ADDITIONAL AUTHORIZATION NO. 2 FOR CONSULTANT SERVICES
TO: Joseph L. Ririe, P.E., President Pavement Engineering, Inc. 26007 Huntington Lane, Unit 5 Santa Clarita, CA 91355 Under terms of our Professional Consultant Services Agreement dated May 8th, 2018, you are authorized to proceed with the following consulting services: Project Name: Revive 25 Pavement Management Program Consulting Services Original Authorization: $324,465.00 Previous Additional Authorizations: $110,615.00 This Authorization: $221,230.00 Total Not To Exceed: $656,310.00 Date Required: Immediately Project Manager: Marissa Diaz ACCEPTED: Joseph L. Ririe, P.E., President Date Pavement Engineering, Inc. AUTHORIZED: Jason Caudle Date City Manager MD:vr
PW-123 (1/14)
EXHIBIT "A"
SCOPE OF SERVICES & SCHEDULE The Consultant shall maintain separate costs for each project and shall identify the costs specific to each project. The work to be performed under this Additional Authorization No. 2 shall include:
SEE ATTACHED
EXHIBIT “A” SCOPE OF SERVICES
ADDITIONAL AUTHORIZATION NO. 2
PROJECT DESCRIPTION AND LOCATION
With approval of this Additional Authorization No. 2, PEI will provide additional citywide pavement evaluation and analysis, including Rotation B (2021) and Rotation C (2022).
GENERAL SCOPE OF WORK
This Additional Authorization Amendment amends the payment terms, including rates and fee schedule, and amends the Task 11 schedule. All other tasks, pricing, terms and conditions in the base Agreement and Additional Authorization No. 1 not specifically amended herein with Additional Authorization No. 2 shall remain unchanged and in full effect. TASK 11 – ANNUAL ROTATIONAL UPDATE The Annual Rotational Update shall be completed as noted in the amended schedule in Table 1.
TABLE 1 SCHEDULE
Annual Update
Rotation Completion Due Date
2020 A: All Arterials and Northwest & Southeast Quadrants November 15, 2021
2021 B: All Arterials and Southwest Quadrant April 30, 2022 2022 C: All Arterials and Northeast Quadrant February 15, 2023
Rotation ACity of Lancaster
TestFeature LegendA ArterialC CollectorR Residential/Local
0 1 2 3
Miles
Rotation BCity of Lancaster
TestFeature Legend
A ArterialC CollectorR Residential/Local
0 1 2 3
Miles
Rotation CCity of Lancaster
TestFeature LegendA ArterialC CollectorR Residential/Local
0 1 2 3
Miles
City of Lancaster Network Summary Statistics
Printed: 9/21/2021
Total Sections Total Center Miles Total Lane Miles Total Area (sq. ft.) PCI
674Arterial 195.42 564.18 5749,689,445
68Other 7.01 14.03 39731,516
361Collector 63.44 139.72 5115,972,480
3,659Residential/Local 379.30 764.70 5068,951,599
1,482.63645.174,762Total
52Overall Network PCI as of 9/21/2021:
** Combined Sections are excluded from totals. These Sections do not have a PCI Date - they have not been inspected or had a Treatment applied.
