lh

Page 92: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

0 '

~'

'4f„

Page 93: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment I IIPage 13

IKITIATIKG

TRASK

DOCUMENT

IDENTDATE ECD DESCRIPTION

STATUS OF PGandE OPEN ITIHS

STATUSDESCRIPTIOM OF RESOLUTION

COfCLUSIVE '-'EFEREfCE TO ERROR % X ffODIFI-STATEHENT ITP PHASE I CLASS ANALYSIS CATI0%

OF RESOLUTION FINAL REPORT PER IDVP CNPLETE CNPLET

70183* S emf monthlyStatus Repo tKo. 13

Open Item 26

820504 820504 PGSE Open Item:The Blume fnte.nal review hasrequested URS/Blume to r evfsethe auxf lfary buf ldfng reportto reflect the actual timehistory used fn the analysfs(20 rather than 24 secondslongs and to supplement thecalculations to demonstratethe app op iateness of thetruncated tfme-hf story.

The auxf lfary buf ldfngrepe t, "Diablo CanyonNuclear Power Plant,Auxiliary Guf ldfngDynamic Seismic Analysisfa'he 7.5H HosgrfEarthquake", has to berevised to reflect theactual tfme history usedfn the analysis perfamedby URS/8 lume (20 ratherthan 24 seconds longi.Calculations to determinethe approprfatness of thetruncated tfme-hf storywere pe fa med. Theanalysis was re un usingthe 24-second tfmehistory. The r esultsbetween the 24- and the20- second time historieswe e compared and foundto be fdentfcal.

The report hasbeen revised toreflect theactual tine-hf story used.Calculations havebeen included fnrevision 1 of thecalculatf on ffleswhich dex6nstr atethat the trun-cated tfme-hf story produces

'n

identical re-sponse spectrumto that of theoriginal tfme-hfste y. Thf sftem is closed( 820504 I.

Sec tfon C 100 N/A2'1.2

A7A7hlAA71A

Page 94: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

\

Page 95: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IIIPage 14

IHITIATINGTJ5K DXWEHT

IDENTDATE ECD DESCRIPTION

STATUS OF PGandE OPEN ITEHS

STATUSDBCRIPTIOH OF RESOLUTION

I

COKLUSIYE REFEREICE TO ERROR i iMODIFI-STATEMEHT ITP PHASE I CLASS ANALYSIS CATI0%

OF RESOLUTION FINAL REPORT PER IDYP COMPLETE COMPLETE ~70184* 5 emf monthly

Status ReportHo. 13

Open Item 27

701%* 5 emf monthlyStatus ReportNo. 13

Open Item 28

820503 821015 PGSE Open Item:The Blume fnte nal reviewhas fdentf fied a possiblediscrepancy fn the co relatfonbetween intake structure inputspectrun and floe responsespectra. This may affect theintake structure craneanalysis. It was also notedthat the intake structureseismic analysis dfd notinclude the effects of atsunami afte'ossible sefsmfcdanage to the intake flowdfvfde walls.

820506 821031 P fmE Open Item:An electrfcal design review hasfound that fnce rect circuitbreake s we e supplied force tain 125 YOC circuits;20,000 amp fnte.ruptfngcapacfty breakers we especified. Howeve, 10,000amp breake s were received andI ns ta 1 led.

URS/B lone has developedfloi response spectrafor the intake structureand has pe formedanalyses of the intakestructure crane wfth thatspectre. The effects ofa tsunami on the intakestructure are befngrevf ewed to determinewhether modf ffcatfonsare needed. I,fnecessary, modfffcatfons

!

wf 11 be performed.

20,000 amp fnterruptfngcapacf ty br cake s we eprocured and will beinstalled .

The intake crane Sectfonsb ucture has 2.1.5been qual fffedwith the correctfloor responsespectra and nonod f ffcatfons arenecessary.

Sf x r eplacement Honebr eak er s wf 11 beinstalled thatneet speci ffca-tfons.

Open item 50 N/A

100

n7A7 h/nn7 fh

Page 96: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

C

C

1

J

I'

Page 97: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IIIPage l5

INITIATINGTASK DOCWEHT

IDENTDATE ECD D ESC R IPTIO H

STATUS OF PGandE OPEN ITB45

STATUSDESCRIPTION OF RESOLUTION

CO fC LUS IVESTATEMENT

OF RESOLUTIOH

REFEREICE TO ERROR X X ffODIFI-ITP PHASE I CLASS AHALTSIS CATI016FINAL REPORT PER IOTP CIPIPLETE CNIPLETE

70186» SemimonthlyStatus Repo tNo. 13

Open Item 29

70198* 5 emf monthlyStatus Repo tHo. 14

Open Item 30

820507 821130 PGEE Open Item:Pipe suppo.t spacing tables fononcomputer analyzed pipfng donot consider the effect of thepf pe fnsu1 atf on, and the tableused fo piping greate than4 fn. diameter was not reviewed,approved, and controlled asrequfred by the PGEE qualf ty

. assurance program.

