COLLAPSE ANALYSIS OF A
METAL TRUSS STRUCTURE
Chiara Crosti, Franco Bontempi
“Sapienza” University of Roma, [email protected], [email protected]
![Page 2: Sei2013 crosti](https://reader033.fdocuments.us/reader033/viewer/2022052821/554a27d9b4c90520578b4aa8/html5/thumbnails/2.jpg)
2/22
Radiohead’s concert, 2012
Image taken from: http://abcnews.go.com/Entertainment/stage-collapses-
radiohead-concert
killing/story?id=16587415#.UGrriE3A9_c
Country music concert, 2011
Image taken from: http://www.billboard.com/news/
Big valley Jamboree, 2009
Image taken from: http://www.cbc.ca/news/canada/edmonton/story/2012/01/
20/edmonton-charges-stayed-big-valley-jamboree.html
Jovanotti’s concert, 2011
Image taken from: http://tg24.sky.it/tg24/cronaca/photogallery/201
1/12/12/crollo_palco_concerto_jovanotti_trieste
.html
FORENSIC ASPECTS
![Page 3: Sei2013 crosti](https://reader033.fdocuments.us/reader033/viewer/2022052821/554a27d9b4c90520578b4aa8/html5/thumbnails/3.jpg)
http://www.udine20.it/wp-content/uploads/2012/03/palco-laura-pausini.jpg
CASE STUDY
AIM OF THIS WORK:
The aim of this work was not to define who made the mistake, but:
a. to investigate which kind of “error” could have compromised the safety of
this structure; and,
b. to evaluate the consequence of these “errors” in terms of global structural
response.
3/22 FORENSIC ASPECTS
![Page 4: Sei2013 crosti](https://reader033.fdocuments.us/reader033/viewer/2022052821/554a27d9b4c90520578b4aa8/html5/thumbnails/4.jpg)
A temporary structure can be defined as a structure that can be readily and completely
dismantled and removed from the site between periods of actual use.
They comprise 3 distinct elements:
1. The foundations – designed to both support the structure and hold it down (due to wind-
uplift, sliding or over-turning).
2. The superstructure – to carry all the imposed vertical (gravity) loads safely to the ground,
e.g. people, equipment.
3. The stability system – bracing and other specialist members to resist horizontal loads, e.g.
due to crowd movement and wind loads.
TEMPORARY DEMOUNTABLE STRUCTURES (TDM)
4/22 FORENSIC ASPECTS
![Page 5: Sei2013 crosti](https://reader033.fdocuments.us/reader033/viewer/2022052821/554a27d9b4c90520578b4aa8/html5/thumbnails/5.jpg)
A temporary structure can be defined as a structure that can be readily and completely
dismantled and removed from the site between periods of actual use.
They comprise 3 distinct elements:
1. The foundations – designed to both support the structure and hold it down (due to wind-
uplift, sliding or over-turning).
2. The superstructure – to carry all the imposed vertical (gravity) loads safely to the ground,
e.g. people, equipment.
3. The stability system – bracing and other specialist members to resist horizontal loads, e.g.
due to crowd movement and wind loads.
Management & Administration
Design Built-up Load-in
EVENT
Load-out Break-down
TEMPORARY DEMOUNTABLE STRUCTURES (TDM)
4/22 FORENSIC ASPECTS
![Page 7: Sei2013 crosti](https://reader033.fdocuments.us/reader033/viewer/2022052821/554a27d9b4c90520578b4aa8/html5/thumbnails/7.jpg)
Management &
Administration
Inadequate site
investigation
Inappropriate
ground condition
Inadequate safety
plan
………..
Inadequate
structural design
Failure to adopt
Building Codes
Inadequate loads
estimation
……..
Improper construction procedure
Improper working position
Breach of regulation or code of
practice
………..
SWISS CHEESE MODEL (Reason, 1997)
FORENSIC ASPECTS
6/22
Built-up Load-in Design
![Page 8: Sei2013 crosti](https://reader033.fdocuments.us/reader033/viewer/2022052821/554a27d9b4c90520578b4aa8/html5/thumbnails/8.jpg)
Management &
Administration
Inadequate site
investigation
Inappropriate
ground condition
Inadequate safety
plan
………..
Inadequate
structural design
Failure to adopt
Building Codes
Inadequate loads
estimation
……..
Improper construction procedure
Improper working position
Breach of regulation or code of
practice
………..
COLLAPSE
SWISS CHEESE MODEL (Reason, 1997)
FORENSIC ASPECTS
6/22
Built-up Load-in Design
![Page 9: Sei2013 crosti](https://reader033.fdocuments.us/reader033/viewer/2022052821/554a27d9b4c90520578b4aa8/html5/thumbnails/9.jpg)
BUILD-UP PHASES (CASE STUDY)
Positioning on the ground
of the load distribution
plates
Positioning of the bases of
the columns
Assembling on the floor of
the roof structure called
“Space Roof”
Assempled and anchored
secondary beams
Lifting the columns of the
roof structure and
anchoring the top of the
columns to the roof
Assembling of the hung
beams and other
components of the stage
(lighting, video, etc.)
