Section Two REV – 19 JUN 2013 Structural Note: shoring
Transcript of Section Two REV – 19 JUN 2013 Structural Note: shoring
Section Two REV – 19 JUN 2013 Structural
Picture below shows an example of the locations of the structural equipment for a typical ship. Note: shoring material red dot and the box, plate, and bucket are brown.
AOR showing Shoring layout DCAMS Deck Plan View showing Spread Stowage
(structural Icons yellow)
Shoring Equipment Compartment Diagram Shoring layout with wood shoring, steel shoring (3ft – 5 ft & 6 ft – 11 ft), and metal box patch
Plate patches, bucket patch, and box patch stored in
same location Box patch (not shown are 2 smaller inside larger
box) with plate patches in bracket
Box patch with securing straps
Note the plate patch bracket on right Two box patches different brackets
Box patches (stacked inside are 2 other smaller) in
passage with securing strap Box patches front view
Box patch with securing straps.
Lighter metal with gasket attached. Box patch not secured. Heavier metal with no
gasket. Note: bracket incorrect size.
Box patch with angle iron retainer Box patch brackets
Bucket patches (two)
Mount has rod which extends through buckets Bucket patches (three)
Mount has rod which extends through buckets
Plate patches in a heavy duty bracket Plate patches in bracket
Note: label plate on bracket incorrect.
Folding round plate patch. Note the “J” bolts dangling on angle iron.