135,345,040
Criteria: 1 MTC StreetSaver
Updated Organizational Chart
Joe Seely
Project Manager
& GIS Technician
Sam Ho, PE
Associate Engineer
Joe Ririe, PE
Principal-in-Charge
Senior Principal Engineer
Peer Review
Cody Latzer
Ben Ririe
Senior Engineering
Technician
Joe Seely
Project Manager
& GIS Technician
Sam Ho, PE
Associate Engineer
Joe Ririe, PE
Principal-in-Charge
Senior Principal Engineer
Peer Review
Cody Latzer
EnEnggiinneeeeririnngg T Teecchhnniicciiaann
Ben Ririe
Senior Engineering
Technician
Garon Williams
EEnnggiinneeeeriringng
TeTecchhnniicciiaann
9/27/2021 Page 2 of 2
M P 2 1 - 5 0 6 A P a g e | 7
Proposed Rotation B Task Schedule
MONTH Nov. 2021
Dec. 2021
Jan. 2022
Feb. 2022
Mar. 2022
April 2022
TASK 1: PROJECT MANAGEMENT Ongoing
TASK 7: MAPPING & GIS As Needed
TASK 10: PROJECT CLOSEOUT
TASK 11: ANNUAL PMS UPDATE
TASK 11-A: FIELD RATINGS
TASK 11-B: DATABASE UPDATE
TASK 11-C: UPDATE CIP PLAN
TASK 11-D: ANNUAL REPORT
City of Lancaster
Proposed Rotation C Task Schedule
MONTH Oct. 2022
Nov. 2022
Dec. 2022
Jan. 2023
Feb. 2023
Mar. 2023
TASK 1: PROJECT MANAGEMENT Ongoing
TASK 7: MAPPING & GIS As Needed
TASK 10: PROJECT CLOSEOUT
TASK 11: ANNUAL PMS UPDATE
TASK 11-A: FIELD RATINGS
TASK 11-B: DATABASE UPDATE
TASK 11-C: UPDATE CIP PLAN
TASK 11-D: ANNUAL REPORT
9/27/2021 Page 1 of 2
PW-125 (1/14)
EXHIBIT “B” TERM, PAYMENT AND TIME FOR COMMENCMENT AND COMPLETION CLAUSE
Payment
For Task 1, Task 7, Task 10, Task 11, and Task 12, payment terms shall be amended to the attached Rates and Fee Schedule. This Additional Authorization No. 2 shall include Task 1, 7, 10, 11 work for the 2021 and 2022 rotational update. Not to exceed amount shall be increased by $221,230 for Additional Authorization No. 2, for a total contract not to exceed amount of $656,310 for Tasks 1 through 11.
Joseph L. Ririe, P.E., President, Principal-in-Charge Pavement Engineering, Inc.
City of Lancaster Annual Pavement Management System Update
Task 1 – Project Management
Position Units Unit Rate Total
Principal Engineer 16 $245 $3,920
Project Manager 82 $145 $11,890
Task 1 fee $15,810
Task 7 - Mapping and GIS
Position Units Unit Rate Total
GIS Technician 25 $145 $3,625
PMS Data Technician 16 $95 $1,520
PMS Clerical 3 $75 $225
Task 2 fee $5,370
Task 10 – Project Closeout
Position Units Unit Rate Total
Principal Engineer 6 $245 $1,470
Project Manager 9 $145 $1,305
PMS Data Technician 16 $95 $1,520
PMS Clerical 3 $75 $225
Task 10 fee $4,520
Task 11 – Annual PMS Update by Rotation
Position Units Unit Rate Total
PMS Data Technician 75 $95 $7,125
PMS Inspection Team 316 $190 $60,040
PMS Quality Control 50 $145 $7,250
Per diem 35 $300 $10,500
Task 11 fee $84,915
Estimated Annual Fee $110,615
Estimated Total fee (2020-2022): $331,845
Engineering Services
Senior Principal Engineer ............................................................................................... $240/hr
Principal Engineer ........................................................................................................... $205/hr
Senior Associate Engineer ............................................................................................. $180/hr
Associate Engineer ......................................................................................................... $165/hr
Assistant Engineer .......................................................................................................... $160/hr
Technical Services
Project & Construction Managers ................................................................................... $160/hr
Senior Engineering Technician ....................................................................................... $145/hr
Engineering Technician .................................................................................................. $130/hr
Inspector* ........................................................................................................................ $130/hr
Clerical ............................................................................................................................ $ 80/hr
Field Services
PW Dynaflect Operator* ................................................................................................. $295/hr
PW Assistant Dynaflect Operator*.................................................................................. $165/hr
PW Dynaflect Operator Travel* ...................................................................................... $170/hr
PW Assistant Dynaflect Operator Travel* ...................................................................... $170/hr
PW Coring Technician* ................................................................................................... $240/hr
PW Assistant Coring Technician* ................................................................................... $145/hr
PW Coring Technician Travel* ....................................................................................... $170/hr
PW Assistant Coring Technician Travel*........................................................................ $170/hr
* Two (2) hour minimum
Basis of Charges
Miscellaneous Charges
Equipment rental, reproductions, testing (other than
by PEI), photographic expenses and other outside services: ................................. Cost + 15%
Payments
Invoices will be submitted either semi-monthly or monthly and are payable upon receipt. Interest of 1-1/2% per month (but not exceeding the maximum rate allowable by law) will be payable on any amounts not paid within 30 days, payment thereafter to be applied first to accrued interest and then to the principal unpaid amount. Attorneys' fees or other costs incurred in collecting any delinquent amount shall be paid by the client.
