Pacific Gas and Electric Company
Semimonthly Report No. 23
Diablo Canyon Verification Program
October 8, 1982
SUMMARY
This is PGandE's twenty-third Semimonthly Status Report which summarizes theprogress of our design verification program from September 21, 1982, throughOctober 4, 1982.
The Teledyne Engineering Services (TES) Independent Design VerificationProgram (Independent Program or IDVP) has identified 199 items to date. Allbut 52 items represent TES'eview of work performed by R. L. Cloud Associates(RLCA) and R. F. Reedy, Inc. (RFR) prior to March 25, 1982. Of the 199 items,147 completion reports have been issued, 25 require action by PGandE, and 27
require action by the Independent Program.
PGandE has reviewed the Independent Program's twenty-second Progress Reportand has no comments at this time.
PGandE's Internal Technical Program has identified to date a total of 33
items. During this reporting period, no new items were identified. To date,six of the 33 items have been closed by PGandE.
8210i50i59 821008PDR *DOCK 05000275
I R PDR
I'
I'
I, ' ll e I'
STATUS OF INDEPENDENT PROGRAM
This section provides the status of items identified in the Independent
Program.
Status Of Inde endent Pro ram Items
The items identified by the Independent Program are described inappropriate Independent Program progress reports. A list of the
Independent Program items is given in Attachment I, together with a
brief indication of the status of each item. A summary of Attachment
I is given in Table l. Although Phase II of the IDVP has not been
approved, Stone and Webster Engineering Corporation (SWEC) has been
performing Phase II work under the direction of TES. During thisreport period, SWEC has identified certain items related to Phase
II. These items are listed in Attachment I with file numbers in the
8000 series. PGaE will report Phase II items as a separate list once
Phase II is approved by NRC.
In addition, attachment IA indicates the Project status, includingthe expected Project resolution date, for each of the items that have
not been issued as a Completion Report.
1
4)" +ci J
I C I'-V
1 J
g'! "p ~ ll
TABLE 1: SUMMARY OF ATTACHMENT I
NUMBER REPORTED AS NUMBER REPORTED ASTYPE OF INDEPENDENT PROGRAM REPORTS OF SEPT. 20'982* OF OCT. 4 1982*
Open Item Reports
Potential Program Resolution Reports
Closed ItemDeviationOpen Item with future action by PGandESubtotal
5038
10
1213
Program Resolution Reports
Closed ItemDeviationOpen Item with future action by PGandESubtotal
0189
0
189
Potential Error Reports
Class A ErrorClass A or B ErrorClass B ErrorClass C ErrorClass D ErrorSubtotal
11020
150208
Error Reports
Class A ErrorClass A or B ErrorClass B ErrorClass C ErrorClass D ErrorSubtotal
34
110
0
18
351
100
19
Completion Reports
TOTAL NUMBER OF REPORTS
141
189
147
199
* Since the Independent Program's reporting period differs fromPGandE's, these numbers may differ from those reported in theIndependent Program's progress reports.
~ ~, "IgI
I'~)J~ >»I-
I."t '-Ek f
I
t ~* J
't I'j
»
F
F h
.~ «!»"
jF ~ »
;FI,F,, I
II> Inde endent Pro ram'"Re uests For Information
Twenty-seven'of 466 Requests For Information by the Independent Program
remain outstanding as of this report (Attachment II). Certain of the
items listed in Attachment II relate to Phase II of the verificationeffort.
III. PGandE's Review of Inde endent Pro ram's Twent -second Pro ress Re orts
PGandE has reviewed the Independent Program's twenty-second Progress
Report and has no comments at this time.
STATUS OF INTERNAL TECHNICAL PROGRAM
This section describes the status of work in PGandE's Internal TechnicalProgram being performed in addition to the Independent Program.
I. Annulus Review
This subsection provides a description of PGandE's progress inresolving concerns identified during review of the annulus design.Issues which were described in this section in previous reports butwhich are not now listed here, such as mechanical, piping, and
conduit supports, are now complete.
hs~
Civil En ineerin
Structures
The confirmatory analysis of the steel annulus structure iscontinuing. This analysis accounts for loadings from as-builtmechanical equipment and piping. All members and their connections
will be evaluated for Hosgri, DDE, and DE loads. The examination ofthe structure for Hosgri loads is complete, including the design ofmodifications. Confirmatory analyses of this structure for DE and
DDE are in progress. The status of structural review for otherstructures are discussed below.
Corrective Action Pro ram
Status reporting for each particular piping issue, identified as an
Open Item by the Internal Technical Program and listed in Attachment
III, has been discontinued. The status of piping review is now
given on Table 2.
0 en Items Status
To date, a total of 33 open items have been identified by PGandE
(Attachment III). No new open item was identified during thisperiod. To date, six open items generated by the Internal TechnicalProgram have been closed by PGandE.
1
P
J
i»' I'
TABLE 2: STATUS OF PIPING REVIEW
Large Bore Piping
Percent~Com lete
Field as-built check
Drawing incorporation of field check results
Establish procedures and criteria
98
80
100
Qualification or reanalysis of seismic andthermal problems 65
Modifications — 0
Large Bore Pipe Supports
Procedures and criteria
Qualification or redesign of pipe supports
Modifications — 4
100
15
Small Bore Piping
Procedures and criteria
Initial sample selections
Computer Analyses Review
Span Criteria Sample Review
Other Review Activities
100
100
12
12
Modifications — 0
Small Bore Pipe Supports
Procedures and criteria
Initial sample selections
Span Criteria Sample Review
Standard Support Details Review
Seismic and Thermal Anchor Movement Review
100
100
I
II~ ' ~ '
V
t
If
st I ~ N f'I
I ~
ff ~ f.
TABLE 2 (Continued)
Percent~Cem lete
Code Boundaries Review
Local Pipe Stress From Lugs Review
Modifications — 0
80
John B. HochDiablo Canyon Project Manager
l
'I
t
I.
1
a
ATTACHMENT I
STATUS OF IDVP ITEMS
LEGEND
* Asterisk denotes revision or addition since last report.
l. FILE NO: The file number assigned to each item by the IDVP.
2. SUBJECT: Self-explanatory. Detailed description of the concern identifiedfor each item is available in Revision 0 of the Open Item Report associatedwith the same file number.
3. REV. 0 DATE: Date issue initially identified by Open Item Report, Revision0.
4. LATEST REV. NO: Latest revision number received by PGandE.
5. LATEST REV. DATE: Date latest revision received by PGandE.
6. STATUS: Status is indicated by the type of classification of latest reportreceived by PGandE:
OIRPPRRPRR
PER
ER
CR
CIDEV
0IPAB
C
D
Open Item ReportPotential Program Resolution ReportProgram Resolution ReportPotential Error ReportError ReportCompletion ReportClosed ItemDeviationOpen Item with future action by PGandEClass A ErrorClass B ErrorClass C ErrorClass D Error
Details of current actions related to each item are described in the latestrevision of the referenced report with the same file number.
7. ACTION RE(}'D BY: Indicates whether action on an item is needed by eitherIDVP or PGandE. Closed means IDVP Completion Report has been received.
8. PHY NODS: Physical modifications required to resolve the issue. Blankentry indicates that modification has not been determined.
9. PGandE TASK NO: PGandE task number assigned for tracking. Task numbersare not necessarily sequential.
0003L/0005P
)
Attachment IPage 1
STATUS OF IDVP ITEMS
FILENO. SUBJECT
REV. 0DATE
LATESTREV NO.
LATESTREV. DATE STATUS
ACTION PHY. PG&E
~BK 'D BY NODS TASK NO.
910 RACEWAY SUPPORTS INSTALLATIONVARIANCE 01-05-82
930 RACEWAY CRITERIA
931 VALVE 9001A
932 SUPPORT 58S-23R DIRECTION
933 LINE 110 DIMENSION
934 SUPPORT 72-llR DIRECTION
935 LINE 931 CONNECTION TO LINE 1971
936 LINE 1971 DIMENSION
937 LINE 44 FLANGE
938 VALVE 8805B ORIENTATION
939 SUPPORT 73-72R DIRECTION
940 LINE 103 DIMENSION
01-05-82
01-06-82
01-06-82
01-20-82
01-20-82
01-20-82
01-20-82
01-20-82
01-20-82
01-20-82
01-20-82
920 AUX BLDG FLOOR RESPONSE SPECTRA DIFFERENCES 01-06-82
07-08-82
07-08-82
CR
CR
07-23-82 CR
07-22-82 CR
07-23-82 CR
05-24-82 CR
05-10-82 CR
05-24-82 CR
05-24-82 CR
04-09-82 CR
05-24-82 CR
07-08-82 CR
06-19-82 PRR/OIP
CLOSED NO 70000
CLOSED NO 70001
CLOSED NO 70002
CLOSED NO 70003
CLOSED YES 70004
CLOSED NO 70005
CLOSED NO 70006
CLOSED NO 70007
CLOSED NO 70008
CLOSED NO 70009
PG&E NO 70010
CLOSED NO 70011
CLOSED NO 70012
0003L/0005P
II ~
V ~
Attachment IPage 2
STATUS OF IDVP ITEMS
FILENO. SUBJECT
REV 0 LATESTDATE REV. NO.
LATESTREV. DATE STATUS
ACTION PHY PG&E~BK 'D BY NODS TASK NO.
941 SUPPORT 18-4R DIRECTION
942 SUPPORT 18-7R LOCATION
943 SUPPORT 5006V LOCATION
944 SUPPORT 5003V LOCATION
945 SUPPORT 55S-20R DIRECTION & LOCATION
946 LINE 1980 DIMENSION
947 VALVE 8821A ORIENTATION
948 SUPPORT 13-23SL DIRECTION
01-20-82 .
