RMIT - Landscape Arch - Semester 2, 2011 - Lower Pool Studios
SEMESTER 1: Constructed Landscape Project 3 Brief (group)
Click here to load reader
-
Upload
taylors-university-lakeside-campus -
Category
Design
-
view
61 -
download
0
Transcript of SEMESTER 1: Constructed Landscape Project 3 Brief (group)
SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Research Unit for Modern Architecture Studies in Southeast Asia Foundation of Natural and Built Environments CONSTRUCTED LANDSCAPE [ARC 3343]
Prerequisite: None Lecturers: Normah Sulaiman & Fariz Hilmi _____________________________________________________________________
Project 2 – 30% (Group -30%) Landscape Project Submission date – 9th June 2014
Introduction
The aim of the project is to introduce students to Landscape Project from ideas stage to completion. Students will have basic exposure to concept, analysis, master plan, costing, planting plan, construction and maintenance. Student will be given a small site within campus to study and apply the anatomy of project accordingly. Learning Objective
1. To understand basic landscape architecture drawings as a means of communication and representation of ideas
Learning Outcome
1. Explain and apply basics in anatomy of a landscape project, regulations and maintenance in landscaping
Tasks In a group of 6 you need to select a 10mx10m site within the campus. You are to study the selected site and
come up with an analysis. From the analysis, each group need to come up with a green space proposal for the
site. This includes concept, master plan, planting plan, costing (bill of quantities), and construction detail
as well as maintenance plan. You are to present your concept, master plan and planting plan on 2 A2
presentation board and the rest of the study a report format.
Submission Requirement
Presentation Day : 9th June 2014 @ Class venue and time
Concept and Master Plan – A2 board Planting Plan – A2 board
Report Compilation – 9th June 2014 @ Class venue and time Introduction Site analysis Concept Master Plan Planting Plan Costing 2 construction details Maintenance Plan
Soft copy submission**: Scanned works in a CD format with proper cover and information
according to group and individual folders. Submission date – 9th June 2014
Works submitted late will yield 10% mark reduction. For works submitted later than two working days, no assessment will be done. **Please use the proper CD cover, with a proper cover inlay of your submission details. Please do not use soft CD cover.