Selected Works

30
selected works of

description

Selected works of metal fabrication and architecture

Transcript of Selected Works

Page 1: Selected Works

selected works of

Page 2: Selected Works
Page 3: Selected Works

0102

EDUCATION PRATT INSTITUTE Bachelor of Architecture AUG 2007 - MAY 2013

BROOKLYN TECHNICAL HIGH SCHOOL Architecture SEP 2003 - JUN 2007

PROFESSIONAL TOTAL METAL RESOURCE Brooklyn, NY Design & Project Manager MAY 2012 - APR 2014Production of shop drawings based on field measurements for fabrication of custom metal work for commerical, residential, and hospitality projects. Research of various hardware required for the projects. Coordination between clients, vendors, and fabricators to bring projects to completion.

MULTI-STONE LTD. Kowloon, HK Design Intern & Assistant Project Manager MAY - AUG 2010Production of shop drawings for custom stone work for commerical, residential, and hospitality projects. Selective stone pattern layout. Coordinate and supervise on-site installations.

PRATT ACADEMIC COMPUTING Brooklyn, NY IT Assistant MAY - DEC 2009Assist students and faculties with troubleshotting computer related issues. Malware removal and computer maintenance on Mac’s & PC’s.

RAINBOW DIGITAL PHOTO Brooklyn, NY Photographer’s Assistant JUN 2004 - SEP 2008Assist photographer with set preparations and lighting adjustments. Film and photo development. Photo editing and retouching.

AWARDS Pratt Institute - Graduating Students’ Thesis Exhibition 2013

Dean’s List 2008, 2010, 2011, 2012, 2013School academic award for students with semester GPA of 3.0 to 3.50

SKILLS Adobe Creative Suite, AutoCAD, Revit, Rhino, V-Ray, Maxwell Render, Microsoft Office, Model Building, Metal Fabrication, Tile & Stone Design, Photography, Bilingual English & Chinese (Mandarin & Cantonese)

ABOUT Hi, my name is Jordan Lu, I am a motivated graduate of Pratt Institute Undergraduate School of Architecture. I wish to expand my horizons in the fields of architectural design, fabrication, and photography. I enjoy figuring out how things are made and how they come together. I believe that the best sense of accomplishment is to be able to work with my mind and my hands to produce quality and detail work that will be used by thousands of people everyday. My ultimate goal is to become a self-sufficient, licensed architect in New York, Hong Kong and China.

CONTACT [email protected] EMAIL 718.552.0744 MOBILE

self portraitgoes here

Page 4: Selected Works
Page 5: Selected Works

0304

05. Shinola Flagship Store, TriBeCa

09. The Wayfarer, Midtown

13. Chobani Flagship Store, SoHo

17. Pratt Degree Project - Park Terminal, Chinatown

23. Musical Creature - Claremont Concert Hall, Riverside Drive

Page 6: Selected Works

ShinolaTriBeCa, NYC

Shinola is an Detroit branded wax-based shoe polish company from 1907 to 1960. Shinola recently reopened in New York that sells custom handmade bicycles and watches.

Working with the Rockwell Group and MG & Company, we had the chance to work on this amazing flagship store in TriBeCa. We fabricated a custom steel catwalk and sprial staircase for exposed storage area for inventory. Finished with Japanese brown patina to give it a dark brown look and topped off with accents of brass to bring a warm and welcoming feel to the store. The Japanese brown patina brings out Shinola’s original color of the shoe polish, as the saying goes, “you don’t know sh*t from Shinola”.

For this project, we also fabricated the frame for the skylight panels, the numerous brass bicycle hangers and display shelvings throughout the store to match the rest of the metalwork.

This project has been featured in New York Times, CoolHunting, Dwell and many other publications.

Photo Credits:Jordan LuTotal Metal Resourcenytimes.comvmsd.combicycleretailer.comwornandwound.compapermag.com

Page 7: Selected Works

0506

Page 8: Selected Works
Page 9: Selected Works

0708

Page 10: Selected Works

The WayfarerMidtown, NYC

The Wayfarer, a two-story restaurant at the Quin Hotel in Midtown Manhattan is a place where locals and hotel guests can enjoy fresh seafood-focused menu in an inviting setting.

Working with Meyer Davis Studios and MG & Company, we had the chance to work on this giant 8,800 lbs. steel staircase suspended in air with hanger rods and finished with wood cladding. With precise field measurements, we were able to generate shop drawings and prefabricate parts in our shop in Greenpoint and build the entire staircase suspended in air on-site. We also worked on the miscellaneous metalwork found throughout the resturant bar area.

