Section 4 Storm Water Pump Station Stability Analysis

44
Fort Worth Central City Preliminary Design Civil/Structural Preliminary Design Draft Environmental Impact Statement Appendix C TARRANT REGIONAL WATER DISTRICT May 2005 Images courtesy of CDM, Gideon Toal, and Bing Thom Architects Volume V – Stability Analysis Storm Water Pump Station

Transcript of Section 4 Storm Water Pump Station Stability Analysis

Page 1: Section 4 Storm Water Pump Station Stability Analysis

Fort Worth Central CityPreliminary Design

Civil/Structural Preliminary Design

Draft Environmental Impact Statement

Appendix C

TARRANT

REGIONAL

WATERDISTRIC

T

May 2005

Imag

es co

urte

sy of

CDM

, Gide

on T

oal, a

nd B

ing T

hom

Arch

itects Volume V – Stability Analysis

Storm Water Pump Station

Page 2: Section 4 Storm Water Pump Station Stability Analysis

STABILITY ANALYSES FOR STORM WATER PUMP STATION

Page 3: Section 4 Storm Water Pump Station Stability Analysis

Contents: Stability Analyses for Storm Water Pump Station

Volume V

Section 1 Index of Excel Spreadsheets

Section 2 Center of Gravity (CG) Spreadsheet for Various Components

Section 3 Counterfort

Section 4 Storm Water Pump Station Stability Analyses Load Case 1 – During Construction Load Case 2 – During Construction Maintenance Load Case 3 - Normal Load Case 4 - Normal

Section 5 Bearing Pressure Section 6 Cell Formulas for Excel Spreadsheets

Counterfort Stability Bearing Pressure Analysis

Section 7 Design of Steel H – Piles (Manual Calculations) Section 8 Seismic Load Case Check

A 2521-42275

Page 4: Section 4 Storm Water Pump Station Stability Analysis

Section 1

Index of Excel Spreadsheets

A 2521-42275

Page 5: Section 4 Storm Water Pump Station Stability Analysis

STABILITY ANALYSES STORM WATER PUMP STATION Index of Excel Spreadsheets: Center of Gravity of various structure components: File name: CG of building side walls File name: CG of conc Upper side wall File name: CG of conc Lower side wall File name: CG of conc Upper counterfort File name: CG of conc Lower counterfort Counterfort: File name: Counterfort.xls

Stability: File name: PS Stability.xls Tab name: Load Case 1

(Construction Case - Unusual) Tab name: Load Case 2

(Maintenance or Construction Case - Unusual) Tab name: Load Case 3

(Normal (drained soil) - Usual) Tab name: Load Case 4

(Normal (undrained soil) - Usual)

Bearing Pressure: File name: PS Bearing Pressure.xls

Page 6: Section 4 Storm Water Pump Station Stability Analysis

Section 2

Center of Gravity (CG) Spreadsheets for Various Components

A 2521-42275

Page 7: Section 4 Storm Water Pump Station Stability Analysis

Storm Water Pump Station Center of Gravity (CG) spreadsheets for various components:

1. Building Side Walls (File: CG of building side walls.xls)

2. Upper Concrete Side Wall (File: CG of conc Upper side wall.xls)

3. Lower Concrete Side Wall (File: CG of conc Lower side wall.xls)

4. Upper Counterfort for Lateral Force (File: CG of conc Upper counterfort.xls)

5. Lower Counterfort for Lateral Force (File: CG of conc Lower counterfort.xls)

Page 8: Section 4 Storm Water Pump Station Stability Analysis
Page 9: Section 4 Storm Water Pump Station Stability Analysis
Page 10: Section 4 Storm Water Pump Station Stability Analysis
Page 11: Section 4 Storm Water Pump Station Stability Analysis
Page 12: Section 4 Storm Water Pump Station Stability Analysis
Page 13: Section 4 Storm Water Pump Station Stability Analysis

Section 3

Counterfort

A 2521-42275

Page 14: Section 4 Storm Water Pump Station Stability Analysis

Storm Water Pump Station Counterfort

(File: Counterfort.xls)

Page 15: Section 4 Storm Water Pump Station Stability Analysis
Page 16: Section 4 Storm Water Pump Station Stability Analysis

Section 4

Storm Water Pump Station Stability Analysis

A 2521-42275

Page 17: Section 4 Storm Water Pump Station Stability Analysis

Storm Water Pump Station Stability

(File: PS Stability.xls with Tabs for Load Cases)

Load Case 1 – During Construction

1. Dead loads + equipment.

2. No live loads, no soil, no water.

Page 18: Section 4 Storm Water Pump Station Stability Analysis
Page 19: Section 4 Storm Water Pump Station Stability Analysis

Storm Water Pump Station

Stability

(File: PS Stability.xls with Tabs for Load Cases)

Load Case 2 – During Construction or Maintanence

1. Dead loads.

2. No equipment, no live loads, low water (empty inlet).

3. Undrained (saturated) backfill.

4. Uplift

Page 20: Section 4 Storm Water Pump Station Stability Analysis
Page 21: Section 4 Storm Water Pump Station Stability Analysis

Storm Water Pump Station Stability

(File: PS Stability.xls with Tabs for Load Cases)

