Selkirk Parish Church

(SC014883)

PV project

David Bethune

Page 2: Selkirk Parish Church (SC014883) PV project David Bethune.
Page 3: Selkirk Parish Church (SC014883) PV project David Bethune.
Page 4: Selkirk Parish Church (SC014883) PV project David Bethune.

Why bother?

Page 5: Selkirk Parish Church (SC014883) PV project David Bethune.
Page 6: Selkirk Parish Church (SC014883) PV project David Bethune.
Page 7: Selkirk Parish Church (SC014883) PV project David Bethune.

Where next?

Page 8: Selkirk Parish Church (SC014883) PV project David Bethune.
Page 9: Selkirk Parish Church (SC014883) PV project David Bethune.

Stage 1: Initial proposal (2009)

• sketches

• congregational board

• design

• costs

Page 10: Selkirk Parish Church (SC014883) PV project David Bethune.

Design:

• 40 x 180Wp modules

• Coverage 53.5 m2

• Capacity 7.2 kWp

• Predicted annual output: 5,575 kWh

• Cost £31K (+scaffolding, electrical connection)

• predicted saving £2.5K per annum

• payback time c12 years

Page 11: Selkirk Parish Church (SC014883) PV project David Bethune.

Design:

Page 12: Selkirk Parish Church (SC014883) PV project David Bethune.

• inverter (in roof space)

• direct connection to existing supply

• generation meter (with display)

• no moving parts = minimal maintenance

Page 13: Selkirk Parish Church (SC014883) PV project David Bethune.

Stage 2: Permissions (2010)

congregational board

planning permission

listed building

general trustees

Page 14: Selkirk Parish Church (SC014883) PV project David Bethune.
Page 15: Selkirk Parish Church (SC014883) PV project David Bethune.

Stage 3: Funding (2010)

LCBP2e 50%

X E-on Source Fund

X Scottish Power Green Energy Fund

X EDF Green Fund

£34K

Page 16: Selkirk Parish Church (SC014883) PV project David Bethune.

Stage 4: Decision (Dec 2010)

LCBP2e 50%

loan from General Trustees

£5,700 from own funds

Page 17: Selkirk Parish Church (SC014883) PV project David Bethune.

Installation (Feb 2011)

Page 18: Selkirk Parish Church (SC014883) PV project David Bethune.

complete!

Page 19: Selkirk Parish Church (SC014883) PV project David Bethune.

Was it worth it?

Page 20: Selkirk Parish Church (SC014883) PV project David Bethune.

after 8 months ….

Page 21: Selkirk Parish Church (SC014883) PV project David Bethune.

Financially:

heading towards c7000 Units per annum

= £3530 from FiTs

+ £105 from export

+ ?£500 reduced bills

= £4000+ per annum benefit

Page 22: Selkirk Parish Church (SC014883) PV project David Bethune.

Environmentally:

> 3 tonnes CO2 per annum less

If all 2000 churches ….

…. 6 kilo tonnes saving!

Page 23: Selkirk Parish Church (SC014883) PV project David Bethune.

a success! significant financial benefit

significant environmental benefit

a visual sign to our community

encouraging others

members houses

manses

community buildings

Page 24: Selkirk Parish Church (SC014883) PV project David Bethune.

It’s good stewardship!

Page 25: Selkirk Parish Church (SC014883) PV project David Bethune.

Thanks for listening!

David Bethune