Page 11: Selected Works

0910

Page 12: Selected Works

D

E

M x2

F

DWG #:

Stairs Frame Elevation

MG - QUIN - 101 W57 ST

Date: Scale: 1/2" = 1'-0"

DWG By: SD-500

Project:

Title:

10.10.2013

J. LU0'-0"

351/4

"

1ST SUBFLOOR

351/4

"

38 1/2"

38 1/2"

2ND SUBFLOOR

39"

31 3/4"

45 7/8"

44 5/8"

149.0°

383/4

"

12"

2"

15'-8 15/16"

12"

50 1/2"

T. O. LANDING

T. O. LANDING

T. O. LANDING6'-6 1/4"

8'-2 1/16"

3'-9 1/4"

Stairs Frame Elevation

2" X 2" X 1/4" STEEL TUBESUPPORT TYP.

1

2" X 3" STEEL TUBE SUPPORT TYP.

SCALE:

7/8" Ø BRASS SLEEVE 7/8" Ø BRASS SLEEVE3/4" Ø STEEL HANGER ROD

12" X 3" X 1/4" STEEL TUBESTRINGER TYP.

1/2"=1'-0"

1" X 1" X 1/8" STEEL ANGLE SUPPORT TYP.

3/4" Ø STEEL HANGER ROD

10/10/2013 1:20:40

193"

Project:

DWG #:

213 1/8" BRICK TO COLUMN

190 1/4" FINISH WALL TO INT. WEB

1/2" = 1'-0"

FINISH WALL AS PERMEETING 9/17/2013

DWG By:

10/10/2013 1:20:39

125"

STA

IR W

IDTH

Scale:

Stairs Frame Plan

MG - QUIN - 101 W57 ST

SD-100

10.10.2013

132 7

/16" F

INIS

H W

ALL T

O CO

LUMN

212" TO BRICK COLUMN

220 5/8" BRICK TO I-BEAM

J. LU

Title:

Date:

3/4" DECORATIVE WOODPANEL BY OTHERS

3" X 2" STEEL TUBESUPPORT TYP.

2"

3"3/4

"3/4

"

6"

I-BEAM BELOW

3/4" DECORATIVE WOOD PANEL BY OTHERS

I-BEAM ABOVE

3/4" DECORATIVE WOODPANEL BY OTHERS

1" X 1" X 1/4" ANGLE TYP.

47" T

READ

WID

TH

47" T

READ

WID

TH

143"

3/4" Ø HOLE O. C.

2"

3"

3" X 2" STEEL TUBESUPPORT TYP.

93 3/4"

12" X 3" X 1/4" STEELTUBE STRINGER TYP.

4 1/2"

3/4" Ø HOLE O. C.

8" X 1/2" STEEL PLATE TREAD TYP.

4 1/2"

82 5/8" LANDING WIDTH

142 1/4"

57 7/8"48" LANDING

2" X 2" X 1/4" STEEL TUBE SUPPORT TYP.

2" X 2" X 1/4" STEELTUBE SUPPORT

192 1/4"

47" LANDING

6"

3" X 6" X 1/4" STEELTUBE SUPPORT

20 1/

2"

123 1

/2"

6"

109 11/16"

2" X 2" X 1/4" STEELTUBE SUPPORT

48" L

ANDI

NG

3" X 6" X 1/4" STEELTUBE SUPPORTEMBED INTO FINISHCOLUMN

22"

12" X 3" X 1/4" STEELTUBE STRINGER TYP.

12" X 3" X 1/4" STEEL TUBE STRINGER TYP.

EXISTING COLUMN

46" L

ANDI

NG

3"

3"

3/4"

SD-300

1

SD-900

SD-800

SD-600

SD-500

SD-1003

3"=1'-0"

3 SCALE:

Railing Detail Plan View

Railing Detail Plan ViewSCALE:2

SD-100

1/2"=1'-0"1

3"=1'-0"

SCALE:

Stair Frame Plan

1

SD-2001

1

1

1

2

A

C

Project:

10.10.2013Date:

MG - QUIN - 101 W57 ST

SD-200J. LU

1/2" = 1'-0"

DWG By:

10/10/2013 1:20:39

DWG #:

Scale:

Title: Stair Frame Elevation

35 1/2"

33 1/4"

38 3/

4"

171 5/16"

42"