01-20-82
01-20-82
01-20-82
01-20-82
01-20-82
01-20-82
01-20-82
950 VALVE FCV 95 PLATE THICKNESS
951 LINE 593 DIMENSION
952 LINE 593 DIMENSION
953 SUPPORT 58S-69R DIRECTION
954 LINE 574 DIMENSION
955 SUPPORT 55S-57R IDENTIFICATION
01-28-82
01-29-82
01-29-82
01-29-82
01-29-82
01-29-82
949* MAIN ANNUNCIATOR CABINET RIGIDITY & FREQUENCY 01-20-82
05-24-82 CR
05-24-82 CR
05-24-82 CR
05-24-82 CR
05-24-82 CR
05-24-82 CR
05-24-82 CR
05-24-82, CR
09-03-82 OIR
07-01-82 CR
05-24-82 CR
05-24-82 CR
07-08-82 CR
07-08-82 CR
04-09-82 CR
CLOSED
CLOSED
NO 70013
NO 70014
CLOSED NO 70015
CLOSED NO 70016
CZDSED NO 70017
CLOSED NO 70018
CLOSED NO 70019
CLOSED NO 70020
IDVP YES 70021
CLOSED
CLOSED
CLOSED
NO 70024
NO 70025
NO 70026
CLOSED NO 70027
CLOSED YES 70022
CLOSED NO 70023
0003L/0005P
rl
t ll
L
I, 'I II
1 t,i" ' I
4
l
I
I
~ II
Attachment IPage 3
STATUS OF IDVP ITEMS
FILENO. SUBJECT
REV. 0DATE
LATESTREV. NO.
LATESTREV. DATE STATUS
ACTIONREIE'D BY
PHY. PG&EMODS TASK NO.
956 LINE 574 DIMENSION
957 LINES 577 6 578 INSULATION
958 SUPPORT 58S-55V LOCATION
959 SUPPORT 11-49SL LOCATION
960 LINE 19 DIMENSION
961%'UPPORT 11-59SL DIRECTION
962 SUPPORT 48-44R DIRECTION
963%'UPPORT 58S-32R DIRECTION
964 LINE 2519 SUPPORT IDENTIFICATION
965 SUPPORT 55S LOCATION
966 SUPPORT 14-33SL LOCATION
967 INTAKE STRUCTURE ACCELERATIONS
968 HARDING LAWSON ASSOCIATES QA FINDING
969 HARDING LAWSON ASSOCIATES QA FINDING
01-29-82
01-29-82
01-29-82
01-29-82
01-29-82
01-29-82
01-29-82
01-29-82
01-29-82
01-29-82
01-29-82
01-30-82
01-30-82
01-30-82
05-24-82 CR
07-23-82 CR
07-08-82 CR
06-28-82 CR
05-24-82 CR
09-21-82 CR
06-21-82 CR
07-19-82 ER/B
05-10-82 ER/C
06-19-82 CR
05-24-82 CR
09-10-82 CR
05-24-82 CR
05-24-82 CR
CLOSED NO 70028
CLOSED YES 70029
CLOSED
CLOSED
NO 70030
NO 70031
PG6 E
PGS E
YES 70035
70036
CLOSED NO 70037
CLOSED NO 70038
CLOSED 70039
CLOSED NO 70040
CLOSED NO 70041
CLOSED NO 70032
CLOSED NO 70033
CLOSED NO 70034
0003L/0005P
I l
" JI
I
4
Attachment IPage 4
STATUS OF IDVP ITEMS
FILENO. SUBJECT
REV 0 LATESTDATE REV NO.
LATESTREVe DATE STATUS
ACTION PHY. PG&E~BB 'D BY NODS TASK NO.
970 HARDING LAWSON ASSOCIATES QA FINDING
971 EDS NUCLEAR QA OBSERVATION
972 EDS NUCLEAR QA OBSERVATION
973 EDS NUCLEAR QA OBSERVATION
974 EDS NUCLEAR QA OBSERVATION
975 EDS NUCLEAR QA OBSERVATION
976 EXTERIOR CONTAINMENT SPECTRA SUPERSEDED
977 ANNULUS AREA REEVALUATION
978 REGENERATIVE HEAT EXCHANGER SPECTRA
01-30-82 2
01-30-82
01-30-82
01-30-82
01-30-82
01-30-82
02-05-82
02-05-82
02-05-82
981 BURIED PIPELINE IS TO AB QUALIFICATION
982 TURB BLDG BLUME TRANSMITTALS
983* RACEWAY SUPPORT REEVALUATION
(includes files 910 and 930)
02-05-82
02-05-82
02-05-82
979 OTHER EQUIPMENT IN CONTAINMENT NOT REVIEWED 02-05-82
980 ASWP COMPARTMENTS QUALIFICATION DOCUMENTATION 02-05-82
05-24-82 CR
04-09-82 CR
04-09-82 CR
04-09-82 CR
04-09-82 CR
04-09-82 CR
04-17-82 CR
09-10-82 CR
06-21-82 CR
04-17-82 CR
04-17-82 CR
05-11-82 CR
07-23-82 CR
09-10-82 ER/A
CLOSED NO 70042
CIDSED
CIDSED
CLOSED
NO 70043
NO 70044
NO 70045
CIDSED NO 70046
CLOSED NO 70047
CZDSED NO 70048
CLOSED 70049
PG&E 70055
CLOSED NO 70050
CLOSED NO 70051
CLOSED NO 70052
CLOSED NO 70053
CLOSED NO 70054
0003L/0005P
I
I
l
II "i l II
l
I
1
i
T) , ~
]l~
*
Attachment IPage 5
STATUS OF IDVP ITEMS
FILENO. SUBJECT
REV. 0DATE
LATESTREV. NO.
LATESTREV. DATE STATUS
ACTIONREIE'D BY
PHY.MODS
PG&ETASK NO,
984 TURB BLDG INTERFACE PROCEDURES
985 AUX BLDG WEIGHTS
986 CONTROL ROOM SPECTRA
987 AUX BLDG QUALIFICATION DETAILED REVIEW
988 INTAKE STRUCTURE CRANE REVIEW
989 TURB BLDG CRANE REVIEW
990 FH BLDG CRANE DESIGN INFO
991 FH BLDG CRANE MODIFICATIONS
992 OD WATER TANK DESIGN INFO
993 OD WATER TANK DESIGN INFO
994 PIPING CONSULTANT INTERFACE
995 EES TRANSMITTAL COVER SHEETS
02-05-82
02-05-82
02-05-82
02-05-82
02-05-82
02-05-82
02-05-82
02-05-82
02-05-82
02-05-82
02-06-82
02-06-82
07-23-82 CR
04-17-82 CR
07-22-82 CR
04-17-82 CR
09-10-82 CR
07-23-82 CR
07-23-82 CR
07-23-82 CR
09-09-82 CR
09-09-82 PRR/OIP
04-09-82 CR
04-09-82 CR
CLOSED NO 70056
CLOSED NO 70057
CLOSED NO
CLOSED NO
CLOSED
70058
70059
70060
CLOSED
PGE E
70064
70065
CLOSED NO 70066
CLOSED NO 70067
CLOSED NO 70061
CLOSED NO 70062
CLOSED NO 70063
0003L/0005P
l
'I
II
(~
Attachment IPage 6
STATUS OF IDVP ITEMS
FILENO. SUBJECT
REV. 0DATE
LATESTREV. NO.
LATESTREV. DATE STATUS
ACTIONR~R'D BY
PHY. PGEEMODS TASK NO.
996 BLUME PIPING CORRESPONDENCE
997 VALVES TRANSMITTALS TO EES
998 VALVES TRANSMITTALS TO EDS
999 VALVES TRANSMITTALS TO EDS
1000 VALVES TRANSMITTALS TO WESTINGHOUSE
1001 VALVES VERIFICATION OF ACCELERATIONS
1002 SUPPLY FANS S67, 68 6 69 INPUT
1003 4 KV SW RM HVAC DUCT SUPPORT
1004 WESTINGHOUSE CONTAINMENT ELEC EQUIP
1005 ALE LABS TRANSMITTALS OF SPECTRA
1006 ELEC EQUIP QUALIFIED BY ANALYSIS
1007 ELEC EQUIP TRANSMITTAL OF INFO
1008 MAIN ANNUNCIATOR CABINET SPECTRA
02-06-82
02-06-82
02-06-82
02-06-82
02-05-82
02-05-82
02-05-82
02-05-82
02-05-82
02-05-82
02-05-82
02-05-82
02-09-82
05-10-82 CR
04-09-82 CR
04-09-82 CR
04-09-82 CR
04-17-82 CR
04-17-82 CR
06-23-82 CR
08-25-82 PER/C
06-22-82 CR
04-17-82 CR
04-21-82 CR
04-21-82 CR
06-08-82 ER/C
CLOSED NO 70068
CLOSED NO 70069
CLOSED
CLOSED
NO 70070
NO 70071
CLOSED NO 70072
CLOSED NO 70073
CLOSED NO 70074
IDVP NO 70075
IDVP NO 70080
CLOSED NO 70076
CLOSED NO 70077
CLOSED NO 70078
CLOSED NO 70079
0003L/0005P
1l
Attachment IPage 7
STATUS OF IDVP ITEMS
FIIE
NO. SUBJECTREV 0 LATEST LATEST ACTION
DATE REV;-NU. REV. DATE STATUS ~RE 'D BYPHYMODS
PG&ETASK NO.
