Section 6 B2H SOP
-
Upload
dayaram-sah -
Category
Documents
-
view
103 -
download
0
Transcript of Section 6 B2H SOP
-
5/26/2018 Section 6 B2H SOP
1/91
Ooredoo FTTx NationalBroadbandProject
FiberforBusiness
StandardOperationProcedure B2HConnectionsGuideBook
1
-
5/26/2018 Section 6 B2H SOP
2/91
Standard Operation Procedure B2H Connections Guide Book
FiberForBusiness
Chapter1:B2HScenariosOverview 7.5:Stripping,leadingin,SplicingandFixingof
ap er : roce ure or ns a a on
Chapter3:CommunicationandSurvey
Chapter4:PreparationforB2H
Chapter5:StandardLayingofOutdoorOFC
5.1: SafetyEnvironmentDeployment
7.6:PreparingofVerticalRisercable
7.7:PreparingofRisercable
7.8:Leadingin,splicing andFixingoffibers.
7.9:Exampleinstallations
. : tan ar raw ngs
5.3: ImplementationPreparation
5.4: TransportingofCable
5.5:
FixingCable
Drum5.6: ManholeOpening
.
Chapter8:Standard Installation of Sub FAT3101
8.1: Plantheinstallationspace
8.2: Fixingonthewall
8.3: PreparingofVerticalRisercable
5.7: DuctRo ng5.8: Makingtractionend
5.9: Laying thecable
Chapter6: StandardLayingofRiserandDropCable
6.1: TransportingandFixingofCableinside
.
8.5: Leadingin,Fixingandsplicing ofDropfibers.
8.6: Splicingrequirementpercustomer
8.7: Additionalrecommendations
Chapter9:StandardLabeling
6.2: Layingof VerticalCable6.3: Layingof DropCable
Chapter7: Standard Installation of FAT3201-24and FAT3201-48 (direct drop fibers)
7.1:Procedureof FATInstallation
. :
Chapter10:StandardISPinstallation
10.1:InstallationprocedureforSCS
10.2:StandardInstallationofATBandONT
Chapter11:StandardSplicing
7.2:InstallationofFATinthewall
7.3:Preparationof FeederCable
7.4:LeadinginandFixingofDropCables
. : p c ng roce ure
11.2: JointSplicingintheManhole
2
-
5/26/2018 Section 6 B2H SOP
3/91
Chapter OneBusiness Lines B2H ScenariosOverview
3
-
5/26/2018 Section 6 B2H SOP
4/91
Feasibilit Surve
Beforestartinganyactivitywithimplementationinthebuilding,ensurethatthe
buildingwiringandinfrastructurecorrespondstooneofthefollowingscenarios.
Incaseofanydeviations refertoHuaweiSiteEngineer/AreaManagerforguidance.
4
-
5/26/2018 Section 6 B2H SOP
5/91
DropcablesaredistributeddirectfromtheFAT3201 24(2nd Splitterwith16
1.B2HScenarios
st , .Expansion).
X*Delnumber/CustomerReferenceNumber/ElectricityNumber
of DELs 1,2,3,4 5,6,7,8 948 >48
2nd Floor
DirectDrop
Cables
Equipment 1ONTSupports 4Ports
(ONT8447)
2ONTSupports 4PortsEach
2*(ONT8447)
MA5612 nxMA5612
1stFloor
GroundFloor
Basement
FAT320124(16)
(1Splitter)Feeder
Cable
5
-
5/26/2018 Section 6 B2H SOP
6/91
Ifabuildinghas47floorsandeachfloorhas2connections,itispossible
nd
1.B2HScenarios
conduithasenoughspacetoaccommodate814dropcables.
6thFloor
DirectDropCables
oor
4thFloor
2ndFloor
1stFloor
Basement
GroundFloor
(1splitters)
Feeder
cable
6
-
5/26/2018 Section 6 B2H SOP
7/91
DropcablesaredistributeddirectfromtheFAT3201 48(32)(2splitters,
rd
1.B2HScenarios
X*Delnumber/CustomerReferenceNumber/ElectricityNumber
of DELs 1,2,3,4 5,6,7,8 948 >48
Equipment 1ONTSupports 4Ports 2ONTSupports 4PortsEach M5612 nxMA5612
2ndFloor
DirectDrop
Cables
(ONT8447) 2*(ONT8447)
1stFloor
GroundFloor
Basement
FAT320148(32)(2splitters)
Feeder
cable
7
-
5/26/2018 Section 6 B2H SOP
8/91
IfDistancefromFATtothenecessaryflooristoolong,orriseris
th
1.B2HScenarios
congeste ,poss etouse u ,connecte tot e a n v a ser
Cable.
of DELs 1,2,3,4 5,6,7,8 948 >48
2ndFloor
Dro Cables
SubFAT3101
(ONT8447)
2*(ONT8447)
1stFloorVertical
RiserCables DropCables
SubFAT3101
GroundFloor
BasementFeeder
Cable
FAT320148
(2Splitters)
8
-
5/26/2018 Section 6 B2H SOP
9/91
InthiscaseDropCablesaredistributedbySubFAT3101,eachSubFATis
5
th
Case
1.B2HScenarios
servicing2floors(upto6Onts perfloor).
2ndFloor
DropCables
1stFloor
DropCables
SubFAT3101
GroundFloor
VerticalRiser
Cables
SubFAT3101
Basement
Feeder
Cable
FAT320148
(2Splitters)
9
-
5/26/2018 Section 6 B2H SOP
10/91
IncaseifoneSubFATisservicingmorethanonefloor:6th Case1.B2HScenarios
3rdFloor
AllflatsfromthesamefloorshouldbeconnectedtothesameSubFATonly.
2ndFloor
SubFAT3101
1stFloor
GroundFloor
SubFAT3101
Basement
Feeder
Cable
10
-
5/26/2018 Section 6 B2H SOP
11/91
TwoFAT
3201
48
is
combined,
Drop
cables
are
distributed
by
Sub
FAT3101,
each
7th Case1.B2HScenario's
3rdFloor
FATisservicing2floors(7to12ONTsperfloor).
DropCables
2ndFloorVerticalRiserCables
u
1stFloor
Sub FAT3101
GroundFloor
SubFAT3101
BasementFeeder
FAT320148
(2Splitters)
Cable FAT320148
(2Splitters)
11
-
5/26/2018 Section 6 B2H SOP
12/91
IncaseifnumberofSubFATisequaltothenumberofsplittersandfreesplitterports8th Case1.B2HScenario's
arestillavailable,itispossibletousedirectdropsfromFATtotheSAMEfloor.
3rdFloor
2ndFloor
u
1stFloorVertical
RiserCables
SubFAT3101
DirectDrop
Cables
GroundFloor
Feeder
FAT320148(2Splitters)
Cable
(1Splitters)
12
-
5/26/2018 Section 6 B2H SOP
13/91
SimilarscenarioforsingleFAT320148.Wehave2splittersand2ofSub9th Case1.B2HScenario's
. x u cancon a n rop ersmax mum. ccor ng o
Ooredoo businessrules,wecanconnect28Onts to2splitters.So,4
splitterportsstillfreeandcanbedistributedbydirectdrops(onlytothe
nearestfloor).
