SECIN S · Capacity: 780000 Std.m3/d @ 78 barg. 5. Client TOTAL AUSTRAL 6. Job 3062 - Plant...

19
SECIN S.A. 1 1. Client Chevron Texaco Job 3052 - Las Bases Field Surface Facilities Construction Year 2001 Turn Key Dew Point Plant. Scope of supply Basic Engineering, Construction, Commissioning and Start-Up. The plant consisted of a Dew-Point Control Plant, with mechanical Propane Refrigeration Unit and Etylenglicol Injection System, a Regenerator System for the Etylenglicol and a Propane Stabilization System. Capacity: 780000 Std.m 3 /d @ 78 barg.

Transcript of SECIN S · Capacity: 780000 Std.m3/d @ 78 barg. 5. Client TOTAL AUSTRAL 6. Job 3062 - Plant...

Page 1: SECIN S · Capacity: 780000 Std.m3/d @ 78 barg. 5. Client TOTAL AUSTRAL 6. Job 3062 - Plant Debottlenecking, Aguada Pichana Construction Year 2001 Process Simulation, Engineering,

SECIN S.A.

1

1. Client Chevron Texaco Job 3052 - Las Bases Field Surface Facilities

Construction Year 2001 Turn Key Dew Point Plant.

Scope of supply

• Basic Engineering, Construction, Commissioning and Start-Up.

The plant consisted of a Dew-Point Control Plant, with mechanical Propane Refrigeration Unit and Etylenglicol Injection System, a Regenerator System for the Etylenglicol and a Propane Stabilization System. Capacity: 780000 Std.m3/d @ 78 barg.

Page 2: SECIN S · Capacity: 780000 Std.m3/d @ 78 barg. 5. Client TOTAL AUSTRAL 6. Job 3062 - Plant Debottlenecking, Aguada Pichana Construction Year 2001 Process Simulation, Engineering,
Page 3: SECIN S · Capacity: 780000 Std.m3/d @ 78 barg. 5. Client TOTAL AUSTRAL 6. Job 3062 - Plant Debottlenecking, Aguada Pichana Construction Year 2001 Process Simulation, Engineering,

5. Client TOTAL AUSTRAL 6. Job 3062 - Plant Debottlenecking, Aguada Pichana

Construction Year 2001 Process Simulation, Engineering, Construction and Precomissionning of Vessels, Piping and Control.

Scope of supply

• Skid with HEAT EXCHANGER & CHILLER Package.

Quantity: 1

Gas-Gas Design - Type: Nat Gas – Nat Gas Exchanger, NEM horizontal TEMA type. 2 Shell

connected in Series. - Heat Duty: 7304 kW. - Size: OD 1156 mm, Length 18000 mm, Thickness 44.5 mm. - Tubes: 1504 plain tubes, OD 15.9 mm. - Design: Shell Side: 87 barg., Temperature: -45.5 ºC in, 65 ºC out.

Tube Side: 87 barg., Temperature: 65 ºC in, -45.5 ºC out. Chiller Design

- Type: Propane – Nat Gas Exchanger, BKM horizontal TEMA type. - Heat Duty: 1779 kW. - Size: OD 1614 mm, Length 11000 mm, Thickness 19 mm. - Tubes: 941 plain tubes, OD 19 mm. - Design: Shell Side: 25.4 bara., Temperature: -45 ºC in, 38 ºC out.

Tube Side: 87 bara., Temperature: 65 ºC in, -45 ºC out.

- Total Weight: 180000 Kg.

• Skid with LOW TEMPERATURE SEPARATOR Package. Quantity: 1

Design

- Inlet: Gas 5522000 Std.m3/d, Liquid 500 m3/d. - Design Pressure: 87 barg. - Design Temperature: -45 / 65 ºC. - Vessel: Horizontal, OD 1475 mm, Length (TL-TL) 7100 mm, Thickness 50.8

mm. - Additional Equipments: Refrigerant Reclaimer and Condensate-Refrigerant

Exchangers. - Skid Weight: 25000 Kg

Page 4: SECIN S · Capacity: 780000 Std.m3/d @ 78 barg. 5. Client TOTAL AUSTRAL 6. Job 3062 - Plant Debottlenecking, Aguada Pichana Construction Year 2001 Process Simulation, Engineering,
Page 5: SECIN S · Capacity: 780000 Std.m3/d @ 78 barg. 5. Client TOTAL AUSTRAL 6. Job 3062 - Plant Debottlenecking, Aguada Pichana Construction Year 2001 Process Simulation, Engineering,

SECIN S.A.

1

1. Client Chevron Texaco Job 3121 - Campo Bremen Project

Construction Year 2002 Engineering, Construction and Precomissionning of Vessels, Piping and Control.

Scope of supply

• GASOLINE STABILIZER Package.

Quantity: 1

- Includes Stabilization Tower, Stabilizer Reboiler, Heater, Liquids and Flash Separator.

- Production: 150 m3/d Gasoline PVR < 11 PSIA a - PVR 7.0 PSIA.