Load Case 3 – Normal

1. Dead loads + equipment + live loads.

2. Maximum design water surface (full inlet) at Elevation 527.3.

3. Drained (dry) backfill.

4. No uplift.

Page 22: Section 4 Storm Water Pump Station Stability Analysis
Page 23: Section 4 Storm Water Pump Station Stability Analysis

Storm Water Pump Station

Stability

(File: PS Stability.xls with Tabs for Load Cases)

Load Case 4 – Normal

1. Dead loads + equipment.

2. No live loads, low water (empty inlet).

3. Undrained (saturated) backfill.

4. Uplift

Page 24: Section 4 Storm Water Pump Station Stability Analysis
Page 25: Section 4 Storm Water Pump Station Stability Analysis

Section 5

Bearing Pressure

A 2521-42275

Page 26: Section 4 Storm Water Pump Station Stability Analysis

Storm Water Pump Station

Bearing Pressure

(File: PS Bearing Pressure.xls)

Page 27: Section 4 Storm Water Pump Station Stability Analysis

PR

OJE

CT:

TR

WD

- S

TOR

M W

ATE

R P

UM

P S

TATI

ON

PR

OJE

CT

NO

: 25

21-4

2275

-PR

STR

.PS

DE

SIG

NE

D B

Y:

E. B

JOR

KLU

ND

DA

TE:

1/18

/200

5C

HE

CK

ED

BY

:D

ATE

:

Fdn

Leng

thFd

n W

idth

Wei

ght

Late

ral f

orce

Mom

. Res

ist

Mom

. Ove

rturn

ftft

lbs

lbs

lb-ft

lb-ft

Cas

e 1

5175

4,41

6,46

90

97,2

28,1

550

Cas

e 2

5175

8,20

3,18

77,

403,

902

410,

561,

703

266,

531,

945

Cas

e 3

5175

12,9

96,1

184,

935,

898

366,

920,

543

64,1

69,3

75C

ase

451

758,

411,

797

7,40

3,90

241

4,12

5,79

626

6,53

1,94

5

frict

ion

coef

ficie

nt =

0.4

Cas

e 1

Cas

e 2

Cas

e 3

Cas

e 4

slid

ing

ratio

= (w

eigh

t x fr

ictio

n co

eff)

/ lat

eral

forc

e =

n/a

0.44

1.05

0.45

over

turn

ing

ratio

= m

omen

t res

ist /

mom

ent o

vertu

rn =

n/a

1.54

5.72

1.55

ecce

ntric

ity (f

rom

CL)

(ft)

= 1

/2 F

dn le

ngth

- (m

omen

t res

ist -

mom

ent o

vertu

rn) /

wei

ght =

3.49

7.94

2.20

7.95

bear

ing

pres

sure

(psf

) = (

(wei

ght /

Fdn

leng

th) x

(1 +

\- (6

x (e

ccen

/ Fd

n le

ngth

))) )

/ Fd

n w

idth

=m

ax b

earin

g pr

essu

re (p

sf) =

( (w

eigh

t / F

dn le

ngth

) x (1

+ (6

x (e

ccen

/ Fd

n le

ngth

))) )

/ Fd

n w

idth

=16

2841

4942

7942

57m

in b

earin

g pr

essu

re (p

sf) =

( (w

eigh

t / F

dn le

ngth

) x (1

- (6

x (e

ccen

/ Fd

n le

ngth

))) )

/ Fd

n w

idth

=68

114

125

1614

1

Val

ues

from

STA

BIL

ITY

spr

eads

heet

PS

Bea

ring

Pre

ssur

e.xl

s

Page 28: Section 4 Storm Water Pump Station Stability Analysis

Section 6

Cell Formulas for Excel Spreadsheets

A 2521-42275

Page 29: Section 4 Storm Water Pump Station Stability Analysis

CELL FORMULAS FOR EXCEL SPREADSHEETS

(Exception is the Center of Gravity (CG) spreadsheets, which were produced using a freeware spreadsheet with the sheet protected by the author)

Page 30: Section 4 Storm Water Pump Station Stability Analysis
Page 31: Section 4 Storm Water Pump Station Stability Analysis

Storm Water Pump Station Stability Excel Spreadsheet with Cell Formulas Displayed

Page 32: Section 4 Storm Water Pump Station Stability Analysis
Page 33: Section 4 Storm Water Pump Station Stability Analysis
Page 34: Section 4 Storm Water Pump Station Stability Analysis
Page 35: Section 4 Storm Water Pump Station Stability Analysis
Page 36: Section 4 Storm Water Pump Station Stability Analysis

Storm Water Pump Station Bearing Pressure Analysis Excel Spreadsheet with Cell Formulas Displayed

Page 37: Section 4 Storm Water Pump Station Stability Analysis
Page 38: Section 4 Storm Water Pump Station Stability Analysis

Section 7

Design of H-Piles (Manual Calculations)

A 2521-42275

Page 39: Section 4 Storm Water Pump Station Stability Analysis

Design of Steel H-Piles (Manual Calculations)

Page 40: Section 4 Storm Water Pump Station Stability Analysis
Page 41: Section 4 Storm Water Pump Station Stability Analysis
Page 42: Section 4 Storm Water Pump Station Stability Analysis

Section 8

Seismic Load Case Check

A 2521-42275

Page 43: Section 4 Storm Water Pump Station Stability Analysis

Stability Analysis Seismic Load Case Check (Manual Calculations)

Page 44: Section 4 Storm Water Pump Station Stability Analysis