2ndFloorSubFAT3101
1stFloorVertical
RiserCables
SubFAT3101
FAT 320148
DirectDrop
Cables
GroundFloorFeeder
Cable
(2splitters)
13
-
5/26/2018 Section 6 B2H SOP
14/91
10th Case1.B2HScenario's
SubFAT3101
SubFAT3101 5thFloor
6thFloorIdealscenario ifwehaveupto7ofSubFAT.In
thiscaseispossibletoterminateeachof24F
SubFAT3101 4thFloor
.
Otherwiseweneedtosplitthecablesto
differenttrays.
2ndFloor
3rdFloor
22UCabinet,5Splitters,72ONTsMaximum.
SubFAT3101
SubFAT3101
GroundFloor
1stFloor
Vertical
RiserCables
SubFAT3101
SubFAT3101
BasementFeeder
22UCabinet
Cable
14
-
5/26/2018 Section 6 B2H SOP
15/91
22Ucabinet 6s litters 84connectionsmaximum.
11th Case1.B2HScenario's
SubFAT3101
SubFAT3101 5thFloor
6thFloorForabuildingwhichhas7184connections,
Install1x22Ucabinetwith6splitters.Use
SubFAT3101 4thFloor
.
alsopossibletoterminateeachof24Fcableto
dedicatedsplicing/terminationtray.Otherwise
weneedtosplitthecablestodifferenttrays.
2ndFloor
3rdFloorSubFAT3101
SubFAT3101
GroundFloor
1stFloor
Vertical
RiserCables
SubFAT3101
SubFAT3101
Basement
Feeder
22UCabinet
cable
15
-
5/26/2018 Section 6 B2H SOP
16/91
IncaseifnumberofONTsperfloorismorethan12 twoSubFATstobe12th Case1.B2HScenario's
.
3rdFloor
Dro Cables
EachcasetobedealtwithonacasebycasebasisinagreementwithOoredooDesignApproval
2ndFloor
SubFAT3101
SubFAT3101
SubFAT3101
SubFAT3101
1stFloor
SubFAT3101SubFAT3101
GroundFloor
SubFAT3101SubFAT3101
Basement
Vertical
RiserCables
Feeder
Cable
22UCabinet
(WallMounted)
16
-
5/26/2018 Section 6 B2H SOP
17/91
Scenariowithtworisers,1324ONTsperfloor.
13th Case1.B2HScenario's
3rdFloor
SubFAT3101SubFAT3101
SubFAT3101SubFAT3101
2ndFloor
1stFloor
SubFAT3101SubFAT3101
roun oor
SubFAT3101SubFAT3101
Riser2
Feeder
Riser1
22UCabinet
(WallMounted)
Basement
17
-
5/26/2018 Section 6 B2H SOP
18/91
Scenariowithtworisers,712ONTsperfloor.
`
14th Case1.B2HScenario's
ac case o e ea w onacase ycase as s nagreemen w ore oo es gn pprova
SubFAT3101SubFAT3101
2ndFloor
1stFloor
GroundFloorSubFAT3101SubFAT3101
Riser2
Feeder
Cable
Riser1
22UCabinet
(WallMounted)
18
-
5/26/2018 Section 6 B2H SOP
19/91
B2HRestrictions
3rdFloor
SubFAT3101
2ndFloor
1stFloor
SubFAT3101
GroundFloor
BasementFeeder
cable22UCabinet
(WallMounted)
19
-
5/26/2018 Section 6 B2H SOP
20/91
Chapter TwoProcedureforBusinessLinesB2Hinstallation
20
-
5/26/2018 Section 6 B2H SOP
21/91
2.1B2HBusinessLinesProcess
21
-
5/26/2018 Section 6 B2H SOP
22/91
-
5/26/2018 Section 6 B2H SOP
23/91
2.3NamingConvention
SE+ISPInstallationTeam:A
1. InstallationofATB&ONT
cabinet/casing
2. Knowrouteofbuilding
B2HInstallationTeam:B
1. Installationofrisercable,
FATandsubFAT
2. Installationof2Fdrop
.
communicationskills
.
3. Knowrouteofbuilding
4. SimpleEnglish
communicationskills
SplicingTeam:D
1. HaveexpertFusionsplicing
OSPInstallationTeam+OSP
SplicingTeam:C
capability.
2. SimpleEnglish
communicationskills.
3. Havegoodknowledgeof
healthandsafety.
1. Haveagood
understandingofOSPwork
2. HaveexpertFusionsplicing
capability.
3. Havegoodknowledgeof
healthandsafety
MigrationTeam:E
1. Provisioning&testingofall
services.
2. Troubleshootingcapability
3. HaveknowledgeofISP
MigrationTeam:F
1. Haveprofessional
electricalcertification
2. Troubleshootingcapability
3. GoodEnglish
.
4. GoodEnglishcommunicationskills.
.
Huawei/OoredooisnotresponsibleforanyThirdParty
23
internalcabling.PleaserefertolocalITdepartment
relatingtoanyissue.
-
5/26/2018 Section 6 B2H SOP
24/91
Chapter ThreeCommunication and Survey
24
-
5/26/2018 Section 6 B2H SOP
25/91
3.1CommunicationandSurveySN Task Description Operator Duration
Communication and Surve1
. Procedure
1 Introduce oneself at the office reception. As shown in Picture 1
2 Show the ID card to the Customer;
3Get the access signature from customer on new Ooredoo Authorisation forms.
.
4 Converse with the customer according to the script (Ask for IT person if available)
5Agree the location of ONT/ATB with the Customer and confirm the installation
scenario based on xxxxxx (power socket location).
6 Survey the ODP location (drop cable route) as Image 4 shown.
7 Validate the customer's data information with customer;
Note
1If it is inconvenient for the Customer to give access there and then, ISP
coordinator will make an appointment with customer and record the appointment
time via Ooredoo Call Center.
2
2
work.
3If customer does not allow ISP team to carry out installation then ISP coordinator
will note this into his report and quality sign off sheet, will request the customer to
sign the sheet for not allowing the installation and report back.
4 The workers should be in neat and clean Ooredoo uniform at all times.
5e wor ers mus e a equa e y ra ne e ore ey v s cus omer; uawe w
provide the technical training & Ooredoo will provide the communication training)6 The workers should take off shoes if needed;
7 Ooredoo will provide the Authority letter;
Tools
ODP
25
1 Iron wire push rod 2
screwdriver3 Straight Screwdriver
Materials
1 Introduction letter 2 Work order 3 Authority letter
-
5/26/2018 Section 6 B2H SOP
26/91
Chapter FourPreparationforB2H
26
-
5/26/2018 Section 6 B2H SOP
27/91
Preparation for B2H SN Task Description Co-ordination Duration
4.1 Preparation for B2H A & B
1 Refer to door knocking procedure for the building access
2Refer to building survey report, familiarize yourself for all the works needed to
be done
Before start an activit ive a brief safet instruction for the workin force.
3 Check the uniform and their appearance and ensure cleanliness and
professionalism to upheld at all times
4Politely speak to the building property manager, building owner or the security
guard regarding the installation
5 Inspect the building scenario and compare it with the building survey report.
6If any mismatches found (different quantity of floors, cable routes, FAT
capacity and etc.) immediately report to Huawei site engineer.