09-10-82 CR
07-23-82 CR
07-09-82 CR
04-21-82 CR
07-23-82 CR
09-10-82 ER/AB
02-09-82 6
02-09-82 6
02-09-82 3
02-0 9-82 1
02-09-82 7
02-09-82 7
1009 CONTAINMENT INTERIOR ABOVE 140 SPECTRA
1010 TURB BLDG ABOVE 140 SPECTRA
1011 DG OIL PRIMING TANK SPECTRA
1012 DG OIL PRIMING TANK 158 DIFFERENCE
1013 WYLE LAB SPECTRA
1014* CONTAINMENT SEISMIC REVIIÃ
(includes files 977 and 1009)
1015 DG OIL PRIMING TANK DAMPING
1016 ANCHOR ALLONABLES
1017 DG OIL PRIMING TANK SG WEIGHT
1018 SUPPLY FAN S-31 SUPPORT
2 04-17-82 CR
2 06-21-82 PRR/OIP
3 07-09-82 CR
02-11-82
02-11-82
02-11-82
02-18-82 CR3 07-13-82r
2 04-09-82 CR1019 CVCS SYSTEM SEPARATOR/STABILIZER DOCUMENTATION 02-18-82
CLOSED
CLOSED NO
70081
70082
PG&E 70086
CLOSED NO 70087
IDVP NO 70088
CLOSED NO 70089
CLOSED NO 70110
CLOSED NO 70090
CLOSED NO 70083
CLOSED NO 70084
CLOSED NO 70085
l
II
1
,0
gJeg
e q
I „
k
gF
II
Jl
4 4'
(M(Rlt"'
Iht
I
t1% I r
! l
Attachment IPage 8
STATUS OF IDVP ITEMS
FIIENO. SUBJECT
REV 0DATE
LATEST LATEST ACTION PHYT PG&EREV NO 'EV DATE STATUS ~RE
' EY NODS TASK NO
1020 AUX SALTWATER PUMP PRELIM SPECTRA
1021* CCWHX ANALYSIS AS RIGID ANCHOR
1022* INTAKE STRUCTURE SEISMIC REVIEW
(includes files 967 and 988)
1023 3" VELAN VALVE DOCUMENTATION
1024 PIPE SUPPORT NOMENCLATURE
1025 VERTICAL SPECTRA FOR TURB BLDG ELEV104'026*
TURBINE BUILDING SEISMIC REVIEW (includesfiles 982, 984, 989, 1010, and 1025)
1027 FUEL HANDLING CRANE SUPPORT
1028 AUX BLDG HORIZONTAL ACCELERATION
1029 AUX BLDG MODEL DISCREPANCIES
1030 BORIC ACID TANK ANALYSES
1031 VALVES FCV-37 AND LCV-115 DOCUMENTATION
1032 PIPE SUPPORT 73/70R DIRECTION
02-18-82
02-18-82
02-18-82
02-19-82
02-20-82
02-20-82
02-20-82
02-23-82
02-23-82
02-25-82
02-25-82
03-02-82
03-02-82
3 06-29-82 CR CLOSED NO 70091
6 09-21-82 CR CLOSED NO 70092
5 09»10-82 ER/AB PG&E 70093
NO 700946 07-17-82 CR
3 06-07-82 CR
6 07-23-82 CR
5 07-23-82 ER/AB
CLOSED
CLOSED NO 70095
CLOSED NO 70096
70097PG&E
6 07-23-82 CR CLOSED NO 70111
5 07-13-82 PRR/OIP IDVP NO 70112
3 07-22-82 CR CLOSED NO 70113
3 07-09-82 CR CASED NO 70114
7 07-17-82 CR CLOSED NO 70115
5 07-07-82 CR CLOSED NO 70116
0003L/0005P0
\ M
M
lf
I III I tl M I
t
M
I
I
f t
C 't
Attachment IPap,e 9
STATUS OF IDVP ITEMS
FILENO. SUBJECT
REV. 0DATE
LATESTREV. NO.
LATESTREV. DATE STATUS
ACTION~RR 'D BY
PHY. PG6 EMODS TASK NO.
1033 EES (CYGNA) QA OBSERVATIONS
1034 EES (CYGNA) QA OBSERVATIONS
1035 EES (CYGNA) QA OBSERVATIONS
1036 EES (CYGNA) QA OBSERVATIONS
1037 EES (CYGNA) QA OBSERVATIONS
1038 EES (CYGNA) QA OBSERVATIONS
1039 EES (CYGNA) QA OBSERVATIONS
1040 EES (CYGNA) QA FINDINGS
1041 FES (CYGNA) QA FINDINGS
1042 ANCO QA FINDINGS
1043 PIPE SUPPORTS 512/7R 6 512/6R LOCATION
1044 SMALL BORE LINES LOCATION
1045 SUPPORT 99/9R DIRECTION
1046 SUPPORTS 99/7R 6 99/9R DIMENSION
1047 SMALL BORE LINES LOCATION
1048 SUPPORT 99/101R LOCATION
03-02-82
03-02-82
03-02-82
03-02-82
03-02-82
03-02-82
03-02-82
03-02-82
03-02-82
03-02-82
03-08-82
03-08-82
03-08«82
03-08-82
03-08-82
03-08-82
04-09-82 CR
04-09-82 CR
04-09-82 CR
04-09-82 CR
04-09-82 CR
04-09-82 CR
04-09-82 CR
05-24-82 CR
05-24-82 CR
05-24-82 CR
07-28-82 CR
08-11-82 CR
07-28-82 CR
07-28-82 CR
09-11-82 PPRR/CI
06-10-82 CR
CLOSED NO 70117
CLOSED NO 70118
CLOSED NO 70119
CLOSED
CLOSED
NO 70120
NO 70121
IDVP
CLOSED
NO 70133
NO 70134
CLOSED NO 70122
CLOSED NO 70123
CLOSED NO 70124
CLOSED NO 70125
CLOSED NO 70126
CLOSED NO 70129
CLOSED NO 70130
CLOSED NO 70131
CLOSED NO 70132
0003L/0005P
I
V
h'E p
Attachment IPage 10
STATUS OF IDVP ITEMS
FILENO. SUBJECT
REV. 0DATE
LATEST LATESTREV. NO. REV. DATE STATUS
ACTIONREIE'D BY
PHY.MODS
PG6 E
TASK NO.
1049 MAIN ANNUNCIATOR TYPEWRITER SPECTRA
1050 LINE 279-8 INSULATION
1051 INSULATION SPEC FOR LINES 264-8 S 2519-8
1052 WYLE LABORATORIES QA FINDINGS
03-08-82
03-08-82
03-08-82
03-09-82
1055 CONTAINMENT ANNULUS SPECTRA
1056 NO SIGNATURES ON SEVERAL PGSE CALCULATIONS
1057
1058+
ANALYSIS 106 DIFFER FROM THE PGBE ANALYSIS
SMALL BORE PIPING LUG DESIGN
1059%'MALL BORE PIPE REPORT OVERSTRESS
1060~ PIPES AND ADPIPE CODES
1061 HVAC FAN S31 FABRICATION DRAWING
1062 RLCA PIPING ANALYSIS 100-STRESS DIFFERENCE
1063 RLCA PIPING ANALYSIS 107-STRESS DIFFERENCE
03-10-82
03-10-82
03-15-82
03-15-82
03-15-82
03-15-82
03-15-82
03-15-82
03-15-82
1053 DIESEL GEN STARTING AIR RECEIVER TANK DAMPING 03-09-82
1054 DIESEL GEN STARTING AIR RECEIVER TANK ANALYSIS 03-09-82
07-23-82 CR
07-08-82 CR
06-07-82 CR
05-24-82 CR
07-09-82 CR
06-22-82 CR
05-24-82 CR
05-24-82 CR
04-17-82 CR
09-21-82 CR
09-21-82 CR
09-21-82 CR
05-11-82 CR
08-05-82 ER/C
07-22-82 ER/C
CLOSED NO 70135
CLOSED NO '0136CLOSED NO
CLOSED NO
CLOSED NO
70137
70138
70139
PG6E
PG6 E
70156
70157
CLOSED NO 70140
CLOSED NO 70149
CLOSED NO 70150
CLOSED NO 70151
CLOSED NO 70152
CLOSED NO 70153
CLOSED NO 70154
CLOSED NO 70155
0003L/0005P
J
Attachment IPage ll
STATUS OF IDVP ITEMS
FILENO. SUBJECT
REV. 0bATE
LATESTREV. NO.
LATESTREV. DATE STATUS
ACTION~RR 'D BY
PHY.MODS
PG&ETASK NO.
1064 PG&E, QA FINDINGS
1065 PG&E, QA FINDINGS
1066 PG&E, QA FINDINGS
1067 URS/BLUME QA FINDINGS
1068 URS/BLUME QA FINDINGS
1069 VALVES LCV 113 AND LCV 115 UNSUPPORTED
1070 HORIZONTAL SOIL SPRING CALC DIFFER BY 507
1071 RLCA PIPING ANALYSIS 109-OVERSTRESS
1072 TURBINE-DRIVEN AUX FEEDWATER PUMP
1073 AUX SALTWATER PUMP BOLT STRESSES
03-15-82
03-15-82
03-15-82
03-15-82
03-15-82
03-15-82
03-15-82
03-23-82
03-23-82
03-23-82
1075 SUPPORTS 5007-R & 18-5R DIRECTION 03-31-82
1074 RLCA PIPING ANALYSIS 101-STRESS DIFFERENCE 03-23-82
05-24-82 CR
05-24-82 CR
05-24-82 CR
05-24-82 CR
05-24-82 CR
06-30-82 ER/A
07-22-82 CR
09-09-82 CR
09-10-82 CR
07-08-82 CR
08-05-82 ER/C
06-19-82 CR
CLOSED NO 70158
CLOSED NO 70159
CLOSED NO
CLOSED NO
CLOSED NO
70160
70162
70163
PG&E 70169
CLOSED NO 70170
PG&E YES 70164
CLOSED NO 70165
CLOSED NO 70166
CLOSED NO 70167
CLOSED NO 70168
0003L/0005P
tl
Attachment IPage 12
STATUS OF IDVP ITFMS
FILENO. SUBJECT
REV. 0DATE
LATESTREV. NO.
LATESTREV. DATE STATUS
ACTIONREIE'D BY
PHY.MODS
PG8 E
TASK NO.
1076 SUPPORT 55S-3R DIRECTION
1077 HVAC DUCT SUPPORT
1078 VENTILATION SYSTEM LOGIC PANEL POV1, POV2
1079 AUX BLDG — FUEL HANDLING STRUCTURE
03-30-82
04-06-82
04-19-82
04-19-82
1082 VALVE FCV-95 ANALYSIS
1083 HVAC VOLUME DAMPER 7A
1084~ RLCA PIPING ANALYSIS 102
1085+ RLCA PIPING ANALYSIS 105
1086 RLCA PIPING ANALYSIS 108
1087 HOT SHUTDOWN REMOTE CONTROL PANEL
1088 COMPONENT CLG WATER HEAT EXCHANGER
1089 PIPE SUPPORT 3/30A
04-22-82
04-22-82
05-14-82
05-14-82
05-14-82
05-14-82
05-14-82
05-21-82
1080 RLCA PIPING ANALYSIS 103 — STRESS DIFFERENCE 04-22-82
1081 RLCA PIPING ANALYSIS 104 — STRESS DIFFERENCE 04-22-82
05-24-82 CR
08-11-82 PRR/OIP
07-13-82 CR
07-23-82 CR
09-03-82 ER/C
08-31-82 ER/C
07-01-82 CR
09-10-82 CR
09-10-82 ER/C
08-31-82 ER/C
09-10-82 ER/C
06-23-82 CR
08-17-82 OZR
06-19-82 CR
CLOSED NO 70171
PGSE NO 70173
CLOSED NO 70177
CLOSED NO
PG6 E
PG8 E
70178
70179
70180
PG8 E
PG&E
YES 70187
YES 70188
70189
CLOSED NO 70190
IDVP NO 70191
CLOSED NO 70199
CLOSED NO 70181
CLOSED NO 70182
0003L/0005P
J
Attachment IPage 13
STATUS OF IDVP ITEMS
FILENO; SUBJECT
REV 0DATE
LATESTREV NO
LATESTREV. DATE
ACTION PHY PG&ESTATUS ~BB
' BY NODS TASK NO.