Page 6: SECIN S · Capacity: 780000 Std.m3/d @ 78 barg. 5. Client TOTAL AUSTRAL 6. Job 3062 - Plant Debottlenecking, Aguada Pichana Construction Year 2001 Process Simulation, Engineering,
Page 7: SECIN S · Capacity: 780000 Std.m3/d @ 78 barg. 5. Client TOTAL AUSTRAL 6. Job 3062 - Plant Debottlenecking, Aguada Pichana Construction Year 2001 Process Simulation, Engineering,

SECIN S.A.

1

1. Client Repsol YPFRepsol YPF Job 3167 – Loma de La Lata Plant

Construction Year 2002 / 2003 Turn Key gasolina estabilization plant

Scope of supply

• Basic Engineering, construction, commissioning and Start-up. • Gasolina estabilitation instalation with stabilization tower, reboiler, gasolina cooler, recicle compresor, piping, instrumentation and control.

Design - 1000 m3/day gasolina - PVR 7.0 PSIA.

Page 8: SECIN S · Capacity: 780000 Std.m3/d @ 78 barg. 5. Client TOTAL AUSTRAL 6. Job 3062 - Plant Debottlenecking, Aguada Pichana Construction Year 2001 Process Simulation, Engineering,
Page 9: SECIN S · Capacity: 780000 Std.m3/d @ 78 barg. 5. Client TOTAL AUSTRAL 6. Job 3062 - Plant Debottlenecking, Aguada Pichana Construction Year 2001 Process Simulation, Engineering,

SECIN S.A.

1

12. MERICHEMMERICHEM

Job 3245 – UN MODULO PARA TRATAMIENTOS DE NAFTAS

Construction Year 2004

Page 10: SECIN S · Capacity: 780000 Std.m3/d @ 78 barg. 5. Client TOTAL AUSTRAL 6. Job 3062 - Plant Debottlenecking, Aguada Pichana Construction Year 2001 Process Simulation, Engineering,
Page 11: SECIN S · Capacity: 780000 Std.m3/d @ 78 barg. 5. Client TOTAL AUSTRAL 6. Job 3062 - Plant Debottlenecking, Aguada Pichana Construction Year 2001 Process Simulation, Engineering,
Page 12: SECIN S · Capacity: 780000 Std.m3/d @ 78 barg. 5. Client TOTAL AUSTRAL 6. Job 3062 - Plant Debottlenecking, Aguada Pichana Construction Year 2001 Process Simulation, Engineering,
Page 13: SECIN S · Capacity: 780000 Std.m3/d @ 78 barg. 5. Client TOTAL AUSTRAL 6. Job 3062 - Plant Debottlenecking, Aguada Pichana Construction Year 2001 Process Simulation, Engineering,

11. Client TOTAL AUSTRALTOTAL AUSTRAL Job 3248 – CARINA ARIES MEG UNIT

Construction Year 2004 TWO MEG UNITS

Scope of supply

• Basic Engineering, construction, commissioning and Start-up. • MEG UNITS with reboiler, contactor column, pumps, filters, aircooler and control

Design: Flow: 9,4 m3/hr Initial concentration: 60% Final Concentration: 90%

Salto de página

12.

jmontanez
Rectangle
Page 14: SECIN S · Capacity: 780000 Std.m3/d @ 78 barg. 5. Client TOTAL AUSTRAL 6. Job 3062 - Plant Debottlenecking, Aguada Pichana Construction Year 2001 Process Simulation, Engineering,
Page 15: SECIN S · Capacity: 780000 Std.m3/d @ 78 barg. 5. Client TOTAL AUSTRAL 6. Job 3062 - Plant Debottlenecking, Aguada Pichana Construction Year 2001 Process Simulation, Engineering,

SECIN S.A.

1

Client PROFERTIL Job 3223

Construction Year 2004 Reparing one CARBAMATE Stripper

Scope of supply

Man power Material Engineering

Design

- Weight: 150.000 Kg.

Material: Carbon steel lined with 25/22/2 (Cr/Ni/Mo) Tubes: Stainless Steel 25/22/2 (Cr/Ni/Mo) inner lined with zirconium

Page 16: SECIN S · Capacity: 780000 Std.m3/d @ 78 barg. 5. Client TOTAL AUSTRAL 6. Job 3062 - Plant Debottlenecking, Aguada Pichana Construction Year 2001 Process Simulation, Engineering,
Page 17: SECIN S · Capacity: 780000 Std.m3/d @ 78 barg. 5. Client TOTAL AUSTRAL 6. Job 3062 - Plant Debottlenecking, Aguada Pichana Construction Year 2001 Process Simulation, Engineering,
Page 18: SECIN S · Capacity: 780000 Std.m3/d @ 78 barg. 5. Client TOTAL AUSTRAL 6. Job 3062 - Plant Debottlenecking, Aguada Pichana Construction Year 2001 Process Simulation, Engineering,
Page 19: SECIN S · Capacity: 780000 Std.m3/d @ 78 barg. 5. Client TOTAL AUSTRAL 6. Job 3062 - Plant Debottlenecking, Aguada Pichana Construction Year 2001 Process Simulation, Engineering,