173 1

/4" B

.O. I-

BEAM

1ST SUBFLOOR0'-0"

2ND SUBFLOOR

190 5/16"

42"

6'-6 1/4"

178 11/16"

15'-8 15/16"

35 1/2"

8'-2 1/16"

31 3/4"

121.0

°

12"

35 1/

4"

47"

46 13/16"

3'-9 1/4"

40"

300 5

/8"

35 1/2"

39 1/

4"

72"

T. O. LANDING

T. O. LANDING

59.0°

T. O. LANDING

4"

35 1/2"

1/2"=1'-0"1

DECORATIVE WOOD PANEL BY OTHERS

12" X 3" X 1/4" STEEL TUBE STRINGER TYP.

7/8" Ø BRASS SLEEVE

3/4" PLYWOOD SUBFLOOR

3/4" WOOD FINISH FLOOR

12" X 3" X 1/4" STEEL TUBE SUPPORT

3/4" Ø STEEL HANGER ROD

2" X 2" X 1/4" STEEL TUBESUPPORT TYP.

12" X 3" X 1/4" STEEL TUBESTRINGER TYP.

2" X 2" X 1/4" STEEL TUBESUPPORT TYP.

SCALE:

Stairs Frame Elevation

Page 13: Selected Works

1112

193"

Project:

DWG #:

213 1/8" BRICK TO COLUMN

190 1/4" FINISH WALL TO INT. WEB

1/2" = 1'-0"

FINISH WALL AS PERMEETING 9/17/2013

DWG By:

10/10/2013 1:20:39

125"

STA

IR W

IDTH

Scale:

Stairs Frame Plan

MG - QUIN - 101 W57 ST

SD-100

10.10.2013

132 7

/16" F

INIS

H W

ALL T

O CO

LUMN

212" TO BRICK COLUMN

220 5/8" BRICK TO I-BEAM

J. LU

Title:

Date:

3/4" DECORATIVE WOODPANEL BY OTHERS

3" X 2" STEEL TUBESUPPORT TYP.

2"

3"3/4

"3/4

"

6"

I-BEAM BELOW

3/4" DECORATIVE WOOD PANEL BY OTHERS

I-BEAM ABOVE

3/4" DECORATIVE WOODPANEL BY OTHERS

1" X 1" X 1/4" ANGLE TYP.

47" T

READ

WID

TH

47" T

READ

WID

TH

143"

3/4" Ø HOLE O. C.

2"

3"

3" X 2" STEEL TUBESUPPORT TYP.

93 3/4"

12" X 3" X 1/4" STEELTUBE STRINGER TYP.

4 1/2"

3/4" Ø HOLE O. C.

8" X 1/2" STEEL PLATE TREAD TYP.

4 1/2"

82 5/8" LANDING WIDTH

142 1/4"

57 7/8"48" LANDING

2" X 2" X 1/4" STEEL TUBE SUPPORT TYP.

2" X 2" X 1/4" STEELTUBE SUPPORT

192 1/4"

47" LANDING

6"

3" X 6" X 1/4" STEELTUBE SUPPORT

20 1/

2"

123 1

/2"

6"

109 11/16"

2" X 2" X 1/4" STEELTUBE SUPPORT

48" L

ANDI

NG

3" X 6" X 1/4" STEELTUBE SUPPORTEMBED INTO FINISHCOLUMN

22"

12" X 3" X 1/4" STEELTUBE STRINGER TYP.

12" X 3" X 1/4" STEEL TUBE STRINGER TYP.

EXISTING COLUMN

46" L

ANDI

NG

3"

3"

3/4"

SD-300

1

SD-900

SD-800

SD-600

SD-500

SD-1003

3"=1'-0"

3 SCALE:

Railing Detail Plan View

Railing Detail Plan ViewSCALE:2

SD-100

1/2"=1'-0"1

3"=1'-0"

SCALE:

Stair Frame Plan

1

SD-2001

1

1

1

2

A

C

Project:

10.10.2013Date:

MG - QUIN - 101 W57 ST

SD-200J. LU

1/2" = 1'-0"

DWG By:

10/10/2013 1:20:39

DWG #:

Scale:

Title: Stair Frame Elevation

35 1/2"

33 1/4"

38 3/

4"

171 5/16"

42"

173 1

/4" B

.O. I-

BEAM

1ST SUBFLOOR0'-0"

2ND SUBFLOOR

190 5/16"

42"

6'-6 1/4"

178 11/16"

15'-8 15/16"

35 1/2"

8'-2 1/16"

31 3/4"

121.0

°

12"

35 1/

4"

47"

46 13/16"

3'-9 1/4"

40"

300 5

/8"

35 1/2"

39 1/

4"

72"

T. O. LANDING

T. O. LANDING

59.0°

T. O. LANDING

4"

35 1/2"

1/2"=1'-0"1

DECORATIVE WOOD PANEL BY OTHERS

12" X 3" X 1/4" STEEL TUBE STRINGER TYP.