1090 PIPE SUPPORT ll/92SL1091 AUX BLDG —FUEL HANDLING BUILDING
1092* FUEL HANDLING BUILDING REEVALUATION
05-21-82
05-21-82
06-11-82
3 06-19-82 CR
6 08-10-82 CR
6 08-10-82 ER/A
CLOSED
PG&E
NO 70201
70204
CLOSED NO 70200
1094 INTAKE STRUCTURE SOILS REVIEW
1095 AUX BLDG — FLOOR RESPONSE SPECTRA
1096 SUPPLY FAN S-31
07-07-82
07-0 9-82
07-09-82
1097* AUXILIARYBUILDING SEISMIC REEVALUATION 07-13-82
(includes files 920, 986, 1029, 1070, and 1093)
(includes files 990, 991, 1027, 1079, and 1091)
1093 AUX BLDG — FAN RM AND VENTILATION RM 06-18-82 6 07-22-82 CR CLOSED NO 70205
3 07-09-82 PRR/OIP PG&E NO 70206
0 07-09-82 OIR IDVP 70207
1 07-13-82 PER/A IDVP 70208
4 07-22-82 ER/AB PG&E 70209
1098* PIPING SEISMIC REEVALUATION 07-14-82 5 09-22-82 ER/AB PG&E 70210
(includes files 961, 1021, 1058, 1059, 1060, and 1104)
1099* CCW HX FIELD INSPECTION DEFICIENCY
1100 HLA SOILS REVIEW —OD WATER STORAGE TANKS
1101 HLA SOILS REVIEW — OD WATER-STORAGE TANKS
1102 HVAC DAMPER 7A
1103 PIPE SUPPORTS ATTACHED TO AUXILIARYSTEEL
08-04-82
08-16-82
08-16-82
08-19-82
08-31-82
1104* RLCA PIPING ANALYSIS 110 LINES 4260 AND 3078 09-03-82
2 08-20-82 PRR/OIP PG& E 70211
2 09-10-82 PRR/DEV PG&E 70215
2 09-10-82 PRR/OIP PG&E 70216
1 08-19-82 PER/C IDVP 70217
1 08-31-82 PP~OIP IDVP 70218
3 09-22-82 CR CIDSED NO 70219
0003L/0005P
N
n
'p
Attachment IPago 14
STATUS OF IDVP ITEMS
FILENO. SUBJECT
REV. 0DATE
LATESTREV. NO.
LATESTREV. DATE
ACTIONSTATUS REIE'D BY
PHY.MODS
PG8 E
TASK NO.
3000 HARDING LAWSON ASSOCIATES QA REPORT
3001 EES (CYGNA) QA REPORT
3002 ANCO QA REPORT
3003 WYLE LABORATORIES QA REPORT
3004 PGLE QA REPORT
3005 URS/BLUME QA REPORT
05-24-82
05-24-82
05-24-82
05-2a-82
05-24-82
05-24-82
06-22-82 CR
06-22-82 CR
06-22-82 CR
06-22-82 CR
06-22-82 CR
06-22-82 CR
CLOSED NO
CLOSED NO
CLOSED NO
70194
70195
70196
CLOSED NO 70197
CLOSED NO 70192
CLOSED NO 70193
0003L/0005P
t
f
Attachment IPage 15
STATUS OF IDVP ITEMS
FILENO. SUBJECT
REV~ 0DATE
LATEST LATESTREV. NO. REV DATE STATUS
ACTION PHY PG&E~BS 'D BY NODS TASK NO.
8001* NSC ENVIRONMENTS — COMPUTER CODE
8002* NSC MASS-ENERGY RELEASE CALCULATION
8003* NSC VALUE OF BIDWDOWN ENTHALPY
8004* NSC INITIALTEMPERATURES
8005* ASSUMPTIONS FOR SUBMERGENCE ANALYSIS
8006* NSC PRESSURES AND TEMPERATURES
8007* PIPE RESTRAINT 1030 — 14RT
8008* PIPE RESTRAINT 1031-llRT8009* AFWS DISCHARGE PIPING PRESSURE
8010* AFW TURBINE THROTTLE VALVE
8011* AFW AND CRVP SYSTEMS CABLE
8012* CLASS 1 PORTIONS OF THE CRVP SYSTEMS
8013* EMERGENCY DIESEL GEN NOS. 11,12 and 13
09-09-82
09-09-82
09-09-82
09-09-82
09-09-82
09-09-82
09-13-82
09-13-82
09-13-82
09-13-82
09-23-82
09-23-82
09-23-82
8015* AFW SYSTEM FLOW CAPACITY
8016* POWER SUPPLIES TO CRVP EQUIPMENT
09-27-82
90-27-82
8014* AFW SYSTEM VV. LCV 108,109s113,115KFCV 436K 09-23-82
437
1 09-09-82 PER/AB
10-01-82 PER/AB
IDVP
IDVP
10-01-82
10-01-82
10-01-82
10-01-82
PER/AB
PER/AB
PPRR/OIP
PPRR/OIP
IDVP
IDVP
IDVP
IDVP
10-01-82 PPRR/OIP IDVP
10-01-82 PPRVOIP IDVP
10-01-82
10-01-82PPRR/OIP
PPRR/OIP
IDVP
IDVP
10-01-82 PPRR/OI P IDVP
10-01-82 PPRR/OIP IDVP
10-01-82 PPRR/OIP
10-01-82 PER/AB
IDVP
IDVP
1 10-01-82 PPRR/OIP IDVP
1 10-01-82 PPRR/OIP IDVP
70220
70221
70222
70223
70224
70225
70226
70227
70228
70229
70230
70231
70232
70233
70234
70235
0003L/0005P
N 4
n II
I II
t
II ~ (
f II
I
~ I
Attachment IAPage 1
STATUS OF OPEN EOIsS
IDENTIFIED BY THE IDVP
EOIFILE NO. TITLE
ACTIONRE 'D
IDVPREPORTSTATUS
SCHEDULED RESOLUTIONDATE FOR PROJECT
REQUIREMENTSANALYSIS MODIFICATION*
938
949
963
964
983
993
1003
1008
Valve 8805B Orientation
Main Annunciator Cabinet Rigidity and Frequency
Support 58S — 32R Direction
Line 2519 Support Identification
Raceway Support Reevaluation
(includes files 910 and 930)
OD Water Tank Design
4 kV SW RM HVAC Duct Support
Main Annunciator Cabinet Spectra
Project PRR/OIP
IDVP OIR
Project
Project
Project
ER/C
ER/A
IDVP PER/C
IDVP ER/C
Project PRR/OIP
10/15
Done
10/31
10/31
12/07
10/15
Done
Done
M/E
M/E
N/I
N/I
N/A
N/A
* N/A = Not Applicable,
N/E = Not Expected,
N/I = Not Identified,
M/E = Modifications Expected
II''i
Eli5
I
C
0t"f~~4
V
D
,r
E
VN
h
4ttachment IAPage 2
EOIFILE NO TITLE
ACTIONRE AD
IDVPREPORTSTATUS
SCHEDULED RESOLUTIONDATE FOR PROJECT
REQUIREMENTSANALYSIS MODIFICATION
1014 Containment Seismic Review
(includes files 977 and 1009)
Project ER/AB 11/05 N/I
1016 Anchor Allowables IDVP PRR/OIP Done N/A
1022 Intake Structure Seismic Review
(includes files 967 and 988)
Project ER/AB 11/19 N/I
1026 Turbine Building Seismic Review
(includes files 982, 984, 989, 1010, and 1025)
Project ER/AB TBD N/I
1028 Auxiliary Building Horizontal Acceleration
1047 Small Bore Lines Location
1062 RLCA Piping Analysis 100 Stress Difference
1063 RLCA Piping Analysis 107 Stress Difference
1069 Valves LCV 113 a LCV 115 Unsupported
1074 RLCA Piping Analysis 101 Stress Difference
IDVP
IDVP
PRR/OI P
PPRR/CI
Project ER/C
Project ER/C
Project ER/A
Project ER/C
9/30
Done
10/15
10/15
10/15
10/15
N/I
N/A
N/E
N/N
N/A
N/E
ll
I
t
'IlI
Attachment IAPage 3
EOIFILE NO. TITLE
ACTIONRE 'D
IDVPREPORTSTATUS
SCHEDULED RESOLUTIONDATE FOR PROJECT
REQUIREMENTSANALYSIS MODIFICATION
1077 HVAC Duct Support
1080
1081
1084
1085
1086
1088
1092
1094
1095
1096
1097
RLCA Piping Analysis 103 Stress Difference
RLCA Piping Analysis 104 Stress Difference
RLCA Piping Analysis 102
RLCA Piping Analysis 103
RLCA Piping Analysis 108
Component CLG Water Heat Exchanger
Fuel Handling Building Reevaluation
(includes files 990, 991, 1027, 1079, and 1091)
Intake Structure Soils Review
Auxiliary Building — Floor Response Spectra
Supply Fan S-31
Auxiliary Building Seismic Reevaluation
(includes files 920, 986, 1029, 1070, and 1093)
Project
Project
Project
Project
Project
Project
PRR/OIP ll/01
ER/C 10/15
ER/C 10/15
ER/C 10/15
ER/C 10/15
ER/C 10/15
IDVP OIR Done
Project ER/A 11/30
Done
IDVP OIR 11/16
IDVP PER/A
Project ER/AB
IDVP
11/16
Project PRR/OIP
N/I
N/E
N/E
N/E
N/E
N/A
N/I
N/A
N/I
N/I
N/I
C
~ ( It'
It
I'
I''V
f II
. ~,I
f ll
If
r"
3
Msl
f
flijlf I"f
I
f
lfI t» =
, ~
I'' I
VC'„I a ~
\ l
f ~ I 'f
I Ile'
~
t'
g
fff
I
g~
I- t
I
~-p alC*
;.a
fl ~
It
~ \f 4 f
~t
Attachment IAPage 4
EOIFILE NO. TITLE
ACTIONRE 'D
IDVPREPORTSTATUS
SCHEDULED RESOLUTIONDATE FOR PROJECT .