Rigging phase Delivery of the structure
for its use
Technical-administrative
testing
COLLAPSE
INVESTIGATION ON TECHINAL CAUSES OF THE COLLAPSE
7/22
![Page 10: Sei2013 crosti](https://reader033.fdocuments.us/reader033/viewer/2022052821/554a27d9b4c90520578b4aa8/html5/thumbnails/10.jpg)
INVESTIGATION ON TECHINAL CAUSES OF THE COLLAPSE
8/22
BUILD-UP PHASES (CASE STUDY)
![Page 11: Sei2013 crosti](https://reader033.fdocuments.us/reader033/viewer/2022052821/554a27d9b4c90520578b4aa8/html5/thumbnails/11.jpg)
INVESTIGATION ON TECHINAL CAUSES OF THE COLLAPSE
8/22
BUILD-UP PHASES (CASE STUDY)
![Page 12: Sei2013 crosti](https://reader033.fdocuments.us/reader033/viewer/2022052821/554a27d9b4c90520578b4aa8/html5/thumbnails/12.jpg)
COLLAPSE
INVESTIGATION ON TECHINAL CAUSES OF THE COLLAPSE
8/22
BUILD-UP PHASES (CASE STUDY)
![Page 13: Sei2013 crosti](https://reader033.fdocuments.us/reader033/viewer/2022052821/554a27d9b4c90520578b4aa8/html5/thumbnails/13.jpg)
15/22
FINITE ELEMENT MODEL
INVESTIGATION ON TECHINAL CAUSES OF THE COLLAPSE
9/22
ton
A
B
C
1 2
16
m
21
.8 m
33 m
a
b
c d e
f
g h i l m
a (ton) 8.7
b (ton) 6.5
c (ton) 8.7
d (ton) 2.3
e (ton) 2.3
f (ton) 7.75
g (ton) 4.3
h (ton) 5.6
I (ton) 5.6
l (ton) 6.7
m (ton) 6.7
MATERIAL: ALUMINIUM
EN AW-6082 T6
![Page 14: Sei2013 crosti](https://reader033.fdocuments.us/reader033/viewer/2022052821/554a27d9b4c90520578b4aa8/html5/thumbnails/14.jpg)
EUROCODE
φ 0.005
kc 1.224745 > 1
nc 1
ks 1.224745 > 1
ns 1
φ0 0.005
N 2.25E+05 N
φN 1.13E+03 N
This structure is designed to be indoor; therefore the structural elements were
designed to carry vertical loads but may not have been designed for lateral loads. That
could be a fatal error in the design phase, in fact, following what prescribed in the
UNI ENV 1999-1-1:2007, in order to run global analyses, it is necessary to take
account of horizontal forces due to the imperfections of the elements composing the
structure.
FAILURE TO ADOPT STANDARD PROCEDURES
INVESTIGATION ON TECHINAL CAUSES OF THE COLLAPSE
NO HORIZONTAL LOADS
NO BRACING MEMBERS
10/22
![Page 15: Sei2013 crosti](https://reader033.fdocuments.us/reader033/viewer/2022052821/554a27d9b4c90520578b4aa8/html5/thumbnails/15.jpg)
Top of the column
Bottom of the column
Rigid or Hinged
Rigid or Hinged
IMPROPER CONSTRUCTION PROCEDURE
INVESTIGATION ON TECHINAL CAUSES OF THE COLLAPSE
11/22
![Page 16: Sei2013 crosti](https://reader033.fdocuments.us/reader033/viewer/2022052821/554a27d9b4c90520578b4aa8/html5/thumbnails/16.jpg)
1 kN
Rigid
Rigid
A
1 kN
Hinged
Rigid
B
1 kN
Rigid
Hinged
C
Columns going through the space roof Column not going through the space roof
1 kN
Rigid
Rigid
A
1 kN
Hinged
Rigid
B
1 kN
Rigid
Hinged
C
Node 42 Node 42
INVESTIGATION ON TECHINAL CAUSES OF THE COLLAPSE
A
B
C
12/22
![Page 17: Sei2013 crosti](https://reader033.fdocuments.us/reader033/viewer/2022052821/554a27d9b4c90520578b4aa8/html5/thumbnails/17.jpg)
RIGID HINGED RIGID
A
A
B
B
C
C
RIGID RIGID HINGED
RIGID HINGED RIGID
RIGID RIGID HINGED
16 m
14 m
INVESTIGATION ON TECHINAL CAUSES OF THE COLLAPSE
A
B
C
