SEERA-EI project kick-off meeting, Athens, 9-10 April 2009 SEERA-EI WP5 – Dissemination and...
-
Upload
gerard-price -
Category
Documents
-
view
226 -
download
3
Transcript of SEERA-EI project kick-off meeting, Athens, 9-10 April 2009 SEERA-EI WP5 – Dissemination and...
SEERA-EI project kick-off meeting, Athens, 9-10 April 2009
SEERA-EI
www.seera-ei.eu
WP5 – Dissemination and liaison with pan-European
initiatives
Athens, 9 April 2009
Margarita NikolovaIPM Director, SAITC
[email protected] Gurov
SEERA-EI project kick-off meeting, Athens, 9-10 April 2009 2/12
Outline
Overview Objectives Tasks Deliverables & Milestones Person-months per participant Timing of WP5 and its components
Planning for 1st project period (18 months) Event Actions Dissemination event monitoring
Objectives
A platform for PR, communication and dissemination of information about SEERA-EI, including also liaisons and SEERA-EI branding will be provided
Ensuring that the relevant activities in eInfrastructure programme coordination on the European level are followed in detail and contributed to significantly liaison with eIRG, ESFRI and EGI
Liaison with regional eInfrastructure activities Organization of an open event of EU Ministries General dissemination activities of project results.
SEERA-EI project kick-off meeting, Athens, 9-10 April 2009
WP5 Task
A5.1 – Dissemination and outreach This task will ensure a wide dissemination campaign aimed at
national, regional and European levels, encompassing the audience as wide as research infrastructure operators and users, other government bodies and policy makers, and industry.
A5.2 – Related Initiatives’ liaison This task will ensure that the relevant activities in eInfrastructure
programme coordination on the European level are followed in detail and contributed to significantly.
A5.3 – Develop and maintain promotional material The project will prepare a promotional package including the project
brochure or fact sheet and a presentation, which will be updated when needed. Newsletters, distributed through existing established channels will ensure a wide information flow and dissemination activity
SEERA-EI project kick-off meeting, Athens, 9-10 April 2009
Deliverables and month of delivery (1)
D5.1a – SEERA-EI Promotional material – M06 This deliverable will outline the project promotional material.
The material includes a brochure or a fact sheet and an electronic presentation of the project’s main characteristics (i.e. consortium structure, goals and objectives, etc.). The aim of these materials will be to spread the project’s strategic mission and objectives with different formats adapted to the events where the SEERA-EI will be presented.
D5.2a – Intermediate report on project dissemination and outreach – M18 This deliverable will include the reports on all dissemination
activates the project will pursue. Concertation events, representation in eInfrastructure workshops and presentations to conferences are a few to name.
SEERA-EI project kick-off meeting, Athens, 9-10 April 2009
Deliverables and month of delivery (2)
D5.3a – Intermediate report on project liaison activities – M18 D5.3 will include reports from the result of liaison with similar
regional or European activities. Some of them have already been addressed and ranked as of high priority. To name a few, GEANT and EGEE are the cornerstone projects that the consortium will establish substantial synergies.
D5.4 – Project conference for EU audience – M30 D5.4 will report on the results of a regional workshop of
SEERA-EI with a broader audience that will also serve to increase the interaction of research communities and concentrate on project opportunities appeared by the realization of SEERA-EI.
Deliverables and month of delivery (3)
D5.1b– SEERA-EI Promotional material – M31 Second version of D5.1
D5.2b – Final report on project dissemination and outreach – M36 Second version of D5.2
D5.3b – Final report on project liaison activities – M36 Second version of D5.3
Deliverables
Del. no. Deliverable name Delivery date(proj. month)
Lead bene-ficiary
Est. indicative PMs
D5.1a/bSEERA-EI Promotional
materialM6/M31 GRNET 5
D5.2a/b
Intermediate report on project dissemination and outreach
M18/M36 IPP 33
D5.3a/bIntermediate report on
project liaison activities
M18/M36 SAITC 33
D5.4Project conference for
EU audience M30 TUBITAK 5
SEERA-EI project kick-off meeting, Athens, 9-10 April 2009
Milestones
Milestones Lead beneficiary
Delivery date
Means of verification
Objective addressed
M5.1 - Intermediate dissemination and related activities reports available
IPP M18 D5.2aD5.3a
O8: - Enable information exchange with rest of ERA, carry out international collaboration activities, and contribute to EU policy on eInfrastructures
M5.2 - Project conference for EU audience
TUBITAK M30 D5.4 Conference
M5.3 - Final dissemination and related activities reports available
IPP M36 D5.2bD5.3b
Person-months per participant
Participant number
P01 P02 P03 P04 P05 P06 P07 P08 P09 P10
Participant short name
GRNET GSRT MoES PUoT MoCT SAITC IPP-BAS MoIS MARNET ASM
Person-months per participant
6 3 5 5 5 6 7 3 3 4
Participant number
P11 P12 P13 P14 P15 P16 P17 P18 P19 -
Participant short name
RENAM MoES UoM ANCS RoEduNet MoS UoB-RCUB TUBITAK ULAKBIM
Person-months per participant
4 4 4 3 4 3 3 2 2
Total PMs: 76
Timing of WP5 and its components
WP5 Activity Leaders (Task leaders)
Actions
Define the activity leader per task
Send the name + email of the activity leaders per partner to me
Create/Subscribe to the mailing lists
Communication about dissemination: „-all” list
Planning for 1st project period (18 months)
Dissemination events have to target at all society levels, including policy-makers, users, commercial environment, mass media
1 regional policy meeting + 1 regional dissemination event for broader public: where? suggestions?
1 country-level dissemination event per country targeting local public, 20 attendants per event minimum
Policy Meetings organization: 1-1 per project partner
Maintaining: Publications and paper repository Event calendar Training calendar
Promotional package, communication infrastructure
Event Actions (EA)
Plan four event minimum 1-2 month ahead Let other partners attend on the event if you are an organizer
(!visa!) Announce the event on the Dissemaination Agenda!
(automatic email will go to the appropriate lists)
Please provide enough info on: Minimal info about dissemination events (before)
Name/!DATE!/Type/Target/Location/Description/Contact/etc. Links to web presence (if any) PR materials created for the event
Minimal info about dissemination event (after) Presentations uploaded to Dissemination Portal Pictures uploaded to Dissemination Portal Evaluation Form of the training upload to Dissemination Portal
Papers/Presentations/PR/Other Media
ActionsRepository location (volunteers?)SEERA-EI project s should be mentioned in the material in
standardized mode Create the reference template
Upload the material to the common repository and comment itWhere, who, impact, etc.Digitalized version (TV/Radio/newspaper),
Dissemination event monitoring
Quantitative Number of events Number of attendees (event size) Number of communities Number of Institutes/governmental organisations Number of SMEs …
Qualitative Feedback from attendees Type of Institutes/SMEs/governmental organisations …
Action: Please send your ideasEvent organizer/participants should provide the statistics after the event
Coming events so far…
Open e-IRG Workshop, Prague, Czech Republic May 14-15, 2009
E-IRG meeting of delegates, Prague, Czech Republic, May 15, 2009
E-IRG meeting of delegates, Prague, Czech Republic, June 17, 2009
Further suggestions by participants?......
WP5
THANK YOU FOR THE ATTENTION!