REQUIREMENTSANALYSIS MODIFICATION
1098 Piping Seismic Reevaluation Project ER/AB 10/15 N/I
1099 CCW HX Field Inspection Deficiency
1100 HLA Soils Review-OD Water Tanks
1101
1102
1103
8001
8002
8003
8004
8005
8006
HLA Soils ReviewWD Water Tanks
HVAC Damper 7A
Pipe Supports attached to Auxiliary Steel
NSC Environments — Computer Code
NSC Mass-Energy Release Calculation
NSC Value of Blowdown Enthalpy
NSC Initial Temperatures
Assumptions for Submergence Analysis
NSC Pressures and Temperatures
(includes files 961, 1021, 1058, 1059, 1060, and 1104)
Project
Project
Project
IDVP
IDVP
IDVP
IDVP
IDVP
IDVP
IDVP
IDVP
PRR/OIP
PRR/DEV
PRR/OIP
PER/C
PPRR/OIP
PER/AB
PER/AB
PER/AB
PER/AB
PPRR/OI P
PPRR/OIP
Done
IDVP
IDVP
Done
IDVP
IDVP
IDVP
IDVP
IDVP
IDVP
IDVP
N/I
N/I
N/I
N/I
N/I
N/I
N/I
N/I
N/I
N/I
N/I
,tl
T
II > ~
Attachment IAPage 5
EOIFILE No. TITLE
ACTIONRE 'D
IDVPREPORTSTATUS
SCHEDULED RESOLUTIONDATE FOR PROJECT
REQUIREMENTSANALYSIS MODIFICATION
8007
8008
8009
8010
8011
8012
8013
8014
8015
8016
Pipe Restraint 1030-14RT
Pipe Restraint 1031-llRT
AFWS Discharge Piping Pressure
AXW Turbine Throttle Valve
AFW and CRVP Systems Cable
Class 1 Portions of the CRVP Systems
Emergency Diesel Generator Nos. 11, 12, & 13
AXW System Valves LCVs, 108, 109, 113, 115,
FCVS 436'37
AXW System Flow Capacity
Power Supplies to CRVP Equipment
IDVP
IDVP
IDVP
IDVP
IDVP
IDVP
IDVP
IDVP
IDVP
IDVP
PPRR/OIP
PPRR/OIP
PPRR/OIP
PPRR/OI P
xxaa/ozp
PPRR/OI P
xxaa/ozp
PER/AB
x xaa/ozp
xxaa/ozp
IDVP
IDVP
IDVP
IDVP
IDVP
IDVP
IDVP
IDVP
IDVP
IDVP
N/I
N/I
N/I
N/I
N/I
N/I
N/I
N/I
N/I
N/I
C
l 4
"I4
4
4
'PW,P
4 II
Ih
«4
LCd5
l- ~
I
4
I/1
lg
lP,
t)
I
4 II
t
I
ls
C'.
lI
II
4)li l
4
44
I~''
1 ~ 4
~4
Pr~
ATTACHMENT II
OUTSTANDING
IDVP REQUESTS FOR INFORMATION
LEGEND
* One asterisk denotes a revision since the last report.
** Two asterisks denote an addition since the last report.
0003L/0005P
l
Attachment IIPage 1
OUTSTANDING IDVP RE UESTS FOR INFORMATION
REQUEST DATE OFNO. ~HH VEST DESCRIPTION OF RE UEST
ESTIMATEDDELIVERY DATE
RESPONSIBLEGROUP
RLCA-291* 08-18-82 16 design valve accelerations. 10-15-82 PIPING
RLCA-294 08-19-82 Procedures and results of the comparison ofcontrolled spectra against all Hosgri quali-fications and implementation of the recom-mendations in Section 3.5 of ITR 4.
11-01-82 I a CELEC
RLCA-306 08-24-82 Computer code documentation and benchmarking forall codes being used for the current seismicreevaluation.
10-15-82 EQC
RLCA-317* 08-27-82 All piping line numbers related to Table 1 andTable 2 (Section II) of PGaE's 8/24/82 letterto NRC.
10-15-82 VERIF
RLCA-323* 09-10-82 Additional copy of the information providedfor RFI No. 75.
10-15-82 PIPING
RLCA-325** 09-21-82 List of all completed isometrics for large andsmall bore computer analysed piping.
10-13-82 PIPING
RLCA-328** 09-22-82 Pipe size and schedule for the pipe attach tothe pipe support 58S/23R.
10-15-82 PIPING
- RLCA-329** 09-22-82 Supported pipe masses for lines 319 and 594 acting 10-15-82on supports 58N/3R and 58S/69R.
PIPING
N
I 'f )il
I
Attachment IIPage 2
OUTSTANDING IDVP RE UESTS FOR INFORMATION
REQUEST DATE OFNO. ~RE UEST
RLCA-330** 09-22-82
DESCRIPTION OF RE UEST
Detailed criteria, procedures and methodologyfor the containment exterior applicable to theITP
ESTIMATEDDELIVERY DATE
To be determinedat a later date.
RESPONSIBLEGROUP
CIVIL
RLCA-331** 09-22-82 Detailed criteria, procedures and methodologyfor the containment interior applicable to theITP
To be determinedat a later date.
CIVIL
RLCA-332** 09-22-82 Detailed criteria, procedures and methodologyfor the turbine building applicable to theITP.
To be determined CIVILat a later date.
RLCA-333** 09-22-82 Detailed criteria, procedures and methodologyfor the intake structure applicable to theITP.
To be determined CIVILat a later date.
RLCA-334** 09-22-82 Detailed criteria, procedures and methodologyfor the auxiliary building (shear wall portion)applicable to the ITP.
10-15-82 CIVIL
RLCA-335** 09-22-82 Detailed criteria, procedures and methodologyfor the fuel handling building applicable to theITP
10-15-82 CIVIL
RLCA-340** 09-22-82 Detailed criteria, procedures and methodologyfor mechanical equipment applicable to theITP.
10-13-82 MECHSYSTEM
tC
N
]I
r
II
tr
W
V
8
II
II
II
w
Attachment IIPage 3
OUTSTANDING IDVP RE UESTS FOR INFORMATION
REQUEST DATE OFNO. ~RE UEST
RLCA-341** 09-22-82
DESCRIPTION OF RE UEST
Detailed criteria, procedures and methodologyfor electrical equipment applicable to theITP.
ESTIMATEDDELIVERY DATE
11-01-82
RESPONSIBLEGROUP
ELEC
RLCA-342** 09-22-82 Detailed criteria, procedures and methodologyfor HVAC equipment applicable to theITP
11-01-82 HVAC
RLCA-343** 09-22-82 Detailed criteria, procedures and methodologyfor electrical raceways applicable to theITP
10-15-82 CIVIL
RLCA-344** 09-22-82 Detailed criteria, procedures and methodologyfor instrument tubing applicable to theITP
11-01-82 I&C
RLCA-346** 09-24-82 List of all qualification calculations relatedto the current Hosgri review for the containmentauxiliary, intake, turbine and fuel handlingbuildings.
10-15-82 CIVIL
RLCA-347** 09-24-82 List of all large bore piping supports(restricted to the Hosgri evaluation only) forwhich the ITP review and reanalysis (wherenecessary) have been completed.
10-15-82 PIPING
RLCA-349** 09-24-82 List and description of samples of small borepiping qualified by span criteria, small borepiping supports and instrument tubing and tubingsupports (restricted to the Hosgri evaluation)selected for the Internal Technical Program.
TO BE DETERMINEDAT A LATER DATE
PIPING
II
I'P
Attachment IIPage 4
OUTSTANDING IDVP RE UESTS FOR INFORMATION
REQUEST DATE OFNO. ~RE VEST
TES-0100** 09-16-82
TES-0102** 09-17-82
DESCRIPTION OF RE VEST
Reanalysis packages for piping problems 6-11and/or 4A-26 that were sent to BNL.
Computer Input/Output for piping models 6-11and 4A-26 sent to BNL.
ESTIMATEDDELIVERY DATE
10-13-82
10-13-82
RESPONSIBLEGROUP
PIPING
PIPING
TES-0103** 09-21-82
TES-0105** 09-23-82
PGandE and M. W. Kellogg piping drawings.
Clarification of PGandE supplied envelopespectra. Annulus stress calculations.
10-15-82
10-15-82
PIPING
CIVIL
TES-0106** 09-24-82 Stiffness calculations for Elev. 140'fAnnulus Structure. Provide drawings referencedin hand calculations (JAB-8168-02-CA-06).
10-15-82 CIVIL
I
MO
'4
I
N
t
I
It
a
fi
I
l
)f
1o
'II
f
1t
I
)
4I
f.l
ii.
(
f II
«)
liI 4 )
' f
IA
I
f) „
tt
Y
f'
rI'
I
I
'I
I
Il
I'I
II'~
'If'
If
IIY
ATTACHMENT 111
OTHER FINDINGS (OPEN ITEMS)
LEGEND
* Asterisk denotes item with revisions this reporting period.
** Status is reflected in Table 2.
l. TASK: The number assigned by PGandE for tracking.
2. INITIATING DOCUMENT: The document which first identified theopen item.
3. IDENT DT: The date the problem was identified (year-month-day) .
4. ECD: Estimated completion date. The computer will enter 999999until a date is entered.
Note ls Task numbers are not necessarily sequential for thislisting. All 70000 series task numbers are dedicated toIDVP items or OIs.
0003L/0005P
q~
*
V
Attachment II IPage 1
IHITIATIHGTASK DOCNEHT
IOEHTDATE ECD 0 ESCR IPTIO H
STATUS OF PGandE OPEH ITEMS
5TAlllSDESCRIPTIOH OF RESOLUTIOH
COICLUSIVE 'EFEREICE TQ ERROR I 'L liODIFI-STATIliEHT ITP PHASE I CLASS AHALTSIS CATIOI6
OF RESOLUTIOH 'IHAL REPORT PER IDVP CNPLETE CNPLE
70098* 5 emi san th1yStatus ReportHo. 7Other Findings,Item 1
70099* 5 eminonth ly5 ta tv s R epe'tHo. 7Other Findings,Item 2
820212 821130 PGSE Open Item:Hodeling of all annulus areavalves uas reviewed. Six verefound to he modeledinca.rectly. The valvemodeling in all Unit 1 pipinganalyses wf 11 be revieved. Ifmodeling errors are found,affected piping analysesHII be rerun.
820212 820521 PQE Open Item:The digitization of theeast-uest translational Hosgrispectra for the 140 ft elevationin the auxiliary building hasbeen found to contain ane r or. All affected pipinganalyses Nill be rerun andpipe suppa ts requalified.
The initial conc e nadd~essed inapp op.iatemodeling of valveeccentric masses at thepipe center line and allanalyses were revieNed tolocate modeling errors ofthis type. The modelshave been corrected andanalyses rerun. Theinternal technicalprogram includes revimand reanalysis, asnecessary, for othervalve modeling issuessuch as extendedstructure stiffness,valve weights andlocation of the extendedmass center of gr avity.