λBuckling= 13.57
λBuckling= 8.26
λBuckling= 2.61
λ: Linear Buckling Eigenvalue
13/22
![Page 18: Sei2013 crosti](https://reader033.fdocuments.us/reader033/viewer/2022052821/554a27d9b4c90520578b4aa8/html5/thumbnails/18.jpg)
0
3
6
9
12
-1,0 -0,8 -0,6 -0,4 -0,2 0,0
Load
Facto
r (v
erti
cal
load
s)
Horizontal Displacement node 42 (m)
RIGID
HINGED
B C
RIGID
RIGID
A
RIGID
HINGED
B
A
B
C
ULF=11.3 ULF=7.86 ULF=1.53
INVESTIGATION ON TECHINAL CAUSES OF THE COLLAPSE
FINITE ELEMENT ANALYSIS RESULTS (Nonlinear)
14/22
![Page 19: Sei2013 crosti](https://reader033.fdocuments.us/reader033/viewer/2022052821/554a27d9b4c90520578b4aa8/html5/thumbnails/19.jpg)
Cut-off bar,
No tension element
Translation Stiffness
Beam Rigid
link
Column
Hinge
Rigid
Unilateral
INVESTIGATION ON TECHINAL CAUSES OF THE COLLAPSE
FINITE ELEMENT ANALYSIS RESULTS (Nonlinear)
15/22
![Page 20: Sei2013 crosti](https://reader033.fdocuments.us/reader033/viewer/2022052821/554a27d9b4c90520578b4aa8/html5/thumbnails/20.jpg)
-2,5E+04
-2,0E+04
-1,5E+04
-1,0E+04
-5,0E+03
0,0E+00
5,0E+03
-0,1 -0,08 -0,06 -0,04 -0,02 0 0,02 0,04 0,06 0,08 0,1
Lo
ad
(N
)
Displacement (m)
Compression Tension
Maximum Compressive Strength = 2100 Kg
Mechanical properties for the “cut-off bar”
16/22 INVESTIGATION ON TECHINAL CAUSES OF THE COLLAPSE
![Page 21: Sei2013 crosti](https://reader033.fdocuments.us/reader033/viewer/2022052821/554a27d9b4c90520578b4aa8/html5/thumbnails/21.jpg)
0
2
4
6
8
10
12
-0,40 -0,35 -0,30 -0,25 -0,20 -0,15 -0,10 -0,05 0,00
Lo
ad
Fa
cto
r (v
erti
cal
loa
ds)
Horizontal Displacement node 42 (m)
A
D
Decreasing of 63 %
1 2 3
4 5
6 7
8
INVESTIGATION ON TECHINAL CAUSES OF THE COLLAPSE
FINITE ELEMENT ANALYSIS RESULTS (Nonlinear)
17/22
Case D: Column C2
![Page 22: Sei2013 crosti](https://reader033.fdocuments.us/reader033/viewer/2022052821/554a27d9b4c90520578b4aa8/html5/thumbnails/22.jpg)
1 2 3
4 5
6 7
8
Compression Tension
INVESTIGATION ON TECHINAL CAUSES OF THE COLLAPSE
FINITE ELEMENT ANALYSIS RESULTS (Nonlinear)
18/22
5
6
3
4
8
7
![Page 23: Sei2013 crosti](https://reader033.fdocuments.us/reader033/viewer/2022052821/554a27d9b4c90520578b4aa8/html5/thumbnails/23.jpg)
1 2 3
4 5
6 7
8
INVESTIGATION ON TECHINAL CAUSES OF THE COLLAPSE
FINITE ELEMENT ANALYSIS RESULTS (Nonlinear)
19/22
![Page 26: Sei2013 crosti](https://reader033.fdocuments.us/reader033/viewer/2022052821/554a27d9b4c90520578b4aa8/html5/thumbnails/26.jpg)
CONCLUSION
Inadequate site
investigation
SWISS CHEESE MODEL (Reason, 1997)
Management &
Administration Design Built-up Load-in
COLLAPSE
1 2 3
4
5
6 7
8
NO HORIZONTAL LOADS
NO BRACING MEMBERS
Failure to adopt
Building Codes
Improper construction
procedure
COLLAPSE
22/22
![Page 27: Sei2013 crosti](https://reader033.fdocuments.us/reader033/viewer/2022052821/554a27d9b4c90520578b4aa8/html5/thumbnails/27.jpg)
Inadequate site
investigation
SWISS CHEESE MODEL (Reason, 1997)
Management &
Administration Design Built-up Load-in
COLLAPSE
NO HORIZONTAL LOADS
NO BRACING MEMBERS
Failure to adopt
Building Codes
Improper construction
procedure
COLLAPSE
22/22 CONCLUSION