Note
1 Ensure all PPE is in place
2 Ensure all the accreditation cards are available
3
4
Tools
See separate tool list
Requirements
1Installation
2Building Survey
3 Way leaves form
Remember -Think Safety - Work Safely
4 5 6
27
-
5/26/2018 Section 6 B2H SOP
28/91
Chapter FiveStandard Laying of Outdoor OFC
28
-
5/26/2018 Section 6 B2H SOP
29/91
Safety Environment
De lo ment
SN Task Description Operator Duration
5.1 a e y env ronmendeployment
A & C 10 Min
Procedure
1 Ensure All PPE is worn
2
3
Note
1Always wear safety glasses, high visibility jerkins, suitable safety
Helmet and protective gloves.
2 Keep all food and beverages out of the work area.
3Don't touch your eyes while working with fiber optic systems until
they have been washed thoroughly.
4
Tools
Safety glasses Hi-Vis Vest
oa a e y
Signs
Safety Helmets Safety foot wear Gloves
MaterialsRemember -
1 2 3Think Safety, Work Safely
29
-
5/26/2018 Section 6 B2H SOP
30/91
Safety Environment Deployment SN Task Description Operator Duration5.1.1 Safety environment
deployment
A & C 10 Min
Procedure1 Deploy road safety precaution:"Keep left-Right" (see pic 1)(Observance of
the sign is mandatory and drivers must pass on the side indicted). Care must
therefore be taken to ensure that drivers are not directed onto the footway by
unintentionally placing the sign the wrong way round. The sign is always
placed at the start of a temporary kerbed line taper and at other locations.)
1
2 Cones, Reflecting (see pic 2)(cones are used to delineate a temporary
kerbed line). For day and night work, they should be used in conjunction withlamps. Road caution, a cone and a lamp being placed alternately around the
obstructions that will be removed before darkness. Only cones should be
used to guard the area. Where cones are placed at between 45 and 90to2approaching traffic, they must be spaced 1.2m apart. Where cones are
placed in line of traffic ,they must be spaced 9m apart.
3 Lamps, Road caution (see pic 3)(lamps, road caution are used with
cones),reflecting to delineate a working area for night work, lamps being.
during the day. Lamps are used on footways at night to warn pedestrians of
obstruction.
Note
1 Deploy all required SLG(Signing ,Lighting and Guarding ) as per traffic
requirements
3
2 You are responsible for your own safety, the safety of your workmates and
that of public.
3
4
Tools
1 Cones 2 Lamps 3 Sign for Keep left-
Right
30
-
5/26/2018 Section 6 B2H SOP
31/91
Implementation Preparation SN Task Description Operator Duration
.
Procedure
1 Legend details (see pic 1)
2 Layers by colour (see pic 2)
1
3 Duct details (see pic 4)
4 Update the duct details used in FAT section of design
5
Note
1 Always Used the Approved OSP As-built Drawing
2
3
Tools
1 2 3
4 5Materials
1 Drawing 2 3
4 5 6
31
-
5/26/2018 Section 6 B2H SOP
32/91
Implementation Preparation SN Task Description Operator Duration
5.3Implementation
A & C 5mins
Procedure
1 Refer to the cable route design to start installation
2Cross Check the Actual Route on cable route design and ODF
design.
3
4
5
6
Note
1 Always Used the Approved OSP As-built Drawing
2
4
Tools
4 5
Materials
1Cable route
design2 3
4 5 6
32
-
5/26/2018 Section 6 B2H SOP
33/91
Standard laying of Distribution O.F. cable SN Task Description Operator Duration
5.4 Transporting of Cable A & C 5mins
Procedure
1 Unload the O.F.cable drum from the truck (see pic 1)
2 Roll the cable tray to the place near the manhole.1
3 Secure the working area and set up the materials and tools properly
4Observe the safety standard precaution measurement when carrying
out the work
5
Note
1 Ensure proper PPE is used
2 Ensure stopping block is in place when off loading cable drum2
4
5
6
Tools
1 2 34 5
Materials
1 Cable 2 3
4 5 6
33
-
5/26/2018 Section 6 B2H SOP
34/91
Standard Laying of Distribution O.F. Cable
SN Task Description Operator Duration
5.5 Fixing Cable Drum A & C 15mins
1 Fix the cable drum on drum hydraulic as pic 1.
2 Adjust the height of holder as the pic 2 shown.
3Put a ground sheet underneath the cable drum to prevent any
1
4
5
6
Note
1 Make sure the cable rolling direction is correct.
2The drum hydraulic should be set up at safe distance from the open
manhole
2
3 Do not block door entry or customer access
Tools
1Cable
hydraulics2 PPE 3 Ground Sheet
Materials
1 Cable Drum 2 Cable 3
4 5 6
34
-
5/26/2018 Section 6 B2H SOP
35/91
Standard Laying of Distribution O.F. Cable
SN Task Description Operator Duration
5.6 Manhole Opening A & C 5mins
Procedure
1Deploy cones and warning tape around manhole(see pic 1), clean
manhole cover (see pic 2)
2
Open manhole with proper Ooredoo manhole key as the pic 3,4 and
5 shown. Always ensure gas detector is used when opening
21
.
3 Check the detail design and choose the right duct as pic 6 shown.
4 If there is water, sundries or sand in manhole which will affectimplementation, need to clean out with bailer, shovel or other tools.
5
Note
1 Always bring detail design and diagram drawing with the team.
2 Use proper key for different manholes.
3 Not allowed to change the design on site.
43
4 When opening the cover of manhole, there should be two people.
5 Must use gas detector for all manholes.
Tools
1 Manhole keys 2 Bailer 3 Shovel5 6
4 Gas Detector 5 Gloves 6 Brush
7 SLG 8 Cones
Materials
1 2 3
4 5 6
35
-
5/26/2018 Section 6 B2H SOP
36/91
Standard Laying of Distribution O.F.
Cable
SN Task Description Operator Duration
5.7
Duct Roding
(No Rope or Rope
can not be used)
ABCDE 30mins
Procedure
1
Pay attention to the connector of PVC duct rod,one side is the
female,the other is the male.And then start duct rodding,as pic
1,2,3,4,5,6 and 7 shown.
Take the push rod from truck, and disjoin them as the pic 1,2
. , .
the tools near both of the manhole A and B at the same time,
3
Install the female connector on one side of the duct rod at manhole
A, and the male connector at manhole B. Use the tape to fix the
two connectors firmly(pic 4,5,6).
4Lead the duct rod to the underground duct both of manhole A and
. , ,
5Tie up the draw rope on the push rod, turn back the push rod to the
manhole until the rope is in the duct from manhole A to manhole B.
Note
1 Ensure proper PPE is used
3
4
5
Tools
1Distance
measurer2
Tools for
dredging3 PVC Duct Rods
4 Gloves 5 PVC tape 6 Rope
Distancemeasurer
1 Draw Rope 2Ground
Sheet3
4 5 6
Duct X
Female ConnetorMale Connetor
36
-
5/26/2018 Section 6 B2H SOP
37/91
Standard Laying of Distribution O.F. CableSN Task Description Operator Duration
5.8 Making traction end A & C 5mins
Procedure
1 Connect the Cable Grips and Cable Swivel as pic 1 shown.
2 Insert cable end into cable grips as pic 2 shown.
3 Wrap the cable and cable grips with tape (see pic 3).
1 2
4Connect the cable Swivel and the pulling rope. splice the pulling
rope and wrap the splice rope with a PVC tape as pic 4,5
5
6
3
1
2
3
4
4
5
6
Tools5
4 5
Materials
1 Tape 2 3
Connectto
O.F.cable
viaswivel
37
-
5/26/2018 Section 6 B2H SOP
38/91
Standard Laying of Distribution O.F. CableSN Task Description Operator Duration
5.9 Laying the cable A & C 20mins
Procedure
1Put the ground sheet on the ground between the cable drum
and the manhole (see pic 1).