7/8" Ø BRASS SLEEVE

3/4" PLYWOOD SUBFLOOR

3/4" WOOD FINISH FLOOR

12" X 3" X 1/4" STEEL TUBE SUPPORT

3/4" Ø STEEL HANGER ROD

2" X 2" X 1/4" STEEL TUBESUPPORT TYP.

12" X 3" X 1/4" STEEL TUBESTRINGER TYP.

2" X 2" X 1/4" STEEL TUBESUPPORT TYP.

SCALE:

Stairs Frame Elevation

Page 14: Selected Works

ChobaniSoHo, NYC

Chobani, the famous Greek yogurt opened its flagship store in SoHo on Prince Street in 2012.

We had the chance to work with a l m project and MG & Company on making this happen. The store is located in the historic Cast Iron District, using corten steel on the storefront to preserve its cast iron feel and yet a simple and clean design. This look and feel is carried through the entire store where we made corten steel diamond plate base for seating and corten steel custom t-bar and glass shelves for the vitrine. We also made the custom stainless steel t-bar shelves for the interior kitchen area.

Recently, near the end of 2013, due to its popularity in the area, the flagship store expanded, taking over its adjacent store and we had the chance to work on this project again, re-renovate the store with another set of custom corten steel storefront, custom interior metalwork, signage and deck with a spiral stairs for the staff to access the basement.

Images courtesy of Total Metal Resource and Chobani SoHo.

Page 15: Selected Works

1314

Page 16: Selected Works

Scale:12.11.2013

MG - CHOBANI SOHO EXP

DWG #:

Title:

J. LU

131205_Chobani Stair Shop Dwgs.3dm

NTS

12.11.2013 14:00:25

DWG By: SD-100

Date:

Courtyard Stairs Axon

Project:

4" Ø TUBE SPIRAL SUPPORT

1/8" DIAMOND PLATE PLATFORM

1/8" DIAMOND PLATE TREAD & LANDING

3" X 6" X 1/4" SQ. TUBE DECK FRAME TYP.

1" X 1" X 1/8" SQ. TUBE SPINDLE TYP.

1" X 1" X 1/8" SQ. TUBE SPINDLE TYP.

1 1/2" Ø TUBE HANDRAIL TYP.

1 1/2" Ø TUBE HANDRAIL TYP.

INTERIOR FINISH FLOOR

CUSTOM BEND 1/8" DIAMOND PLATE TREAD TYP.

1/2" Ø ROD SPINDLE TYP.

SCALE:1 Spiral Stairs AxonNTS

SD-200DWG By:

131205_Chobani Stair Shop Dwgs.3dm

Title:

12.11.2013 14:00:25

Scale:Date:

MG - CHOBANI SOHO EXPProject:

DWG #:

1/2" = 1'-0"

J. LU

12.11.2013

Courtyard Stairs Elev & Plan

24"

1/8" DIAMOND PLATETREAD & LANDING TYP.

24 3/

4" 16" WALL

6" X 6" X 1/4" ANGLEBRACKET W/ 1/2"THREADED ROD

W/ EPOXY

66"

105"

MAX

. CLE

ARAN

CE

7 1/8"

TYP

.

39 3/4" OPENING

1/4" STEEL PLATESTRINGER

12" TYP.

30 7/

8"

1/8" DIAMOND PLATETREAD & LANDING TYP.

3" X 6" X 1/4" SQ. TUBEDECK FRAME TYP.

33"

57"

72" Ø SPIRAL STAIRS

2" X 2" X 1/4" ANGLE BRACEFIELD WELDED

1" X 1" X 1/8" SQ. TUBE SPINDLE TYP.

4" Ø TUBE SPIRAL SUPPORT

1 1/2" Ø TUBE HANDRAIL TYP.

1 1/2" Ø TUBE HANDRAIL TYP.

142 1

/8"13

6"

CUSTOM BEND 1/8" DIAMONDPLATE TREAD TYP.

