Semester Wrapup

22
EE 5200 - Lecture 42 Friday Dec 15, 2017 Topics for Today: Announcements Term Project final report due Mon Dec 18 th Appendices: include journal paper and journal paper review. Final Project .ppt presentations - by Tues Dec 19 th 9am All teams prepare .ppt (if not presenting on Weds, embed audiostream). Office: EERC 614. Phone: 906.487.2857 Project Presentations (on-campus teams) Emphasize your project (Journal paper in Appdx of report) 6 presentations in 2 hrs - ~15-20 mins each including Q&A. Provide .ppt handouts for audience (15 copies). Handouts - landscape, 4 slides/page, double-sided, stapled Today: Closing comments on stability Intro to overall system operation (EE5230) Quick look at State Estimation (Ch.15). Intro to Smart Grid Technologies Semester Wrapup

Transcript of Semester Wrapup

Page 1: Semester Wrapup

EE 5

200

- Lec

ture

42

Frid

ay D

ec 1

5, 2

017

Topi

cs fo

r Tod

ay:

•A

nnou

ncem

ents

•Te

rm P

roje

ct fi

nal r

epor

t due

Mon

Dec

18th

App

endi

ces:

incl

ude

jour

nal p

aper

and

jour

nal p

aper

revi

ew.

•Fi

nal P

roje

ct .p

pt p

rese

ntat

ions

- by

Tue

s D

ec 1

9th 9

am

•A

ll te

ams

prep

are

.ppt

(if n

ot p

rese

ntin

g on

Wed

s, e

mbe

d au

dios

tream

).

•O

ffice

: EE

RC

614

.P

hone

: 906

.487

.285

7

•P

roje

ct P

rese

ntat

ions

(on-

cam

pus

team

s)•

Em

phas

ize

your

pro

ject

(Jou

rnal

pap

er in

App

dx o

f rep

ort)

•6

pres

enta

tions

in 2

hrs

- ~1

5-20

min

s ea

ch in

clud

ing

Q&

A.

•P

rovi

de .p

pt h

ando

uts

for a

udie

nce

(15

copi

es).

•H

ando

uts

- lan

dsca

pe, 4

slid

es/p

age,

dou

ble-

side

d, s

tapl

ed

•To

day:

•C

losi

ng c

omm

ents

on

stab

ility

•In

tro to

ove

rall

syst

em o

pera

tion

(EE

5230

)•

Qui

ck lo

ok a

t Sta

te E

stim

atio

n (C

h.15

).•

Intro

to S

mar

t Grid

Tec

hnol

ogie

s•

Sem

este

r Wra

pup

Page 2: Semester Wrapup

EE5200 students:

See this link for a full listing of term projects. The TA and I have pre-identified 6 teams that are invited to present (marked with ?). Let us know by Friday what you intend to do.

http://www.ece.mtu.edu/faculty/bamork/ee5200/ProjList.pdf

Other teams are welcome to volunteer as well. We will choose six that are a combination of timely interesting topics and well-executed projects. Those that present at the final exam timeslot can avoid needing to record audio on all of the ppt slides.

Summary of deadlines and deliverables (as posted on class web page):

Fri 5pm - Dispatch exercise due. Mon 9am - Term project report due. Send via e-mail, include all code and files that make up the project deliverables. No extensions. Tues 9am - Term project presentation ppt slides due. No extensions. Wed Dec 20th, 12:45pm - Final exam timeslot - all on-campus students will meet for presentations and evaluations. Attendance is mandatory, role shall be taken. (Online students: view the recorded video, evaluate the project presentations, submit to me and TA by Thursday COB.)

I understand that many of you were absent from today's lecture due to a deadline in Dr. Weaver's class. Unfortunately, you missed a detailed guidance on structuring your report and presentations, how to write Executive Summary, how to address Conclusions and Recommendations, etc. This will be on today's recorded video, really important for you to view it.