2 Deploy the bellmouths at both sides of duct (see pic 2)
12
x u w .
4
In order to feed the cable into the duct in preparation for pulling
E.G. person at manhole A pulls the pulling rope slowly whileperson at cable drum E.G. person at pic 4 feeds the cable into
the duct . Pull the cable accordingly.
After the cable is installed Leave maintenance loop of 8 meters
43 Manhole A
inside the splitter/joint manhole
6Coil a loop of cable atleast 5 meters inside telecom room for
arranging and splicing purposes
7Seal the duct entry point from the manhole and inside telecoms
room by using compound 16.
Note
RopeGuiding
Roller
Always adhere for the safety standard precaution measurement
Cable labeling should be in this format Approved format by
Ooredoo
to be confirmedManhole B
6
Tools
1Split Bell
mouths2
Rope Guiding
Roller3
Road safety
precaution
4 Ladder 5 ground sheet 6 Screw drivers
Materials
1 Cable 2 PVC tape 3
4 5 638
-
5/26/2018 Section 6 B2H SOP
39/91
Chapter SixStandardLayingofRiserandDropCable
39
-
5/26/2018 Section 6 B2H SOP
40/91
SN Task Description Operator Duration
Transporting and
fixing of cable
. drum insidetelecom room
Procedure
1
Make sure that the cable drum is correctly positioned. See pic 1
as shown1
2
3
Note
1 Ensure proper PPE
2
cable drum, If not take the cable drum outside telecom room
and proceed for the standard laying of the cable and ensure all
the safety precautions are taken
3
Tools
1 Cable Cutter 2Ground
Sheets3 Cable Jacks
Materials
1 Cable Drum 2 Drop cable
40
-
5/26/2018 Section 6 B2H SOP
41/91
Standard Laying of Vertical Cable
SN Task Description Operator Duration
6.2 Laying of Vertical Cable B
1Open the tray works safely and Identify the route of the riser
cable.(see pic 1)
2Rod and Pull the vertical cable from the telecom room to the
next floor where the sub FAT is located. (see pic 2)
Keep a loop of cable for splicing inside the telecom room
1
3(approximately 3 meters for main FAT) and to the designated
floor where the sub FAT is required (approximately 2 meters for
the sub FATs) (see pic 3)4
Mark the vertical cable with a temporary label according to the
floor number where the sub FAT will be installed.
Tie up the vertical cable neatly in the existing tray works in the
2 3
dry riser by using cable ties. (see pic 4)
6Seal the duct entry point by using fire stopping compounds from
telecom and riser room. (see pic 5)
6 close the tray works safely. (see pic 6)
Note4
1 The minimum bending radius of the fibre is 8 cm.
2The cables should be routed neatly and together. Do NOT mix or twist
the cables up with the existing copper cables in the dry riser.
3 Label the cables as per Labeling SOP
Tools
1 Screw drivers 24 mm
cobra rod3 Cutter
4 Ladder 5 6
Materials
65
1 12/24F cable 2 Cable ties 3 Insulation tape
4Fire stopping
compound
5Ground
Sheets
6
41
-
5/26/2018 Section 6 B2H SOP
42/91
Standard Laying of Vertical Cable
SN Task Description Operator Duration
6.3Laying of Drop
CableA
Procedure
1Identify the primary telephone socket outlet in the customer
premises. (see pic 1)
2Identify the route of the drop cable from installed FAT or sub-
1 2
3Open the telephone socket and search if there is a pulling rope.
Push rod should be used if there is no pulling rope. (see pic 2)
4Tie up the pulling rope and drop cable with PVC tape. (see pic
3)
Lay the drop cable from the installed FAT or Sub FAT to inside
customer premises
6
Keep a loop of cable inside the ONT cabinet (approximately 2
meters) and inside FAT or Sub FAT(approximately 2 meters)
for splicing
7 Mark each drop cable with a temporary cable and ensure its
Note
1Keep the maintenance loop safe and avoid unnecessary
bends.
2Minimum bending radius of the drop cable shall be maintained
according to the cable specification.
Dropcable
3 4
3
Tools
1 Screw Drivers 2 Cutter 3 4mm rod
Materials
1 pulling rope 2 PVC Tape 3 Drop cable
4Cable
Lubricant5
Ground
Sheets6
42
-
5/26/2018 Section 6 B2H SOP
43/91
Chapter SevenStandard Installation of FAT3201-24 and FAT3201-48 (direct drop fibers)
43
-
5/26/2018 Section 6 B2H SOP
44/91
SurveyInformation
BeforestartinganyB2HinstallationitisMANDATORYthatthepresitesurvey
informationformisrequested,studiedandapreimplementationsurveyis
.
yourintendedinstallationdate.
Thisformwillprovidecontactdetailsforaccessintothebuilding.
WillprovideasuggestedsolutionforB2Hinstallation.
Willprovideaguidetothematerialrequirementsforinstallinginthebuilding.
Willgiveyouanopportunitytocompleteyourownpresitesurveytoconfirm
.
Willgiveyouanopportunitytoarrangeforanyamendmentsandchangesto
material andimplementationrequirements.
Willsupportyourplanandmakeyourteamsmoreefficient.
44
SN Task Description Operator Duration
-
5/26/2018 Section 6 B2H SOP
45/91
Standard Installation of FAT3201-24 and
FAT3201-48 7.1Procedure for FAT
installationB
Feedercable
FAT320124
Dropcableinlet
The personnel in charge of installation and maintenance must betrained and master the correct operating methods and safety
precautions before beginning of work. Ensure permission to work on premiseshas been granted
Procedure
1 Check FAT and the accessories are fit for purposes
2 Check the space where the FATs will be installed.
The preferred installation location of FATs is nearby of Cable Trays , as close as
Riser/Drop
cableinlet
Feeder
cableinlet
poss e to t e ex st ng copper
4
5
If FAT is installed in Telecom room, the new cable tray is required, to link the FAT
with existing cable trays. In other cases 60 x 40 or 100 x 50 cable trunk, to provide
smooth banding radius, (not less than 80 mm)
FAT320148
FeedercableoutletDropcableinletIn case of combination of 2 FATs, vertical cascading
is preferable, to reduce the length and routes of
cable trays or cable trunks .5
Note
1 Please make sure that the FATs are leveled properly by using spirit level
Riser/Drop
cableinlet
Feeder
cableinlet
2Please make sure to keep clear the area of work from obstacles like :
decoration or any material that can be damaged due to work.
3 ALWAYS install the FAT-48 above the FAT-24 whenever 3 splitters are requiredas Pic545
SN Task Description Operator Duration
-
5/26/2018 Section 6 B2H SOP
46/91
Standard Installation of FAT3201-24 and
FAT3201-48 (direct drop fibers) 7.2Installing of FAT in
the wallB
1
Marker
Procedure1
Determine the installation position. Use Cable avoidance tool to identify
Level
Installation
location
e ex s ng serv ces e ore r ng e wa ensure no serv ces n e wa
2Put a piece of ground sheet on the ground just under the
installation space to cover the floor/carpet from waste
material, dirt etc. as picture 2 shown;
3 Drill holes using a percussion drill as picture 3 shown;
2 3
8drillbit
Install the anchor bolts and remove the nut with washer.44 5O en the lower la er of FAT, then han the case to the ex ansion bolts on
Note
42mm45mm
the wall, fasten the nuts.
