SEMESTER 1: Constructed Landscape Project 3 Brief (group)

2

Click here to load reader

Transcript of SEMESTER 1: Constructed Landscape Project 3 Brief (group)

Page 1: SEMESTER 1: Constructed Landscape Project 3 Brief (group)

SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Research Unit for Modern Architecture Studies in Southeast Asia Foundation of Natural and Built Environments CONSTRUCTED LANDSCAPE [ARC 3343]

Prerequisite: None Lecturers: Normah Sulaiman & Fariz Hilmi _____________________________________________________________________

Project 2 – 30% (Group -30%) Landscape Project Submission date – 9th June 2014

Introduction

The aim of the project is to introduce students to Landscape Project from ideas stage to completion. Students will have basic exposure to concept, analysis, master plan, costing, planting plan, construction and maintenance. Student will be given a small site within campus to study and apply the anatomy of project accordingly. Learning Objective

1. To understand basic landscape architecture drawings as a means of communication and representation of ideas

Learning Outcome

1. Explain and apply basics in anatomy of a landscape project, regulations and maintenance in landscaping

Tasks In a group of 6 you need to select a 10mx10m site within the campus. You are to study the selected site and

come up with an analysis. From the analysis, each group need to come up with a green space proposal for the

site. This includes concept, master plan, planting plan, costing (bill of quantities), and construction detail

as well as maintenance plan. You are to present your concept, master plan and planting plan on 2 A2

presentation board and the rest of the study a report format.

Submission Requirement

Presentation Day : 9th June 2014 @ Class venue and time

Concept and Master Plan – A2 board Planting Plan – A2 board

Page 2: SEMESTER 1: Constructed Landscape Project 3 Brief (group)

Report Compilation – 9th June 2014 @ Class venue and time Introduction Site analysis Concept Master Plan Planting Plan Costing 2 construction details Maintenance Plan

Soft copy submission**: Scanned works in a CD format with proper cover and information

according to group and individual folders. Submission date – 9th June 2014

Works submitted late will yield 10% mark reduction. For works submitted later than two working days, no assessment will be done. **Please use the proper CD cover, with a proper cover inlay of your submission details. Please do not use soft CD cover.