Sec tion C Sec to r Design Concep ts
Cndash17Western Ring Route ndash Waterview Connection Urban and Landscape Design Framework Beca bull Jasmax bull SBEL bull NZTA June 2010
C2 Sector 2 Whau River
Sector 2 works include widening of the motorway
across the Whau River crossing and on reclaimed
land near Rosebank Domain Additional reclamation
is proposed to enable improved stormwater
treatment with the additional bene1047297t of relocating
the northwestern cycleway further away from the
vehicle traffi c
C121 Existing situation
Sector 2 includes the enlargement of the existing
Whau River Bridge to accommodate additional lanesA separate dedicated cyclepedestrian bridge is to
also be constructed alongside the enlarged Whau
River Bridge
Movement and connectivity
Local road stops at raceway off-road cycleway
continues westwards
Landscape planting views
Transition between harbour and peninsularlandscape areas
Views from the mainline to surrounding areas are
not promoted due to crossfall but views to CBD
skyline are available from slower eastbound traffi c
lanes and elevated cycleway
Urban form
Residential development to the south along the
Whau River with Te Atatu Boat Club occupying
a large area of the foreshore with Bridge Avenue
Reserve
Rosebank Domain is used for vehicle racing with
some buildings and areas of open ground used for
spectating
Structures
Whau Bridge ramps up towards Te Atatu
Bridge has a narrow cycle lane immediately adjacent
to vehicle lanes and with steel edge barriers
Pier layout and deck elevation of bridge enables
boat passage boat moorings immediately to south
16
16
Figure C-21 Aerial view of the sector 2 from the north
Figure C-23 Photo 2ndash2 Existing view westwards adjacent to Rosebank Domain
Figure C-24 Photo 2ndash3 Existing view westwards crossing the Whau River on the off-road route
Figure C-22 Photo 2ndash1 Existing view to the north adjacent Rosebank Domain on off-road route
8192019 Section c Sector 2 Design Concepts
httpslidepdfcomreaderfullsection-c-sector-2-design-concepts 24
Weste rn Ring Rou te Wa te rv iew Connec tion
Cndash18 Western Ring Route ndash Waterview Connection Urban and Landscape Design Framework Beca bull Jasmax bull SBEL bull NZTA June 2010
Figure C-25 Whau River existing plan
0 10 20 50 100
Photo 2ndash2
Photo 2ndash1
Photo 2ndash3
8192019 Section c Sector 2 Design Concepts
httpslidepdfcomreaderfullsection-c-sector-2-design-concepts 34
Sec tion C Sec to r Design Concep ts
Cndash19Western Ring Route ndash Waterview Connection Urban and Landscape Design Framework Beca bull Jasmax bull SBEL bull NZTA June 2010
VIEW 3
VIEW 4
WHAU RIVER
ROSEBANK DOMAIN
ONCRETE FASCIA PANEL
ETAININ WALL
N I EWALL
WELDED WIRE PANEL FEN
ONCRETE MOTORWAY
BARRIE
EXISTING DESIGNATION
Figure C-26 Whau River concept plan
N o r
t h
8192019 Section c Sector 2 Design Concepts
httpslidepdfcomreaderfullsection-c-sector-2-design-concepts 44
8192019 Section c Sector 2 Design Concepts
httpslidepdfcomreaderfullsection-c-sector-2-design-concepts 24
Weste rn Ring Rou te Wa te rv iew Connec tion
Cndash18 Western Ring Route ndash Waterview Connection Urban and Landscape Design Framework Beca bull Jasmax bull SBEL bull NZTA June 2010
Figure C-25 Whau River existing plan
0 10 20 50 100
Photo 2ndash2
Photo 2ndash1
Photo 2ndash3
8192019 Section c Sector 2 Design Concepts
httpslidepdfcomreaderfullsection-c-sector-2-design-concepts 34
Sec tion C Sec to r Design Concep ts
Cndash19Western Ring Route ndash Waterview Connection Urban and Landscape Design Framework Beca bull Jasmax bull SBEL bull NZTA June 2010
VIEW 3
VIEW 4
WHAU RIVER
ROSEBANK DOMAIN
ONCRETE FASCIA PANEL
ETAININ WALL
N I EWALL
WELDED WIRE PANEL FEN
ONCRETE MOTORWAY
BARRIE
EXISTING DESIGNATION
Figure C-26 Whau River concept plan
N o r
t h
8192019 Section c Sector 2 Design Concepts
httpslidepdfcomreaderfullsection-c-sector-2-design-concepts 44
8192019 Section c Sector 2 Design Concepts
httpslidepdfcomreaderfullsection-c-sector-2-design-concepts 34
Sec tion C Sec to r Design Concep ts
Cndash19Western Ring Route ndash Waterview Connection Urban and Landscape Design Framework Beca bull Jasmax bull SBEL bull NZTA June 2010
VIEW 3
VIEW 4
WHAU RIVER
ROSEBANK DOMAIN
ONCRETE FASCIA PANEL
ETAININ WALL
N I EWALL
WELDED WIRE PANEL FEN
ONCRETE MOTORWAY
BARRIE
EXISTING DESIGNATION
Figure C-26 Whau River concept plan
N o r
t h
8192019 Section c Sector 2 Design Concepts
httpslidepdfcomreaderfullsection-c-sector-2-design-concepts 44
8192019 Section c Sector 2 Design Concepts
httpslidepdfcomreaderfullsection-c-sector-2-design-concepts 44