For safety concern, at least two persons are required to install the case. One
person is to hold the case and the other person to fasten the nuts
b
ALWAYS check for other services BEFORE drilling any holes using a metal
detector and by using information from the Building in - charge.
46
St d d I t ll ti f FAT3201 24 dSN Task Description Operator Duration
-
5/26/2018 Section 6 B2H SOP
47/91
Standard Installation of FAT3201-24 and
FAT3201-48 7.3Preparing o f
Feeding cableCD
Striptheoutdooropticalcableaccordingtotheactualscenario.MakesurethatcablewillfitinsideofFATwithfollowingrouting.
Procedure
1
FAT 3201-24Fiber Tubes Route
Feeder
Pig Tails
FAT 3201-48 Fiber Tubes Route
Pig Tails
b
Feeder
47
Standard Installation of FAT3201 24 andSN Task Description Operator Duration
-
5/26/2018 Section 6 B2H SOP
48/91
Standard Installation of FAT3201-24 and
FAT3201-48 7.3Preparing o f
Feeding cableCD
Cascading of FAT 3201-48 and FAT 3201-24
Tube 1 Route
Pig Tails
Bridge between splitter
modules
Tube 2 Route
Pig Tails
b
Feeder
48
Standard Installation of FAT3201 24 andSN Task Description Operator Duration
-
5/26/2018 Section 6 B2H SOP
49/91
Standard Installation of FAT3201-24 and
FAT3201-48 7.3Preparing o f
Feeding cableCD
Cascading two of FAT 3201-48
Tube 1 Route
Bridge between splitter
modules
Note: In this situation a maximum of four Fibres will
be used One for each s litter.
Two from the Red Tube and Two from the green
Tube
Pig Tails
Bridge between splittermodules
b
Feeder
49
Standard Installation of FAT3201-24 andSN Task Description Operator Duration
-
5/26/2018 Section 6 B2H SOP
50/91
Standard Installation of FAT3201-24 and
FAT3201-48 7.3Preparing o f
Feeding cableCD
1 2
Dressthefiberloosetubesinto protectivetube1Polishthesheathwhichisnearthestrippedpointusingthesand
paper2
Procedure
wrapitwith insulatingtape.3
4Remove the tower plug on the case. Cut a cable hole on the
tower plug based on the diameter of the optical cable.
5 Insert and fix the Feeding optical cable.
6 Seal the cable inlet/outlet using insulating tape
6
Thediameteroftheopticalcablemustbelessthan 20mm.1
2 Thestrippedlengthoftheopticalcabledependsonthecable
route.
When cutting the cable hole, please pay attention to the
different diameters mark on the tower plug .3
50
Standard Installation of FAT3201-24 andSN Task Description Operator Duration
-
5/26/2018 Section 6 B2H SOP
51/91
Standard Installation of FAT3201 24 and
FAT3201-48 7.4 LeadinginandFixing
ofDropCablesCD
Procedure
Lead in and fix the drop cable.
For FAT3201-24, the drop cable inside the FAT should
be 1600 mm in len th.
1a 1b
Drop
Cable
For FAT3201-48, when the drop cable and distribution
optical cable are led into the bottom section, the drop
cable inside the FAT should be 2500 mm in length.
Arrangement of Drop Fibers must be done according to
figures 1-3, dependant of the Drop Fibers Entry point
location.
2 Drop Cable
Copex
Tube
1-a
Note: Labeling of Drop Fibers shou ld be done
according to the Chapter of SOP B2H Labeling
Entry point is on top of FAT
1-bEntry point is on the bottom of FAT. In this case
drop fibers MUST BE PROTECTED with Copex
tube or Cable Trunk.
2 Routes of drop fibers for FAT 3201-243
3 Routes of drop fibers for FAT 3201-48
b 51
Standard Installation of FAT3201-24 andSN Task Description Operator Duration
Stripping Leading in
-
5/26/2018 Section 6 B2H SOP
52/91
Standard Installation of FAT3201 24 and
FAT3201-48 7.5Stripping,Leadingin,
splicing andFixingof
fibers.
CD
1 Arrange the loose tube and drop cables according to table
Procedure
Splicing Tray NO
Tray 1 (Bottom tray)
Side A
Feeder INPUT
Splitter input
Feeder output (if
Side B
1 Specification of splicing tray module
1
Note:Dropfibers/loosetubesmustbewrappedwiththe
Tray 2Splitter outputs 0-3
Pigtails 1-4
casca ng o
Drop Fibers 1-4
Tray 3Splitter outputs 4-7
Pigtails 5-8Drop Fibers 5-8
2 Strip the Drop Cables with the length of 950 mm
insulationtapeandbefixedattheportsofthesplicingtray
withstraps.
3
the optical fiber.Tray 4
Splitter outputs 8-11
Pigtails 9-12Drop Fibers 9-12
Tray 5Splitter outputs 12-15
Pigtails 13-16
Drop Fibers 13-16
Tray 2- Tray 5Side A Side B
Splicing
Bottom tray
Splicing
Side A Side B
Drop Fibers
Splitter
Pig Tails
Splitter outputsInsulation Tape
Insulationtape
b
p ce e ers accor ng o ap er o .Feeding input
Arrange fibers and protective heat shrinks inside of splicing tray.5
52
Standard Installation of FAT3201-24 andSN Task Description Operator Duration
-
5/26/2018 Section 6 B2H SOP
53/91
FAT3201-48 7.6Preparing o f
Vertical Riser cableCD
1
Before start any operation with Vertical
Riser cable, you should pay attention to
the Color Code Table fi ure 1 .
2
Cores 1-12 have pure colors, cores 13-24 have the same color coding as 1-12,
but w ith b lack marks, every 5 cm. (figure
2)
b
53
Standard Installation of FAT3201-24 and
SN Task Description Operator Duration
7 7Preparing of Riser
CD
-
5/26/2018 Section 6 B2H SOP
54/91
FAT3201-487.7
cableCD
Procedure
Route 2 - 1900 mm
(950 mm of spiral tube)
Route 3 - 2200 mm
StriptheRiserCablesto2.2moflengthfromtheEntryPoint.1
IdentifyfiberroutestoallocatedsplittermodulesaccordinglytotheRoutingTable.Dividefiberstodifferentbundles(8fiber
perbundle) Dressthebundles intospiral protectivetube.2
Route 1 - 1550 mm
3 WrapthejointingplaceofCablesheathandspiraltubes with
insulatingtape.
4 LeadallcablesintotheFATandfixattheentrypointwith
CableStraps.
Entry Point
2
3
4
b 54
-
5/26/2018 Section 6 B2H SOP
55/91
Standard Installation of FAT3201-24 and
FAT3201 48
SN Task Description Operator Duration
-
5/26/2018 Section 6 B2H SOP
56/91
FAT3201-48 7.9 Exampleinstallations CD
56
Standard Installation of FAT3201-24 and
FAT3201 48
SN Task Description Operator Duration
7.10 Finishing CD
-
5/26/2018 Section 6 B2H SOP
57/91
FAT3201-48
No Check list
1 Splitters are installed incorrect inside FATs and MUST be removed , rotated 180 degrees and re-installed
BEFORE any dressing in of Fibres takes place. If not , the dressing in is not to SOP and will have to be re-done
2 Is the optical cable properly fixed?
3 Is the optical fiber neatly routed and fixed (with optical fiber fastener)?
4 Is the optical fiber routing correct?
5 Fibre A, Fibre 1 or the blue core will ALWAYS be spliced to the Ooredoo network.nd , .
6 Splicers MUST follow the colour code for the riser cable.
Example:
Customer for port 00 will have the Blue and Orange cores Blue is Ooredoo, Orange is 2nd service provider.