Dr. Mork Mani

To: [email protected]: Bruce Mork <[email protected]>Subject: EE5200 wrapup, deadlines & deliverables

Page 1 of 1

12/15/2017file:///C:/Users/bamork/AppData/Local/Temp/eudCD4.htm

Page 3: Semester Wrapup

Time: Finals W

eek

Wed

nesday, D

ec 20th ‐ 1

2:45

 ‐ 2:45

pm                                              Roo

m: D

OW 642

Start T

ime

Team

 Mem

bers

Topic

?Zhiyuan Yang

Yinq

i Wang

Risk‐based

 Con

tingency An

alysis Usin

g Mon

te Carlo Sim

ulation Metho

d

Shiena

 Kun

duAm

it Sabu

Compe

nsation techniqu

es fo

r reactive po

wer con

trol in

 transm

ission system

s.

Moh

amed

 Hassan*

*Ay

odeji A

moo

**Techniqu

es fo

r red

ucing total harmon

ic distortio

n (THD

) on low and

 high volta

ge 

system

s by analyzing and utilizin

g activ

e/passive metho

ds.

?Vivek Vy

asraj Sorab

Madhu

r Arun Jagtap

Effects o

f dynam

ics o

f PV gene

ratio

n on

 Pow

er Systems.

Kara Eshelman**

Moh

ammed

 A. H

ossain**

Effects o

f series c

apacito

rs in

 transm

ission lines

Apeksha Manekar

Vaibhavi Tharval

Power factor correction and redu

ction of voltage fluctuation in m

icrogrid

?Eric M

onte*

Britton

 Borlace*

Transm

ission Line

 Protection through the use of Lighting Arrestors

?Sreenivasulu Kam

ma

Renu

 Anvesh Maddi

Activ

e Po

wer Flow Con

trol usin

g the Ph

ase Shift Transform

er and

 TCSC comparison

?Moh

ammad

 Asif Iqbal Khan*

Aashay Thatte

Data‐driv

en m

odeling of a re

newable ene

rgy po

wered

 micro‐grid

 at M

ichigan Tech 

Campu

sHa

rshada

 Gaikw

adSaurabh Singh

Lightning transie

nt effe

ct on transm

ission line.

 Nikun

j Mathu

kiya

Raakesh Ra

ja Ram

achand

ran

To stud

y the analysis of fault current fo

r the

 selection of th

e ratin

g of differen

t circuit b

reakers

Vishal Arya

Ashw

in Pathak

Mod

elling and analysis of Lightning

 Arrestors fo

r use in

 Distrib

ution substatio

ns

Yashde

ep Datta

Rushikesh Kadam

Impact of D

istrib

uted

 Gen

eration over Transmission line & Distrib

ution ne

twork 

(study

 pow

er sy

stem

 attrib

utes)

?Praveen Iyer

Mud

it Ku

mar

Evaluatin

g the pe

rformance of T

ransmission line with

 UPFC through sim

ulation

Naren

dra Ra

ghav

Arun

 Varkey Malpp

anAp

plication of phase sh

ifting transformers(PST) in

 electrical networks

Devalkum

ar Thakar

Aakash Revdiwala

Comparison

 between tw

o fault d

etectio

n metho

ds in

 transm

ission line: Two‐

Term

inal Transmission Line

 Fault Locatio

n Usin

g Traveling Waves and

 com

binatio

n of im

pedance based metho

d and volta

ge sa

ge m

atching.

Miche

al Tracy**

Remed

iatio

n of VAR

 deficiency on

 a sm

all isla

nded

 grid

 with

 limite

d gene

ratio

n

Allocated Time: ~15

‐20 minutes per presentation; 2‐4 m

ins b

etween

*Stand

s for On‐Campu

s On‐line Stud

ent

**Stands fo

r Off‐Campu

s On‐line Stud

ent

Page 4: Semester Wrapup

Time: Finals W

eek

Wed

nesday, D

ec 20th ‐ 1

2:45

 ‐ 2:45

pm                                              Roo

m: D

OW 642

Start T

ime

Team

 Mem

bers

Topic

?Zhiyuan Yang

Yinq

i Wang

Risk‐based

 Con

tingency An

alysis Usin

g Mon

te Carlo Sim

ulation Metho

d

Shiena

 Kun

duAm

it Sabu

Compe

nsation techniqu

es fo

r reactive po

wer con

trol in

 transm

ission system

s.

