Self Quiz From CD Chap 17

download Self Quiz From CD Chap 17

of 2

description

POM

Transcript of Self Quiz From CD Chap 17

  • 3/19/14 Self Quiz from CD

    highered.mcgraw-hill.com/novella/QuizProcessingServlet 1/2

    Self Quiz from CD(See related pages)

    Results Reporter

    Out of 11 questions, you answered 6 correctly, for a final grade of 55%.

    6 correct (55%)

    5 incorrect (45%)

    0 unanswered (0%)

    Your Results:

    The correct answer for each question is indicated by a .

    1 CORRECT Scheduling is primarily concerned with the timing of operations.

    A)True

    B)False

    2 CORRECTJob shop schedule by priority rules is inherently deterministic in nature; the scheduler must plan as if both the orderof processing and the amount of time each job would take in each work center were known exactly.

    A)True

    B)False

    3 INCORRECT The assignment method will solve a wide variety of problems that have to do with flow systems.

    A)True

    B)False

    4 CORRECT The hierarchy of decisions in production operations is, in order: (1) long-term capacity planning, (2) aggregateplanning, (3) material requirements planning, (4) capacity requirements planning, (5) schedulingA)True

    B)False

    5 INCORRECT Johnson's rule, the assignment method, and loading and priority rules are all appropriate methods of scheduling forjob shops.A)True

    B)False

    6 INCORRECT Which one of the following is not an appropriate job-shop scheduling rule?

    A)Due date

    B)Assignment method

    C)First come first served

    D)Shortest processing time

    E)Johnson's rule

    7 CORRECT Which one of the following is an optimizing technique?

    A)Shortest processing time

    B)Assignment method

    C)First come first served

    D)Loading

    E)None of these

    8 INCORRECT A major disadvantage of the SPT rule is:

    A)it tends to make long jobs wait.

    B)it results in high in-process inventories.

    C)long jobs tend to delay other jobs.

    D)it does not take processing time into account.

    E)none of these.

    9 CORRECT Which statement is correct?

    A)Vertical loading involves infinite loading.

    B)Horizontal loading involves infinite loading.

    C)Vertical loading involves finite loading.

    D)a. and b. are correct.

    E)b. and c. are correct.

    10 CORRECT Finite loading, as compared to infinite loading, assumes that:

    A)There are a finite number of jobs to be done.

    B)Work centers can be loaded without regard to their capacity.

    C)Work centers' capacity must be taken into account.

    D)Work centers' capacity may be taken into account, but it's not required.

    E)none of the above

    11 INCORRECT In a task assignment situation, in how many different ways can five jobs be assigned to five machines?

    A)1

    B)5

    C)25

    D)120

    Course-wide ContentData SetsExcel TemplatesPowerWebWeb LinksOperations Management ... Interactive OMUpdates and Errata

    Chapter 17

    News, Articles & LinksNews FeedsPowerWeb ArticlesWeekly Update Archive

    QuizzesMultiple Choice QuizTrue or FalseSelf Quiz from CD

    Interactive ExercisesInteractive OM

    More ResourcesProblems/SolutionsGlossary

    Home > Chapter 17 > Self Quiz from CD

  • 3/19/14 Self Quiz from CD

    highered.mcgraw-hill.com/novella/QuizProcessingServlet 2/2

    E)3,125

    Routing Information

    Date: Wed Mar 19 09:47:48 EDT 2014

    My name:

    Section ID:

    Email these results to:

    Email address: Format:

    Me: HTML

    My Instructor: HTML

    My TA: HTML

    Other: HTML

    E-Mail The Results

    To learn more about the book this website supports, please visit its Information Center.

    2002 McGraw-Hill Higher EducationAny use is subject to the Terms of Use and Privacy Notice.

    McGraw-Hill Higher Education is one of the many fine businesses of The McGraw-Hill Companies.