Customer for port 06 will have the Blue and Orange cores with black dashes Blue/black is Ooredoo and
Orange/black is 2nd service provider.
Blue & Blue/black, Orange & Orange/black etc IS NOT the colour code and MUST NOT be followed.
7 Maximum number of ports allocated per splitter is 14. (00-13) If ports 14/15 are required to be used permission
MUST be requested from Ooredoo BEFORE using these ports.
8 If an additional splitter is required due to more customers identified than on the survey, a DCR MUST be
submitted through normal procedures.
9 Has the Labeling SOP been followed 100% - This is a MUST DO task and is critical.
10 Does the pigtail storage meet the requirement for the bending radius and is fixed (with roll protection tube)?
11 Does the door open and close with ease?
12 Is the earthing good (if OF cables have a metal element)?
14 All keys for FAT-24 & FAT-48 are universal One fits all.
15 FAT patch panel door access keys must be handed to Ooredoo
16 Implementation details for each building installation must be recorded for future maintenance purposes. 57
-
5/26/2018 Section 6 B2H SOP
58/91
Chapter EightStandard Installation of Sub FAT3101
58
Standard Installation of Sub FAT3101SN Task Description Operator Duration
8 1Plan the
CD
-
5/26/2018 Section 6 B2H SOP
59/91
8.1installation space
CD
The personnel in charge of installation and maintenance must be trained and master the correct operating
methods and safety precautions before beginning of work. Ensure permission to work at premises has been granted
ExteriorandStructureoftheCase
Procedure
1Check the quality of FATs and the
accessories
2Check the space where the FATs will be
installed.
3The preferred installation location of FATs is
on top of existing copper IDP
Opticalcablestrippingandfixingarea
Note
1 Please make sure that the FATs are leveled properly by using spirit level
2Please make sure to keep clear the area of work from obstacles like :
decoration or an material that can be dama ed due to work.
SubFAT has 2 kinds: 12F and 18F. 12F subFAT can accommodate a maximum of 9
customers 3 trays 3 customers per tray 6 splices per tray 2 splices per
customer. 18F subFAT can accommodate a maximum of 12 customers 4 trays 3
customers per tray 6 splices per tray 2 splices per customer
3
59
Standard Installation of Sub FAT3101SN Task Description Operator Duration
8 2 Fixing on the wall CD
-
5/26/2018 Section 6 B2H SOP
60/91
8.2 Fixing on the wall CD
Marker
Wall
Level
1Determine the installation position. Use Cable avoidance tool to identify
Procedure1
Mountinghole
Template
e ex s ng serv ces e ore r ng e wa nsure no serv ces n e wa
2Put a piece of plastic sheet on the ground just under
the installation space to cover the floor/carpet from
waste material, dirt etc. as picture 2 shown;
2 3
8drillbit
Flatwasher
Drill holes using a percussion drill as picture 3 shown;
4 5
Nut
Coneheadbolt
42mm45mm
Install the anchor bolts.4
Open the lower layer of FAT, then hang the
case to the expansion bolts on the wall,
fasten the nuts.5
b 60
Standard Installation of Sub FAT3101SN Task Description Operator Duration
8 3Preparing o f
CD
-
5/26/2018 Section 6 B2H SOP
61/91
8.3Vertical Riser cable
CD
1
Before the start any operation withVertical Riser cable, you should pay
attention to the Color Code Table (figure
.
2
Cores 1-12 have pure colors, cores 13-
24 have the same color coding as 1-12,
but w ith b lack marks, every 5 cm. (figure
2)
b
61
Standard Installation of Sub FAT3101SN Task Description Operator Duration
8.3Preparing of Riser
blCD
-
5/26/2018 Section 6 B2H SOP
62/91
cable
Procedure
1
Striptheopticalcable.UsingIndustrystandardstrippers&
cleansingwipes1
Dressthefibersintospiral protectiontube,6fiberspertube.32Prepare4piecesofspiralprotectiontube,55cmlength2
4 WrapthejointingplaceofCablesheathandspiraltubes with
insulatingtape.
5 CablenowreadyforthefixinginsideofSubFAT
3
4
b
5
62
Standard Installation of Sub FAT3101SN Task Description Operator Duration
8.4 LeadinginandFixing
of Riser CableCD
-
5/26/2018 Section 6 B2H SOP
63/91
ofRiser Cable
1 Lead in and fix the Vertical Riser optical cable.
-
Procedure
, .
3Insert the spiral tube with fibers 1-6 into the splicing tray 1 and fix
with cable ties.
1 24
Coil the fibers inside of the splicing tray and fix end of the bundle
with iece of insulatin ta e
3
5 Repeat item 3 and 4 for the rest of splicing trays.
o e
Arrangement of fibers inside of splicing
trays must be done in order to the
following table
Tray 1 Fiber 1 to 6
Tray 2 Fiber 7 to 12
Tra 3 Fiber 13 to 18
b 5
Tray 4 Fiber 19 to 24
63
Standard Installation of Sub FAT3101SN Task Description Operator Duration
8.5
Leadingin,Fixingand
splicing ofDrop CD
-
5/26/2018 Section 6 B2H SOP
64/91
fibers.
1 2 3Labels Labels
Procedure4 Specification of splicing tray module
M3flatheadscrewdriver
1 Confirmthenumberoftheleadinginflatdropcables,andpiercethecable
leadinginholesofthesamenumber.
2Leadintheflatdropcable fromthecableleadinginholeatthebottomofthe
fiberaccessterminal.
RunDropFibersthrough thelabelingrings,accordingtothelabelingrules.
Splicing Tray NOSide A (Riser
Cable)
Tray 1 Fiber 1-6
Side B (Drop
Cables)
Drop Fibers 1-3
Tray 2 Fiber 7-12 Drop Fibers 4-6
,
theentrypoint.
Splicethe fibersaccordingtothetable,arrangefibersandprotectiveheat
shrinksinsideofsplicingtray4
Repeattheitem2,3and4fortherestofsplicingtrays.Fixdropfiberswiththe
strapsatFAT d/fiberentry point.5
Side A Side B
- -
Tray 4 Fiber 19-24 Drop Fibers 10-12
Splicing
5 Straps
bFeeding input Drop Fibers
64
Standard Installation of subFAT 3101SN Task Description Operator Duration
8.6 Splicingrequirement
per customerCD
-
5/26/2018 Section 6 B2H SOP
65/91
percustomer
65
Standard Installation of Sub FAT3101SN Task Description Operator Duration
8.7 Additional
recommendationsCD
-
5/26/2018 Section 6 B2H SOP
66/91
1Position of FAT must be as close as possible to the existing
copper IDP or to existing cable tray/cable trunk.1
2All visible vertical riser cable and drop fibers must be
protected with cable trunk or Copex tube
No Item
1 Are all the bolts tightened?
2 Is the optical cable properly fixed?
3 Is the optical fiber neatly routed and fixed (with optical fiber
fastener)?
