Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second...
Transcript of Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second...
Semi – annual Environmental Monitoring Report
January – June 2018 October 2018
Loan 2772-UZB: Second CAREC-Corridor 2 Investment Project, Tranche 1
Prepared by the Republican Road Fund for Asian Development Bank.
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
(Volume 3 : Pages 106-132)
Semi-annual Environmental Monitoring Report _________________________________________________________________________
Project Number: Loan No. 2772-UZB Reporting period: January-June, 2018 Republic of Uzbekistan: Second CAREC-Corridor 2 Investment Project, Tranche 1 Funded by: the Asian Development Bank (ADB)
Prepared by: Timur Dadabaev, Republican Road Fund
Tashkent, Republic of Uzbekistan
Askar Abdurupov SAMBO Engineering Co. LTD:
Angren, Republic of Uzbekistan
For: The Asian Development Bank (ADB). Approved by: Nodir Khadzhimetov, Head of the Project Management Unit (PMU) of the RRF Signature: Date of submission: 19.10.2018
Report on Environmental Protection for the first half of 2018 [Title]
11 December 2018 106
Report on Environmental Protection for the first half of 2018 [Title]
11 December 2018 107
Report on Environmental Protection for the first half of 2018 [Title]
11 December 2018 108
Report on Environmental Protection for the first half of 2018 [Title]
11 December 2018 109
Report on Environmental Protection for the first half of 2018 [Title]
11 December 2018 110
Report on Environmental Protection for the first half of 2018 [Title]
11 December 2018 111
Report on Environmental Protection for the first half of 2018 [Title]
11 December 2018 112
ANNEX 2: Photos of site visits
PHOTO REPORT
SAMBO Engineering
for the first half of 2018
Report on Environmental Protection for the first half of 2018 [Title]
11 December 2018 113
B/P at km 109
Pre-treatment settler after washing the equipment of the B/P an
bodies of dump trucks and mixers.
Report on Environmental Protection for the first half of 2018 [Title]
11 December 2018 114
B/P at km 144
Before Now
A settler provided for pre-treatment of water after washing th
equipment of the B/P and bodies of dump trucks and mixers.
A settler is missing for pre-treatment of water after washing the
equipment of the B/P and bodies of dump trucks and mixers.
Report on Environmental Protection for the first half of 2018 [Title]
11 December 2018 115
B/P at km 152
Now
The settler has been cleaned of sludge
Before
The settler has been filled with sediment sludge
Report on Environmental Protection for the first half of 2018 [Title]
11 December 2018 116
B/P at km 175
The dismantling of B/P equipment is ongoing The leveling of the area at the site of dismantled equipment of the B
was performed, the remains of foundations, construction and
household garbage were removed. Fertile soil was brought.
Report on Environmental Protection for the first half of 2018 [Title]
11 December 2018 117
Construction camp at km 144
Before Now
Report on Environmental Protection for the first half of 2018 [Title]
11 December 2018 118
Builder’s camp at km 146.
Residential boxes Summer dining room
Report on Environmental Protection for the first half of 2018 [Title]
11 December 2018 119
Area of relocated builders’ camp at km 172.
Remains of foundations, construction and household garbage were removed.
Report on Environmental Protection for the first half of 2018 [Title]
11 December 2018 120
The area of the former builders' camp of the JSC Elektrtarmoqqurilish at km 185
The leveling of the area was performed, the remains of foundations, construction and household garbage were removed.
Report on Environmental Protection for the first half of 2018 [Title]
11 December 2018 121
The quarry of non-metallic materials in the riverbed of the Rezaksay river at km 185-
190.
The river bed is being leveled, bank protection works are ongoing.
Report on Environmental Protection for the first half of 2018 [Title]
11 December 2018 122
Sampling of air, water and measurement of noise and vibration level by specialists of
the Republican Sanitary and Epidemiological Service.
Sampling of water from the B/P settler at km 109. Sampling of air at the B/P at km 109.
Report on Environmental Protection for the first half of 2018 [Title]
11 December 2018 123
Sampling of air at the B/P at km 144. Sampling of water from the B/P settler at km 144.
Report on Environmental Protection for the first half of 2018 [Title]
11 December 2018 124
Joint inspections of the environmental situation at production facilities and at the site of reconstruction of the A-373 Tashkent-Osh road with representatives of the
Contractor and the Republican SES
Measuring the noise level on the road section. Checking the environmental status of the fuel depot.
Report on Environmental Protection for the first half of 2018 [Title]
11 December 2018 125
ADB missions
Report on Environmental Protection for the first half of 2018 [Title]
11 December 2018 126
ADB's mission dated 17.07.2018
The mission of ADB representatives dated 03.07.2018.
Report on Environmental Protection for the first half of 2018 [Title]
11 December 2018 127
Report on Environmental Protection for the first half of 2018 [Title]
11 December 2018 128
Report on Environmental Protection for the first half of 2018 [Title]
11 December 2018 129
Report on Environmental Protection for the first half of 2018 [Title]
11 December 2018 130
Report on Environmental Protection for the first half of 2018 [Title]
11 December 2018 131
Report on Environmental Protection for the first half of 2018 [Title]
11 December 2018 132