1 1/2" Ø TUBE HANDRAIL TYP.

1/8" DIAMOND PLATE PLATFORM3" X 6" X 1/4" SQ. TUBEDECK FRAME TYP.

1" X 1" X 1/8" SQ. TUBE SPINDLE TYP.

STRUCTURALI-BEAM BELOWPLATFORMBY OTHERS

2" X 2" X 1/4" ANGLE BRACEFIELD WELDED

2" X 2" X 1/4" SQ. TUBE SUPPORT

6" X 6" X 1/4" ANGLEBRACKET W/ 1/2"THREADED ROD

W/ EPOXY

1" X 1" X 1/8" SQ. TUBE SPINDLE TYP.

36"

1" TYP.

CUSTOM BEND 1/8" DIAMONDPLATE TREAD TYP.

7 3/4"

TYP

.

1/8" DIAMOND PLATE PLATFORM

42"

-9'-3 1/4"BASEMENT

2'-6 7/8"T.O. PLATFORM

102"

36"

11"

57"

11"

30"

36"

11"

28 3/4"

16" W

ALL

1 1/4" GAP

20 7/16"

36"

DN

10"

EXISTING STORAGEPLATFORM

0'-0"1ST FLOOR

1 1/2" Ø TUBE HANDRAIL TYP.

24"

66"

1" X 1" X 1/8" SQ. TUBE SPINDLE TYP.

1/2" Ø ROD SPINDLE@ 3" SPACING TYP.

1/2" Ø ROD RAIL

4" Ø TUBE SPIRAL SUPPORT

1

1

SCALE:1 11/2"=1'-0"

SD-202

Stairs Elevation1/2"=1'-0"SCALE:2

1

Stairs Plan

1SD-200

SD-204

SD-201

1

SD-201

SD-203

J. LU

MG - CHOBANI SOHO EXP

11.26.2013

Title:

Date:

Storefront Axon

Project:

NTS

131126_Chobani Fab Dwgs.3dm

DWG #: SD-800

12.2.2013 13:32:45

DWG By:

Scale:

E

SD-900A

B

C

SD-1300

D

SD-1100

SD-1000

SD-1200

MG - CHOBANI SOHO EXP

Date:

SD-900

11.26.2013

131126_Chobani Fab Dwgs.3dm

Scale:

Project:

NTS

J. LU

Title:

DWG By: DWG #:

4.24.2014 01:07:39

Part A - Diamond Plate Base

1" X 1/4" FLAT BAR TYP.

1" X 1" X 1/8" ANGLE TYP.

67"

1" X 1/4" FLAT BAR TYP.BELOW

3" X 3" X 1/4" ANGLE BRACKET TYP.

1/8" DIAMOND PLATE (F)

16 7/

16"

81 3/4" OUTSIDE

2 1/8" 16 GA. BLADE

FRONT DIAMOND PLATESLIGHTLY PITCHED

18 11

/16"

3" X 3" X 1/4" ANGLE BRACKET TYP.

2 1/8"

16 1/2"

69 1/8"

1/8" DIAMOND PLATE17 1/2"

1/8" DIAMOND PLATE

1" X 1" X 1/8" ANGLE TYP.

16 1/2"

FULLY WELD SEAM

1" C

LR

16 1/2"16 1/2"2 1/4"

18 3/

8" IN

SIDE

78" ANGLE

12 5/8"

3" X 3" X 1/4" ANGLE BRACKET TYP.

2"

1/8" DIAMOND PLATE (R)

12 5/8"

1" X 1" X 1/8" ANGLE TYP.

81 3/4" INSIDE

16 7/

16"

18 11

/16"

1 1/2" X 1/4" FLAT BAR TRIM

1/8" DIAMOND PLATE

2" X 2" X 3/16" ANGLE

16 1/2"

SIDEWALK1" X 1/4" FLAT BAR TYP.

2" X 2" X 3/16" ANGLE

16 1/

2" V

ISIB

LE

18 3/

8"

FULLY WELD SEAM

2"

18"

1 1/8"36 1/4"

18 11/16" 16 7/16"

17 7/

8"

81 1/2" OUTSIDE

81 3/4" INSIDE

69 1/8" OUTSIDE

67" INSIDE2 1/8"

3"

16 7/

8" V

ISIB

LE

12 3/4"

1 1/2"

16 1/2"17"

36"

18" O

UTSI

DE

36 1/4"

12 5/8"1" X 1" X 1/8" ANGLE TYP.