4 Is the optical fiber routing correct?
2
5 Does the door open and close with ease?
6
7
8
b 66
-
5/26/2018 Section 6 B2H SOP
67/91
Chapter NineStandardLabeling
67
B2HLabeling
-
5/26/2018 Section 6 B2H SOP
68/91
Inordertorepresentthebestinquality,serviceandperformance,
, ,
understandprofessionallabelingsystemthatshouldnotbeabletobe
removed,abradeorfadeinashortperiodoftimebyusingthecorrect
toolsand materialsasstatedintheLabelingSOP.
AccordinglylabelingMUSTbedoneaspertheagreedsolutionwith
Ooredoo
68
B2HLabeling
FAT with S litter s & Feeder Cable
-
5/26/2018 Section 6 B2H SOP
69/91
FATwithS litter s &FeederCable
FAT320148
(2splitters)
FAT320124
(1splitter)
FAT320124and320148 aretobelabeled
ontheoutsidewithfeedercableand
splitterinformation
FAT320124Example:KRG/1/F1
Explanation: Area/Cable/buildingsplitter
FAT320148Example:KRC/1/F1F2
Explanation:Area/Cable/buildingsplittersKRC/1/J17F1/12F(1)
FeedercablesaretobelabeledasOSPandnumberinbracketsdenotes
howmanysplittersinthebuilding
Example:KRC/1/J17F1/12F(3) Explanation:Area/cable/jointBuildingsplitter/cablesize/Totalsplitters
KRC/1/J17F1/12F(2)
69
FAT&subFATLabeling
-
5/26/2018 Section 6 B2H SOP
70/91
70
B2HLabelingOverview
labelin in FAT and sub FAT
-
5/26/2018 Section 6 B2H SOP
71/91
labelin inFATandsubFAT
Labeltherisercablewithdetailsasshown
inPic1.
1
2Fibredropcabletobelabeledwith
splitterandportdetailsinsideeachFATas
showninPic1.
Note:IncaseofSubFAT,onlySplitterport
Noisrequired
00,01,02etc istherecommendedmethod.
2
A/PP2/00
/121A
71
B2HLabelingOverview
Sub FAT Customer Routin Information for ODF & 22U Scenario
-
5/26/2018 Section 6 B2H SOP
72/91
SubFATCustomerRoutin InformationforODF&22UScenario
FAT310112/18
(12F/24Fsplices)
1 2 A/PP2/2
1 3 4
ODF:A/PP2/1(24)
F1/00/SED
5 6
7 8
2 9 10
11 12
13 14
3 15 16
17 18
19 20
4 21 22
23 24
Customerinformationlabelinside
subFATtobeshownHorizontally. SubFATODFtermination Address Spare coreODFAddress
Example:F1/00/E4532889
Explanation:buildingsplitter/port
number/Electricitynumber
Example:A PP2 1(24)
Explanation:TerminationBlock/Patch
Panel/FirstPatchPanelPort(numberof
terminatedfibers)
Example:A/PP2/2
Explanation:TerminationBlock/Patch
Panel/FirstPatchPanelPort
72
B2HLabelingOverview
Sub FAT Customer Routin Information for FAT Scenario & Riser Cable
-
5/26/2018 Section 6 B2H SOP
73/91
Sub Custo e out o at o o Sce a o& se Cab e
FAT310112/18
(12F/24Fsplices)
1 2 B/1
1 3 4
FAT:B/F3/0011(24)
F3/00/SED
5 6
7 8
2 9 10
11 12
13 14
3 15 16
17 18
19 20
4 21 22
23 24
ProvidelabeltagonrisercabletoeachsubFAT
SubFAT FATtermination Address
Example:B/F3/00 11(24)
Explanation: TerminationBlock/
Splitteroutputport .used/ of
Example:B/1
Explanation:Termination
Block/FATPigtail
SpareCoreAddress
ExampleFAT320124/48scenario:A/F3/00/121/AExplanation: TerminationBlock /Buildingsplitter /firstsplitterport used/totalnumberofsplitter
portsused Floor /subFATcode
ExampleODFCabinetScenario:A/PP2/1/121/AExplanation: TerminationBlock /PP/firstPPport//totalnumberofPPportsFloor /subFATcode
73
B2HLabelingOverview
SubFAT&RiserCable
-
5/26/2018 Section 6 B2H SOP
74/91
Splicinginformationlabelinside
subFATtobeshownHorizontally
FAT310112/18(12F/24Fsplices)
FAT310112/18(12F/24Fsplices)
Providelabelsonrisercable
from1st subFATto2nd subFAT.3
xamp e or
cabinetscenario:
xamp e or
24/48scenario:
SubFATtobelabeledonthe outsideofthe
subFATasshowndisplayingfloornumber2/A 2/B
SubFATtobenumberedperfloorfroma
clockwisedirectionaseachfloorisentered
fromeithertheliftorthestairs
an su FAT es gnat onco e
74
IdentifyingandlabelingsubFATsandsubFATportallocation
subFAT labeling 03 04
-
5/26/2018 Section 6 B2H SOP
75/91
First Floor Note: No matter which location you enter the
floor the first subFAT will be the first one on
your left from where you enter the floor.
1 is floor # A is subFAT A etc
If you have more than one entry onto a floor,subFAT subFAT
02
choose the left side of the building from the
ground floor entrance as your starting point.1/A 1/BClockwise Direction
01
Lift or Stairs
First Floor
Port allocation
00
2/01 1/00 3/02
Clockwise Direction
Note: If there are no numbers on the doors of
each apartment then follow the same
instruction as for subFAT labeling and allocate
accordingly.
If the apartments have numbers then follow the
numbers regardless of sequence.
subFAT
1/A
subFAT
1/B
Lift or Stairs
xamp e: par men s oppos e or
stair entrance and apartments 2 & 3 are either
side (as shown) then you will still allocate portsto the apartment number and not in a
clockwise direction from Apartment 1.
6/057/06
Existing
Ooredoo
access panel
SubFAT Clockwise Direction
75
B2HLabelingOverview
labelin inATB&ONTCabinet
-
5/26/2018 Section 6 B2H SOP
76/91
PlaceroutinginformationoninsideofinspectioncoverofONTCabinet
Placeroutinginformationon
insideofinspectioncoverofATB
ForODFCabinetScenario
KRC/1/F1/00 COName/Cable
/Splitter
/Splitterport
v ONTcabinet cover
KRC/1/F1/00
A/PP2/2
SpareFiberODFterminationAddress
(TerminationBlock /PP /PPport )
ForFAT320124/48Scenario
ATBcoverONTCabinetcover
KRC/1/F1/00A/1 COName/Cable /Splitter
/Splitterport KRC/1/F1/00
A/1SpareFiberFATterminationAddress
(TerminationBlock /PPPort )
76
-
5/26/2018 Section 6 B2H SOP
77/91
A
77
-
5/26/2018 Section 6 B2H SOP
78/91
78
-
5/26/2018 Section 6 B2H SOP
79/91
79
-
5/26/2018 Section 6 B2H SOP
80/91
80
Standard Labeling of FAT, sub FAT, 22U and
42U cabinet
SN Task Description Operator Duration
9.9 Labeling D
-
5/26/2018 Section 6 B2H SOP
81/91
No Check list
Additional Information and check list1
1 Labeling SOP MUST be followed 100% - This is critical
2 Labeling is required to be 100% accurate for providing information for 2nd service
provider by Ooredoo
3 Existin labelin inside the subFAT is wron Vertical and must be chan ed.
4 ALL routing information is to be entered horizontally inside the subFAT. (See slide
68)
5 Alternative labeling template is available from the Processes, procedures and
SOPs team. (See Slide 68)
6 SubFAT labeling follows the floor level and locations in a clockwise direction
from the left as you enter each floor. From the lift or stairs.