21 821015 PGEE Open Item:During the addition fn 1979of the control room pressuri-zation system, the vitalelectrical power supply tothe redundant control roomheating, ventilation, and afrconditioning (HYKE system foeach unf t was changed. Thischange defeated the abf lfty ofthe Unit 1 control roomHVACsystem to meet the singlefaf lure criteria f f Unf t 2 we'enot operating.

Hew spacing tables whichconsfder the weight offnsulatfon are preparedand the effect on pipingand support design willbe dete mfned. Largebore piping will bereanalyzed by compute .Hodiffcatfons, f frequfred, will be made.

Two tests have beenpe.formed. These testsprovided performance datathat pressurization, afrdistribution and terpe a-ture control can be main-tained satfsfactorf lywith one of fourventilation trafns.Electrical power modfff-catfons shall be made tobe compatible with pro-viding r edundant afrconditioning, ventilationand pressurization to theUnit 1 and Unit 2 controlroom, and to comply wf thsingle faf lure crf teria.

Sec tfon2.2.1,2.2 2'.2.2.2'-3.3.2.2.4.3.2.2

None

A o'

I

Open item 75

0787 A/007 1A

Page 98: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

'0 e"

J p't

P

4

Page 99: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IIIPage 16

IHITIATIHG

TASK DOClHEHTIDENTDATE ECD D ESC RIP TIO N

STATUS OF PGandE OPEN ITBfS

STAIUSDISCRIPTIOH OF RESOLUTIOH

COfCLUSIVE REFERECE 19 ERROR % C MODIFI-STATEHEHT ITP PHASE I CLASS ANALYSIS CATIOMR

OF RESOLOTLOK FTRRL REPORT PER lOTP CINPLETE COLPLETE

70202* SemimonthlyStatus Repa.tHo. 15

Open Item 31

70203* 5 emf can th lyStatus Repm'tHo. 15

Open Item 32

820604 821130 PGIE Open Item:The Blume internal review hasidentified certain items Afchrequire further investigationto verify the acceptabilityof fielded pipe attachments atthe main steam and feed~aterpiping anchor. The anchi islocated on column line G.

820607 999999 PGSE Open Item:Hodels and assumptfons used fnthe analyses for the sefsmfcqualfffcatfon of the fuelhandling buf ldfng steelsupe structure may haveresulted fn designs Afch donot totally satfsfy allapplicable cr f terf a.

Reanalysis of the mafnsteam and feed~atepiping anchor pipeattachments and ~eldsH I I be per formed. Thepipe attachments andvelds designs vill berevfmed to dete minecomplf ance to seismiccrfterfa. ffodfffcatfonsAll be performed, ifnec essa'y.

A study is befngpe'formed to determfneHat modfffcatfons areneeded. Reanalysis ofthe structure fs beingperformed using affnfte-element model.Evaluation fs unde way tocheck the acceptabilityof the merbe s and theirconnectfons to seismiccrf teria.

Sectfon A a B 25 0 t

2 2 3.2.2.3.3. 1

Sec tf on A2.1.3

nvnl a lnn7 1A

Page 100: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

r'

4 b Fg

(

Page 101: 'Semimonthly Rept 23,Diablo Canyon Verification Program ... · attachment i page 1 status of idvp items file no. subject rev. 0 date latest rev no. latest rev. date status action

Attachment IIIPage 17

IHITIATING

TJSK DOCILEHTIDENTDATE ECD DESCRIPTION

STATUS OF PGandE OPEN ITIMS

STATUSDESCRIPTION OF RESOLUTION

COC LOS IVE REFERECE 10 ERROR X % MODIFI-STATEMENT, ITP PHASE I CLASS ANALYSIS CATIOHS

OF RESOLUTIOH 'INALREPORT PER IDYP CNPLETE COMPLE

70212* 5emimonth 1yStatus Repo tHo. 19Open Item 33

820813 8212'15 PG6E Open Item:A review of the Hosgri qua1ifi-cation ca1cu1ations for C1ass IHYK duct supports identifieda gene ic support type whichapparent1y does not satisfy theapplicab1e cri teri a.

A revie~ of 20 generic,C 1ass I HVAC ductsupport designs isunderway to determine theseismic adequacy of a11CIass I HYX ductsupports. Modificationswi'l1 be pe formed wherenecessary.

Section2.5.4

Ao'8 5 01

n7m ainn7 >a