PEI Professional Fee Schedule
Aggregate Testing for HMA, Soils, and Concrete ASTM AASHTO CTM Fee
C 136 T 27 202 $140
C 136 T 27 202 $70
C 136 T 27 202 $95
202-A $140
D 5444 202-A $145
D 2419 T 176 217 $125
D 3744 T 210 229 $245
D 3744 T 210 229 $180
227 $200
C 128 T 84 207 $275
C 127 T 85 206 $140
208 $130
D 5821 T 335 205 $160
205 $100
D 4791 235 $190
C 566 T 255 226 $55
C 142 $110
C 123 $110
C 1252 T 304 234 $185
C 40 $110
C 131 / 535 T 96 211 $215
D 2844 301 $350
C 88 214 $480
303 $110
303 $110
Soils ASTM AASHTO CTM Fee
4318 / 2487 T 89 / 90 204 $300
D 4318 T 89 $200
D 4318 T 90 $100
D 698 T 99 $250
D 1557 T 180 $250
216 $240
D 2844 T 190 301 $325
D 2844 T 190 301 $340
D 2419 T 176 217 $125Sand Equivelant
Plasticity Index *Includes Liquid and Plastic Limit
Liquid Limit (Atterberg Limits)
Plastic Limit (Atterberg Limits)
Moisture Density: Standard Proctor
Moisture Density: Modified Proctor
Relative Compaction (California Density Tube)
Resistance Value (R-Value)
Resistance Value (R-Value) Treated Soil or Base
Flat and Elongated Particles
Aggregate Moisture Content
Clay Lumps & Friable Particles
Lightweight Pieces
Fine Aggregate Angularity (FAA) *May require Fine Specific Gravity
Organic Impurities
Abraision Resistance LA Rattler
Resistance Value (R-value)
Sodium Sulfate Soundness
Centrifuge Kerosene Equivelant: Coarse
Centrifuge Kerosene Equivelant: Fine
Crushed Particles: Fine Aggregate (One Face only)
Sieve Analysis: Fine Only
Sieve Analysis: Ignition Extraction Sample
Sieve Analysis: Solvent Extraction Sample
Sand Equivelant
Durability: Coarse Aggregate
Durability: Fine Aggregate
Cleanness Value
Specific Gravity: Fine Aggregate
Specific Gravity: Coarse Aggregate
Specific Gravity: Apparent
Crushed Particles: Coarse Aggregate (One and Two Face)
2020 Laboratory Fee Schedule
Effective from January 1, 2020 until further notice. Field tests and QC/QA Testing provide by Quote
Discount rates are determined on a per project basis. Please DO NOT bid projects assuming a discount rate prior to receiving verification from PEI of discount.