1/4" VERTICLE CLAD

REAR DIAMOND PLATE 1 1/2" X 1/4" FLAT BARTRIM BEYOND

1 1/2" X 1/4" FLAT BAR TRIM

2" X 2" X 3/16" ANGLE

36"

36 1/

4"

36 1/

4"

1" X 1/4" FLAT BAR DIAGONAL BRACING TYP.

SD-901

SD-901

3

2

Axon View4 NTSSCALE:

2 3 Side ViewNTSSCALE:

Front ViewSCALE: NTS

SD-901

NTS1 SCALE:

Top View

1

Page 17: Selected Works

1516

Page 18: Selected Works

Park TerminalChinatown, NYCPratt Institute Degree Project

The Chinatown Bus network started as a mode of transportation for immigrant Chinese restaurant workers to travel to and from other major Chinatowns along the East Coast for work, as time passes, it attracted a more diverse group of travelers because it is inexpensive compare to flying or other bus companies. Due to its increasing popularity among commuters and lack of proper facility, many of these buses park on the streets of Chinatown to load and unload passengers causing congestion for vehicular traffic as well as pedestrian traffic, causing accidents and altercations because of tight spacing.

My thesis takes a critical view of micro and macro ecology of people in and around Chinatown by proposing a hub that sorts and mixes social and cultural diffusion. I want to create a hub which stitches two scales of network together—global and local. The global scale where travelers from other areas of the country reach as their destination, and local scale where people in the neighborhood can go and relax.

The site is located at Sara D. Roosevelt Park, and the idea is to elevate the park and use the movement of the bus as the programmatic base of the building, while the movement of people determines the placement of internal and external programs. This blends the boundary where the program and landscape becomes one another.

Page 19: Selected Works

1718

Bow

ery

St

Chry

stie

St

Fors

yth

St

Grand St

Hester St

Canal St

Manhattan Br

Page 20: Selected Works

Pedestrian Route (Terminal)

Retail / CafeBus Zones

Park / Recreational

Terminal Zones

Pedestrian Route (Park)

Page 21: Selected Works

1920

Page 22: Selected Works

B1 - Loading / Unloading Area Ground Level - Lobby 2nd Floor - Waiting Area / Retail

UP

UP

DOWN

UP

UP

AA

BB

CC

D

D

UPUP

UP

N

50'10'

25'5' 100'

200'

Page 23: Selected Works

2122

Section B-B

Section D-D

Page 24: Selected Works

Musical CreatureClaremont Concert HallRiverside Drive, NYC

The idea of this concert hall was “a building that lives in a park”, so I looked at the building’s home, the park. I want people to be able to peacefully traverse through the park, which leads to a narrow-trapezoidal building footprint given by the site condition. The narrow base accomodates all the essential programs for visitor’s lobby and staffs, while the top heavy for everything else. Manipula-tion of the geometry by cutting through the building from the north at the slope of the auditorium to enhance a visitor’s experience and to feel consumed as you enter this heavy box and the ceiling begins to rise and the space opens up. The facade of the building is an attempt on emphasizing the building’s overall geometry while transforming the heavy and distorted box into a more dynamic being, a musical creature.

1'

2'

4'

8' 32'

16'

EAST ELEVATION

Page 25: Selected Works

2324

N

SITE PLAN

1'

2'

4'

8' 32'

16'

CROSS SECTION

1'

2'

4'

8' 32'

16'

SOUTH ELEVATION

Page 26: Selected Works

N

3RD FLOOR

DN

UP

GROUND FLOOR

2ND FLOOR

1'

2'

4'

8' 32'

16'

1

2

76

3 4

9 98 10

51. Public Lobby2. Box Office3. Coat Check4. Gift Shop5. Lower Intermission Space6. Staff Entrance7. Temporary Storage8. Trash Room9. Staff Locker10. Staff Lavatory

1. Intermission Space2. Bar3. Outdoor Intermission Space4. Auditorium5. Main Stage6. Back Stage7. Changing Rooms

1. Intermission Space2. Balcony Seating3. Offices4. Waiting/Lounge5. Green Room

15

1 3

4

5

3

3

3

1

67

32

4

2

1'

2'

4'

8' 32'

16'

CONDUCTOR AXIS

Page 27: Selected Works

2526

1'

2'

4'

8' 32'

16'

CONDUCTOR AXIS

ACOUSTICS ANALYSIS

Page 28: Selected Works

THANK YOU

Page 29: Selected Works
Page 30: Selected Works