Moh

amed

 Hassan*

*Ay

odeji A

moo

**Techniqu

es fo

r red

ucing total harmon

ic distortio

n (THD

) on low and

 high volta

ge 

system

s by analyzing and utilizin

g activ

e/passive metho

ds.

?Vivek Vy

asraj Sorab

Madhu

r Arun Jagtap

Effects o

f dynam

ics o

f PV gene

ratio

n on

 Pow

er Systems.

Kara Eshelman**

Moh

ammed

 A. H

ossain**

Effects o

f series c

apacito

rs in

 transm

ission lines

Apeksha Manekar

Vaibhavi Tharval

Power factor correction and redu

ction of voltage fluctuation in m

icrogrid

?Eric M

onte*

Britton

 Borlace*

Transm

ission Line

 Protection through the use of Lighting Arrestors

?Sreenivasulu Kam

ma

Renu

 Anvesh Maddi

Activ

e Po

wer Flow Con

trol usin

g the Ph

ase Shift Transform

er and

 TCSC comparison

?Moh

ammad

 Asif Iqbal Khan*

Aashay Thatte

Data‐driv

en m

odeling of a re

newable ene

rgy po

wered

 micro‐grid

 at M

ichigan Tech 

Campu

sHa

rshada

 Gaikw

adSaurabh Singh

Lightning transie

nt effe

ct on transm

ission line.

 Nikun

j Mathu

kiya

Raakesh Ra

ja Ram

achand

ran

To stud

y the analysis of fault current fo

r the

 selection of th

e ratin

g of differen

t circuit b

reakers

Vishal Arya

Ashw

in Pathak

Mod

elling and analysis of Lightning

 Arrestors fo

r use in

 Distrib

ution substatio

ns

Yashde

ep Datta

Rushikesh Kadam

Impact of D

istrib

uted

 Gen

eration over Transmission line & Distrib

ution ne

twork 

(study

 pow

er sy

stem

 attrib

utes)

?Praveen Iyer

Mud

it Ku

mar

Evaluatin

g the pe

rformance of T

ransmission line with

 UPFC through sim

ulation

Naren

dra Ra

ghav

Arun

 Varkey Malpp

anAp

plication of phase sh

ifting transformers(PST) in

 electrical networks

Devalkum

ar Thakar

Aakash Revdiwala

Comparison

 between tw

o fault d

etectio

n metho

ds in

 transm

ission line: Two‐

Term

inal Transmission Line

 Fault Locatio

n Usin

g Traveling Waves and

 com

binatio

n of im

pedance based metho

d and volta

ge sa

ge m

atching.

Miche

al Tracy**

Remed

iatio

n of VAR

 deficiency on

 a sm

all isla

nded

 grid

 with

 limite

d gene

ratio

n

Allocated Time: ~15

‐20 minutes per presentation; 2‐4 m

ins b

etween

*Stand

s for On‐Campu

s On‐line Stud

ent

**Stands fo

r Off‐Campu

s On‐line Stud

ent

Page 5: Semester Wrapup
Page 6: Semester Wrapup
Page 7: Semester Wrapup
Page 8: Semester Wrapup
Page 9: Semester Wrapup
Page 10: Semester Wrapup
Page 11: Semester Wrapup
Page 12: Semester Wrapup
Page 13: Semester Wrapup
Page 14: Semester Wrapup
Page 15: Semester Wrapup
Page 16: Semester Wrapup
Page 17: Semester Wrapup
Page 18: Semester Wrapup
Page 19: Semester Wrapup
Page 20: Semester Wrapup
Page 21: Semester Wrapup
Page 22: Semester Wrapup