Example: G/A Ground floor subFAT A. 2/B 2nd Floor subFAT B
81
-
5/26/2018 Section 6 B2H SOP
82/91
Chapter TenStandardISPinstallation
82
Installation of Structured
Cabling System
SN Task Description Operator Duration
10.1-aInstallation procedure for
SCSAB
-
5/26/2018 Section 6 B2H SOP
83/91
Procedure
1 Rod the section from location a to b
2 Prepare CAT6 (see pic 1)
1
3 Tie up the push rod and CAT6 with tape(see pic 2)
4 One worker pulls the push rod from location B (see pic 3)
5 One worker should feed in the cat6 from location A(see pic 3 and 4)
2
NOTE
1Pulling of cat 6 must be in one direction
3
4
Tools
LocationB3
1 4mm rod 2Cross
screwdriver3 Gloves
4 5 6
Materials
LocationA
4
1 CAT6 2 ground sheet 3 Tape
4 5 6
83
Installation of Structured
Cabling System
SN Task Description Operator Duration
10.1-bInstallation procedure for
SCSAB
Procedure
-
5/26/2018 Section 6 B2H SOP
84/91
1If the location A doesn't connect to B directly, we should open the intermediate
box between location A and B as pic 1 shown.
2 Lay the push rod from location B to intermediate ,and then to location A;
1
location
Intermediate
3 Lay the CAT6 from location A to intermediate ,and then to location B;
4
Note
A oca on
2If there is no existing internal conduit, trunking should be installed with the
permission of the customer.
3
4
Tools
1 4mm rod 2 Gloves 3 Cross screwdrivers
4 5 6
Interme ate
Materials
1 CAT6 2 Ground sheet 3Insulating Tape
4 5 6
84
StandardInstallationofATBandONT
-
5/26/2018 Section 6 B2H SOP
85/91
Refer to Section 5 Chapter 8
85
-
5/26/2018 Section 6 B2H SOP
86/91
Chapter ElevenStandardSplicing
86
Standard Splicing ProcessSN Task Description Operator Duration
11.1 Splicing procedureSplicing
technician15 Minutes
Procedure
1 Arrange the drop cable inside ONT cabinet and splicing traySpliceprotection0.25Optical
fib
-
5/26/2018 Section 6 B2H SOP
87/91
2Strip the optical fiber cable sheathing, expose the bare fibres and then
install the splice protection sleeve. See Pic 1.
3 Strip, cleave, clean and splice both optical fibres. See Pic's 2 - 5
4
After the splicing is complete and passes the check, heat shrink the
protection tube. Insert the splice protection sleeve into the fixing base of
sleevefiber0.25
Opticalfiber
1
the splicing tray to protect the splicing point. See Pic 6.
5Put the splicing information according to the coding standard approved by
Ooredoo
6 Arrange the spliced fibres in the fibre management tray7
Note
2 3
1All route cables from the same splitters to be labeled firmly as per the
labeling standard approved by Ooredoo
2Labeling inside ATB to be confirmed
Isopropyl alcohol and lint free cloth MUST be used for all splicing
4 5
operat ons.4
Tools
1Cable Sheath
Cutter2
Cable(Tube)
Cutter3
Isopropyl alchohol and lint free
cloth
4 Fusion splicer 5 Fibre Cleaver 6 Sharps box6 7
p c ng oo s c ssors u er s r pper
10 11 12
13 14 15Materials
1Splice protection
sleeve2
soft ground
tube3 Cable tie
4 Ground sheet 5 6
87
Splicing from the Splitter or joint
SNTask Description Operator Duration
11.2Joint Splicing in the
Manhole
Splicing
technician30 minutes
Procedure
-
5/26/2018 Section 6 B2H SOP
88/91
1 Open the closure inside an air conditioned splicing vehicle or splicing tent
2 Label th drop cable outside the closure with the port number allocated.
3 Prepare, lead-in and fix the drop cable into the closure.
1
r p, c eave, c ean an sp ce e op ca ers.
5 Arrange the spliced fibres in the splicing tray or cassette.
6Update the fiber label according the coding standard for the drop cable.
See Pic 2.
7close and replace the closure fixing it to the wall of the manhole using the
bracket rovided and arran in the cables neatl to OSP s ecifications.
8 Clean the site
Note
1 A vehicle or tent must be used when opening closures.
2 The detailed splicing procedure is the same with OSP splicing;2
3Fibre shards after cleaving are dangerous and must be disposed of
properly.
Tools
crew r ver agona p ers re s r pper
4Adjustable
wrench5
Black sealing
tape6 Cable (Tube) Cutter
7Cable Sheath
Cutter8 Fusion splicer 9
Isopropyl alchohol and lint free
cloth
10 Fibre Cleaver 11 Sharps Box 12 Splicing tools
88
-
5/26/2018 Section 6 B2H SOP
89/91
Cha ter 12BusinessLines Migration
89
MigrationSN Task Description Operator Duration
12 1
Preparation for
migration Co ordinator 1 hour
-
5/26/2018 Section 6 B2H SOP
90/91
12.1 migration Co-ordinator 1 hour
Procedure
1 Run off the work orders from CRM
2 Confirm appointments with the customers
3Confirm number and types of existing services
n e wor or er y a a ase
4Confirm existing services are working in the
premises,
5 Issue work orders to Supervisor.
6 Plan the work in advance.
Note
Exchange D-Side DP-Pairs DP No CAB No. Telephone Customer Name Status Electricity Equipment
Installatio
n
KTR 256 2 3267 69 44878308
CONSULTANT
LEGAL
CONSULTATI
ON &
ARBITRATION O SU B 1 41 658
E3_008-
12 7
1 ONT ,
1Drop
Cable 4
ports
(8447) ,
CONSULTANT
KTR 287 5 3267 69 44873938
LEGAL
CONSULTATI
ON &
ARBITRATION O SU B 1 41 658
E3_008-
1328
overthesplitter
KTR 294 9 3267 69 44873877
CONSULTANTLEGAL
CONSULTATI
ON &
ARBITRATION O SU B 1 41 658
E3_008-
1672
EASTERN
GALAXY
TRADING & SX 10.10.
1 ONT ,
1Drop
Cable 4
No Shahry
Subscriptio
n
KTR 224 21 3267 69 44869159
CONT . CO.
W.L.L. O SU B 1 41 657
_
19.148:29
44-0-29-1
l
ports
(8447) ,
KTR 295 10 3267 69 44869154
EASTERN
GALAXY
TRADING &
CONT . CO.
W.L.L. O SU B 1 41 657
SX_10.10.
19.148:29
44-1-7-29
1portoverthesplitter
Shahry
Subscriptio
n
90
-
5/26/2018 Section 6 B2H SOP
91/91
From this point onwards, you should follow:Migration SOP guidebook (Section 9) to continue with
Migration
91