All piping analysesvere revi eNed to identifyaffected piping. Oneanalysis was found toneed r eana lysi s. Thispiping analysis was rerun.
Reanalysis iscomplete, andsupport redesignand quali ficationare complete.This iten isclosed (8205211.
Section A2.2.1,2.2.1.3.3.2,2.2.22.2.2.3.1.2
Section A2.1.2
100 100
n1n7 hlnn7 lh
I
1I
/if
Attachment IIIPage 2
IHITIATINGTlSK DOC WENT
IDENTDATE ECD DESCRIPTIOH
STATUS OF PGandE OPEN ITOfS
STATUSDESCRIPTIOH OF RESOLUTION
COKLUSIVE REFEREICE TO ERROR X X ffODIFI-STATEHENT ITP PHASE I CLASS AHALTSIS CATIONS
OF RESOLUTION FINAL REPORT PER IDYP CWPLETE CO1PLETE ~70100+ 5 emf month ly
S tatus Reps.tNo. 7
Other Findings,Item 3
820212 821215 PQE Open Item:The method used to calculateraceway weights may haveresulted fn an underestfmatfonof the weights of someconduf ts. A thoroughreve.kffcatfon programfor all raceway suppm.ts willbe conducted.
A review of all safety-c lass raceway supports fsbeing conduc ted. Thesuppm ts either wf 11 bequalfffed by analysfs orwill he modf fied.
Section A or B 50 02.4
70101* S earlmonthlyStatusKo. 7Othe Ffndfngs,Item 4
70102* S emf month lyStatus Reps tNo. 7Othe Ffndfngs,I tem 5
820212 820315 PQE Open Item:Review of all Unit 1 smallbae piping has fdentfffed40 supports requiringvertical restraint where onlya single rod was utflfzed.ffodfffcatfon of these suppo tswill be made.
820212 821130 PG&E Open Item:One valve lfst fn theHosgrf report was not updatedas required by the secondphase. All design Class 1
active valves wf 11 be reviewedto nake use they are quaif fied.
All small ba e pfpfngt
single r od supportsrequired to function asvertfcal restraints willbe fdentf ffed,andand modfffed to providerestraint to both upwardand down~a~d movement.
A complete lfstfng of allactive valves requfredfor cold shutdownfollowfng a sefsrrfc eventwill be prepar ed andthese v a ives wf 11 bereviewed to assure theyare qualf ffed to Hosgrfcrf ter f a.
100 100
Section2.2. 1
2.2. 1.3.42.2.2.3 .2.2
A or 8 15
Forty sing le Section Arod supports were 2.2.4.1.1found fn
I'ocationswhichr equfred verticalrestr af nt andthese supportshave beenmodfffed to pre-vent uplift. Thisitem is closed(8203 15 I.
nVn Amn7 >A
jX
I I
k'
Attachment IIIPage 3
INITIATINGTASK DOC IHEHT
70103* S emk monthlyStatus ReportNo. 7Othe'indings,Item 6
IOEHTDATE ECD D ESC RIP TIDE
STATUS OF PGandE OPEN ITEHS
STATUSDESCRIPTIOH OF RESOLUTIOH
A large sample of smallbore piping has beenreviewed and me spanskdentk fied. Analysis hasbeen completed toidentify those spanswhich may incur seismicstresses exceedingal 1owab les. Th e percent-age of spans kn thisclass relative to thetotal population ks 0.19%Design requirements havebeen issued to correctthe few ove'stressesfound. Yerk fication ofsupport quali ficationsassociated with overspansis complete and allsupports reviewed werefound to comply with thewith the originalacceptance criteria. Asample review to addressthe curaiatkve effect ofoverspans coupled withother issues ks knprogress.
820212 821130 PGEE Open Item:Certain small bore pipingspans have been identifiedas deviating from seismiccriteria. Review and analysiswill be performed to dete mineextent and skgni fkcance.
COICLUSIYESTATUE NT
OF RESOLUTIOHI
This item wasclosed on April20, 1982 for thespecific issueidentified. How-ever, the statusof piping reviewbeing performedas a part of thecorrective actionprogram, Akchincludes recon-sideration ofthis issue isr eflected inTable 2.
REFERECE TO ERROR X C HODIFI-ITP PHASE I CLASS ANAL'%IS CATIOl5FINAL REPORT PER IDYP CNPLETE CNPLETE~
Section A2 2.2.2 2 2.3 3.2.2.4,2.2.4.3.2.2
0
'7
87 A/007 lA
I
Pcw
L
Attachment IIIPage 4
STATUS OF PGandE OPEN ITIMS
IHITIATIHG
TASK OOCll1EHT
70104* S emimonthlyStatus Repa tHo. 7Othe. Findings,Item 7
IOEHTOATE EC0 DESCRIPTION
820212 821130 PGSE Open Item:I Piping revie~ of the annulus
revealed two thermal analyseswhich used incorrect modelingof supports. A sample of otherthermal analyses will beper formed.
STATUSOESCRIPTION OF RESOLUTIOH
The two thermal analyseswill be rerun andsupports qualified. Also,all thermal analyses willbe reviewed and thosefound to contain supportmodeling ere s will bererun and associatedsupports will berequali fied.
The two therma'1analyses havebeen re un andsuppl'tsqua lified.
Section2.2.1,Z.Z.1.3.2. 1,2.2 2.2.2.2.3.2. 1
2.2.2.3.3
A or 8
COCLUSIVE ', REFERECE 10 ERROR
STATEMEHT ITP PHASE I CLASSOF. REEOLUTIOR FIRRL REPORT PER IOTP
C MOOIFI-ANALYSIS CATIONSCNPLETE COMPLETE
** **
70105+ 5 emi monthlyStatus Repm tHo. 7Othe Findings,Item 8
820212 821130 PGEE Open Item:Piping with supports attachedto the containment internalstructure above elevation 140ft we e dynamically analyzedusing 140 ft spectra. Piping,electrical r aceways andsuppa ts attached tocontainment exteri or pipewaywere analyzed usingcontainment exterior spectra.Further analysis is beingperformed to verify appro-
priatenesss
of theseassumptions.
Appropriate spectra weredeveloped. The newspectra are beingcompared to spectra usedin the previous qualifi-cations. lhere qualifyingspectra do not envelopethe new spectra, analyseswill be performed toqua'li fy piping systemsand electrical raceway tocri te'1 a. Modi ficatfonswill be performed, asrequired.
The app.opriatespectra have beendev eloped.
Section2.2.1,2.2.1.3.2-2,2 2 2R2.2.2.3.2.1.2.2.2.3.3
35(non-pipingt50
(piping'787
A/007 1A
h
~I
Attachment IIIPage 5
I HIT I ATI HG
TASK DOCIMENTIOEHTDATE ECO DESCRIPTION
STATUS OF PGandE OPEN ITEHS
STATUSDESCRIPTION OF RESOLUTIOH
COICLUSIVE; REFEREICE TD ERROR I X HODIFI-STATB/ENT,'TP PHASE I CLASS AHALTSIS CATIOI6
OF RESOLUTION FINAL REPORT PER IOYP CNPLETE CNPLETE
70106* 5 emf amnthlyStatus Repa tHo. 7Other Findings,Item 9
70107* 5 emf monthlyStatus Repa.tHo. 7Othe Findings,Item 10
820212 821130 PQE Open Item:One case of a pipe supportdesign with fewer pfpe lugsthan required by designcrfterfa, r esultfng fn localpfpe overstress, has beenidentified. All pipe supportdesigns wfll be reviewed tofdentf fy any devi atfons.
820212 821 130 PGEE Open Item:Seven analyses were fdentf ffedfor which the spectra sets usedwere not enveloped by theappropriate revised reorfentedspectra. The analyses will herun with appropriate spectra.
All welded pipe attach-ment designs will bereviewed and qualf fiedor redesfgned. Includedfn this review are localpfpe stress effects.
The seven analyses wfllbe rerun using appro-priate spectra sets andall remaining pfpinganalyses will be reviewedto assure use of allapproprfate spectra.lhere required, analyseswf 11 be rerun. ffodfff-catfon will be performedas required.
,Section A
2.2.3.3.1,1 2.2.42.2.4.3.1.4
The seven pfpfng 'Section Aanalyses hav e 2.2.1,been rerun. 2.2.1.3.2.2,
2.2.22.2.2.3.2.12.2.2.3.3
70108* S emf aenth lyS tatvs R epor tHo. 7Othe Findings,Item 11
820212 820910 PGEE Open Item:Dynamic propertfes used fn thesefsmfc qualfffcatfon of theplant exhaust vent will berev f ewed.
The plant vent desfgn waswas revf ewed. Anappropriate model wasdeveloped. A dynamicanalysis was performed.
A dynamicanalysis of theplant vent hasbeen completed.The vent and ftssupports havebeen determfnedto neet criterf a.
None 100 HIA
07 87 A/007 1A
'1
I
', ~
/
Attachment IIIPage 6
IHITIATIKG
TASK DOC NEHTIOEHTDATE ECO D ESC RIP TIO N
STATUS OF PGandE OPEN ITIMS
STATUS( DESCRIPTIOH OF RESOLUTION
COICLUSIVE 'EFEREKE TO ERROR X C HODIFI-STATEHEHT ITP PHASE I CLASS AHALTSIS CATIOS ~
OF RESOLUTIOH FINAL REPORT PER IDVP CNPLETE CNPLET~70109* Semimonthly
Status ReportNo. 7Other FindingsItem 12
820212 820604 PGEE Open Item:Some masses sere rep'esentedincorrectly in the forrulationof the vertical dynamic modelof the containment interiorstruc tur e. An investigationoil'I be made to determine thesignificance of this matter.
A design revie~ of thevertical dynamic modelhas been made to deter-mine the significance fathe containment interiorstructure. Revised floorresponse specb a havebeen generated for threeframes: fi arne 2 and 3at elevation 101 ft, andfi arne 5 at elevation 140ft of the model. Pipingand equipment Ail be re-i~ed fa the effect ofthese spectra changes andwhere requir ed, reanalysisH11 be performed.
Piping analyses Section~ere found to be 2.1.1unaffected by thespectra changes,quali fying spec-
traa
are found toenvelope the ne~spectra. Thisitem is closedfor piping(820604 I. Equi p-,ment review iscontinuing .