Sieve Analysis: Coarse and Fine with wash
Sieve Analysis: Coarse Only
Hot Mix Asphalt - Hveem Method ASTM AASHTO CTM Fee
set Set $525
1561/2726 T 247/166 304, 308 $300
1561/1560 T 247/246 304, 366 $300
309 $150
382 $180
382 $440
371 $950
371 $1,250
Hot Mix Asphalt - Marshall Method ASTM AASHTO CTM Fee
set set $550
D 1559 T 245 $410
D 1559 T 245/269 $300
T 209 $150
T 308 $180
T 308 $440
T283 $950
T283 $1,250
Hot Mix Asphalt - Gyatory Method ASTM AASHTO CTM Fee
set $550
set $650
T 209 $150
T 308 $180
T 308 $440
D 2172 Method B $300
T 324 Modified $950
T 283 $950
T 283 $1,250
Concrete ASTM AASHTO CTM Fee
C 39 $30
C 78 / 293 $80
$95
Various $850
Various $650
Various $1,200
$110
Concrete Cylinder Casting, Air Meter, Slump Test, Kelly Ball, and Unit Weight completed under daily field rates.
Tensile Strength Ratio (TSR) - Laboratory Produced
6" x 12" or 4" x 8" Cylinder: Compression Strength (Per Cylinder)
6" x 6" x 18" Flexural Bream
6" x 6" x 30" Flexural Bream
Concrete Trail Batch (Slump Test, Unit Weight, Air, and 6 Cylinders)
Concrete Technician - Half Day Rate
Concrete Technician - Full Day Rate
Cylinder Pick-Up Only Trip - Within 20 miles of PEI Office
Tensile Strength Ratio (TSR) - Plant Produced
Asphalt Content
Ashphalt Content Oven Correction
Tensile Strength Ratio (TSR) - Plant Produced
Tensile Strength Ratio (TSR) - Laboratory Produced
HMA Mix Tests - Complete Set
RHMA Mix Tests - Complete Set (Includes 1 hour pressure cooling)
Maximum Specific Gravity
Asphalt Binder Content - Ignition Method
Ashphalt Content Oven Correction
Asphalt Binder Content - Chemical Extraction Method
Hamburg Wheel Tracking (2 full sets per caltrans requirement)
Maximum Specific Gravity
HMA Mix Tests - Bulk Specifc Gravity Only
HMA Mix Tests - Stability Only
Maximum Specific Gravity
Asphalt Content
Ashphalt Content Oven Correction
Tensile Strength Ratio (TSR) - Plant Produced
Tensile Strength Ratio (TSR) - Laboratory Produced
HMA Mix Tests - Complete Set with Air Voids
HMA Mix Tests - Flow and Stability Only
HMA Mix Tests - Bulk Specifc Gravity Only
HMA Mix Tests - Complete Set with Air Voids
2020 Laboratory Fee Schedule
Effective from January 1, 2020 until further notice. Field tests and QC/QA Testing provide by Quote
HMA Mix Design - Hveem Method Fee
$400
$1,375
$3,000
$3,200
$3,500
HMA Mix Design - Marshall Method Fee
Marshall HMA Mix Design Base - FHWA, ACCE, and other standard specs $3,900
$4,235
HMA Mix Design - Gyratory Method Fee
$400
$1,550
$3,200
$4,950
$800
$1,750HMA Mix Design - JMF Verification TSR and Hamburg for design completion
Marshall HMA Mix Design Custom - Speciality Specifications and Projects
HMA Mix Design - Admin Review *Allowed on PEI original mix designs less than 24 months old
HMA Mix Design - Update *Allowed on PEI original mix designs older than 24 Months * Max 1.
HMA Mix Design - CEM 3513SP JMF Verification *Requires Plant produced mix.
2015 Superpave JMF HMA Includes complete CEM 3511 and CEM 3512 (TSR + Hamburg Separate)
HMA Mix Design - LP-9 Data - For a PEI Mix Design
HMA Mix Design - Update *Allowed on PEI original mix designs older than 24 Months * Max 1.
HMA Mix Design - CEM 3513 JMF Verification *Requires Plant produced mix.
2006 Standard Coarse / Medium / Max Including all aggregate and Mix Tests
2010 Standard HMA Includes complete CEM 3511 and CEM 3512 (TSR + Hamburg Separate)
HMA Mix Design - Admin Review *Allowed on PEI original mix designs less than 24 months old
2020 Laboratory Fee Schedule
Effective from January 1, 2020 until further notice. Field tests and QC/QA Testing provide by Quote