8 100 H/A( forpiping i
70141* S emf monthlyStatus ReportHo. 8Open Item 13
820127 821130 PQE Open Iten:RLCA has identified nuns'ousdiscrepancies between the as-built piping configurations andthe piping isometric drawings.Audits, drawing revisions and,as necessary, plant modifica-tions will be performed.
Audits, draHng revisionsand, as necessary, plantmodifications «f 11 beperformed. Field as-built checks Q11 beconducted to verifydesign information.
Section A2.2.1,2.2.1.3.2. 1,2 2 2.2.2.2.3.2.1,2.2.2.3.3
n7AT A/nn71A
I '
f )
P'A
Attachment IIIPage 7
STATUS OF PGandE OPEN ITOfS
IKITIATIHGTASfl DOGIE HT
70142* S emfmonthlyStatus R epor tHo. 8Open Item 14
70143~ SemfmonthiyStatus Repe tHo. 9Open Item 15
IDENTDATE ECO DESCRIPT IOH
820224 820430 PGK Open Item:A deficiency fn the small bo esefsmfc anchN movement designcri to'f a document was foundduring revfew 5 requalfffcatfonof small bo e piping faattached large bore pfpfngrevf sed sef smfc df splacenents.The instruction for p'ojectfonof skewed lines into effectivelengths fl the appropriateplanes resulted fn gr eater spanlengths than the true projectedlength. The instruction willbe revised and all small borepiping r evfewed and qualfffed.
820309 821130 PGSE Open Item:Documentation for qualf ffcatfonof ce tafn sma'll bl e pfpfngsupport standard details forbfdfrectfonal loading cannot helocated . The exfstfng standarddetaf ls wf 11 be requalf ffed.
STATUSDESCRIPTIOH OF RESOLUTIOH
The fnsfructfon wascarected. Small borepfpfng was reviewed andreanalyzed using cl'rectprojected span lengths.
The stande'd suppl tdetails will be qualifiedand modf ffcatfons pe-for med, f f requfred. Theeffects of spectrarevfsfons and insulationweight will be includedfn the review.
Small bore piping Sectionattached to 2.2.2dynamfcallyanalyzed 'largebore piping hasbeen reviewed andanalyzed. Hored f ffcatfonswere found to be,required. Thisitem fs closed(820421a.
C 100 H/A
Section A or 8 10 *~2.2.4,2.2.4.3.1. 1
CO fC LOS IYE REFEREK E TO ERROR I % HODIFI-STATEHEHT ITP PHASE I CLASS AHALTSIS CATIOHS
OF RESOLUTION FINAL REPORT PER IDVP COfPLETE COMPLETE ~
0787 A/007 lA
I'1
Attachment IIIPage 8
IHlTIATIHG
TASK DOGIE HT
IDENTDATE ECD DESCRIPTION
STA1US OF PGandE OPEN IT&IS
STATUSDESCRIPTIOH OF RESOLUTIOH
COKLUSIVE REFERElCE TO ERROR C C NODIFI-STATENEHT -ITP PHASE I CLASS ANALYSIS CATIONS
OF RESOLUTION FINAL REPORT PER IDVP COlPLETE CNPLETEk
70144» S emimonthlyStatus ReportHo. 9Open Item 16
820309 821130 PG5E Open Iten:The existing fi1e 44 Hosgrihorizontal sei smic coef ficientfo. the auxiliary bui 1dingat elevation 163 ft is 5 ft. Itshou1d be 8.5. The fi1e 44horizontal and vertical seismiccoefficients All be veri fiedfor current spectra.
The file 44 horizonta1and vertical seismiccoefficients are beingveri fied for consistency4 th current spectra.Changes wf 1 I be reviewedfor effect on design andmodi fications performed,i f required.
Section2.2.4,2.2.4.3.1. 1,2.2.4.3.2.2
Aor8
70145* S emimonthlyStatus ReportHo. 9Open Item 17
820309 821130 PRE Open Item:Seismic anchor movement (SR$ ~
effects ~ere not addressedfa'argebore PGIE design Class I
lines that vere installed byspan criteria and attached tocomputer analyzed lines. Theselines &11 be identified andanalyzed for SN.
IA11 large bore piping%11 be analyied bycomputer and the effectof SN %11 bec onsid er ed.
Section A or 8 *»,2.2.1,2.2.1.3.1. 1
, 70146* SemimonthlyStatus ReportHo. 9Open Item 18
820309 821015 PGIE Open I ten:Class I equipment for theauxi1iary saltwater systemin the intake structure verequalified to the Nosgr i gr oundf1oor response spectra.
Seismic. analyses forC1ass I equipment andpiping for the auxiliary-saIt~ater system ar ebeing reviewed to assurethat the equipmentseismic qualification ismaintained .
Section2.2.1,2.2.1.3.2.2,2o3 ~
2.4,2.5
A or 8 ~ 85
n7fn a/nn7 lh
IL~
Attachment IIIPage 9
IHITIATIHGTASK OXIDEHT
IDENTDATE ECO D ESC RIPTIDE
STATUS OF PGandE OPEN ITEIfS
STATUSDESCRIPTION OF RESOLUTION
COfCLUSIVE REFERElCE TO ERROR t t HODIFI-STATEHENT, ITP PHASE I CLASS ANALYSIS CATIOHS
OF RESOLUTIOH FINAL REPORT PER IOVP CNPLETE COMPLETE
70148* SemimonthlyStatus Repo tHo. 9Open Item 19
820309 82103'1 PGEE Open Item:The NRC considers that the 3D
analysis of the contafnmentpolar crane shous that theresults of the 20 non-linearana'lysis included fn the Hosgrfreport are not conservative.
The polar crane fs befngreanalyzed to assure thatdesfgn complfes wf thseismic crf terfa. The 3Danalysf s being performedhas identified some areasthat may requirestreng thenfng.
Section to A or B. 50be addedlater II
70147* Semimonthly 820309 821115 PGIIE Open Iten:Status Repa.t The sefsmfc analysfs of theHo. 9 containment dome serv fce craneOpen Item 20 utflfzed some results of the
30 nonlinear polar craneanalysfs. These analyses havenot yet been submitted for NRC
revf ew.
The dome s~ fee craneuf 11 be reanalyzed.Since input from thepolar crane fs needed forthese analyses, theseanalyses vf ll hecompleted Ken the polarcr ane analysis fscomplete.
Section to A I 8.," 50be added
. laterJ
07 f17 A/007 1A
I
P
I
Attachment I I IPage 10
IHITIATIHG
TJSK DOC NE NT
7016 7* S emi ron thlyStatus Repa tHo. 10
Open Item 21
IDENTDATE ECD DESCRIPTIOH
STATUS OF PGandE OPEN ITD4S
STATUSDESCRIPTION OF RESOLUTIOH
Floor response spectra atelevation 163 ft in theturbine building havebeen developed by PQE.The NVlC duct and itssuppe'ts have been r e-analyzed for theseappropriate spectra. Theturbine building has beenchecked fe'he newsupport loads resultingfrom the reanalyzed HVACduct supports.
820322 821015 PGSE Open Iten:Calculations made by EDS fo l4in. HYLIC duct support loadingsused incorrect seismic responsespecb a in some cases. This mayhave resulted because thespectra provided by PQE(shown in Appendix A of the EDScalcu'lati on fi 'l ee inadvertentlyomitted designating the eleva-tion 163 ft spectra as pertain-ing to the aux'ia y bui ldfngonly. Apparently, EDS pe.sonne1mistakenly assumed that thosespectra could be used forseismic loading at elevation163 ft in the turbine building.
,t'OKLUSIVEREFEREICE TD ERROR C t NODIFI-STATEHENT ITP PHASE I CLASS ANALTSIS CATI0%
OF RESOLUTION FINAL REPORT PER IDVP COMPLETE CNPLETE ~Results of the Section A or 8 % H/Areanalysis thus 2.5.3far indicate thatqualifications of;the HVAC ductwill be main-tained and nomodifications
are„'ecessary.
n7av ainn7 >n
lI
jIj
Attachnent III'Page 11
IHITIATIHG" TASK DOCUMENT
IDEHTDATE ECD DESCRIPTIOH
STATUS OF PGandE OPEN ITEMS
STATUSDESCRIPTIOH OF RESOLUTIOH
COICLUSIYE REFEREfCE TO ERROR % % ffODIFI-STATEHENT ITP PHASE I CLASS ANALYSIS CATIONS
OF RESOLUTION FINAL REPORT PER IDVP COMPLETE COMPLETE
70172* SemimonthlyStatus Repo tHo. 11
Open Iten 22
70174* S emf son th lyStatus Repa tHo. 12
Open Item 23
820405 821130 PQE Open Iten:The reacto coolant systenpressurizer suppor ts and theconponent cooling wate heatexchanger we e modeled fncompany scope piping analysesas rigid. Additional analyseswfll be pe f9ned with actualequfpnent stfffnesses to ve ffythe approp.fateness of thisnod elf ng technique, orreanalysis and requalf ffcatfonof associated piping systemswill be performef.
820412 821015 PfIE Open Item:The Blune fnternal review hasdete ninedthat seve al computeranalyses were perforned beforeft was required that allcomputer analyses be OAve.f fied. Each such progr anfs being fnvestfgated thoroughly.
Revfew of the pressurizersuppo t dete mined by thestfffness to be 2.04 x108 lb/fn., which fsconsistent wfth theDiablo Canyon criteriafo nodelfng as rigid.The analysis of pipingwith the actual componentcooling wate heatexchanger stiffnessresulted fn suppe't Toadincreases but acceptablepfpe stress. Actions arefn progress to fdentffyall equfpnent that doesnot qualify for rigidnodelfng and reanalysfswill be pe formed.
The p ograms are beingv erf f fed. Reanalyseswill be pe famed, ffrequired.
Section A2.2.1,2.2.1.3.3.2,2 2.2.2.2.2.3.2.1
Appendix 1A A or 8 70 H/A
0787A/007 1A
A'
t~
Attachment II IPage 12
IHITIATIHG
TASK DOC WENT
IDENTDATE ECD D ESC R IPTIO N
STATUS OF PGandE OPEN IT035
STAIUS3 DESCRIPTION OF RESOLUTION
C03CLUSIYE 'EFERE3CE TO ERROR X % HODIFI-STATEHENT ITP PHASE I CLASS ANALTSIS CATI035
OF RESOLUTION, FINAL REPORT PER IDVP CNPLETE CO3PLE
70175» SemfrenthlyStatus ReportNo. 12Open Item 24
70176» SemimonthlyStatus Repo'tHo. 12Open Item 25
820414 821015 PGEE Open Item:The Blume into.nal revfew hasidentified several questionsconcerning the turbine buf ldfnganalysf s. These questions arerelated to the mathematfcalmodeling and computer analysisof some of the Hosgr 3 and post-INI modfffcatfons on thebuf ldfng response.
820420 821015 PGSE Open Item:The Blume internal review hasidentf fied questfons related tothe seismic analysts of thecontainment inter f or. Thesequestions are fnsufffcfentlyaddressed in the existingdocumentation of the analyses,and relate to the mass, shearvalues, stiffness, and to thecenters of mass and r fgfdfty ofthe model as well as to 'thefnterp etatfon of some of ther esu its.
URS/8 lume 3 s r ev 3 ewi ngeach area of conce.n todetermine fts resolution.PG5E fs continuing tomonitor the resolution ofthe BIR issues. Inaddition, PGSE fsperfo ning parametrfcstudies fn fts effort tomonite'ny reanalysfsand modfffcatfonsconsidered necessary toassure that qualf ffcatfonis mafntafned.
URS/Blume fs revfewfngeach area of concern todetermine 3 ts resolution.PQE fs continuing tomonitor the resolution ofthe BIR. In addftfon,PGSE fs perfo mfngparametrfc studies fn itseffort to monitor anyreanalysis and
modificat-
ionss considerednecessary to assure thatqualiffcation fsma3ntaf ned.
. Section Open item 70 02.1.4
Section Open Item2.1.1
n7n7 hlnn7 lh
0 '
~'
'4f„
Attachment I IIPage 13
IKITIATIKG
TRASK
DOCUMENT
IDENTDATE ECD DESCRIPTION
STATUS OF PGandE OPEN ITIHS
STATUSDESCRIPTIOM OF RESOLUTION
COfCLUSIVE '-'EFEREfCE TO ERROR % X ffODIFI-STATEHENT ITP PHASE I CLASS ANALYSIS CATI0%
OF RESOLUTION FINAL REPORT PER IDVP CNPLETE CNPLET
70183* S emf monthlyStatus Repo tKo. 13
Open Item 26
820504 820504 PGSE Open Item:The Blume fnte.nal review hasrequested URS/Blume to r evfsethe auxf lfary buf ldfng reportto reflect the actual timehistory used fn the analysfs(20 rather than 24 secondslongs and to supplement thecalculations to demonstratethe app op iateness of thetruncated tfme-hf story.
The auxf lfary buf ldfngrepe t, "Diablo CanyonNuclear Power Plant,Auxiliary Guf ldfngDynamic Seismic Analysisfa'he 7.5H HosgrfEarthquake", has to berevised to reflect theactual tfme history usedfn the analysis perfamedby URS/8 lume (20 ratherthan 24 seconds longi.Calculations to determinethe approprfatness of thetruncated tfme-hf storywere pe fa med. Theanalysis was re un usingthe 24-second tfmehistory. The r esultsbetween the 24- and the20- second time historieswe e compared and foundto be fdentfcal.
The report hasbeen revised toreflect theactual tine-hf story used.Calculations havebeen included fnrevision 1 of thecalculatf on ffleswhich dex6nstr atethat the trun-cated tfme-hf story produces
'n
identical re-sponse spectrumto that of theoriginal tfme-hfste y. Thf sftem is closed( 820504 I.
Sec tfon C 100 N/A2'1.2
A7A7hlAA71A
\
Attachment IIIPage 14
IHITIATINGTJ5K DXWEHT
IDENTDATE ECD DESCRIPTION
STATUS OF PGandE OPEN ITEHS
STATUSDBCRIPTIOH OF RESOLUTION
I
COKLUSIYE REFEREICE TO ERROR i iMODIFI-STATEMEHT ITP PHASE I CLASS ANALYSIS CATI0%
OF RESOLUTION FINAL REPORT PER IDYP COMPLETE COMPLETE ~70184* 5 emf monthly
Status ReportHo. 13
Open Item 27
701%* 5 emf monthlyStatus ReportNo. 13
Open Item 28
820503 821015 PGSE Open Item:The Blume fnte nal reviewhas fdentf fied a possiblediscrepancy fn the co relatfonbetween intake structure inputspectrun and floe responsespectra. This may affect theintake structure craneanalysis. It was also notedthat the intake structureseismic analysis dfd notinclude the effects of atsunami afte'ossible sefsmfcdanage to the intake flowdfvfde walls.
820506 821031 P fmE Open Item:An electrfcal design review hasfound that fnce rect circuitbreake s we e supplied force tain 125 YOC circuits;20,000 amp fnte.ruptfngcapacfty breakers we especified. Howeve, 10,000amp breake s were received andI ns ta 1 led.
URS/B lone has developedfloi response spectrafor the intake structureand has pe formedanalyses of the intakestructure crane wfth thatspectre. The effects ofa tsunami on the intakestructure are befngrevf ewed to determinewhether modf ffcatfonsare needed. I,fnecessary, modfffcatfons
!
wf 11 be performed.
20,000 amp fnterruptfngcapacf ty br cake s we eprocured and will beinstalled .
The intake crane Sectfonsb ucture has 2.1.5been qual fffedwith the correctfloor responsespectra and nonod f ffcatfons arenecessary.
Sf x r eplacement Honebr eak er s wf 11 beinstalled thatneet speci ffca-tfons.
Open item 50 N/A
100
n7A7 h/nn7 fh
C
C
1
J
I'
Attachment IIIPage l5
INITIATINGTASK DOCWEHT
IDENTDATE ECD D ESC R IPTIO H
STATUS OF PGandE OPEN ITB45
STATUSDESCRIPTION OF RESOLUTION
CO fC LUS IVESTATEMENT
OF RESOLUTIOH
REFEREICE TO ERROR X X ffODIFI-ITP PHASE I CLASS AHALTSIS CATI016FINAL REPORT PER IOTP CIPIPLETE CNIPLETE
70186» SemimonthlyStatus Repo tNo. 13
Open Item 29
70198* 5 emf monthlyStatus Repo tHo. 14
Open Item 30
820507 821130 PGEE Open Item:Pipe suppo.t spacing tables fononcomputer analyzed pipfng donot consider the effect of thepf pe fnsu1 atf on, and the tableused fo piping greate than4 fn. diameter was not reviewed,approved, and controlled asrequfred by the PGEE qualf ty
. assurance program.
21 821015 PGEE Open Item:During the addition fn 1979of the control room pressuri-zation system, the vitalelectrical power supply tothe redundant control roomheating, ventilation, and afrconditioning (HYKE system foeach unf t was changed. Thischange defeated the abf lfty ofthe Unit 1 control roomHVACsystem to meet the singlefaf lure criteria f f Unf t 2 we'enot operating.
Hew spacing tables whichconsfder the weight offnsulatfon are preparedand the effect on pipingand support design willbe dete mfned. Largebore piping will bereanalyzed by compute .Hodiffcatfons, f frequfred, will be made.
Two tests have beenpe.formed. These testsprovided performance datathat pressurization, afrdistribution and terpe a-ture control can be main-tained satfsfactorf lywith one of fourventilation trafns.Electrical power modfff-catfons shall be made tobe compatible with pro-viding r edundant afrconditioning, ventilationand pressurization to theUnit 1 and Unit 2 controlroom, and to comply wf thsingle faf lure crf teria.
Sec tfon2.2.1,2.2 2'.2.2.2'-3.3.2.2.4.3.2.2
None
A o'
I
Open item 75
0787 A/007 1A
'0 e"
J p't
P
4
Attachment IIIPage 16
IHITIATIHG
TASK DOClHEHTIDENTDATE ECD D ESC RIP TIO N
STATUS OF PGandE OPEN ITBfS
STAIUSDISCRIPTIOH OF RESOLUTIOH
COfCLUSIVE REFERECE 19 ERROR % C MODIFI-STATEHEHT ITP PHASE I CLASS ANALYSIS CATIOMR
OF RESOLOTLOK FTRRL REPORT PER lOTP CINPLETE COLPLETE
70202* SemimonthlyStatus Repa.tHo. 15
Open Item 31
70203* 5 emf can th lyStatus Repm'tHo. 15
Open Item 32
820604 821130 PGIE Open Item:The Blume internal review hasidentified certain items Afchrequire further investigationto verify the acceptabilityof fielded pipe attachments atthe main steam and feed~aterpiping anchor. The anchi islocated on column line G.
820607 999999 PGSE Open Item:Hodels and assumptfons used fnthe analyses for the sefsmfcqualfffcatfon of the fuelhandling buf ldfng steelsupe structure may haveresulted fn designs Afch donot totally satfsfy allapplicable cr f terf a.
Reanalysis of the mafnsteam and feed~atepiping anchor pipeattachments and ~eldsH I I be per formed. Thepipe attachments andvelds designs vill berevfmed to dete minecomplf ance to seismiccrfterfa. ffodfffcatfonsAll be performed, ifnec essa'y.
A study is befngpe'formed to determfneHat modfffcatfons areneeded. Reanalysis ofthe structure fs beingperformed using affnfte-element model.Evaluation fs unde way tocheck the acceptabilityof the merbe s and theirconnectfons to seismiccrf teria.
Sectfon A a B 25 0 t
2 2 3.2.2.3.3. 1
Sec tf on A2.1.3
nvnl a lnn7 1A
r'
4 b Fg
(
Attachment IIIPage 17
IHITIATING
TJSK DOCILEHTIDENTDATE ECD DESCRIPTION
STATUS OF PGandE OPEN ITIMS
STATUSDESCRIPTION OF RESOLUTION
COC LOS IVE REFERECE 10 ERROR X % MODIFI-STATEMENT, ITP PHASE I CLASS ANALYSIS CATIOHS
OF RESOLUTIOH 'INALREPORT PER IDYP CNPLETE COMPLE
70212* 5emimonth 1yStatus Repo tHo. 19Open Item 33
820813 8212'15 PG6E Open Item:A review of the Hosgri qua1ifi-cation ca1cu1ations for C1ass IHYK duct supports identifieda gene ic support type whichapparent1y does not satisfy theapplicab1e cri teri a.
A revie~ of 20 generic,C 1ass I HVAC ductsupport designs isunderway to determine theseismic adequacy of a11CIass I HYX ductsupports. Modificationswi'l1 be pe formed wherenecessary.
Section2.5.4
Ao'8 5 01
n7m ainn7 >a
~'
II